METROPOLITAN EDISON COMPANY sussic,uoe,+wm-veucuriurascow>wio.v 1
l POST OFFICE BOX 480 MIDDLETOWN.PENNSYi.VANIA 17057 TELEPHONE 717 944 4041 September 14, 1978 i
i Mr. Paul F. Colli..s i
U.S. fluclear Regulatory Cormnission Office of fluclear Reactor Regulation Washington, D.C.
20555 I
Dear fir. Collins:
l Picase consider this application for a Senior Reactor Operator's License t
exanination.
In accordance with Section 55.10 of 10CFR55, the following i
information is submitted:
1.
flame:
oseph B. Logan i
6Q Age:
l Present Employment: Unit II Superintendent, Metropolitan Edison Company, Three title Island fluclear Station, Unit It i
l 2.
a) Education:
Fort Smith Senior High Schoo1 Information in this record was de!ete Graduated - Fort Smith, Ark. %
n accordance wilf; the freedom of InformMion 1.
l Act, exemptions u F0lA % C D?
2.
U.S. flaval Acad D.S. in fiarine Eng neering - raduated r
i Annapolis, Md.
1 3.
U.S. flaval ?!uclear Propulsion Training - (1958) (1 year)
<4 tiew London, Conn.; Idaho Falls, Idaho a
b) Experience:
1.
U.S. rlavy
-1977)
[(
2 A r
a) Aboard USS Patrict: Henry (1959-1964) x Enqincer Officer i
i b) Aboard USS James Madison (19r4-1&) as Executive Of ficer.
9610040155 960924 PDR FOIA DEKOK96-207 pop i
fir,. Paul Collins *O'
)
l c) Aboard USS Francis Scott Key (1966-1969) as Commanding Officer.
I d) Submarine Division 62(1969-1970) as Commander.
l e) Commander Submarince Force Pacific (1973-197'6) as Assista Chief of Staff Training and Readiness.
f) Commander in Chief U.S. A1 antic Fleet (1976-1977) as Assistant Chief of Staff Current Operations l
UnitIISuperintendent(01/04/78-present) 2.
Metropolitan Edison Company, Three Mile Island Nuclear Station Middletown, Pa.
l During this period I have been studying to pass an flRC Senior Operator's License examination.
l f
3.
Previous Operator's License flumber - flone 4.. License is requested to operate a pressurized water reactor; Metropolitan 1
l Edison Company, Three Mile Island Nuclear Station Unit II.
5.
See attached letter.
l 6.
See Enclosure I.
l 7.
Medical exar.rf nation will be forwarded under separate cover.
i Sincerely yours, l
$fA"~
j/JosepI,,B.Logab j
JBL/drg i
Er. closures a
i W.i W
', ' f su 4
EllCLOSURE I I
TRAltill!G PROGRAMS RECEIVED BY:
JOSEPH B. LOGAtl l
i
- (
The general outline of Mr. Logan's training follows:
License Training Program- (minimum 400 hrs) (01/78-present) 1.
j 1.
ReactorThenry(40 hrs) 2.
llealth Physics (30 hrs) 3.
ICS (40 hrs) 4 4.
Reactor Operations (40 hrs) 5.
Systems (NSSS and Balance of Plant (194 hrs) 6.
Procedures (40 hrs) 7.
TechnicalSpecifications(16 hrs)
PWR Sinulator Training at Babcock and Wilcox Corporation with Startup Cert-1 ification (00 hrs) (Startup Certification will be forwarded by Babcock and 2.
WilcoxCorp.).
(10/02/78-10/06/78 and 10/09/78-10/13/78) i OntheJobTraining(Minimum 200 hrs) 3.
(Participated in, simulated or discussed the following:
Control Room:
Reactor Coolant System Fill and Vent - including steps to fill, vent and pressurize, running of reactor coolant pumps, and heatup to Hot Shutdown co 1.
tion.
Reactor Criticality and Power Escalation - participated in Unit Reactor Discussed 2.startup including calculation of estimated critical rod position.
rod withdrawal, chemical shim and necessary rod index for power escalation.
