|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20100M3571996-02-26026 February 1996 Forwards Proprietary Documentation of Algebraic for of GE Critical Power Correlation.Ge Requests Concurrence Recognizing Attachment as Legal Documentation of GEXL & GEXL-PLUS Critical Quality Correlations ML20099F5851992-08-0404 August 1992 Clarifies Statement Made in NRC Safety Evaluation of Rept NEDE-31758P-A, GE Marathon Control Rod Assembly, W/ Regards to Stress Limit Used by Ge.Nrc Concurrence W/ Clarification Requested by 920930 ML20055E0691990-06-29029 June 1990 Forwards Synopsis of NRC Investigation Rept 03-87-011 Re Investigation Performed at Facility,For Info ML20235S9511989-02-25025 February 1989 Responds to NRC Bulletin 88-010, Test Program. Recommends That Temp Test Be Permitted as Alternate to Millivolt Drop/ Pole Resistance ML20235L1561989-01-17017 January 1989 Forwards Endorsements 141 & 142 to Nelia Policy NF-1, Endorsements 44 & 45 to Maelu Policy MF-95 & Endorsements 5 to Nelia Policy NW-1 & Maelu Policy MW-66 ML20155E1331988-06-0606 June 1988 Partial Response to FOIA Request for Documents.Forwards App B Documents.App a & B Documents Available in PDR ML20153B1541988-03-15015 March 1988 Informs of Relocation of NRR to Stated Address in Rockville, MD ML20235L6161987-09-25025 September 1987 Extends Invitation to Attend Region V 871110 Meeting in South San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program.W/O Stated Encl ML20235M4251987-07-13013 July 1987 Partial Response to FOIA Request for Documents Re Acrs. Forwards Documents for Categories One & Three of FOIA Request.Review of 21 Addl ACRS Documents Continuing ML20234E4571987-06-23023 June 1987 Partial Response to FOIA Request for 771026 Minutes of ACRS Subcommittee on Fluid/Hydraulic Dynamic Effects Meeting in Portland,Or & Addl ACRS Documentation.Documents Identified on App H & Addl ACRS Documents Encl ML20207S5001987-03-0606 March 1987 Forwards Technical Evaluation Repts for Domestic Mark III Plants (Grand Gulf,Clinton,River Bend & Perry) & Gessar Ii. Inserts to Be Included in Section 6.2.1.8 of Draft Sser 2 for Clinton,River Bend & Perry Plants Also Encl ML20207M6941987-01-0909 January 1987 Final Response to FOIA Request Re GESSAR-II.App a Document Available in Pdr.App B Document Partially Withheld (Ref FOIA Exemption 4) IA-86-821, Final Response to FOIA Request Re GESSAR-II.App a Document Available in Pdr.App B Document Partially Withheld (Ref FOIA Exemption 4)1987-01-0909 January 1987 Final Response to FOIA Request Re GESSAR-II.App a Document Available in Pdr.App B Document Partially Withheld (Ref FOIA Exemption 4) ML20207M6741986-11-17017 November 1986 FOIA Request for GESSAR-II Chapters on Human Factors & Engineering & GESSAR-II Probabilistic Safety Study ML20210J3961986-09-22022 September 1986 Forwards Amend 2 to Final Design Approval FDA-1 for BWR/6 Nuclear Island Design (GESSAR-II) & Notice of Issuance of Amend.Amend Removes Constraints on Issuing CPs & OLs to Applicants Ref GESSAR-II Design NUREG-0979, Forwards Sser 5,(NUREG-0979).W/o Encl1986-06-25025 June 1986 Forwards Sser 5,(NUREG-0979).W/o Encl ML20211K8171986-06-17017 June 1986 Proposes Final Design Approval (Fda) Conditions 3-6 Be Treated as Interface Items & Removed from Amend 2 to FDA-1. Action on Condition 1 Should Be Taken by Nrc,Not GE ML20199D5321986-06-11011 June 1986 Forwards Proposed Amend 2 to Final Design Approval-1 for BWR/6 Nuclear Island Design,Gessar Ii,Documenting Staff & ACRS Review of Gessar II for Severe Accident Concerns,For Comment.Amend Removes Constraints on Issuance of CPs & OLs ML20155G0971986-04-25025 April 1986 Forwards Nonproprietary & Proprietery Amend 21 to Gessar II,238 Nuclear Island. Amend