ML20080C104

From kanterella
Jump to navigation Jump to search
Forwards Impell Corp two-vol Rept, Confirmatory Soil- Structure Interaction Analysis for GESSAR-II, in Response to SER Confirmatory Issue 3.Rept Will Be Incorporated Into GESSAR-II by Amend
ML20080C104
Person / Time
Site: 05000447
Issue date: 08/17/1983
From: Sherwood G
GENERAL ELECTRIC CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20080C109 List:
References
JNF-059-83, JNF-59-83, MFN-147-83, NUDOCS 8308190105
Download: ML20080C104 (1)


Text

l GENERAL $ ELECTRIC NUCLEAR POWER SYSTEMS DMSION GENERAL ELECTRIC COMPANY

  • 175 CURTNER AVENUE
  • SAN JOSE, CAUFORNIA 95125 h!FN# 147-83 August 17., 1983 JNF# 059-83 U.S. Nuclear Regulatory Commission l

Office of Nuclear Reactor Regulation Washington, DC 20555 Attention:

Mr. D.G. Eisenhut Division of Licensing i

Gentlemen:

4

SUBJECT:

IN THE MATTER OF 238 NUCLEAR ISLAND GENERAL ELECTRIC STANDARD SAFETY ANALYSIS REPORT (GESSAR II) DOCKET NO. STN 50-447 SOIL _ STRUCTURE INTERACTION (SER CONFIRMATORY ISSUE NO. 3)

Enclosed please find the two volume report " Confirmatory Soil - Structure Interaction Analysis for GESSAR II" prepared by the Impe11 Corporation located in Walnut Creek, California. This report is provided in response to GESSAR II Safety Evaluation Report Confirmatory Issue No. 3.

Following review and approval by the staff, this report will be incorporated into GESSAR II by amendment.

If you have any questions please contact J.N. Fox on (408) 925-5039.

Sincerely, g

I sll

\\

enn G. Sherwood, Manager

[

Nuclear Safety 6 Licensing Operation Attachments l

cc:

F. J. Miraglia (w/o attachments)

C. O. Thomas (w/o attachments)

D. C. Scaletti L. S. Gifford (w/o attachmentq D. C. Jeng 8308190105 030817 PDR ADDCK 05000447 E

PDR

-s

~ -