ML20112B007
Jump to navigation
Jump to search
| ML20112B007 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 12/31/1984 |
| From: | CAROLINA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20112A850 | List: |
| References | |
| NUDOCS 8503180560 | |
| Download: ML20112B007 (1) | |
Text
.. _. -......
OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 02/06/85 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STATUS
- i. UNIT NAME: BRUNSWICK UNIT 2 1 NOTES l
- 2. REPORTING PERIOD: DECEMBER 84 l
l
- 3. LICENSED THERMAL POWER (MWT): 2436 I
l
- 4. NAMEPLATE RATING (GROSS MWE)- 867.0 l
l
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 l
1
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 l l
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE ii. HOURS IN REPORTING PERIOD 744.00 8784.00 80329.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 373.07 2650.10 47377.52
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00
.00
- 14. HOURS GENERATOR ON LINE 321.68 2239.60 44025.07
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN. (MWH) 713582.35 4534146.29 83110867.31
- 17. GROSS ELEC. ENERGY GEN. (MWH) 237764.00 1492006.00 27601704.00
- 10. NET ELEC. ENERGY GENERATED (MWH) 227242.00 1392656.00 26420474.00
- 19. UNIT SERVICE FACTOR 43.24 25.50 54.81
- 20. UNIT AVAILABILITY FACTOR 43.24 25.50 54.81
- 22. UNIT CAP. FACTOR (USING DER NET) 37.20 19.31 40.06
- 23. UNIT FORCED OUTAGE RATE 56.76 23.21 16.37
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION). FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l
hhR j4 O
O R
i.16 - 9