ML20112B003: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:--
APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0325 UNIT BRUNSWICK UNIT i
                                                      ~
DATE 02/06/05 l                                                        COMPLETED BY FRANCES HARRISON l                                                        TELEPHONE (919)457-9521 l
JANUARY        1985 DAY  AVG. DAILY POWER LEVEL          DAY  AVG. DAILY POWER LEVEL (MWE-NET)                            (MWE-NET) i          i            715                    17              682              -
2            701                    18              596 l
3            700                    19              634 693 1          4            711                    20 0          5            706                    21              678 6            705                    22              674
!          7            703                    23              672 8            703                    24              638 9            701                -
25              -11 i
10              698                    26              -4 l        ti            696                    27              488
!        12            694                    28              656 i        13            695                    29              667 14            692                    30              660 15            690                    31              659 16            688 a
4 4
1.16 - 8
:                                                                                      i i
h R
K      324 FH
 
p    -.
OPERATING DATA REPORT DOCKET NO. 050-0325 DATE                    02/06/85 COMPLETED BY FRANCES HARRISON TELEPHONE                (919)457-9521 OPERATING STATUS
: 1. UNIT NAME: BRUNSWICK UNIT i                      l NOTES                                                    l
: 2. REPORTING PERIOD: JANUARY      85                  l                                                        1
: 3. LICENSED THERMAL POWER (MWT): 2436                  l                                                        [
: 4. NAMEPLATE RATING (GROSS MWE): 867.0                l                                                        l
: 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 t                                                                  i
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 1                                                                  I
: 7. HAX DEPENDABLE CAPACITY (NET MWE): 790.0          -------------------------------
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
        ?. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
: 10. REASONS FOR RESTRICTION IF ANY:
THIS                      YR TO                CUMUL MONTH                        DATE                ATIVE
: 11. HOURS IN REPORTING PERIOD                      744.00                      744.00            69049.00
: 12. NUMBER OF HOURS REACTOR CRITICAL              711.52                      711.52            44133.38
: 13. REACTOR RESERVE SHUTDOWN HRS                        .00                          .00            1647.10
: 14. HOURS GENERATOR ON LINE                        696.97                      696.97            41585.80'
: 15. UNIT RESERVE SHUTDOWN HOURS                        .00                          .00                      .00
: 16. GROS 3 THERMAL ENERGY GEN. (MWH)        1437179.59                1437179.59          85436376.51
: 17. GROSS ELEC. ENERGY GEN. (MWH)            484531.00                  484531.00          28226628.00
: 10. NET ELEC. ENERGY GENERATED (MWH)          469990.00                  469990.00          27115781.00 19 UNIT SERVICE FACTOR                              93.68                        93.60                  40.23
: 20. UNIT AVAILABILITY FACTOR                        93.68                      93.68                  60.23
: 21. UNIT CAP. FACTOR (USING MDC NET)                79.96                      79.96                  49.71
: 22. UNIT CAP. FACTOR (USING DER NET)                76.94                      76.94                  47.83
: 23. UNIT FORCED OUTAGE RATE                          6.32                        6.32                20.81
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
REftlE!.ING 04-01-85              30 WEEKd
: 25. IF UHUTDOWN AT END OF REPORT PERIOD, ESTIM%TED DATE OF START UP
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST                            ACHCIVED INITIAL CRITICALITY                                              --------      --------
INITIAL ELECTRICITY                    ,
COMMERCIAL OPERATION                                              --------      --------
 
f
!                                                            APPENDIX DOCKET NO.: 050-0325 UNIT: Brunswick 1 DATE: February 1985 COMPLETED BY: Frances Harrison 4                                                      OPERATIONS SU) MARY BRUNSWICK UNIT 1 Brunswick Unit 1 operated at a 93.68 availability factor for the month of January with a 79.96% capacity factor. There was one scram and one power reduction. Details are in Appendix D, Unit Shutdowns and Power Reductions log.
There are 656 BWR and 160 PWR spent fuel bundles in the Brunswick Unit I fuel pool.
i s
I e
f i
t
 
