|
|
Line 1: |
Line 1: |
| {{Adams | | {{Adams |
| | number = ML20055C803 | | | number = ML20272A287 |
| | issue date = 02/20/2020 | | | issue date = 09/28/2020 |
| | title = Information Request February 20, 2020 River Bend Station NRC Inspection Report 05000458/2020412 | | | title = Security Baseline Inspection Report 05000458/2020412 |
| | author name = | | | author name = Kellar R |
| | author affiliation = NRC/RGN-IV | | | author affiliation = NRC/RGN-IV/DRS/PSB-1 |
| | addressee name = | | | addressee name = Vercelli S |
| | addressee affiliation = | | | addressee affiliation = Entergy Operations, Inc |
| | docket = 05000458 | | | docket = 05000458 |
| | license number = | | | license number = NPF-047 |
| | contact person = Kellar R | | | contact person = |
| | case reference number = IR 2020412 | | | document report number = IR 2020412 |
| | document type = - No Document Type Applies | | | document type = Inspection Report, Letter |
| | page count = 3 | | | page count = 7 |
| }} | | }} |
|
| |
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:ML20055C803 PAPERWORK REDUCTION ACT STATEMENT This letter contains mandatory information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) | | {{#Wiki_filter:ber 28, 2020 |
| approved these information collections (approval number 3150-0011). Send comments regarding this information collection to the Information Services Branch, Office of the Chief Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and Budget, Washington, DC 2050 Public Protection Notification The NRC may not conduct nor sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control numbe ML20055C803 Information Request February 20, 2020 River Bend Station NRC Inspection Report 05000458/2020412 Inspection Date April 13-17, 2020 Please provide the attached information to the inspection team for in-office inspection and review to arrive at our regional office no later than March 31, 2020. Items may be provided on CERTREC/IMS, emailed if appropriate, in hard copy, or a combination of all.
| |
|
| |
|
| NOTE: DO NOT forward any information on flash drives. Please properly package and mark SGI materials. Thank you in advance for your assistance.
| | ==SUBJECT:== |
| | RIVER BEND STATION - SECURITY BASELINE INSPECTION REPORT 05000458/2020412 |
|
| |
|
| Send to: Attention, Michael Chambers / Arnold Meyen U.S. Nuclear Regulatory Commission 1600 E. Lamar Blv Arlington TX 76011-4511 In an effort to keep the requested information organized please submit the information to us using the same lettering system below. For example, all condition reports should be in a file/folder titled 1- A, Applicable procedures in 1- B, etc.
| | ==Dear Mr. Vercelli:== |
| | On April 17, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at River Bend Station. On September 16, 2020, the NRC inspectors discussed the results of this inspection with Mr. Bruce Chenard, Director of Engineering, and other members of your staff. |
|
| |
|
| General: All Security Event Log entries since April 13, 2019. Security Program Procedure indices for all procedures, instructions, desk-top guides, standing orders, etc. The site Corrective Action Program procedure. The Safety Security Interface procedure. Please state what revision of your physical security plan you are currently using.
| | The results of this inspection are documented in the enclosed report. |
|
| |
|
| Document Request List - RBS - Week of 04/13/20 Team Inspection 1. Licensee Protective Strategy and Performance Evaluation Program (71130.05), Issue Dated 12/10/18) Condition Reports written since January 1, 2018 to February 20, 2020, that relate in any way to your Protective Strategy and/or Performance Evaluation Program, as related to the effectiveness of the onsite physical protection program and protective strategy, including drills and exercises. Please provide any additional Protective Strategy and Performance Evaluation Program CRs that may be written after February 20, 2020 while we are on site. Any Protective Strategy related procedure or lower tier document. Also, any procedure that covers contingency equipment available to the security force. Security Program Reviews, audits, or self-assessments which in any way address the Protective Strategy and Performance Evaluation Program since January 1, 2018. Provide documents/procedures that describe how the licensee will demonstrate and assess the effectiveness of the onsite physical protection program and protective strategy, to include: any implementing procedure or lower tier tool related to your PEP, any procedures or lower tier tool related to design and implementation of tactical drills and FOF exercise program. Provide any procedure or lower tier document that governs your training and use of exercise controllers and the mock adversary forc ML20055C803 Please be prepared to provide the following items upon our arrival onsite. Quarterly drill records w/participants, to include scenarios and critiques, since January 1, 2018. Also include tabletop drill records. Annual exercise records, to include scenarios and critiques, since Jan 1, 2018. A complete list of personnel that will be used as controllers during the exercise that you will be conducting during the week of April 13, 2020. Exercise controller and mock adversary force training and records. Any exercise scenarios that will or may be used during the exercise that you will be conducting during the week of April 13, 2020. MILES weapons issue procedures and MILES no play areas.
