S*t 1 Of 2 Statt ".
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.
C, V/ f Equip. Class12 4
Equipment Description G6r40ifV/
07)15, ý Pe. 4-Location: Bldg.
t13 Floor El.. U&
Room, Area-1"
'-AA' O
- A Manufacturer, Model, Etc. (optional but recommended)
M/oc
,'senjh Instructions for Completing Checklist This checklist may be used to document the results of the.Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additionil space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one YJ&NEI of the 50% of SWEL items requiring such verification)?
I
- 2. Is the anchage free of bent, broken, missing or loose hardware?
"V'"Ia C
YANO UO N/AO
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YNO YANO UC N/AO UO NIAO UO NIAO VKNO U5 12 Enter the equipment class name from Appendix B: Classes of Equipment.
A C-3 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrPmnnnH1~nr.
Kin
- RR-19 C-400
Sheet 2 of 2 Equipment ID No.
ISV6 63
. Equip. Class12 A4)
ý'L4 s Equipment Description 89y4 45ý izi',,
ý!"...4 0 F4, Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
/"a 5it 0 W YgNO-UrI N/ACl
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yur-NI and masonry block walls not likely to collapse onto the equipment?
No 5e, 4 v c; ve Se U0
'5 N/AQI
- 9. Do attached lines have adequate flexibility to avoid damage?
10.. BaSeOO on the abov e seismic 'interaction evaluations, is'eluipment free of potentially adverse seismic interaction effects?
Y5EIo Uri N/AQI Y~fNC UCn Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could SCI*I" UEI adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Date: g (z 2-Evaluated 24L27LL2~~
< C-4 )>
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 TnrrPnnndnnrI nrP N*
C-401
T co w 0
3 m
0 3) 0 c
m 30 CD C) 00 CY)
03 X 3u 0 3n 0
C:
m 3CD CCD
=
0*
w*
Sheet I of 2 Status:&N U Seismic Walkdown Checklist (SWC)
Equipment ID No. 0DE377 Equip. Class"2 (21) Tanks or Heat Exchangers ALaH (NOrjnoie/)
Pntnmnnf flpcr.i.4,,44 nn 1'A flb,~01 ~
r ~ 171., fill C'~,, I,,,.
. h->AOj)-
Location-Bldg. Diesel Generator Floor El. 127 Room, Area Building Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one NEI of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
YI'N' UE N/AE YOIYNE UE-N/AE
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YM/NE] U1E-N/AE1 ma(*
+.....
0 "O-O k i 1-anl v/lf
- 5. Is the anchorage configuration consistent with plant documentation?
Y16 NE U-N/All (Note: This question only applies if the item is one of the 50% for which an anchorage configuration ver cainS required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y.NEI UE[
12 Enter the equipment class name from Appendix B: Classes of Equipment.
<.C-3 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrrPqnnndPnrn Nn* RR-19-171 C-404
Sheet 2 of 2 Equipment ID No. 0DE377 Equip. Class"2 (21) Tanks or Heat Exchangers-mv:-
(
0*1)
Equipment Description E4 Diesel Generator Lube Oil Cooler Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
YvNJ UEI N/AU 0 o T -r,
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, -Y N
UE N/AD.
and masonry block walls not likely to collapse onto the equipment?
qI31
- 9. Do attachedlines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YQ'ND -UU N/AU Y9/`NI UI Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Y[ 1 NU UU adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
VI/
Evaluated by:.
A-J,6 I-A Date:
9A o&
911 'IŽ~
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrr*.,nnndInr.p Nn
- RR-19-173 C-405
D
~
~
~
~
z
~* ~
0 c~)
ZI
-~
(D
'3 Lw
-J
~
A
-5 C
m
-oc 2
CD 5
0 m
(~)
-4
-4
- 0 0
S-0
- 0 We* ý-A m
mo C."a CD 0
m co)
-4
D 3) z 0.
- 0 C/)
m CD mco
-4.
0 m
CA)
Sheet I of 2 Status:0 N U Seismic Walkdown Checklist (SWC)
Equipment ID No. ODGO12 Equip. Class12 (17) Engine Generators Equipment Description E4 Standby Diesel Generator Location: Bldg. Diesel Generator Floor El. 127 Room, Area D/G-9 Building Manufacturer, Model, Etc. (optional but recommended)
,-V.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchora2e
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
Y)XNEI YM"NE] UE1 N/AlO Ur1 N/All UlO N/AO Y[9+NE]
L J
- 5. Is the anchorage configuration consistent with plant documentation?
YE] No U]1 N/Al]
(Note: This question only applies if the item is one of the 50% for
.which a anchorage configuration verication is required.)
^
t.,
,"]
014s'TU0OSfAU tr O4C"ýfw AKc tlf A-r dyi tg44A evo fOIU rf.
- 6. Based on the above anchorage evaluations, is the aneho/tage free of YX NEI ULI
(-
potentially adverse seismic conditions?
\\SAltCoozV. OLi-
&IZC jbrCjiCpA),y io
'j-I'
' t 0 i 3jv'z-f 12 Enter the equipment class name from Appendix B: Classes of Equipment.
<C-3 >,
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 C-409 rl.nrrmnnnH1nre.. Nn
- R -1 9-1*7.
Sheet 2 of 2 Equipment ID No. ODG012 Equip. Class12 (17) Engine Generators Equipment Description E4 Standby Diesel Generator Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
Y[VNDI UE1 N/AL]
1P~r~~
C.qvi~2w OA/
S1?-JOhsIP1O AIR COOuL.
Pvtt-r C-tiLif) W.A'or
'4 O;-tL'Ar-,
WAJ.T*,,.b 140UL5/M,'
N vl-WI) C*.MC-.
Pr dr
-,--a-y~i'f~
V 7
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YI*NI-UD N/AE and masonry block walls not likely to collapse onto the equipment?
POT-3iGJP1t4,/r-
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YLI'4L] UI] N/AL]
YIn(N[L] UE]
Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YINED UD adversely affect the safety functions of the equipment?
Comments.(Additional pages may be added as necessary.)
IPE-M ` -CtAV C~r1?MLLdLr At
- 4"4 V'AUL 4 A e
v"6 7 L
/,),
444;t 4 wt4>
esi4'tr CW,-*
Evaluated by:
fl(%
-i~
Date:
qh/7Jwia 9(17 f <C4>
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rTnrrla-nnndInr.* Nn ' R-19-17.
C-410
iL W,,I-i V -
....
- 1i ii I
~CA I I I
I I
1 K I
9 Iqb.
1~
~
IS It.'
o F,&I, A1I~
~~J-L I
~
AL A4, Ot
~aal, 794fi R;...
I.E 4P KV 5etto nAtc mic o~weý.Sta on ini 15, Feisjon 31 i 1..
I I
~tk6e~1b Jt~egfr r 4 iL
- 1 LS~
II
(~A L~ 6
,Jc~
.I..
e, 4 2k,
'C J
5" 0
I 1Tq
~1 I
LQt I
.4 Coii 47 A
]0s
_260-1If..
7
.111 IZ A
L C1
~I3I
[C, I..
acli Cr MRrp~
4 I-(.
ODGo/2-Coarse ThreadUNC Series Thread U.
Series Desig~n -Hom Scr."ew, T hre. a ds Wread System Unified Screw Threads.
U NC C oar se U.NF Fnine e
J UNEd E xtra Fine.
Unififed Standard Series TaptDrin..
I Constant Puitch Series Metric Screw Threads. "
Torque in BoltS Intr' ductiqn; Torq'ue' Calculato'r U Resources IBibli
'a P hy' L
FREE Publicationisi Waste Management:*.
Wind Systems*
Chemical Engineering NASA Tech. Briefs*
Industrial Maintenance Paint &.Coatings Machinery Lubrication LEDs Magazine more...
I Magazines
-1 V,,;-"I,",,2'I','
I -I 42s Design Processes
.4i Units L
materials Ads by Google I
Formulas Math j1 Download sae j 1926 Download sae j 1926 SAE International Standards - webstore.ansliorg
- 1*
- 0.073."
- 64.
0.0629.
" 050544
.#2-
- 3*
- 4
- 5
- 6
- 8-
- 10:
- 12*
5/16 3/8:
7/16
- 1/2.
9/16 5/8 3/4 7/8 0.086 0.112 0.125.
04138 0.164 0.19 0.216
" 0.25 0.3125 0.375 0.4375
.0.5
.0.5625 0.625 0.75 0.875 56 "
- .40**
32.:
32" 24
- 24**
20:
18.
i6
'14
.13
.12,
' 11 10, 9
8 0.0744
.0.0855 0.0958 010o88 0.,1177 0.1437
- 0.1629
.0.1889.
0.2175 0.2764 0.3344 0.3911 0.5084 0.566 0.685 0.8028 0,9188
.0.0648 Sl"I "0.0741.
0.0822
'0.-0952 0.1008
.0.1268.
- 0. 1404.
.01664 0.1905 o0.24641 "0.3005 0.3525 0.4084 0.4633
.0:.5168 0.6309 0.7427
.0.8512 0.0561
- 0.00218.
0.0667
-0.0031.
0.0764 0.0.0o406 0.0849.
.0.00496 0.0979.
0..00672.
0.1042 0.00745 0.1302" 0.01196 0.1449:
0.0145 0.1709 0.0206
.0.1959 0.0269
-0.2524:
0.0454 0.3073 0.0678 0.3602 0.0933 0.4167 0". 1257 0.4723' 0.162 05266.
0.202:
0.6417 0.302
- 0.7547 0.4 19 0,8647 0.551.
.0.9704 0.693 0.;00263 0.0037.
0.0o0487 0.00.604.
0.00796 0.00909 0.014 0.0175
.0.0242 0.0318 0.0524 0.0775 0 o1063 0..1419
.0.182 0.226:
0.334 0.462 0.606 1
1 :
" 1 -
1/8 1.125 11/4 1.25:
7 1.0322 0.9549 7
1.1572 1.0799
.0.763.
1.0954.'
0.89 0.969 http://www.ekl~cffilggiA~sW fao r.
hc[iugc.cfm[9/13/2012 4:15:32 PM]
MPR-3815, Revision 3 rlnrrP-nnndPnrP. Nn" RS-19-17.-
C-412
0 P~
(go.
Coarse Thread UNC Series 3/8 11/2/2
.2
- 21/4 121/24 233/4/
.3 31/4.
31/21/
.33/4 1.375 1.5 1.75
.2
- 2.25
.2.5
.2.75 3.
3.725
- 3,.75 6
1.2667.
.. 1.1766 6
1.3917 1.3016.
5 1.620i. -i511i9" 45:
1.8557 137353 4.5 2.1057 1.9853
.4.
2.3376
'2.2023
- 4.
2.5876 2.4523 4 :
2.8376 2.7023 4
3.0876 2.9523-4 3.3376 3.2023 4
3.5876 3.4523.
4 :
3.8376 3.7023
- 1.
i1946 1.3196 1
.51335 1.7594
-2.0094:
2.2294 2.4794.
. 2.7294-2'.9794
.3.2294 3.4794
- 3.7294 1.054 1.155
.1.294 1.74
.2.3.
3.02 3.72
.4.62' 5.62 6.72
- 7921
- 9.
.,21 10.61'
- '1.405 1.9 2.45 3.25 4:
4.93 5.97 7.1 8.33 9.66 11.08
-4 4
Ads by Google MIT Engi-neering MS + MBA Dual Graduate degrees In 24 months 6-mth Internship. Fellowships Avail - LGO.MIT.edu NJ Stainless Steel Screw Distributor of Stainless Steel Screws. Order Online Today! - www.FordFastenerscom Bolts, Nuts. and Tools You Want It, We Got It! #1 In Customer Service - B60tsNutsandToois.com Taps and Dies 100,000 In stock specials, metric, hard to find - www~holesawsunlimlted.com j
Marzna Mem~besip AbnuL Us Privacy Disclaimer Contact Adets CopyrIght C 2012 e~unda, Inc.
http://www.efw KOktcg#"
fpigqgWrglo*reqn~c.cfm[9/13/2012 4:15:32 PM]
MPR-3815, Revision 3 rTnrrPqnnnriP.*nr.
Nn ' RR-19-171 C-413
-. 0
- 0 C D
'3 o
Lcn m
3 C
0
A2=00 a) 0 0
3
~,
3.
C. 0 0
m
-o C
~0 2
CD
~0-5 0
0 0
p.3
0 C3 0
- 5 0
m 3
.0C E5 G)
Sheet 1 of 2 Status:0 N U Seismic Walkdown Checklist (SWC)
Equipment ID No.
Class (05) Horizontal Pumps Equinment Descrintion E4 DIG Luk Oil Transfer PumD Location: Bldg. Diesel Generator Floor El. 1) 4-1'T*'-&-Room, Area D/G-9 Building "4 W Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hgrdware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YEI NX YE]"N" UE" N/AE Y["/NE] U' N/AD Y4NE1 UE N/AE YE-NEI U3 N/AWj XN[ U[]
2 Enter the equipment class name from Appendix B: Classes of Equipment.
<C-3 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrP.mnnndf.nr.P Nn *
.R-S19-17.
C-417
Sheet 2 of 2 Equipment ID No. ODP~f 6A Equip. Class12 (05) Horizontal Pumps Equipment Description E4 DIG IuAe Oil Transfer Pump Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
AM8 WoF*
TAf~bqTS
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YU~NEI UE1 N/AE1 Ynr4LJ UEJ /AI YOIN5 UDJ N/Afl Y[9NEI UEJ Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YM*I[E UL1 adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary) 4/A Evaluated by:.
1r~
Date:
III_________
TrLIbLa
<C4 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Cnrrq..qnnndrP.nr.P. Nn
- R.R-19-17.1 C-418
OD 0
C. 0"u U
S co, m
C*
0
Sheet I of 2 Status: 0 N U Seismic Walkdown Checklist (SWC)
Equipment ID No. ODT40 Equip. Class12 (2 1) Tanks or Heat Exchangers (Vertical)
Equipment Description E4 Diesel Generator Fuel Oil Day Tank Location: Bldg. Diesel Generator Floor El. 127 Room, Area D/G-9 Building Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and.
findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?*
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
CdJAJPCL41ATI&V MATCI5 IWO I1q W-i63, W&. 7
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YVNfl Y[(NE] U[D N/AOl Y[*NE-UEJ N/AL YIM"Nf UD N/AE1 Y9"NO UC N/AEl YIfNEI U']J 12 Enter the equipment class name from Appendix B: Classes of Equipment.
<C-3 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrn-,nnndPn.P Nn* RR-19-17.1 C-420
Sheet 2 of 2 Equipment ID No. ODT40 Equip. Class12 (21) Tanks or Heat Exchangers (Vertical)
Equipment Description E4 Diesel Generator Fuel Oil Day Tank Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
Y[9/NED U' N/AD
.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM(NKE UD N/AD and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction. evaluations, is equipment free of potentially adverse seismic interaction effects?
YIANI UDiI N/AD Y[DNE] UD Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could:
Y[+/NEI ULI adversely affect the safety functions of the equipment?
Comments.(Additional pages may, be added as necessary.)
NI/A Evaluated by:
l a1?'
_r-Date:
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r*nrrqnnndpnr'.P Nn" RR-19-17, C-421
'Jo z
z.o 0
Lcn
-J4:
0i mt-o CD C) 0
-I°H 0
06 C)
Sheet 1 of 2 Statums N U Seismic Walkdown Checklist (SWC)
Equipment ID No. ABO*-V-Equip. Class12 (09) Fans Equipment Description DIG Building Vent Supply Fan Location: Bldg. Diesel Generator Floor El. 151 Room, Area D/G-20 Building Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one Y1* NI]
of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
}9NEI UE-N/AEl UE1 N/A-1
- 3. Is the anchorage free of corrosion that is more than mild surface Y
.N-1 oxidation? iV/ 0 f d
. t,
_. F,
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y;fNE-] Ut] N/AE1
"" NE] ULi N/AL
)iN UEI 12 Enter the equipment class name from Appendix B: Classes of Equipment.