.i i
4-DOCKET NO. 'H50-0325 UNIT SHUTDOWNS AND POWER REDUCTIONS                        UNIT NAME Brunnutek i              '
DATE February 1985 COMPLETED BY Francen Harriann REFORT MONTH Januarv 1985                          TELEPHONE (919 M 57-4s?1 i
_ ~h                                '3".
jN'5                      jg                              Cause & Corrective
                                                      ~
                                          -        - gg        3                      Licensee
                                                                                                                                        ^'"'"
W          Dec      y,      3g        4    2iE              Event    g,'?
mo        EO                  Prevent Recurrence 3:          E    =gjj g
                                                                        ~              Reptwt a              g 6
85-002    850118      S        00        B      5      NA                                  Power reduction-I&C working.on stator cooling pressure control valve,                .
l                :                                                      3 Method:
4                  .
Exhibit G-Instructions F: Forced            Reason:
A-Equipment Failure (Explain)                        l-Manual                          for Preparatism of Data S: Scheduled 8-Maintenance of Test                              2-Manual Scram.                    Entry Sheets for Licensee C-Refueling                                          3-Automatic Scram.                Event Repsut (LER) File (NUREG-D-Regulatory Restriction                                                              0161)
E-Operator Training & Ucense Examination 8s-Continuations F Administrative                                    5-toad Reductions            5 G-Operational Errus (Explaini                      6-Other                            Eshibit I - Same Source (9/77)                  Il-Other (Explaini
    --- . -- --_--- .                                                                                                                _              __                }
 
1                                                                                                                                                                                                                          .
l                                                                                                                                                                                    DOCKET NO. ' 050-032s UNIT SHUTDOWNS AND POWER REDUCTIONS                                                            UNIT NAME Brunnuick i
* DATE February 19AS N M EY                        """" " " " " " "
                                                                  -                                    REPORT MONTH Janiinry ica5                                                      TELEPHONE (919u s7-os?1 I
I                                                                                                                                                                                                        *:
'                            (                    -
                                                          -{-
                                                                          ;      j s*k                              Licensee      Eg                                                Cause & Corrective 2s&                                    Evene    g?                                                        ^*'        '"
)                %.                Daic              $          3        ?,
W          f :,,    d      yv g g                            Repews =      eU                      gE O.                    Prevent Recurrence 6
                                                                                                                                                                                                                    ~
l        85-003            850124                  F          47.03    A              3                    NA                                                .
                                                                                                                                                                  . Reactor scrant-turbine ,stop valve fast ,
closure due to loss of vacuum.
i i
l 1
i l
i l
I                                    2                                                                            3                                              4 F: Fawced                      Reasem:                                                                      Method:                                              Exhibit G Instructisms S Scheduled                    A Esavipment Failure (Explain)                                                1-Manua!                                            for Preparalism of Data B-Maineenance or Test                                                          2-Manual Scram.                                      Entry Sheets for Licensee C-Refueling                                                                    3-Autuenatic Scram.                                  Event RepewI (LER) File (NUREG-D-Regulatsw> Restriction                                                                                                          0161)
E Operator Training & license Exarnisation 4-Continuations F Administrative                                                              5-Load Reductions                        5 G-Operational Error (Explain)                                                  6-Other                                              Exhibit 1 Same Source l'8/77 l'                                ll-Oeher (Explaint
 
APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 UNIT BRUNSWICK UNIT 2 DATE 02/06/85 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521
!            JANUARY                                1985 DAY                  AVG. DAILY POWER LEVEL                DAY      AVG. DAILY POWER LEVEL (MWE-NET)                                      (MWE-NET) 1                              785                  17                  789 2                              782                  18                  789 3                              602                  19                  776 l                  4                              168                  20                  781 5                              660                  21                  781 j                  6                              687                  22                  783 7                              783                  23                  787 l                                                                        s 8                              785                  24                  787 9                              786              -
25                  787 10                                  786                  26                  766 11                                  770                  27                  784 12                                  728                  28                  785 13                                  786                  29                  787 14                                  789                  30                  786 15                                  772                31                  786 16                                  792 1.16 - 8
_ _ _ _ _ _ _ _ _ _ _ _ _ . _ .        - - , . -                          . . er        _  ,
 
