ML20129H201

From kanterella
Jump to navigation Jump to search
Partially Withheld Application by D Mayhue for Reactor Operator License Examination
ML20129H201
Person / Time
Site: Crane  Constellation icon.png
Issue date: 01/31/1979
From: Mayhue D
METROPOLITAN EDISON CO.
To: Collins P
Office of Nuclear Reactor Regulation
Shared Package
ML20125B444 List: ... further results
References
FOIA-96-207 NUDOCS 9610080050
Download: ML20129H201 (3)


Text

-. - -. -. _. -. - -

~f '

f a +lp..

lD.... w_ -. g naa.

a n

/

/

/ METROPOLITAN EDISON COMPANY POST OFFICE BOX 400 M8DDLETOWN PENN3YLV ANIA '7057 TELEPHONE 717-944 4041 January 31, 1979 lir. Paul F. Collins U.S. fluclear Regulatory Comission Office of fluelear Reactor Regulation liashington, D.C.

20555

Dear fir. Collins,

Picast consider this application for a lleactor Operator's License exanination.

In accordance with Section 55.10 of 10CFR55, the following infornation is subrtitted:

1.

flane: David B. liayhue Eyb Age.-

Present Enploynent: fietropolitan Edison Company, Three lile Island fluclear Station, Unit !

2.

a) Education:

1.

Altoona Area High School Graduated - Altoona, Pa.

~

l hh Information in this record was de:etee 2.

Pennsylv:nia State iv ty in accordance wit the Freedom of Infofmation fluclear Engineering Act, e ptions Graduated - State Co eri, Pa.

b) Experience:

1.

Ili<th Pressure Auxiliary Operator

'ei.sinia Electric Power Company (1974-1976) 2.

Auviliary Operator "A" - flucicar (10/26/76-06/25/78) fietropoli tan Edison Company. Three fille Island *bclear Station, filddletown, Pa.

fly experience as an Auxiliary Operator "A" Iluclear included studying systens and orieratinti procedures and alam responses.

I have also operated systens and e<1uipment for plant startups and shutdnuns and per'ori.ed sui tt.hing anj tailr;ino.

i ' j.09 s~

9610080050 960924 PDR FOIA DEKOK96-207 PDR i

]

u I

a s

2-January 31, 1979 hr. Paul F. Collins Control Roon Operator - fluclear (06/26/73-present 4

3.

i l

Experience as a Control Room Operator - fluclear consists of studying plant systems, operating procedures and alarm responses, operating i

systens and equipcent for plant startups and shutd i

l ging.

4 Previous Operator's License flumber - ti0fJE

  • 3.

License is requested to operate a pressurized water reactor; fictropolitan Edison Company, Three Mile Island TJuclear Station, Unit I.

4.

i 5.

See attached letter.

6.

See Enclosure I.

liedical exanination will be forwarded under separate cover.

7.

Sincerely yours.

f D.Oa O. h'. C-David B. fiayhue i

DC'1/drg Enclosure i

.)

i i

t I

d 9 'KO l

1 i

l 4

I 4

y

.-u---y

,.w v

w-

l i

\\

EllCLOSURE I TRAlt!!!!G PROGPA'1 j

RECElyr0 BY:

David C. tiayhue The general outline of !!r. tiayhue's training follows:

Auxiliary Operator "A" fluclear Training Progran (432 hrs)(11/1/76-08/30/77) 1.

Prirary Systens (152 hrs)

A.

Advanced llealth Physics (80 hrs)

B.

On the Job Training (200 hrs)

C.

Category IV CR0 Program (6/26/78-present) (iiinimum 800 hrs) 2.

Guideline Attached Pi!R Sinulator Training Proqram (02/12/79-02/23/79) (80 hrs) 3.

I will have completed a two week course in operator training on the Babc and 1111cox f:uclear Power Plant Simulator at Lynchburg, Va. prior to my A copy of the Startup Certification letter and copies of the sinulator training evolutinns performed and classroom training will be for-sinq exan.

varded to you by Babcock and Illicox, i

l 4