Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23334A25030 November 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation
CCN:22-15, (Pbaps), Units 1, 2, and 3 - Annual Commitment Revision Report for the Period 01/01/21 Through 12/31/2131 January 2022(Pbaps), Units 1, 2, and 3 - Annual Commitment Revision Report for the Period 01/01/21 Through 12/31/21
ML20303A17523 October 2020Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting
ML18093A38230 March 2018Decommissioning Status Report - 2017
ML17093A69730 March 2017Decommissioning Status Report - 2016
ML19064B22324 February 2017Final Report for Post-EPU Thermal and Biological Monitoring Peach Bottom Atomic Power Station
ML17027A01527 January 2017ISFSI - Biennial 1OCFR 50.59 and 10CFR 72.48 Reports for the Period 1/1/2015 Through 12/31/2016 and Annual Commitment Revision Report for the Period 1/1/16 Through 12/31/16Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Aging Management
License Renewal
Coast down
Power Uprate
Overspeed trip
ML16342B6217 December 2016Results of Visual Inspections of Replacement Steam Dryer
RS-16-103, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal30 June 2016Mitigating Strategies Flood Hazard Assessment (Msfha) SubmittalUltimate heat sink
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
ML19064B21631 December 2015Data Report or Intake Screen Sampling at Peach Bottom Atomic Power Station in 2015
ML15051A26220 April 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Related to Recommendation 2.1Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML15097A0766 April 2015Soarca Peach Bottom 2005 Site File
ML15096A0085 April 2015Extended Power Uprate: Response to Replacement Steam Dryer Requests for Additional Information
ML15026A46912 February 2015Interim Staff Evaluation Relating to Overall Integrated Plan in Response to EA-13-109 (Severe Accident Capable Hardened Vents)High winds
Safe Shutdown Earthquake
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Tornado Missile Protection
Design basis earthquake
Containment Hardened Vent
Earthquake
Scaffolding
ML15028A38128 January 2015Independent Spent Fuel Storage Installation (ISFSI) - Biennial 10 CFR 50.59 and 10CFR 72.48 Reports for the Period 1/1/2013 Through 12/31/2014 and Annual Commitment Revision Report for Period 1/1/14 - 12/31/14Offsite Dose Calculation Manual
Stroke time
Hydrostatic
Surveillance Frequency Control Program
Earthquake
Fuel cladding
Power Uprate
Overspeed trip
ML14119A05717 June 2014Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident (Tac Nos. MF0261 and MF0262)Safe Shutdown
Unanalyzed Condition
Operator Manual Action
Fukushima Dai-Ichi
Earthquake
ML14086A62430 April 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (MF0157 and MF0158)Safe Shutdown
Unanalyzed Condition
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML19064B22028 February 2014Final Report for the Thermal Study to Support a 316(a) Demonstration: Peach Bottom Atomic Power Station Part 1 of 2High winds
Coast down
ML14070A14628 February 2014WCAP-17639-NP, Revision 3, Instrumentation Description for the Peach Bottom Unit 2 Replacement Steam Dryer.
ML14070A14528 February 2014WCAP-17626-NP, Revision 1, Processing of Peach Bottom Unit 2 and Unit 3 MSL Strain Gauge Data and Computation of Predicted EPU Signature.
ML14070A14428 February 2014WCAP-17649-NP, Revision 1, Peach Bottom Units 2 and 3 ASME Code Stress Report.Earthquake
Flow Induced Vibration
ML14070A14328 February 2014WCAP-17590-NP, Revision 2, Peach Bottom Units 2 and 3, Replacement Steam Dryer, Acoustic Load Definition.
ML19064B2336 December 2013Data Report or Intake Screen Sampling at Peach Bottom Atomic Power Station in 2013
RS-13-085, Response to March 12, 2012, Request for Information Per 10 CFR 50.54(f) Recommendations of the Near- Term Task Force Review of Insights from Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency...30 April 2013Response to March 12, 2012, Request for Information Per 10 CFR 50.54(f) Recommendations of the Near- Term Task Force Review of Insights from Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency...Safe Shutdown
High Radiation Area
Fukushima Dai-Ichi
Scram Discharge Volume
Severe Accident Management Guideline
Earthquake
ML13109A05218 April 2013Revised Gnf Response to NRC RAI 44 for License Amendment Request for Use of Neutron Absorbing Spent Fuel Pool Rack Inserts, Attachment 3, Enclosures 2, 3 and 4
ML19064B23725 February 2013Entrainment Characterization Study 2012
IR 05000456/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000272/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000289/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
ML13008A21931 January 2013U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000454/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000461/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000237/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000373/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000352/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000219/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000277/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000254/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
NEI 99-04, Peach Bottom, Units 1, 2 and 3 and Independent Spent Fuel Storage Installation - Biennial 10CFR 50.59 and 10CFR 72.48 Reports for the Period 1/1/2011 Through 12/31/2012 and Annual Commitment Revision Report for the Period 1/1/12 Through 1228 January 2013Peach Bottom, Units 1, 2 and 3 and Independent Spent Fuel Storage Installation - Biennial 10CFR 50.59 and 10CFR 72.48 Reports for the Period 1/1/2011 Through 12/31/2012 and Annual Commitment Revision Report for the Period 1/1/12 Through 12/B.5.b
Scram Discharge Volume
License Renewal
Turbine Missile
ML19064B2307 December 2012Data Report or Intake Screen Sampling at Peach Bottom Atomic Power Station in 2012
ML13003A02716 November 2012Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-1 Through Page C-76
ML13003A02616 November 2012Report No. MPR-3812, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-372 Through EndProbabilistic Risk Assessment
Scaffolding
ML13003A02516 November 2012Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page B-104Safe Shutdown
Unanalyzed Condition
Boric Acid
Reactor Vessel Water Level
Ultimate heat sink
Stroke time
Commercial Grade Dedication
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Finite Element Analysis
Aging Management
Design basis earthquake
Scram Discharge Volume
Earthquake
Flow Induced Vibration
Weak link
GOTHIC
ML13003A02816 November 2012Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-77 Through Page C-156
ML13003A02916 November 2012Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-157 Through Page C-249Scram Discharge Volume
ML13003A03016 November 2012Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-250 Through Page C-333
ML13003A03116 November 2012Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-334 Through Page C-399
ML13003A03216 November 2012Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-400 Through EndProbabilistic Risk Assessment
Coatings
Scaffolding
ML13003A03316 November 2012Report No. MPR-3812, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page B-104Safe Shutdown
Unanalyzed Condition
Boric Acid
Reactor Vessel Water Level
Ultimate heat sink
Stroke time
Commercial Grade Dedication
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Finite Element Analysis
Aging Management
Design basis earthquake
Scram Discharge Volume
Earthquake
Flow Induced Vibration
Weak link
ML13003A03416 November 2012Report No. MPR-3812, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-1 Through Page C-67Reactor Vessel Water Level
Scram Discharge Volume