ML20129G460
Text
.
i
/
N
_m #} g y
]-
i i
l METROPOLITAN EDISON COMPANY sussioranvorcustnarvoucununtsconronanon i
4 i 03T OFFICE BOX 480 MIDDLETOWN. PENNSYLVANIA 17057 TELEPHONE 717 944 4041 l
l September 14, 1978 i
\\
I f
Mr. Paul F. Collins i
U.S. Nuclear Regulatory Comission j
Office of fluclear Reactor Regulation l
Washington, D.C.
20555
Dear Mr. Collins:
i Please consider this application for a Reactor Operator's License examination.
i In accordance with Section 55.10 of 10CFR55, the following information is i
subnitted:
i 1.
flame: E 1 D. Hemila Age:
Present Employnent: Control Room Operator, Metropolitan Edison Company, i
Three Mile Island Nuclear Station. Unit II 2.
a) Education:
1.
Lincoln High School M ~)
Graduated - Esko, filiinesota
_gy
- 2. _ University of H nesota
!d'owat:r U ibs r:ccrc 7:cs den
_ - Duluth, Itinn.
m accordance.y;ti the freedom cl Intxmaar Act, e ptions 3.
fluclear Power School (19721 (6 mo)
F0lA-
-3D-)
Graduated - Bainbridge,!)o.
4.
fluclear Prototype School '1972-1973) (6 mo)
Graduated - Idaho Falls,,daho 5.
ELT School (19731 (3 mo) - Graduated Idaho Falls, Idano
,- y a
b) Experience:
$$00Mjji96o924 DEKOK96-207 PDR r
a
._ __ _ __ _ _ _. _ j g 'Mr. Paul F. Collins i
1.
U.S. Navy (1970-1976) anaMachinistMate(E-6) i 2.
Auxiliary Operator "A" (10/18/76-04/23/78), Metropolitan Edison Company. Three Mile Islam Nuclear Station. Middletown. Pa.
l
% experience as an Auxiliary u p rator "A" Nuclear included studying systems and writing operati.'s procedures and alarm i
responses.
I also operated systems ano' equipment for plant startup and acceptance testing ano perform.04 switching and 1
tagging.
l 3.
ControlRoomOperator(04/24/78-present)MetropollenEdison
)
Company. Three Mile Island fluclear Station, Unit !!, Middletown, Pa.
l l
Experience as a Control Room Operator consists of studying ple.'t i
systems, writing operating procedures and system lectures, oper-l 1
ating equipment and systems for plant startup and acceptance test directing the efforts of others in this direction, and performing i
i i
j switching and tagging, i
3.
Previous Operator License flumber - flane 4
)
4.
License is requested to operate a pressurized water reactor; Metropolitan Edison Company. Three Mile Island Nuclear Station Unit II.
l 5.
See attached letter.
6.
See Enclosure I.
t J
7.
Medical examination will be forwarded under separate cover.
i Sincerely yours, j
.J 0
[^Lm 0 Earl 0. Hamila EDH/drg Enclosures 2.165 d
i ENCLOSURE I, TRAINING PROGRAM RECEIVED BY:
Earl D. Hemmila The general outline of Mr. Hamila's training follows:
1.
AUXILIARY OPERATOR "A" NUCLEAR TRAINING PROGRAM (432 hours0.005 days <br />0.12 hours <br />7.142857e-4 weeks <br />1.64376e-4 months <br />) (11/1/76-08/30/7 a
Pri..ArySystems(152 hours0.00176 days <br />0.0422 hours <br />2.513228e-4 weeks <br />5.7836e-5 months <br />) b Advanced Health Ph'ysics (80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />) c OntheJobTraining(200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />) 2.
CATEGORYIVCR0 PROGRAM (04/24/78-present)(Minimum 800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br />)
Guideline Attached 3.
PWR SIMULATOR TRAINING PROGRAN (10/02/78-10/13/78) (80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />)
I will have completed a two week course in operator training on the 1
Babcock and Wilcox Nuclear Power Plant Simulator at Lynchburg, Va.
]
Prior to my licensing exam. A copy of the Startup Certification letter and copies of the simulator training evolutions perfomed and classroom training will be forwarded to you by Babcock and Wilcox.
l 9
i G
2.166