ML20129H188

From kanterella
Jump to navigation Jump to search
Partially Withheld Application for D Smith for Reactor Operator License Examination
ML20129H188
Person / Time
Site: Crane  
Issue date: 01/31/1979
From: Danni Smith
METROPOLITAN EDISON CO.
To: Collins P
Office of Nuclear Reactor Regulation
Shared Package
ML20125B444 List: ... further results
References
FOIA-96-207 NUDOCS 9610080043
Download: ML20129H188 (3)


Text

. _,

~

a g..

j d

y.7.
7..:ri

-w-l METROPOLITAN EDISON COMPANY j

POST OFI' ICE DOX 4HO f.ilDDt f l OWN. l'O NfJSYt V A!J *. * /OW.*

li l l l*llON0 717 944 4041 i

January 31, 1979 l

fir. Paul P. Collins U.S. Iluclear llequlatory Consaission i

Of f t:e of fluclear Reactor Regulation i

liashington. 0.C.

20555 I

i

Dear f1r. Collins:

]

Picase consider this application for a Peactor Operator's License exanination.

l' In accordance with Section 55.10 of 10Cri:55, the following informatien is j

suln11tted:

1.

flano:._. David A. Snith h

Aqe:

Present Enployment: Metropolitan Edison Company, Threc flile Island fluclear Station, Unit i 2.

a) Education:

Ilt. Picasant Arca ( t, Pa.

1.

Graduated fit. Picasan h

2.

Connecticut Llglding in ute Metallic Artsy Graduated - flii rd. Connecticut Information in th' d r/as deleted O accordance wjf 3.

Itachinist flate A (1971) (4 rio) ct e Ndom of Inf0fmatI00 Graduated - Great tal:es, 111.

~

4.

Iluclear Power School (1972) (6 r.o)

Graduated - Bainbridge, Md.

5.

Basic Subnarine School (1972)

" ~'

(1 no) Graduated -

flew London, Connecticut

-g - 4fM3

{

6.

fluc' lear Power Trair.inq Unit (IM2) (6 mo) Graduated -

tiest flilton, fl.Y.

9610000043 960924 PDR FOIA DEKOK96-207 PDR w

. January 31, 1979

[

.. Mr. Paul F. Collins 7.

flaval Submarine School (1972) (I no)

Graduated - flew London, fcanecticut b) Experience:

1.

US flavy (1970-1976) !!!1 (55)

Engineering Watch Supervisor 2.

Anco of florvelt (1970)

Shipping Clerk - floryc1t, Pa.

j 3.

Latrobe Steel Co. (1969)

Laborer - Latrobe, Pa.

l 4.

Billingsicy Chevrolet (1969-1970) j flechanic - Mt. pleasant Fa.

Auxiliary Operator "A" - flucicar (10/18/76 - 04/16/78) fletropoli tan S.

Edison Company, Three flite Island flucicar Station, iiiddletown. Pa.

fly experi.:nce. an Auxiliary Operator "A" fluclea have also operated systems and eq sipnent for plant startups and shutdowns and performed switcning and tagging.

present) Hetropolitan Control P.oom Opeartor - flucicar (04/17/78 -

Edison Company Three lille Island fluclear Station, Unit I, fliddle-6.

toun, Pa.

xperience as a Control P.oom Operator - flucicar consists of stud I

plant systens, operating procedures and alam responses, operating systens and equipment for plant startups and shutdowts, and dir inq the ef forts of others in this direction and taqqing.

4 j

3.

Previous Ouerator's License flumber - flone License is requested to operate a pressurized water reactor; lietropolitan 4.

f.dison Conpany, Three fille Island flucicar Station Unit 1.

i S.

See attached Ictter.

6.

See Enclosure 1.

11cdical exanination will be forwarded ur. der separate cover.

)

7.

Sigcerclyyour, 1

i 4

David A. Smith j

DAS/drg g

i Enclosure

~^^ -

g;, "

t. ;, -

EllCt.050RE I

i TRAirliflG PROGRtJ1 i

RECEIVED BY:

David A. Smith The general outline of tir. Smith's training follows:

1.

Auxiliary Operator "A" Nuclear Training Pr_oran (432 hrs) (11/1/76-08/30/77)

A.

Primary Systems (152 hrs)

B.

Advanced Health Physics (80 hrs) i C.

On the Job Training (200 hrs) 2.

Category,lV CR0 Program (4/17/78-present) (flininum 800 hrs)

Guideline attache) 3.

P11R Sinulator Training Progran (02/12/79-02/23/79) (80 hrs)

I will have completed a two week course in operator training on the Babcock and tillcox fluclear Power Plant Sinulator at Lynchburg Va. prior to my if cen-sing exam. A copy of the Startup Certification letter and copies of the simulator training evolutinns perforned and classroon training will be for-warded to you by Babcock and llilcox.

i J

~3 '1.Pb

.