Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23334A250 | 30 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
CCN:22-15, (Pbaps), Units 1, 2, and 3 - Annual Commitment Revision Report for the Period 01/01/21 Through 12/31/21 | 31 January 2022 | (Pbaps), Units 1, 2, and 3 - Annual Commitment Revision Report for the Period 01/01/21 Through 12/31/21 | |
ML20303A175 | 23 October 2020 | Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting | |
ML18093A382 | 30 March 2018 | Decommissioning Status Report - 2017 | |
ML17093A697 | 30 March 2017 | Decommissioning Status Report - 2016 | |
ML19064B223 | 24 February 2017 | Final Report for Post-EPU Thermal and Biological Monitoring Peach Bottom Atomic Power Station | |
ML17027A015 | 27 January 2017 | ISFSI - Biennial 1OCFR 50.59 and 10CFR 72.48 Reports for the Period 1/1/2015 Through 12/31/2016 and Annual Commitment Revision Report for the Period 1/1/16 Through 12/31/16 | Reactor Vessel Water Level Stroke time Anticipated operational occurrence Aging Management License Renewal Coast down Power Uprate Overspeed trip |
ML16342B621 | 7 December 2016 | Results of Visual Inspections of Replacement Steam Dryer | |
RS-16-103, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal | 30 June 2016 | Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal | Ultimate heat sink FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation |
ML19064B216 | 31 December 2015 | Data Report or Intake Screen Sampling at Peach Bottom Atomic Power Station in 2015 | |
ML15051A262 | 20 April 2015 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Related to Recommendation 2.1 | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML15097A076 | 6 April 2015 | Soarca Peach Bottom 2005 Site File | |
ML15096A008 | 5 April 2015 | Extended Power Uprate: Response to Replacement Steam Dryer Requests for Additional Information | |
ML15026A469 | 12 February 2015 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to EA-13-109 (Severe Accident Capable Hardened Vents) | High winds Safe Shutdown Earthquake FLEX Tornado Generated Missile Fukushima Dai-Ichi Tornado Missile Protection Design basis earthquake Containment Hardened Vent Earthquake Scaffolding |
ML15028A381 | 28 January 2015 | Independent Spent Fuel Storage Installation (ISFSI) - Biennial 10 CFR 50.59 and 10CFR 72.48 Reports for the Period 1/1/2013 Through 12/31/2014 and Annual Commitment Revision Report for Period 1/1/14 - 12/31/14 | Offsite Dose Calculation Manual Stroke time Hydrostatic Surveillance Frequency Control Program Earthquake Fuel cladding Power Uprate Overspeed trip |
ML14119A057 | 17 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident (Tac Nos. MF0261 and MF0262) | Safe Shutdown Unanalyzed Condition Operator Manual Action Fukushima Dai-Ichi Earthquake |
ML14086A624 | 30 April 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (MF0157 and MF0158) | Safe Shutdown Unanalyzed Condition Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML19064B220 | 28 February 2014 | Final Report for the Thermal Study to Support a 316(a) Demonstration: Peach Bottom Atomic Power Station Part 1 of 2 | High winds Coast down |
ML14070A146 | 28 February 2014 | WCAP-17639-NP, Revision 3, Instrumentation Description for the Peach Bottom Unit 2 Replacement Steam Dryer. | |
ML14070A145 | 28 February 2014 | WCAP-17626-NP, Revision 1, Processing of Peach Bottom Unit 2 and Unit 3 MSL Strain Gauge Data and Computation of Predicted EPU Signature. | |
ML14070A144 | 28 February 2014 | WCAP-17649-NP, Revision 1, Peach Bottom Units 2 and 3 ASME Code Stress Report. | Earthquake Flow Induced Vibration |
ML14070A143 | 28 February 2014 | WCAP-17590-NP, Revision 2, Peach Bottom Units 2 and 3, Replacement Steam Dryer, Acoustic Load Definition. | |
ML19064B233 | 6 December 2013 | Data Report or Intake Screen Sampling at Peach Bottom Atomic Power Station in 2013 | |
RS-13-085, Response to March 12, 2012, Request for Information Per 10 CFR 50.54(f) Recommendations of the Near- Term Task Force Review of Insights from Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency... | 30 April 2013 | Response to March 12, 2012, Request for Information Per 10 CFR 50.54(f) Recommendations of the Near- Term Task Force Review of Insights from Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency... | Safe Shutdown High Radiation Area Fukushima Dai-Ichi Scram Discharge Volume Severe Accident Management Guideline Earthquake |
ML13109A052 | 18 April 2013 | Revised Gnf Response to NRC RAI 44 for License Amendment Request for Use of Neutron Absorbing Spent Fuel Pool Rack Inserts, Attachment 3, Enclosures 2, 3 and 4 | |
ML19064B237 | 25 February 2013 | Entrainment Characterization Study 2012 | |
IR 05000456/2013202 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000272/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000289/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
ML13008A219 | 31 January 2013 | U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000454/2013202 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000461/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000237/2013202 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000373/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000352/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000219/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000277/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000254/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
NEI 99-04, Peach Bottom, Units 1, 2 and 3 and Independent Spent Fuel Storage Installation - Biennial 10CFR 50.59 and 10CFR 72.48 Reports for the Period 1/1/2011 Through 12/31/2012 and Annual Commitment Revision Report for the Period 1/1/12 Through 12 | 28 January 2013 | Peach Bottom, Units 1, 2 and 3 and Independent Spent Fuel Storage Installation - Biennial 10CFR 50.59 and 10CFR 72.48 Reports for the Period 1/1/2011 Through 12/31/2012 and Annual Commitment Revision Report for the Period 1/1/12 Through 12/ | B.5.b Scram Discharge Volume License Renewal Turbine Missile |
ML19064B230 | 7 December 2012 | Data Report or Intake Screen Sampling at Peach Bottom Atomic Power Station in 2012 | |
ML13003A027 | 16 November 2012 | Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-1 Through Page C-76 | |
ML13003A026 | 16 November 2012 | Report No. MPR-3812, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-372 Through End | Probabilistic Risk Assessment Scaffolding |
ML13003A025 | 16 November 2012 | Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page B-104 | Safe Shutdown Unanalyzed Condition Boric Acid Reactor Vessel Water Level Ultimate heat sink Stroke time Commercial Grade Dedication Safe Shutdown Earthquake Weld Overlay Hydrostatic Finite Element Analysis Aging Management Design basis earthquake Scram Discharge Volume Earthquake Flow Induced Vibration Weak link GOTHIC |
ML13003A028 | 16 November 2012 | Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-77 Through Page C-156 | |
ML13003A029 | 16 November 2012 | Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-157 Through Page C-249 | Scram Discharge Volume |
ML13003A030 | 16 November 2012 | Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-250 Through Page C-333 | |
ML13003A031 | 16 November 2012 | Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-334 Through Page C-399 | |
ML13003A032 | 16 November 2012 | Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-400 Through End | Probabilistic Risk Assessment Coatings Scaffolding |
ML13003A033 | 16 November 2012 | Report No. MPR-3812, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page B-104 | Safe Shutdown Unanalyzed Condition Boric Acid Reactor Vessel Water Level Ultimate heat sink Stroke time Commercial Grade Dedication Safe Shutdown Earthquake Weld Overlay Hydrostatic Finite Element Analysis Aging Management Design basis earthquake Scram Discharge Volume Earthquake Flow Induced Vibration Weak link |
ML13003A034 | 16 November 2012 | Report No. MPR-3812, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-1 Through Page C-67 | Reactor Vessel Water Level Scram Discharge Volume |