< C-3 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3
.nrrnPnnnr1i'nr.n Nn
- RR-19-171 C-423
Sheet 2 of 2
-IOVO(OV' I;nr.11,/
Equipment ID No. RD*VO9T Equip. Class 12 (09) Fans Equipment Description DIG Building Vent Supply Fan Interaction Effects
- 7. Are soft taets free from impact b e
uipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YNNEI UD N/AE
--NrE UI' N/ADl DE] UL N/AEl Y4NE UE-Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could j'9-0r UiI adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Date:
/~
I" 1'
< C-4 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 CnrrP..qnnndP.nr.*. Nn
- RR-19-171 C-424
0 0
cn m
.0CD V
C) 0)
0th
A
=r
-. 0 z A. 0 0
'33 C:
m 0
C)
C) 0 0
0
-. 0 (CD cl)
Sheet 1 of 2 Status:)
N U Seismic Walkdown Checklist (SWC)
Equipment ID No. 0HT95 Equip. Class'2 (21) Tanks or Heat Exchangers (Vertical)
Equipment Description E4 Diesel Generator Starting Air Reservoir Location: Bldg. Diesel Generator Floor El. 127 Room, Area D/G-9 Building Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the-SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YKNEJ
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
rjo" (Note: This question only applies if the item is one of the 50% for
,.*hic a L anchorage configuration verification is required.) _
,1*-.*
- --"4 43~
4;
- i/*0E
-I-/
(ROV. 6) ý a-o; c.9" e'roc~
hoig tv -6ri'i
$6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
-b 1' WC'l P 4 N*
-A s'. E Vr4t -
P -Ct ? lJ C, (
P 9 06 ? L 1 A
V C, A dC.C -1'rA UL C,.
le'e 11/51 Z Y[E/NOI UE-N/AO-Y[9"N-U"I N/AF-YV~NEJ UE N/AEJ YDI N UE-N/AOl Y
NO" U'
ýDI 1 Enter the equipment class name from Appendix B: Classes of Equipment.
<C-3 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrmnnnd~nrýp Nn* RR-19-17.t C-428
Sheet 2 of 2 Equipment ID No. 0HT95 Equip. Class12 (21) Tanks or Heat Exchangers (Vertical)
Equipment Description E4 Diesel Generator Starting Air Reservoir Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
YLE"ND UD N/AD
- 8. Are overhead equipment, distribution systems, ceiling tiles.and lighting, YEtiND UDJ N/AEJ and masonry block walls not likely to collapse onto the equipment?
V TVXL73 MC YZS F4[L4A16' N) kl>
YO
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Y93N[O Ufl N/AOY YER7NE] U11 Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YEY'/ND UDL.I adversely affect.the safety functions of the equipment?
Comments (Additional pages may be added as necessary) 6)ee 0+Ac 4
6
. vIO Uc 4 VeI Evaluated by:
Date:
'tI -71iZ(-Z-u Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrPnnnrlPnr* Nn
- RR-19-171 C-429
.-t 1p f2&%' I) bL/{ f~
I.
rlv-.
1.
0~~
tCI Coarse Thread UNC Series Cors Thea U
ere
- 0P k
coyIC ie N
v-ISadii f(LIha
~ceidF:
S Design Hom--e L
Materials Design Proce
- J
~sse5 E
i Units F ormulas Math j
Ads by Google Download saei 1926 Download sae j 1926 SAE International Standards -- webstore.anshiorg
- 1*
0.073
- 64.
.0.0629.
0;0544 FREE. Ptublications Waste Management.
Wind Systems
LEDs Magazine more;...
'#2 0.086
- 3*.
0.099
- 4, 0.112
- 45 0.125
-4*-
.04.3 S#6 0.138
- 8 0.164 4#10:
0A.9
- 12*
0.216 1/4 0.25 5/16 0.3.12' 3/8 0.375 7/16. 0.4371
- 1/2.
"0 5
9/16 0.562!
5/8.
0.625 3/k 0.75
.7/8 0.875 1/8 1 12 5 114 1.25:
.1-..
5 5
5-56.:
0;0744
.48:
-0.0855 40 '.
- 0.0958'.
40-.
0.1o88.
32-:
0.1177.
32.
0.1437 24
- 0.1629 24-.
0.1889 20:
.0.2175
- 18.
0,2764
.16 0.3344 14 '
0.3911..
13..
0.45
.12.
0.5084 11.
0,566"'
10o 0.685 9
0.8028 8
0.9188 7
1.0322 0.0648
- .0.074.1.
0.040822, 0.0952 0.4008 0.1268 M
- 0. 1404.
0.1664.
0.1905 0.2464 0.3005 0.3525 0.4084 0.4633 0.5168 0.6309.
-0.7427
.:0.8512
-09549 0,0561.
- 0.00218 0.0667.
0.00031 0.0764:
0.00406.
0.0849 0.00496 0.0979 0.000672.
0.-1042-
'.0.00745 0.1302 0..0.1196
- o. 1449 0.0145 0.1:709
" 0.0206 0..959 0'.0269 :
0.2524:
.0.0454 0.3073
- 0.0678 0.3602 0.0933
- 0.41677 0.1257
-0.4723.
0.162
.0.5266...
0.202 0.6417.'
0.302.
0.7547 0..419 0.8647.
.0.551 0.00263 0.0037 0,00487.
0.00604 0.00796 0.00909 0.014 0.0175 0.0242 0.0318 0.0524 0.0775 0.1063
- 0. 01419" 0.182 "0. 226 Sl0.334,
0..462.
0.606 0.9704 1.0954 0.693 0.89.
0.763 0.969 7
1.1572 1.0799 http://www.efunda.com/designstandards/screws/screwunc.cfm[9/13/2012 4:15:32 PM]
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrpmnnnrpnrP. Nn PRA-19-171 C-431
01 9
Coarse Thread UNC Series 3/8 1.375 11/2/
1.5 13/
1.75 2
2 21/4.
2.25.
2
.2.5 23/3/4 2.7s 3
- 3 31/41/4 3.25:
31/2 3.5 33/4/,
3.75
- 6 1.2667 1.1766.
-6.
1.391.7 1.3016-5 1.6201.
1,5119 4.5 1.8557 1.7353 4.5..
.-2.1057 1.9853.
.4 2.3376
.2,.2023 4
.2.5876 2.4523 4
2.8376 2.7023 4
3.0876 2.9523 4
- 3.3376 3.2023 4
3.5876
- 3.4523 1.1946 1.054 1.3196 1.294 1.5335.
- 1.74 1J759.4
- 2.3 2.0094 3.02 2.2294
.-3.72 2.4794 4.62 2,7294 5.62 2.9794:
6.72 3.2294
. 7.92 3.4794.
9.21 3.7294 "10.61 1.155
.1.405 1.9 3.25 4.
4.93 5.97
.7.1 8.33
- 9.66
- 11.08 4
4 4
3.8376
.3.7023 Ads by Google MIT Engineering MS + MBA Dual Graduate degrees in 24 months 6ýmth Internship. Fellowships Avail - LGO.MIT.edu N* Stainless Steel Screw Distributor of Stainless Steel Screws. Order Online Today! - www.FordFasteners.com Bolts. Nuts. and Tools You Want It, We Got It! #1 In Customer Service - B01tsNutsandTools.com 100,000 in stock specials, metric, hard to find - wWwwholesawsunlim ted.com
)
Hamn Membershio Ui PIy Disc rC Adverise Copyright © 2012 eFunda, Inc.
http://www.efpl~q~ioogK r&ý/sgFt~ff ric.cfm[9/13/2012 4:15:32 PM]
MPR-3815, Revision 3 CnrrmnnnPnrnP.. Nn R.-19-17, C-432
-5a0 z
3 0
(.3 cn-m 30 C)
CA
'-go C)
U, ww
, g
~.
C)
(A)
~
-U
-k CD
'3 L
cn 53.
a.a C
N) m 30 CD C) 5o 0n
Sheet I of 2 Status:* N U Seismic Walkdown Checklist (SWC)
Equipment ID No. AO-33-0241D Equip. Class12 (07) Fluid (Air/Hyd) Valves Equipment Description ESW Outlet Block Valve from Diesel Generator E4 Coolers Location: Bldg. Diesel Generator Floor El. 127 Room, Area D/G-9 Building Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YEI
ý
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
Y3"NEI UEI N/AEJ
- 3. Is the anchorage free of corrosion that is more than mild surface Y0/ND UO N/AD oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YEI NE UEJ N/AE..
- 5. Is the anchorage configuration consistent with plant documentation?
YE' NEI UO N/Ag'<
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Y(NDI UD potentially adverse seismic conditions?
Soo o+4tAc1&
tovouok r? -For~ aeýw ýta z1 nep'ikn o~on i0O fiD(-
otr o p LordJvC 12 Enter the equipment class name from Appendix B: Classes of Equipment.
< C-3 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrm-nnndrnr.P Nn
- RR-19-171 C-435
Sheet 2 of 2 Equipment ID No. AO-33-0241D Equip. Class12 (07) Fluid (Air/Hyd) Valves Equipment Description ESW Outlet Block Valve from Diesel Generator E4 Coolers Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
)J 0 or UrApgrr%
YIE'ND UED N/AD
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[YN5 UD' N/AD and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Y[!ND UD N/AD Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could END UD-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Af/A Evaluated by:
Evaluated by:
Date:
q)-Z12 9 1
Z~
< C-4 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrP-nnnd1PnrA. Nn - MR-t9-17.'A C-436
fAe 02-41P Purpose The lateral stiffnesses of the vertical support (two structural angles) attached to the operator of Air-Operated Valve AO-0-33-0241 D and the pipe support (square structural tubing) attached downstream of the valve at the pipe elbow are calculated. The lateral stiffnesses of the supports are compared to help judge whether the valve being supported at two different locations (the diesel room wall and the top of the diesel engine base frame) could potentially cause damage to the valve during a seismic event.
Data hangle := 7ft Langle:= 3in tangle := 0.25in Lbox.l 6in Lbox.2 4in tbox := 0.25in hbox.l 3.5ft hbox.2 2ft angle: 1.23in4 Ibox. :30.3in
.4 Ibox.2 8.22in Est := 29 x 106 psi Height of angle support above base frame top surface (from walkdown)
Length of angle leg (from walkdown)
Thickness of angle (from walkdown)
Approximate width of horizontal section of pipe support (square cross-section) (from walkdown)
Approximate width of vertical section of pipe support (square cross-section) (from walkdown)
Thickness of pipe supports (square cross-section). This is a conservative estimate.
Length of horizontal section of pipe suppoi (from walkdown)
Length of vertical section of pipe support (from walkdown) 3 x 3 x 1/4 Angle area moment of inertia; AISC Shapes Database v14.0 6 x 6 x 1/4 Square tubing area moment of inertia; AISC Shapes Database v14.0 Historic 4 x 4 x 1/4 Square tubing area moment of inertia; AISC Shapes Database v14.0 Historic Elastic modulus of carbon steel, typical value.
Stiffness Calculations 3. Est" Iangle kangle "
lbf kangle = 180.545-in hangle Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 C.nrrP..qnnnr1Pnr.. Nn
- RR-1917.1 C-437
- 3. Est [box.I kbox.].-
E hbox.l 3
3-Est -box.2 kbox.2 hbox.2
__ kbox.1
- kbox.2 kbox.l + kbox.2 kbox
-=
58 2kangle Conclusions kbox.1 = 3.558 x 10 lbf in kbox.2 = 5.173 x 10 lb4ff in kbox = 2.108 x 104 lbf in Note that angle stiffness is multiplied by two since there are two supports.
The lateral stiffness of the pipe support is an order of magnitude stiffer than the support at the valve operator. Thus, if there is any differential motion between the wall of the diesel room and the diesel engine base frame during a seismic event, the support at the valve operator will easily displace without imparting significant load to the valve operator. Additionally, a structural joint was not observed between the floor of the diesel room and the wall of the diesel room so any differential displacement between these two locations will be very small. The diesel engine baseframe is securely attached to the floor, and the base frame is very stiff, so the top of the base frame (where the operator support is anchored) should displace with the floor.
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 C-438
'nrrPnnnd*.nr.. Nn RRA-19-17.1
- 00 0 -
0 CD C/
m
-a CD 0
6 C4) 6
04 0
6 E
w D
1*
0 ccJ r-0 U r-ECC
.1 Sheet I of 2 Status:c0 N U Seismic Walkdown Checklist (SWC)
Equipment ID No.
-M3 Equip.Class'2 (08a0 Motor Operated Valves Equipment Description ESW Return to Discharge Pond jrI.0, Location: Bldg. Diesel Generator Floor El. 42 al. i/8/.
Room, Area D/G-2 Building Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoralle 1, Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
YCI N(
NEAJ to Y* Nil UQ: N/ A m'v
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YXLNO UUU Yg NEI UEII Nl~d'HO YEI NFI U[7I NfAtR YNNO UO 2Enter the equipment class name from Appendix B: Classes of Equipment.
<C-3 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 flnrrP.nnnr1dnr.* Nn* RR-19-17.
C-441
Sheet 2 of 2 V
Equipment ID No. MO-33-0498 Equip. Class"2 (08a) Motor Operated Valves Equipment Description ESW Return to Discharge Pond Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
nlo 5oR brý & 1ý.
YN NEI ULI N/AO
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM NEI UE-N/AEO and masonry block walls not likely to collapse onto the equipment?
A httdU I I./A
- 9. Do attached lines have adequate flexibility to avoid damage?
Y[R NEI UE N/AB:
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
.YVINEI UO Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YR NEI UE adversely affect the safety functions of the equipment?
Comments (Additional pages may, be added as necessary)
-AvK Wv-ofrxJcIt I" "~44
?y prefcvtf AWkIerl,1 OLd
)ode-Evaluated by:
V~
Date:
5*?12-i I2
'1 /~-
< C-4 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrr*mnnnrPnr*.
No " RR-19-17.
C-442
CD 0
C.-0 0
m CD
-o 0
0 C,)
CD co
0 r3 m
3 CD 0
6 C!,
CA, 6
0h,
Sheet I of 2 Status: (
N U Seismic Walkdown Checklist (SWC)
Equipment ID No. MO-48-0501A Equip. Class12 (08a) Motor Operated Valves Equipment Description ESWA Inlet to ECT Reservoir Location: Bldg. Emergency Floor El. 114 Room, Area ECT-1 Cooling Towers Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YEI N 9 YIN1 NE ULD N/A[
NE UL N/AEI YNE UE-N/AE YEI NEI UE[
N/A, YM NONE U 12 Enter the equipment class name from Appendix B: Classes of Equipment.
< C-3 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrqnnndrPnrP Nn* RR-19-171 C-445
Sheet 2 of 2 Equipment ID No. MO-48-050 lA Equip. Class'2 (08a) Motor Operated Valves Equipment Description ESWA Inlet to ECT Reservoir Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
Y Ni] Ui] N/AE]
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YJ ND UD N/Al and masonry block walls not likelvto collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?
Y NEI ULi N/A[]
- 10. Based on the above seismic interaction evaluations, is equipment free Yq ND Ui of potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YIK NEI Uil adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Evaluated by:.
V Date: g 2J-**2 C-
~2~/2.
< C-4 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrP..nnnrIPnr.P Nn* R.R-19-173 C-446
10 3 OD
!.0 C)
- u o Lcn m
30 CD 00 6
c-Il 0)
~CD z
o*
- 0 30J 0D m
CD 5
0 co 0
3 m
0
.31h 90
Sheet 1 of 2 Status:0 N U Seismic Walkdown Checklist (SWC)
Equipent I No.-.
--P43-o2SI2-61 Equipment ID No..-
- _.*I*_ Equip. Class12 (10) Air Handlers Mo %o/7111 Location: Bldg. Diesel Generator Floor El. 151 Room, Area D/G-19 Building Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y1NJ'/
YYINO!
YIrNf U-] N/AE!
UE-N/A'-
YEý'NEI UE1 N/AE1 YL! NEI UEI N/As<
Y)'NEI ucj Enter the equipment class name from Appendix B: Classes of Equipment.
<C-3 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3
.nrrP.qnnnr1.nr.. Nn" RR-19A-T7I C-449
Sheet 2 of 2 po-o-qoF/_7?..-ot Equipment ID No.
ZIP-Equip. Class12 (10) Air Handlers Equipment Description Master for EIEDG Building Vent Supply Fan Outside Air Damper Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
YE(rNO ONA
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[rN[] Uj-N/A[:
and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Y13*IE~j UEJ N/AEl Y[5'NE] UO Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Y[dNL U3 adversely affect the safety functions of the equipment?
