ML20077B685: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20077B685
| number = ML20077B685
| issue date = 07/18/1983
| issue date = 07/18/1983
| title = Forwards Amend 18 to GESSAR-238,incorporating 830428 Ltr Re post-accident Monitoring instrumentation,830615 Ltr Re Question 410.24 of NRC 820815 Request for Addl Info & Summary of Measures to Avoid Stress Corrosion Cracking
| title = Forwards Amend 18 to GESSAR-238,incorporating Re post-accident Monitoring instrumentation, Re Question 410.24 of NRC 820815 Request for Addl Info & Summary of Measures to Avoid Stress Corrosion Cracking
| author name = Sherwood G
| author name = Sherwood G
| author affiliation = GENERAL ELECTRIC CO.
| author affiliation = GENERAL ELECTRIC CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = JNF-052-83, JNF-52-83, MFN-128-83, NUDOCS 8307250377
| document report number = JNF-052-83, JNF-52-83, MFN-128-83, NUDOCS 8307250377
| title reference date = 04-28-1983
| package number = ML20077B688
| package number = ML20077B688
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC, VENDOR/MANUFACTURER TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC, VENDOR/MANUFACTURER TO NRC
Line 26: Line 27:
Amendment No. 18 further amends GESSAR II by:
Amendment No. 18 further amends GESSAR II by:
: 1. Incorporation of the following General Electric submittals:
: 1. Incorporation of the following General Electric submittals:
: a. April 28, 1983 letter pertaining to post-accident monitoring instrumentation (Appendix 1D).
: a. {{letter dated|date=April 28, 1983|text=April 28, 1983 letter}} pertaining to post-accident monitoring instrumentation (Appendix 1D).
: b. June 15, 1983 letter pertaining to Question 410.24 of the Commission's August 15, 1982 information request and a summary of the measures taken to avoid intergranular stress corrosion cracking.
: b. {{letter dated|date=June 15, 1983|text=June 15, 1983 letter}} pertaining to Question 410.24 of the Commission's August 15, 1982 information request and a summary of the measures taken to avoid intergranular stress corrosion cracking.
: c. June 28, 1983 letter pertaining to a revised response to the CP/ML Rule (Appendix 1G).
: c. {{letter dated|date=June 28, 1983|text=June 28, 1983 letter}} pertaining to a revised response to the CP/ML Rule (Appendix 1G).
: 2. Updating the GESSAR II/FSAR interface tables of Subsection 1.9.1.
: 2. Updating the GESSAR II/FSAR interface tables of Subsection 1.9.1.
8307250377 830718 PDR ADOCK 05000447 K                PDR
8307250377 830718 PDR ADOCK 05000447 K                PDR

Latest revision as of 10:19, 27 September 2022

Forwards Amend 18 to GESSAR-238,incorporating Re post-accident Monitoring instrumentation, Re Question 410.24 of NRC 820815 Request for Addl Info & Summary of Measures to Avoid Stress Corrosion Cracking
ML20077B685
Person / Time
Site: 05000447
Issue date: 07/18/1983
From: Sherwood G
GENERAL ELECTRIC CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20077B688 List:
References
JNF-052-83, JNF-52-83, MFN-128-83, NUDOCS 8307250377
Download: ML20077B685 (2)


Text

GENERAL @ ELECTRIC NUCLEAR POWER systems DMslON GENERAL ELECTRIC COMPANY

  • 175 CURTNER AVENUE
  • SAN JOSE, CAllFORNIA 95125 MC 682, (408) 925-5040 MFN 128-83 JNF 052-83 July 18, 1983 U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C. 20555 Attention: Mr D. G. Eisenhut, Director Division of Licensing Gentlemen:

SUBJECT:

IN THE MATTER OF 238 NUCLEAR ISLAND GENERAL ELECTRIC STANDARD SAFETY ANALYSIS REPORT (GESSAR II); DOCKET NO.

STN 50-447 Enclosed please find 3 original copies (transmitted under separate cover are 60 conformed copies) of Amendment No. 18 to the 238 General Electric Standard Safety Analysis Report (GESSAR II) for the above numbered application:

Amendment No. 18 further amends GESSAR II by:

1. Incorporation of the following General Electric submittals:
a. April 28, 1983 letter pertaining to post-accident monitoring instrumentation (Appendix 1D).
b. June 15, 1983 letter pertaining to Question 410.24 of the Commission's August 15, 1982 information request and a summary of the measures taken to avoid intergranular stress corrosion cracking.
c. June 28, 1983 letter pertaining to a revised response to the CP/ML Rule (Appendix 1G).
2. Updating the GESSAR II/FSAR interface tables of Subsection 1.9.1.

8307250377 830718 PDR ADOCK 05000447 K PDR

GENERAL U. S. Nuclear Regulatory ion Commiss$ ELECTRIC Page 2

3. Clarifying portions of the text where obvious discrepancies exist.

Very truly yours, i

j Gendf'Sherwood, Manager i

Nuclear Safety & Licensing Operation GGS:csc/IO7071 Attachments cc: F. J. Miraglia (w/o att.)

C. O. Thomas (w/o att.)

D. C. Scaletti (w/o att.)

L. S. Gifford (w/o att.)

i

_ . - , - _ , - _ _ _ _ . _ , , - - , - . - . _ . . , . . , _ , , . _