Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217F0841999-10-0808 October 1999 Informs That During 466th Meeting of ACRS on 990930-1002, CEOG Proposal to Eliminate PASS from Plant Design & Licensing Bases for CEOG Plants,Were Reviewed.Discussion & Recommendations,Listed ML20217C5311999-10-0808 October 1999 Notification of 991027 Meeting with Representatives of Gpu in Rockville,Md to Discuss Recent Control Rod Surveillance Performance Issues at TMI-1.Proprietary Portions of Meeting Will Be Closed to Public ML20212K8901999-10-0505 October 1999 Notification of 991027 Meeting with Util in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TM1-1 ML20216J0151999-09-29029 September 1999 Notification of 991020 Meeting in Forked River,Nj to Discuss Licensee 990922,response to NRC & Other Info Addressing Sale of Portion of Land That Is Part of Plant Site ML20216G3671999-09-10010 September 1999 Forwards CNWRA Program Manager Periodic Rept (Pmpr) for Period 990731-0827 ML20210U7571999-08-20020 August 1999 Forwards Info Received from Gpu Nuclear,Inc on 990820 in Preparation for 990823.Requests Info Be Docketed ML20210C9991999-07-22022 July 1999 Revised Notification of 990813 Meeting with Gpu Nuclear,Inc Rockville,Maryland to Discuss TMI-1 Licensing Action Status. Meeting Date Changed ML20210E9511999-07-12012 July 1999 Notification of 990805 Meeting with Representative of Gpu Nuclear,Inc in Rockville,Md Re Plant,Unit 1 Licensing Action Status ML20212H9621999-06-23023 June 1999 Revised Notification of Meeting with Gpu Nuclear,Inc to Discuss Proposed Mods to RBS Sys Procedures & HPI Cross Connect Lineup.Meeting Rescheduled to 10 A.M. on 990713 ML20195H8521999-06-18018 June 1999 Requests That Encl Questions,Faxed to Gpu Nuclear,Inc on 990616,be Docketed,In Preparation for Forthcoming Conference Call Re TS Change Request 248, Remote Shutdown Sys, ML20195H9911999-06-15015 June 1999 Notification of 990707 Meeting with Util to Discuss Licensee Proposed Mods to Reactor Bldg Spray Procedures & High Pressure Injection Cross Connection Lineup ML20206F2921999-05-0505 May 1999 Forwards Draft Questions Which Were Faxed to Licensee for TMI Unit 1,GPUN on 990505 in Preparation for 990506 Conference Call on TS Change Request 279 ML20206D1291999-04-28028 April 1999 Notification of 990507 Meeting with Gpu Nuclear,Inc in Rockville,Maryland to Discuss Three Mile Island,Unit 1 Licensing Action Status ML20205N3161999-04-0909 April 1999 Notification of Significant Licensee Meeting 99-19 with Util on 990423 to Discuss Emergency Feedwater Flow Discrepancies ML20197G6381998-12-0707 December 1998 Forwards Program Manager Period Rept (Pmpr) for Period 981024-1120 ML20196E2801998-11-30030 November 1998 Discusses Closeout of TAC MA1607 Re Cross Potential for common-cause High Pressure Injection Pump Failure IR 05000289/19983011998-11-0404 November 1998 Forwards NRC Operator Licensing Exam Rept 50-289/98-301 with as Given Written Exam for Tests Administered on 980824-27 at Facility ML20154G3451998-10-0101 October 1998 Rev 2 to Notification of Significant Licensee Meeting 97-73 on 981023 in King of Prussia,Pa to Discuss Actions Taken Re Engineering Corrective Action Performance Assessment Team Findings ML20153D9681998-09-24024 September 1998 Notification of 981006 Meeting W/Gpu Nuclear,Inc in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20237E8381998-08-28028 August 1998 Notification of 980917 Meeting W/Gpu Nuclear,Inc & Amergen in Rockville,Md to Discuss Sale & Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen ML20237E4591998-08-20020 August 1998 Submits Rev 1 to Notification of Significant Licensee Meeting 98-73 W/Util in Middletown,Pa to Discuss Actions Taken Re Engineering Corrective Action PA Team Findings. Meeting Postponed ML20237C9401998-08-14014 August 1998 Notification of Significant Licensee Meeting 98-73 on 980828 W/Gpu Nuclear,Inc in Middletown,Pa to Discuss Actions Taken Re Engineering C/A Performance Assessment Team Findings ML20247M2191998-05-19019 May 1998 Notification of 980604 Meeting W/Gpu Nuclear Inc in Royalton,Pa to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20216B6871998-05-0808 May 1998 Notification of 980527 Meeting W/Representative of Gpu Nuclear,Inc in Rockville,Md to Discuss Licensee 980324 