ML110280103: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 01/26/2011 | | issue date = 01/26/2011 | ||
| title = Response to Request for Additional Information, License Amendment Request Concerning Non-Conservative Technical Specification Associated with the Amount of Liquid Nitrogen Storage | | title = Response to Request for Additional Information, License Amendment Request Concerning Non-Conservative Technical Specification Associated with the Amount of Liquid Nitrogen Storage | ||
| author name = Helker D | | author name = Helker D | ||
| author affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | author affiliation = Exelon Generation Co, LLC, Exelon Nuclear | ||
| addressee name = | | addressee name = | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:Exelonii Nu Nuclear wwwexeloncorp.com WWWtX(cflcOtpCO1fl Exel n Exekn l Nucl Nuclear kTH1eI t PJ\ iq 10 CFR 50.90 10 CFR 50.90 January 26, 2011 U.S. Nuclear Regulatory Commission AnN: | ||
ATTN: Document Control Desk Washington, D.C. 20555-0001 Peach Bottom Atomic Power Station, Units 2 and 33 Renewed Facility Operating License Nos. Nos. DPR-44 and and DPR-56 DPR-56 NRC Docket Nos. 50-277 and 50-278 | |||
==Subject:== | ==Subject:== | ||
.Response to Request for Additional Information License Amendment Request Concerning Non-Conservative | . Response to Request for Additional Information License Amendment Request Concerning Non-Conserv ative Technical Non-Conservative Specification Associated with the Amount of Liquid Nitrogen Storage | ||
==References:== | ==References:== | ||
: 1) Letter from P. B. Cowan (Exelon Generation Company, LLC) to U.S. U.S. Nuclear Nuclear Regulatory Commission - License Amendment Request for Non-Conserv | |||
- ative Non-Conservative Technical Specification Associated with the Amount of Liquid Nitrogen Nitrogen Storage - dated June 25, 2010 (ML1O1 | |||
- 790114) | |||
(ML101790114) | |||
: 2) Letter from J. D. Hughey (U.S. Nuclear Regulatory Commission Commission)) to M. J. | |||
J. | |||
Pacilio (Exelon Generation Company, LLC), Peach "Peach Bottom Atomic Power Supplemental Information Needed for Acceptance of Station, Units 2 and 3: Supplemental Requested Licensing Action Re: Liquid Nitrogen Storage (TAG (TAC Nos. ME41 ME4131 31 ME4132), dated JUly and ME4132), II (ML102110061) | |||
July 30, 2010 (ML102110061) | |||
: 3) Letter from P. B. Cowan (Exelon Generation Company, LLC) to U.S. Nuclear Supplemental Information for License Amendment Regulatory Commission - Supplemental Non-Conservative Technical Specification Associated with the Request for Non-Conservative Amount of Liquid Nitrogen Storage - dated August 16, | |||
- 16, 2010 (ML1 0231 0079) | |||
(ML102310079) | |||
Commission) to M. J. | |||
: 4) Letter from J. D. Hughey (U.S. Nuclear Regulatory Commission) | |||
Pacilio (Exelon Generation Company, LLC), "Peach Peach Bottom Atomic Power Station, Units 2 and 3 - Request for Additional Information Regarding License Amendment Request Related to Liquid Nitrogen Storage (TAC (TAG Nos. | |||
ME4131 and ME4132),1I 21, 2010 (ML102861886) | |||
ME4132),° dated October 21,2010 (ML102861886) | |||
(5) Letter from P. B. Cowan (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission - Response to Request for Additional Information for Non-Conservative Technical Specification License Amendment Request for Non-Conservative Associated with the Amount of Liquid Nitrogen Storage, dated December 6, (ML103410398) 2010 (ML103410398) | |||
Commission) to M. J. | |||
(6) Letter from J. D. Hughey (U.S. Nuclear Regulatory Commission) | |||
Pacilio (Exelon Generation Company, LLC), "Peach Peach Bottom Atomic Power Station, Units 2 and 3 - Request for Additional Information Regarding License Amendment Request Related to Liquid Nitrogen Storage (TAC (TAG Nos. | |||
(ML103540505) | |||
ME4132),II dated December 30, 2010 (ML103540505) | |||
ME4131 and ME4132), | |||
u.s. | |||
U.S. Nuclear Regulatory Commission Response to Request for Additional Information License Amendment Request Liquid Nitrogen Storage Docket Nos. 50-277 and 50-278 January 26,2011 26, 2011 Page 2 By letter dated June 25, 2010 (Reference 1), LLC, (Exelon) 1), Exelon Generation Company, LLC, (Exelon) submitted a License Amendment Request (LAR) for the Peach Bottom Atomic Power Station Station (PBAPS), Units 2 and 3, requesting changes to the Technical Specifications (TS) to address address non-conservative TS Surveillance Requirements (SR) associated with the amount of nitrogen nitrogen available in the liquid nitrogen storage tank. | |||
References 2 thru 5 involve requests for additional information and associated responses. | |||
Subsequently, by letter dated December 30, 2010 (Reference 6), the NRC requested that Exelon provide additional information and clarification justifying the newly derived leakage leakage values and existing surveillance methods. The attachment to this letter restates the NRCs NRC's questions followed by Exelon's Exelons response. | |||
