ML13339A335: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 11
| page count = 11
}}
}}
=Text=
{{#Wiki_filter:DETROIT EDISON -FERMI 2AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST11/21/13PAGE 1WASHINGTON, DC 20555Media: 8 1/2 X 11Number Cnt IssueDTC Doc. Serial Number Page Rev Copies Lvl Date Sec StatusTMTRM TRM VOL I 105 1 IR 11/21/13 AFCPlease destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.
Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway,Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.
Ref: cb14614oo/
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL -VOL IRevision 105 dated 11/21/13Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.
Destroy the removed pages. Be sure that Revision 104 has been inserted prior to inserting thesepages.SECTIONREMOVE and DESTROYINSERTIn Front of TRM ManualImmediately following Title PageTitle Page Rev 104 03/16/13List of Effective PagesLEP-1 through LEP-4 Rev 104 03/16/13Title Page Rev 105 11/21/13List of Effective PagesLEP-1 through LEP-4 Rev 105 11/21/13Table of Contents5.0 Administrative ControlsTRM-iii Rev 99 09/10TRM 5.0-a Rev 99 09/10TRM 5.0-1 Rev 99 09/10TRM 5.0-2 thru TRM 5.0-7 Rev 99 09/10TRM 5.0-8 Rev 99 09/10TRM-iii Rev 105 11/13TRM 5.0-a Rev 105 11/13TRM 5.0-1 Rev 105 11/13N/ATRM 5.0-2 Rev 105 11/13END Fermi2Technical Requirements ManualVolume IDTEEnergyARMS -INFORMATION DTC: TMTRM [File: 1754 I DSN: TRM VOL I I Rev:105Date 11/21/2013 Recipient q.6S FERMI 2 -TECHNICAL REQUIREMENTS MANUALVOL ILIST OF EFFECTIVE PAGESPage Revision Page RevisionTRM i Revision 76 TRM 3.3-31 Revision 31TRM ii Revision 73 TRM 3.3-32 Revision 31TRM iii Revision 105 TRM 3.3-33 Revision 31TRM iv Revision 76 TRM 3.3-34 Revision 31TRM v Revision 79 TRM 3.3-35 Revision 60TRM vi Revision 31 TRM 3.3-36 Revision 104TRM 1.0-a Revision 31 TRM 3.3-37 Revision 72TRM 1.0-1 Revision 31 TRM 3.3-38 Revision 31TRM 2.0-1 Revision 31 TRM 3.3-39 Revision 31TRM 3.0-a Revision 31 TRM 3.3-40 Revision 56TRM 3.0-1 Revision 63 TRM 3.3-41 Revision 56TRM 3.0-2 Revision 72 TRM 3.3-42 Revision 45TRM 3.0-3 Revision 54 TRM 3.3-43 Revision 62TRM 3.0-4 Revision 72 TRM 3.3-44 Revision 72TRM 3.1-a Revision 31 TRM 3.3-45 Revision 31TRM 3.1-1 Revision 31 TRM 3.3-46 Revision 31TRM 3.2-1 Revision 31 TRM 3.3-47 Revision 31TRM 3.3-a Revision 31 TRM 3.3-48 Revision 31TRM 3.3-b Revision 31 TRM 3.3-49 Revision 31TRM 3.3-c Revision 31 TRM 3.4-a Revision 31TRM 3.3-d Revision 31 TRM 3.4-1 Revision 36TRM 3.3-1 Revision 34 TRM 3.4-la Revision 71TRM 3.3-2 Revision 59 TRM 3.4-lb Revision 71TRM 3.3-3 Revision 31 TRM 3.4-2 Revision 31TRM 3.3-4 Revision 31 TRM 3.4-3 Revision 31TRM 3.3-5 Revision 31 TRM 3.4-4 Revision 31TRM 3.3-6 Revision 31 TRM 3.4-5 Revision 31TRM 3.3-7 Revision 31 TRM 3.4-6 Revision 31TRM 3.3-8 Revision 31 TRM 3.4-7 Revision 31TRM 3.3-9 Revision 31 TRM 3.4-8 Revision 31TRM 3.3-10 