Submittal Re Control Room Habitability at TMI-1 IR 05000289/19980991998-02-26026 February 1998 Notification of Significant Licensee Meeting 98-22 W/Util on 980318 to Discuss SALP for Period Covering 960805-980124,as Documented in SALP Rept 50-289/98-99 IA-98-345, Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 11998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20154B7931998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20199H6701997-11-20020 November 1997 Notifies of 971212 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability at Unit 1 ML20199E7071997-11-14014 November 1997 Revised Notification of 971119 Meeting W/Gpu Nuclear Corp,In Rockville,Md to Discuss Control Room Habitability at TMI-1 Nuclear Facility.Meeting Cancelled Until Further Notice ML20199B3111997-11-0606 November 1997 Notifies of 971119 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability ML20212G9531997-11-0505 November 1997 Forwards Gpu SE Re Review of AP600 Shutdowm Ts.Section B.3.9.4 of STS Cites Gpu Nuclear SE 0002000-001 Rev 0,880520 as Ref E Temporary Containment Penetration Closure Devices Equivalent to Valve or Blind Flange ML20216E9871997-09-0808 September 1997 Notification of 970910 Meeting W/Util in Rockville,Md to Discuss Potential Dose Consequences from Postulated Steam Line Break & Postulated Accident Sys Leakage Limits ML20149D8881997-07-11011 July 1997 Notification of Significant Licensee Meeting 97-86 W/Util on 970725 in King of Prussia,Pa to Discuss Apparent Violations Re Failure to Recognize General Emergency Condition During 970305 Exercise ML20140G6231997-06-0505 June 1997 Notification of 970716 Meeting W/Gpun in King of Prussia, Pennsylvania for Presentation & Discussion Re Root Cause Determination for Recent QC Issues Performed by Gpun Per NRC CAL ML20151U4191997-05-23023 May 1997 Discusses Review of Two Addl Concerns Identified in 970407 Memo to Recipient from Special Insp Branch Re Addl Open Items Associated W/Dec 1996 Design Insp Rept 50-289/96-201 ML20148D9851997-05-21021 May 1997 Notification of Significant Licensee Meeting 97-57 W/Util on 970528 to Discuss Formal Exit Meeting for Licensee Remedial Emergency Preparedness Exercise on 970513 & Licensee Discussion Re NRC CAL ML20141E5381997-05-15015 May 1997 Notification of 970530 Meeting W/Representatives of Gpu Nuclear Corp in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 ML20138D3161997-04-21021 April 1997 Notification of Significant Licensee Meeting 97-47 W/Util on 970430 to Discuss Root Cause Analysis of 970305 Emergency Preparedness Drill Weaknesses ML20140D5251997-04-18018 April 1997 Notification of 970502 Meeting W/Util in Rockville,Md to Discuss Schedules & Resolution of Issues Relating to Thermo-Lag Fire Barriers ML20135F8801997-03-0404 March 1997 Notification of Significant Licensee Meeting 97-27 W/Util on 970317 to Discuss Emergency Preparedness Insp Exit Meeting ML20138M3111997-02-20020 February 1997 Notification of 970306 Meeting W/Gpu in Rockville,Md to Discuss Three Mile Island,Unit 1 Reactor Pressure Vessel pressure-temp Limit Curves ML20147D8391997-02-12012 February 1997 Notification of 970220 Meeting W/Util Representatives in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 Facility ML20133Q3031997-01-16016 January 1997 Notification of Significant Licensee Meeting 97-08 W/Util on 970131 in Middletown,Pa Re Safety Sys Functional Insp Exit Meeting ML20149M0471996-12-10010 December 1996 Forwards Internet Mail Received from PM Blanch ML20129K3731996-11-21021 November 1996 Notification of 961126 Meeting W/Gpun in North Bethesda,Md to Discuss TMI-1 SG Issues ML20135B0871996-11-15015 November 1996 Notification of Significant Licensee Meeting 96-118 W/Util on 961122 to Discuss Plant Motor Operated Valve Testing Program self-assessment ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20136E3011996-10-31031 October 1996 Forwards Schedule for Activities at Plant for Next Few Months ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20128G1661996-10-0303 October 1996 Summarizes 960924 Meeting W/Gpu Nuclear Corp in Rockville,Md Re Preliminary Responses to Staff RAI Concerning Request to Change EALs for TMI-1.List of Participants & Copy of Preliminary Response to RAI Encl 1999-09-29