Responds to NRC Proposed Severe Accident Policy Statement.Proprietary Amend Withheld (Ref 10CFR2.790) ML20137L4871986-01-22022 January 1986 Forwards,For Info & Comment,Acrs Rept Re Review of GESSAR-II for Concerns Addressed in Commission Severe Accident Policy Statement.Comments Requested by 860204 ML20137H8641986-01-14014 January 1986 Disagrees W/Nrc Re Final Design Approval of Gessar II BWR/6 Nuclear Island Design Applicable to Future Plants.Design Does Not Satisfy All Concerns of Commission Severe Accident Policy Statement.W/Addl Comments by ACRS Members ML20140F3691986-01-14014 January 1986 Further Response to FOIA Request for Several Categories of Documents Re Pressure Suppression Containment.Fsar & SER for Limerick Only Documentation Re 4x4 Tests.Encl Apps D-G Documents Responsive to Item 4 Also Available in PDR IA-85-804, Responds to FOIA Request for Specified Documents to Be Placed in Pdr.Encl App a Documents & Listed App B Document Placed in Pdr.Portions of Document 2 on App a Withheld (Ref FOIA Exemption 4)1986-01-13013 January 1986 Responds to FOIA Request for Specified Documents to Be Placed in Pdr.Encl App a Documents & Listed App B Document Placed in Pdr.Portions of Document 2 on App a Withheld (Ref FOIA Exemption 4) ML20154A6611986-01-13013 January 1986 Responds to FOIA Request for Specified Documents to Be Placed in Pdr.Encl App a Documents & Listed App B Document Placed in Pdr.Portions of Document 2 on App a Withheld (Ref FOIA Exemption 4) ML20209H4261985-10-30030 October 1985 Forwards marked-up Proprietary Review of BWR/6 Std Plant Pra:Vol 2:Seismic Events...Analysis in Response to 851009 Request.Technical Error Identified on Encl Pages 6/3 & 6/4. Review Withheld IA-84-175, Responds to Appeal Re Denial of FOIA Request for GE PRA for GESSAR-II Standardized Plant Design.Forwards 11 Pages from PRA Due to Court Approved Stipulation of 850718 Settlement. Info Also Available in PDR1985-10-11011 October 1985 Responds to Appeal Re Denial of FOIA Request for GE PRA for GESSAR-II Standardized Plant Design.Forwards 11 Pages from PRA Due to Court Approved Stipulation of 850718 Settlement. Info Also Available in PDR ML20133J3821985-10-11011 October 1985 Responds to Appeal Re Denial of FOIA Request for GE PRA for GESSAR-II Standardized Plant Design.Forwards 11 Pages from PRA Due to Court Approved Stipulation of 850718 Settlement. Info Also Available in PDR ML20135B7601985-09-0505 September 1985 Ack Receipt of 850806 Memo Re ACRS Severe Accident Review. NRR Ltr to ACRS Endorsed.Acrs Review Completion Expected by Sept or Oct 1985 Meeting ML20133N9891985-08-12012 August 1985 Forwards Proprietary Suppl 1 to Draft Gessar II Amend Supporting Leak-Before-Break. Submittal Based on Recommendations of NUREG-1061,Vol 3 for leak-before-break Mechanistic Methodology.Suppl Withheld (Ref 10CFR2.790) ML20134A5511985-08-0909 August 1985 Forwards Amend 1 to Final Design Approval FDA-1 & Fr Notice of Issuance.Amend Removes Constraint on Forward Referenceability of GESSAR-II Design & Permits Ref in New CP & OL Applications ML20133L5951985-08-0606 August 1985 Expresses Concern Over Progress of Severe Accident Review of Design.Requests That Steps Be Taken to Complete Review on Schedule That Would Result in Ltr to Commission in Sept 1985 ML20128H3171985-06-28028 June 1985 Forwards NRR Sser 4 Re Severe Accident Design.Severe Chatter Issue Will Be Resolved Prior to Publishing Final Suppl.W/O Encl ML20129B7391985-06-25025 June 1985 Advises of Review of Proposed SERs for Proprietary Info,Per 850618 Request.Page 3 of Ref 3, Table 2:Conditional Consequences Predicted by GE for Internally Initiated Events... Classified as Proprietary IA-85-412, Responds to FOIA Request for 