Revision 31 TRM 3.4-9 Revision 31TRM 3.3-11 Revision 31 TRM 3.4-10 Revision 31TRM 3.3-12 Revision 67 TRM 3.5-1 Revision 31TRM 3.3-13 Revision 74 TRM 3.6-a Revision 70TRM 3.3-13a Revision 67 TRM 3.6-1 Revision 60TRM 3.3-14 Revision 67 TRM 3.6-2 Revision 67TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 87TRM 3.3-18 Revision 100 TRM 3.6-6 Revision 33TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 85TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 71TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31TRM 3.3-28 Revision 76 TRM 3.6-16 Revision 31TRM 3.3-29 Revision 76 TRM 3.6-17 Revision 31TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31TRM Vol. ILEP-IREV 105 11/21/13 FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL ILIST OF EFFECTIVE PAGESPage Revision Page RevisionTRM 3.6-19 Revision 31 TRM 3.8-13 Revision 61TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 80TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 88TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31TRm 3.6-32 Revision 70 TRM 3.11-a Revision 31TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75TRM 3.7-a Revision 73 TRM 3.12-2 Revision 31TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 102TRM 3.7-2 Revision 70 TRM 3.12-5 Revision 53TRM 3.7-3 Revision 70 TRM 3.12-6 Revision 53TRM 3.7-4 Revision 73 TRM 3.12-7 Revision 31TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 75TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31TRM 3.7-12 Revision 72 TRM 3.12-15 Revision 31TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 75TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31TRM 3.7-15 Revision 98 TRM 3.12-18 Revision 75TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 75TRM 3.7-18 Revision 77 TRM 3.12-21 Revision 31TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31TRM 3.7-20 Revision 79 TRM 3.12-23 Revision 31TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 75TRM 3.8-3 Revision 96 TRM 3.12-27 Revision 31TRM 3.8-4 Revision 96 TRM 3.12-28 Revision 31TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 78TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31TRM 3.8-8 Revision 50 TRM 5.0-a Revision 105TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 105TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 105TRM 3.8-11 Revision 50TRM 3.8-12 Revision 31TRM Vol. ILE P- 2REV 105 11/21/13 FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL ILIST OF EFFECTIVE PAGESPageTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMB1.0-1B2.0-1B3.0-1B3.0-2B3.0-2aB3.0-2bB3.0-2cB3.0-3B3.0-4B3.0-5B3.0-6B3.0-7B3.1-1B3.2-1B3.3. 