3.
Power Operations 1.
Leak Rate Calculations 2.
Ileat Balance Calculations 3.
Batch Feed. Batch Bleed. Feed and Bleed 1
Balance of Plant:
1.
Fuel Shuffle Reactor Buildin'; lding a.
Fuel Handling Bui b.
i y
I
p o.
hh*
SEilIOR REACTOR OPERATO?. LICEllSE PROGR/d4 FOR J. LMel 1978 The SRO Program for Mr. Logan will commence on February 20 and will terminate during the week of November 17 (tentative date) with an fiRC written and oral e. tam-ination.
i The attached schedule provides for 12 half cycle self_ study assignments Each half (See Enclosure #1), special leactures, practical evolutions and tests.
cycle assign::ient will require two weeks to cor.plete. The program will continue wit a makeup period, startup certification progran, Mock NRC written and oral examination and end with the actual ?!RC exam.
Specifically, each half cycle assignment will include:
1.
Procedure reading assignments.
Questionnaires to be completed and returned to the Training 2.
Department on or before the end of the half cycle.
Half cycle test to be taken on the last day of each half cycle.
3.
Oral exam to be given, as assig.ed, after cot.pleting each full 4.
Cral exam to be administered by the Training Departr.ent cycle.
instructors.
Practical evolution assigr v.ts (See Erclosure f 2).
Practical 5.
a.
c.olutions are to be cc.-' -H at tu ra.e of 18 poirts per two week peric:'. !bst of t a ite.s intoite either perfoming 2, j )R7 evolutions (?). Sir.ulatir,-
e f r-i ; e.":'.utions (5), or dis-
. 6 e e'.' ".1 5.
L/ b0
/
cussing the evoh.;10 6.
'.acd )..i 5-t '- F:.. 'r. or lice,ued Tr. tining citen by the 5*.ift Sure / -
Apministrator.
Where possible, lle. Logan sh:uld witness.various Unit II Fueling f
b.
and low power physics testing evalutions.
i N
l Special lectures, when assigned, are provided to assist Mr. Logan 6.
l i
in his training.
l Answering these Practice NRC exam questionnaires *as assigned).
7.
questionnaires will familiarize Mr. Logan with the type of questions associated with NRC examinations.
Following the 12 half cycle program, there is an eight week period which Since Hr. Logan may want to witness certain portions i
allow for makeup assignments.
of the Unit 11 fueling and startup evolutions, the makeup period will allow his l
However, every effort should be made to attend the i
l schedule to slip accordingly.
j classroom 1ectures as scheduled.
i Mr. Denny Boltz, Training Administrator, has been assigned as program l
Mr. Logan should' work closely with Mr. Boltz on any problems or I
ator for fir. Logan.
schedule changes.
2.18R 1
~
PROGRAM SCHEDULE 1
1978_
Assignment 31_
g Complete 1st cycle /1st half assignment 1.
Complete 18 points - practical evolution February 20-March 3 2.
3.
Assionment #2_
March 6-March 17 Complete 1st cycle /2nd half assignment Complete 18 points - practical evolutions 1.
1 2.
3.
Assignment #3 March 20-ftarch 31 Oral Exam - Cycle 1 Start 0900 l'.onday, March 20 (See D. Boltz - Training 1.
Department)
Complete 2nd cycle /1st half assignment 2.
Complete 18 points - practical evolutions 3.
(54 points total to date)
Take 2nd cy:ie/1st half test Friday, tiarch 31 4.
Assignment f4 April 3-April 14 April 4,5 and.6th - attend (8 hr/ day 1.
0730 (fl. Classroom-Training Trailer)
Complete 2nd cycle /2nd half assignment Complete 18 points - practical evolutions (72 poin 2.
3.
total to date)
Complete 2nd cycle /2nd half test Friday, April 14 4.
Assignment 65 April 17-Aprf1 28 Oral Exam - Cycle 2 Monday, April 17 (See !!elson Brown) 1.
Complete 3rd cycle /1st half assignme 2.
3.
total to date)
Complete 3rd cycle /1st half test Friday, April 28.