850404 Ltr from GG Sherwood to Hl Thompson on Review of Leak-Before-Break Approach on Gessar II Docket. Forwards Document1985-06-19019 June 1985 Responds to FOIA Request for 850404 Ltr from GG Sherwood to Hl Thompson on Review of Leak-Before-Break Approach on Gessar II Docket. Forwards Document ML20128Q6981985-06-19019 June 1985 Responds to FOIA Request for from GG Sherwood to Hl Thompson on Review of Leak-Before-Break Approach on Gessar II Docket. Forwards Document ML20126B8981985-06-10010 June 1985 Forwards Info Re Resolution of Open Item Concerning Clutter on GE Emergency Response Info Sys.Ge Will Display Changes Recommended by Human Factors Consultant,Anacapa Sciences,Inc & NRC ML20126F4911985-06-0707 June 1985 Forwards Proposed Amend 1 to FDA-1 for GESSAR-II BWR/6 Nuclear Island Design,For Review.Amend Prepared in Anticipation of Final Commission Action on Severe Accident Policy Statement.Comments Requested by 850614 ML20128Q6731985-06-0606 June 1985 FOIA Request for GG Sherwood to Hl Thompson on Review of Leak-Before-Break on Gessar II Docket ML20117K0761985-05-0909 May 1985 Forwards Anacapa Technical Rept TR-550-1, Human Factors & Performance Evaluations of Emergency Response Info Sys. Rept Should Resolve Questions Raised by NRC Re Amount of Info Contained in Gessar Displays.W/O Encl ML20117H5241985-05-0707 May 1985 Permits NRC to Reproduce,Furnish to Third Parties & Make Public Rept NEDC-30885, Generic Emergency Response Info Sys (Basic Rtad) Software Validation ML20133A2391985-05-0303 May 1985 Further Response to FOIA Appeal & Ucs Motion for Summary Judgement That 10 Categories of Info in GESSAR-II PRA Could Be Released.No Basis Found to Recommend Reversal of Determination.Documents Released by GE Encl ML20154A6791985-05-0202 May 1985 Forwards NUREG/CR-4135 P, Review of BWR/6 Std Plant PRA: Vol-1 Internal Events,Core Damage Frequency. Task 12 of GESSAR-II Review Project Complete ML20116M0941985-05-0101 May 1985 Submits Supplemental Info Re Concerning Addendum 1 to NEDO-10466, Power Generation Control Complex (Pgcc) Fire Suppression Licensing Topical Rept. Establishment of Halon Concentration Requirement for Control Room Discussed ML20116E5961985-04-26026 April 1985 Forwards Proprietary Updated Draft Gessar II Amend Supporting Leak-Before-Break. Submittal for Carbon Steel Piping Scheduled for 850618.Rept Withheld (Ref 10CFR2.790) ML20126J0841985-04-19019 April 1985 Responds to Appeal Re Denial of FOIA Request for GESSAR-II Pra.Forwards Pages 2-7 - 2-16 of Document 5 on App A. Portions Withheld (Ref FOIA Exemption 4) ML20117J5801985-04-17017 April 1985 Forwards NEDC-30885, Generic Emergency Response Info Sys (Basic Rtad) Software Validation, Re Program to Evaluate & Test Integrated Software,Data Bases & Command Files Associated W/Emergency Response Info Sys ML20128M6211985-04-15015 April 1985 Partial Response to FOIA Request for Four Categories of Documents Re APS Source Term Review.Forwards Documents in App A.App B Documents Available in Pdr.App a Documents Being Placed in PDR NUREG-0770, Partial Response to FOIA Request for Four Categories of Documents Re APS Source Term Review.Forwards Documents in App A.App B Documents Available in Pdr.App a Documents Being Placed in PDR1985-04-15015 April 1985 Partial Response to FOIA Request for Four Categories of Documents Re APS Source Term Review.Forwards Documents in App A.App B Documents Available in Pdr.App a Documents Being Placed in PDR ML20113A8501985-04-0404 April 1985 Forwards Application Fees for Amends 10 & 11 to Gessar II Topical Rept NEDE-24011-P-A-6 ML20126E0031985-04-0404 April 1985 Further Response to Appeal Re Partial Denial of FOIA Request for Documents Re GE PRA for GESSAR-II Standardized Plant Design.App Lists Documents Responsive to Request 1996-02-26
