ML20128F556

From kanterella
Jump to navigation Jump to search
Partially Withheld Application by J Garrison for Senior Operator License Examination
ML20128F556
Person / Time
Site: Three Mile Island  Constellation icon.png
Issue date: 01/31/1979
From: Garrison J
METROPOLITAN EDISON CO.
To: Collins P
Office of Nuclear Reactor Regulation
Shared Package
ML20125B444 List: ... further results
References
FOIA-96-207 NUDOCS 9610080120
Download: ML20128F556 (5)


Text

. _ . . . . -.

. 1.? * . f(RC79-08 c

7.- - .

.,. 7-..-_....._....__.

,I

) ,h;.&-& fjy

., - , , ~ ,,,

i

/

METROPOLITAN EDISON COMPANY ... , .

.c..u.o.,:,e,u,..,,,.u..,ma,.,/ .

/.__.

TELEPHONE 717 044 4041 POGT OFFICE DOX 480 MiDDLETOWN.PENNSYLVANtA 17057 January 31, 1979 fir. Paul F. Collins U.S. Nuclear Regulatory Conmission Office of fluclear Reactor Regulation liashington, D.C. 20555

Dear ffr. Collins:

Picase consider this application for a Senior Reactor Operator's License exanination. In accordance with Section 55.10 of 20CFR55, the following infnmation is subnf.tted:

1. flame: k tl. Garrison -'

)

Age:

Present Employment: Hetropolitan Edison Company, Three fille Island I Nuc1 car Station Unit !!.

2. a) Education:
1. Lawrenceburg Consolidated High Schoo bY (f Graduated - Lawrenceburg, Ind.
2. Electrician"A" School (4/65-8/65)(h4wks)

Graduated - Great Lakts, Ill. .

Infctmat. ion in thc. reccid nas dCe:ed in accordance wit lne freedom of Information

3. fluclear Power School (8/65 - 3/66) (6 mo) Act, e ptions Graduated - liare Island, Calif.

r M7

4. Ilucicar Power Prototype (3/66-10/66) (6 mo)01A-Graduated - Saratoga Springs,fl.Y.
5. Subr.tarine School (10/66 - 12/66) (3 mo)

Graduated - New London, Conn.

2.I.4

6. Electrician "B" School (1/69 - 9/69) (7 mo)

Graduated - Great Lakes, Ill. ,

7. Voltage Regulator School (1970) (1 wk)

Graduated - New London, Conn.

9610080120 960924 T PD9 FOIA L c)

DEKOK96-207 PDR

. *. *~

)8.'/,'

  • l 1 ,

January 31, 1979 l

[ ,. fir. Paul F. Collins l

l D. 3ft Supervisors School (1972) (2 wks)

Graduated - flew London, Conn. l l

b) Experience:

US flavy (1964-1973) EMI - Electrician 1st Class  !

1. - 1
2. J.E. Seagrams Inc. (1964) Assembly' Line llorker -

Lawrenceburg Ind.

3. Town of Greendale (1963)  ;

General Laborer - Greendale. Ind.

l

4. Auxiliary Operator "A" (04/05/73 - 08/10/75) Three Nile Island fluclear Station, fliddletown, Pa.

As Auxiliary Operator "A":

Completed 26 week Aux. Operator "A" Nuclear Company Training Program. l 1.

2. llorked as Aux Operator "A" during Till-1 initial startup.
3. Participated in THI-1 initial fueling as Fue1~ Pool Drfdge Operator l handling fuel assemblics for transport to Rx. B1dg.
4. llork in plant af ter startup as Aux Operator during steady state i power operations.
5. Control Room Operator (08/11/75 - 09/14/75) Three Mile Island fluclear Station, fliddletown, Pa.

As Control Room Operator:

1. Entered company training program for Titl-Il CR0 ( 1 month)
2. llrote initial draf ts to some of THI-Il minor operating procedures.
6. Technical Analyst Senior I (09/15/75-07/31/78) Three title Island fluclear Station,111ddletown, Pa.

