Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-1 Through Page C-76
ML13003A027
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 11/16/2012
From: Schlaseman C S
MPR Associates
To:
Office of Nuclear Reactor Regulation, Exelon Generation Co
References
RS-12-173 MPR-3815, Rev 3
Download: ML13003A027 (76)


Text

{{#Wiki_filter:C Seismic Walkdown Checklists (SWCs)Below are the names and signatures of the personnel who performed the seismic walkdowns. Ben Frazier Kevin Gantz Mojtaba Oghbaei Craig Swanner James Wiggin?~ ~(.e~hMA~~%~JZg4 The order of the Seismic Walkdown Checklists (SWCs) for Unit 2 is shown in Table C-1 below and the order of the SWCs for Unit 0 (common) is shown in Table C-2.The "Anchorage Configuration Confirmation" column is described in Section 5.2.1 of this report. The last column in Tables C-1 and C-2 provides the corresponding Area Walk-By Checklist (AWC). (AWCs are included in Appendix D of this report.) AWC identifiers with asterisks (*) indicate the second or subsequent SWEL item included with a specific Area Walk-By.Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 C-1 Table C-1. Unit 2 Seismic Walkdown Checklists (SWCs)Anchor AWC-Ux-Component ID Description Configuration yy Confirmed? 20A016 Emergency 4kV Aux Switchgear (E22) N U2-30*20A015 Emergency 4kV Aux Switchgear (E12) N U2-9*20B037 Reactor Area MCC E224-R-B N U2-29 20B060 Turbine Area MCC E224-T-B Y U2-30 20B324 MO-2-23-015 Motor Control Power U2-28 Transfer Switch 208325 RCIC INBD Iso. Valve M02-13-15 U2-28*Motor Controls 20B338 Remote Motor Starter MO-2-10-16D Y U2-28*20C003 Reactor and Containment Cooling and y UO-7*Isolation 20C004C RCIC Control Panel Y U0-7*20C005A Reactor Manual Control Panel Y UO-7 20C006C Main Control Room Console Y U0-7*20C39 HPCI Relay Cabinet Y U2-2*20C722A Accident Monitoring Instrumentation y U2-2 Panel 20C87 HPCI Instrument Rack N U2-1 1 20C95 RCIC Instrument Rack N U2-11*20D37 Static Inverter N U2-12 20D43 HPCI Aux Lube Oil Pump Starter N U2-27*20E105 HPCI Turbine Lube Oil Cooler N U2-27*20P033, HPCI Booster Pump, Pump Y U2-27 20P038 20P036 & RCIC Pump & Turbine Y U2-16 20S038 20S037 HPCI Turbine Y U2-27*20X032 Reactor Area Load Center E324 N U2-31 Transformer 20X033 Load Center E424 Transformer N U2-7*20X133 Panel 20Y33 Transformer N U2-9 20X30 Load Center Transformer El 24 N U2-7 20Y050 120V AC Distribution Panel 2C N U2-1 20Y35 120V AC Distribution Panel 2C N U2-3 2AC65 RX Vessel Level and Pressure U2-5*Instrument Rack A 2AD01 125V DC Battery 2A Y U2-15 2AD025 125V DC Distribution Panel N U2-2*2AD03 Battery Charger 2A Y U2-23 2AV060 HPSW Pump Room Supply Fan A N U2-18 2BC270 Steam B Leak Monitor Cabinet N U0-6*2BC65 RX Vessel Level and Pressure U2-5*Instrument Rack B 2BDO1 125V DC Battery 2B Y U2-14 2BE24 RHR Heat Exchanger B N U2-20*Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 C-2 Table C-1. Unit 2 Seismic Walkdown Checklists (SWCs)Anchor AWC-Ux-Component ID Description Configuration yy Confirmed? 2BE55 RCIC Pump Room Cooling Coil B Y U2-16*2BE56 HPCI Pump Room Cooling Coil B Y U2-27*2BP037 Core Spray Pump B Y U2-10*2BS377 Back-up N2 Supply to ADS Y U2-4*2CP042 High Pressure Service Water Pump C Y U2-18*2DD03 Battery Charger 2D Y U2-113 2DE24 RHR Heat Exchanger D N U2-19*2DP035 RHR Pump D Y U2-19 2EE57 Core Spray Room B Cooling Coil E Y U2-10*2FE57 Core Spray Room B Cooling Coil Y U2-10*2GE58 RHR Room D Cooling Coil G Y U2-17 2GT545 Instrument N2 Accumulator Y U2-26*2KT545 Instrument N2 Accumulator Y U2-26*A02-03-033 Scram