C&
IW"I-VJRT1U/
V VIL MOr A Vj)ý76
ý,-~~yFA~ei Comments (Additional pages may be added as necessary)
NIA Evaluated by:
V Date:
.b7/W ý qI -1. Iz.Oi
< C-4 )>
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrpnnndinr.- Nn
- RR-19-171 C-450
-4w LI m
~0
-5.
2 0
0 0
-u
=rJ OD 0
2 3 CD z
0)
- a 3
cl m
.0 C=
C)
NJ 4a 9%
6
Sheet I of 2 Status:
9N U Seismic Walkdown Checklist (SWC)
-2. oto/ 21/12.
Equipment
,ID No.
Equip. Class' (U0) Air Handlers I mO 10/31/IL.
Equipment Description Master for E#'EDG Building Vent Supply Fan Return Air DamIer Location: Bldg. Diesel Generator Floor El. 151 Room, Area D/G-19 Building Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
"L YOEN YE(N-U-N/AE YENE-U-N/AO YIYNO UE N/ADl YO NEI UD N/Ag Y4 NO U[:]
12Enter the equipment class name from Appendix B: Classes of Equipment.
<C-3 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrPimnnndPnr.P Nn
- R5-19-17.1 C-453
Sheet 2 of 2 po-e-OF-0029.7Z-OV0*223/"2-Equipment ID No. --
O*
nn Equip. Class 2 (10) Air Handlers iE io&
- 013/121 Equipment Description Master for E,4EDG Builin Vent Supvlv Fan Return Air Damper Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YEI'ND UU N/ADI YlI'ND UEJ N/AD YE0ND UD N/AQ Y[*IND UD Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Y[* ND Uri adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
NIA Evaluated by:
Date:
9/1*/
1/'
qfII 1Z6)UZ
<C-4>
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r*nrrPnnndPnrF Nn - Rq-19-17T C-454
-~0
- 0 C-00 m
3 CD 9
0 6
C=)n 00 N
Sheet 1 of 2 Status:Q) N U Seismic Walkdown Checklist (SWC)
ETqiC-e-59e--
7i)d3VAv Equipment ID No. -T-ý
ý Equip. Class"2 (07) Fluid (Air/Hyd) Valves En.mlin--.nt D~esrintion W')rý.[Tn,--,t rnnl""t
- ?.Wat Thaomnvmf;h' P*fý",vI Vnh,o Location: Bldg. Diesel Generator Floor El. 127 Room, Area DIG-3 Building Manufacturer, Model, Etc. (optional but recomme-nded)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one YE] No of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
YXI NEI UE' N/A[l YKj NEI U-I N/AEC
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
Y[] NEI UOi N/AK
,Avie-ho red P~o OA-C374p C1 p/6--
I~cktd
/001i?4tt Leo/le.
n cA 14 bl 14al-4.
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YE] NEI Uil N/Anj YJR NEI UI-12 Enter the equipment class name from Appendix B: Classes of Equipment.
<C-3 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrP.nnndPnr.* Nn R-V19-17.1 C-456
Sheet 2 of 2 Ig oV-q*-ý? -TZ391 A Equipment ID No. TGV 52E 7239A Equip. Class' 2 (07) Fluid (Air/Hyd) Valves Equipment Description DIG Jacket Coolant 3-Way Thermostatic Control Valve Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
YC4 NEI UF1 N/AO
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yo NEI UI' N/Afl and masonry block walls not likely to collapse onto the equipment?
F,*ltiý'3 Lb,4 I6LA t,,;61
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based. on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yo NO UO N/AD.
YX NEI U0 Other Adverse Conditions
.11. Have you looked for and found no other seismic conditions that could Y$ NE! UE!
adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Evaluated by:
Date:
/z5
ý /Z 3-12ý f
f Z7
< C-4 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rorm.-nnndrinr.'. Nn
- RR-19-171 C-457
-~0
- L 0
z o
- 0 3 cjn m
.0 Cn
-!o 111)
.0 co
Status of N2 Seismic Walkdown Checklist (SWC)
Equipment ID No. :f3- 0 (O 7D Equip. ClasSl2C 19) T-,ie*i'i,A,o1e-%,fP Equipment Description EV-/ 3'/'-
YSkcte_
1n Cr Location: Bldg.
J: b.-)&-
Floor El.
0 Room, Area 0/6- -
Manufacturer, Model, Etc. (optional but recommenued)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YO NJW YqND UD N/AD YN1 NDI UEI N/AD Y$1 Nil UEI N/AD Y[:1NEIUD NIAs Y* ND-UD 12 Enter the equipment class name from Appendix B: Classes of Equipment.
< C-3 >'
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3
.nrr-..qnnndPnrý'.
Kin
- 2R9-173 C-459
Sheet 2 of 2 Equipment 1D No.
'- 5-O(O 70 Equip. Class1244 fl
.o*¢0^e 5;torr Equipment Description
'6--19 6/6-J e*e*P ld-Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YK NEI UEI N/AE YI[
NE ULI N/AL!
Y[g NEI UDI N/AE!
Y[
NE UE Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YIP NEI UL adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Evaluated by:
- ~
Date:
/.¢///
to/4t/iz_
< C-4 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrP.nnndPnrP Nn
- RR-19-171 C-460
5"o~
z
- 0
- 33 m
30 CD C) 4 0
D Area Walk-By Checklists (AWCs)
Below are the names and signatures of the personnel who performed the area walk-bys.
Ben Frazier Kevin Gantz Mojtaba Oghbaei Craig Swanner James Wiggin 7%~ ~
,~1'. G~hb~
The order of the Area Walk-By Checklists (AWC) for Unit 2 is shown in Table D-1 below and the order of the AWCs for Unit 0 (common) is shown in Table D-2.
Note: Photos for the AWCs are included in the base component SWC in Appendix C.
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 D-1
Table D-1. Unit 2 Area Walk-By Checklists (AWCs)
AWC-Ux-YY Building Elevation Location Component ID U2-1 Turbine 150 T2-81 20Y050 U2-2 Turbine 150 T2-81 20C722A U2-3 Reactor 135 R2-20 20Y35 U2-4 Reactor 135 R2-22 SV-2-3-36 U2-5 Reactor 165 R2-40 PT2-2-3-404A U2-6 Reactor 135 R2-24 HCU-30-23 U2-7 Reactor 165 R2-41 20X30 U2-8 Reactor 195 R2-53 PT-2508A U2-9 Turbine 135 T2-171 20X133 U2-10 Reactor 91 R2-10 LS2-23-91 B U2-11 Reactor 88 R2-15 20C87 U2-12 Turbine 135 T2-73 20D37 U2-13 Turbine 135 T2-172 2DD03 U2-14 Turbine 135 T2-169 2BDO1 U2-15 Turbine 135 T2-70 2AD01 U2-16 Reactor 91 R2-14 20P036 & 20S038 U2-17 Reactor 116 R2-19 2GE58 U2-18 Pump Structure 112 P/H-6 2AV060 U2-19 Reactor 91 R2-8 2DP035 U2-20 Reactor 91 R2-6 M02-10-174 U2-21 Reactor 116 R2-18 M02-10-015B U2-22 Screen House 116 S/H-4 M02-30-2233A U2-23 Turbine 135 T2-170 2AD03 U2-24 Reactor 135 R2-30 A02-01-086D U2-25 Drywell 134 DIW2-17 M02-10-018 U2-26 Drywell 155 DIV2-35 RV2-02-071K U2-27 Reactor 88 R2-13 20P033, 20P038 U2-28 Turbine 135 Recirc 20B324 mg set room U2-29 Turbine 135 R2-23 20B037 U2-30 Turbine 135 T2-71 20B060 U2-31 Reactor 165 R2-41 20X032 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 D-2
,#e t-az-.1 Sheet 1 of 2 Status: 0 N U Area Walk-By Checklist (AWC)
Location: Bldg. -,r!L Floor El.
.5J*
Room, Area 3
&i/'
- 5resz, 7 r
(
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening' cabinets)?
YX ND UD N/AD -
- 2. Does anchorage of equipment in the area appear to be free of significant Y)J NO UD N/AD degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit
-
- raceways and HVAC ducting appear to be free.of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Ylg NDI UD N/AD' Y4 NEI UD N/AD 13 If the room in which the SVEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SVVEL item.
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rlnrrPsnnndHn-n Nn N
RR-1 9-1773 D-3
Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. T7"o "4 Floor El.
/
Room, Area' 3 Cg/& ">
/W-i*-
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
1'Jp71,
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
Y29 NEI UQ N/A[l YJM NEI UF N/A-I:
- 7. Does it appear that the area is free of potentially adverse seismic YJ4 NI U-' N/A interactions associated with housekeeping practices, storage of portable.
U. N/A,.
equipment, and temporary installations (e.g., scaffolding, lead shielding)?.
,e
,,, r.- rJ, lo~zde r1"
- 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?
YR NL] ULI Comments (Additional pages may be added as necessary) 1'aen*sty Wt/_5<
,v efIC J2A-
.2 o0Y495 4 Evaluated by:.
Date:
0/s1/,J-V UZI// 2 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrmnnnd*.nrP KIn
-RR-17A D-4
Sheet 1 of 2 Status: @ N U Area Walk-By Checklist (AWC)
Location: Bldg. Zjrbi;*
FloorEl.
4'5 Room, Area.
C4 ~'le,,g, 51/"
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of YR NEI UO N/AD' potentially adverse seismic conditions (if visible without necessarily opening cabinets)?.
,o, b3
°'eiv*wd as-m, I'jf'a
' 5zs--
a.o.
-rs~
A-klraised'
- 2. Does anchorage of equipment in the area appear to be free of significant YQj NDI UE] N/AD degraded: conditions?::
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appeartobe free of potentiallyadverse seismic conditions (e.g.,: conditi6n: of supports 'is adequate and fill conditions of cable: trays appear to be inside acce table limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
YI NO Ul N/AEJ YR NEI Uf N/AD
'3 If the room in which the SVVEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
< C-5 >
Peach Bottom Atomic Power Station Unit 2 D-5 MPR-3815, Revision 3
'nrrm*nnnri.nr.p Nn - RR-19-173
SheVe 2 f
Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. 7"*, 2.-
Floor El, I S-O Room, Area13 rc-j
/,-
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray, in the area?
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Y)NEI U'- N/AD Y)
NO UE-N/AE.
/PNE UE" N/A0.
- 8. Have you looked for and found no other seismic conditions that could Y/
NEI Ul' adversely affect the safety functions of the equipment in the area?
Comments (Additional pages may be added as necessary)
Evaluated by:
46 ccfii Date:
1041//2/
1 1
1( 0 2 &
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrP-qnnndonr.P Nn
- RR-19-171 D-6
A,4Jc-at-
- Sheet 1 of 2 Status:()N U Area Walk-By Checklist (AWC)
. Location: Bldg.
&22 Floor El...1$L.. Room, Area13
_5OL) /
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Y4 NEI UE] N/AE.
- 2. Does anchorage of equipment in the area appear to be free of significant YX Ni] UEI N/A[]
degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to. be free of potentially adverse seismic conditions: (e.g.,"condition of supports is adequate and fill conditions of cabletraysappear to be inside acceptable limits)?
- 4. Does.it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
NE] UD1 N/AE]
SNEI UI-N/AE]
13 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
< C-5 >
Peach Bottom Atomic Power Station Unit 2 D-7 MPR-3815, Revision 3 rnrrPnnndInrP= Nn
- R.9-19-171
pfAJc -0o-3 Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg./(e
/e/
Floor El.
1 35 Room, Area13 Vo16&
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismnic interactions that could cause a fire in the area?
NE ULI N/AO Y)
ND U[3 N/AD
- 7. Does it appear that the area is free of potentially adverse seismic Yjn NO interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
f4Qr1f/~~
- 8. Hae yo looed fr an fundnYte esi odtosta ol
/
OU rý-
RAZ4 U-NIAO
/~
- 8. Have you looked for and found no other seismic conditions~that could
'ýg N[D UI' adversely affect the safety functions of the equipment in the area?
Comments (Additional pages may be added as necessary)
Evaluated by:
Date:
g o
e 5/3 0 Il Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rlnrrPqnnndpnr.P Nn
- R,:-1 9-1.73 D-8
lfw6-9Z-e Sheet I of 2 Status: (D N U Area Walk-By Checklist (AWC)
Location: Bldg. j*
Floor El 1 *"
Room, Area13
-"L.q D.,
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings.:
Additional space is provided at the end of this checklist for documenting other comments.
I. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening-cabinets)?
Y NO UD N/AD.:'
- 2. Does anchorage of equipment in the area appear to be free of significant Y1Tr NO UD N/AD degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways andHVAC ducting appear to be free of potentially adverse seismic`conditions (e.g., condition of supports is adequate and fill
.conditions of dable trays appear to be inside acceptable limits)?
YJR NDI UD NIAD
- 4. Does it appear that the area is free of potentially adverse seismic spatial Yo ND UD-N/AD interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
"If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
K C-5 >"
Peach Bottom Atomic Power Station Unit 2 D-9 MPR-3815, Revision 3 CnrrPgnnndHnrP. Nn
- RR-19-17.
AWC-Uz-q Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg.
R_ý Floor El.
j? r Room, Area13 Rz - 2Z-Sc-rv*, rAA69 Area-
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
7'v I
/dke.
"nh~ee Y/
NE U-N/AE Y
NED UI N/AD YD6 NE ITJ N/AD
- 8. Have you looked for and fotnd no other Seismic conditio.ns that c.ould Y)A NEI Ul'3 adversely affect the safety functions of the equipment in the area?
Comments (Additional pages may be added as necessary)
Evaluated by:,
0/
Date:
X13/
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrnnnrInr* Nn - R=-1 2-173 D-1 0
/1C i-(Az-5 Sheet 1 of 2 Status:(V N U Area Walk-By Checklist (AWC)
Location: Bldg. g Floor El.
I Room, Area13'1/4Z L-Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Ypl NO] UD N/AD
- 2. Does anchorage of equipment in the area appear to be free of significant Y(% Nl' UEi N/AE]
degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit
-- raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g.,'condition of supports is adequate andfill:
conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
YO NFI UQ-N/AE-Y;4 ND UD-N/AD
,1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
< C-5 >
Peach Bottom Atomic Power Station Unit 2 D-11 MPR-3815, Revision 3 rnrrFqnnr1n P.nP Nn " RS-19-171
Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg.
Floor El.
I *"
Room, Area"
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
YX ND ULI N/AD YFI ND UEJ N/AD YND UE3 N/AI]
8, Have you looked for and found no Other s~eismic conditions that could YP9] NEI UO1 adversely affect the safety functions of the equipment in the area?
Comments (Additional pages may be added as necessary)
Evaluated by:
V Date:
9/3 0 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrPmntndpnr.p Nn
- PR.-19-17T D-12
/hc-az -6 Sheet 1 of 2 Status: 6 N. U Area Walk-By Checklist (AWC)
Location: Bldg.
Jf,.A Floor El.
"].
Room, Area'3
/*/-.
eetW-Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
YR NOD UC N/AO
- 2. Does anchorage of equipment in the area appear to be free of significant YM[Ni] UOI-N/AO]
degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
.Y'NflO UD N/A-
- 4. Does it appear that the area is free of potentially adverse seismic spatial. YPQ NIO UOi N/A'.
interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
tl.(
Mo
/r/
tA~yc&9 1
/e c~#A4,
- 12WWO, AS#tqt "Ae 13 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3
".nrrPnnndr1nr. Nn
- RR-19-17.1 D-13
SheC
- o2z-2 Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. AX.
Floor El.
k35 Room, Area 3l 1A eesI'
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause floodin or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does. it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
~eei- &r
- i pNE UED N/AD YfrNEI UDJ N/AD YNEI UD N/AO:
I/VW Zt/,0 51
- 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?
Y
.NE-UI-Comments (Additional pages may be added as necessary)
Evaluated by:
Date: g/Aso/1 g
?bob Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrPqnnndnP.n.
Nn
- RR-19-17.
D-14
4wce-tL I--7-T Sheet I of 2 Status:.
N U Area Walk-By Checklist (AWC)
Location: Bldg. -
,*Lw Floor El. 4,*..
