ML20212H962

From kanterella
Jump to navigation Jump to search
Revised Notification of Meeting with Gpu Nuclear,Inc to Discuss Proposed Mods to RBS Sys Procedures & HPI Cross Connect Lineup.Meeting Rescheduled to 10 A.M. on 990713
ML20212H962
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 06/23/1999
From: Colburn T
NRC (Affiliation Not Assigned)
To: Bajwa S
NRC (Affiliation Not Assigned)
References
NUDOCS 9906280237
Download: ML20212H962 (6)


Text

t RESCHEDULED - NOTE DATE & TIME CHANGE l

"* bbbNkNDUM TO: S. Singh Brjwa, Chief, S:ction 1

.. . Proj:ct Dir:ctorata I Division of Lic'nsing Project Managem:nt Office of Nuclear Reactor Regulation Original signed by:

FROM: Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH GPU NUCLEAR, INC.

DATE & TIME: July 13,1999 10:00 a.m. - 3:00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 16-B-4 Rockville, Maryland PURPOSE: To discuss the licensee's proposed modifications to the reactor building spray system procedures and high pressure injection cross connect lineup.

PARTICIPANTS:* Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC GPU Nuclear. Inc.

T. Colburn, NRR R. Knight G. Hubbard, NRR W. McSorely S. Bajwa, NRR S. Wilkerson R. Lobel, NRR J. Link E. Weiss, NRR A. Irani C. Jackson, NRR B. Parfitt, et al. O C. Doutt, NRR et al.

Docket No. 50-289 cc: See next page CONTACT: Timoth G. Colburn gp g ~\

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340,9/20/94.

DIS 9IBUTION: See next page DOCUMENT NAME: G:\PDI-1\MTN71399.WPD To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy 0FFICE PDI-1/PM , l PDl-2/LA ,3 j lt) PDI-1/SC A l l NAME TColburn:1cc W TClark') F SBajwa /i' W DATE 06/1,$99 06 4) /99 0644/99 / /99 Official Record Copy 9906286237 990623 PDR ADOCK 05000289 p PDR s

l .

e Meetina Notice Distribution:

E-Mail Hard Coov J. Zwolinski/S. Black Docket E. Adensam PDI-1 Reading S. Bajwa PUBLIC -

T. Colburn OGC T. Clark ACRS OPA (e-mail to OPA) Receptionist (OWFN and TWFN)

G. Hubbard R. Lobel cc: Licensee & Service List E. Weiss C. Jackson C. Doutt M. Oprendek, RI P. Eselgroth, RI PMNS (Meeting Announcement Coordinator)

. f1 COL,r1tWULCU - NOlh UAlb & IIME CHANGE

< ",* bbbNkNDUM TO: S. Singh Bajwa, Chief, S ction 1 Proj:ct Directorats 1 4 Division of Lic:nsing Project Marcagement Office of Nuclear Reactor Regulation Original signed by:

FROM: Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate I '

Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH GPU NUOLEAR, INC.

DATE & TIME: July 13,1999 10:00 a.m. - 3:00 p.m. l J

LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 16-B-4 Rockville, Maryland PURPOSE: To discuss the licensee's proposed modifications to the reactor building spray system procedures and high pressure injection cross connect lineup.

PARTICIPANTS:* Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC GPU Nuclear. Inc.

T. Colburn, NRR R. Knight G. Hubbard, NRR W. McSorely i S. Bajwa, NRR S. Wilkerson i R. Lobel, NRR J. Link E. Weiss, NRR A. Irani  !

C. Jackson, NRR B. Parfitt, et al.

C. Doutt, NRR et al. l Docket tb. 50-289 cc: See next page CONTACT: Timothy G. Colburn 415-1402

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340,9/20/94.