4.
As e nant 36
- 7 1.f!ay Complete 3rd cycle /2nd half assignmen*.
Complete 13 points - practical evolutions (103 toca 1.
2.
points to date)
Complete 3rd cy le/2nd half test Frtusy, May 12 3.
g;jpg
ssignment a7_
' 26' G i Oral Exam Cycle 3
[j)$ )8 Honday, May 15 (See Denny Boltz) tray 15-May 2 Complete 4th cycle /1st half assignment 4
?-3dComplete 18 points - practical evolutions (126 to':a1 f
ntstndate)
Hay 23 andgattend Comprehensive ICS Review Program.
Program starting at 0730 (N. Classroom-Training Trailer
/
)
5.
Complete 4th cycle /1st half test Friday, May 26.
FM;,29(Holiday)
Assignment #8 lby 30-June 9 Complete 4th cycle /2nd half assignment 1.
Complete 18 points - practical evolutions (144 total 2.
pointstodate)
Attend Compreherisive HP and Rad Monitoring Training 3.
Program June 5, 6, and 8.
Program will begin at 0730 in the Training Trailer North Classroom 4.. Complete 4th cycle /2nd half test Friday, June 9 June 12-June 23 Assignment 79 1.
Oral Exam Cycle 4 Tuesday, June 13 (See Helson Brown)'
Complete 5th cycle /1st half assignment 2.
Complete 18 points - practical evolutions (162 total 3.
points to data)
Cecture wf11
/
June 20 - Attend Heat Transfer Lecture.
4.
start at 0730 in the Training TraiTer North classroom 5.
Complete "0 pan Book" NRC type questions - Category A, B and C 6.
Complete 5th cycle /1st half test Friday, June 23 i
Assignment #10 7
June 26-July (Holiday)
July 3 t, 4 Complete 5th cycle /2nd half assignment 1.
Complete 18 points - practical evolutions (180 tora 1 2.
points to date)
July 5 - Attend Fuel Handling / Equipment Program.
3.
Program to start at 0730 in the Training Trailer North Classroom.
Complete "Open Book" HRC questions, Category D, E and 4.
F.
5.
Complete 5th cycle /2nd half test Friday, July 7 Assiennent dil_
. 'y 10-July 21 1.
Oral E.c.. /:le 5
!!onday, July 10.
(SeeDennyBoltz)
Coviett 6th cycle /Ist half assignment 2.
Complete 13 points - practical evolutions (198 point 3.
total te date) 2'400 July 1*? ?. 13 attend Rad lias*..: (Liquid / Solid / Gas) u s11 side i. a t 000 1:a :::e Tr.it :!. -
~
Lec tur e.
eq.
Trailer ::vth :: r,srom Cor.plete "Open Cook" fiRC (1.mstions, Category G, H.u
.5.
Assignment #11_(Con'd)
ATE 6.
Complete 6th cycle /1st half test July 10-July 21 Friday, July 21 Assignment #12 July 24-August 4 Complete 6th cycle /2nd half assignment Complete 18 points - practical evolutions (216 points 1.
2.
total to date)
Complete "Open Book" flRC Questions, Category J, K a 3.
i L
k; gust 3 - Attend Nuclear Instrumentation Lecture.
4.
Program will start at 0730 in the Training Trailer North Classroom Complete 6th cycle /2nd half test Friday, August 4.
S.
Assignment #13 August 7-September 29 Oral Exam Cycle 6 '
1.
Monday, August 7 (See Denny Boltz)(date pending)
Attend Standard Tech Spec Program 2.
Complete 35 points - practical evolutions..
3.
- 4. Makeup period October 2-October 13 Assignment #1_4_
Attend Startup Certification Program - BN Simulator, 1.
Lynchburg,Va.(datepending)
October 16-October 20 Assignment J15_
1.
IIRC liock Written and Oral exam Written Tuesday October 17 a.
b.
Oral during the week of October 16 l
Assignment #16
!{ovember 13-November 17 HRC Written and Oral Exam (date pending) 1.
2: 191
..