| | No findings or violations of more than minor significance were identified during this inspection. |
|
| |
|
| Please be prepared to provide the following items during the on-site inspection. Engineering standoff calculations related to DBT requirements related to human fragility. Manufacturer or vendor manuals or data sheets supporting various barriers, BREs, etc. Basis document for security force and adversary timelines, and a list of all timelines. Current Target Set list. Unattended Openings map and analysis. Documented copy of liaison established with LLEA Protective Strategy Brief, to include maps/overview of site footprint, with structures and OCA/PA boundaries and delays, and interior delays. All current compensatory measure LAST ITEM FOR 71130.05 3
| | This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. |
| | |
| | Sincerely, Digitally signed by Ray L. Kellar Ray L. Kellar Date: 2020.09.28 15:54:33 -05'00' |
| | Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 05000458 License No. NPF-47 |
| | |
| | ===Enclosure:=== |
| | As stated |
| | |
| | ==Inspection Report== |
| | Docket Number: 05000458 License Number: NPF-47 Report Number: 05000458/2020412 Enterprise Identifier: I-2020-412-0000 Licensee: Entergy Operations, Inc. |
| | |
| | Facility: River Bend Station Location: St. Francisville, Louisiana Inspection Dates: September 14, 2020 to September 16, 2020 Inspectors: R. Lanfear, Physical Security Specialist A. Meyen, Physical Security Inspector Approved By: Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Enclosure |
| | |
| | =SUMMARY= |
| | The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at River Bend Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. |
| | |
| | List of Findings and Violations No findings or violations of more than minor significance were identified. |
| | |
| | Additional Tracking Items None. |
| | |
| | =INSPECTION SCOPES= |
| | |
| | Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at: |
| | http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. |
| | |
| | ==SAFEGUARDS== |
| | |
| | ==71130.05 - Protective Strategy Evaluation The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements: |
| | Protective Strategy Evaluation== |
| | {{IP sample|IP=IP 71130.05|count=1}} |
| | |
| | (1) |
| | * Tier I: 02.01 all requirements completed except 02.01j 02.02 all requirements completed 02.03a completed 02.04a,b,c,e completed |
| | * Tier II: 02.05a complete 02.06 all requirements completed except 02.06b,c 02.07b,c,e completed |
| | * Tier III: 02.08 all requirements completed 02.09a,b completed 02.10a completed 02.11 all requirements completed |
| | |
| | ==INSPECTION RESULTS== |
| | No findings were identified. |
| | |
| | ==EXIT MEETINGS AND DEBRIEFS== |
| | The inspectors verified no proprietary information was retained or documented in this report. |
| | * On September 16, 2020, the inspectors presented the security baseline inspection results to Mr. Bruce Chenard, Director of Engineering, and other members of the licensee staff. |
| | |
| | =DOCUMENTS REVIEWED= |
| | |
| | Inspection Type Designation Description or Title Revision or |
| | Procedure Date |
| | 71130.05 Corrective Action CR 2018-05785 |
| | Documents 2018-05786 |
| | 2018-08834 |
| | 2018-05884 |
| | 2018-05164 |
| | 2018-05950 |
| | 2018-05573 |
| | 2018-05593 |
| | 2018-05779 |
| | 2019-01163 |
| | 2019-00618 |
| | 2019-04024 |
| | 2019-03790 |
| | 2018-00027 |
| | 2018-02352 |
| | 20-03878 |
| | 20-03879 |
| | 2019-03793 |
| | LO-RLO 2019-00033 CA-4/5 |
| | LO-RLO 2018-00005 |
| | Miscellaneous Local Law |
| | Enforcement |
| | Agreement |
| | Physical Security |
| | Plan |
| | Safeguards |
| | Contingency Plan |
| | Training and |
| | Qualification Plan |
| | Procedures EN-NS-215 Conduct of Security Force Exercises and Drills 21 |
| | EN-NS-215-1 Tactical Response Drills 0 |
| | SDI-08 RBS Protective Strategy Plan 25 |
| | Inspection Type Designation Description or Title Revision or |
| | Procedure Date |
| | Self-Assessments LO-RLO-2019- Self-Assessment/Formal Benchmark Report 12/12/2019 |
| | 00033 |