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217C5311999-10-0808 October 1999 Notification of 991027 Meeting with Representatives of Gpu in Rockville,Md to Discuss Recent Control Rod Surveillance Performance Issues at TMI-1.Proprietary Portions of Meeting Will Be Closed to Public ML20217F0841999-10-0808 October 1999 Informs That During 466th Meeting of ACRS on 990930-1002, CEOG Proposal to Eliminate PASS from Plant Design & Licensing Bases for CEOG Plants,Were Reviewed.Discussion & Recommendations,Listed ML20212K8901999-10-0505 October 1999 Notification of 991027 Meeting with Util in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TM1-1 ML20216J0151999-09-29029 September 1999 Notification of 991020 Meeting in Forked River,Nj to Discuss Licensee 990922,response to NRC & Other Info Addressing Sale of Portion of Land That Is Part of Plant Site ML20216G3671999-09-10010 September 1999 Forwards CNWRA Program Manager Periodic Rept (Pmpr) for Period 990731-0827 ML20210U7571999-08-20020 August 1999 Forwards Info Received from Gpu Nuclear,Inc on 990820 in Preparation for 990823.Requests Info Be Docketed ML20210C9991999-07-22022 July 1999 Revised Notification of 990813 Meeting with Gpu Nuclear,Inc Rockville,Maryland to Discuss TMI-1 Licensing Action Status. Meeting Date Changed ML20210E9511999-07-12012 July 1999 Notification of 990805 Meeting with Representative of Gpu Nuclear,Inc in Rockville,Md Re Plant,Unit 1 Licensing Action Status ML20212H9621999-06-23023 June 1999 Revised Notification of Meeting with Gpu Nuclear,Inc to Discuss Proposed Mods to RBS Sys Procedures & HPI Cross Connect Lineup.Meeting Rescheduled to 10 A.M. on 990713 ML20195H8521999-06-18018 June 1999 Requests That Encl Questions,Faxed to Gpu Nuclear,Inc on 990616,be Docketed,In Preparation for Forthcoming Conference Call Re TS Change Request 248, Remote Shutdown Sys, ML20195H9911999-06-15015 June 1999 Notification of 990707 Meeting with Util to Discuss Licensee Proposed Mods to Reactor Bldg Spray Procedures & High Pressure Injection Cross Connection Lineup ML20206F2921999-05-0505 May 1999 Forwards Draft Questions Which Were Faxed to Licensee for TMI Unit 1,GPUN on 990505 in Preparation for 990506 Conference Call on TS Change Request 279 ML20206D1291999-04-28028 April 1999 Notification of 990507 Meeting with Gpu Nuclear,Inc in Rockville,Maryland to Discuss Three Mile Island,Unit 1 Licensing Action Status ML20205N3161999-04-0909 April 1999 Notification of Significant Licensee Meeting 99-19 with Util on 990423 to Discuss Emergency Feedwater Flow Discrepancies ML20203E0321999-02-11011 February 1999 Staff Requirements Memo Re 990211 Affirmation Session in Rockville,Md (Open to Public Attendance) Re Secys 99-044 & 99-045 ML20197G6381998-12-0707 December 1998 Forwards Program Manager Period Rept (Pmpr) for Period 981024-1120 ML20196E2801998-11-30030 November 1998 Discusses Closeout of TAC MA1607 Re Cross Potential for common-cause High Pressure Injection Pump Failure IR 05000289/19983011998-11-0404 November 1998 Forwards NRC Operator Licensing Exam Rept 50-289/98-301 with as Given Written Exam for Tests Administered on 980824-27 at Facility ML20154G3451998-10-0101 October 1998 Rev 2 to Notification of Significant Licensee Meeting 97-73 on 981023 in King of Prussia,Pa to Discuss Actions Taken Re Engineering Corrective Action Performance Assessment Team Findings ML20153D9681998-09-24024 September 1998 Notification of 981006 Meeting W/Gpu Nuclear,Inc in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20237E8381998-08-28028 August 1998 Notification of 980917 Meeting W/Gpu Nuclear,Inc & Amergen in Rockville,Md to Discuss Sale & Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen ML20237E4591998-08-20020 August 1998 Submits Rev 1 to Notification of Significant Licensee Meeting 98-73 W/Util in Middletown,Pa to Discuss Actions Taken Re Engineering Corrective Action PA Team Findings. Meeting Postponed ML20237C9401998-08-14014 August 1998 Notification of Significant Licensee Meeting 98-73 on 980828 W/Gpu Nuclear,Inc in Middletown,Pa to Discuss Actions Taken Re Engineering C/A Performance Assessment Team Findings ML20248H7001998-05-20020 May 1998 Staff Requirements Memo Re SECY-98-071,exemption to 10CFR72.102(f)(1) Seismic Design Requirement for TMI-2 ISFSI