Room, Area'3 LM5o~o C-t ter-fV Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Y)4 ND UD N/All,,:
- 2. Does anchorage of equipment in the area appear to be free of significant YJQ NO U[] N/A[-.
degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be. free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill 7.1 conditions oftcable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
YK ND UD N/AD YK NO UD N/AD 1
3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWVEL item.
C c-5 >
Peach Bottom Atomic Power Station Unit 2 D-15 MPR-3815, Revision 3 r.nrrP.snnnr1PnrP. Nn RR-1 9-1773
AWC -Uz--
Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. g.e0w,r FloorEl.
I G Room, Area1 3 4-
'1" Lo,,
ee.w,-e'- f3.y,
- 5. Does it appear that the area is free of potentially adverse seismic YO NEI U[ N/Al]
interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic YR[ NEI UEI N/A interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic YK. NE! UD] N/AOl]
interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
- ,/
e
/
Y...
- 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?
YXNEI UFI Comments (Additionail pages may be added as necessary)
V9, I Oc' k "I'a //S
" 6106-e'5y -a / A 5'e")-f :s F
6o)(ow,zoexo33.
Evaluated by:.
4 z X1, ý V
Date: --9,13011-
??O 13 Itd-
< C-6 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrqnnndanrP. Nn
- RS-19-17.1 D-16
Sheet 1 of 2 Status: 0 N U Area Walk-By Checklist (AWC)
Location: Bldg. XeqC'ftr Floor El.
IJi Room, Area13
_. *2-S3 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?..
Y.
NE U-' N/AC
- 2. Does anchorage of equipment in the area appear to be free of significant YRI NE-UC N/AO degraded conditions?'
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
rvoC*',j t:ite-"l..
Y54 NEI U" N/AO Y4 NO U-I N/AI 13 If the room in which the SVVEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
<C-5 >
Peach Bottom Atomic Power Station Unit 2 D-17 MPR-3815, Revision 3 r.nrrPnnndnnr.P Nn
- RR-19-171
AWC-V,2-9 Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. Gr*-o Floor El.
I i Room, Area13
.2 -53
- 5. Does it appear that the area is free of potentially adverse seismic Ya NIO U'I N/A[I interactions that could cause flooding or spray in the area?.,
'6. Does it appear that the area is free of potentially adverse seismic YPI NEI UE N/A"]
interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic Y[5 NEI Ui N/AEII interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
1-t Lt,,^Jer is decf 4-o tte *1t.
- 8. Have you looked for and found no other seismic conditions.,that could YF2 NEI U..
adversely affect the safety functions of the equipment in. the area?
Comments (Additional pages may be added as necessary)
Evaluated by:
Date: !
?O 1o -
U
~257~Zz
- /~3 o//8-Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrPqnnndfnrP. Nn
- RR-19-17.1 D-18
/kMC-U#2Zc1 Sheet 1 of 2 Status: 0 N U Area Walk-By Checklist (AWC)
Location: Bldg. TvAt,0 Floor El. d_3.
Room, Area' 3 T I
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of YX NO U" N/AO potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- OAf.
pCMPI aver W11-P7T 53410 (0171 riTO U/
"' 'on 4
7 box
ý ace-r 61(.
9 6 zM
- 2. Does anchorage of equipment in the area appear to be free of significant NEI U N/A" degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
YX NEI U[: N/AlU
- 4. Does it appear that the area is free of potentially adverse seismic spatial Yg NEI U' N/A["]
interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
13 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrm=qnnnri-nr. Nn
- R.9-1 9-17q D-19
ShetW2 Vo
-2 Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. "rurh 4
-n('
Floor El.
13-Room, Area13 T - 1 I
- 5. Does it appear that the area is free of potentially adverse seismic Y
N N
UO N/AEI interactions that could cause flooding or spray in the area?
In dOL 0
sI~
,I n~
y~,f
- 6. Does it appear that the area is free of potentially adverse seismic Y
NEI UD] N/Al]
interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic YX NEI UDI N/AE]
interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
- Noc 4 ilpvrOry or-Pbf"WI1
- 8. Have you looked for and found no other seismic conditions that could YX NI UO adversely affect the safety functions of the equipment in the area?
(IaJock W0l 1 #5 ý
-i) q.F oij -I~b') 9O(_ 9/1 /Wjia Comments (Additional pages may be added as necessary)
Al/A Evaluated by:
Date:
Of/I 7&1 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrpqnnrnda.nr.P Nn
- RR-19-171 D-20
Sheet I of 2 Status:O) N U Area Walk-By Checklist (AWC)
Location: Bldg.
Floor El.
L1 Room, Area13
- I (
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
NOUJE N/AO
- 2. Does anchorage of equipment in the area appear to be free of significant Y"R NCi UO N/AD]
-degraded conditions?,
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic' conditions (e.g.,-condition of supports is adequate and'lill conditions of cable trays appear to be inside acceptable limits)?
- Lao POOfAC uAus i'ove efrolI
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
YXNEI UD N/AD]
YX NEI UD N/AE]
1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
<C-5 >
Peach Bottom Atomic Power Station Unit 2 D-21 MPR-3815, Revision 3 rCnrrP.nnndP.nr Nn
- RR-19-171
Avw -UZ -10 Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. fJ Floor El.
q I Room, Area13
- 5. Does it appear that the area is free of potentially adverse seismic Y'gN[- UI-' N/A1 interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic NEI UE] N/AD j:
interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismicY)ý NEI U13 N/A' interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shieldn
-R O
- 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the *area?
13N U11 Comments (Additional pages may be added as necessary)
N/Ph Evaluated by:
Date:
'6O 2-1 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rlnrrP..qnnndrnrP. Nn
- PS-19-171 D-22
Sheet I of 2 Status:&) N U Area Walk-By Checklist (AWC)
Location: Bldg.1eFC1
'f(
Floor El.
69o Room, Area13 1
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of YX NEI UD N/AD potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant YKND UD N/ADl degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
4ND UD N/AD YWNED UD N/AD 13 If the room in which the SVVEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
SC-5 >
Peach Bottom Atomic Power Station Unit 2 D-23 MPR-3815, Revision 3 flnrrmnnndP.nr.- Nn - R.-19-17.,
AWC-Vz -ii Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. Reac Floor El.
S ?-*
Room, Area'3 R).-I
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
r),--*-
e*
-,- <p'r g/p/,X).
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g,, scaffolding, lead shielding)?
YX NE UD N/AC Y
NEI UED N/ACl Y*NEI UEC N/A[3
- 8. Have you looked for and found no other seismic conditions that could Ix NE UC adversely affect the safety functions of the equipment in the area?
Comments (Additional pages may be added as necessary)
NAl/
Evaluated by: ~c~~i2C#I Date:
Ooo abakzd I Z. -
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rlnrrP~nnndInr.n Nn
- RRA-1T7I D-24
Sheet I of 2 Status:c( N U Area Walk-By Checklist (AWC)
Location: Bldg. "irkrit Floor El. I *3 5 Room, Area13 '*-[-74" Instructions for Completing Checklist This checklist may be used to document.the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening'cabinets)?
YX NO UE N/AD
- 2. Does anchorage of equipment in the area appear to be free of significant.YX NO U0 N/AD
,degraded conditions?
- 3. Based.on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
..... l o, 4-.
'I a
o,
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
NEI Ul N/AED Q Odec Oflel Y* NEJ ur N/AD-13 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
<c-5 >"
Peach Bottom Atomic Power Station Unit 2 D-25 MPR-3815, Revision 3 rlnrrP..nnnr1nnrP_ Nn
- Rq-19-17.1
AWC_-LU-lZ Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. TT)O J6fli Floor El. 13*
Room, Area 1.Ta --43
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
1 r %Tto 4i5 6 er~- A'19 6, Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
. YAery YNO UEJ N/AO YA NO UD N/A..
- 7. Does it appear that the area is free of potentially adverse seismic YX NEI Ur] N/i interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding? ý
- orw,
- r iLa-,Yotv m~On 4
cr4 bleJ~ 4I~i9 -4 or AD..
9 54 II..
- 8. Have you looked for and found no other seismic conditions that could YXNI urO adversely affect the safety functions of the equipment in the a~rea?
Comments (Additional pages. may be added as necessary)
N/A Evaluated by:
Date:
9/1-7
!?/171201 2 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 flnrrP..*nnndPnr.
Nn - RRA19-171 D-26
Sheet 1 of 2 Status-cv N U Area Walk-By Checklist (AWC)
Location: Bldg. T"rhiit. Floor El. J1.
Room, Area"13 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions maybe used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of 1Z NEI UDI' potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
'Ancbom 4k-6lO $
rcb rr cerýveufy 4W YJ'CkrvewtM'I IS
/JL1 'r£ArCrY-rzcLAfV ICY Lj'67
- 2. Does anchorage of equipment in the area appear to be fred of significant Y(
ND Ui] I' degraded conditions?
IT/AE3 4/AD
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Y%ý ND UO NIAD Y}X NO UD N/AD 13 If the room in which the SVWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based ofi judgment, e.g., on the order of about 35 feet from the SVVEL item.
- C-5 >
Peach Bottom Atomic Power Station Unit 2 D-27 MPR-3815, Revision 3 f.nrrP-nnndrn.n Kn
-RR-19-17.
Awc -UZ-13 Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. TuCA
-t' Frloor El. 1j-Room, Area13 T2-31
- 5. Does it appear that the area is free of potentially adverse seismic YX No interactions that could cause flooding or spray in the area?
Tk~oAA "V
P04 o
le-,-1
~
c U-N/AOl a,7y*~m
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Y*ND UD N/AD YP( NI UD N/AD
- 8. Have you looked for and found no other seismic conditions that could adversely affect the sap f9ons of the equipment in the area?
bt VAc V0 1rSs31A p BeAFý 5P YD, NEI UDI CA, 0-66
.51) Rim I Comments (Additional pages may be added as necessary)
Orea OfC j woe?
a' wr W/
C,65MýI acdectpocy 04~
Evaluated by:
a-i
&j Date:
--- 2zqlw' Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Cnrrmunnndr.nr. Nn
- R-l 9-173 D-28
Sheet I of 2 Status:* N U Area Walk-By Checklist (AWC)
Location: Bldg.1'ur6, me FloorEl.
13S Room, Area',
U L
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Y)4ND UE N/AD
- 2. Does anchorage of equipment in the area appear to be free of significant Y)
NDi UI] N/AD1 degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit Yk NDI Uil N/ADl raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
- on rocmy 5
t JateA 4-ve4col 6-1m
+lnT O( ds bC o fweow)-
On acaarok o w c well v
1J
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Yk NEI UD N/AD 1
3 If the room in which the SWVEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
<C-5 >
Peach Bottom Atomic Power Station Unit 2 D-29 MPR-3815, Revision 3
.nrrPAnnndPnrP.P Nn, RR-19-17.A
Shc-etz-lq Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. r1'b'
ý i
Floor El.
S'J Room Area 3
- I
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
.TirlreoA" 4P~ne
'5 o
% v) per
~
No. P-S S IIRe,1
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
-EYcQ w-adi or Y4 NEI UO N/Af YýK NO UID N/A-Y NOI UF N/AD W Orem
- 8. Have you looked for and.found no other seismic conditions that could YX" NEI U1I adversely affect the safety functions of the e ipme n the are9a?
.o w0oI5 r--
b4iI.
d pSAP5
-_:oi i (66ok. wall #s' L-o_=7.a
ýori 1 qA/4 Comments (Additional pages may be added as necessary)
N/IA Evaluated by:
v OMWA' qrIj2;jj Date:
dj)q;ot I
I
?/-2q/2012 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrr,-pnnnfntnrý. Nn - R.q-1i-17.1 D-30
Sheet I of 2 Status:6 N U Area Walk-By Checklist (AWC)
Location: Bldg. ¶j/in.
Floor El.
N. 5 -- Room, Aea'3 1
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
YX" NE UD N/AEJ
- 2. Does anchorage of equipment in the area appear to be free of significant YX NO U] N/A]
degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Y' NO UQ N/AEl
- 4. Does it appear that the area is free of potentially adverse seismic spatial Yý(NC U!
N/AD interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
13 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
<C-5 >
Peach Bottom Atomic Power Station Unit 2 D-31 MPR-3815, Revision 3 rnrr.nnnd1nrnp NJn
- R5-19-17.
Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg.
L' Floor El.
3S Room, Area',
T_
- 5. Does it appear that the area is free of potentially adverse seismic YO'N-UF N/AD interactions that could cause flooding or spray in the area?
,Tkri,6CI41
+'I
{% V iIP 0 obe,-J-lc
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Nc~ 4~~ec~r A
1o 0
YXND Uf N/AD Y)r(ND UD N/AD
- 8. Have you looked for and found no other seismic conditions that could YX NO UD adversely affect the safety functions of the equipment in the area?
64Y ý;O/?11 pr eMAP5 Comments (Additional pages may be added as necessary)
NIA Evaluated by:
Date:
A 2QID 4 - I Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrpqnnndPnr.P Nn - RA-2-17.3 D-32
,qwc-U g-/6 Sheet 1 of 2 Status:&) N U Area Walk-By Checklist (AWC)
Location: Bldg. Rft)2r Floor El.
q I Room, Area13 14
- ).
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of YK ND UD' N/AQ potentially adverse seismic conditions (if visible without necessarily
'opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant Y}QND U] N/AD degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
YKNEI U!] N/AD YXCND! U1 N/AD 1
3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
,KC-5 >
Peach Bottom Atomic Power Station Unit 2 D-33 MPR-3815, Revision 3 flnrrP.nnn1snrs* Nn
-RR 29-17R
AWC.-UZ-1t Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg.RW f '. Floor El.
q Room, Area"3.*
-L.
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shield'
)?
YYNEI Uf" N/AD' YV NEI UO N/AOl Y)
NEI UD N/ADl
- 8. Have you looked for and found no other seism~ic conditions that. could Y
NEI' Uil
,-O adversely affect the safety functions of the equipment in the area?
'-O.--
o tRev. I Comments (Additional pages may be added as necessary) lt/A Evaluated by:
~~m4( Wi Date:
ýý1(-20(-
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrP.qnnndPnr.P. Nn
- RR-19-171 D-34
qwAc-ag Sheet 1 of 2 Status:&
N U Area Walk-By Checklist (AWC)
Location: Bldg. L2(1/2!L Floor El. /
Room, Area" R_- I-Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
YýP(ND U N/MAE.
- 2. Does anchorage of equipment in the area appear to be free of significant YX(NO UI' N/Al]
degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and UVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
NEI U[- N/AE]
.:4. Does it appear that the area is free of potentially adverse seismic spatial Y
NE] UE] N/AI],
interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
13 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rTnrrp_,nnndPnre Nn " RR-19-171' D-35
AWCS-ht2-of7 Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. fR&9./
('C Floor El. iL
.. Room, Area"
e I
- 5. Does it appear that the area is free of potentially adverse seismic Y
/NEI UO N/A[I interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic Y/V/ND UDI N/AO interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic YA NEI UD N/A interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
- 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment. in the area?
YA NEI UEJ Comments (Additional pages may be added as necessary)
Evaluated by:. 0-t7mv,_ MV110h V "
t \\1
, x-4_6ý_
Date:
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rlnrrP'qnnndPnr.P Nn
- RR-19-17.1 D-36
,1qW6az- /9 Sheet 1 of 2 Status;O N U Area Walk-By Checklist (AWC)
Location: Bldg.
mP
'%!l'oor El.
JQ Room, Area
!..*L*i"..0 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of YX NI] UDJ N/All potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant YXNE" UEi N/AL]
degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic condifions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Yý(NQ ULI N/AO
- 4. Does it appear that the area is free of potentially adverse seismic spatial YX NFI U[] N/A]
interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
1 3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
< C-5>
Peach Bottom Atomic Power Station Unit 2 D-37 MPR-3815, Revision 3 r.nrrm..qnnr1PnrnP Mn - RR-19-177T
Shece Uz-Ifs Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg.t &440lMoor El. L..,
Room, Area'%../T-D
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Y4XN5 U[I N/AD YKNE! urO N/Af.