[Table view] Category:NRC TO ENGINEERING/CONSTRUCTION/CONSULTING FIRM
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20055E0691990-06-29029 June 1990 Forwards Synopsis of NRC Investigation Rept 03-87-011 Re Investigation Performed at Facility,For Info ML20155E1331988-06-0606 June 1988 Partial Response to FOIA Request for Documents.Forwards App B Documents.App a & B Documents Available in PDR ML20153B1541988-03-15015 March 1988 Informs of Relocation of NRR to Stated Address in Rockville, MD ML20235L6161987-09-25025 September 1987 Extends Invitation to Attend Region V 871110 Meeting in South San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program.W/O Stated Encl ML20235M4251987-07-13013 July 1987 Partial Response to FOIA Request for Documents Re Acrs. Forwards Documents for Categories One & Three of FOIA Request.Review of 21 Addl ACRS Documents Continuing ML20234E4571987-06-23023 June 1987 Partial Response to FOIA Request for 771026 Minutes of ACRS Subcommittee on Fluid/Hydraulic Dynamic Effects Meeting in Portland,Or & Addl ACRS Documentation.Documents Identified on App H & Addl ACRS Documents Encl ML20207M6941987-01-0909 January 1987 Final Response to FOIA Request Re GESSAR-II.App a Document Available in Pdr.App B Document Partially Withheld (Ref FOIA Exemption 4) IA-86-821, Final Response to FOIA Request Re GESSAR-II.App a Document Available in Pdr.App B Document Partially Withheld (Ref FOIA Exemption 4)1987-01-0909 January 1987 Final Response to FOIA Request Re GESSAR-II.App a Document Available in Pdr.App B Document Partially Withheld (Ref FOIA Exemption 4) ML20210J3961986-09-22022 September 1986 Forwards Amend 2 to Final Design Approval FDA-1 for BWR/6 Nuclear Island Design (GESSAR-II) & Notice of Issuance of Amend.Amend Removes Constraints on Issuing CPs & OLs to Applicants Ref GESSAR-II Design NUREG-0979, Forwards Sser 5,(NUREG-0979).W/o Encl1986-06-25025 June 1986 Forwards Sser 5,(NUREG-0979).W/o Encl ML20199D5321986-06-11011 June 1986 Forwards Proposed Amend 2 to Final Design Approval-1 for BWR/6 Nuclear Island Design,Gessar Ii,Documenting Staff & ACRS Review of Gessar II for Severe Accident Concerns,For Comment.Amend Removes Constraints on Issuance of CPs & OLs ML20137L4871986-01-22022 January 1986 Forwards,For Info & Comment,Acrs Rept Re Review of GESSAR-II for Concerns Addressed in Commission Severe Accident Policy Statement.Comments Requested by 860204 ML20140F3691986-01-14014 January 1986 Further Response to FOIA Request for Several Categories of Documents Re Pressure Suppression Containment.Fsar & SER for Limerick Only Documentation Re 4x4 Tests.Encl Apps D-G Documents Responsive to Item 4 Also Available in PDR IA-85-804, Responds to FOIA Request for Specified Documents to Be Placed in Pdr.Encl App a Documents & Listed App B Document Placed in Pdr.Portions of Document 2 on App a Withheld (Ref FOIA Exemption 4)1986-01-13013 January 1986 Responds to FOIA Request for Specified Documents to Be Placed in Pdr.Encl App a Documents & Listed App B Document Placed in Pdr.Portions of Document 2 on App a Withheld (Ref FOIA Exemption 4) ML20154A6611986-01-13013 January 1986 Responds to FOIA Request for Specified Documents to Be Placed in Pdr.Encl App a Documents & Listed App B Document Placed in Pdr.Portions of Document 2 on App a Withheld (Ref FOIA Exemption 4) IA-84-175, Responds to Appeal Re Denial of FOIA Request for GE PRA for GESSAR-II Standardized Plant Design.Forwards 11 Pages from PRA Due to Court Approved Stipulation of 850718 Settlement. Info Also Available in PDR1985-10-11011 October 1985 Responds to Appeal Re Denial of FOIA Request for GE PRA for GESSAR-II Standardized