ML20128F507

From kanterella
Jump to navigation Jump to search
Partiallt Withheld Application by C Mell for Reactor Operators License Examination
ML20128F507
Person / Time
Site: Three Mile Island  Constellation icon.png
Issue date: 01/31/1979
From: Mell C
METROPOLITAN EDISON CO.
To: Collins P
Office of Nuclear Reactor Regulation
Shared Package
ML20125B444 List: ... further results
References
FOIA-96-207 NUDOCS 9610080105
Download: ML20128F507 (3)


Text

. - . __. - __ . . .- -. .. . - - . - - . _ _- ..-- .

a. _ . _ . -

/

r .  :

4

.=.y.

,_ i g n > .

.... . . ....r.- .

METROPOLITAN EDISON COMPANY 17067 1ELEPeaONE 717 444.4041 POST OFFICE BOX 480 MiOOLETOWN PENNSYLVANIA January 31, 1979 fir. Paul F. Collins U.S. fluclear Regulatory Comission Office of fluclear Reactor Regulation liashington, D.C. 20555

Dear fir. Collins:

Please consider this application for a Reactor Ope mitted:

1.  !!ane:Arles F. Mell ----

^9 tietropolitan Edison Company, Three title Island :!uclear Present Enploynent: Station, Unit 11 2a) O!ucation: .

EV

1. Itelvindale High School i

Graduated - tielvindal . flich.

2. Basic Electricity and Electronics (1970) (3 no) Graduated - Great Lakes, Ill.
3. Electrician itate "A" (1970) (6 mo)

Graduated - Great Lakes, Ill.

Information in this record was d0idd fluclear Power School (1971) in accordac3 wit (3g - gom of Wormatbn 4.

(G no) Graduated - Bainbridge, !!d. Act, ex7mpting

5. Prototype SIC (1971) (6 no)

Graduated - !!insor, Conn.

2b) Er.perience:

1. 115 tlavy (1970-1976) as Electrician !'-ate (*1uclear) t 9610000105 960924 PDR FOIA _ , __

DEKOK96-207 PDR _

lg

January 31, 1979 str. Paul F. Collins

2. DTI Railroad (6/69-9/69) as Telegraph Operator -

Dearborn,

flich.

3. Auxiliary Operator "A" (10/26/76 - 05/14/78) Hetropolitan Edison Company, Three Mlle Islant fluclear Station, fifddletown, Pa.

fly experience as an Auxiliary Operator "A" fluelear included j studying systems and writing operating procedures and alarm '

responses. I also operated systens and equipment for plant  !

startup and acceptance testing and performed switching and tagging.

Present) Hetropolitan Edison

4. Control Room Operator (05/15/78 -

Company Three Nile Island fluclear Station, Unit !!, Middletown, Pa.

Experience as a Control Room Operator consists of studying plant systens, writing operating procedures and system lectures, oper-ating equipment and systems for plant startup and acceptance tests, directing the efforts of others in this direction, and perfoming switching and tagging.

3. Previous Operator's License flumber - flone.
4. License is requested to operate a pressurized water reactor; Netropolitan j Edison Company Three Nile Island fluclear Station, Unit !!. l S. See attached letter.
6. See Enclosure I.
7.  !!edical examination will be forwarded under separate cover.

Sincerely yours, 4

Charles F. Mell CFM/drg Enclosure

^9~22.6

- - - _ - . -- - -- = -. .-

. ,. . m ,. l EllCLOSURE I TRAlfil!!G PROGRN!

Received by:

Charles F. Mell The genersi outline of Mr. Hell's training follows:

1.

Auxiliary Operator "A" fluclear Trainino Progran (432 hours0.005 days <br />0.12 hours <br />7.142857e-4 weeks <br />1.64376e-4 months <br />) (11/1/76-A. Prinary Sytens (152 hours0.00176 days <br />0.0422 hours <br />2.513228e-4 weeks <br />5.7836e-5 months <br />)

8. Advanced Health Physics (80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />)

C. ~0n the Job Training (200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />)

2. Category IV CR0 Program (5/15/78 - present) (Minimum 800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br />)

Guideline Attached 3.

PUR Sinulator Trsining Progran (02/26/79 - 03/09/79) (80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />)

I will have completed a two week course in operator training on the Dabc and llilcox fluclear Power Plant Simulator at Lynchburg, Va. prior to my lice sinq exan. A copy of the Startup Certification letter and copies of the sinulator training evolutions performed and classroom training will be for ed to you by Babcock and Wilcox.

i P

-9 2P9 1

I j