OPERATING DATA REPORT DOCKET NO. 050-0324 DATE                        02/06/85 COMPLETED BY FRANCES HARRISON TELEPHONE                  (919)457-9521 OPERATING STATUS
: i. UNIT NAME: BRUNSWICK UNIT 2                      1 NOTES                                                  I
: 2. REPORTING PERIOD: JANUARY      85                l                                                        1
: 3. LICENSED THERMAL POWER (MWT): 2436              l                                                        l
: 4. NAMEPLATE RATING (GROSS MWE): 867.0              l,                                                      t
: 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I                                                                I
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 l                                                              1
: 7. MAX DEPENDABLE CAPACITY (NET MWE)- 790.0        -------------------------------
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)
: 10. REASONS FOR RESTRICTION IF ANY:
I THIS                        YR TO                  CUMUL MONTH                          DATE                ATIVE
: 11. HOURS IN REPORTING PERIOD        -
744.00                        744.00                81073.00
: 12. NUMBER OF HOURS REACTOR CRITICAL            744.00                        744.00                48121.52
: 13. REACTOR RESERVE SHUTDOWN HRS                      .00                              .00                  .00
: 14. HOURS GENERATOR ON LINE                      728.48                        728.48                44753.55
: 15. UNIT RESERVE SHUTDOWN HOURS                      .00                              .00                  .00
: 16. GROSS THERMAL ENERGY GEN. (MWH)          1708487.63              1708487.63              84819354.94
: 17. GROSS ELEC. ENERGY GEN. (MWH)            573279.00                573279.00            28174983.00
: 18. NET ELEC. ENERGY GENERATED (MWH)          557137.00                557137.00            26977611.00
: 19. UNIT SERVICE FACTOR                          97.91                          97.91                  55.20'
: 20. UNIT AVAILABILITY FACTOR                      97.91                          97.91                  55.20
: 21. UNIT CAP. FACTOR (USING MDC NET)              94.79                          94.79                  42.12
: 22. UNIT CAP. FACTOR (USING DER NET)              91.21                          91.21                  40.53
: 23. UNIT FORCED OUTAGE RATE                        2.09                            2.09                16.17
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)-
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)                      FORCAST        ACHEIVED INITIAL CRITICALITY                                                --------        --------
INITIAL ELECTRICITY                                                --------        --------
COMMERCIAL OPERATION                                              --------        --------
1.16 - 9
 
APPENDIX DOCKET NO.: 050-0324 UNIT: Brunswick 2 DATE: February 1985 COMPLETED BY: Frances Harrison OPERATIONS
 
==SUMMARY==
 
BRUNSWICK UNIT 2 A
Brunswick Unit 2 operated at a 97.91% availability for the month of January with a 94.79% capacity factor. There was one reactor recirculation pump trip and two power reductions. Details are in Appendix D. Unit Shutdowns and Power Reductions Log.
There are 608 BWR and 144 PWR, spent fuel bundles in the Brunswick Un*t 2 fuel pool.
O
 