YPR NEI UD N/A-,
- 8. Have you looked for and found no other seismic conditions that could YXJ NE 4
adversely affectg*a safety functions otbteq uip, ent in the area.
UEn P60P5 Comments (Additional pages maybe added as necessary) aA/I Evaluated by:
rX. Ak-Date:
YI 7zY z01I2I Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 flnrri~nnndrnr'. Nn
- R,-
9-17.1 D-38
koc-UX-/9 Sheet I of 2 Status:g N U Area Walk-By Checklist (AWC)
Location: Bldg. ____-
Floor El.
q [
Room, Area-Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space beloweach of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant
.. degraded conditions?.-,,.
- 3. Basedon a visual inspection from the floor, do the cable/conduit
- raceways and HVAC ducting-appear to be free of potentially adverse
"::seismic conditions (e.g., conditi6n of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
YJN"(N UL-N/AD YWN-U' N/AFD Y' NOI/AE Y;ND UQ N/AD 13 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
< C-5 >
Peach Bottom Atomic Power Station Unit 2 D-39 MPR-3815, Revision 3 rnrrmnnndPnr. Nn " RA-9-171
Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. 1 W Floor El. qi Room, Area13" a,*.
- 5. Does it appear that the area is free of potentially adverse seismic Y ' NI] U-I N/AI]
interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic Y,<NEl U[] N/Afl interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic YM NEl UOI N/AO1 interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
t 0-
'a j
A Btpoovvi
ý N
- 8. Have you looked for and found.no other seismic conditions that could adversely affect the safety functions of the equipment in the area?
XNEI UE1 Comments (Additional pages may be added as necessary)
NIA Evaluated by:
~91 iA~§4i Date:
5/0
?A--
- M
-St ?6 7 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrr.nnndrnrP. Nn - RR-19-17.1 D-40
/71ýxc-az-ze2 Sheet 1 of 2 Status:&
N U Area Walk-By Checklist (AWC)
Location: Bldg. R6 Floor.El. AL
.Room, Area" RL -to Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of Y1 NEI UCI N/A potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant NEj] U, N/Al]
idegraded conditions?'....
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting-.appear to be.free of potentially adverse seismic conditions (e.g., cofidition of supports is adequate and fill, conditions of cable trays appear to be inside acceptable lim s)?
400r "Or7&
4 S-V 1403
~
'T
~
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
YXNI UD N/AD1 YJeNV'I 6UFN/
AA Y NEI UD1 N/AD1
" If the room in which the SWVEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWVEL item.
<C-5 )>
Peach Bottom Atomic Power Station Unit 2 D-41 MPR-3815, Revision 3 Ca.nrrmnnndPnr'.P Nn
- R-1 2-1 7T
Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. R C-Floor El.
L !
.Room,Area" PDA
- 5. Does it appear that the area is free. of potentially adverse seismic interactions that could cause flooding or spray in the area?.
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
X/ND UE-N/AQ Y)< NO UD N/ADO YXNOI UD N/AO
- 8. Have you looked for and found no other seismic conditions that could NE] UD adversely affect the safety functions of the.equipment in the area?
Comments.(Additional pages may be added as necessary)
AI)A Evaluated by:
Date:
Peach Bottom Atomic Power Station Unit 2 D-42 MPR-3815, Revision 3 rTnrrPnnnr1~nr.A Nn - R 171
Sheet 1 of 2 Status: (9 N U Area Walk-By Checklist (AWC)
Location: Bldg. R____-
Floor EI. iiL Room, Area'3 R a,-I Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?.
Y)<NFI UEI N/A.
- 2. Does anchorage of equipment in the area appear to be free of significant Yg NEI UI" N/A[3 degraded, conditions, 4Ptlc n-ka M4 pepO>r1 cl Me4(O W9 0,ýcca acceo
- 3. Based on a visual inspection from the floor, do the cable/conduit
_ raceways and HVAC ducting appear to be free of potentially adverse seismic-conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
YX'NO UE1 N/A[]
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
11 1 i L
- Qje~eo Cf~f 1 k1~s ray 0'~
&ka) n S.
ot) 0K Yý( NEI UEI N/AE1 CO -
e4VII 6C -&V b1A c2ftfr3 ti If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
< C-5 >,
Peach Bottom Atomic Power Station Unit 2 D-43 MPR-3815, Revision 3 r.nrrPqnnndPnrP. Nn*
R-R1 73
MC--OUz-?I Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. Re__d_
Floor El. AIb Room, Area1'3 lb-
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
60
,e
+1 4 4 Y
NE UE N/AE X
D NE UD N/AD YXN[O Un N/AD, OM 5'5_"'5
- 8. Have you looked for and found no other seismic conditions that could Y*rND U-'
adversely affect the safety functions of the equipment in the area?
Comments (Additional pages may be added as necessary)
Evaluated by:
Date:
9o/bi/holTl*
I I
yh-ýI fI -o 1L2 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrP.qnnndrrir.* Nn
- RR-19-171 D-44
AubC-
~z-zZ Sheet 1 of 2 Status:
N U Area Walk-By Checklist (AWC)
Location: Bldg. SCfftflA t/*"Floor El. 'IL Room, Area13
,L..L Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of Y% ND UED N/AE potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
-Norm( W -5 4
OIOdrl~ '
- 2. Does anchorage of equipment in the area appear to be free of significant YX[ N[
U1] N/ADJ degradedconditions?
-i--
JWt6+.'
e 4
ie r v'Ay6vj-Qn 9e;)
tnpr Ai c'oe,&oI nonS - SIf4 rI4J C# rx~
iw~r4 no 11O"Ia
- 3. -Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions: of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
YW'NE U!] N/AD-YXNE UEJ N/AD I u4n dwJ 4w] t..oLrJit
.01 j-ra 5'ý (.ýs 3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 C.nrrm..qnnnd*.nr.'P Nn
- RR-19-171 D-45
WC..-Li- - Z7-Sheet 2'of 2 Area Walk-By Checklist (AWC)
Location: Bldg.S6rL[on&h
,. FloorEl.
1i1 Room, Areai 3/L{- L 1
- 5. Does it appear that the area is free of potentially adverse seismic YX NOi-ULI N/AD interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic YX NEI UE N/AD interactions that could cause-a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic V.$'Nfl UD N/AD interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
- 8. Have you looked for and found no other seismic conditions that could YX$ND UI-adversely affect the safety. functions of the equipment in the area?
.VAo14CJ 6QtjA 4 COVIet f flor IwV&l eA (d144le Comments (Additional pages may be added as necessary)
/V/A Evaluated by:
r Date:
ý< C-6 )
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3
.nmrr-qnnnr1-nreP Nn
- RR-19-17T D-46
Sheet 1 of 2 Status:&9 N U Area Walk-By Checklist (AWC)
Location: Bldg. Thin Floor El. 13 5 Room, AreTaý Q
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of 3*
NEI UD1 N/A["..
potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
.Anc~~~~~w~~'1 46e 5Cinoe~
3~ 4~ll fl$,
0 flUT or?
14V5
&a;4W ol-14o0V*V, 4wo oLo4 61o4s o&" securr 4v +ooc.
A5-bu :H-
- '*vo apw,4-v 6e o 6ack-+-4 on4 Coe 4~lr e~ 2e
- 2. Does anchorage of equipment in the area appear to be free of significant Y)N6 0 UD N/A-1
-degraded conditions?.
- 3. Based on. a. visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill
" conditions of cable trays appear to be inside acceptable limits)?
YO NEI U[-
N/AI-]
- 4. Does it appear that the area is free of potentially adverse seismic spatial Yk NEI interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
$i pe) 5 ok (me J
4,4w
+0 0 ra&
%6(,
UEJ N/AE3 13 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
SC-5 >
Peach Bottom Atomic Power Station Unit 2 D-47 MPR-3815, Revision 3 Cnrrm~nnnd1nr'p Nn
- R5.-19-173
Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. ¶rk"v~~
Floor El. ______Room, Area' I
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
- Th4eaL
'4 ;,e *pt s o dki 3/4-.;',P.kId f)oo N.
prN
. pi 5
NW I
/.
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
-J" NVO e
4rn focafy
.orA~
f-0 6 )Ie Y$ NEI UO N/AO YX NEI UO N/AOt Yo NOI UD N/AO
- 8. Have you looked for and found no other seismic, conditions that ýcould YX NO U adversely affect the safety functions of the equipment in the area?
0&_4,k walk O,
-rd,4 rr PMAP,' Spv*
"Iý,',
/No. M-7oI, ev. I, i1'3&t W4 L
- R JIk
- 1. A", -lt. I
.'?/1l1201 Comments (Additional pages may be added as necessary)
IAA Evaluated by:
?
~!~4 Date: z)t Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rCnr*..qnnndrnr.p Nn PRA-19-171 D-48
910C -4%-Zr Sheet I of 2 Status:a N U Area Walk-By Checklist (AWC)
Location: Bldg. JKeOC6*
Floor El.
I Room, Area'3. RnL-3 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
YX Nr U[I N/AD
- 2. Does anchorage of equipment in the area appear to be free of significant **
NEI UI N/AE" degraded conditions?
3.._Based on.a visual inspection from the floor, do the cable/conduit
--raceways and HVAC ducting appear to be free-of potentially adverse seismic 6onditioiffs (e.g., condition of supports is adequate and fill
'conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
YX NE U-N/AD[I Y*NE U-N/AD 13 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
< C-5 >
Peach Bottom Atomic Power Station Unit 2 D-49 MPR-3815, Revision 3 flnrrmqnnndPnr-Nn
- RR-19-17.1
SheC
-t)2 -oZf Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location:. Bldg. Reai¢ Floor El. I*5 Room, AreaD3 R.- 0
- 5. Does it appear that the area is free of potentially adverse seismic YX' NI U[] N/Al interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic Y
NO UD N/AO interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic YX NEI U'I] N/A-.
interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
k
- cv4 k o~ cW, wie
- 8. Have you looked for and found no other, seismic conditions that could YR NE] Ul.
adversely affect the safety functions of the equipment in the area?
0WIA Comments,(Additional pages may be added as necessary)
N/A Evaluated by:.
2 Date: ~
~?O~
q)131-2012_
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 f.nrrP..nnnrIdnr. Nn
- Rq-19-172, D-50
Status: (YN U Area Walk-By Checklist (AWC)
Location: Bldg. DQywtMlI Floor El.
13ýL Room, Area" D,13 IO 2a -t/1-/t*4.?
Instructions for Completing Checklist:
This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Y;(NE UEJ N/AE:
- 2. Does anchorage of equipment in the area appear to be free of significant YK NE] U' N/AQ degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
..4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
YX/ NE UE N/AE.
YX NEI UE N/AEl Qares'
'w 10AA
',,I 6me. P057*0il O
13 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
<C-5 >
Peach Bottom Atomic Power Station Unit 2 D-51 MPR-3815, Revision 3 rnrmrnnnrIP.nrP.
Nn " R.-19-17."
PteC - o Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location. Bldg. Or' A FloorEl1. I*4 Room, Area13 blW"-I\\
on" bw---l
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
YX ND UDj N/AD YX NDI UD N/AI.
- 7. Does it appear that the area is free of potentially adverse seismic YX NEI UEI N/AD interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e scaffolding, lead.
shielding)?.Sd4 5' 5-c.!*,*.
r mo IJ 4v 5,4e.o&,urol 96-e
-T0oole 6oA
- 'VneJ 4v Wt tord i #ferl
- Loo,,e -4.001
'n a~v? wOrk -ZMO n
,~e voi
&re b-JM
,~,
- 8. Have you looked for and found no other seismic conditions that could YX NDI U
adversely affect the safety functions of the equipment in the area?
X~r1 nf box(
+Mf'Ol
'f(Z5M(
4qý bo ws."
oet 0 + Tou mov/
554 re
-4~4wr ~~1 Comments.(Additional pages may be added as n:cessary)
NIA Evaluated by: -
i%;4 Date: ALa9K Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrPnnndFinn.- Nn
- RR-19-173 D-52
Sheet 1 of 2 Status6 N U Area Walk-By Checklist (AWC)
Location: Bldg. *Cywc'I FloorEl. 15+/-
Room, Area' 3
) W?), -
5 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant
--degradedconditi0ns?..
'P.
- " "{~et 4~
- 3. _Based on a visual inspection from the floor, do the cable/conduit
. raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill
'*' :conditions ofcable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Y[ NEI U" N/All YK NOl UFIJ N/AEI YkNEJ U[- N/AEl YX NEl Ufl N/AEI e.-Cronvs
IC('
QMC 96 I*lQ9*~W c(~~
QwoY Ipmor
, Looe ',nvlkAot L-QOIe(
Oiln a
a2 e-cekJWe 4kwi'04 4-i "o
CY'
- -1wr ý4ný ) Jie4 rA) 13 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
SC-5 >
Peach Bottom Atomic Power Station Unit 2 D-53 MPR-3815, Revision 3
(.nrrP~nnndfnrcP Nn
- R 9-1 2-1773
Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg.
w IL. Floor El.
I Room, Area42 OKi/bj-
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
-Leod sk'~v Vl ir'~
YV NEI UEJ N/A[1 V' ND UEJ N/AO YX NEl U'- N/Af
- 8. Have you looked for and found no other seismic conditions that could X
NEI1 U-1 adversely affect the safety functionsý,ofthe equipment in.the prea?
Comments (Additional pages may be added as necessary)
V/AI Evaluated by:
Date:
1/
nI
-N Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 CnrrP~nnndenrc Nn
- RA D-54
Sheet 1 of 2 Status:&
N U Area Walk-By Checklist (AWC)
Location: Bldg. IZCA6TOf Floor El. _'9
, Room, Area13 %-I'.Sj Instructionsfor Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
YI ND UD N/AD
- 2. Does anchorage of equipment in the area appear to be free of significant Y0 NEI UD N/Al degraded conditions?.
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse
- seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Y.V NEI UD' N/Al]
-L 906 ~- 13OR-6 PiPI""4 o V(NJ--A PZOPI~~CR'ý' YXpr-iD
.4. Does it appear that the area is free of potentially adverse seismic spatial Y14 NEI UD N/AD interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
,_ O VCIDVIý Aýt C eA~ui*
PJ P£ZO P ORq M'* P._A e IPLAC C-i C0
)JT-Z-0LL J-:I.
Wk/
r S'EC KI ZE"*"
(CO OJ ttc )
-1Pei:
tl00OOS'rllZ PkK P PC PC 5r4 L)
"JOT A
CIZE 013LE-T1)IiO'CAr
~-T0 pitu-tp Oz OTh4 AIZOA SIC'c, CAWA/.Or A-&i-( A-rC AMor PW676P JyV.
13 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SW'EL item.
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 CnrrP~nnndinr*..
Nn - RR-1'2-171 D-55
A/*WC-Z -Lz Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. 26ACrO T. Floor El..
ge Room, Area"'
R -1?
- 13
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
YC4 NI] UO N/AEJ
'F14
_ýT I-b
-S" eol A4 1 S'ElIv C(
AAI('ijdsK ROCr.
C-IM66[tLAT&I-
-O~~.A
~
~
f TIZ Jac-3qq k e 101161 IL
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
Yg N] UL N/AD
- 7. Does it appear that the area is free of potentially adverse seismic Yo NEI UD N/A[I interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
ýýjVfZA L 3CAV:jOLO I(W AR64 A,"L~L £L'uRELI/
H4~
T
-0 r
SrRU0rtll?A C
- 8. Have you looked for and found no other seismic conditions that, could adversely affect the safety functions of the equipment in the area?
YjY(NEI UI]
Comments (Additional pages may be added as necessary)
- IM0LI,0,ID 5MIAu.I.L w/ APCI AttX UtGVC OIL Pq-y SYAizrC7i.
Evaluated by:
Date:
i (6/
SOIl~zot-2 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrPnnntI~nri. Nn
- R-1 9-171 D-56
Status:10 N U Area Walk-By Checklist (AWC)
Location: Bldg.
Flo& El.
Room, Area"!
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-fly near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgmentsand findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without.necessarily opening cabinets)?