ML20247M2191998-05-19019 May 1998 Notification of 980604 Meeting W/Gpu Nuclear Inc in Royalton,Pa to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20216B6871998-05-0808 May 1998 Notification of 980527 Meeting W/Representative of Gpu Nuclear,Inc in Rockville,Md to Discuss Licensee 980324 Submittal Re Control Room Habitability at TMI-1 IR 05000289/19980991998-02-26026 February 1998 Notification of Significant Licensee Meeting 98-22 W/Util on 980318 to Discuss SALP for Period Covering 960805-980124,as Documented in SALP Rept 50-289/98-99 ML20154B7931998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 IA-98-345, Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 11998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20199H6701997-11-20020 November 1997 Notifies of 971212 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability at Unit 1 ML20199E7071997-11-14014 November 1997 Revised Notification of 971119 Meeting W/Gpu Nuclear Corp,In Rockville,Md to Discuss Control Room Habitability at TMI-1 Nuclear Facility.Meeting Cancelled Until Further Notice ML20199B3111997-11-0606 November 1997 Notifies of 971119 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability ML20212G9531997-11-0505 November 1997 Forwards Gpu SE Re Review of AP600 Shutdowm Ts.Section B.3.9.4 of STS Cites Gpu Nuclear SE 0002000-001 Rev 0,880520 as Ref E Temporary Containment Penetration Closure Devices Equivalent to Valve or Blind Flange ML20216E9871997-09-0808 September 1997 Notification of 970910 Meeting W/Util in Rockville,Md to Discuss Potential Dose Consequences from Postulated Steam Line Break & Postulated Accident Sys Leakage Limits ML20149D8881997-07-11011 July 1997 Notification of Significant Licensee Meeting 97-86 W/Util on 970725 in King of Prussia,Pa to Discuss Apparent Violations Re Failure to Recognize General Emergency Condition During 970305 Exercise ML20140G6231997-06-0505 June 1997 Notification of 970716 Meeting W/Gpun in King of Prussia, Pennsylvania for Presentation & Discussion Re Root Cause Determination for Recent QC Issues Performed by Gpun Per NRC CAL ML20151U4191997-05-23023 May 1997 Discusses Review of Two Addl Concerns Identified in 970407 Memo to Recipient from Special Insp Branch Re Addl Open Items Associated W/Dec 1996 Design Insp Rept 50-289/96-201 ML20148D9851997-05-21021 May 1997 Notification of Significant Licensee Meeting 97-57 W/Util on 970528 to Discuss Formal Exit Meeting for Licensee Remedial Emergency Preparedness Exercise on 970513 & Licensee Discussion Re NRC CAL ML20141E5381997-05-15015 May 1997 Notification of 970530 Meeting W/Representatives of Gpu Nuclear Corp in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 ML20138D3161997-04-21021 April 1997 Notification of Significant Licensee Meeting 97-47 W/Util on 970430 to Discuss Root Cause Analysis of 970305 Emergency Preparedness Drill Weaknesses ML20140D5251997-04-18018 April 1997 Notification of 970502 Meeting W/Util in Rockville,Md to Discuss Schedules & Resolution of Issues Relating to Thermo-Lag Fire Barriers ML20135F8801997-03-0404 March 1997 Notification of Significant Licensee Meeting 97-27 W/Util on 970317 to Discuss Emergency Preparedness Insp Exit Meeting ML20138M3111997-02-20020 February 1997 Notification of 970306 Meeting W/Gpu in Rockville,Md to Discuss Three Mile Island,Unit 1 Reactor Pressure Vessel pressure-temp Limit Curves ML20147D8391997-02-12012 February 1997 Notification of 970220 Meeting W/Util Representatives in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 Facility ML20133Q3031997-01-16016 January 1997 Notification of Significant Licensee Meeting 97-08 W/Util on 970131 in Middletown,Pa Re Safety Sys Functional Insp Exit Meeting ML20149M0471996-12-10010 December 1996 Forwards Internet Mail Received from PM Blanch ML20129K3731996-11-21021 November 1996 Notification of 961126 Meeting W/Gpun in North Bethesda,Md to Discuss TMI-1 SG Issues ML20135B0871996-11-15015 November 1996 Notification of Significant Licensee Meeting 96-118 W/Util on 961122 to Discuss Plant Motor Operated Valve Testing Program self-assessment ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20136E3011996-10-31031 October 1996 Forwards Schedule for Activities at Plant for Next Few Months 1999-09-29
[Table view] |
Text
.