l 1                                                                                                                    DOCKET NO. 050-0324 UNIT SHUTDOWNS AND P WER REDUCTIONS                        UNIT NAME Brunswick 2 DATE Februarv logs          ~
COMPLETED BY Frances Harrison REPDRT MONTH January 1985                        TEl.EPHONE (919)457-9571
                              -        [g        ')    h ~y h      Licensee  ,Ev,          ,                    Cause & Corrective
                                                                                                                          ^''
2 5 i
          %..        Ibic      h,      3i          i                Event    g,1          EU H                    E  jgg          Repost a  mu        g                      Prevent Recurrence f
5 85-003    850103      F      15.5
* 11      6      NA                                  Trip 2A reactor recirculation mg
                                                                                                    ~
caused by inadvertent bumping of                            -
temperature switch B32-5002A-TS-4 which trips the mg on drive motor.
* personnel error  y                                                  3                                  4 F: Forced          Reason:                                          Method:                              Exhibit G Instructions S: Scheduled        A Equipment Failure (Explain)                    I Manual                            for Preparation of Data B Maintenance of Test                            2-Manual Scram.                      Entry Sheets for Licensee C Refueling
: 3. Automatic Scram.                  Event Report (LER) File (NUREG-D Regulator) Restriction                                                              0161)
E Oper:sor Training & Ucense Examination i-Continuatlons t
F Adminisiralive                                  5-Load Reductions              5 G-Operational Error ll'xplain)
(,-Other                            Eshibii 1 Same Source 19/77)                Il-Other IExplain)
 
DOCKETNO. '050-0324 UNIT SHUTDOWNS AND PAWER REDUCTIONS                      UNIT NAME Brunswick 2 DATE Februnrv IQRs COMPLETED BY Frances'Harrinon REPORT MONTH Janunrv Iogs                        TELEPHONE (9191457-9521
                                            ..    *: u                                5                    Cause & Currective
:j 5j        y    f j,:y      l icensee  h uT g4 E                        Action lo N" -        DJ'c                            2 ; ec          Event 25
                                  $_          E 4
jig 6
Report
* N0 f'l                  Prevent Recurrence 85-006    850111    S        00        B      5      NA                              . Reduced power to 90% for E i>us degraded
* voltage test.
f I                  2                                                3                              4 F: Forced        Reason:                                          Method:                          Exhible G-Instructions S: Scheduled      A Equipment Failure (Explain)                    1-Manual                          for Preparation of Data B Maintenance uiTest                              2-Manual Scram.                  Enity Sheels for Licensee C Refueling                                      3 Automatic Scram.                Event Report (LER) File (NUREG-D Regulatory Restriction                                        .                  0161)
E. Operator Training & Ucense Examination i-Continuations t
F-Administrative                                  5-Load Reductions            3 G-Operational Error IExplain)                    6-Other                          Exhibit I Same Source P8/77)              Il Other (Explaini
 
t j
UNIT SHUTDOWNS AND POWER REDUC 110NS DOCKETNO. nsn-nwa UNITNAME 3runswick 2 DATE Tebruary 1985 REPORT MONTH Taa"ary 1485 COMPLETED BY Frneen Harrinnn TELEPHONE (919)457-9521 y,
E j*l,
                                  .$ E      'h    j $5        Licensee      Eg        g                  Cause & Corrective No.          Dale    (    $~j i      s    jg&          Event        uT vyG 63                      Action to p,,,,,,g,y,,,,,c, H        6      5    j12g a
Repost #
fu 85-007    050115      F      00          B      5        LCO-A2-85-097                      Reduced power-unlocked B reactor
                                                                        .                      recirculation pump scoop tube.                            3 8
1                  2                                                  3                              4 F: Forced          Reason:                                            Method:                        Exhibit G Instructions
;    S: Scheduled      A Equipment Failure (Explain)                      1-Manual                        for Preparation of Data B-Maintenance of Test                              2 Manual Scram.                Entry Sheets for Licensee C Refueling                                        3-Aulomatic Scram.              Event ReporI (LER) File INUREG-D-Regulatory Restriction                                                          016.)
E-Operator Training & License Examinath            4-Contlauatlons
,                        F-Administrative                                  5-Load Reductions            5 Goperational Error (Explain)                      6-0ther                        Exhibil 1 Same Source l'8/77)                Hother(Explain)
                                                          ..}}

