ML20063M190: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20063M190
| number = ML20063M190
| issue date = 03/01/1994
| issue date = 03/01/1994
| title = Forwards Rev 2 to Univ of Utah Nuclear Engineering Lab Reactor Operation Requalification Plan.
| title = Forwards Rev 2 to Univ of Utah Nuclear Engineering Lab Reactor Operation Requalification Plan
| author name = Slaughter D
| author name = Slaughter D
| author affiliation = UTAH, UNIV. OF, SALT LAKE CITY, UT
| author affiliation = UTAH, UNIV. OF, SALT LAKE CITY, UT

Latest revision as of 16:57, 6 January 2021

Forwards Rev 2 to Univ of Utah Nuclear Engineering Lab Reactor Operation Requalification Plan
ML20063M190
Person / Time
Site: University of Utah
Issue date: 03/01/1994
From: Slaughter D
UTAH, UNIV. OF, SALT LAKE CITY, UT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20063M192 List:
References
NUDOCS 9403110146
Download: ML20063M190 (1)


Text

, e.

I-THE )

UNIVERSITY OFUTAH March 1,1994 U.S. Nuclear Regulatory Commission Document Control Desk Washington D.C. 20555 RE: Revision 2, Reactor Operator Requalification Plan, University of Utah

Dear Sirs:

We have recently revised our Reactor Operator Requalification Program for our laboratory containing the TRIGA reactor (Docket No. 50-407). Enclosed is revision 2 dated 1 March 1994. Since these changes do not reduce the effectiveness of the plan, we have already implemented this revised Program.

l I

If there are any questions concerning this matter, please contact me at (801) 581-8499.

cctfully, L ou 1 David M. Slaughter, Ph.D.

Director and Reactor Supervisor Nuclear Engineering Laboratory DMS/ cdp 0S'151 cc. Marvin Mendonca Department of Mechanical 1:ngineering MEB 32WI I NH l& W. Mah AH 12 94031101469g30100497

{DR ADOCK O PDR

  • " O N6*

AN M"I * ' **2 h" l

._ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _