ML20076F473

From kanterella
Jump to navigation Jump to search
Informs That GESSAR-II Drywell Structure Drawings Requested by BNL Transmitted to M Reisch.Drawings Will Be Used in Review of PRA Re Containment Structural Sys pressure- Carrying Capacity
ML20076F473
Person / Time
Site: 05000447
Issue date: 08/22/1983
From: Quirk J
GENERAL ELECTRIC CO.
To: Thomas C
Office of Nuclear Reactor Regulation
References
JNF-063-83, JNF-63-83, MFN-152-83, NUDOCS 8308260049
Download: ML20076F473 (1)


Text

GENERAL $ ELECTRIC NUCLEAR ENERGY BUslNEsS OPERATIONS GENERAL ELECTRIC COMPANY e 175 CURTNER AVENUE e SAN JOSE, CALIFORNIA 95125 MC 682 (408) 925-5040 MFN 152-83 JNF 063-83 August 22, 1983 U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, DC 20555 Attention: Cecil 0. Thomas, Chief Standardization & Special Projects Branch Gentlemen:

SUBJECT:

IN THE MATTER OF 238 NUCLEAR ISLAND GENERAL ELECTRIC STANDARD SAFETY ANALYSIS REPORT (GESSAR II)

DOCKET NO. STN 50-447 DRYWELL STRUCTURE DRAWINGS The GESSAR II drywell structure drawings requested by Brookhaven National Laboratory (BNL) have been transmitted to Dr. Morris Reisch. These drawings, in conjunction with the Reactor Building foundation drawings (Figures 3.8-39 through 3.8-45), will be utilized by BNL in its review of the GESSAR II PRA pertaining to the containment structural system pressure-carrying assessment.

Sincerely,

( F eh . Qu rk R Systems Licensing cc: F.J. Miraglia M. Reisch D.C. Scaletti L.S. Gi fford fooS 8308260049 830822 PDR ADOCK 05000