Discharge Volume Outboard N/A U2-4*Isolation Valve A02-03-036 Scram Discharge Volume Inboard N/A U2-4*Isolation Valve A02-01-080A Inboard Main Steam Isolation Valve A N/A U2-25*A02-01-080B Inboard Main Steam Isolation Valve B N/A U2-25*A02-01-086A Outboard Main Steam Isolation Valve N/A U2-24 A DPS20224-4 HPSW Pump Room DP Sensor N U2-18*H02-23C-4513 HPCI Turbine Stop Valve N/A U2-27*HCU-30-23 Hydraulic Control Unit Y U2-6 L12-2-3-113 Reactor Water Level N U0-7*L12-3-86 Reactor Vessel High Water N U0-7*LI-8027 Torus Water Level N U0-7*LR/TR-8123B Torus Water Level/Temperature N U0-7*'Recorder LS2-23-91 B Suppression Pool Level Switch N U2-1 0 LT-8123A Torus Water Level Transmitter for LR- N U2-1 0*8123A M02-06-029B Feedwater Stop Valve N/A U2-26*M02-10-013D RHR Pump D Torus Suction N/A U2-19*M02-10-015B RHR Pump B Shutdown Cooling N/A U2-21 Suction (2BP035)M02-10-018 RHR Shutdown Cooling Suction N/A U2-25 Inboard Isolation Valve M02-10-174 HPSW to RHR Emergency Inner N/A U2-20 Cross-tie M02-23-014 HPCI Turbine Steam Supply Valve N/A U2-27*M02-30-2233A Unit 2 Sluice Gate A Y U2-22 MO-2-32-2486 HPSW Return Valve to Discharge N/A U0-1*Pond M02-48-2804A HPSW Discharge Inlet Outer Valve N/A UO-5 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 C-3 Table C-1. Unit 2 Seismic Walkdown Checklists (SWCs)Anchor AWC-Ux-Component ID Description Configuration yy Confirmed? POD-2-40H-HPSW Pump Room Outside Air N U2-18*20223-3 Supply Damper POD-2-40H-HPSW Pump Room Exhaust Return to N U2-18*20223-4 Room Damper PT2-2-3-404A Reactor Pressure Transmitter Y U2-5 PT-2508A Containment Drywell Pressure N U2-8 Transmitter for PR-2508 PT2-06-53-B Reactor Wide Range Pressure Y U2-5*Transmitter RV2-02-071G Safety Relief Valve G N/A U2-26*RV2-02-071 K Safety Relief Valve K N/A U2-26 SV2-23A-4543 HPCI Turbine Stop Valve Remote Trip N/A U2-27*Valve SV-2-3-33 Instrument Air Solenoid Valve N U2-4*SV-2-3-36 Instrument Air Solenoid Valve N U2-4 TS-20224-01 HPSW & ESW Equipment Room TS N U2-18*TS-20224-02 HPSW & ESW Pump Room N U2-18*Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 C-4 Sh , 1of 2 StatuskP N U Seismic Walkdown Checklist (SWC)Equipment ID No. _ "_- __-_Equip. Class12 (03) 04e J .., Se i-4 ,r Equipment Description (-W) AO i1) AL .v.i Location: Bldg. T~r-", 4 Floor El. 13 "' 'Area T Manufacturer, Model, Lfe. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an itemof equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YO NK Y§ý NEI U' N/AD Y)JNO U" N/AE" YXNO U- N/AD1 YO NO UED N/AEA YM NO UE]12 Enter the equipment class name from Appendix B: Classes of Equipment. A C-3>Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 (C.nrr.nnnd-.nr. Nn -R 171 C-5 OlIVIC;L 4. UL ýEquipment ID No. C- 2.2 -Equip. Class'2 (03) Mcd;t~m il , Equipment Description ýo A 0 G) 6eraetc4 Ay A-ce~Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? A'D fo,.,C .',,,(5.YN UO N/AQI 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y&,NO UO N/AO and masonry block walls not likely to collapse onto the equipment? S Dof a6 49,C d 4 Y1NI'-IU l N/AI"I 9. Do attached lines have adequate flexibility to avoid damage? YA~.NO UQI N/A[U 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?ýýOUO Other Adverse Conditions II. Have you looked for and found no other seismic conditions that could YJN'NO UC'adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary)l ,t r icaCtih , ciA C.eccAt. o to/ %DIo Z Evaluated by: J; (I Date: ( [2-( C-4 >Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrfnnnrIPnr.P Nn