l . .
gc * ' t ,: *: ;
F ;4.yJftCL, "i
2 g I WIY l
l
rjt:::
,i f l' ,
s
? . .;.
l C; .
i UMTED STATES l
NUctEAR REGUtATORY COMMISSloN 4.~ wasmwaren, o. c. nm l Yh E
l '! F i
o c.cc m zsecarta v September 26, 1975 l]...
i ., ME)!ORANDU>l FOR: Lee V. Gossick, Executive F Director for Operations i
FRO >!: Samuel J. Chilk, Secretary b
SUBJECT:
SECY - INV;0 R T THE ALLEGED SECURITY PROBLEM AT THREE MILE ISlAh y LEAR POWER STATION l
Attached are comments by members of the Commission concerning the proposed NRC responses to Senator Schwei*aer and Mr. Nader, Included are comments on the letters and enclosed investigation reports, ricase review the draft responses and the report for incorporation of these comments.
The revised letter and enclosures should be returned for Commissioner !
action by October 3, 1975.
Attachments:
Commissioner Comments cc:
Chairman Anders Commissioner Rowden
. Commissioner Mason Commissioner Gilinsky Commissioner Kennedy Director, Inspection 6 Enforcement ) '
Director, Nuclear Reactor Regulation Director, Standards Development
. Executive Legal Director l
i
(
y -y i( $96/Z00 VA / VAT) gri- 251
~
l ]!-
1 A, .
l __
i i
('
)
h
! '. 1-:onorable Richarda. S. Schweiker *
.f .
~
i tie appreciate your concerns as it is cur belief that physical protection i
p'rogra=s for nuclear power reactors =est be carefully for=ulated.
l cvaluated, i=ple=ented and inspcceed, tie consider adequate physical I
- security to be a =atter of high priority.
4 Thank you for your interest in this =atter. .
i j Sincerely,
}
1
' William A. Anders Chair =an
Enclosure:
Investigation Report No. 50-289/75-18 1
1 7 F.' M 3 4
e
-~~ - - __ _ _ _ _ _ _ _ ,
, Ol.
.- . g
- 4 .- ,
\(
\t i
".r. Ralph Nader 2000 "P" Street, N.U. -
' 7th Floor '
Usshington, D.C. 20036
)
Dear Mr. Nader:
This is 1. rasponse to your letter of June 4.1775, in which you request an investigation of security operations at all nucle:r power 4
plante. Your request is prompted by " ... the serious probic:s at Three Mile Island and M111stene."
i a
- j j
An investigation has been co:pleted of the z.llegations cade by the two former watchmen who were e= ployed at the Metropolitan Edison i
Company's Three Mile Island site. A copy of the investigation report is enclosed, We found that the physical protection progrs:s currently
&17. ,.:wt
~
th; .... w ir.s tar.: r in scets all applicable NRC requirc=ents. i m e_.
- r. -p ,.. . < --3=;;;;;;; 7, ; A I -
.+4,w < z , -<n-e 4, m M . . f.
e c 5the infractions had been identified and corrected by the c
licensye independently of the infor:ation provided by the two former e oibed itu t c d<.cc l '" **b"' p' catchmen.
eg Furthermore,theissuesofsecessandkey,[ontro1Yro ,
i identif ed and correctivo action verified as a result of URC inspections t
K~
- u. ..
.: A 4_ " [e,h,,p .
in only three nstances were Infractions note:! In the complete implementatio l F of the physical protection program; namely, the inadequ::ry of control ovar gato locks and keys, inadequacy of the system of access contrnt to prin buildings, and the entry of a watchman into the Control Room.
~
4
T 1
.:d.-r *
' l' ,
l . .
