ML20155E133
| ML20155E133 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf, 05000447 |
| Issue date: | 06/06/1988 |
| From: | Grimsley D NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| To: | Connor L DOC-SEARCH ASSOCIATES |
| Shared Package | |
| ML20155E140 | List:
|
| References | |
| FOIA-88-91, RTR-REGGD-01.007, RTR-REGGD-1.007 NUDOCS 8806160005 | |
| Download: ML20155E133 (7) | |
Text
u U.S. NUCLE AR REGULATO.lY COMMISSION uc sotA atouest wvstmesi p=asa,
,f
.g
\\.
F01 A-88-91 re ais,w.se ros C
5 RESPONSE TO FREEDOM OF i
l'"
X XI ""*
/
INFORMATION ACT (FOI A) REQUEST
^"
N J#N - 61%L_
oe..-
oocatt wvaga si ad ecoeeee KE0VisYla Ms. Lynn Connor PART 1.-RECORDS RELEASED OR NOT LOCATED (See checAed bosesi No agency records subrect to the request have been located No addeteral agency records sutsect to the request have been located.
k Agency records Abrect to the request that are et#ed m Appenda are already avadatde f or putdic inspecten and copM m the NRC Pwedic Document Room.
X iii7 H Street. N w.. washegion. DC Agency records sutrect to the roccest thtt are gentded e Appendeu _A are beeg made asadable for pwbhc espection and copyeg a the NRC Putdec Document X
Room.1717 H Street, N W. Washegton. DC, e a focer under the FOI A n mber and requester naw u
The nonproprieta'y verson cf t*e proposabs) tPat you ag'eed to accept in a tefechone conversation uth a me*ter of rny staM rs now beg made avadatdo for pubbc especten and coymg at the NRC Pubhc Docurrent Room.1717 H Street. N W. Washegion, DC. m a fodder under this Fol A number and requester name EncloseJ e eformaton on how you may ottain access to and the charges for copyeg records placed m the NRC Pubbe Document Room.1717 H Street. N W,. Washington. DC.
Ayency records subrect to the request ses enclosed Ar*y apphcatde charge for copes of the records proveed and payment procedu es are noted m the comments secton r
Records sobtect to the request
- ave been referred to another Fede'ai agencyhest for revew and dwect response to you.
In ve* of NRC's respoene to the request, no fwrther acte e beeg taken on appeal letter 09ted PART ll A-INFORMATION WTTHHELD FROM PUBLIC DISCLOSURE Certam eformaton in t*e requested records e beeg et held from putd+c disclosu e pursuant to the FOIA enemptoms described in aM for the reasons etated in Pan 11. sec-h r
tions 8. C, and D Any reteated porter's of the documeets for which ccty pa't of the record.s being ethheld are teing made avadaele for putdic inspecten and copyeq m the NRC Pwtd.c Docwwnt Room.1717 H Street. N W. Washington. DC. m a foider under th s FOIA number and requester name Ce.- c.ts
/ *)
$4%
D'agCYon Oy
% i nags comes
$1C /
/.44 W s
/
8806160005 080606 PDR FOIA CONNORB8-91 PDR b:C FORM 464 r -
e
, a.
APPENDIX A
- iECOR05 AVAILABLE 111 THE PDR FOIA-88-91 APPENDIX A 1.
8707080687 11/16/73 TO:
LAINAS FROM: CUOLIN SUBJ.:
FORTHCOMING MEETING WITH GENERAL ELECTRIC CO AND AEROJET NUCLEAR CO.
t 2.
8707080571 9/18/74 TO:
TEDESCO FROM: CUDLIN SUBJ:
POTENTIAL EFFECTS OF owr PRESSURE SUPPRESSION CONTAINVENTS DUE TO REGULATORY GUIDE 1.7 REVISION (AUGUST 14, 1974) 3.
8707160533 10/1/74 TO:
LAINAS FROM: CUOLIN SUBJ: FORTHCOMING MEETING WITH GENERAL ELECTRIC 4
8707110050 1/28/75 TO:
LAINAS FROM: CUDLIN SUBJ:
FORTHCOMING MEETING WITH GENERAL ELECTRIC 5.
8604020046 4/16/75 TO:
LAINAS FROM: CVOLIN SUBJ:
MEETING WITH GENERAL ELECTRIC COMPANY-POOL OYNAMIC AND EdLIEF VALVE LOAOS ON MARK I AND Il CCtJTAINMENTS 6.
8707090299 7/7/75 TO:
LAINAS FROM: CUOLIN SUBJ. MEETING - GENERAL ELECTRIC - MAY 20 & 21, 1975 7.
8707090591 7/9/75 TO:
LAINAS FROM: CUOLIN SUBJ:
MEETING - SOUTHWEST RESEARCH INSTITUTE - JUNE 26, 1975 8.
8707090106 7/11/75 TO:
LAINAS FROM: CUOLIN SUBJ:
TRIP REPORT - GENERAL ELECTRIC CO. - JUNE 27, 1975 9.
