ML20070B456

From kanterella
Jump to navigation Jump to search
Forwards Procedure Forms for Univ of Utah Triga Reactor. Forms Correct Deficiencies Noted in Previous Audits by Reactor Safety Committee & NRC During Insp on 880216-19. Update & Correction of Facility Documents Ongoing
ML20070B456
Person / Time
Site: University of Utah
Issue date: 08/31/1988
From: Sandquist G
UTAH, UNIV. OF, SALT LAKE CITY, UT
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20070B459 List:
References
NUDOCS 9101310134
Download: ML20070B456 (4)


Text

P . .

m$

UNIVERSITY OFUTAli August 31,1988 Mr. Robert D. Martin Regional Administrator U. S. Nuclear Regulatory Commission ReL; ion IV 61 Ryan Plaza Drive, Suite 1(XX)

Arlington, Texas 76011

Dear Mr. Martin:

Enclosed are severa: facility procedure forms for the University of Utah TRIGA Reactor, License R 126, Docket No. 50-407. These forms correct deficiencies noted in previous audits of the facility by the Reactor Safety Committee (RSC) and by the NRC during an inspection conducted February 16-19, 1988. All forms were reviewed and approved by the RSC on May 25,1988. The operations staff continues to update and correct other facility documents and will send the approved documents to your office as they are completed.

Please direct any questicas regarding these forms to the operations staff at (801) 581-4188.

Yours truly, i

,f,) , .y ,.(V . .

a !(uis Relic r Supervisor' '

j,' cNu6 lear Engine 6 ring Laboratory l

Departinent of Methanical and todu trial 1.ngineering l 'l 9101310134 880831 mn uno k i

l PDR ADOCK 05000407 Nn take on. tu m u nou Wut {

i Q PDR

.'. Form NEl 001 Sheet 1

. . RSC Appmval:5/25/88

. B.1 TRIG A EjtELIMINARY CIIECK SIIFET NO. DATE OPERA ~IOR

1. Door Closed: (V) Front door closed: _(V) Rad Dose Log: _(V)
2. Visualinspection of reactor tank and area: (4) Source & D 2O reflector in core: _ (V)*

Demineralizer: (on-off) Flow rate: gal / min Check and date Air Monitor: _(4)

Deactivate Security System: ,_,(4) Deactivate Radiation Alarm Damper: _(V)

3. Auxiliary Survey Meter: Make Serial Number On _(4)

Console Power On: _(V) Source Light On: (4) Recorder On: (V)

Paper Checked and Dated: (V) Chart Speed Standby: (V)

Review Maintenance leg for any core alterations since the last operation which may possibly affect core reactivity:_(V)

Record Checkout in Operations leg: (V) Log Number:

Ventilation System On: (V) Damper Lights Checked: (4) off

4. Calibrate Radiation Monitor: _(V)

Background:

mR/hr Ion Chamber Voltages LVxt: (14) LVx10: (34) HVx10: _(74)

FuelTemperature TC#1: 'C TC#2: 'C 'IC#3: 'C Water Conductivity: _ pmho/cm (< 5) Water Temperature: 'C Compare Fuel and Water Temperatures: (4)

(NOTE AND REPORT ANY ANDMALOUS READINGS TO SRO)

Rods Down: (V) Shim Position: Reg Position:

5. Reactor Room Pressure: 1205 E/ outside: iwg(> ~.01')

1205 E/1205 D: iwg(> .01)

~

Radiation Monitor Set Point Checki ~ ~ TRIGA Tanki~ ~iew: _(4) High: (V)

Ceiling: lew: (V) High: (V) Vent: Low: (V) High: (V)

6. Recorder tolow Speed: (4) Recorder Pens Down: (V)

Linear Power Switch to Ix100: (4) Log Power Switch to 101: (4)

Low Log Cal to "LO" (6x104 W) Meter: Red Pen: (-10)

Low log Cal to "Hi" (1x100 W) Meter
Red Pen: ( 80)
7. Key On: (4) LICENSED OPERATOR AND ONE OTHER PERSON MUST BE PRESENT.

Additional Personnel:

8. Scram Reset: (V) WAIT 1 MINUTE BEFORE READING CURRENT.

, Magnet Current Safety: (37) Shim: (33)

'If source or D 2O not in core inform Reactor Supervisor before startup.

