| ML20206E246 | |
| Person / Time | |
|---|---|
| Site: | 05000072, University of Utah |
| Issue date: | 11/14/1988 |
| From: | Murray B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Brophy J UTAH, UNIV. OF, SALT LAKE CITY, UT |
| Shared Package | |
| ML20206E250 | List: |
| References | |
| CAL-88-06, CAL-88-6, EA-88-064, EA-88-64, NUDOCS 8811180019 | |
| Download: ML20206E246 (2) | |
See also: IR 05000072/1988003
Text
a
.
t
e
p
r
.
>
l
,,
,
t
p 14 M
%"
In Reply Refer To:
Deckets:
50-072/88-03
.
<
,
50-407/88-03
!
,
EA: 88-64
'
t
'L
s
Dr. James J. Bropb'
i
Vice Fresident of lese rch
University of Utah
Salt Lake City, Utah 84112
{
>
Gentlemer,
This refers to the inspection conducted by Messrs. H. D Chaney and
'J. A. Kelly of thiv office during the period October 5-6, 1988, of
'
activities authorized by NRC Op; rating Licenses R-25and R-126 for the
,
University of Utah's AGN-201 and TRIGA reactors, respectively, and to the
,
r
discussion of our findings with Messrs. D. K. Gehmlich and G. M. Sa:,cquist, and
r
}
other members of your staff at the conclusion of the inspection.
{
r
I
Areas examined during the inspection involved your correct ce actions taken in
!
response to the findings discussed in NRC Inspection Reports 50-072/88-01 and
!
50-407/88-01, and the July 8,1988, Order and Notices of Violation and
[
. Deviation (EA 88-64).
During this inspection, your ability to safely restart
,
L
the TR:GA reactor (R-126) was also reviewed (CAL 88-06). Within these
areas. the inspection consisted of selective examination of procedures and
representative records, intsrvlews with personnel, and observations by the NRC
(
inspe: tors. The inspection fir. dings are documented in the enclo,ed inspection
g
report.
l
'
I
TRIGA reactor restart aspects were communicated to you via separate
correspondence.
Within the scope of the inspection, no violations or deviations were
,
s
identified.
,
]
Should you have iny questions concerning this inspection, we will be pleased to
p
discuss them with you.
4
Sincerely.
Om ut si,md +.sy:
iM .!d L 3:nca t
B. Murray, Chief
Reactor Programs Branch
Enclosure:
Appendix - NRC Inspection Report
l/
h'{
N
50-072/88-03
A
50-407/88-03
C:FRPS:kPB
SEPS:RPB
C:SEPS:RPB
C:
T!
,k
RIV:FRPS: P
BMurrak \\bQ:DR
HDChaney/t
REBaer
JAF4elty
R Everett
LBa
rt
g/Q/88
il / /88
q
it /p /88
d/g/88
88
/ 4 /88
I
8811100019 881114
$DR
ADOCK 0500
p
gg }
i
a
,
,
,
cc w/ enclosure:
University of Utah
ATIN: Gary Sandquist, Director Nuclear
Engineering Laboratory
Merrill Engineering Building
Department of Mechanical Engineering
Salt Lake O'+.Y
Utah 84112
Utah Department of Health
ATTN:
L. F. Anderson, Director
Bureau of Radiation Health
288 North 1460 West
P.O. Box 16700
Salt Lake City, Utah 84116-0700
University of Utah
ATTN:
K. J. Schiager
Radiation Safety Officer
Radiological Health Department
100 Orson Spencer llall
Salt Lake City, Utah 84112
Univ 1rsity of Utah
ATTN:
Kevan frewford, Reactor Supervisor
Merrill Engineering Building
Department of Mechanical Engineering
Salt Lake City, Utah 84112
University of Utah
Dietrich K. Gehmlich, Reactor Adiainistrator
Merrill Engineering Building
Deph'tment of Mechanical Engineerirg
Salt Lake City, Utah 84112
S
DMB - IE-01
bcc:
R. Martin
- H.
D. Chaney
- C . f,P SD-DRS S
A. Adams, NRR Project Manager
- DRP
Lisa Shea, RM/ALF
"RIV File
- MIS Coordinator
- RSTS Operator
- DRS
R. L. Bangart DRSS
- C:FRPS
- R. Hall-DRSS
- RPB-DRSS
>~
F. Sanborn, E0
- J
A. F. /elly
- u ' ; . ~.