.a
[2 l -
l I
y.r. Ralph Nadar - ~2-Corrections of security itens of noncenpliance at Millotone were verified F ,
by direct observation of ERC inspeerors. Of further 1 /
interest is the fact j
e[torswere t the Millstone site o April 11, when thatourinsp/
/ {esent a//
a bonb threat and a fir of s sus icious origin occur ed. Our in pectors
/ / / /
ro eCures re utred by IEC were efficiently and effec-
/
,/velyf./ observed t..at the p/ /
ti ollowed by the utili,ty. .
(
/.c a result of the above findings and inspection efforts, ue do not consider that there are serious prob 1cus at the Three Mile Island and Millstone cites. He believe our existing inspection program is suf-10 L'tb #,a.
ficient to identify problensjand
- h% 4 im) aNs c c. in ne (o{.see.necessaryb
Due to the addition of the requirecent for reactor physical security plans in April 1974, and subsequent revisions of reactor license con-ditict.s, we have devoted special attention to the inspection of physical
- r. curity during the last year. Since March 1974,12C inspectors have devor.ed in excess of 200 can-days at forty-one plant sites inspecting phycical security. Physical security reviews and inspections are conducted __ _
Unannounced reinspections prior to the issuance of operating licenses.
at operating plants are part of our routine inspection progran.
- 77. .n . ..~-ae .
ace . .
n A
, y .s. , .
- i. -
?,.y i 5!:
- r. Ralph :tador fh" l
E te a se picmed Evve A64kle,
- f,ng.c::3h our investipA 3ations revealed ht no serious items of nonec=pliance,[ it
! L. cur belief that physical protection progre=s for nuclear power reactors t
nust be carefully formulated, evaluated, implemented and inspected. We
]
consider cdequate physical ' security to be a natter of continuing high i
priority.
l i
l j
Sincerely, l
7 T099 C C 124114em A- And ws ,
Chimn i
Enclosure:
Investigation Report No. 50-2d9/75-18 CW' r* t 4 s
- /e . . e ,' '4) s N N *O
$ ;? ct
i Q %.3 7 . ,, .c -
j l
y [h c' ,
i
,$, s,', f*
- 4 ;. .
- i.": '
l t r;.
i ; '.
a ,'
l f. Ti-4 . . .
- .g:'
p.Y j +3L i* !L
- . t
- It is suggested that the investigation report be expanded i
l from the sentence, "The causes of the layoffs were complex l
but did not relate to a lack of security consciousness by licensee management." to explain specifically why the men
- were laid off. .
?
I 1
s l
l 1
i I
! l i
t l
l I 4
I
^
i l
~
l r.
r~i.?
1 7t'. .
{ .-
t l
k< - ,.
u 1 - . -
9 d
.r i CP v' n ~g.- .~1 c, "r ,
s:
a
- h' l f.llonorable Richard S. Schwaiker -
l i 8 United States Senate
- l tu .
1 " Dear. Senator Schweiheri
?
$This ,is in response to your letter of June 6,1975, requesting an inves !
{ , ,.
h Three l k;by the !!uclear Regulatory Co:rmission of of the theallegations conl
,, fccility.
Hile Island !!uclear power Station made by two former watchmen l
{@"
k An investigation has been completed of the allegations made by the tuo former A copy of the 5 watchmen at the raetropolitan Edison's Three Mile Island site.
5 investigation report is enclosed. ,
The I:3C investigation has identified three infractions of agency regulations.
These relate to the inadequacy of control over gate locks and keys; the inadequa of the system of access control to principal buildings; and the ent'ry of a watchl into the Control Room. It should be noted that these conditions occurred 'and made their allegations.
. were corrected well before the watchmen f.
l The allegation that a gate was removed from its hinges was confirmed, thoug ;
t.. ..
The inv'estigation l the incident did not result in a threat to the plant's security.
.hfurther found that the watchmen's dismissal was not related to their l
[J' $ ' reDarding security. One allegation dealt with security conditions at anoth l ki This plant is still under 5 nuclear plant in the same Three Mile Island complex.
Other
- [c construction and is not yet subject to NRC's security requirements.
[
?. *
" allegations related to conditions, below the level of infractions, which These include the report' of corrected prior to the date of the allegations. J' ;
t . .'
M problems with the elcetronic surveillance system and the allegation( tha w
7 .
Still t several occasions, patrols,were falsely logged in as having taken place.