  • RR-19-173 C-6 00 w 0 CA.z S.(40 0:E m 30 CD Co C)0)m NJ

-w z o* 0-e C Z m.0 CD CD C)0)K)r..) -~0 z 0;a 3'3 0 m CD C)N, Status.:6.N U-S eis l-W-aikdown-Cheeklist-(SWG) Equipment ID No. 4&&I Equip. Class 1 2 (Q3) Ada,- t/e([v- g'.,,-/Equipment Description -£ -5,i Location: Bldg. 1'rr kb*e FloorlEl. 135 Room, Area 7'2"171 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoraye 1. Is the anchorage configuration verification required (i.e., is the item one "0 N14 of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?..3,IstanchQragefreeQf orrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Adreep0^_I~L 5ew5NO U0 N/AF'I YM NOUTO-N/AO.. Y NE UO N/AQ YO NEI UF N/Ag YN NE U11 12 Enter the equipment class name from Appendix B: Classes of Equipment.>Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrA nnnd~nr.Nn* R5-19-173 C-10 6neet 20t 2 Equipment ID No. c>ýOAe i-5 Equip. Class1 2 ('0) /b4r'- 1/ //X ,c'9ec Equipment Description c //~'~Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? YM NEI U- N/AD; 4 "" 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? B1.~k (A/,t/5 -£4r T/ (5CL,+rLA PGR TUP.P s~~Ma AJO -A 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YK NEI Ul N/AD--di, reLV. 1(13LOCX W4 LL AJ% o..S YXNEI UDI N/AD3 Y; N[3 U'.-Other Adverse-Coaditions --........ .. ..... .... .. ... .... .11. Have you looked for and found no other seismic conditions that could YR N['I U[3 adversely affect the safety functions of the equipment? Comments (AdditiOnal pages may be added as necessary)

MCC -IA TC, -Frot rLJ h4c/.F pfte4 +4-< "00, Evaluated by: Date: 912 rI I 2.< C-4 >Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrP..qnnnHF~nr.

Nn " R5-19-17T C-11 -ow 00 a 0. 0 m.0 C-5-2 CD 5 r'3 0 0 0i r~3 Equipment ID: 20A015 (E12)Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrP.qnnndPnrP Nn " R.R-1-17.1 C-13 Equipment ID: 20A015 (E12)II Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrP.nnnHd~nriP Nn

