ML20129G431
Text
- _ _ _. _ _. _
=+i g
(-
BC L~.
a j
i METROPOLITAN EDISON COMPANY suosrow > wanuuwcurtura:couannot-i,'
,,L POGT OFFICE BOX 480 MIDDLETOWN. PENNSYLVANIA 17057 TELEPHONE 717.h4041 f
/
- L.
Septenber 14, 1978 l\\
]A t
l Mr. Paul F. Collins
)
U.S. Iluclear Regulatory Comission Office of fluclear Reactor Regulation Washington, D.C.
20555 i
Ocar fir. Collins, Please consider this application for a Senior Reactor Operator's License examination.
In accordance with Section 55.10 of 10CFR55, the following in-format-fon is ruberitted:
1.
flame:_
i _M Present Emnloyment: Engineer II - fluclear, Metropolitan Edison Company, Three tiile Island Nuclear Station, Unit 1.
2.
(A) Education:
1 1.
Pennerest liigh Schoo" (graduated
) Lima, Pa.
AlbrightCollege(Pa.
Graduated - B.S. in 2.
Pnysics - Reading, 3.
flavy Electronics "A" School (12/67) (36 wks) Graduated -
Great Lakes, Ill.
4.
flavy Nuclear Power Training (5/69-5/70) (1 year) Graduated Dainbridge, Md.
5.
Basic Mag Amp Theory (10/70) Graduated
'lew London, Conn.
h -
f' a
4 eh VS 7
g3 0 3
~
2: W 9610070184 960924 PDR FOIA DEKOK96-207 PDR
Ifr.'Ppul F. Collins l
'Page.
SIpteraber 14. 1978 i
2.
(A) Education:(Con't) l 6.
flavy Periscope Photography (3/71) (1 mo) Graduated - Neu London, Conn.
i (B) Experience:
1.
U.S. flavy (1969-1972) Aboard the USS Ethan Allen as a Reactor Operator. (Last stationed on the USS Ethan Allen.)
2.
Sutuner Student tlorker (6/74-12/74) Coporate Division of Metro-politan Edison Company, Reading, Pa.
3.
Engineer Jr. (12/74-01/76) Corporate Division of Metropolitan Edison Company, Reading, Pa.
4.
Engineer II (01/76-08/76) Corporate Division of Metropolitan Edison Company, Reading, Pa.
S.
Engineer II-Nuclear (09/76-present) Metropolitan Edison Company, Three Mile Island Nuclear Station, Middletown, Pa.
As an Engineer II-fluclear I have been studying to pass an MRC Senior Operator's License exanination.
3.
Previous Operator's License flumber - fl0NE.
4.
License is reques*ed to operate a pressurized water reactor; fietropolitan Edison Company,1 ree Mile Island fluclear Station, Unit I.
5.
See attached letter.
I 6.
See Enclosure I.
7.
!!cdical examination will be sent under separate cover.
Sincerely yours.
W%S b Henry B. Shipman HOS:knr Enclosures 2 t?R l
ENCLOSURE I TRA!NIrlG PROGRAttS RECEIVED BY:
HENRY 8. SHIPMAtl The general outline of Mr. Shipman's training follows:
1.
LicenseTrainingProgram(Minimum 400 hrs)(09/76-present)
Reactor Theory (40 hrs)
Health Physics (30 hrs)
ICS(40 hrs)
Reactor Operations (40 hrs)
Systems (ftSSS and Balance of Plant)(194 hrs)
Procedures (40 hrs)
TechnicalSpecifications(16 hrs) 2.
PWR Simulator Training at Babcock and thicox Corporation with St.. e Certi-fication (80 hrs) (Startup Certification will be forwarded by Babcock and WilcoxCorp).(10/16/78-10/20/78and10/23/78-10/27/78) 3.
OntheJobTraining(Minimum 200 hrs)
(Participated in, simulated or discussed the following):
Control Room:
1.
Reactor Coolant System Fill and Vent - including steps to fill, vent and pressurize, running of reactor coolant pumps, and heatup to Hot Shutdown condition.
2.
Reactor Criticality and Power Escalation - perfomed actual Unit I reactor startup and shutdown. Performed calcuation of estimated critical rod position.
Discusssd rod withdrawal, chemical shim and necessary rod index for power escalation.
3.
Power Operaftons 1.
Leak Rate Calculations 2.
Heat Balance Calculation 3.
Batch Feed, Batch Bleed, Feed and Bleed Salance of Plant:
1.
Fuol $huffle a.
Reactor Building b.
Fuel Handling Building
'?. Y
![.@'
t 2.
Instrument Air Startup/ Operation j
. Service Mr Startup/ Operation j
Powdex Operation Solid Waste Disposal System Operation j
3.
Liquid llaste Disposal System Operation i
Gas llaste Disposal System Operation l
l 4.
System Lineups l
j I
i 11akeup and Purification a.
Letdown b.
11akeup' l
c.
Seals l
f flucicar Service closed Cooling fluclear Service River Water i
Seconda'ry Service River Water Reactor Buildi,, Emergency River !!atir l
l Decay Heat River Water Decay Heat Closed Cooling ifater Secondary Service Clored Cooling 1:ater j
Stator Cooling Turbine Lube Oil Gland Steen Feedwater Condensate Heater Drain 4
Extraction Steam liain Steam l
1
.s. g, i, c;:py.gg%;::.$pyppggggqq.)gg4~p:
7,g,
.-o-
}
1 i
4 i
?