8707090540 9/9/75 TO:
LAINAS FROM: CUOLIH SUBJ: FORTHCOMING MEETING WITH GENERAL ELECTRIC
Re: FOIA-88-91 APPENDIX B RECORDS TO BE PLACED IN PDR 1.
Undated Handwritten fortn on Drywell. (3 pages) t 2.
Undated Drawing.(1page) 3.
Undated Handwritten chart. (1 page) 4.
Undated Mark III Pressure Suppression System Loads on Structures.
(7 pages) 5.
Undated Vent Uncovering and Loads Due To Wave Phenomena. (21 pages) 6.
Undated Mark III Pressure Suppression System, Potantial Interaction Between Adjacent Vents. (5 pages) 7.
Undated Mark III Pressure Suppression System, Vibrations During A Loss of Coolant Accident. (2 pages) 8.
9/21/72 Project No. 465, re: Preliminary Review of PSAR for Grand Gulf Station. (2 pages) 9.
9/22/72 Note to A. Giambusso thru Butler from Owsley, re:
Forthcoming Meeting to Consider Preliminar Mississippi Power and Light PSAR. (1 page) y Review of 10.
9/25/72 Note to Denton, et al, re: Project 465 (2 pages) 11.
10/11/72 Ltr to Roger S. Boyd, re: Acceptance Review - Grand Gulf Station, Units 1 and 2. (4 pages) 12.
11/17/72 Ltr to Mississippi Power and Light from Giambusso. (2 pages) 13.
12/6/72 Ltr to Giambusso from Owsley, re: Forthconning Meeting with Mississippi Power and Light - Grand Gulf Nuclear Station. (1 page) 14.
12/8/72 Handwrittennotes.(2pages) 15.
12/29/72 Note to Files from Cudlin. (1 page) 16.
12/12/72 Schedule. (1 page) 17.
1/11/73 Ltr to Roger Boyd from Tedesco, re: Review Schedule for Grand Gulf Units 1 and 2. (1 page)
Re: FOIA-88-91 APPENDIX B (CONTINUED) 18, 1/30/73 Ltr to Roger Boyd from Tedesco, re: Review Schedule for Grand Gulf, Units 1 and 2. (2 pages) t
- 19. 2/9/73 Ltr to Boyd from Denton, re:' Grand Gulf Nuclear Station Questions. (7 pages) 20.
2/15/73 Handwritten notes re: Orywell Cracking. (1 page) 21.
2/16/73 Grand Gulf Nuclear Station, Review Schedule Dated for Containment System Branch. (1 page) 22.
3/1/73 Memo route slip, w/ attachment. (3 pages) 23, 3/13/73 Applicant: Mississippi Power and Light Company summary of Meeting Regarding Fisson Product transport modeling for the Grand Gulf Containment. (2 pages)
- 24. 3/23/73 Request for Schedule Change. (1 page) 25, 4/2/73 Handwritten note to Fred Carmichael. (1 page) 26, 4/3/73 Handwritten note - telecon. (1 page) 27.
5/4/73 Ltr to Voss A. Moore, re: Containment Systems Branch -
Request for Additional Information on Grand Guld Nuclear Station, Units 1 and 2. (19 pages) 28.
5/10/73 Ltr to Giambusso from Mississippi Power and Light. (2 pages) 29.
5/12/73 Ltr to liississippi Power ane Light from Butler, w/ attachment. (18 pages) 30.
5/23/73 Ltr to Voss A. Moore, re: Considerstion of Hydrogen Generation from Metal-Water Reaction - Mark III Containment. (3 pages) 31, 5/31/73 Note to J.M. Hendrie from Tedesco, re: Metal-Water Reaction Rate for Containment Evaluation per Regulatory Guide 7.(7pages)
- 32. 6/15/73 Note to J.M. Hendrie from Cudlin and Lainas, re:
Potential Bypassing in Mark III and Ice Condenser Containments (DRAFT) (7 pages) 33.
6/18/73 Memo Route Slip, w/ attachment. (2 pages)
Re: FOIA-88-91 APPENDIX B (CONTINUED)
- 34. 7/13/73 Ltr to Voss A. Moore from Tedesco, re: Request for Additional Information for Grand Gulf Nuclear Station. (3 t,
pages)
Memo for Walter Butler from Owsley, re: Forthcomin
- 35. 7/17/73 Meeting with Mississippi Power and Light. (1 page)g 36, 8/8/73 Memo to Butler from Owsley, re: Forthcoming Meeting with Mississipoi Power and Light. (1 page)
- 37. 8/14/73 Ltr to Giambusso from Stampley, subject: Grand Gulf. (15 pages)
- 38. 8/28/73 Handwritten notes, re: 6.4 (3 pages)
- 39. 9/4/73 Note to J.M. Hendrie from Tedesco. (2 pages)
- 40. 9/5/73 Ltr to Mississippi Power and Light from Moore, w/ attachment. (7 pages) 41, 9/17/73 Memo for Butler from Owsley, re: Forthcoming Meeting with Mississippi Power and Light Company. (1 page)
- 42. 9/21/73 Engineering Calculation Sheet. (3 pages)
- 43. 9/26/73 Ltr to Voss Moore from Tedesco. (11 pages) 44 10/2/73 Ltr to Mississippi Power and Light from Moore. (11 pages) 45, 10/9/73 Ltr to Dr. Walter R. Butler from Stampley, re: Grand Gulf Nuclear Station Units 1 and 2. (1 page) 46.