  • R5-19-17A C-14 1~0~CD 2.m *m 30 CD C2 C)-.11 m N,

-.0 (D 3* 0 0 Cl)0*m C)CA 5 Sheet I of 2 U Seismic Walkdown Checklist (SWC)Equipment ID No. -2 _,. Equip. Classl2. (0) l. v CC -Equipment Descriptidn -o.a 9-) /A&c +1-. rAm , w ¢lih0o) C.--..fr Location: Bldg. ke.-cvr FloorEl. 13 5 "Room, Area R2. -2.3 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the SeisriicWalkdown of an,.it of Equipment on the SWEL. The space below each of the following questions may be used to record thd results'of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Issthe anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YO NX Y,6 NEI U[- N/Al YZNED U- N/AD"IZNO UO N/AU YO NO UO N/A Yd NEI UO-12 Enter the equipment class name from Appendix B: Classes of Equipment.(C-3 >" Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrqnnndPr.P.i Nn" RS-19-17.C-17 Sheet 2 of 2 Equipment ID No. £'?L4 -?, -9g Equip. Class'2(01) d-ofr Equipment Description (-2o 9, o3"-) ,e6,.ctr Are- '1,,"r C,,,-h,/ a, 1 ,-r Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y91NO U[=] N/AD Y1 ND UD N/ADl YM NE UI N/AF=YA ND UD Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could ND3 UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluatec d by: h.coW4 Date: 0/ & 12-.< C-4 >Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r..nrrmtnnndPnrP Nn RR-1 9-171 C-18 -0 ,l* 0'a -0 0 U)C4 m-o CD C)r.3h 0 0 -0w 10 3 oC 0 z, 3. C 5':3 c-m 30 CD C)w-4 Sheet 1 of 2 Status:(9 N U Seismic Walkdown Checklist (SWC)Equipment ID No. -~4B Equip. ClasS12 (00 PtCCx Equuipmernt Descrinti~n6OýA M ' r> .1A%.& A , ~7) 'Location: Bldg. "r-,m4 Floor El. ..L .Robin; "'ea TZ -T Manufacturer, Model, Etc. (optional but recommended) $I PA'(ro Instructions for Completing Checklist This checklist may be used to d6cument the results of thq Seismic Waall-down of an item,,fequipment on the SWEL. The space below eaZfi f the follo6wing uestions may" b u'sed t6"record the .results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Avvc,-# A5,( Wf 4 by fy1dU$;!I5 AwHr9J-3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YjýNEI YJ N[3 UE- N/AD1 Y9 Ni3 Ur N/AD" YNFI Ur- N/A"]Y NEI UO N/AO Y'ND Ul 1 2 Enter the equipment class name from Appendix B: Classes of Equipment. I < C-3 >'Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrmnnndP~nr.P Nn RRS-19-171 C-21 Sheet 2 of 2 Equipment ID No. I2,, fi-I.Equipment Description ... 3 o)Equip. Class12.. lot) Ae_, Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? 1 v° ,.J --./.:- 0 C ,,C ,i,- -."Y 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls ot likely toollapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YXNFNO U[ N/A-NIO U] N/A.Il U. N/A YSNI- UP] N/Ai"NE'I U[F]Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YrIz NEI Ul adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluate d b .y: Date: 4 C-4 >Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Cnrrqnnnr1Pnc.P Nn -RS-19-17.C-22 g(D3 S D)-.0 m.0 CD C)0)a K --u 10* 0 CD C/)m CD 0 Sheet 1 of 2 Status:- N U Seismic Walkdown Checklist'(SWC)" " Equipment ID No. E 0 52 Equip. Class 1 2 (i) N r cC Equipment Description Aio. Z,2.3 01 CAr 4 rc4(, .Location: Bldg. *ý oorf.'2-13X-< Ro(mr, U,- $wTY # " Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdpwn of an item of equipment on the SWEL. The space below each of the following questions may be-used to record the results',of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y/ Ni of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

YgNL-I UI N/AD 3. Is the anchorage free of corrosion that is more than mild surface oxidation? YAN- UEI N/A" 4. Is the anchorage free of visible cracks in the concrete near the anchors? Y INEI UEI N/Af-5. Is the anchorage configuration consistent with plant documentation? -(Note-'This question only appiies"if the item-is 6ne of the 50% for, which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y/M NOI U[ .N/AlD Yd6-%NEI UD]I.-'1 2 Enter the equipment class name from Appendix B: Classes of Equipment. Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Nn

  • RR-19-17.1 C-25 Sheet 2 of 2-Z,,7 ID No. -Equip. Class 1 2 Equipment Description Aht -. /t.#,tI((Oi~tcc.iý,Ll Interaction Effect&.7..A'.e soft tagetsffreomimpact byqnearby equipment-or structures?" Y -U[-i N/AC 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y* NO UC1 N/AE" and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO N[3 UQI N/ACI 10. Based on the above seismic interaction evaluations, is equipment free NI"O U13 of potentially adverse seismic interaction effects?Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Yo--I"I UI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by -Date: Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Nn -Rq-I 9-173 C-26 7)K-< >, 0 m 30 CD C) Equipment ID: 20B324 I I Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3..nrrqnnndlnr. Nn -RR-1 7-17TI C-28 Sh.et 1 of 2 Status: 0 N U Seismic Walkdown Checklist (SWC)>4Equipment ID No. ' 3 42 Equip. Class2 (1) A Cc'-Equipment Description Inv.C1A/OzT, VtIve- 142.-P i,1' ~wvsl Location: Bl~ '- Ei iFloor El. I t& Ioom, Area {.t#/t. A " "" Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown (f an item of equipment on the SWEL. The space below each of the following questibns may be used to record the.results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?YX NO Y4-N[J u[- N/AD YO-ND UDO N/AD Y11 NOi UO N/AD 5. I .the anchorage.

copfiguration consistent with plant documentation?(Note: This questfin only applies if theifem i one Af-the 50% for " t" which an anchorage configuration verification is Aequired.) IV .&], UO N/AD 6. Based on the above anchorage evaluations, is the ancho:rage free of potentially adverse seismic conditions? Y~NE] UD1 1 2 Enter the equipment class name from Appendix B: Classes of Equipment.( C-3>Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrqnnndrnrnP Nn RR-19-173 C-29 Sheet 2 of 2 Equipment ID No. 6 .3 ,Z Equip. Class 2.Equipment Description ý C71C 14 0 l 5OVA-II Interaction Effects 7. Are soft targejq free fro* impa'tby nearby'equipmeift orstructures?!