DISTRIBUTION: See next page DOCUMENT NAME: G:\PDl 1\MTN71399.WPD To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy 0FFICE PDI-1/PM _ l PDI-2/LA g j lN PDI-1/SC A l l NAME TColburn:lec W TClarkj F SBajwa /lf' W DATE 06/ $ 99 C6M) /99 06.4/99 / /99 Official Record Copy

.a

e, ,

, +Mt 49 A O' t UNITED STATES g g NUCLEAR REGULATORY COMMISSION e f WASHINGTON, D.C. 20066 4 001 k..... June 23, 1999 RESCHEDULED - NOTE DATE & TIME CHANGE MEMORANDUM TO: S. Singh Bajwa, Chief, Section 1 Project Directorate i Division o' Licensing Project Management Office of Nuclear Reactor Regulation l FROM: Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate i Division of Licensing Project Management l Office of Nuclear Reactor Regulation j

SUBJECT:

FORTHCOMING MEETING WITH GPU NUCLEAR, INC.

1 DATE & TIME: July 13,1999 l 10:00 a.m. - 3:00 p.m.

l LOCATION: U.S. Nuclear Regulatory Commission l One White Flint North l 11555 Rockville Pike, Room 16-B-4 Rockville, Maryland i

PURPOSE: To discuss the licensee's proposed modifications to the reactor building spray system procedures and high pressure injection cross connect lineup.

PARTICIP' NTS:* Participants from the NRC include members of the Office of Nuclear l Reactor Regulation (NRR). '

NRC GPU Nuclear. Inc.

l T. Colburn, NRR R. Knight l G. Hubbard, NRR W. McSorely l S. Bajwa, NRR S. Wilkerson

( R. Lobel, NRR J. Link E. Weiss, NRR A. Irani C. Jackson, NRR B. Parfitt, et al.

C. Doutt, NRR et al.

l Docket No. 50-289 cc: See next page CONTACT: Timothy G. Colburn 415-1402

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340,9/20/94.

=., ..

Three Mile Island Nuclear Station, Unit No.1 cc:-

'f Michael Ross Director, O&M, TMI Robert B. Borsum B&W Nuclear Technologies GPU Nuclear, Inc. Suite 525

. P.O. Box 480 1700 Rockville Pike Middletown, PA 17057 - Rockville, MD 20852 John C. Fornicola William Dornsife, Acting Director Director, Planning and Bureau of Radiation Protection Regulatory Affairs Pennsylvania Department of GPU Nuclear, Inc. Environmental Resources 100 Interpace Parkway P.O. Box 2063 Parsippany, NJ 07054 Harrisburg, PA 17120 Jack S. Wetmore Dr. Judith Johnsrud Manager, TMI Regulatory Affairs National Energy Committee GPU Nuclear, Inc. Sierra Club .

P..O. Box 480 433 Orlando Avenue Middletown, PA 17057' State College, PA 16803 j Emest L. Blake, Jr., Esquire Peter W. Eselgroth, Region l Shaw, Pittman, Potts & Trowbridge U.S Nuclear Regulatory Commission 2300 N Street, NW. 475 Allendale Road LWashington, DC 20037 King of Prussia, PA 19406 Chairman Mr. James W. Langenoach, Vice President Board of County Commissioners and Director, TMI of Dauphin County GPU Nuclear, Inc.

Dauphin County Courthouse P.O. Box 480 Harrisburg, PA 17120 Middletown, PA 17057 iChairman Board of Supervisors -

of LondonderryTownship R.D. #1, Geyers Church Road Middletown, PA 17057 '

4 Wayne L. Schmidt Senior Resident inspector (TMI-1)

U.S. Nuclear Regulatory Commission P.O. Bov 219 Middletown, PA 17057 '

. Regional Administrator' Region 1-U.S. Nuclear Regulatory Commission 475 Allendale Road '

- King of Prussia, PA 19406 I i

j

Meetina Notice Distribution:

E-Mail Hard Coov J. Zwolinski/S. Black Docket '

E. Adecsam PDI-1 Reading S. Bajwa PUBLIC T. Colburn OGC T. Clark ACRS OPA (e-mail to OPA) Receptionist (OWFN and TWFN)

G. Hubbard R. Lobel cc: Licensee & Service List E. Weiss C. Jackson C. Doutt M. Oprendek, RI P. Eselgroth, RI '

PMNS (Meeting Announcement Coordinator)

) ,

l l

i 1

l l

!