Plant Design.Forwards 11 Pages from PRA Due to Court Approved Stipulation of 850718 Settlement. Info Also Available in PDR ML20133J3821985-10-11011 October 1985 Responds to Appeal Re Denial of FOIA Request for GE PRA for GESSAR-II Standardized Plant Design.Forwards 11 Pages from PRA Due to Court Approved Stipulation of 850718 Settlement. Info Also Available in PDR ML20134A5511985-08-0909 August 1985 Forwards Amend 1 to Final Design Approval FDA-1 & Fr Notice of Issuance.Amend Removes Constraint on Forward Referenceability of GESSAR-II Design & Permits Ref in New CP & OL Applications IA-85-412, Responds to FOIA Request for 850404 Ltr from GG Sherwood to Hl Thompson on Review of Leak-Before-Break Approach on Gessar II Docket. Forwards Document1985-06-19019 June 1985 Responds to FOIA Request for 850404 Ltr from GG Sherwood to Hl Thompson on Review of Leak-Before-Break Approach on Gessar II Docket. Forwards Document ML20128Q6981985-06-19019 June 1985 Responds to FOIA Request for from GG Sherwood to Hl Thompson on Review of Leak-Before-Break Approach on Gessar II Docket. Forwards Document ML20126F4911985-06-0707 June 1985 Forwards Proposed Amend 1 to FDA-1 for GESSAR-II BWR/6 Nuclear Island Design,For Review.Amend Prepared in Anticipation of Final Commission Action on Severe Accident Policy Statement.Comments Requested by 850614 ML20133A2391985-05-0303 May 1985 Further Response to FOIA Appeal & Ucs Motion for Summary Judgement That 10 Categories of Info in GESSAR-II PRA Could Be Released.No Basis Found to Recommend Reversal of Determination.Documents Released by GE Encl ML20126J0841985-04-19019 April 1985 Responds to Appeal Re Denial of FOIA Request for GESSAR-II Pra.Forwards Pages 2-7 - 2-16 of Document 5 on App A. Portions Withheld (Ref FOIA Exemption 4) ML20128M6211985-04-15015 April 1985 Partial Response to FOIA Request for Four Categories of Documents Re APS Source Term Review.Forwards Documents in App A.App B Documents Available in Pdr.App a Documents Being Placed in PDR NUREG-0770, Partial Response to FOIA Request for Four Categories of Documents Re APS Source Term Review.Forwards Documents in App A.App B Documents Available in Pdr.App a Documents Being Placed in PDR1985-04-15015 April 1985 Partial Response to FOIA Request for Four Categories of Documents Re APS Source Term Review.Forwards Documents in App A.App B Documents Available in Pdr.App a Documents Being Placed in PDR ML20126E0031985-04-0404 April 1985 Further Response to Appeal Re Partial Denial of FOIA Request for Documents Re GE PRA for GESSAR-II Standardized Plant Design.App Lists Documents Responsive to Request ML20126D2661985-02-15015 February 1985 Further Response to 840806 Appeal Re Partial Denial of FOIA Request for Documents Concerning GE PRA for GESSAR-II Standardized Plant Design.Forwards Pages of Seven Withheld Documents ML20127A4151983-01-0404 January 1983 Requests Proposal from BNL to Provide Technical Assistance to Div of Sys Integration Through FY85 Re Safety Evaluation of Core Melt Accidents:Cessar - Final Design Approval; Westinghouse Std Plant - Final Design Approval ML20197B0231978-10-23023 October 1978 Responds to Advising That NEDO-24048, Evaluation of Acoustic Pressure Loads on BWR/6 Internal Components Part of Gessar Docket & Fee Exempt.Concurs on Fee Exemption ML20234E7981976-07-0808 July 1976 Forwards List of Info Required to Complete Review of LWR ECCS Performance to Verify Conformance to 10CFR50.46.Info Must Be Filed on GESSAR-238 & GESSAR-251 Dockets as Part of Std SAR & Be Reviewed Prior to Preliminary Design Approval ML20235C5191975-07-0101 July 1975 Forwards Round 1 to Request for Addl Info Re Application for Preliminary Design Approval of GESSAR-238 Std