YVZNE] UE-N/AOl
- 2. Does anchorage of equipment in the area appear to be free of significant Y% NO UC N/AO degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways. and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Y9LNEI UE] N/AE" -
,4. Does it appear that the area is free of potentially adverse seismic spatial Y
NEI UE' N/ACl interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
r 13 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
<C-5 Peach Bottom Atomic Power Station Unit 2 D-57 MPR-3815, Revision 3 f.nrrPnnnrn*nrP Nn - RR-19-17.1
Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. 1I- 0"A oQr El.
1J35 Room, Area'3 K("el(Y*C, Of
- 5. Does it appear that the area is free of potentially adverse seismic intractons a couk!fause/gooding or pray in tbhearea?
V(i f
tA
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (eg., scaffoldi ead shielding)?*
'0~
ý-Nfl UEl N/AO
.AOEl UEI N/AO r.N0 UF1 N/A]
CA
-&- Lc'ktr ctA &
- 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?
$NFI U13 Comments (Additional pages may be added as necessary)
Date:
/
,0 (-.
< C-6 >"
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrFnnndPnr.P. Nn
D-58
,f00J6-a z-gZ1 Status.
~U Area Walk-By Checklist (AWC)
Location: Bldg. A Floor El.
135' Room, Area 13 R 2.- 23 Instructions for Completing Checklist This checklist may be used to'document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be usedto record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of Y)K NO UO N/AD potentially adverse seismic conditions (if visible without necessarily opening cabinets)?,
- 2. Does anchorage of equipment in the area appear to be free of significant ))
NE UOI N/A!-
degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC-ducting appear-to-be free of potentially adverse seismiic conditions (e~g., condition of supports is adequate* and fill conditions of cable-trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?/V No-*
- I/
YAJNO1 U!] N/A0 Y*NE! UD N/A..
13 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
<C-5 >
Peach Bottom Atomic Power Station Unit 2 D-59 MPR-3815, Revision 3 r.nrrP..nnnrPnr.P Nn
- R.-19-17.A
Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. R.k1cor Floor El.
1 3 5 Room, Area13 AZ2-3--
- 5. Does it appear that the area is free of potentially adverse seismic Yd Ni Ur N/Al interactions that could cause flooding or spray in the area?
IV el,
rve
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area.?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
YEA-NO UD N/AD YJRNO UD N/AD
- 8. Have you looked for and found no other.seismic conditions, that could YA N-Ur adversely affect the safety functions, of the equipment in the area?
Comments (Additional pages may be added as necessary)
Evaluated1by:
Date:
LI7L 1342,~
.9-11 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 (TnrrPqnnndInr.p Nn
- RR-19-171 D-60
Sheet 1 of 2 Status:Q N U Area Walk-By Checklist (AWC)
Location: Bldg...-.
- e_
FloorEl.
13 5
. Room, Area1 3 TZ-_71 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of theifollowing questions may be used io record -the results of judgments and findings.:
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?UV.: V%
it
&A 4440 24 (0 aA An 4
OAf) e, t
4, (Ce
- 2. Does anchorage of equipment in. the area appear to be free of significant degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequateand fill conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? L* 5 Yk X
It I
f -et$1.
5P.*
YA NEI UEI N/AE" YJKNE] UD1 N/AD3 YKNEI UD N/AD.
YNF-I U-U N/AD 610A V4 if re Per 3 40,ý&Q 2-6aAvc( 9&'ec, 4-7b, PwI /
lckI"ý 13 If the room in which the SVVEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should ke hbased on judgment, e.g., on the order of about 35 feet from the SWEL item.
< C-5 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rCnrrnnnr1Pnr t Nn
- RRA -1=71 D-61
Sheet 2 of 2 Area Walk-By Checklist (AWC)
_.Location: Bldg. 4_~
Eloor-E1. -.----
Room, Areal3
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
- e.
- i.
V:"
.6. Does it appear that.the area is free of potentially adverse seismic..
interactions that could cause a fire in the area?
YA NEI Ul] N/Al if Pr Y'
NEI UI] N/Al,
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead.
shielding)? Lk'm 1
,X.ee VI I
f e,
YA NO UD N/ADO
- 8. Have you looked for and found no other seismic, conditions that could YM NEl Ul]
adversely affect the safety functions of the equipment in the area?
Comments,(Additional pages may be added as necessary)
Co met bead
.s e
Date:
Peach Bottom Atomic Power St ion Unit 2 MPR-3815, Revision 3 rlnrrm..nnndrnr.* Nn " RSA 9-1.l D-62
f (
t.A- (_-.
1 Sheet 1 of 2 Status' N U Area Walk-By Checklist (AWC)
Location: Bldg._. 9
-f.I%', Floor El. (ýfr RoomA.Ar. a13 Atr-Instructions'for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant degraded: conditions?
x)
NO Ur N/AD.
qNEI UD N/AD
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways andI-iVAC ducting appear to be-free of potentially adverse seismic conditions (e.g., condition of supports is'adequate and fill conditions of cable trays appear to be inside'acceptable limits)? :
Y4-NO UD N/AD
- 4. Does it appear that the area is free of potentially adverse seismic spatial Y44N. UDI N/AD":
interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
13 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
< c-5 >,
Peach Bottom Atomic Power Station Unit 2 D-63 MPR-3815, Revision 3 r.nrrmnnnrIdnr.P Nn
- P.-1 9-173
Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location:
dg....
W Floor El. [L... Room, Area'3 Ak-ta r"
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding lead shielding)?Alk
-tcyAo 4 /% d lo-"pe.
,(444d X a 72-
~
,NE] UD N/AD YX ND ULj N/A.
Y*INI-UDI N/AD],
if
- 2(14
- 8. Have you looked for and found no other seismic conditions that could YjKNI1 U-adversely affect the safety functions of the equipment in the area?
Comments (Additional pages may be added as necessary)
Evaluated by:
A77az Date:
/ ý jar L 6
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 flnrrPqnnndPnr.A Nn
- RR-1T-17 D-64
Table D-2. Unit 0 Area Walk-By Checklists (AWCs)
AWC-Ux-Building Elevation Location Component ID UO-1 Diesel Generator Building 121 & 127 D/G-1 & DG-2 MO-0-33-0498 UO-2 Diesel Generator Building 121 & 127 D/G-3 OAP060 UO-3 Emergency Cooling 195 ECT-6 0BK032 Towers UO-4 Emergency Cooling 114 ECT-1 MO-48-0501A Towers UO-5 Emergency Cooling 114 ECT-1 MO-2-48-2804A Towers UO-6 Turbine 165 T2-100 & T3-100 00C29B (East Corridor)
UO-7 Turbine 165 T2-1 00 & T3-1 00 20C005A (Main Floor)
UO-8 Turbine 165 Fan room OBV030 UO-9 Diesel Generator Building 151 D/G-13 0AV064 UO-1 0 Radwaste 165 RAW-32 0AV036 UO-1 1 Diesel Generator Building 121 & 127 D/G-9 0DE377 UO-12 Diesel Generator Building 151 D/G-20 0DV064 UO-1 3 Pump Structure 112 U2 HPSW pump 00B061 I
room Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 D-65
Sheet 1 of 2 Status:ý)
N U Area Walk-By Checklist (AWC)
Location: Bldg.,i',&i C(i,..FloorEl.
[21 4 'ZRoom, Area'3 b!6---
A-bI/6.-
K / Jol,
MO 103*/12.
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
YP3 NEI UEI N/AE
- 2. Does anchorage of equipment in the area appear to be free of significant YPQ NEI UO N/AE]
degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit Y]
.:raceways and HVAC ducting appearto be free of potentially adverse seismic conditions (e.g.; condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial Y
- interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
One_ oij,, S howk 40,4 n 6,/
X/,_ CA c te NE UO N/AD NEI U-N/Ali
- H V-o-q' r-,y'oM, it,'<'*'z*
f'"
/
",, '7..-
,-o I/ea--.<..,
4k,<
v,,,
,.zi,>..,
. *..-,, I Th.t...-,
PMO Axv
,* daf nev6 ey a, e l
,W/
)~/tV h/
~ r-1/,9 4
41
/3 Ie' l b1 7%4 r~ eh 4 e4/,
it e
13 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.orrmnnndr.nr.P. Nn
- PRA-17.17.
D-66
ASe C-o-I Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. V',i*.' C
. Floor El.
GZ IJ+/-aI Room, Area'13 3*I - i-/7-I
- 5. Does it appear that the area is free of potentially adverse seismic YZI NE] U[1 N/AD interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic Y[N NO. UE1 N/A interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic YJ NE ULI N/Al].
interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
- 8. Have you looked for and found no other seismic conditions that could YP NE] Ul]
adversely affect the-safety functions of the equipment in the area?
Comments (Additional pages may be added as necessary)
Evaluated by:
Date:
/M 1-J
,~1
~;~-
< C-6 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 r.nrrPlqnnnrIAnrP_ Nn
- RR-19-171 D-67
e-Ut#-Z Sheet 1 of 2 Status: 6) N U Area Walk-By Checklist (AWC)
Location: Bldg. AieSet Gif,.FloorEl. 121-It TRoom, Area'3 b&.--3 WJ :7.L4f*
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Y0 NFI U-I N/AU
- 2. Does anchorage of equipment in the area appear to be free of significant Y6 NI] UE] N/A[]
degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit YEI raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial YA interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
1 i
.1d,
.i,,,b,,. appee NEI UK] N/AK]
NEI UO N/AK]
JtALm
'3 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
'<C-5 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 flnrrP.nnnrdenr.s Nn
- RR-9-17R D-68
Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. b k j (
Floor El.
It--17..!
Room, Area13 D/&--)
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
YK NEI Ur' N/AO YN NEI UD N/ADI
- 7. Does it appear that the area is free of potentially adverse seismic YýK NDI UDi N/ADl interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding?
- 8. Have you looked for and found no other seismic conditions that could YPO ND UD adversely affect the safety functions of the equipment in the area?
Comments (Additional pages may be added as necessary)
Evaluated by:.
4f.
Date:
_S
'J/
Y-/3/
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3
.nrrA.*nnndInrP_ Nn ' RRA9-17.1 D-69
Sheet 1 of 2 Status: O N U Area Walk-By Checklist (AWC)
Location: Bldg. Cc r-Floor El.
t15 Room, Area 13 4f 66 Q
-*.%k*o-"
)
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The, space below each of the following questions may be used to record the results of judgments and. findings. -
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions,(if visible without necessarily opening cabinets)?
Y`
NO UE N/A-
- 2. Does anchorage of equipment in the area appear to be free of significant YIK NEI U] N/A' degraded condlitions?;;.-
- 3. Based on a visual inspection from the floor, do thecable/conduit raceways and HVAC-ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports iseadequate and fill-conditions of cable trays appear to be inside icceptable limits)?,-
YP9-NEl UO N/AO -
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
1yNO U!' N/AO 13 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
< C-5 >-
Peach Bottom Atomic Power Station Unit 2 D-70 MPR-3815, Revision 3 nrrnm-nnlnnrP.
Nn " RR-19-17.
Ateec -
0-3 Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. 45-e I-Floor El.
/1--V Room, Area13
-6 4pZ2/
- 5. Does it appear that the area is free.of potentially adverse seismic interactions that could cause flooding or spray. in thearea?
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?.
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary. installations.(e.g.,, scaffolding, lead shielding)?
Y)J NO UE-N/AO YJA NO UO N/AD YK NO UO N/AD-
- 8. Have you looked for and found no,,other seismic, conditions that could adversely affect the safety functions of the equipment in the area?
YjWNEI UO.
Comments (Additional pages may be added as nece`ssa' :
ry)
Evaluated by:
Fj 4 L/
Date:
A /
F f
or vhtlla-Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Tnrrm..nnnr-nre. Nn - RR-19-17.
D-71
Sheet 1 of 2 Status: (
N U Area Walk-By Checklist (AWC)
Location: Bldg.
Floor El..iA-Room, Area13 b
-r I,
Instructions for Completing Checklist This checklist maybe used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
I. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily
- opening cabinets)?
Y[
NO-JO N/AO
- 2. Does anchorage of equipment in the area appear to be free of significant Y4 NO UO N/AO
-"degraded conditions?-`":!.,,.'*
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVACducting-appearto be-free of potentially;adverse
- -,eisrmccondifions (e.g:-'conditionwof supports is; adequate and fill conditions 6f cable trays appear to be inside acceptable limits)?
- 4. Does it. appear that the area is free of potentially adverse seismic spatial
!interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
oA),vi 0y
¢Cas e4 Y
lNO UO N/AO Y,83J NEI UO N/AOl 13 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
<C-5 >"
Peach Bottom Atomic Power Station Unit 2 D-72 MPR-3815, Revision 3
('nrrPnnnHPnrP. Nn " R,-19-171
Awc-u-q-q Sheet 2 of2 Area Walk-By Checklist (AWC)
Location: Bldg.. L6Cr-
-Floor El.
I1),*
Room, Area13 Cr - I
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
- 6. Does it appear that the.area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Y,0CNO UD N/A[
YJ] ND U] N/AD.
YF NO UD N/AD'
- 8. Have you looked for and found,nq9o other seismic. co'ndition-that' could Ya NEI UF'I.
adversely affect the safety functions.oflthe~equipment in the area?
Comments (Additional pages may be aiaddd ai necessary)
Evaluated by:
Date:
< C-6>
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrP..nnndFnrP. Nn
- MR-19-171 D-73
Sau N U,
Area WlkBy heklist AWC Location Bldg.
C<
-EloEl.
B
.dk+ R koom, Area1 I/41 +
This checklitmay beused toe docmenter oi the AreaWal-Byne.ar one Morm.oreSWELitems..The spgacebelo*weachof the following questions ma "be usd to record the results of judgments anfdfindings.
'.J
- yprov,
,ec:
7+
Additioa sA c is proided at the eid of this'I khecist for documenting other comments 1... Does an+ hage of+eq~p*
intthe
,,+4area ppea*rto be free of 9potentialy dverse seismic dsis*1-
,,qon (ifor isible without necessarily Y3
/,NO`U
+N..
openingqcabints)?,
- 2. oesancorageO' oeqimnin. te area appear to be, fref ignfiant i:
O ONA degdade caenditions?ic- -
3.,B dOn a visual i.,spectionf*rmthe flor' 0, d
Y0 N..
N...
cewiAys and HVAC ducting appear to be freeof
.pioentially adverse.,
&eimi9coditin (e.g., condtion-of supportsi's Aadeut andfin; coniton o cbl trays.appear tob 1isd cetbelmt) mnteracton with other equipment in'thearea (e.g-,Ace'i ng tiles and.,
li~hin*g)?-
'-fo C+et/"
. ".me Ob ~~b'e~'
As#o'i~'S' repkr~X
.~;-ecvtEd s.ji~$'.
13select*siolbe room scn which-the SVE.+.mselcatedareishoeiyl'd*barge (eog.,urbgmentilel),o +the ardea~ f sebii~$eefo thee SVsh d
EL tern.
Peach Bottom Atomic Power StatiOn Unit.2 D-74 MPR-3815, Revision 3 Cnrrp.onnnnpnr.p Nn *R-19-17.
Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg.
EC T" Fl6or El.
//
Room, Area"
-CCT - /
1/4 11'e-opt 9-
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentiall adverse seismic interactions'associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
YM NE UE N/AU]
YJ6 NO UO N/AO Y%[ NO UO N/AU
- 8. Have you looked for and found no other seismic conditio ns that could Yjo NO UO adversely affect the safety functions of the equipment in the area?
Comments (Additional pages may be added as necessary)
Evaluated by:,
"P ZIL-LI-11 Date:
,i Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrm~nnnd-nr.P Nn
- RR-19-17.1 D-75
SheN1o Area Wlk-B "C" 6ckilist(A
__idosfl _.__ g l
e;k Thfis checklist mybusdtdouetterslsothAeaWl-Bynear onrmr WE t~sTe spae elo~echof hefolowngquestions mray: beused toreor th6 eut ofjumetadddns Addtioalspae i Povied ~tthe~nd~fthi chckistfo ido~inntin reuts rc gihentsai p~oentall ad~rs~sesm cn-ditions (i visibeWithoutnecessar'ly qopning-caiiniets)Tr, 2 Doe.s ancho'r age ofe*q-uipm*e"
'ntinteareaappeartobefree of "sinific*Ant
.3 Based on a.suainspectuinfrom the floor, do&thecable/condut
.... :4racewaysandYC ductigappear to be, freeo-fpotentially adverse seismic conditions (e.g.~, condition of supports is adeuti fiMl conditionrsof cable trays appear to be inside-c"ceptablei4hrmts)?