Exelon has concluded that the information provided in this response does not impact the conclusions of the: 1) Technical Evaluation, 2) No Significant Hazards Consideration under the standards set forth in 10 CFR 50.92(c), or 3) Environmental Consideration as provided in the original submittal (Reference 1). | |||
There are no regulatory commitments contained in this submittal. | |||
Subsequently, by letter dated December 30, 2010 (Reference 6), the NRC requested that Exelon provide additional information and clarification justifying the newly derived leakage values and existing surveillance methods.The attachment to this letter restates the NRC's questions followed by Exelon's response.Exelon has concluded that the information provided in this response does not impact the conclusions of the: 1)Technical Evaluation, 2)No Significant Hazards Consideration under the standards set forth in 10 CFR 50.92(c), or 3)Environmental Consideration as provided in the original submittal (Reference 1).There are no regulatory commitments contained in this submittal. | If you have any questions or require additional information, please contact Mr. Richard Gropp at (610) 765-5557. | ||
If you have any questions or require additional information, please contact Mr.Richard Gropp at (610)765-5557. | II declare under penalty of perjury that the foregoing is true and correct. Executed on the 26th day of January 2011. | ||
Respectfully, Respectfully, David P. Helker David Manager - Licensing Manager - Licensing Licensing and Regulatory Affairs Licensing Exelon Generation Exelon Generation Company, LLC | |||
==Attachment:== | ==Attachment:== | ||
Response to Request for Additional Information - License Amendment Request Response - | |||
Concerning Non-Conservative Technical Specification Associated with the Amount of Amount of Liquid Liquid Nitrogen Nitrogen Storage cc: | |||
cc: Region I,I, Regional Administrator NRC Region NRC NRC Project NRC Manager, NRR - Peach Bottom Project Manager, - | |||
NRC Senior NRC Senior Resident Inspector - Peach Bottom Resident Inspector - | |||
T. Gray, S. T. Gray, S. State of Maryland Maryland R. R. | |||
R. R. Janati, Janati, Bureau Bureau of Radiation Protection, Commonwealth of Pennsylvania | |||
ATTACHMENT PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 UNITS2AND3 NRC Docket Nos. 50-277 and 50-278 Renewed Facility Operating License Nos. | |||
-License | DPR-44 and DPR-56 Response to Request for Additional Information License Amendment Request Concerning Non-Conservative Technical Specification Associated with the Amount of Liquid Nitrogen Storage | ||
The instrument | |||
The leak rate calculations to support the LAR submittal were determined during operation with the majority of the SGIG system filled with nitrogen, as well as the CAD system piping which takes a supply off the CAD liquid nitrogen storage tank.The calculation also considers the leakage from portions of SGIG system tubing, leakage at the end-user valve stations, boot seals, and valve stroking.There are multiple factors which provide a high degree of confidence that there is not significant leakage from the additional portion of piping supplied by SGIG during a post- | Attachment Response to RAI Nitrogen Storage LAR for Liquid Nitrogen Storage Docket Nos. | ||
In addition, the end-user pneumatically operated valves are included in the Peach Bottom | Docket Nos. 50-277 50-277 andand 50-278 50-278 Page 11 of 4 Response to Resonse to Request Request for Additional Additional Information Information License Amendment Request License Request Concerning Concerning Non-Conservative Technical Srecification Non-Conservative Specification Associated with with thethe Amount Amount Liquid Nitrogen of Liquid Nitrogen Storage Storage | ||
The results of the 1ST program valve testing is recorded and trended and any anomalies are identified and entered into the Correction Action Program (CAP)for further evaluation and resolution. | |||
The methodology presented in this LAR is suitable to determine the required inventory during normal operation and to accommodate the minor increase in system piping during post-LOCA line-up.NRC Question (RAI-03) | ===Background=== | ||
Attachment Response to RAI LAR for Liquid Nitrogen Storage Docket Nos.50-277 and 50-278 Page 3 of 4 Response | By letter dated June 25, 2010, Exelon Generation Generation Company, LLC, LLC, (Exelon) submitted aa License (Exelon) submitted License Amendment Request (LAR) for the Peach Bottom Atomic Power Station (PBAPS), Units Station (PBAPS), Units 22 and and 3, requesting changes to the Technical Specifications (TS) to address non-conservative TS address non-conservative TS Surveillance Requirements (SR) associated with the amount of nitrogen available in nitrogen available the liquid in the liquid nitrogen storage tank. The proposed changes would revise TS SR 3.6.1.3, Primary SR 3.6.1.3, "Primary Containment Isolation Valves (PCIVs), "Reactor BuildThg-to-Suppression (PCI Vs)," and SR 3.6.1.5, Reactor Building-to-Suppression Chamber Vacuum Breakers, Breakers,"to to modify the required level for the liquid nitrogen storage tank. | ||