Latest revision as of 19:37, 13 July 2020

Monthly Operating Repts for Jan 1985
ML20112B003
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 01/31/1985
From: Harrison F
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20112A850 List:
References
NUDOCS 8503180554
Download: ML20112B003 (11)


Text

{{#Wiki_filter:-- APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0325 UNIT BRUNSWICK UNIT i

                                                      ~

DATE 02/06/05 l COMPLETED BY FRANCES HARRISON l TELEPHONE (919)457-9521 l JANUARY 1985 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) i i 715 17 682 - 2 701 18 596 l 3 700 19 634 693 1 4 711 20 0 5 706 21 678 6 705 22 674 ! 7 703 23 672 8 703 24 638 9 701 - 25 -11 i 10 698 26 -4 l ti 696 27 488 ! 12 694 28 656 i 13 695 29 667 14 692 30 660 15 690 31 659 16 688 a 4 4 1.16 - 8

i i

h R K 324 FH

p -. OPERATING DATA REPORT DOCKET NO. 050-0325 DATE 02/06/85 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STATUS

1. UNIT NAME: BRUNSWICK UNIT i l NOTES l
2. REPORTING PERIOD: JANUARY 85 l 1
3. LICENSED THERMAL POWER (MWT): 2436 l [
4. NAMEPLATE RATING (GROSS MWE): 867.0 l l
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 t i
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 1 I
7. HAX DEPENDABLE CAPACITY (NET MWE): 790.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
       ?. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.00 744.00 69049.00
12. NUMBER OF HOURS REACTOR CRITICAL 711.52 711.52 44133.38
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10
14. HOURS GENERATOR ON LINE 696.97 696.97 41585.80'
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROS 3 THERMAL ENERGY GEN. (MWH) 1437179.59 1437179.59 85436376.51
17. GROSS ELEC. ENERGY GEN. (MWH) 484531.00 484531.00 28226628.00
10. NET ELEC. ENERGY GENERATED (MWH) 469990.00 469990.00 27115781.00 19 UNIT SERVICE FACTOR 93.68 93.60 40.23
20. UNIT AVAILABILITY FACTOR 93.68 93.68 60.23
21. UNIT CAP. FACTOR (USING MDC NET) 79.96 79.96 49.71
22. UNIT CAP. FACTOR (USING DER NET) 76.94 76.94 47.83
23. UNIT FORCED OUTAGE RATE 6.32 6.32 20.81
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

REftlE!.ING 04-01-85 30 WEEKd

25. IF UHUTDOWN AT END OF REPORT PERIOD, ESTIM%TED DATE OF START UP
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHCIVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY , COMMERCIAL OPERATION -------- --------

f

!                                                             APPENDIX DOCKET NO.: 050-0325 UNIT: Brunswick 1 DATE: February 1985 COMPLETED BY: Frances Harrison 4                                                       OPERATIONS SU) MARY BRUNSWICK UNIT 1 Brunswick Unit 1 operated at a 93.68 availability factor for the month of January with a 79.96% capacity factor. There was one scram and one power reduction. Details are in Appendix D, Unit Shutdowns and Power Reductions log.

There are 656 BWR and 160 PWR spent fuel bundles in the Brunswick Unit I fuel pool. i s I e f i t

.i i 4-DOCKET NO. 'H50-0325 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunnutek i ' DATE February 1985 COMPLETED BY Francen Harriann REFORT MONTH Januarv 1985 TELEPHONE (919 M 57-4s?1 i _ ~h '3". jN'5 jg Cause & Corrective

                                                      ~
                                          -        - gg         3                      Licensee
                                                                                                                                       ^'"'"

W Dec y, 3g 4 2iE Event g,'? mo EO Prevent Recurrence 3: E =gjj g

                                                                       ~               Reptwt a              g 6

85-002 850118 S 00 B 5 NA Power reduction-I&C working.on stator cooling pressure control valve, . l  : 3 Method: 4 . Exhibit G-Instructions F: Forced Reason: A-Equipment Failure (Explain) l-Manual for Preparatism of Data S: Scheduled 8-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Repsut (LER) File (NUREG-D-Regulatory Restriction 0161) E-Operator Training & Ucense Examination 8s-Continuations F Administrative 5-toad Reductions 5 G-Operational Errus (Explaini 6-Other Eshibit I - Same Source (9/77) Il-Other (Explaini

