ML20129H165

From kanterella
Jump to navigation Jump to search
Partially Withheld Application for M Kending for Reactor Operators License Examination
ML20129H165
Person / Time
Site: Crane  Constellation icon.png
Issue date: 01/31/1979
From: Kendig M
METROPOLITAN EDISON CO.
To: Collins P
Office of Nuclear Reactor Regulation
Shared Package
ML20125B444 List: ... further results
References
FOIA-96-207 NUDOCS 9610080031
Download: ML20129H165 (3)


Text

-.-~. _

..~.....-...z.-...

A 4

m--A na,

_,y

/

}ej2 sw

\\

/

T.:::p,.~,-m METROPOLITAN EDISON COMPANY POST OFFICE DOX 480 MIDDt.ETOWN PENNSYLVANIA ~7057 1ELLPHONE 717.tM4 4011 January 31,19/9 l

f1r. Paul F. Co11tns

.nf m tion in this record was ge;et U.S. fluclear Regulatory Conraission in accordance Wit the fre 0"UIOMJllua Office of fluclear Reactor Regulation Act, exeAptions Washington, D.C.

20555 f0lA. M G-3cq

Dear fir. Collins:

Picate consider this application for a Reactor Operator's License examination.

in accordance with Section 55.10 of 10CFR55, the following information is sub-mitted:

1.

flame: flichael P. Kendio EK Q Age:

Present Employment: Metropolitan Edison Company, Three flile Is. land fluclear Station, Unit I.

2.

a) Education:

m 1.

Ullson liigh School h

Graduated - West Lawn, a.

b) Experience:

Auxiliary Operator "C" (6/10/75 - 6/13/76) Hetropolitan Edison 1.

Company Th:ce Mile Island fluclear Statinn, Unit !.

fly experienr.e es an Auxiliary Operator "C" fluclear included qualifying in secondary systems, operating procedures and alarm I also operated the secondary systens and equipment responses.

for plant startups and shutdrn<ns and performed switching and taDging.

Auxiliary Operator "B" (6/14/76 - 6/12/77) Metropolitan Edison 2.

Company, Three fille Island fluclear Station Unit 1.

fly experience as an Auxiliary Operator "C" fluclear included p

qualifying in primary systens, operating procedures and alarm h g ary systems and equipment for responses.

I also operate 9610080031 960924 PDR FOIA DEKOK96-207 PDR

c

- Hr. Paul F. Collins January 31, 1979 plant startups and shutdowns and perforned switching and tagging.

3.

Auxiliary Operator "A" - flucicar (6/13/77 - 7/16/78) 11etropolitan Edison Company, Three fille Island fluclear Station, fliddletown, Pa.

!!y experience as an Auxiliary Operator "A" Nuc1 car included studying systems and operating procedures and alarm responses.

I ahve also operated systems and equipnent for p1=nt startups and hsutdowns and performed switching and tagging.

4.

Control Room Operator - flucicar (7/17/78 - f. resent) fletropoli t.in Edison Company Three Mile Island flucicar Station, Unit I, fliddle-town, Pa.

Experience as a Control Room Operator - fluclear consists of studying plant systems, operating procedures and alarm responses, operating systens and equipment for plant startups and shutdowns, and directing the efforts of others in this direction and performed switching and ta gg is '-).

3.

Previous Operator's License flumber - flone 4.

License is requested to operate a pressurized water reactor; lietropolitan Edison Company, Three title Island fluclear Station, Unit I.

5.

See attached letter.

6.

See Enclosure !.

7.

lledical examination will be forwarded under separate cover.

Sincerely yours,

~');G, /i lI j.D $l...

y Michael P. Kendig MPK/drg Enclosure T 210

6 ENCL 0stlRE I TRAlfilflG PROGRAll J

Received by:

Michael P. Kendig The general outline of Mr. Kendig's training follows:

Auxiliary Operator "B" Training Progr_am (07/07/75 - 05/14/76) (512 hrs) 1.

A.

tiechanical Fundamentals B.

Secondary Systems C.

Electrical Systems D.

On the Job Training AuxiliaryOperator"C"YearlyReview(05/17/76-05/21/76)(40 hrs) 2.

Auxiliary Operator "A" Nuclear Training Program (06/14/76 - 06/12/77) (1040 hr 3.

A.

flath (80 hrs)

Atonic Physics (20 hrs))

8.

!!uclear Physics (60 hrs C.

D.

Reactor Operations and Kinetics (140 hrs)

E.

Core Perfornance (60 hrs)

PlantChenistry(40 hrs)(20 hrs)

F.

fluclear Instrumentation G.

11. Radiatien Protection (80 hrs)

Plant Operation (40 hrt)

Studied prinary)and secondary systems and operation I.

J.

basis. (500 hrs Category IV CR0 Program (7/17/78 - Present) (!!!nimum 800 hrs) 4.

Guideline Attached PWR Simulator Training Program (02/12/79-02/23/79) (80 hrs) 5.

I will have completed a two week course in operator training on the Babcock l

and tillcox Nuclear Power Plant Simulator at Lynchburg, Va. prior to my A copy of the Startup Certification letter and copies of licensing exam.

the simulator training evolutions performed and classroom training will be forwarded to you by Babcock f.lificox.

+

-3 211

^--

- - _ _ _ _,,