The results of the 1ST program valve testing are recorded and trended and any anomalies are identified and entered into the Correction Action Program (CAP)for further evaluation and resolution. | nitrogen storage Specifically, the proposed changes would revise TS SR 3.6.1.3.1 and SR 3.6.1.5.1 3.6.1.5.1 to require the minimum amount of nitrogen inventory in the liquid nitrogen storage tank be maintained maintained at 2:: | ||
Additionally, Peach Bottom has implemented recurring administrative controls to trend SGIG system leakage.Once each refueling cycle for each Peach Bottom unit, a recurring activity has been established for the System Manager to verify leakage using the methodology established in the subject LAR submittal. | 22 inches water column, or equivalent volume of> 124,000 standard cubic feet (scf), | ||
The leakage check recurring task requires extensive data assembly and calculation. | of 2:: 124,000 (set), not not the currently stated level of;:::of 16 inches water column (equivalent volume of 2:: 50,000 scf). | ||
CAD nitrogen liquid storage tank level and pressure data are recorded by Operations during performance of daily ST rounds and the data is uploaded into the plant database for review and evaluation. | set). | ||
This data is used to calculate a SGIG system leak rate and compared to the limiting leakage value established in this LAR to ensure that the established value is still bounding.Supplemental | Exelon provided supplemental information in support of the proposed License Amendment Request (LAR) by letters dated August 16, 2010 and December 6, 2010. | ||
Specifically, an equation described in the December 6, 2010, response did not depict the gravitational constant ( | Subsequently, by letter dated December 30, 2010, the NRC requested additional information in order to complete the review of the LAR. The NRC requested additional information and clarification related to justifying the newly derived leakage values and existing surveillance methods. The specific questions are restated below followed by Exelon's Exelons response. | ||
Therefore, the equation previously depicted in the December 6, 2010, submittal has been modified below to include the (gc)value.Solving for | NRC NRC Question (RAI-02) | ||
Attachment Response to RAI LAR for Liquid Nitrogen Storage Docket Nos.50-277 and 50-278 Page | Provide a suitable method and justification for determining determThing the required amount of nitrogen in the the storage storage tank that wouldwould account for leakage of the entire SG/G SGIG system while in Th post-LOCA line-up. | ||
lhe-up. | |||
===Response=== | |||
Response The The Safety Safety Grade Instrument Gas Grade Instrument Gas (SGIG) system provides a backup pneumatic source to the Containment Containment Atmospheric Control Control (CAC) purge and vent isolation valves, Reactor Building-to-Chamber vacuum Suppression Chamber Suppression breakers, and the Containment Atmospheric Dilution (CAD) vent vacuum breakers, control valves following control valves coincident with a loss of instrument air (non-safety related DBA-LOCA coincident following aa DBA-LOCA piping). | |||
piping). | |||
The SGIG The SGIG nitrogen supply is nitrogen supply is from the CAD from the nitrogen storage tank. A common supply liquid nitrogen CAD liquid header from the header from the tank is sent tank is to each sent to unit each unit aa to total of 18 end-user pneumatically operated valve of 18 stations per unit. | |||
stations per The majority unit. The majority of of the the SGIG piping is SGIG piping normally filled with gaseous nitrogen from is normally the tank, the from the isolated from tank, isolated instrument air the instrument piping by air piping valve configuration. | |||
check valve by aa check instrument configuration. The instrument piping isis non-safety air piping air with dual related with non-safety related safety-related check dual safety-related providing isolation between check valves providing safety-related SGIG the safety-related the SGIG and and non-safety non-safety related instrument air related instrument air systems. Instrument air nominal systems. Instrument | |||
Attachment Response to RAI LAR for Liquid Nitrogen Storage Docket Nos. 50-277 and 50-278 Page 2 of 4 2of4 pressure is approximately 15 pressure maintains the delta pressure 15 psig greater than SGIG, and this delta the SGIG check valve closed, thus isolating the SGIG nitrogen piping piping from the instrument air piping. | |||
instrument air piping. | |||
Following a DBA-LOCA with loss of instrument air, the instrument air pressure would drop to would drop to less than SGIG pressure, allowing the SGIG check valve to open and distributing nitrogen to distributing nitrogen to the pneumatic stations. The instrument air system would be isolated by the dual SGIG check dual SGIG check valves closed with backpressure from the SGIG system. | |||