Form approved by Reactor Safpty Commit .c: ,f i

Reactor Administrator: gh4/# /, '-

1- n c M i_

\

Date: May 25.1988 l

1

.. Form NEL 001 Stat 2 RSC Approval:5/25/88

- D.2

( TRIGA PREI IMINARY CIIECK SIIEET NO. DATE ,

9. Reg Rod-Drop and Linear Recorder Scram Check Linear Power Switch to 3x100: N/A(V) Raise Safety Rod 1 min.: ElA(V)

Linear Power Recorder Scram: Sl%(V) Scram at Pull Scale: N/A(4)

Magnet Lights Out: N/%(V) Down Limit Lights On: N/A(V)

Scram Reset: .N/A(4)

Calibrate Switch to "Zero": Meter N/A(0) Recorder.E!A(0)

Calibrate Switch to " Cal": Meter N!%(9) Recorder N/A(9)

10. Shim Rod. Drop and High Log Scram Check Log Power Switch to 104: (4) Raise Shim Rod 1 minute: (4) liigh Irg Scram: ,_,(V) Scram Set at kW (120 kW)

Magnet Lights Out: _(V) Down Limit Lights On: (4) Scram Reset: (V)

Calibrate Switch to"LO": Meter (100) Black Pen (0)

Calibrate Switch to"HI": Meter (3x104) Black Pen (90)

Log Power Switch to 101: (4)

Test law Log (6x10-3): Meter Red Pen ( 10)

11. Safety Rod Drop and Percent Power Scram Check Raise Safety Rod 1 minute: (4) Percent Power Scram: ,__(V)

Scram Set at  % Magnet Lights Out: _(V)

Down Limit Lights On: (4) Scram Reset: _(V) Recalibrate Meter: (4)

12. Source Induced Scram and Startup Channel Check Safety Rod Up: (V) Shim Rod to 1 Watt: (4)

Remove Source from Core: (4) ~ low leg Power: Meter Red Pen Place Source near Fission Chamber: (4)

Scram (Linear Power Switch to 3x10-2): (V) Magnet Lights Out- (V)

Replace Source in Core: _(V) Low log Power: Meter Red Pen All Down Limit Lights On: (V) Scram Reset: (4) 13 Other Scram Systems Checks (Observe Magnet Current Lights)

Manual Scram: _(V) len Chamber Power Supply: (4)

Magnet Key Scram: _(V) WaterI.evel Scram: (V)

Fuel Temperature Scram @ 'C (200*C)

14. Reactivate Radiation Alarm Damper: (V) Scram Reset: (V)

Operator's Signature e tor A ini a : 4/ d Date:May 25.1988

  • . Form NEL001 Sheet 3 -

. . RSC Approvat:$/25/88 l

, B.3 TRIGA CRITICAL Alt 40ACH RUN NUMBER DATE I OPERATOR SENIOR OPERATOR SUPERVISOR I

1. Linear Power Switch to 1x100: (V) Log Power Switch to 101: ,,,,_(V)
2. Power to 1 Watt Start Position: Time:

Safety Rod Up Position: Time: _

1 Reg Rod at Position: Time:

l Shim Rod at Position: Time:

Power Level At I Watt: (V) Record Powerin Operations Log: (V)

Remove Source and Stabilize Power: (V) Record Power in Operations Log: _(V)

3. Log Power Switch to 104: (V) Linear Switch to 100 kW: (V)

Linear Power: Meter at 1 Watt: (V) Percent Power at 0: (V)

High Log Power: Meter at 100: (V) Black Pen at 0: _(V)

Operator's Signature FUEL TEMPER ATURE Cll ANNEL CIIECK (Satisfies TRIGA Technical Specification 4.2(3))

Power Level: kW Puel Temperature: 'C Thermocouple Chanel No.

' ~

Previous Run: Date: Log & Page Nos. -

Power: kW - Temperature: 'C Operator's Signature:

- - - ~~ - " - - -

TRIGA TERMINATION RUN NUMBER DATE OPERATOR SENIOR OPERATOR SUPERVISOR

1. Reconfer off: (V) Pens Up: (V) Water Temperature: 'C

' Water Conductivity: mho/cm Ventilation System Off: (V) Auxiliary Survey Meter Off: (V)

2. Source Replaced in Core: (V) Demineralizer Off: (V) Activate Security Sytem: (V)
3. Key Removed from Console at: (time) - Console Power Off: ,_(V)
4. Incremental Power Generated KWH Incremental Hours Operated TotalPower Generated KWH Total Hours Operated Run Loggedi Log No. Pages to Operator's Signature e tor A ini ao: / -

/ t/h i Date: May 25.1988 f