| | QA-16-2018- Quality Assurance Audit Report 12/03/2018 |
| | RBS-1 |
| | Work Orders WTRBS 2018-27-CA-28/29 |
| | 5 |
| }} | | }} |
|
---|
Category:Inspection Report
MONTHYEARIR 05000458/20240102024-10-31031 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2024010 IR 05000458/20240032024-10-31031 October 2024 Integrated Inspection Report 05000458/2024003 IR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) IR 05000458/20240022024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation ML24164A0862024-06-12012 June 2024 Notification of Commercial Grade Dedication Inspection (05000458/2024010) and Request for Information IR 05000458/20240012024-05-14014 May 2024 Integrated Inspection Report 05000458/2024001 IR 05000458/20244022024-04-15015 April 2024 Security Baseline Inspection Report 05000458/2024402 (Full Report) IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 IR 05000458/20240402024-03-15015 March 2024 – 95001 Supplemental Inspection Report 05000458/2024040 and Follow-Up Assessment IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 IR 05000458/20230042024-01-30030 January 2024 Integrated Inspection Report 05000458/2023004 IR 05000458/20230402024-01-18018 January 2024 – 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter IR 05000458/20230102023-12-12012 December 2023 Biennial Problem Identification and Resolution Inspection Report 05000458/2023010 IR 05000458/20230032023-11-13013 November 2023 Integrated Inspection Report 05000458/2023003 IR 05000458/20234012023-09-26026 September 2023 Cyber Security Inspection Report 05000458/2023401 IR 05000458/20234032023-09-21021 September 2023 NRC Security Inspection Report 05000458/2023403 (Cover Letter) IR 05000458/20230012023-09-21021 September 2023 NRC Inspection Report 05000458/2023001, Disputed Non-Cited Violation Rescinded IR 05000458/20230122023-09-0101 September 2023 – Comprehensive Engineering Team Inspection Report 05000458/2023012 IR 05000458/20230052023-08-21021 August 2023 Updated Inspection Plan for River Bend Station (Report 05000458/2023005) - Mid Cycle Letter IR 05000458/20230922023-08-15015 August 2023 Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023092 IR 05000458/20230022023-08-0909 August 2023 Integrated Inspection Report 05000458/2023002 IR 05000458/20230912023-07-20020 July 2023 Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023091 IR 05000458/20234042023-07-11011 July 2023 NRC Security Inspection Report 05000458/2023404 (Cover Letter Only) IR 05000458/20230902023-06-26026 June 2023 NRC Inspection Report 05000458/2023090 and Preliminary White Finding ML23116A2352023-05-0101 May 2023 Integrated Inspection Report 05000458/2023001 IR 05000458/20230112023-04-12012 April 2023 NRC License Renewal Phase 1 Inspection Report 05000458/2023011 IR 05000458/20220062023-03-0101 March 2023 Annual Assessment Letter for River Bend Station Report 05000458/2022006 IR 05000458/20220042023-02-0101 February 2023 Integrated Inspection Report 05000458/2022004 IR 05000458/20220102022-12-12012 December 2022 Triennial Fire Protection Inspection Report 05000458/2022010 IR 05000458/20220032022-11-0303 November 2022 And Independent Spent Fuel Storage Installation Integrated Inspection Report 05000458/2022003 and 07200049/2022001 IR 05000458/20224022022-09-12012 September 2022 NRC Security Inspection Report 05000458/2022402 (Full Report) IR 05000458/20220022022-08-0909 August 2022 Integrated Inspection Report 05000458/2022002 IR 05000458/20220112022-06-0202 June 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2022011 IR 05000458/20220012022-04-27027 April 2022 Integrated Inspection Report 05000458/2022001 IR 05000458/20210062022-03-0202 March 2022 Annual Assessment Letter (Report 05000458/2021006) IR 05000458/20210042022-01-25025 January 2022 Integrated Inspection Report 05000458/2021004 ML22011A0992022-01-14014 January 2022 IR 2021012 EOI CO3 IR 05000458/20214022021-12-15015 December 2021 Security Baseline Inspection Report 05000458/2021402 IR 05000458/20214042021-12-0707 December 2021 Material Control and Accounting Program Inspection Report 