The additional piping supplied by the SGIG system following a DBA-LOCA DBA-LOCA with loss loss of instrument air is minimal compared to the entire volume of the SGIG and CAD system system that is is normally filled with nitrogen. Approximately five (5) to ten (10) feet of small diameter instrument instrument piping at each pneumatic operating station will be supplied by SGIG nitrogen in this configuration. | |||
The leak rate calculations to support the LAR submittal were determined during operation with the majority of the SGIG system filled with nitrogen, as well as the CAD system piping which takes a supply off the CAD liquid nitrogen storage tank. The calculation also considers the leakage from portions of SGIG system tubing, leakage at the end-user valve stations, boot seals, and valve stroking. There are multiple factors which provide a high degree of confidence that there is not significant leakage from the additional portion of piping supplied by SGIG during a post-LOCA scenario. Each refuel cycle, a Surveillance Test (ST) of the SGIG system is performed to stroke all of the SGIG valves with instrument air manually isolated by hand valves. | |||
The end-user pneumatically operated valves are stroke-timed and the results are trended to ensure that no adverse trends occur in the ability to stroke the valves. Additionally, whenever the pneumatically operated valve stations are maintained, post-maintenance leak checks of the external piping are performed to ensure that there is no external piping leakage. | |||
The periodic checks performed on the SGIG system piping in conjunction with the proportionally small volume placed in service post-LOCA provides a high degree of confidence that negligible additional nitrogen leakage would be incurred while in the post-LOCA line-up in comparison to the leakage values described in conjunction with this LAR submittal and supporting calculation. | |||
In addition, the end-user pneumatically operated valves are included in the Peach Bottom In Inservice Testing (1ST) program and are tested at a periodicity specified by the 1ST program to lnservice ensure operability of the referenced valves. This test also includes SGIG / instrument air valve manipulations locally at each end-user SGIG supplied valve. These operations would detect manipulations significant leakage from the SGIG piping / valves that would be exposed to SGIG pressure any significant any post-LOCA operations. The results of the 1ST program valve testing is recorded and during post-LOCA during trended and any anomalies are identified and entered into the Correction Action Program (CAP) trended for further evaluation and resolution. The methodology presented in this LAR is suitable to determine the required inventory during normal operation and to accommodate the minor determine increase in increase in system piping during post-LOCA line-up. | |||
system piping NRC Question (RAI-03) | |||
NRC the system leakage represents such a significant amount of the required quantity of Since the Since the NRC nitrogen, the nitrogen, staff requests that the licensee either justify how the existing surveillance NRC staff (Le. tank requirement (i.e. | |||
requirement tank level of 22 inches) will assure that future leakage rates will not increase to level of a point point where where 22 inches willwill no SGIG system for the 7-day period, or propose no longer sustain the SG/G new requirements that surveillance requirements new surveillance 50.36(c) that meet the requirements of 50. 36(c) (3). | |||
Attachment Response to RAI LAR for Liquid Nitrogen Storage Docket Nos. 50-277 and 50-278 Page 3 of 4 | |||
===Response=== | |||
25% margin on top of the The margin contained in the original site calculation was selected as 25% | |||
SGIG system required volume (Le., (i.e., approximately 10,000 scf margin for a required 40,000 scf SGIG system required volume). This was not based on extensive empirical data or any proposed system specific criteria. When the non-conservative TS value was originally identified, the new leakage values and administratively controlled level limit to support SGIG system operation were based on extensive empirical data. A past operability evaluation was performed that investigated system usage back to early 2000. An additional investigation was performed in 2010 during preparation of the LAR. Both investigations identified that CAD tank re-fill frequency and tank level changes have been consistent for the past ten (10) years. The current leakage trend is holding steady and the value represented in the LAR is determined to be bounding for this leakage. Furthermore, as previously discussed in response to the question above, the end-user pneumatically operated valves are included in the Peach Bottom lnservice Inservice Testing (1ST) program and are tested at a periodicity specified by the 1ST program to ensure operability of the referenced valves. This test also includes SGIG / instrument air valve manipulations locally at each end-user SGIG supplied valve. These operations would detect any significant leakage from the SGIG piping / valves that would be exposed to SGIG pressure during post-LOCA operations. The results of the 1ST program valve testing are recorded and trended and any anomalies are identified and entered into the Correction Action Program (CAP) for further evaluation and resolution. | |||