- 4. Dokes itappeartat the area is free ofpotentially adverse seisnrC spatial,
-r on..wth other equpmentin th lighting)?ii tfe":an M'j'
`q Do N~A YýN Un Wý
~jNQUQN/AQ,
'1
~
,seec~d so~dbe se a s dbttsd iujud g7 6bot1 fefonh~VVE
,bwnr.e~~nih~~or of Peach Bottom Atomic Powver Station Uniit 2 D-76 MPR-3815, Revision 3 rnr_,niPnP Njný RR_19 17I
Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. 7*/buf Floor El.
2&*
Room; Area13 4./
k'4/s, Ar 6t,/
- 5. Does it appear that the area is free of potentially adverse seismic
-interactions that could cause flooding or spray: in the area?
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
YM NO UD N/AO YIj NO UO N/AO,:
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Y,4 NO UO N/AO
- 8. Have you looked for and found no other seismic conditions that-co(uld YMND UO:
adversely affect the safety functions of the equipment inhe area?,.,
Comments (Additional pages may be addedas necessary)
Evaluated by:
AX 42X,4-,eý 1 1/1' Date: ' s
/izL I
I Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 (lnrr'nnnndPnrIP. Nn ' RR-19-17.
D-77
Sheet 1 of 2 Status:.
N U Area Walk-By Checklist (AWC)
Location: Bldg. $-rrb?,, 4/
.Floor El.
t63" Room, Area' 3
- o-vL-tj kr*-
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of Yq. N] UD N/AD:
potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant Y-* ND U[] N/AEl S degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismicconditions (e.g., condition of supports is adequate and fill
- conditions of cable trays appear to be inside acceptable limits)?
Y4 ND UD N/AO Y45 NEI U-N/ADE 2' /Z
(:9
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
4"
/,
41J "If the room in which the SWVEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
ý< C-5 >"
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 (f.nrrmgnnnHPnrl
.Nn
- RR-19-17.1 D-78
Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. T4k-2b F,
M loor El. _1 6 Room, Area13
° I r'.
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
Y* NO UJ N/AO
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
YJ NO UO N/AO Yýt NE UE N/AE:
- 8. Have you looked for and found no other seism'n-ic conditions that could YR NO UO' adversely affect the safety functions of the equipment in the area?
Comments (Additional. pages may be added as necessary)
Evaluated by:
C55ýý 212 --
==
"I do' Date:
0 //
19 1,.
,I%
IF Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrP.*nnnrnPmrP Nn
- RR -1T-17.
D-79
zfwd 11 Sheet 1 of 2 Status: (D N U Area Walk-By Checklist (AWC)
Location; Bldg.
7v-,'/,I Floor El.
46-S Room, Area13 F*4 -t Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of YCCNO UO N/AF:!
potentially adverse seismic conditions (if visible without necessarily
'opening.cabinets)?
dve 4vbo 5;ý e3;me eble-ý,
?v:re 4P-YOý -
1
,,er,,er,,tJ ~sr e"r
'd
- 2. Does anchorage of equipment in the area appear to be free of significant YM NO UO N/AD,
- degraded conditions?
'~ C~-~/eI p/~er OMi~vie 4,6, xAep~~
- .Z"
- 3. Based on a visual inspection from the floor, do the cable/conduit
-raceways, and 1HVAC:ducting appear-to be free of potentially adverse-seismic condiiibns (e.ag.,:condition of supports is adequate and fillt
- conditions of cable trays appear to be inside acceptable limits)?
Y)Jý- NEI U!
N/AD
- 4. Does it appear that the.area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
YW NEI UD] N/AD]
13 If the room in which the SVVEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
<c-5 >
Peach Bottom Atomic Power Station Unit 2 D-80 MPR-3815, Revision 3
.nrrmnnnrI.nrs Nn - RR-19-171
AwcShe2of Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. 7i"_w 6i-Floor El.
ib*
Room, Area' 3 r
4
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
YfA NE UD N/AEJ.
YP NE UD N/AO.
- 7. Does it appear that the.area is free of potentially adverse seismic YCR NEI UDJ interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
N/AO-
- 8. Have you looked for and found no other seismic. condition.sthat could YP NE) UE) adversely affect, the safety functionsoof the equipment irnathe area?...
Comments (Additional pages may be added as necessary...
Evaluated by: 44*'
A-_
Date:
ff 9,2btaý Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 CnrrmnnndrnPn kPn* R--19-17.
D-81
Sheet 1 of 2 Statuso IN U Area wa!k-ByCheckllst (AWO)
L0cation;.! *1g,.*
F.*6r El. '.
Room, Arca....
Instructions for Completing Checklist
,This checklist may be used to document the results of teArea Walk-By near one or more SWEL items. The space below each of the following questions miay~be used to record the results of judgments and findings.
-Additional space is provided at the end of this checklist for documenting other comments.
1.Does anchorage of equipmlent in the area, appear to be free of'
- ,potentially adverse seismic conditions (if visible itoutnecessarily openig cabinets)?
YE` NO U[] N/AEl]
2.: Des anchorage of equipment in the area appear to be free of significant`
EYlN WI] :N/Al]
degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appearto be free of potentially adverse se.
......is.
conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear'to be-inside aeceptable limits)?
4.4 Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in -the area (e.g., ceilin g tilesand lightingp)?
Y'O UW NAG Y[<NO U] N/Al]
IAAAII'jjV ON Ovev
- fWats, edvr)ýttjz 13110 V 4/fr to 4ff)UV L~
812 I~.
Iq AVIP A ro 9)eu U4*T "Ift the room in which the SWEL item islbcatked is veryI are6ge
, ubie Hall) theare selected should be described. This selected area should becbased on judoxent, e~g., on the ord~erpof about 35 feet from the SWEL item.
Peach Bottom Atomic Power Station* Unit 2 D-82 MPR-3815, Revision 3 rTnrrPmnnndPnrP* Nn "RR-19-17"
Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg.
Floor El.
Room, AreaP
- 5. Does it appear that the area i free of potentially adverse seismic Y[d NEI UI-N/AO interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
YCN[NO UQ N/AU YE(NO-U-N/AO
- 8. Have you looked for and found no other seismic conditions that could Y[/N-I UE]
adversely affect the safety functions of the equipment in the area?
Comments (Additional'pages may be. added as necessary)
IV/A Evaluated by:,
Date:
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Cnrom'nnndrncr.pI Mn
- RA-19-171 D-83
Sheet 1 of 2 Status&§ N U Area Walk-By Checklist (AWC)
Location: Bldg. oAub" Floor.El.
IlS Room,Area13 Instructions for Completing Checklist This checklist may beused to document the results of the Area Walk-By near one or more SWEL items. The, space below each of the following questions may be used to recordthe results of judgments and findings.,
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of YX NO UI N/A potentially adverse seismic conditions (if visible without necessarily
-opening cabinets)?
A^.-
J c0o0 J0 hav 1f4"V0 ol
- 2. Does anchorage of equipment in the area appear to be free of significant y'(NO UE[
N/AD 7.'.
.. :: ":':,.degraed conditioiis? :*,:J*
g a L
- 3. Based on a visual inspection from the floor, do the cable/conduit Y*I NO
-. raceways-and HVAC ducting appear-to-befree of potentially.adverse
, "i:*iuc conditions ('.g.,' condition of supports' is adequate and fill:
conditions of cable trays appear to be inside acceptable limits)?'-'
- 4. Does it appear that the area is free of potentially adverse seismic spatial Yk'NO interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
U-N/AD".
U0 N/AD 13 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
< C-5 >
Peach Bottom Atomic Power Station Unit 2 D-84 MPR-3815, Revision 3
.nrrP,.mnnnr1.nr.. Nn
- R,-19-171
Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg. &dAR Floor El. /bt5 Room,.Area13,,... /
3.-"
- 5. Does it appear that the area is free of potentially adverse seismic YWgj NI] UO1 N/A interactions that could cause flooding or spray in the aea?
er CZ 0
- 6. Does it appear that the area, is freeof potentially adverse seismic interactions that could cause a fire in the area?
YX'N'I UO N/A.
- 7. Does it appear that the area, is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
,Tool C,,
jre srdoo upr Y4 NEI UD N/AO
- 8. Have you looked for and found.no.other seismi'cconditions that could YX(NI] U]
adversely affect the safety funcftions.sof the equipment in the area?
Comments (Additional pages may be added as necessar)
NIA.
Evaluated by: 9/nŽ4.
Date:
h o
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrP..qnnnr1Anr-. Nn* RR-19-17.
D-85
Sheet 1 of 2 Status:&.) N U Area Walk-By Checklist (AWC) pive 1-] &, o/3Vj1.L Location: Bldg. No.se FlorEl. i.-2" Room,-Area23 YIXg-b/Q--
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
YII" NOl Ut-N/AD
,-1\\ýz rPesO oeoqs-4A S Y2('0 4/I.NfOt 1SOV-rS A-kb
'S OA.4' To H/AC,v J*
parg
- -TMVTJC 15OokI' "r~t-/-
SA1.,*r
/.1.9 OWT09f). T*c
- stmt, R ve
\\0A~\\)'IL Cq9.A~,1'~ 130 LrS' AlkC tYj)OL'b rO 136~ 4&L q1_Lc?>.
J UC
.'xr~~
~~IL..:
2 1i iý CUALUA-/
a-t4 Ay AOCecs,-Ar.,
%I h
veIv
-,criPhd.
-c.,I,.
IS'1
- 2. Does anchorage of equipment in the area appear to be free of significant YI* Ni Ut] N/Al]
degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
YI9'NI] Ut1 N/ADI Yd NEI Ut] N/AL]
nt~~+
rn'-~ov 4P4+mor iCs
' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3
'.nrmnnndrnr.P Nn
- RP-19-171 D-86
Sheet 2 of 2 Area Walk-By Checklist (AWC)
Location: Bldg.
I.
loor El.
i Room, Area' 3 UIJ-A t',S,,er6IfnI 8u, flnr4
- 5. Does it appear that the area free of potentially adverse seismic interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
"brV 10 YV*lN UE-N/AD YIETNC UD N/AC YO'N-I U[l N/A5
-V'W4 XAx.a-v
- 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?
YIffNEI UE Comments (Additional pages may be added as necessary)
INIA Evaluated by:
)1h rv Date:
0l'*),--'
47-91-201
< C-6 >
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrm-nnndinr.P Nn
- PS-19-17.T D-87
Sheet 1 of 2 Status:&
N U Area Walk-By Checklist (AWC)
Location: Bldg.
FlQor:EI. J"L. RoonAreal3 Lw. r 43 Instructions for Completing Checklist
-This checklist may be used to document the. results of theArea Walk-By near one or more SWEL items. The space below each of the following questionsmay be used to. record the:results. of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appearto be free of Yf.
potentially adverse seismic conditions (if visible without-necessarily opening cabinets)?
- 2. Does anchorage of equipment inthe area appear to be free of significant degraded conditions?
- 3. Based on, a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentiallyadverse seismic conditions (e.g., condition of supports is adequate andfill, conditions of cable trays appear tobe inside acceptable limits)?
'4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment.in the area (e.g., ceiling ti~lesand lighting)?
/
(.
NEI UEI N/AED NEI UQ1 N/ADI.
NEI UD NIAD:.-
ND UD N/AID e.1 4.
,e ;
4 hk-1tb+4
~t4 *x A(.,-
1 V 6if /0' 1 4f t
ewA 10 c'L Ni~
6e eY.
I~.
13 If the room in which the SWEL item is located is veiy large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
<C-5 >
Peach Bottom Atomic Power Station Unit 2 D-88 MPR-3815, Revision 3 rnrrPnnnH~nrP N-PRA 9-171
Sheet 2 of 2
. Area Walk-By Checklist (AWC)
Location: Bldg.:
Floor El.
- L5I Room. Area 13.i OVJ).'
Lj
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire. in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
VIKNo UD NIA:
4CNO: UO N/AD 4NO UO N/A'
- 8. Have you looked for and found no other seismic conditions that~could adversely affect the safety functions of the equipmentin-the area?
afNo 1Uf Comments (Additionai'jages may be idd d as necessary)'
Evaluated by:
Date:
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 rnrrm~nnndPnr.A Nn
- RR?-'173 D-89
Sheet 1 of 2 Status:ON U Area Walk-By Checklist (AWO)
Location: Bldg. F 't Floor El.
I L2-Room, Area'3 LY2.
HPSW PVP
?/i-f M
Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The.
space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments. -
- 1. Does anchorage of equipment in the area appear to be free of Y,
ND UD N/AD..
potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant YIND UD N/AD degraded conditions?
£
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is 'adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Y% ND UM N/AD
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles And lighting)?
N T
,../-
4 i4, 1ND UD NAD:
3 1 ock 4jA'ý csG-A _stafe*
re~t~ ee!r er~A%
s~i~cc' bQ A
~--U%.
I iro/S/1z
'3 If the room in which the SWVEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected areashould be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
<C-5 >
Peach Bottom Atomic Power Station Unit 2 D-90 MPR-3815, Revision 3 flnrrs-nnndPnr. No ' RA-19-171
AWL. -00.-13 Sheet 2of 2 Area Walk-By Checklist (AWC)
Location: Bldg. P..ZL Floor El..
Room, Area13 u?2. HtiSV-J
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cuse flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)? A v
o of I-e
,A.
4AS' 6,t AsmrW-YUFNO UU N/AD YKND UO N/Al.,
YO.ND U" N/A
- 8. Have you looked for and found no other seismic conditions that could YgrN-UD, adversely affect the safety functions of the~equipment-in the area?.
Comments ditional pages may be added ýas ieces'sary)
EValuated by:
0,-/ 94 4-'
Date:
I...
Peach Bottom Atomic Power Station Unit 2.
MPR-3815, Revision 3 rnrrP.,nnnd.nrP Nn - MR-19-17.,
D-91
E Plan for Walkdown of Inaccessible Equipment and Assessment of Electrical Cabinet Internal Inspections E.1.
PLAN FOR WALKDOWN OF INACCESSIBLE EQUIPMENT As shown in the SWEL for PBAPS Unit 2 in Appendix B (Table B-3), one item has been deferred until a future electrical outage. Table E-1 describes the deferred item and the reason it is inaccessible during normal plant operation. PBAPS Issue Report (IR)
- 01426027 has been written to schedule the Seismic Walkdown (and Area Walk-By) for this item in the third quarter of 2013.
Table E-1. Summary of Inaccessible Equipment Reason for Component ID Description Inaccessibility 00B094 480V Bus E13A4 Requires 4KV Bus Outage E.2.
ASSESSMENT OF ELECTRICAL CABINET INTERNAL INSPECTIONS All electrical cabinets on the SWEL require assessment of the need for inspections to address the potential for "other adverse seismic conditions" internal to the cabinet. This assessment is required due to an NRC clarification of their expectations for seismic walkdowns, which was received after the online seismic walkdowns were completed.
Tables E-2 (for Unit 2) and E-3 (for Unit 0) list all electrical items that require assessment. Accessibility of equipment, basis for accessibility determination, completion date of internal inspections, tracking number (if internal inspection has not yet been performed) and inspection results are provided in these tables.
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 E-1
Table E-2. Assessment of Unit 2 Electrical Cabinet Internal Inspections Accessible If Not Accessible, Milestone Tracking Status I Component ID Description EPRI Equipment Class (Y/N)
Why?