1-1B3.3.1-2B3.3.2-1B3.3.2-2B3.3.3-1B3.3.4-1B3.3.4-2B3.3.5-1B3.3.5-2B3.3.6-1B3.3.6-2B3.3.6-3B3.3.6-4B3.3.6-5B3.3.6-6B3.3.7-1B3.3.7-2B3.3.8-1B3.3.9-1B3.3.10-1 B3.3.11-1 B3.3.12-1 B3.3.13-1 B3.3.14-1 B3.4.1-1B3.4.1-2B3.4.1-3B3.4.1-4B3.4.1-5B3.4.2-1B3.4.3-1B3.4.4-1B3.4.5-1B3.4.6-1B3.4.7-1B3.5-1B3.6.1-1B3.6.2-1RevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionPage31316363727272313154727231313131313167318431313131313176763131313156456231313171717171313131313131313167TRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMB3.6.3-1B3.6.4-1B3.6.5-1B3.6.6-1B3.6.7-1B3.6.8-1B3.7.1-1B3.7.2-1B3.7.3-1B3.7.4-1B3.7.4-2B3.7.5-1B3.7.6-1B3.7.7-1B3.7.8-1B3.7.9-1B3.8.1-1B3.8.2-1B3.8.3-1B3.8.4-1B3.8.5-1B3. 8. 6-1B3.9.1-1B3.9.2-1B3.9.3-1B3.9.4-1B3.10-1B3.11.1-1 B3.12.1-1 B3.12.2-1 B3.12.3-1 B3.12.4-1 B3.12.5-1 B3.12.6-1 B3.12.7-1 B3.12.8-1 RevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevision873131703131313173313131319931793131963131433165313131313144313131313131TRM Vol. ILEP-3REV 105 11/21/13 FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL ILIST OF EFFECTIVE PAGESCORE OPERATING LIMITS REPORTCOLR 16, Revision 1Page RevisionNotation Page1 12 13 14 15 16 17 18 19 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 1TRM Vol. ILEP-4REV 105 11/21/13 FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL ITable of Contents (Cont'd)Section andTR 3.9TR 3.9.1TR 3.9.2TR 3.9.3TR 3.9.4TitleREFUELING OPERATIONS Communications
...................................
Refueling Platform
...............................
Crane Travel -Spent Fuel Storage Pool ...........
Reactor Pressure Vessel Water Level -Refueling
..PageTRMTRMTRMTRM3.9-13.9-23.9-43.9-5TR 3.10TRTR3.113.11.1TR 3.12TRTRTRTRTRTRTRTRTRTR3.12.13.12.23 .12 .3.12.33.12.43.12.53.12.63.12.73 .12.84.05.0TR 5.1TR 5.1.1TR 5.2TR 5.2.1SPECIAL OPERATIONS (Blank) ..........................
RADIOACTIVE EFFLUENTS Temporary Outdoor Storage Tank Radioactivity
.....FIRE PROTECTION Fire Detection Instrumentation
...................
Fire Suppression Water System ....................
Spray and Sprinkler Systems ......................
C02  Systems .......................................
Halon Systems ....................................
Fire Hose Stations
...............................
Yard Fire Hydrants and Hydrant Hose Houses .......Fire Rated Assemblies
............................
DESIGN FEATURES (Blank) .................................
ADMINISTRATIVE CONTROLSProgramsInservice Inspection and Testing Program for SnubbersReportsStartup Reports .....................................
BASESUSE AND APPLICATION Definitions (Blank) .............................
SAFETY LIMITS (SLs) (Blank) ........................
Limiting Condition for Operation (TRLCO)Applicability
......................................
Surveillance Requirement (TRSR) Applicability
......REACTIVITY CONTROL SYSTEMSControl Rod Drive Housing Support ...............
POWER DISTRIBUTION LIMITS (Blank) ..................
TRM 3.10-1TRM 3.11-1TRMTRMTRMTRMTRMTRMTRMTRMTRiMTRMTRM3.12-13 .12-83.12-133.12-163.12-183.12-203.12-263.12-294.0-15.0-15.0-2TRTRTRTRTRTRTRTRB1. 0B1 .1B2. 0B3 .0B3 .0B3 .1B3 .1. 1B3 .2TRM B1.0-1TRM B2.0-1TRM B3.0-1TRM B3.0-3TRM B3. 1-1TRM B3.2-1(continued)