Additionally, Peach Bottom has implemented recurring administrative controls to trend SGIG system leakage. Once each refueling cycle for each Peach Bottom unit, a recurring activity has been established for the System Manager to verify leakage using the methodology established in the subject LAR submittal. The leakage check recurring task requires extensive data assembly and calculation. CAD nitrogen liquid storage tank level and pressure data are recorded by Operations during performance of daily ST rounds and the data is uploaded into the plant database for review and evaluation. This data is used to calculate a SGIG system leak rate and compared to the limiting leakage value established in this LAR to ensure that the established value is still bounding. | |||
SurIemental Information Supplemental In addition, Exelon is clarifying information previously provided in the December 6, 2010, 6,2010, response to a request for additional information. Specifically, an equation described in the December 6, 2010, response did not depict the gravitational constant (ge) (gc) value, which should have been referenced for completeness. Therefore, the equation previously depicted in the December 6, 2010, submittal has been modified below to include the (ge) (gc) value. | |||
Solving for hhLL and including a conversion from inches of water column to psi for dP (Note: | |||
3 | |||
): | |||
3 Ibm/in density terms are in units of Ibm/in ): | |||
Attachment Response to RAI LAR for Liquid Nitrogen Storage Docket Nos. 50-277 and 50-278 Page 44of of 4 | |||
( | |||
IdP*[O.036 1 dP * (0.036. psi )_[-D(.i In.Oh*,.c. | |||
in.ofw.c. | |||
- (JL)D(PVl - PV3)J | |||
() . | |||
) | |||
3 p, | |||
h _ | |||
~YV o( | |||
/ | |||
L- | |||
- ((:JPI-P",)J | |||
(((PL Pvi ) - | |||
* gc g - Gravitational Constant | |||
=32.2 lbm*ft | |||
= Ibts2 Ibm*ft / lbf*s 2 | |||
alter, change, Modifying the equation to include this value is simply a clarification and does not alter, or modify the methodology or results for the nitrogen storage tank level/volume correlations asas previously described in the December 6, 2010, supplemental response. | |||
Conclusion The information discussed above verifies that the newly derived leakage values are sufficient to account for leakage of the entire SGIG system while in post-LOCA line-up and that the existing surveillance methods are adequate to ensure that the required amount of nitrogen (i.e., | |||
(Le., | |||
minimum of 22 inches water column) will be available to support SGIG system post-LOCA operations.}} |
Latest revision as of 06:37, 21 March 2020
ML110280103 | |
Person / Time | |
---|---|
Site: | Peach Bottom |
Issue date: | 01/26/2011 |
From: | David Helker Exelon Generation Co, Exelon Nuclear |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
References | |
TAC ME4131, TAC ME4132 | |
Download: ML110280103 (7) | |
Text
Exelonii Nu Nuclear wwwexeloncorp.com WWWtX(cflcOtpCO1fl Exel n Exekn l Nucl Nuclear kTH1eI t PJ\ iq 10 CFR 50.90 10 CFR 50.90 January 26, 2011 U.S. Nuclear Regulatory Commission AnN:
ATTN: Document Control Desk Washington, D.C. 20555-0001 Peach Bottom Atomic Power Station, Units 2 and 33 Renewed Facility Operating License Nos. Nos. DPR-44 and and DPR-56 DPR-56 NRC Docket Nos. 50-277 and 50-278
Subject:
. Response to Request for Additional Information License Amendment Request Concerning Non-Conserv ative Technical Non-Conservative Specification Associated with the Amount of Liquid Nitrogen Storage
References:
- 1) Letter from P. B. Cowan (Exelon Generation Company, LLC) to U.S. U.S. Nuclear Nuclear Regulatory Commission - License Amendment Request for Non-Conserv
- ative Non-Conservative Technical Specification Associated with the Amount of Liquid Nitrogen Nitrogen Storage - dated June 25, 2010 (ML1O1
- 790114)
- 2) Letter from J. D. Hughey (U.S. Nuclear Regulatory Commission Commission)) to M. J.
J.
Pacilio (Exelon Generation Company, LLC), Peach "Peach Bottom Atomic Power Supplemental Information Needed for Acceptance of Station, Units 2 and 3: Supplemental Requested Licensing Action Re: Liquid Nitrogen Storage (TAG (TAC Nos. ME41 ME4131 31 ME4132), dated JUly and ME4132), II (ML102110061)
July 30, 2010 (ML102110061)
- 3) Letter from P. B. Cowan (Exelon Generation Company, LLC) to U.S. Nuclear Supplemental Information for License Amendment Regulatory Commission - Supplemental Non-Conservative Technical Specification Associated with the Request for Non-Conservative Amount of Liquid Nitrogen Storage - dated August 16,
- 16, 2010 (ML1 0231 0079)
Commission) to M. J.
- 4) Letter from J. D. Hughey (U.S. Nuclear Regulatory Commission)
Pacilio (Exelon Generation Company, LLC), "Peach Peach Bottom Atomic Power Station, Units 2 and 3 - Request for Additional Information Regarding License Amendment Request Related to Liquid Nitrogen Storage (TAC (TAG Nos.
