ML20129H188
Text
. _,
~
a g..
j d
- y.7.
- 7..:ri
-w-l METROPOLITAN EDISON COMPANY j
POST OFI' ICE DOX 4HO f.ilDDt f l OWN. l'O NfJSYt V A!J *. * /OW.*
li l l l*llON0 717 944 4041 i
January 31, 1979 l
fir. Paul P. Collins U.S. Iluclear llequlatory Consaission i
Of f t:e of fluclear Reactor Regulation i
liashington. 0.C.
20555 I
i
Dear f1r. Collins:
]
Picase consider this application for a Peactor Operator's License exanination.
l' In accordance with Section 55.10 of 10Cri:55, the following informatien is j
suln11tted:
1.
flano:._. David A. Snith h
Aqe:
Present Enployment: Metropolitan Edison Company, Threc flile Island fluclear Station, Unit i 2.
a) Education:
Ilt. Picasant Arca ( t, Pa.
1.
Graduated fit. Picasan h
2.
Connecticut Llglding in ute Metallic Artsy Graduated - flii rd. Connecticut Information in th' d r/as deleted O accordance wjf 3.
Itachinist flate A (1971) (4 rio) ct e Ndom of Inf0fmatI00 Graduated - Great tal:es, 111.
~
4.
Iluclear Power School (1972) (6 r.o)
Graduated - Bainbridge, Md.
5.
Basic Subnarine School (1972)
" ~'
(1 no) Graduated -
flew London, Connecticut
-g - 4fM3
{
6.
fluc' lear Power Trair.inq Unit (IM2) (6 mo) Graduated -
tiest flilton, fl.Y.
9610000043 960924 PDR FOIA DEKOK96-207 PDR w
. January 31, 1979
[
.. Mr. Paul F. Collins 7.
flaval Submarine School (1972) (I no)
Graduated - flew London, fcanecticut b) Experience:
1.
US flavy (1970-1976) !!!1 (55)
Engineering Watch Supervisor 2.
Anco of florvelt (1970)
Shipping Clerk - floryc1t, Pa.
j 3.
Latrobe Steel Co. (1969)
Laborer - Latrobe, Pa.
l 4.
Billingsicy Chevrolet (1969-1970) j flechanic - Mt. pleasant Fa.
Auxiliary Operator "A" - flucicar (10/18/76 - 04/16/78) fletropoli tan S.
Edison Company, Three flite Island flucicar Station, iiiddletown. Pa.
fly experi.:nce. an Auxiliary Operator "A" fluclea have also operated systems and eq sipnent for plant startups and shutdowns and performed switcning and tagging.
present) Hetropolitan Control P.oom Opeartor - flucicar (04/17/78 -
Edison Company Three lille Island fluclear Station, Unit I, fliddle-6.
toun, Pa.
- xperience as a Control P.oom Operator - flucicar consists of stud I
plant systens, operating procedures and alam responses, operating systens and equipment for plant startups and shutdowts, and dir inq the ef forts of others in this direction and taqqing.
4 j
3.
Previous Ouerator's License flumber - flone License is requested to operate a pressurized water reactor; lietropolitan 4.
f.dison Conpany, Three fille Island flucicar Station Unit 1.
i S.
See attached Ictter.
6.
See Enclosure 1.
11cdical exanination will be forwarded ur. der separate cover.
)
7.
Sigcerclyyour, 1
i 4
David A. Smith j
DAS/drg g
i Enclosure
~^^ -
g;, "
- t. ;, -
EllCt.050RE I
i TRAirliflG PROGRtJ1 i
RECEIVED BY:
David A. Smith The general outline of tir. Smith's training follows:
1.
Auxiliary Operator "A" Nuclear Training Pr_oran (432 hrs) (11/1/76-08/30/77)
A.
Primary Systems (152 hrs)
B.
Advanced Health Physics (80 hrs) i C.
On the Job Training (200 hrs) 2.
Category,lV CR0 Program (4/17/78-present) (flininum 800 hrs)
Guideline attache) 3.
P11R Sinulator Training Progran (02/12/79-02/23/79) (80 hrs)
I will have completed a two week course in operator training on the Babcock and tillcox fluclear Power Plant Sinulator at Lynchburg Va. prior to my if cen-sing exam. A copy of the Startup Certification letter and copies of the simulator training evolutinns perforned and classroon training will be for-warded to you by Babcock and llilcox.
i J
~3 '1.Pb
.