TRM VOL ITRM-iiiREV 105 11/13 1 SECTION 5.0DETAILED INDEX OF SECTIONPageTR 5.1.1 Inservice Inspection and Testing Program forSnubbers
..........................................
TRM 5.0-1TR 5.2.1 Startup Reports ...................................
TRM 5.0-2(Reporting Requirements)
TI~ Vol. I TRM 5.0-a REV. 105 11/13 ITRM Vol. ITRM 5. 0-aREV. 105 11/13 1 ProgramsTR 5.1TR 5.0 ADMINISTRATIVE CONTROLSTR 5.1 ProgramsTR 5.1.1 Inservice Inspection and Testing Program for SnubbersThe Snubber Program specified in ISI-NDE Program, Part C implements the requirements of the ASME OM Code, Subsection ISTA and ISTD, 2004Edition, as allowed by 10CFR50.55a(b)(3)(v) in lieu of ASME SectionXI, IWF-5200(a) and (b) and IWF-5300(a) and (b), which applies topreservice and inservice examination and testing requirements forsnubbers.
TRN Vol. I TRI'I 5.0-1 REV 105 11/13TRM Vol. ITRM 5. 0-1REV 105 11/13 1 ReportsTR 5.2TR 5.0 ADMINISTRATIVE CONTROLSTR 5.2 ReportsIn addition to the applicable reporting requirements of Title 10, Code of FederalRegulations, the following reports shall be submitted to the RegionalAdministrator of the Regional Office of the NRC unless otherwise noted.TR 5.2.1 Startup Reporta. A summary report of plant startup and power escalation testingshall be submitted following:
: 1. Receipt of an Operating License;2. Amendment to the license involving a planned increase inpower level;3. Installation of fuel that has a different design or has beenmanufactured by a different fuel supplier; and4. Modifications that may have significantly altered thenuclear,
: thermal, or hydraulic performance of the unit.b. The startup report shall address each of the tests identified inSubsection 14.1.4.8 of the Final Safety Analysis Report andshall include a description of the measured values of theoperating conditions or characteristics obtained during the testprogram and a comparison of these values with design predictions and specifications.
Any corrective actions that were requiredto obtain satisfactory operation shall also be described.
Anyadditional specific details required in license conditions basedon other commitments shall be included in this report.c. Startup reports shall be submitted within:1. 90 days following completion of the startup test program;2. 90 days following resumption or commencement of commercial power operation; or3. 9 months following initial criticality, whichever isearliest.
If the startup report does not cover all three events (i.e.,initial criticality, completion of startup test program, andresumption or commencement of commercial operation) supplementary reports shall be submitted at least every 3 monthsuntil all three events have been completed.
TRM Vol. I TRM 5.0-2 REV 105 11/13 ITRM Vol. ITRM 5. 0-2REV 105 11/13 1}}