10/25/73 Handwritten notes, re: ACRS Sybcomittee. (2 pages) 47, 11/15/73 Ltr to Voss Moore from Tedesco, re: Request for Additional Information for General Electric Standard Safety Analysis Report. (GESSAR)
(224pages) 48.
11/16/73 Note to John Stolz from Lainas, re: GESSAR Review. (1 page) 49, 12/4/73 Handwritten note. (1 page) 50, 12/19/73 Ltr to DeYoung from Tedesco, re: Draft Safety Evaluation Report - Containment Systems - Grand Gulf Nuclear Station Units 1 and 2. (39 pages)
1 Re: F01A-88-91 APPENDIX B (CONTINUED) 51, 1/12/74 Note to Fraley from Butler, re: Answers to Certain Inquiries on the Grand Gulf Nuclear Generating Station.
(6 pages) 52.
1/16/74 Handwritten note re Grand Guld. (3 pages)
- 53. 3/29/74 Memo to V. Stello from Tedesco, re: BWR 6/ Mark III Blowdown.(2pages)
Ltr to Mississippi Power and Light from Owsley(4 pages) 54, 3/29/74
, re:
Summary of Meeting held on January 16, 1974.
- 55. 4/2/74 Ltr to Mississippi Power and Light Company from Owlsey, re: Summary of ACRS Meeting Held on March 7,1974.(2 pages) 56.
5/1/74 Ltr to Tedesco from Duclin, re: Meeting - General Electric Comapny - April 22-23, 1974. (11 pages) 5)
5/14/74 Ltr to Mississippi Power and Light Company from Owsley.
(4 pages) 58, 6/4/75 Handwritten notes re: GE.(1page) 59.
1/21/75 Ltr to Mississippi Power and Light from Butcher, re:
Sumary of Meeting Held on January 16, 1975 to Discuss Post-CP Outstanding Issues. (5 pages) 60.
1/28/75 Memo to Gus Lainas from Cudlin re: Forthcoming Meeting with General Electric. (3 pages) 61.
2/5/75 Handwritten notes, re: Grand Gulf. (3 pages) 62, 2/14/75 Memo to Mississippi Power and Light from Butcher. (4 pages)
- 63. 4/16/75 Memo to Lainas thru Kudrick from Cudlin, re: Meeting with General Electric Co., - Pool Dynamic and Relief Valve loads on Mark I and 11 Containments. (39 pages) 64 4/25/75 Ltr to Nuclear Regulatory Comission from McGaughy, re:
Grand Guld Nuclear Station. (2 pages)
Re: F0!A-88-91 APPENDIX B (CONTINUED) 65.
5/1/75 Memo to Mississippi Power and Light from Butcher, fe:
Sumary of Meeting Held on April 23, 1975 to Discuss Mark III Containment Design Bases. (3 pages) 66.
5/29/75 Note to Tedesco and Maccary from Butcher, re: Grand Gulf Mark III Containment Design. (2 pages)
- 67. 5/30/75 Ltr to R.C. DeYoung from Maccary, re: Technical Assistance (TAR-1579) Grand Gulf 1 and 2, Mark !!I Containment Suppression Pool Dynamic Loads. (5 pages)
- 68. 6/3/75 Ltr to DeYoung from Maccary re Grand Gulf 1 and 2. (3 pages)
- 69. 6/10/75 Ltr to Mississippi Power and Light from Butcher, re:
Sumary of Meetings held on June 3 and 4,1975, to Discuss Design Bases Loading and Design Methods for the Grand Gulf Mark III Containment. (4 pages) j
- 70. 6/11/75 Ltr to DeYoung from Maccary, re: Techical Assistance Request.(4pages) l
- 71. 6/13/75 Memo to DeYoung from Tedesco, re: Grand Gulf 1 and 2. (5 pages) 72.
10/16/75 Ltr to DeYoung from Maccary, re: Technical Assistance Reauest. (4 pages) 73.
10/17/75 Handwritten notes, re: Grand Gulf. (1 page) 74 10/22/75 Memo to DeYoung from Tedesco, re: Grand Gulf I and 2..(4 pages) 75.
1/12/74 Memo to Okrent from I1cKinney, subject: "Grand Gulf Subcommittee Meeting, January 17-18, 1974,"
(6pages)
,_y
..m
__,