05000458/2021404, Publicly Available IR 05000458/20214012021-12-0303 December 2021 Security Baseline Inspection Report 05000458/2021401 IR 05000458/20223012021-11-30030 November 2021 Notification of NRC Initial Operator Licensing Examination 05000458/2022301 IR 05000458/20210032021-11-0404 November 2021 Integrated Inspection Report 05000458/2021003 IR 05000458/20210912021-09-30030 September 2021 Notice of Violation and Proposed Imposition of $150,000 Civil Penalty, NRC Inspection Report 05000458/2021091 and Investigation Reports 4-2020-008, 4-2020-009, and 4-2020-019 IR 05000458/20210022021-08-11011 August 2021 Integrated Inspection Report 05000458/2021002 IR 05000458/20210902021-07-0101 July 2021 NRC Inspection Report 05000458/2021090 and Investigation Reports 4-2020-008, 4-2020-009, and 4-2020-019 IR 05000458/20210132021-05-25025 May 2021 Rriver Bend Station - NRC Baseline Inspection Report 05000458/2021013 IR 05000458/20214032021-05-24024 May 2021 Security Baseline Inspection Report 05000458/2021403 IR 05000458/20210012021-05-0505 May 2021 RBS2021001-RP-RJK, River Bend Station - Integrated Inspection Report 05000458/2021001 IR 05000458/20210102021-03-18018 March 2021 2021 River Bend Station - Biennial Problem Identification and Resolution Inspection Report 05000458/2021010 and Notice of Violation IR 05000458/20200042021-02-11011 February 2021 RBS2020004-RP-RJK, River Bend Station - Integrated Inspection Report 05000458/2020004 2024-08-22
[Table view] Category:Letter
MONTHYEARIR 05000458/20240102024-10-31031 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2024010 IR 05000458/20240032024-10-31031 October 2024 Integrated Inspection Report 05000458/2024003 RBG-48315, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement2024-09-24024 September 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement RBG-48306, Report of Changes and Errors to 10CFR50.462024-09-24024 September 2024 Report of Changes and Errors to 10CFR50.46 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information RBG-48311, Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022024-08-28028 August 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 IR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24214A2752024-08-0202 August 2024 Acknowledgement of Readiness for Supplemental Inspection RBG-48308, Notification of Readiness for Supplemental Inspection2024-07-31031 July 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20240022024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation ML24164A0862024-06-12012 June 2024 Notification of Commercial Grade Dedication Inspection (05000458/2024010) and Request for Information 05000458/LER-2023-005-01, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-06-0404 June 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors IR 05000458/20240012024-05-14014 May 2024 Integrated Inspection Report 05000458/2024001 ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions ML24102A2842024-05-0707 May 2024 Summary of Regulatory Audit in Support of LARs to Revise Technical Specifications to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 RBG-48276, 2023 Annual Radioactive Effluent Release Report2024-04-23023 April 2024 2023 Annual Radioactive Effluent Release Report RBG-48288, Louisiana Pollutant Discharge Elimination System Permit Renewal2024-04-15015 April 2024 Louisiana Pollutant Discharge Elimination System Permit Renewal IR 05000458/20244022024-04-15015 April 2024 Security Baseline Inspection Report 05000458/2024402 (Full Report) ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair RBG-48277, 2023 Annual Radiological Environmental Operating Report2024-04-10010 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) IR 05000458/20240402024-03-15015 March 2024 – 95001 Supplemental Inspection Report 05000458/2024040 and Follow-Up Assessment ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24066A1802024-03-0707 March 2024 Notification of NRC Follow-Up Inspection for Any Severity Level I or II Traditional Enforcement Violation IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 RBG-48278, 2023 Spent Fuel