Revision as of 13:07, 3 July 2018

Licensing Document Transmittal Fermi 2 Technical Requirements Manual - Vol I
ML13339A335
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/21/2013
From:
DTE Energy
To:
Office of Nuclear Reactor Regulation
References
00935, cb1461
Download: ML13339A335 (11)


Text

DETROIT EDISON -FERMI 2AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST11/21/13PAGE 1WASHINGTON, DC 20555Media: 8 1/2 X 11Number Cnt IssueDTC Doc. Serial Number Page Rev Copies Lvl Date Sec StatusTMTRM TRM VOL I 105 1 IR 11/21/13 AFCPlease destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway,Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: cb14614oo/

LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL -VOL IRevision 105 dated 11/21/13Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 104 has been inserted prior to inserting thesepages.SECTIONREMOVE and DESTROYINSERTIn Front of TRM ManualImmediately following Title PageTitle Page Rev 104 03/16/13List of Effective PagesLEP-1 through LEP-4 Rev 104 03/16/13Title Page Rev 105 11/21/13List of Effective PagesLEP-1 through LEP-4 Rev 105 11/21/13Table of Contents5.0 Administrative ControlsTRM-iii Rev 99 09/10TRM 5.0-a Rev 99 09/10TRM 5.0-1 Rev 99 09/10TRM 5.0-2 thru TRM 5.0-7 Rev 99 09/10TRM 5.0-8 Rev 99 09/10TRM-iii Rev 105 11/13TRM 5.0-a Rev 105 11/13TRM 5.0-1 Rev 105 11/13N/ATRM 5.0-2 Rev 105 11/13END Fermi2Technical Requirements ManualVolume IDTEEnergyARMS -INFORMATION DTC: TMTRM [File: 1754 I DSN: TRM VOL I I Rev:105Date 11/21/2013 Recipient q.6S FERMI 2 -TECHNICAL REQUIREMENTS MANUALVOL ILIST OF EFFECTIVE PAGESPage Revision Page RevisionTRM i Revision 76 TRM 3.3-31 Revision 31TRM ii Revision 73 TRM 3.3-32 Revision 31TRM iii Revision 105 TRM 3.3-33 Revision 31TRM iv Revision 76 TRM 3.3-34 Revision 31TRM v Revision 79 TRM 3.3-35 Revision 60TRM vi Revision 31 TRM 3.3-36 Revision 104TRM 1.0-a Revision 31 TRM 3.3-37 Revision 72TRM 1.0-1 Revision 31 TRM 3.3-38 Revision 31TRM 2.0-1 Revision 31 TRM 3.3-39 Revision 31TRM 3.0-a Revision 31 TRM 3.3-40 Revision 56TRM 3.0-1 Revision 63 TRM 3.3-41 Revision 56TRM 3.0-2 Revision 72 TRM 3.3-42 Revision 45TRM 3.0-3 Revision 54 TRM 3.3-43 Revision 62TRM 3.0-4 Revision 72 TRM 3.3-44 Revision 72TRM 3.1-a Revision 31 TRM 3.3-45 Revision 31TRM 3.1-1 Revision 31 TRM 3.3-46 Revision 31TRM 3.2-1 Revision 31 TRM 3.3-47 Revision 31TRM 3.3-a Revision 31 TRM 3.3-48 Revision 31TRM 3.3-b Revision 31 TRM 3.3-49 Revision 31TRM 3.3-c Revision 31 TRM 3.4-a Revision 31TRM 3.3-d Revision 31 TRM 3.4-1 Revision 36TRM 3.3-1 Revision 34 TRM 3.4-la Revision 71TRM 3.3-2 Revision 59 TRM 3.4-lb Revision 71TRM 3.3-3 Revision 31 TRM 3.4-2 Revision 31TRM 3.3-4 Revision 31 TRM 3.4-3 Revision 31TRM 3.3-5 Revision 31 TRM 3.4-4 Revision 31TRM 3.3-6 Revision 31 TRM 3.4-5 Revision 31TRM 3.3-7 Revision 31 TRM 3.4-6 Revision 31TRM 3.3-8 Revision 31 TRM 3.4-7 Revision 31TRM 3.3-9 Revision 31 TRM 3.4-8 Revision 31TRM 3.3-10 Revision 31 TRM 3.4-9 Revision 31TRM 3.3-11 Revision 31 TRM 3.4-10 Revision 31TRM 3.3-12 Revision 67 TRM 3.5-1 Revision 31TRM 3.3-13 Revision 74 TRM 3.6-a Revision 70TRM 3.3-13a Revision 67 TRM 3.6-1 Revision 60TRM 3.3-14 Revision 67 TRM 3.6-2 Revision 67TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 87TRM 3.3-18 Revision 100 TRM 3.6-6 Revision 33TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 85TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 71TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31TRM 3.3-28 Revision 76 TRM 