   --- . -- --_--- .                                                                                                                 _               __                }

1 . l DOCKET NO. ' 050-032s UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunnuick i

  • DATE February 19AS N M EY """" " " " " " "
                                                                  -                                    REPORT MONTH Janiinry ica5                                                      TELEPHONE (919u s7-os?1 I

I *: ' ( -

                                                          -{-
                                                                          ;      j s*k                              Licensee       Eg                                                 Cause & Corrective 2s&                                    Evene     g?                                                        ^*'        '"

)  %. Daic $ 3  ?, W f :,, d yv g g Repews = eU gE O. Prevent Recurrence 6

                                                                                                                                                                                                                    ~

l 85-003 850124 F 47.03 A 3 NA .

                                                                                                                                                                 . Reactor scrant-turbine ,stop valve fast ,

closure due to loss of vacuum. i i l 1 i l i l I 2 3 4 F: Fawced Reasem: Method: Exhibit G Instructisms S Scheduled A Esavipment Failure (Explain) 1-Manua! for Preparalism of Data B-Maineenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Autuenatic Scram. Event RepewI (LER) File (NUREG-D-Regulatsw> Restriction 0161) E Operator Training & license Exarnisation 4-Continuations F Administrative 5-Load Reductions 5 G-Operational Error (Explain) 6-Other Exhibit 1 Same Source l'8/77 l' ll-Oeher (Explaint

APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 UNIT BRUNSWICK UNIT 2 DATE 02/06/85 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 ! JANUARY 1985 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 785 17 789 2 782 18 789 3 602 19 776 l 4 168 20 781 5 660 21 781 j 6 687 22 783 7 783 23 787 l s 8 785 24 787 9 786 - 25 787 10 786 26 766 11 770 27 784 12 728 28 785 13 786 29 787 14 789 30 786 15 772 31 786 16 792 1.16 - 8 _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . - - , . - . . er _ ,

OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 02/06/85 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STATUS

i. UNIT NAME: BRUNSWICK UNIT 2 1 NOTES I
2. REPORTING PERIOD: JANUARY 85 l 1
3. LICENSED THERMAL POWER (MWT): 2436 l l
4. NAMEPLATE RATING (GROSS MWE): 867.0 l, t
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 l 1
7. MAX DEPENDABLE CAPACITY (NET MWE)- 790.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)
10. REASONS FOR RESTRICTION IF ANY:

I THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD -

744.00 744.00 81073.00

12. NUMBER OF HOURS REACTOR CRITICAL 744.00 744.00 48121.52
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 728.48 728.48 44753.55
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1708487.63 1708487.63 84819354.94
17. GROSS ELEC. ENERGY GEN. (MWH) 573279.00 573279.00 28174983.00
18. NET ELEC. ENERGY GENERATED (MWH) 557137.00 557137.00 26977611.00
19. UNIT SERVICE FACTOR 97.91 97.91 55.20'
20. UNIT AVAILABILITY FACTOR 97.91 97.91 55.20
21. UNIT CAP. FACTOR (USING MDC NET) 94.79 94.79 42.12
22. UNIT CAP. FACTOR (USING DER NET) 91.21 91.21 40.53
23. UNIT FORCED OUTAGE RATE 2.09 2.09 16.17
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)-
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) FORCAST ACHEIVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- -------- COMMERCIAL OPERATION -------- -------- 1.16 - 9

