ML20248M249

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-407/98-201 on 980112-16.No Violations Noted.Two Change Requests Are Expected Following Evaluation & Recommendation to Reactor Safety Committee for Approval Re TS 4.3.3 & 5.4
ML20248M249
Person / Time
Site: University of Utah
Issue date: 06/11/1998
From: Weiss S
NRC (Affiliation Not Assigned)
To: Slaughter D
UTAH, UNIV. OF, SALT LAKE CITY, UT
Shared Package
ML20248M250 List:
References
50-407-98-201, NUDOCS 9806150198
Download: ML20248M249 (4)


See also: IR 05000407/1998201

Text

_

. _ _ _ _ _ _ - _ _ _ _

_-

_

,

June 11, 1998

Dr. David M. Slaughter

Director of CENTER

160 S. Central Campus Dr. Rm.104

Salt Lake City, UT 84112

l

SUBJECT:

NRC INSPECTION REPORT NO. 50-407/98-201

Dear Dr. Slaughter

A U.S. Nuclear Regulatory Commissioa (NRC) inspection was conducted from

January 12 to 16,1998, of your TRIGA reactor facility. The enclosed report represents

the results of that inspection.

No significant safety issues were identified. Two change requests are expected following

your evaluation and recommendation to the Reactor Safety Committee for approval

regarding Technical Specification Sections 4.3.3 and 5.4.

Your cooperation with us is appreciated.

Sincerely,

ORIGINAL SIGNED BY:

Seymour H. Weiss, Director

Non-Power Reactors and Decommissioning

Project Directorate

Division of Reactor Program Management

Office of Nuclear Reactor Regulation

i

Docket No. 50-407

License No. R-126

,/ '

Enclosure: NRC Inspection Report No.50-407/98-201

,

, ., y

See ne t pag

9006150198 900611

PDR

ADOCK 06000407

O

DISTRIBUTION:

HARD COPY

E-MAIL

Docket File 50-407

JRoe

AAdams

WEresian

PUBLIC

SWeiss

TBurdick

Pisaac

PDND r/f

EHylton

PDoyle

DScrenci (2)

DISP (012-H7-form only)

TMichaels

GTracy

TMichaels

CBasset:

SHolmes

MMendonca

-

,

PDN

I

PDND:P

P

LA

P ND:D

SHo

s

TMichae s

on

SWeiss

6/f /98

6////98

6/9 /98

6/{ /98

OFFICIAL RECORD COPY

DOCUMENT NAME: G:\\SECY\\ HOLMES \\ UTAH 1.98

- _ _ _

.

June 11, 1998

!

Dr. David M. Slaughter

Director of CENTER

160 S. Central Campus Dr. Rm.104

Salt Lake City, UT 84112

SUBJECT:

NRC INSPECTION REPORT NO. 50-407/98-201

Dear Dr. Sisughter

A U.S. Nuclear Regulatory Commission (NRC) inspection was conducted from

January 12 to 16,1998, of your TRIGA reactor facility. The enclosed report represents

the results of that inspection.

No significant safety issues were identified. Two change requests are expected following

your evaluation and recommendation to the Reactor Safety Committee for approval

regarding Technical Specification Sections 4.3.3 and 5.4.

Your cooperation with us is appreciated.

Sincerely,

ORIGINAL SIGNED BY:

Seymour H. Weiss, Director

Non-Power Reactors and Decommissioning

Project Directorate

Division of Reactor Program Management

Office of Nuclear Reactor Regulation

Docket No. 50-407

License No. R-126

Enclosure: ' NRC Inspection Report No.50-407/98-201

cc w/ enclosure:

See next page

DISTRIBUTION:

HARD COPY

E-MAIL

Docket File 50-407

JRoe

AAdams

WEresian

PUBLIC

SWeiss

TBurdick

Pisaac

l_

PDND r/f

EHylton

PDoyle

DScrenci (2)-

DISP (012-H7 form only)

TMichaels

GTracy

TMichaels

CBassett

SHolmes

MMendonca

PDNggi

PDND:PM

P

.LA

P

D:D

SHoWes '

TMichael

on

SWeiss

6/ /98

6////98

6/i /98

6/{'?'8

O ICIAL RECORD COPY

. DOCUMENT NAME: G:\\SECY\\ HOLMES \\ UTAH 1.98

1

,

l

l

  1. c trom

.

0

o

9

y

81

UNITED STATES

p*

.

!

j

j

NUCLEAR REGULATORY COMMISSION

2

WASMJ3 ton, D.C. 20%'i4001

%,

June 11, 1998

.....

Dr. David M. Slaughter

l

Director of CENTER

160 S. Central Campus Dr. Rm.104

l

Salt Lake City, UT 84112

SUBJECT:

NRC INSPECTION REPORT NO. 50-407/98-201

Dear Dr. Slaughter

A U.S. Nuclear Regulatory Commission (NRC) inspection was conducted from

January 12 to 16,1998, of your TRIGA reactor facility. The enclosed report represents

the results of that inspection.

No significant safety issues were identified. - Two change requests are expected following

your evaluation and recommendation to the Reactor Safety Committee for approval

regarding Technical Specification Sections 4.3.3 and 5.4.

Your cooperation with us is appreciated.

Sincerely,

r

Seymour H. Weiss, Director

Non-Power Reactors and Decommissioning

Project Directorate

Division of Reactor Program Management

Office of Nuclear Reactor Regulation

Docket No. 50-407

License No. R-126

Enclosure: NRC Inspection Report No.50-407/98-201

cc w/ enclosure:

See next page

1

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

._

.-

_

_

-

________ __-_______ _ ___- __ _-_

_ _ __-_-__

"

.

I

e

.

University of Utah

Docket No. 50-407

cc:

Dr. James J. Thompson

Director, U of U Radiological Health

l

100 OSH, University of Utah

i

Salt Lake City, UT 84112

.

Dr. Ronald J. Pugmire

Assoc. VP for Research

210 Park, University of Utah

Salt Lake City, UT 84112

Test, Research and Training

Reactor Newsletter

,

l

202 Nuclear Sciences Center -

l

l

University of Florida

.

I

Gainesville, FL 32611

l

l ..

i

1

l

l

l

l

I

I

l

h

i

'

-

l