I( ~.' other allegations were not confirmed. The I:RC is fully satisfied that at this tw RC requirenents J time the plant's physical protection program meets all applicable i i
_ , y aa A: s aa -4.
=.'
.f[;;ay'*
i 3:.. . ; .-
2-
\
flll VQ.
Due to the addition of the requirement for reactor physica
. in April 1974, and subsequent revisions of reactor license conditions, tre have l[ devoted special attention to the inspection of physical security during the
- s. last year. Since 14 arch 1974, ilRC inspectors have devoted in excess of 200 man-
,+
~
days at forty-one plant sites inspecting physical security. Physical security reviews and inspections are ' conducted ' prior to the issuance of operating licenses.
Unannounced reinspections at operating plants are part of our routine inspectica program. .
- g,
.y
!!e appreciate your concerns. It is our belief that physical protection programs
' ). for nuclear power reactors must be carefully formulated, evaluated, implemented and inspected. lie consider adequate physical security to be a matter of -
high priority. .
Thank you for your interest in this matter. .
Sincerely, !
\
115111am A. Anders
Enclosure:
Investigation Report f;o. 50-289/75-18 6
9
':3 c 97,-(6 4/s M,
- s. '
s
=^-
.,;* Qig -~m.:y E' y@;.
- , ~.~;.r;;~y.;;;f3!i
- @y.y,,
W ? ;il .y.y..y. . .. I . . . .
y
- ,b.#@,?".;' .5 ycs y' > .Q; ;L Q}lqif. WD- .
+ :. . . aMwr;. ; p.
y A
- 9 p., 4~.y;; .y, @$ N,; &c .%~;;g ; Q e.
- ,.:.v g ,::gg; . :x. ; ,
,;;g;s;
,n. ,
.. w . s .- ' . . -
.s. w .
r.
. . ~,; ,dW +y.Q.m ,. , :t. nQ E. . .MA,W;'.;' '
. ./
.[;!c ' a . .
~ c #, . . . . c.
i lle. P.a1ph Hader? @'*
'1 9 'f - P
,.M[
EM2030>"P" Street.1H.'WN}M,'k't Q.jyEd3M: , ' - '
cW% % ::
- - ' m. '
7 th Fi cori ?': t.'d ~ Y 4 M~ ~
~n >
! M'a W T. . .. E.? .
D'~.D f?&pg Y: $VQ " Q M .:
y@Machington W pnWelQ f D. C'.720036W
Dear Mr.'.flader:
zNy
- t g ;?$gg 1,t.
uumw$w . . 0 d g:c. N ..
1 pc.w w w %p% hwu: V:
O.This is in response to your, letter'of June 4.'1975,-iri which you r'equest y,
an
.g : ~
- 4. .
, htfinvestigation of security operations at all nuclear po.wer plants._ :Your request
- da .
y;q i.s prompted byl" ... the serious problems at Three Mile Island and M111stene."
- c. .g . .,
- y . . a ,
$n 1y An inves'tigation has been completed of the allegations made by the' two former y:s '
g4', watchmen at the Metropolitan Edison's Three Mile I,sland site. A copy of the
/w,~gQ investigation' report is enclosed.
A:
.. c1 i% The flRC investigation has identified three infractions of agency regulations. -
.h' l
$. ':. These relate to the inadequacy of control over gate locks and keys; the inadequacy 1, .
i ( ., of the system of access control to principal buildings; and the entry of a uatchmn 4
into the Control Room. It should be noted that these conditions occurred and 4
.;6 were corrected well before the watchmen made their allegations. .
M
'.: g . .
R7The allegation that a gate was removed from its hinges was confirnied, though .
llr:'.
,. the incident did not result in a threat to the nlant's security. .~ The investigation .
, - + .
.w .
. .~ . ..
- .- further found that the watchmen's dismissal was not related to their complaint hi
? .'f[; -.h<- regarding security [ One allegation v .. .
nuclear' plant in the same Three Mile Island complex. This plant is still,under 1lt.
b construction and is not yet subject to tiRC's security requirements.' Other' v .