3.6-16 Revision 31TRM 3.3-29 Revision 76 TRM 3.6-17 Revision 31TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31TRM Vol. ILEP-IREV 105 11/21/13 FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL ILIST OF EFFECTIVE PAGESPage Revision Page RevisionTRM 3.6-19 Revision 31 TRM 3.8-13 Revision 61TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 80TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 88TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31TRm 3.6-32 Revision 70 TRM 3.11-a Revision 31TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75TRM 3.7-a Revision 73 TRM 3.12-2 Revision 31TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 102TRM 3.7-2 Revision 70 TRM 3.12-5 Revision 53TRM 3.7-3 Revision 70 TRM 3.12-6 Revision 53TRM 3.7-4 Revision 73 TRM 3.12-7 Revision 31TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 75TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31TRM 3.7-12 Revision 72 TRM 3.12-15 Revision 31TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 75TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31TRM 3.7-15 Revision 98 TRM 3.12-18 Revision 75TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 75TRM 3.7-18 Revision 77 TRM 3.12-21 Revision 31TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31TRM 3.7-20 Revision 79 TRM 3.12-23 Revision 31TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 75TRM 3.8-3 Revision 96 TRM 3.12-27 Revision 31TRM 3.8-4 Revision 96 TRM 3.12-28 Revision 31TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 78TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31TRM 3.8-8 Revision 50 TRM 5.0-a Revision 105TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 105TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 105TRM 3.8-11 Revision 50TRM 3.8-12 Revision 31TRM Vol. ILE P- 2REV 105 11/21/13 FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL ILIST OF EFFECTIVE PAGESPageTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMB1.0-1B2.0-1B3.0-1B3.0-2B3.0-2aB3.0-2bB3.0-2cB3.0-3B3.0-4B3.0-5B3.0-6B3.0-7B3.1-1B3.2-1B3.3. 1-1B3.3.1-2B3.3.2-1B3.3.2-2B3.3.3-1B3.3.4-1B3.3.4-2B3.3.5-1B3.3.5-2B3.3.6-1B3.3.6-2B3.3.6-3B3.3.6-4B3.3.6-5B3.3.6-6B3.3.7-1B3.3.7-2B3.3.8-1B3.3.9-1B3.3.10-1 B3.3.11-1 B3.3.12-1 B3.3.13-1 B3.3.14-1 B3.4.1-1B3.4.1-2B3.4.1-3B3.4.1-4B3.4.1-5B3.4.2-1B3.4.3-1B3.4.4-1B3.4.5-1B3.4.6-1B3.4.7-1B3.5-1B3.6.1-1B3.6.2-1RevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionPage31316363727272313154727231313131313167318431313131313176763131313156456231313171717171313131313131313167TRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMB3.6.3-1B3.6.4-1B3.6.5-1B3.6.6-1B3.6.7-1B3.6.8-1B3.7.1-1B3.7.2-1B3.7.3-1B3.7.4-1B3.7.4-2B3.7.5-1B3.7.6-1B3.7.7-1B3.7.8-1B3.7.9-1B3.8.1-1B3.8.2-1B3.8.3-1B3.8.4-1B3.8.5-1B3. 8. 6-1B3.9.1-1B3.9.2-1B3.9.3-1B3.9.4-1B3.10-1B3.11.1-1 B3.12.1-1 B3.12.2-1 B3.12.3-1 B3.12.4-1 B3.12.5-1 B3.12.6-1 B3.12.7-1 B3.12.8-1 RevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevision873131703131313173313131319931793131963131433165313131313144313131313131TRM Vol. ILEP-3REV 105 11/21/13 FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL ILIST OF EFFECTIVE PAGESCORE OPERATING LIMITS REPORTCOLR 16, Revision 1Page RevisionNotation Page1 12 13 14 15 16 17 18 19 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 1TRM Vol. ILEP-4REV 105 11/21/13 FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL ITable of Contents (Cont'd)Section andTR 3.9TR 3.9.1TR 3.9.2TR 3.9.3TR 3.9.4TitleREFUELING OPERATIONS Communications