ME4131 and ME4132),1I 21, 2010 (ML102861886)
ME4132),° dated October 21,2010 (ML102861886)
(5) Letter from P. B. Cowan (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission - Response to Request for Additional Information for Non-Conservative Technical Specification License Amendment Request for Non-Conservative Associated with the Amount of Liquid Nitrogen Storage, dated December 6, (ML103410398) 2010 (ML103410398)
Commission) to M. J.
(6) Letter from J. D. Hughey (U.S. Nuclear Regulatory Commission)
Pacilio (Exelon Generation Company, LLC), "Peach Peach Bottom Atomic Power Station, Units 2 and 3 - Request for Additional Information Regarding License Amendment Request Related to Liquid Nitrogen Storage (TAC (TAG Nos.
ME4132),II dated December 30, 2010 (ML103540505)
ME4131 and ME4132),
u.s.
U.S. Nuclear Regulatory Commission Response to Request for Additional Information License Amendment Request Liquid Nitrogen Storage Docket Nos. 50-277 and 50-278 January 26,2011 26, 2011 Page 2 By letter dated June 25, 2010 (Reference 1), LLC, (Exelon) 1), Exelon Generation Company, LLC, (Exelon) submitted a License Amendment Request (LAR) for the Peach Bottom Atomic Power Station Station (PBAPS), Units 2 and 3, requesting changes to the Technical Specifications (TS) to address address non-conservative TS Surveillance Requirements (SR) associated with the amount of nitrogen nitrogen available in the liquid nitrogen storage tank.
References 2 thru 5 involve requests for additional information and associated responses.
Subsequently, by letter dated December 30, 2010 (Reference 6), the NRC requested that Exelon provide additional information and clarification justifying the newly derived leakage leakage values and existing surveillance methods. The attachment to this letter restates the NRCs NRC's questions followed by Exelon's Exelons response.
Exelon has concluded that the information provided in this response does not impact the conclusions of the: 1) Technical Evaluation, 2) No Significant Hazards Consideration under the standards set forth in 10 CFR 50.92(c), or 3) Environmental Consideration as provided in the original submittal (Reference 1).
There are no regulatory commitments contained in this submittal.
If you have any questions or require additional information, please contact Mr. Richard Gropp at (610) 765-5557.
II declare under penalty of perjury that the foregoing is true and correct. Executed on the 26th day of January 2011.
Respectfully, Respectfully, David P. Helker David Manager - Licensing Manager - Licensing Licensing and Regulatory Affairs Licensing Exelon Generation Exelon Generation Company, LLC
Attachment:
Response to Request for Additional Information - License Amendment Request Response -
Concerning Non-Conservative Technical Specification Associated with the Amount of Amount of Liquid Liquid Nitrogen Nitrogen Storage cc:
cc: Region I,I, Regional Administrator NRC Region NRC NRC Project NRC Manager, NRR - Peach Bottom Project Manager, -
NRC Senior NRC Senior Resident Inspector - Peach Bottom Resident Inspector -
T. Gray, S. T. Gray, S. State of Maryland Maryland R. R.
R. R. Janati, Janati, Bureau Bureau of Radiation Protection, Commonwealth of Pennsylvania
ATTACHMENT PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 UNITS2AND3 NRC Docket Nos. 50-277 and 50-278 Renewed Facility Operating License Nos.
DPR-44 and DPR-56 Response to Request for Additional Information License Amendment Request Concerning Non-Conservative Technical Specification Associated with the Amount of Liquid Nitrogen Storage
Attachment Response to RAI Nitrogen Storage LAR for Liquid Nitrogen Storage Docket Nos.
Docket Nos. 50-277 50-277 andand 50-278 50-278 Page 11 of 4 Response to Resonse to Request Request for Additional Additional Information Information License Amendment Request License Request Concerning Concerning Non-Conservative Technical Srecification Non-Conservative Specification Associated with with thethe Amount Amount Liquid Nitrogen of Liquid Nitrogen Storage Storage
Background
By letter dated June 25, 2010, Exelon Generation Generation Company, LLC, LLC, (Exelon) submitted aa License (Exelon) submitted License Amendment Request (LAR) for the Peach Bottom Atomic Power Station (PBAPS), Units Station (PBAPS), Units 22 and and 3, requesting changes to the Technical Specifications (TS) to address non-conservative TS address non-conservative TS Surveillance Requirements (SR) associated with the amount of nitrogen available in nitrogen available the liquid in the liquid nitrogen storage tank. The proposed changes would revise TS SR 3.6.1.3, Primary SR 3.6.1.3, "Primary Containment Isolation Valves (PCIVs), "Reactor BuildThg-to-Suppression (PCI Vs)," and SR 3.6.1.5, Reactor Building-to-Suppression Chamber Vacuum Breakers, Breakers,"to to modify the required level for the liquid nitrogen storage tank.
nitrogen storage Specifically, the proposed changes would revise TS SR 3.6.1.3.1 and SR 3.6.1.5.1 3.6.1.5.1 to require the minimum amount of nitrogen inventory in the liquid nitrogen storage tank be maintained maintained at 2::
22 inches water column, or equivalent volume of> 124,000 standard cubic feet (scf),
of 2:: 124,000 (set), not not the currently stated level of;:::of 16 inches water column (equivalent volume of 2:: 50,000 scf).
set).