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls rpt likely to collapse onto the equipment?

Ah/, 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?;" YMNQ UEI N/A[3 157NE5 UE- N/AQI V-N03 uO N/AQ Y'NQ U0 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Yg-NEJ UEI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added p necessary) Ihf 1 deLft~'Ok7. --I £?/mllz 1e)L/ z ~7/?/L Date: , -2 ,< C-4.>Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 C.nrrPannndinr'.A Nn -RR-19-173 C-30

7) -0 a. 0 z ou'3 -U 0 m.0 CD

-0 S-.0 a. 0 0*0:E m 30 CD 00 Sheet iof f Statu Y)N U Seismic Walkdown Checklist (SWC)S , , .Equipment ID No. LE&$. I. quip. ClassI2 &- A Equipment Deqcription, /1#db&,.f

5 'C kv+ /- ZO72- I4 Loa'VA- orEl., ______,____________

Loca~jon~ Bldg ~ ~ 35'f Room Area 'e: I"c.Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)? PKY NEI 2. Is the anchorage free of bent, broken, missing or loose hardware? "X: 1N" U" N/A[-]3. Is the anchorage free of corrosion that is more than mild surface Y 0N1 U1 N/AD oxidation?

r 4. Is the anchorage free of visible cracks in the concrete near the anchors? ..I"IN UD N/AD 5. Is the anchorage configuration consistent with plant documentation?

Yl ND U- N/AD (Note: This question only applies if the item is one of the 50% for (N which an" anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of NO U1 potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment. A C-3 >Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrP.nnn~nrc.s Nn ' RP-19-17.C-33 Sheet 2 of 2 Equipment ID No. 2 i J33Ti. Equip. Class 1 2 /_) ,1, a-Equipment Description __ i84e ,4 eA p- V---L-Interaction Effects 7. Are soft targets free f6om impact by nearby equipment or stru.ctures?.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and maponry block wills not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YPNO UD- N/AO Y'NXE1 UEJ N/AE Yo!ýq-3 UD N/AD Y--NDJ U0 Other Adverse Coi6ditions
11. Have you looked for and found no other seismic conditions that could UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) NO ~'I 0 ( 1:- .4V.1.or Jo4 Evaluated Date: .Iq J,__________________________________ ~/ h;L~~Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrPnnnr1Pnr.P Nn2 RR-19-17R C-34 z ~D 03 m 30 CD:3 C=)OD) Sheet 1 of 2 Status:6 N U Seismic Walkdown Checklist (SWC)Equipment ID No. 20C003 Equip. Class'2 (20) Control Panels & Cabinets Equipment Description Reactor and Containment Cooling and Isolation Location: Bldg. Turbine Floor El. 165 Room, Area T2-100 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoraae 1. Is the anchorage configuration verification required (i.e., is the item one YO NI]of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Y' NEI U XSSIAI. Oaddrese 4, /ti 2-I- NIAI]3. Is the anchorage free of corrosion that is more than mild surface oxidation? Y% NED Uil N/AQl 4. Is the anchorage free of visible cracks in the concrete near the anchors? YW[ NI] U"I N/A[]5. Is the anchorage configuration consistent with plant documentation? YIN NI] Ufl N/AD1 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YX N[] UEJ potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment. <C-3 >Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrPAnnndi1nrP. Nn

  • RR-19-17.C-36 Sheet 2 of 2 Equipment ID No. 20C003 Equip. Class 1 2 (20) Control Panels & Cabinets Equipment Description Reactor and Containment Cooling and Isolation Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Y,& NEI UL N/A5 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YA NO U1-0 N/A[and masonry block walls not likely to collapse onto the equipment? CA/C ~ ~ ~ ~ ~ ~ 9 &- Ae~4 b42 $etn,,-0 q~~9. Do attached lines haye adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YICR NEI UD N/AEI-Y NO UO Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YJK NE3 UO adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: Date: /'/ //-V 1 9//I/i Z Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrA-nnndPnr.P Nn" R.R-19-17.A C-37 -U 0-~0 z 000 0 -U--0.c m 3o CD~0 C)C=)w (CD* 0 co m 3o CD C)0 C)C0 co Equipment ID: 20C003 I I Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 flnrr-.Rnnndrnr-= Nn

  • RR-1 9-171 C-40 Equipment ID: 20C003 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 CnrrP.qnnndrInrP.