...................................

Refueling Platform

...............................

Crane Travel -Spent Fuel Storage Pool ...........

Reactor Pressure Vessel Water Level -Refueling

..PageTRMTRMTRMTRM3.9-13.9-23.9-43.9-5TR 3.10TRTR3.113.11.1TR 3.12TRTRTRTRTRTRTRTRTRTR3.12.13.12.23 .12 .3.12.33.12.43.12.53.12.63.12.73 .12.84.05.0TR 5.1TR 5.1.1TR 5.2TR 5.2.1SPECIAL OPERATIONS (Blank) ..........................

RADIOACTIVE EFFLUENTS Temporary Outdoor Storage Tank Radioactivity

.....FIRE PROTECTION Fire Detection Instrumentation

...................

Fire Suppression Water System ....................

Spray and Sprinkler Systems ......................

C02 Systems .......................................

Halon Systems ....................................

Fire Hose Stations

...............................

Yard Fire Hydrants and Hydrant Hose Houses .......Fire Rated Assemblies

............................

DESIGN FEATURES (Blank) .................................

ADMINISTRATIVE CONTROLSProgramsInservice Inspection and Testing Program for SnubbersReportsStartup Reports .....................................

BASESUSE AND APPLICATION Definitions (Blank) .............................

SAFETY LIMITS (SLs) (Blank) ........................

Limiting Condition for Operation (TRLCO)Applicability

......................................

Surveillance Requirement (TRSR) Applicability

......REACTIVITY CONTROL SYSTEMSControl Rod Drive Housing Support ...............

POWER DISTRIBUTION LIMITS (Blank) ..................

TRM 3.10-1TRM 3.11-1TRMTRMTRMTRMTRMTRMTRMTRMTRiMTRMTRM3.12-13 .12-83.12-133.12-163.12-183.12-203.12-263.12-294.0-15.0-15.0-2TRTRTRTRTRTRTRTRB1. 0B1 .1B2. 0B3 .0B3 .0B3 .1B3 .1. 1B3 .2TRM B1.0-1TRM B2.0-1TRM B3.0-1TRM B3.0-3TRM B3. 1-1TRM B3.2-1(continued)

TRM VOL ITRM-iiiREV 105 11/13 1 SECTION 5.0DETAILED INDEX OF SECTIONPageTR 5.1.1 Inservice Inspection and Testing Program forSnubbers

..........................................

TRM 5.0-1TR 5.2.1 Startup Reports ...................................

TRM 5.0-2(Reporting Requirements)

TI~ Vol. I TRM 5.0-a REV. 105 11/13 ITRM Vol. ITRM 5. 0-aREV. 105 11/13 1 ProgramsTR 5.1TR 5.0 ADMINISTRATIVE CONTROLSTR 5.1 ProgramsTR 5.1.1 Inservice Inspection and Testing Program for SnubbersThe Snubber Program specified in ISI-NDE Program, Part C implements the requirements of the ASME OM Code, Subsection ISTA and ISTD, 2004Edition, as allowed by 10CFR50.55a(b)(3)(v) in lieu of ASME SectionXI, IWF-5200(a) and (b) and IWF-5300(a) and (b), which applies topreservice and inservice examination and testing requirements forsnubbers.

TRN Vol. I TRI'I 5.0-1 REV 105 11/13TRM Vol. ITRM 5. 0-1REV 105 11/13 1 ReportsTR 5.2TR 5.0 ADMINISTRATIVE CONTROLSTR 5.2 ReportsIn addition to the applicable reporting requirements of Title 10, Code of FederalRegulations, the following reports shall be submitted to the RegionalAdministrator of the Regional Office of the NRC unless otherwise noted.TR 5.2.1 Startup Reporta. A summary report of plant startup and power escalation testingshall be submitted following:

1. Receipt of an Operating License;2. Amendment to the license involving a planned increase inpower level;3. Installation of fuel that has a different design or has beenmanufactured by a different fuel supplier; and4. Modifications that may have significantly altered thenuclear,
thermal, or hydraulic performance of the unit.b. The startup report shall address each of the tests identified inSubsection 14.1.4.8 of the Final Safety Analysis Report andshall include a description of the measured values of theoperating conditions or characteristics obtained during the testprogram and a comparison of these values with design predictions and specifications.

Any corrective actions that were requiredto obtain satisfactory operation shall also be described.

Anyadditional specific details required in license conditions basedon other commitments shall be included in this report.c. Startup reports shall be submitted within:1. 90 days following completion of the startup test program;2. 90 days following resumption or commencement of commercial power operation; or3. 9 months following initial criticality, whichever isearliest.

If the startup report does not cover all three events (i.e.,initial criticality, completion of startup test program, andresumption or commencement of commercial operation) supplementary reports shall be submitted at least every 3 monthsuntil all three events have been completed.

TRM Vol. I TRM 5.0-2 REV 105 11/13 ITRM Vol. ITRM 5. 0-2REV 105 11/13 1