ML20129H201
Text
-. - -. -. _. -. - -
~f '
f a +lp..
lD.... w_ -. g naa.
a n
/
/
/ METROPOLITAN EDISON COMPANY POST OFFICE BOX 400 M8DDLETOWN PENN3YLV ANIA '7057 TELEPHONE 717-944 4041 January 31, 1979 lir. Paul F. Collins U.S. fluclear Regulatory Comission Office of fluelear Reactor Regulation liashington, D.C.
20555
Dear fir. Collins,
Picast consider this application for a lleactor Operator's License exanination.
In accordance with Section 55.10 of 10CFR55, the following infornation is subrtitted:
1.
flane: David B. liayhue Eyb Age.-
Present Enploynent: fietropolitan Edison Company, Three lile Island fluclear Station, Unit !
2.
a) Education:
1.
Altoona Area High School Graduated - Altoona, Pa.
~
l hh Information in this record was de:etee 2.
Pennsylv:nia State iv ty in accordance wit the Freedom of Infofmation fluclear Engineering Act, e ptions Graduated - State Co eri, Pa.
b) Experience:
1.
Ili<th Pressure Auxiliary Operator
'ei.sinia Electric Power Company (1974-1976) 2.
Auviliary Operator "A" - flucicar (10/26/76-06/25/78) fietropoli tan Edison Company. Three fille Island *bclear Station, filddletown, Pa.
fly experience as an Auxiliary Operator "A" Iluclear included studying systens and orieratinti procedures and alam responses.
I have also operated systens and e<1uipment for plant startups and shutdnuns and per'ori.ed sui tt.hing anj tailr;ino.
i ' j.09 s~
9610080050 960924 PDR FOIA DEKOK96-207 PDR i
]
u I
a s
2-January 31, 1979 hr. Paul F. Collins Control Roon Operator - fluclear (06/26/73-present 4
3.
i l
Experience as a Control Room Operator - fluclear consists of studying plant systems, operating procedures and alarm responses, operating i
systens and equipcent for plant startups and shutd i
l ging.
4 Previous Operator's License flumber - ti0fJE
- 3.
License is requested to operate a pressurized water reactor; fictropolitan Edison Company, Three Mile Island TJuclear Station, Unit I.
4.
i 5.
See attached letter.
6.
See Enclosure I.
liedical exanination will be forwarded under separate cover.
7.
Sincerely yours.
f D.Oa O. h'. C-David B. fiayhue i
DC'1/drg Enclosure i
.)
i i
t I
d 9 'KO l
1 i
l 4
I 4
y
.-u---y
,.w v
w-
l i
\\
EllCLOSURE I TRAlt!!!!G PROGPA'1 j
RECElyr0 BY:
David C. tiayhue The general outline of !!r. tiayhue's training follows:
Auxiliary Operator "A" fluclear Training Progran (432 hrs)(11/1/76-08/30/77) 1.
Prirary Systens (152 hrs)
A.
Advanced llealth Physics (80 hrs)
B.
On the Job Training (200 hrs)
C.
Category IV CR0 Program (6/26/78-present) (iiinimum 800 hrs) 2.
Guideline Attached Pi!R Sinulator Training Proqram (02/12/79-02/23/79) (80 hrs) 3.
I will have completed a two week course in operator training on the Babc and 1111cox f:uclear Power Plant Simulator at Lynchburg, Va. prior to my A copy of the Startup Certification letter and copies of the sinulator training evolutinns performed and classroom training will be for-sinq exan.
varded to you by Babcock and Illicox, i
l 4
".9 'd r i.
.