Nn

  • RR-1 9-173 C-41 Equipment ID: 20C003 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrPqnnndp.nrP.

Nn RRS-I-17.1 C-42 Equipment ID: 20C003 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrA~nnndPnrA. Nn R.0-19-173 C-43 Sheet I of 2 Statu0 N U Seismic Walkdown Checklist (SWC)Equipment ID No. 20C004C Equip. Class 1 2 (20) Control Panels & Cabinets Equipment Description RCIC Control Panel Location: Bldg. Turbine Floor El. 165 Room, Area 12-100 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?.d ckartw- T.- (,&-'*-. NV cn.-r ;-, CC.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

VVee c -6 DMVZ-b &,. 0.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? Y NEI Y], NEI UE- N/A[I Y5Q NEI UO N/Af Yjq NEI UE- N/AEI YMNE- UEI N/A[]YA_ NO UO 1 2 Enter the equipment class name from Appendix B: Classes of Equipment. < C-3 >Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrPqnnndrn-n.P Nn

  • RR-1 -171 C-44 Sheet 2 of 2 Equipment ID No. 20C004C Equip. Class'2 (20) Control Panels & Cabinets Equipment Description RCIC Control Panel Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?I ¶oF. *-T': do- hf::.+ m4,/, YE NEI U- N/AO 8. Are overhead equipment, distribution systems, ceiling tiles and-lighting, YO. NE U[] N/Al]and masonry block walls not likely to collapse onto the equipment?
6. o a6-/ ins ha'e ae e floexbi to ai dam Y D 9. Do attached lines have adequate flexibility to avoid damage? YK NEI UE] N/Al]10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YR NO UO Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YK NO UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: Date: ZIPt 1// 0.-1e3 L.,< C-4 >Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Cnrrm'nnndp.nr.P. Nn

  • RR-19-171 C-45

-~0 CD M3 -0 C: m CD 0 C)0 0 g(D-o 0~ 0 CA). 0 0 c m.0 CD 0 0 C) Sheet 1 of 2 Status& N U Seismic Walkdown Checklist (SWC)Equipment ID No. 20C005A Equip. Class'2 (20) Control Panels & Cabinets Equipment Description Reactor Manual Control Panel Location: Bldg. Turbine Floor El. 165 Room, Area T2-100 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

YtNEI YQ NEI UE N/AD YK ND UD N/AWD YFI ND UD N/AD YO ND UD N/AD A n c lv,ýIc7e co"FiroJ oý ) 11-7 !; /,ý, 3., &-0 -Af -?/6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? Y)4 .NEIUE 12 Enter the equipment class name from Appendix B: Classes of Equipment. <C-3 >Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrP-nnndmnr.i. Nn

  • RS-19-173 C-48 Sheet 2 of 2 Equipment ID No. 20C005A Equip. Cl"S12 (20) Control Panels & Cabinets Equipment Description Reactor Manual Control Panel Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

6-d &-(O6-1 c04 7 J to~ IcA/. tree'9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y91 NEI UO- N/ACl Y;4 NE UD NIAfl Yj No UE N/A".Y) NEO UD Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YJL NO UI ..adversely affect the safety functions of the equipment?

C Nts (6Aita p beaAddedP as necessary) Comments (Additional pages may. be added as necessary) Evaluated by: 6~L2~7 Date: /- 02/ -V i~ ~q z< C-4>Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrimnnnrdPnr.p Nn* RR-19-171 C-49 OD 0 C.)0!.0 U LJL.6ýj 1 11 m 3a CD C)0 C)C0 0~ C -p-p* 0;u -0a 3 CD a IL 11 Iff a Iff it gas 61299 Ic&%valor T m-o 3 CD -0C-.0*0 0 3n cn m 30 CD C)0 Sheet 1 of 2 Status.'DN U Seismic Walkdown Checklist (SWC)Equipment ID No. 20C006C Equip. Classua (20) Control Panels & Cabinets Equipment Descriptioini Main Control Room Console Location: Bldg. Turbine Floor El. 165 Room, Area T2-100 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments .and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild. surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