2.*7c l
i 4
i
SHIPl%H -
5RO LICEiN;a Pr.UGMAM SCHE 00tE r
. +..
SCHEDULED kssion,sig CO?@LETIOil D*TE y...M'c O
~
i 1st cyple 1st half Questionnaires Tuesday, June 13,1978 n/A Wednesday, Ju :e 14, 1978 fl. Brown 1st cycle.lst half Written Exam l
1st cyc12 2nd half Questionnaires Friday, June 23, 1978 N/A l
1st cycle 2nd half Written Exam Monday, June 25, 1978 fl. Brewn Tuesday June 27, 1978 D. Bolt:
i 1st c.vcle Oral Exam Monday July 10, 1978 C. Hartman l
ESAS Lecture 2nd cycle 1st half Questionnaires Tuesday, July 11, 1978 t;/A 2r.d cycle.lst half Uritten Exam Wednesday, July 12, 1978 ti. Brom teactor Theory Reyfew Lecture Honday, July 17, 1978 D. Boltz Reactor Theory Review Lecture Tuesday, July 18, 1978
- p. goitz Reactor Theory Review Lecture Wednesday, July 194-1978 0, go tz 2nd cycle 2nd half Questionnaires Wednesday, July 26,1978 N/A l
2nd cycle 2nd half Written Exam Thursday, July 27,1978 N. Brown l
2nd cycle Oral Exam Friday, July 28, 1978 N. Brown Monday July 21, 1978 C. Hartman RM Lecture 3rd cycle 1st half Questionnaires Thursday, August 3,1978 N/A ti. Brown 3rd cycle 1st half Written Exam Friday, August 4,1978
!!uclear Instrumentation Lecture Thursday, August 10, 1978 fl. grown 3rd cycle 2nd half Questionnaires Friday, August 11,1978
!!/A 3rd cycle 2nd half Written Exam Tuesday, August 15, 1978 ti, a own 3rd cycle Oral Exam Wednesday, August 16,1978 D. coltz ICS Iteview Lecture Thursday, Au;ust 17, 1978 ICS Review Lecture Friday, August 18. 1978 4th cycle 1st half Questionnaires Tuesday, August 22,1978 tt/A 4th cycle 1st half Written Exam Wednesday, Au;ust 23, 1978 ti. Brown Centrol Rod Drive Lec. tare Thursday August 24, 1978 C. Hartman 4th cycle 2nd half Questionnaires Honday, August 28, 1978 N/A 4th cycle 2nd half Written Exam Tuesday, August 29,1978 N. Brown Wednesday, August 30,1978 D. Bolt:
4th cycle Oral Exam Radiation Protection Lecture Thursday, August 31, 1978 R. Dubiel or Designee Friday Septcher 1,1978 R. Dubiel or Designet Portable HP Instruments Lecture Thursday, September 7,1978 ff/A 5th cycle 1st half Questionnaires l
Sth cycle 1st half Uritten Exam Friday, Septe.ber 8,1978 N. Brown Monday, Septs:bar 11,1978 F. McCormick Fuci Handling Lecture Sth cycle 2nd half Questionnaires Thursday September 14, 1978
!!/A Sth cycle 2nd half Written: Exam Friday, September 15, 1978 N. Brown Monday, Septe:ber 18, 1978 H. Brown 5th cycle, Oral Exam Thursday, September 21, 1978 H/A 6th cycle 1st half Questionnaires Friday, Septe.mber 22,1978 N. Brown 6th cycle 1st half Uritten Exam Wednesday, September 27, 1978 N/A 6th cycle '!nd half Questionnaires 6th cycle 2nd half Urltten Exam Thursday, Septr.ber 28,1978 H. Brown
)
Friday, Septs:ber 29, 1978 D. Boltz
)
6th cycle Oral Exsm Raview Category A/H fRC Exam Monday, Octcher 2,1978
!!/A 1
Questions Revleu Category B/K f1RC Exam Tuesday, October 3, 1978 II/A fiumstions Fieview Category C/J/E NRC Exam Wednesday, October 4,1978 N/A J
Questions Retica Category D/F/L MRC Exam Thursday, 0:t:ter 5,1978
!!/A
<2,181 r
l Q w tions Rev t;. Cctegory C/I !!RC Exam Friday, C:Mber 6,1973
!:/A l
Cu u ions Stana:: Certification Progran B?/I 2 e s e,te. ting Oct. 9,1978 Friday. 0:tober 20,1978
1 w j 4
SCHEDULED COMPLETION DATE IllSTRUCTOP.
~
IG M Et!T l
f 1RC !!ock }!ritten Exam Tuesday, Octcher 24, 1978 ti. Brown l
S9.0 fGC.liock ifritten Exam
}!ednesday, 0:tober 25,1978 t!. Brown j
tiRC !?ock Oral Exam Thursday, October 26,1978 (later) 1 l
IGC EXA!4S During the }.'eek Starting Nove.1ber 13,1978 l
l If *any problems arise during the program, contact the Program Coordinator, fl. Brown.
j O a i
}
l l
l 4
l I
J l
2.182