Storage Radioactive Effluent Release Report2024-02-27027 February 2024 2023 Spent Fuel Storage Radioactive Effluent Release Report RBG-48286, Revision to Owners Activity Report Form (OAR) for Cycle 222024-02-27027 February 2024 Revision to Owners Activity Report Form (OAR) for Cycle 22 ML24031A0042024-02-21021 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0052 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000458/LER-2023-006, Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard2024-02-0808 February 2024 Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard RBG-48274, Notification of Readiness for Supplemental Inspection2024-02-0505 February 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20230042024-01-30030 January 2024 Integrated Inspection Report 05000458/2023004 IR 05000458/20230402024-01-18018 January 2024 – 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter 05000458/LER-2023-005, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-01-16016 January 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) 05000458/LER-2023-004, Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure2023-12-28028 December 2023 Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment 2024-09-24
[Table view] |
Text
ber 28, 2020
SUBJECT:
RIVER BEND STATION - SECURITY BASELINE INSPECTION REPORT 05000458/2020412
Dear Mr. Vercelli:
On April 17, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at River Bend Station. On September 16, 2020, the NRC inspectors discussed the results of this inspection with Mr. Bruce Chenard, Director of Engineering, and other members of your staff.
The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Digitally signed by Ray L. Kellar Ray L. Kellar Date: 2020.09.28 15:54:33 -05'00'
Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 05000458 License No. NPF-47
Enclosure:
As stated
Inspection Report
Docket Number: 05000458 License Number: NPF-47 Report Number: 05000458/2020412 Enterprise Identifier: I-2020-412-0000 Licensee: Entergy Operations, Inc.
Facility: River Bend Station Location: St. Francisville, Louisiana Inspection Dates: September 14, 2020 to September 16, 2020 Inspectors: R. Lanfear, Physical Security Specialist A. Meyen, Physical Security Inspector Approved By: Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at River Bend Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations No findings or violations of more than minor significance were identified.
Additional Tracking Items None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
SAFEGUARDS
==71130.05 - Protective Strategy Evaluation The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:
Protective Strategy Evaluation==
Main article: IP 71130.05
(1)
- Tier I: 02.01 all requirements completed except 02.01j 02.02 all requirements completed 02.03a completed 02.04a,b,c,e completed
- Tier II: 02.05a complete 02.06 all requirements completed except 02.06b,c 02.07b,c,e completed
- Tier III: 02.08 all requirements completed 02.09a,b completed 02.10a completed 02.11 all requirements completed
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On September 16, 2020, the inspectors presented the security baseline inspection results to Mr. Bruce Chenard, Director of Engineering, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71130.05 Corrective Action CR 2018-05785
Documents 2018-05786
2018-08834
2018-05884
2018-05164
2018-05950
2018-05573
2018-05593
2018-05779
2019-01163
2019-00618
2019-04024
2019-03790
2018-00027
2018-02352
20-03878
20-03879
2019-03793
LO-RLO 2019-00033 CA-4/5
LO-RLO 2018-00005
Miscellaneous Local Law
Enforcement
Agreement
Physical Security
Plan
Safeguards
Contingency Plan
Training and
Qualification Plan
Procedures EN-NS-215 Conduct of Security Force Exercises and Drills 21
EN-NS-215-1 Tactical Response Drills 0
SDI-08 RBS Protective Strategy Plan 25
Inspection Type Designation Description or Title Revision or
Procedure Date
Self-Assessments LO-RLO-2019- Self-Assessment/Formal Benchmark Report 12/12/2019
00033
QA-16-2018- Quality Assurance Audit Report 12/03/2018
RBS-1
Work Orders WTRBS 2018-27-CA-28/29
5