Nsss. Review of Interfaces Between NSSS & balance-of-plant,site & Options Completed.Response Requested by 750725 ML20235C8961974-04-11011 April 1974 Forwards Detailed Request for Addl Info Needed to Complete Review of Gessar Application.Response to Items Concerning Qa,Instrumentation & Reactor Sys Requested by 740509 & 0517, Respectively ML20235C9071974-03-26026 March 1974 Forwards Request for Addl Info Needed to Continue Review of Gessar Application,Including Discussion of Steam Condensation Rates Assigned to Containment Sprays & Heat Sinks.Info Requested by 740509 ML20235C9121974-03-20020 March 1974 Forwards Requests for Addl Info Re Gessar Application, Including Futher Discussion on Inherent Protection Provided by Gessar Design Against Aircraft Hazards.Info Requested by 740509 ML20235C9261974-02-12012 February 1974 Expresses Concerns Re Delays in Review of Gessar,Due to Introduction of New Designs in Several Areas of Plant & Slips in Transmitting Part of Regulatory Staff Initial Request for Addl Info.Revised Review Schedule Encl 1990-06-29
[Table view] |
Text
,
. ~.
p ..s PD R. 44 g jog UNITED STATES e o NUCLEAR REGULATORY COMMISSION r,; y WASHINGTON, D. C. 20555
%...../ enn n Mr. Steven C. Sholly MHB Technical Associates 1723 Hamilton Avenue, Suite K IN RESPONSE REFER San Jose, CA 95125 TO F01A-85-804
Dear Mr. Sholly:
This is in response to your letter dated December 4, 1985, in which you rEcuested, pursuant to the Freedom of Information Act (F0IA), that copies of specified documents be placed in the Public Document Poom (PDR).
The enclosed Appendix A identifies documents which are being made available for your inspection and copying at the PDR. The enclosed Appendix B identifies a document which the NRC has already made publicly available at the PDR.
Portions of document 2 on Appendix A contain infonnation submitted by the General Electric Company which is confidential business (proprietary) information. This information is being withheld from public disclosure pursuant to Exemption (4) of the F0IA (5 U.S.C. 552(b)(4)) and 10 CFR 9.5(a)(4) of the Commission's regulations.
Pursuant to 10 CFR 9.9 of the Connission's regulations, it has been determined that the information withheld is exempt from production or disclosure and that its production or disclosure is contrary to the public interest. The persons responsible for this denial are the undersigned and Mr. Harold R. Denton, Director, Office of Nuclear Reactor Regulation.
This denial may be appealed to the NRC within 30 days from the receipt of this letter. As provided in 10 CFR 9.11, any such appeal must be in writing, addressed to the Executive Director for Operations, U.S. Nuclear Regulatory Commission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial F0IA Decision."
Sincerely, e603040121 FOIA e60113
& kI PDR PDR SHOLLy eS-OO4 Donnie H. Grimsley, Director Division of Rules and Records Office of Administration
Enclosures:
As stated
. u-Re: F01A-85-804 APPENDIX A ITEM A
.1. May 1985 - An Evaluation of BWR Over-Pressure Incidents in Low Pressure Systems - By J. D. Harris (ORNL) and J. W. Minarick (SAIC). (86 pages)
ITEM B
- 2. 'May.2,1985 - Letter from R. Youngblood (BNL) to Dr. S. Israel (NRC) transmitting a copy of the GESSAR Internal Events Report.
(263 pages)
ITEM C
- 3. Undated - Report entitled " Effects of Ionizing Radiation on the Transport Chemistry of Cesium Iodide," prepared by R. M. Elrick and D. A. Powers, Sandia National Laboratories. (21 pages) 4 3
f i
i
Re: F0!A-85-804 APPENDIX B ITEM C
- 1. September 1985 - NUREG/CR-4401 - SAND 85-0469 " Behavior of Control Rods During Core Degradation: Pressurization of Silver-Indium-Cadmium Control Rods." Accession No. 8512270269 (187 pages)
?