APPENDIX DOCKET NO.: 050-0324 UNIT: Brunswick 2 DATE: February 1985 COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT 2 A Brunswick Unit 2 operated at a 97.91% availability for the month of January with a 94.79% capacity factor. There was one reactor recirculation pump trip and two power reductions. Details are in Appendix D. Unit Shutdowns and Power Reductions Log. There are 608 BWR and 144 PWR, spent fuel bundles in the Brunswick Un*t 2 fuel pool. O

l 1 DOCKET NO. 050-0324 UNIT SHUTDOWNS AND P WER REDUCTIONS UNIT NAME Brunswick 2 DATE Februarv logs ~ COMPLETED BY Frances Harrison REPDRT MONTH January 1985 TEl.EPHONE (919)457-9571

                             -         [g         ')    h ~y h       Licensee   ,Ev,          ,                    Cause & Corrective
                                                                                                                         ^

2 5 i

         %..         Ibic      h,      3i           i                 Event     g,1          EU H                    E   jgg          Repost a   mu         g                       Prevent Recurrence f

5 85-003 850103 F 15.5

  • 11 6 NA Trip 2A reactor recirculation mg
                                                                                                    ~

caused by inadvertent bumping of - temperature switch B32-5002A-TS-4 which trips the mg on drive motor.

  • personnel error y 3 4 F: Forced Reason: Method: Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) I Manual for Preparation of Data B Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling
3. Automatic Scram. Event Report (LER) File (NUREG-D Regulator) Restriction 0161)

E Oper:sor Training & Ucense Examination i-Continuatlons t F Adminisiralive 5-Load Reductions 5 G-Operational Error ll'xplain) (,-Other Eshibii 1 Same Source 19/77) Il-Other IExplain)

DOCKETNO. '050-0324 UNIT SHUTDOWNS AND PAWER REDUCTIONS UNIT NAME Brunswick 2 DATE Februnrv IQRs COMPLETED BY Frances'Harrinon REPORT MONTH Janunrv Iogs TELEPHONE (9191457-9521

                                            ..    *: u                                5                    Cause & Currective
j 5j y f j,:y l icensee h uT g4 E Action lo N" - DJ'c 2 ; ec Event 25
                                 $_          E 4

jig 6 Report

  • N0 f'l Prevent Recurrence 85-006 850111 S 00 B 5 NA . Reduced power to 90% for E i>us degraded
  • voltage test.

f I 2 3 4 F: Forced Reason: Method: Exhible G-Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance uiTest 2-Manual Scram. Enity Sheels for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction . 0161) E. Operator Training & Ucense Examination i-Continuations t F-Administrative 5-Load Reductions 3 G-Operational Error IExplain) 6-Other Exhibit I Same Source P8/77) Il Other (Explaini

t j UNIT SHUTDOWNS AND POWER REDUC 110NS DOCKETNO. nsn-nwa UNITNAME 3runswick 2 DATE Tebruary 1985 REPORT MONTH Taa"ary 1485 COMPLETED BY Frneen Harrinnn TELEPHONE (919)457-9521 y, E j*l,

                                 .$ E      'h     j $5         Licensee      Eg        g                   Cause & Corrective No.          Dale     (     $~j i       s    jg&           Event        uT vyG 63                       Action to p,,,,,,g,y,,,,,c, H        6       5     j12g a

Repost # fu 85-007 050115 F 00 B 5 LCO-A2-85-097 Reduced power-unlocked B reactor

                                                                        .                      recirculation pump scoop tube.                             3 8

1 2 3 4 F: Forced Reason: Method: Exhibit G Instructions

;     S: Scheduled       A Equipment Failure (Explain)                      1-Manual                        for Preparation of Data B-Maintenance of Test                              2 Manual Scram.                 Entry Sheets for Licensee C Refueling                                        3-Aulomatic Scram.              Event ReporI (LER) File INUREG-D-Regulatory Restriction                                                           016.)

E-Operator Training & License Examinath 4-Contlauatlons

,                        F-Administrative                                   5-Load Reductions            5 Goperational Error (Explain)                       6-0ther                         Exhibil 1 Same Source l'8/77)                Hother(Explain)
                                                         ..}}