ML20128F533

From kanterella
Jump to navigation Jump to search
Partially Withheld Application for J Brummer for Senior Operator License Examination
ML20128F533
Person / Time
Site: Three Mile Island, Summer  South Carolina Electric & Gas Company icon.png
Issue date: 01/31/1979
From: Brummer J
METROPOLITAN EDISON CO.
To: Collins P
Office of Nuclear Reactor Regulation
Shared Package
ML20125B444 List: ... further results
References
FOIA-96-207 NUDOCS 9610080113
Download: ML20128F533 (4)


Text

--- - - . - -_ - -_- - - _ - . - -

. #X%. s f

. --. ..-._..-- ..-.. .. .- . ... -. ---- T~~

v6:&- A

1.
  • h .?t.V t
  • g ?, / '

i .

5 a jj .-g_- m  !

/

METROPOLITAN EDISON COMPANY m. - :" ci.m.<: '.. uc m, mu mumw' r / - --

TELEPHONE 717 944 4041 POST OFFICE DOX 480 MIDDLETOWN.PENNSYLV ANIA 17057 January 31, 1979 j Mr. Paul F. Collins U.S. Nuclear Regulatory Comission Office of fluclcar Reactor Regulation liashington, D.C. 20555

Dear Mr. Collins:

Please consider this application for a Senior Reactor Operator's 1.icense exanination. In accordance with Section 55.10 of 10CFR55, the following infomation is submitted: I 4

1. flame Jn Allen Brumer -

h Age: r Present Employment: Metropolitan Edison Company, Three Mile Island Itucicar Station, Unit II

2. a) Education:
1. Annville Cleona High School Graduated - Annville, Pa.
2. Tennessee Technilogical Univeristy Electrical Engineering - Graduated, okevill Tenn.

l b) Experience:

ical University f, 1. Tennessee Ter.hnilok11e, Tenn.

Caretaker - Cookev . formation m. this record was de Of Informatic Tennessee Technilogical University t exe pt on 2.

Proctor - Cookeville, Tenn. f0lA. - c77/ _

l 3. Engineer Jr. (3/74 - 6/75) - lictropolitan Edison Company Three fille Island flucicar Station, Middictown, Pa.

4. Engineer I (7/75 - 12/76) fletropolitan Edison Company.

Three !!ile Island Ifucicar Station, lliddletown, Pa. p' 9610000113 960924 PDR FOIA DEKOK96-207 PDR

s January 31, 1979 l

. tir. Paul F. Collins f

S. Engineer II (1/77 - present) - tictropolitan Edison company, 1 Three title Island Nuclear Station, fliddletown, Pa.

i As an Engineer II, I have been involved with the Unit II PORC which has approved the Operatirg Procedures, which are associated i itith the nuc1 car safety of the Unit, Surveillance Procedures and Unit Energency and Abnornal Procedures. l Ilhile holding this position I have also been responsibic for writing ,

and reviewing some of the Operating and Survie11ance Procedures ase.ociated with Instrumentation and Control dealing with such systems l

a', the Reactor Protection System, fluclear Instrumentation System, i flon-fluclear Instrumentation System, Radiation Monitoring System, and Engineered Safety Features System to mention a few. 1 l

During the startup and test phases of Unit II, I was responsible for  !

performing the Test Procedures associated with the Radiation 11onitoring System. In addition, during the Power Escalation Phase I was the  !

ICS Tuning Coordinator responsible for tuning associated with the Unit II Integrated Control Systen, which required constant interface j

with the Control Room.

Previous Opeartor's License flumber - flone. l 3.

4. License is requested to operate a pressurized water reactor; fietropolitan Edison Conpany Three Mile Island fluclcar Station, Unit II.
5. See attached letter.
6. See Enclosure 1.
7. liedical exanination will be forwarded under separate cover.

Sincerely yours,

$. buw i ^~

John A. Brummer JAD/dra Enclosure 4

,9~222

.[',

!:s

',6 ErlCLOSURE I TRAlfilflG PROGRAff RECEIVED BY:

John A. Drumer

The general outline of Mr. Drummer's training follows:

1. License Trainin Program (minimum 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />)(1/2/79present)

Reactor Theory 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />)

Health Physics 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />) l ICS (40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />)

Reactor Operations (40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />)

Systems (flSS and BOP) (200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />)

Procedures (50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br />)

Tech. Specs. (20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />)

2. PWR Simulator Training at Babcock and Wilcox Corporation with Startup (Startup Certification will be forwarded by Babcock Certification (80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />)(2/26/79 - 3/2/79 and 3/5/79 - 3/9/79) and tillcox Corporation)
3. OntheJobTraining(Minimum 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />)

Participated in, simulated or discussed the following:

Procedures Operation

1. llrote several Operating Procedures for Unit #2 g,uch as EHC, RPS, R!tS.
2. Attended PORC as PORC member and primary reviewer for Instrumentation and Control Procedures. ,

Surveillance

1. Idrote numerous Surveillance Procedures for Unit #2 for such systems as the following: Radiation lionitoring System,' Reactor Protection System, ilon-fluclear Instrumentaton, Engineered Safety Freatures Systens.
2. Provide technical supervisor for performance of Instrunentation and Control Surveillance Procedures.

PORC

1. Reviewed procedures as mentioned above.
2. Served as Instrumentation and Control reviewer during Tech. Spec. review of BfAl generic Tech. Specs. to develop Standard Tech. Specs. for Unit #2.

Control Room

1. Reactor Criticality - Performed calculation of estimated critical rod position.
2. Discussed rod withdrawal, chenical shim and the necessary rod index for power escalation and steady state conditions.
3. Power Operations
1. Performed Heat Balance Calculatinns
2. Perforned Reactor Coolant Total Flow Calculations
3. Olscussed and participated in Feed and Bleed Operations.
4. Discussed and perfor'med ICS Tuning at power to maintain steady-state

-)

lj operations. ~& 'gg

- -- .--.--..____-,_,^^*"*'""'^wme- - n.a__g.__ _

PAGE 2

.EpciosureI Transients i

1. Supervised transient test during power excalation program per TP800/23 such as follows:

i

1. Feedpump trip from 90% F.P. and recovery.
2. Step changes of 10% in magnitude using ULD, steam generator / reactor i demand station and turbine station.
3. Reactor coolant pump trip.
4. Load change from 95% F.P. to 50"..F.P. and recovery to 95%.

Balance-of-Plant _

1. Performed post-core load fuel verification.
2. Participated in reactor building fuel handling operations during core load.

i 1

e i

/

L p