/q eJ~ 1-te 1 -/' S'if7 171kJ 14 34-VlC),a 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? YC lNEI Y$1 ND UI: N/AEU YPINO UI, N/AEJ Y91 NEI UEI- N/AEl YoJ NEI U- N/AU e( NO UIu 12 Enter the equipment class name from Appendix B: Classes of Equipment. < C-3 *0 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rlnrrP'qnnndHnr.P. Nn *RR-19-17.1 C-53 Sheet 2 of 2 Equipment ID No. 20C006C Equip. Class" 2 (20) Control Panels & Cabinets Equipment Description Main Control Room Console Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? YPO NE UDI N/AEJ 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM NOl UO N/A]and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YlS N[3 Ul] N/AQ YP NEIUFJ Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YX NEI U.i adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: Date: " /0/<C-4 >-Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r(nrrrmPnnnri~nrP. Nn

  • RA-19-17.T C-54
z. 0 0 0'3 0 c m 30 CD m C)0 C-)C)CD Sheet 1 of 2 Status:& _N U Seismic Walkdown Checklist (SWC)Equipment ID No. 20C39 Equip. Class'2 (20) Control Panels & Cabinets#.I I e Mlj.. r..n-e MO.-jz E.quipment JesciputiontCLnffY

...L -'7 m Location: Bldg. Turbine Floor El. 150 Room, Area T2-81 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an itenof equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one NO of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YJ Nil UE- N/A[]Y1KL NEI UN N/AD 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yf NO UE1 N/AD 5. Is the anchorage configuration consistent with plant documentation? N' U'I N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) 5,-,I-d f.e {' 0/,,--l/ 0 C~A 4 /~L4V~ A0 a lrJC?4/ eiuý e-6. Based on the above anchorage evaluations, is the anchorage free of YA NOI U'-potentially adverse seismic conditions? 1 2 Enter the equipment class name from Appendix B: Classes of Equipment. <C-3>Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 h.nrrPmnnnrdPnr.P, Nn " R.-17-17-C-56 Sheet 2 of 2 Equipment ID No. 20C39 Equip. Classt2 (20) Control Panels & Cabinets Equipment Description 4eei ....Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? /jo- e'o't4- "ANE UO N/Al 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, 7 NE and masonry block walls not likely to collapse onto the equipment? 1Dota4ej /e -ADa leeibii ta/up~ "'Yv#Sry -V 6 9. Do attached lines have adequate flexibility to avoid damage? YCR NEI UE N/AEC UEI N/All 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y(N[ U[1 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y14NEIUO Comments (Additional pages may be added as necessary) Evaluated by: Date: ea ( -D'-K C-4 >Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rlnrrP-nnnrd.nr,.A Nn

  • RR-19-173 C-57
  • 0 m 30 CD 0 co 0'3 o C.m.0 C-o*CD 0.0 CD) 3 D cuC 0 CD* 0 0 m-o C-5.2 CD N)0 C)CA)Co Sheet 1 of 2 Status:& N U Seismic Walkdown Checklist (SWC)Equipment ID No. 20C722A Equip. Class'2 (20) Control Panels & Cabinets Equipment Description Accident Monitoring Instrumentation Panel Location:

Bldg. Turbine Floor El. 150 Room, Area T2-81 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Is the anchorage configuration verification required (i.e., is the item one YRj] NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Y)A NO] UE1 N/AL-YRJ NEI UL N/AF]YW NEI Ur N/Al 5. Is the anchorage configuration consistent with plant documentation?

Y&J NE] UL1 N/AL1 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

C'4,"e, "u") 0 fý AV /V A j 4CAt CA 4 J YN NO UL'2 Enter the equipment class name from Appendix B: Classes of Equipment. <KC-3 >, Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Nn -RR-19-171 C-61 Sheet 2 of 2 Equipment ID No. 20C722A Equip. Class 1 2 (20) Control Panels & Cabinets Equipment Description Accident Monitoring Instrumentation Panel Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? /J j 'ýYM NO UEJ N/AD 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, NO U' N/AD and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? Y4 NO ur- N/AEJ 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?/,qNEI UEI Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Y1 NEI U]adversely affect the safety functions of the equipment?