Exelon provided supplemental information in support of the proposed License Amendment Request (LAR) by letters dated August 16, 2010 and December 6, 2010.
Subsequently, by letter dated December 30, 2010, the NRC requested additional information in order to complete the review of the LAR. The NRC requested additional information and clarification related to justifying the newly derived leakage values and existing surveillance methods. The specific questions are restated below followed by Exelon's Exelons response.
NRC NRC Question (RAI-02)
Provide a suitable method and justification for determining determThing the required amount of nitrogen in the the storage storage tank that wouldwould account for leakage of the entire SG/G SGIG system while in Th post-LOCA line-up.
lhe-up.
Response
Response The The Safety Safety Grade Instrument Gas Grade Instrument Gas (SGIG) system provides a backup pneumatic source to the Containment Containment Atmospheric Control Control (CAC) purge and vent isolation valves, Reactor Building-to-Chamber vacuum Suppression Chamber Suppression breakers, and the Containment Atmospheric Dilution (CAD) vent vacuum breakers, control valves following control valves coincident with a loss of instrument air (non-safety related DBA-LOCA coincident following aa DBA-LOCA piping).
piping).
The SGIG The SGIG nitrogen supply is nitrogen supply is from the CAD from the nitrogen storage tank. A common supply liquid nitrogen CAD liquid header from the header from the tank is sent tank is to each sent to unit each unit aa to total of 18 end-user pneumatically operated valve of 18 stations per unit.
stations per The majority unit. The majority of of the the SGIG piping is SGIG piping normally filled with gaseous nitrogen from is normally the tank, the from the isolated from tank, isolated instrument air the instrument piping by air piping valve configuration.
check valve by aa check instrument configuration. The instrument piping isis non-safety air piping air with dual related with non-safety related safety-related check dual safety-related providing isolation between check valves providing safety-related SGIG the safety-related the SGIG and and non-safety non-safety related instrument air related instrument air systems. Instrument air nominal systems. Instrument
Attachment Response to RAI LAR for Liquid Nitrogen Storage Docket Nos. 50-277 and 50-278 Page 2 of 4 2of4 pressure is approximately 15 pressure maintains the delta pressure 15 psig greater than SGIG, and this delta the SGIG check valve closed, thus isolating the SGIG nitrogen piping piping from the instrument air piping.
instrument air piping.
Following a DBA-LOCA with loss of instrument air, the instrument air pressure would drop to would drop to less than SGIG pressure, allowing the SGIG check valve to open and distributing nitrogen to distributing nitrogen to the pneumatic stations. The instrument air system would be isolated by the dual SGIG check dual SGIG check valves closed with backpressure from the SGIG system.
The additional piping supplied by the SGIG system following a DBA-LOCA DBA-LOCA with loss loss of instrument air is minimal compared to the entire volume of the SGIG and CAD system system that is is normally filled with nitrogen. Approximately five (5) to ten (10) feet of small diameter instrument instrument piping at each pneumatic operating station will be supplied by SGIG nitrogen in this configuration.
The leak rate calculations to support the LAR submittal were determined during operation with the majority of the SGIG system filled with nitrogen, as well as the CAD system piping which takes a supply off the CAD liquid nitrogen storage tank. The calculation also considers the leakage from portions of SGIG system tubing, leakage at the end-user valve stations, boot seals, and valve stroking. There are multiple factors which provide a high degree of confidence that there is not significant leakage from the additional portion of piping supplied by SGIG during a post-LOCA scenario. Each refuel cycle, a Surveillance Test (ST) of the SGIG system is performed to stroke all of the SGIG valves with instrument air manually isolated by hand valves.
The end-user pneumatically operated valves are stroke-timed and the results are trended to ensure that no adverse trends occur in the ability to stroke the valves. Additionally, whenever the pneumatically operated valve stations are maintained, post-maintenance leak checks of the external piping are performed to ensure that there is no external piping leakage.
The periodic checks performed on the SGIG system piping in conjunction with the proportionally small volume placed in service post-LOCA provides a high degree of confidence that negligible additional nitrogen leakage would be incurred while in the post-LOCA line-up in comparison to the leakage values described in conjunction with this LAR submittal and supporting calculation.