M..W - allegations related to cor$ditions, below the level of infr e w
corrected' prior to th'e date of the allegations. 'These include the report of d .4:,v ., 1., c. .. :< 1 dr . . .n4. ..
h; i
f iproblems with.theTelectroni.c -c surveillance system and the allegation that on &
i i ; .;q;p..:.. w >
m ? % .. . i3mv , L%
M;%:.y 'i.";f o;ns ,t patrol s were,fal selyes.l having ogged .i k,4y severa11occas _taken place. Stiil N
kNV%4afog ere'nobconfirmed.i thertallegations w%%%),5.Mihi&Th'e:t:P.C :tw%:4.:is~ 4.f.y.eM.%.+.
fully' satisfied that at this
es
~
i."1 inspectors have also verified the correction of certain items of non-cceplience i; the physical security progrcm at f4illstone.
On to the addition of the requirement for rea: tor physical security plans in April 1974. und subsequent revisions fo reactor license conditions, we have ,
davoted special attention to the inspection of physical security during the last l
)
year. Since flarch 1974, ICC inspectors have devoted in excess of 200 man-days l J
at forty-cne plant sites inspecting physical security. Physical security reviews ]
and inspections are conducted prior to the issuance of operating licenses.
Unannounced reinspections at operating plants are part of our routine inspection program.
As a result of the above finding,I and inspection efforts, we do not consider that there are serious security problems at the Three flile Island and fillistone sites. l
!!a believe our inspection program is able to identify problems and-insure necessary 'orrective action in a timely manner. l 1:e appreciate your concerns. It is our belief that physical protection programs for nuclear power reactors must be carefully formulated, evaluated, implemented and inspected. !!e consider adequate physical security to be a matter of high nriority.
Thank you for your interest in this patter.
Sincerely, ch
! llliam A. An:!ces r*Q,'
- Chaircan Enclosura:
Investigation P.eport l1o. 50-289/75-18 -
/ -
3 September 1975 l
1 '
- I i
FROM: Comissioner Gilinsky .
SUBJECT:
Coments on SECY 75-454. Three title Island Investigation _
i
- 1. Page 24. Apparently the jobs offered to the men were indeed i
comparable to their jobs at TMI. The text, however, indicates only that the salaries were the same and that the location of the offered jobs were nearby. The fact that the jobs were comparable in all respects should be expressly stated.
- 2. Page 29. The first paragraph of subsection "c" should be rephrased. Ilhile it is. technically true that the allegations ,
were not borne out because the records were falsified by certain guards, rather than guard serceants,it is misleading to state that there is'no basis" for the allegations. This paragraph ,
should acknowledge that falsifications were made, though not, as Darcy and Shapiro alleged, by BISS sergeants.
~_
su
- 3. Pages 33-39. This section, especially subsection c on page 39, should be reworked to explain why certain witnesses were believed while others were not,and a coherent statement of what we*think N
1.appened should be given. Secondly, the failure to interview w t N i tiitness Q" as to whether he ser arried fir 4rms should bk. g, s
explained. Third, the identity (letter designation) of the two
. . ~ _ _ _ _ _ _ _ _ _ . . . _ _ . _ . . . _ _ . . _ _ _ _ _ _ . . _ _ . . _ _ . _ _ _ . _ . . _ _ . _ _ _ . _ _ _ _ _ _ _ _ . .
i w.
I l
i l
guards who apparently failed the firearms training course should i
j be stated so that it can be determined whether they ever carried -
firearms. Finally, evidence fro.i the 'og indicating which guards l l
! , stare issued firearms should be included to corroborate our view i
i of the facts. -
i.
l
~
cc: S.J. Chilk, SECY 'i i
i i
i i .
'J i
72-263 -
1 i
J l
i - .-
UNITED STATES NUCLEAR REGULATORY CO .1MISS10N W ASHINGTON. D. C. 20585 1
CPPl:C OP THE COMMISSIONER August 28, 1975 NOTE FOR COMMISSIONER MASON:
- SECY-75-454 IN" STIGATION OF THE ALLEGED SECURITY PROBLEM AT THPEE-MILE ISLAND This package contains two letters - one to Senator Schweiker; the other to Nader, both of which were related to the Three-Mile Island station. (I should mention that Nader also referred to the security problem at Millstone.) I think that both letters are acceptuble. However, I would add the following paragraph as a third paragraph to Senator Schweiker's letter which would state rg"Due to the addition of the requirement for reactor physical security plants in April, 7 1974, in subsequent revisions of reactor license conditions, we have devoted special attention to the inspection of physical security at all plants Since March, 1974, NRC during the lost year.
inspectors have devoted an excess of 200 man days at 41 plant sites inspecting physical security. Physical security reviews and inspections j are conducted prior to the issuance of operating licensus, and continued unannounced reinspections i f
e occur at operating plants."