Comments (Additional pages. may be added as necessary) j6-c L-cjveJA c il,'4fecI. -.1 , 4:ivC 65-AL 4 I 'J Evaluated by: .Date: ///-444---Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 C'.nrrP.'nnnr1~nr.p Nn

  • IR-19-1773 C-62 2- o 23 z -u 0 CD La-S ci m.0 C.5.2 CD p 0 C)-4 r%3 N, OD CO 0~CA* 0-4 -L'i m-o C V (D'-4.5 0 C)N, N, Sheet 1 of 2 Status:&N U Seismic Walkdown Checklist (SWC)Equipment ID No. 20C87 Equip. Class 1 2 (18) Instruments on Racks/ Not on Racks Equipment Description HPCI Instrument Rack Location:

Bldg. Reactor Floor El. 88 Room, Area R2-15 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YO N)YXNO UIC] N/Al]Y1, N[I Uj N/AD]Y,4NO UF] N/AO YO] NEI U[ N/Ag YRNEI UEJ V 12 Enter the equipment class name from Appendix B: Classes of Equipment. <C-3 >Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrmnnnrlPnr.t Nn

  • RR-19-173 C-65 Sheet 2 of 2 Equipment ID No. 20C87 Equip. Class 1 2 (18) Instruments on Racks / Not on Racks Equipment Description HPCI Instrument Rack Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YXNO UO N/AD YND UD. N/AD Y2 (ND UED N/AD Y)(NEJ U[3 Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YX<ND UD.adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) N/A Evaluated by: Evlae y ae 20Z Z Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrPnnnrIinr.P Nn* RR-19-173 C-66 -0 S~0* 0 cn-m 30 CD C)0 00-4 -~0 3* 0 L4 0:3 m C)C)00-4 Sheet 1 of 2 Status'9 N U Seismic Walkdown Checklist (SWC)Equipment ID No. 20C95 Equip. Class'2 (188) Instruments on Racks / Not on Racks Equipment Description RCIC Instrument Rack Location: Bldg. Reactor Floor El. 88 Room, Area R2-15 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The spacebelow each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchornee 1. Is the anchorage configuration verification required (i.e., is the item one YIO ]N\of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

xNO UOI N/Afl X NEI UJ N/AE 4. Is the anchorage free of visible cracks in the concrete near the anchors? -Y-N zU[ N/ADfAor, woll supWe ,4,,M O'~e&e 4 le bosA on duift ot, -\ol0 sue OVkA ficcm+ esp- 4.cerv, nuec cenJ u49 -Pe\1 nrv;4 '4 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YO- NEI UOI N/A)Y*NO Uf 12 Enter the equipment class name from Appendix B: Classes of Equipment. <C-3 >Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 (.nrrP.nnndi-nr.P Nn -RR-19-171 C-69 Sheet 2 of 2 Equipment ID No. 20C95 Equip. Class'2 (18) Instruments on Racks / Not on Racks Equipment Description RCIC Instrument Rack Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?, Y,$ND UD N/AD Y)(<NO UEJ N/AD YXNEI UL N/AU YNEI UI Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Y;ND- UE adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) A(/A Evaluated by:~o~KiYc~Date: Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrmnnndIP.nrP Nn

  • RR-19-171 C-70

-0w z 0= .CD m-Q 3 0 0 0 01 -0a=r* 0-'1 0 (1 m C)0 C)0o CA Sheet I of 2 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No. 20D37 Equip. Class" 2 (16) Battery Chargers and Inverters Equipment Description Static Inverter Location: Bldg. Turbine Floor El. 135 Room, Area T2-73 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YEJ )YX NEI UrI N/AE]xY NEI YX~NO UE] N/A[]UI'- N/Al]YEI NEI UF] N/A)YX NEI UEl 12 Enter the equipment class name from Appendix B: Classes of Equipment. < C-3 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrpgnnnd~nr.P Nn

  • RA-19-171 C-73 Sheet 2 of 2 Equipment ID No. 20D37 Equip. Class 2..(16) Battery Chargers and Inverters Equipment Description, Static Inverter Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?-EncoWe JK Vro 4 veh 4 i c-L1T WNO ULI N/AED 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y) NEI U[ N/AD .-and masonry block walls not likely to collapse onto the equipment?

SeveroI co~he 4 rays oiwW Jeo , W 4 all ýn l c00nj 0 4ý ACrOAe 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y( NE UD N/AD Y)NE] UD Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could UF-adversely affect the safety functions of the equipment?