As Technical Analyst Senior I:

1. In this capacity worked as Shift Test Engineer under direction of GPU Service Corporation Startup and Test Group.
2. Perfomed or assisted in performing following pre-operational test procedures:

Rx Oldg Purge Supply t. Exhaust he Bldg flydrogen Recombiner Building Spray Condensate Circulating }later itDCT Decay lleat Closed Cooling Decay Heat Removal Emergency feedwater Gland Steam lleater Drains Instrument / Service Air Intermediate Closed Cooling tlater Lube Oil Turbine llakeup and Purification flucicar Services River llater Rx Bldg. flormal Cool. t, Emerg Cool.

Initial Operations of RCp's Secondary Services Closed Cooling (coupled t. uncoupled) Control Bldg. Area. Sumps "S"216

c ,..

'I'.

January 31, 1979

. Mr.PaulPl Collins Secondary Services River Water Screen Wash llater Condenser Air Extraction ifaste Disposal Gas Borated Water Storage Tank Battery Test Discharge Reactor Coolant System (Initial Fill, & Venting)

3. Ilorked extensively in secondary plant to establish vacuum, condensate,

& turbirst to support hot functional testing.

4. Shift Test Engineer during nunerous SFAS tests including loss of off-site power, MU and purification, and decay heat.
5. During power escalation test program, participated in numerous tests:

Loss of Electrical Power.

ICS tuning at power.

1. loss of one FW pump.
2. trip of main turbine (40". power).

Perform loose parts monitoring baseline data acquisition.

RCS thermal expansion and component hanger hot deflection tests.

Unit load steady state data acquisition at various power levels.

Turbine / reactor trip tests.

Shutdown outside cJntrol room tests, ilSS heat balances.

100?. generator tr'p test.

Initial turbine g.nerator operation tests.

6. Performed secondary plant and primary plant hydrostatic tests.
7. Two weeks plant operations and physics test orientation 9 Babcock and llilcox simulator Lynchburg, Va. consisting of:

a) 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of classroom time consisting of approximately 35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br /> of support Icetures for the simulator operations and 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> alloted for supervised self-study, b) 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of simulator operations consisting of:

1. Evolutions dealing with manual and automatic ICS power operations.
2. Zero Power Physics Testing NI Overlap Sensible Heat Temperature Coef ficients Ejected Stuck Rod Measurement
3. Power Escalation Testing Reactivity Coefficients O Power Dropped Rod Test
8. Performed 2 actual THI-!! reactor startups under direction.
7. ShiftForemen(08/01/78- Present) Three Mlle Island flucicar Station, 111ddletown, Pa.

As Shift Foreman:

1. Entered company training program for Shift Foreman and Senior (1/19) Reactor Operator's License at ' completion of startup and test prgegg.,h a A f. t

an.

O "

January 31, 1979 Hr,' Paul F. Collins

{'7';,

j. .
3. Previous Operator's License fluraber - flone. )
4. License is requested to operate a pressurized water reactor; fictropolftan

- Edison Company, Three !!ile Island flucicar Station Unit II.

5. See attached letter.
6. See Enclosure I.
7. tiedical examination will be forwarded under separate cover.

Sincerely yours, och.d. Nod %

VJack W. Garrison JWG/drg 7

Enclosure F

-3 q. , ,,

I l

l i

l EllCt.05URE I TRAltlIflG PROGRAff RECEIVED BY:

JACK W. GARRIS0tl The general outline of Mr. Garrison's training follows:

1. 1.icense Trainin Program (mir.imum 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />) (1/2/79 - present)

Reactor Theory 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />)

Health Physics 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />)

  • ICS(40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />)

Reactor Operations (40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />)

Systems (flSSandBOP)(200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />)

Procedures (50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br />)

Tech. Specs. (20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />)

2. PilR Simulator Training at Babcock and tillcox Corporation with Startup Certification Babcock and Wilcox (80Corp.

hours))(Startup(2/26/79 - 3/2/79 Certification will be forwarded b and 3/5/79 - 3/9/79) j 9

. " 3.* 8 i

i