In addition, the end-user pneumatically operated valves are included in the Peach Bottom In Inservice Testing (1ST) program and are tested at a periodicity specified by the 1ST program to lnservice ensure operability of the referenced valves. This test also includes SGIG / instrument air valve manipulations locally at each end-user SGIG supplied valve. These operations would detect manipulations significant leakage from the SGIG piping / valves that would be exposed to SGIG pressure any significant any post-LOCA operations. The results of the 1ST program valve testing is recorded and during post-LOCA during trended and any anomalies are identified and entered into the Correction Action Program (CAP) trended for further evaluation and resolution. The methodology presented in this LAR is suitable to determine the required inventory during normal operation and to accommodate the minor determine increase in increase in system piping during post-LOCA line-up.
system piping NRC Question (RAI-03)
NRC the system leakage represents such a significant amount of the required quantity of Since the Since the NRC nitrogen, the nitrogen, staff requests that the licensee either justify how the existing surveillance NRC staff (Le. tank requirement (i.e.
requirement tank level of 22 inches) will assure that future leakage rates will not increase to level of a point point where where 22 inches willwill no SGIG system for the 7-day period, or propose no longer sustain the SG/G new requirements that surveillance requirements new surveillance 50.36(c) that meet the requirements of 50. 36(c) (3).
Attachment Response to RAI LAR for Liquid Nitrogen Storage Docket Nos. 50-277 and 50-278 Page 3 of 4
Response
25% margin on top of the The margin contained in the original site calculation was selected as 25%
SGIG system required volume (Le., (i.e., approximately 10,000 scf margin for a required 40,000 scf SGIG system required volume). This was not based on extensive empirical data or any proposed system specific criteria. When the non-conservative TS value was originally identified, the new leakage values and administratively controlled level limit to support SGIG system operation were based on extensive empirical data. A past operability evaluation was performed that investigated system usage back to early 2000. An additional investigation was performed in 2010 during preparation of the LAR. Both investigations identified that CAD tank re-fill frequency and tank level changes have been consistent for the past ten (10) years. The current leakage trend is holding steady and the value represented in the LAR is determined to be bounding for this leakage. Furthermore, as previously discussed in response to the question above, the end-user pneumatically operated valves are included in the Peach Bottom lnservice Inservice Testing (1ST) program and are tested at a periodicity specified by the 1ST program to ensure operability of the referenced valves. This test also includes SGIG / instrument air valve manipulations locally at each end-user SGIG supplied valve. These operations would detect any significant leakage from the SGIG piping / valves that would be exposed to SGIG pressure during post-LOCA operations. The results of the 1ST program valve testing are recorded and trended and any anomalies are identified and entered into the Correction Action Program (CAP) for further evaluation and resolution.
Additionally, Peach Bottom has implemented recurring administrative controls to trend SGIG system leakage. Once each refueling cycle for each Peach Bottom unit, a recurring activity has been established for the System Manager to verify leakage using the methodology established in the subject LAR submittal. The leakage check recurring task requires extensive data assembly and calculation. CAD nitrogen liquid storage tank level and pressure data are recorded by Operations during performance of daily ST rounds and the data is uploaded into the plant database for review and evaluation. This data is used to calculate a SGIG system leak rate and compared to the limiting leakage value established in this LAR to ensure that the established value is still bounding.
SurIemental Information Supplemental In addition, Exelon is clarifying information previously provided in the December 6, 2010, 6,2010, response to a request for additional information. Specifically, an equation described in the December 6, 2010, response did not depict the gravitational constant (ge) (gc) value, which should have been referenced for completeness. Therefore, the equation previously depicted in the December 6, 2010, submittal has been modified below to include the (ge) (gc) value.
Solving for hhLL and including a conversion from inches of water column to psi for dP (Note:
3
):
3 Ibm/in density terms are in units of Ibm/in ):
Attachment Response to RAI LAR for Liquid Nitrogen Storage Docket Nos. 50-277 and 50-278 Page 44of of 4
(
IdP*[O.036 1 dP * (0.036. psi )_[-D(.i In.Oh*,.c.
in.ofw.c.
- (JL)D(PVl - PV3)J
() .
)
3 p,
h _
~YV o(
/
L-
- ((:JPI-P",)J
(((PL Pvi ) -
- gc g - Gravitational Constant
=32.2 lbm*ft
= Ibts2 Ibm*ft / lbf*s 2
alter, change, Modifying the equation to include this value is simply a clarification and does not alter, or modify the methodology or results for the nitrogen storage tank level/volume correlations asas previously described in the December 6, 2010, supplemental response.
Conclusion The information discussed above verifies that the newly derived leakage values are sufficient to account for leakage of the entire SGIG system while in post-LOCA line-up and that the existing surveillance methods are adequate to ensure that the required amount of nitrogen (i.e.,
(Le.,
minimum of 22 inches water column) will be available to support SGIG system post-LOCA operations.