ML20148E636: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20148E636
| number = ML20148E636
| issue date = 05/29/1997
| issue date = 05/29/1997
| title = Forwards Pump & Valve IST Program for Vegp,Representing Second ten-yr Interval Update.Implementation of Updated IST Programs Will Be phased-in Over 1-yr Period Starting on 970531,as Outlined in Util 970314 Ltr
| title = Forwards Pump & Valve IST Program for Vegp,Representing Second ten-yr Interval Update.Implementation of Updated IST Programs Will Be phased-in Over 1-yr Period Starting on 970531,as Outlined in Util
| author name = Mccoy C
| author name = Mccoy C
| author affiliation = SOUTHERN NUCLEAR OPERATING CO.
| author affiliation = SOUTHERN NUCLEAR OPERATING CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = LCV-0861-D, LCV-861-D, NUDOCS 9706030206
| document report number = LCV-0861-D, LCV-861-D, NUDOCS 9706030206
| title reference date = 03-14-1997
| package number = ML20148E642
| package number = ML20148E642
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
Line 28: Line 29:
Electric Generating Plant (VEGP), Units 1 and 2. The two enclosed documents represent the                                      j second ten-year interval update for the inservice testing (IST) of pumps and valves at VEGP.
Electric Generating Plant (VEGP), Units 1 and 2. The two enclosed documents represent the                                      j second ten-year interval update for the inservice testing (IST) of pumps and valves at VEGP.
The IST program was updated to the requirements of the ASME OM Code,1990 Edition, for pump and valve testing, with the exception of safety relief valves. The safety relief valves were updated to the requirements of the ASME OM Code,1995 Edition.
The IST program was updated to the requirements of the ASME OM Code,1990 Edition, for pump and valve testing, with the exception of safety relief valves. The safety relief valves were updated to the requirements of the ASME OM Code,1995 Edition.
By letter dated November 27,1996, the NRC granted relief to update the Unit-2 IST l
By {{letter dated|date=November 27, 1996|text=letter dated November 27,1996}}, the NRC granted relief to update the Unit-2 IST l
                       - Program concurrently with the Unit-1 IST Program update, in addition, the NRC granted                                \
                       - Program concurrently with the Unit-1 IST Program update, in addition, the NRC granted                                \
relief to update the VEGP IST Program according to the above referenced editions of the                              i ASME OM Code. As indicated in Georgia Power Company (GPC) letter LCV-0861 dated August 16,1996, formal relief requests regarding these issues are included in the enclosed program documents as RR-G-1 and RR-G-2.                                                                                        4
relief to update the VEGP IST Program according to the above referenced editions of the                              i ASME OM Code. As indicated in Georgia Power Company (GPC) letter LCV-0861 dated August 16,1996, formal relief requests regarding these issues are included in the enclosed program documents as RR-G-1 and RR-G-2.                                                                                        4

Latest revision as of 22:32, 11 December 2021

Forwards Pump & Valve IST Program for Vegp,Representing Second ten-yr Interval Update.Implementation of Updated IST Programs Will Be phased-in Over 1-yr Period Starting on 970531,as Outlined in Util
ML20148E636
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/29/1997
From: Mccoy C
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20148E642 List:
References
LCV-0861-D, LCV-861-D, NUDOCS 9706030206
Download: ML20148E636 (2)


Text

,

L t'" "/ , C.K. McCoy Southern Nucl::t f

Vice President Operatir.g Compaay. Inc. ,

Vogtle Project 40 inverness Center Parkway

~

EU. Box 12%

Birmingham. Alabama 35201 Tel 205.992.7122 Fax 205.992.0403 SOUTHERN A COMPANY Energy to Serve Your World*

gg 99, Docket Nos.: 50-424, 50-425 LCV-0861-D U. 3. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 VOGTLE ELECTRIC GENERATING PLANT l PUMP AND VALVE INSEkVICE TEST PROGRAM INTERVAL UPDATE Gentlemen:

Pursuant to the requirements of 10 CFR 50.55a(f)(5)(i), Southern Nuclear Operating Company (SNC) herein submits the Pump and Valve Inservice Testing Programs for Vogtle ,

Electric Generating Plant (VEGP), Units 1 and 2. The two enclosed documents represent the j second ten-year interval update for the inservice testing (IST) of pumps and valves at VEGP.

The IST program was updated to the requirements of the ASME OM Code,1990 Edition, for pump and valve testing, with the exception of safety relief valves. The safety relief valves were updated to the requirements of the ASME OM Code,1995 Edition.

By letter dated November 27,1996, the NRC granted relief to update the Unit-2 IST l

- Program concurrently with the Unit-1 IST Program update, in addition, the NRC granted \

relief to update the VEGP IST Program according to the above referenced editions of the i ASME OM Code. As indicated in Georgia Power Company (GPC) letter LCV-0861 dated August 16,1996, formal relief requests regarding these issues are included in the enclosed program documents as RR-G-1 and RR-G-2. 4

/

Implementation of the updated IST Programs will be phased-in over a one-year period y[

starting on May 31,1997 as outlined in GPC letter LCV-0861-C dated March 14,1997.  !

Should there be any questions in this regard, please contact this office.

Sincerely, k O.9 O O EO C. K. McCoy CKM/KLG/k 9706030206 970529 lllllHlllHllllly llll lllllHlllIl PDR ADOCK 05000424 lillllilill111ll1 e pg Ill.illll.illli.lllillill i l

. c .

W  !

n;

- ,j. i t

U. S. Nuclear Regulatory Commission LCV-0861-D Page Two 1

Enclosure:

Valve Inservice Testing Program - Second Ten-Year Interval l Pump Inservice Testing Program - Second Ten-Year interval  :

l xc: Southern Nuclear Onerating Company Mr. J. B. Beasley, Jr.

Mr. W. L. Burmeister Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. C. R. Ogle, Senior Resident Inspector, Vogtle )

Mr. L. L. Wheeler, Licensing Project Manager, NRR 1 I

I l

l