Completion Number Inspection (IR Number)
Results 20B324 MO-2-23-015 Motor Control Power Transfer (01) Motor Control Centers Y
N/A 9/2012 N/A SAT Switch 208325 RCIC INBD Iso. Valve M02-13-15 Motor (01) Motor Control Centers Y
N/A 9/2012 N/A SAT Controls 20B338 Remote Motor Starter MO-2-10-16D (01) Motor Control Centers N
Tools required for N/A N/A N/A disassembly 208037 Reactor Area MCC E224-R-B (01) Motor Control Centers N*
Tools required for N/A N/A N/A disassembly 20B060 Turbine Area MCC E224-T-B (01) Motor Control Centers N*
Tools required for N/A N/A N/A disassembly 20A15 (E12)
Emergency 4kV Aux Switchgear (E12)
(03) Medium Voltage Switchgears N*
Tools required for N/A N/A N/A disassembly 20A016 (E22)
Emergency 4kV Aux Switchgear (E22)
(03) Medium Voltage Switchgears N*
Tools required for N/A N/A N/A disassembly 20X033 Load Center E424 Transformer (04) Transformers N
Tools required for N/A N/A N/A disassembly 20X133 Panel 20Y33 Transformer (04) Transformers N
Tools required for N/A N/A N/A disassembly 20X30 Load Center Transformer E124 (04) Transformers N
Tools required for N/A N/A N/A disassembly 20X032 Reactor Area Load Center E324 (04) Transformers N
Tools required for N/A N/A N/A disassembly 20Y050 120V AC Distribution Panel 2C (14) Distribution Panels Y
N/A 9/2012 N/A SAT 20Y35.
120V AC Distribution Panel 2C (14) Distribution Panels N
Located in N/A N/A N/A contaminated area 2AD025 125V DC Distribution Panel (14) Distribution Panels N
Tools required for N/A N/A N/A disassembly 20D37 Static Inverter (16) Battery Chargers and Inverters N
Energized N/A N/A N/A Equipment; never out of service (diesel backed, no PM) 2AD03 Battery Charger 2A (16) Battery Chargers and Inverters Y
N/A 5/2014 A1872429 Scheduled 2DD03 Battery Charger 2D (16) Battery Chargers and Inverters Y
N/A 7/2014 A1877802 Scheduled 20C003 Reactor and Containment Cooling and (20) Control Panels & Cabinets Y
N/A 8/2012 N/A SAT Isolation 20C004C RCIC Control Panel (20) Control Panels & Cabinets Y
N/A 8/2012 N/A SAT Peach Bottom Atomic Pomr suation Uni 2 MPR-3815, Revision 3 Correspondence No.: RS-12.173 E-2
Table E-2. Assessment of Unit 2 Electrical Cabinet Internal Inspections Component ID Accessible If Not Accessible, Milestone Tracking Status I ComponentIDDescription EPRI Equipment Class (YNumber Inspection (Y/N)
Why?
Completton (IR Number)
Results 20C005A Reactor Manual Control Panel (20) Control Panels & Cabinets Y
N/A 812012 N/A SAT 20CO06C Main Control Room Console (20) Control Panels & Cabinets Y
N/A 8/2012 N/A SAT 20C39 HPCI Relay Cabinet (20) Control Panels & Cabinets Y
N/A 8/2012 N/A SAT 20C722A Accident Monitoring Instrumentation Panel (20) Control Panels & Cabinets Y
N/A 8/2012 N/A SAT 20D43 HPCI Aux Lube Oil Pump Starter (20) Control Panels & Cabinets N
Tools required for N/A N/A N/A disassembly 2BC270 HPCI Steam Leak Detection Cabinet (20) Control Panels & Cabinets N
Tools required for N/A N/A N/A disassembly L12-2-3-113 Reactor Water Level (20) Control Panels & Cabinets Y
N/A 8/2012 N/A SAT L12-3-86 Reactor Vessel High Water (20) Control Panels & Cabinets Y
N/A 8/2012 N/A SAT LI-8027 Torus Water Level (20) Control Panels & Cabinets Y
N/A 8/2012 N/A SAT LR/TR-8123B Torus Water Level/Temperature Recorder (20) Control Panels & Cabinets Y
N/A 8/2012 N/A SAT Item was opened (with tools) by maintenance so that internal anchorage could be confirmed, and no anomalies or other adverse seismic conditions were observed.
Pe-h Bottom Atomic P.-
Metetio Und 2 MPR3815, Revision 3 Correspondence No: RS-12-173 E-3
Table E-3. Assessment of Unit 0 Electrical Cabinet Internal Inspections I
Status I Component ID Description EPRI Equipment Class Accessible (YIN) If Not Accessible, Why?
Milestone Tracking Number Inspection Compont ID CR mber)
Results 00BO61 Pump Structure MCC E224-P-A (01) Motor Control Center N
Tools required for N/A mb N/A I
~~~disassembly
__N/NA 00B94 480V Bus E13A4 (02) Low Voltage Switchgears N
Tools required for N/A N/A N/A 00C29B Emergency Protection Relay Board (20) Control Panels & Cabinets Y
N/A 9/2012 N/A SAT 0AC097 Diesel Generator OAG12 Control (20) Control Panels & Cabinets Y
N/A 5/2015 A1620164 Scheduled Panel I
_IIII Pech BoStom Atomic Power station Uni 2
- MPR43815, RtvitJon 3 Coessondmleno No.: RS-121n E-4
F Peer Review Report This appendix includes the Peer Review Team's report, including the signed Peer Review Checklist for SWEL from Appendix F of the EPRI Seismic Walkdown Guidance (Reference 1).
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 F-1
Peer Review Report for Near Term Task Force (NTTF) Recommendation 2.3 Seismic Walkdown of Peach Bottom Unit 2 Peer Reviewers:
Patrick Butler (Team Leader)
Craig Swanner Caroline Schlaseman Patrick Butler, P.E.
Peer Review Team Leader Signature IL Date 10/16/2012 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 F:2
Contents F.1 Introduction....................................................................................................
4 F.1.1 O ve rv ie w...................................................................................................
.. 4 F. 1.2 Peer Reviewers..........................................................................................
4 F.1.3SW EL Development...................................................................................
5 F. 1.4 Seismic W alkdown.....................................................................................
5 F.2 Peer Review - Selection of SSCs....................................................................
6 F.2.1 P u rpo se...................................................................................................
.. 6 F.2.2 Peer Review Activity - Selection of SSCs..................................................
6 F.2.3 Peer Review Findings - Selection of SSCs...............................................
7 F.2.4 Resolution of Peer Review Comments - Selection of SSCs...................... 7 F.2.5 Conclusion of Peer Review - Selection of SSCs.......................................
8 F.3 Review of Sample Checklist & Area Walk-Bys..............................................
9 F.4 Review of Licensing Basis Evaluations.........................................................
16 F.5 References..........................................................................................................
17, Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 F-3
F.1 Introduction F.1.1 OVERVIEW This report documents the independent peer review for the Near Term Task Force (NTTF) Recommendation 2.3 Seismic Walkdowns performed by MPR Associates, Inc.
for Unit 2 of Peach Bottom Atomic Power Station (PBAPS). The peer review addresses the following activities:
Review of the selection of the structures, systems, and components, (SSCs) that are included in the Seismic Walkdown Equipment List (SWEL),
Review of a sample of the checklists prepared for the Seismic Walkdowns &
Walk-Bys, Review of any licensing basis evaluations, Review of the decisions for entering the potentially adverse conditions in to the plant's Corrective Action Program (CAP), and Review of the final submittal report.
F.1.2 PEER REVIEWERS The Peer Reviewers are Patrick Butler, Caroline Schlaseman and Craig Swanner.
Mr. Butler is the Peer Review Team Leader, per the EPRI Seismic Walkdown Guidance (Reference 1). As Peer Review Team Leader, he was responsible for the entire peer review process, including completion of the final peer review documentation in this report. The Peer Reviewers' qualifications are briefly summarized as follows:
Mr. Butler is a degreed mechanical engineer and has over twenty-five years of nuclear power experience. Mr. Butler and has been trained as a Seismic Capability Engineer (EPRI SQUG training) and is the primary author of EPRI SQUG Guidelines for the use of the SQUG Generic Implementation Procedure (GIP) for new and replacement components and equipment.
Ms. Schlaseman is a degreed civil/structural engineer and has over 30 years of nuclear power experience. Ms. Schlaseman has been trained as a Seismic Capability Engineer and EPRI Seismic Walkdown Engineer (SWE), has performed USI A-46 (SQUG) seismic walkdowns for two stations, and is a principal investigator in (EPRI) document 1025286, "Seismic Walkdown Guidance: For Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic," which is the guidance document for performing the walkdowns documented in this report.
Peach Bottom Atomic Power Station Unit 2 F-4 MPR-3815, Revision 3 Correspondence No.: RS-12-173
Mr. Swanner is a degreed aerospace engineer with 20 years of nuclear plant experience. Mr. Swanner has been trained as a Seismic Capability Engineer and EPRI Seismic Walkdown Engineer (SWE).
Mr. Butler, Ms. Schlaseman and Mr. Swanner are registered professional engineers.
F.1.3 SWEL DEVELOPMENT The SWEL development was performed by Mr. Benjamin Frazier. The initial peer review of the SWEL development was performed by Mr. Butler and Mr. Swanner, and was conducted between August 2, 2012 and August 16, 2012. There were no comments as noted on the SWEL Peer Review Checklist and no findings were cited. The completed SWEL Peer Review Checklist is found in Attachment 1. The discussion for the SWEL development peer review is provided in Section 2. Note that due to equipment accessibility including ALARA and electrical safety concerns, changes to the SWEL were made as the walkdowns were conducted. The Peer Review Team did review changes made during the walkdown and has reviewed the final SWEL included in Appendix B of the Walkdown Report. As noted in the SWEL Peer Review Checklist, there were no items from EPRI Equipment Classes 11, Chillers; 12, Air Compressors; or 13, Motor Generators. This was because there is no safety-related Seismic Class I equipment in these classes at Peach Bottom Unit 2. There is no Class 2, Low Voltage Switchgear (LVS) equipment in the Unit 2 SWEL, but there is one Class 2 LVS in the Unit 0 (common) SWEL, which has been deferred. Also, due to the significant number of modifications performed in the late 1990's as part of the USI A-46 (SQUG) and IPEEE programs, PBAPS Unit 2 has not made significant modifications to Seismic Class I equipment within the last several years.
F.A.4 SEISMIC WALKDOWN The on-site peer review of the seismic walkdowns was performed by Mr. Butler and Ms. Schlaseman on August 30, 2012. The on-site and follow-up reviews included approximately 31% of the SWCs and approximately 43% of the AWCs applicable to the equipment for Unit 2 and common, including checklists, photos, and drawings where applicable. Interviews were conducted with both teams of SWEs to assess conduct of the walkdowns and adherence to the EPRI Seismic Walkdown Guidance (Reference 1).
The discussion of the review of the sample of Seismic Walkdown Checklists (SWCs) and Area Walk-By Checklists (AWCs) is provided in Section 3.
The assessment of Issue Reports (IRs) with respect to current licensing basis is provided in Sections 5 and 6 of the report. These assessments and their outcomes were also discussed with the SWE inspection team in order to completely understand the issues.
Peach Bottom Atomic Power Station Unit 2 F-5 MPR-3815, Revision 3 Correspondence No.: RS-12-173
F.2 Peer Review - Selection of SSCs F.2.1 PURPOSE The purpose of this section is to describe the process to perform the peer review of the selected structures, systems, and components, (SSCs) that were included in the Seismic Walkdown Equipment List (SWEL).
F.2.2 PEER REVIEW ACTIVITY - SELECTION OF SSCs The guidance in Section 3 of the EPRI Seismic Walkdown Guidance (Reference 1) was used as the basis for this review.
This peer review of SWEL 1 was based on reviews of preliminary documents provided by the SWEL preparer, Mr. Benjamin Frazier. Additionally, the Peer Reviewers, Mr. Butler and Mr. Swanner, interviewed Mr. Frazier. Reference 1 Appendix F:
"Checklist for Peer Review of SSC Selection," was used by the Peer Reviewers to guide their review.
For SWEL 1 development, the following actions were completed in the peer review process:
Verification that the SSCs selected represented a diverse sample of the equipment required to perform the following five safety functions:
o Reactor Reactivity Control Reactor Coolant Pressure Control o
Reactor Coolant Inventory Control o
Containment Function This peer review determined that the SSCs selected for the seismic walkdowns represent a diverse sample of equipment required to perform the five safety functions.
Verification that the SSCs selected include an appropriate representation of items having the following sample selection attributes:
o Various types of systems o
Major new and replacement equipment (there are none) o Various types of equipment o
Various environments o
Equipment enhanced based on the findings of the IPEEE (or USI A-46) o Risk insight consideration Peach Bottom Atomic Power Station Unit 2 F-6 MPR-3815, Revision 3 Correspondence No.: RS-12-173
This peer review determined that the SSCs selected for the seismic walkdowns include an appropriate sample of items that represent each attribute/consideration identified above. The justification for this conclusion is: a) Based on a review of the UFSAR and SWEL 1 list, it was determined that an appropriate variety of equipment and systems are represented (e.g., HPCI, RCIC, Core Spray, RHR, CRD Scram Hydraulic, High Pressure Service Water, Batteries); b) The SWEL identifies that there are no "New and Replacement" equipment; c) A variety of location environments are included (e.g., Diesel Rooms, Reactor Building, Drywell, Turbine Building, Screen House, Pump Structure); d)
The SWEL identifies several items of equipment that were enhanced as a result of IPEEE; and e) Risk Significant equipment items are identified on the SWEL. Additional details for these conclusions are presented in Attachment 1: Peer Review Checklist for SWEL.
There are no SWEL 2 items for PBAPS Unit 2. To confirm the appropriateness of this conclusion, the following actions were completed in the peer review process:
Verification that spent fuel pool (SFP) related Seismic Class I SSCs were considered and appropriate justification was documented for why these items were not added to the SWEL 2.
This peer review determined that there are no spent fuel pool related items that are Seismic Class I.
Verification that the potential for rapid drain down of the SFP was considered in accordance with the Reference 1 guidance, and appropriate justification was documented for no items being added to SWEL 2.
This peer review determined that appropriate consideration and justification were provided for there being no items identified that could result in rapid drain down. There are no SFP penetrations that could result in rapid draindown, and Fuel Pool Cooling and Cleanup piping includes holes specifically intended to prevent siphoning and draindown of the spent fuel pool (See Section 4.3 of the Report as well as Attachment 1 to this Appendix).
F.2.3 PEER REVIEW FINDINGS - SELECTION OF SSCs This peer review found that the process for selecting SSCs that were added to the SWEL was consistent with the process outlined in Section 3 of Reference 1.
The Peer Review Checklist is attached to this docurnent with additional observations documented as appropriate. There were no comments or observations on the SWEL.
This peer review resulted in no findings.
F.2.4 RESOLUTION OF PEER REVIEW COMMENTS - SELECTION OF SSCs All comments requiring resolution were incorporated prior to completion of this peer review.
Peach Bottom Atomic Power Station Unit 2 F-7 MPR-3815, Revision 3 Correspondence No.: RS-12-173
F.
2.5 CONCLUSION
OF PEER REVIEW - SELECTION OF SSCs This peer review concludes that the process for selecting SSCs to be included on the seismic walkdown equipment list appropriately followed the process outlined in Reference 1, Section 3: Selection of SSCs. It is further concluded that the SWEL sufficiently represents a broad population of plant Seismic Class I equipment and systems to meet the objectives of the NRC 50.54(f) Letter.
-V'týý-BuAkl Peer Reviewer:
Date 10/16/2012 Peer Reviewer:
Date 10/16/2012 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 F-8
F.3 Review of Sample Checklist & Area Walk-Bys The on-site peer review of the seismic walkdowns was performed for PBAPS Unit 2 on August 30, 2012 by Mr. Patrick Butler and Ms. Caroline Schlaseman. The Peer Review Team reviewed Seismic Walkdown Checklists (SWC) and Area Walk-by Checklists (AWC) that were performed for Peach Bottom Unit 2 and Common equipment, and interviewed the walkdown team members regarding details in checklists.
For Unit 2, there were two walkdown teams, which each consisted of two Seismic Walkdown Engineers (SWEs). The first team consisted of Mr. Benjamin Frazier and Mr.
Mojtaba Oghbaei. The second team consisted of Mr. James Wiggin and Mr. Kevin Gantz. During the second week of walkdowns, Mr. Craig Swanner replaced Mr. Oghbaei.
Table F.3-1 lists the Peach Bottom Unit 2 and Common SWC and AWC sampling during the on-site and follow-up reviews. The SWCs and AWCs reviewed represent approximately 31% of the SWCs and approximately 43% of the AWCs applicable to this equipment for Unit 2 and Common, which exceeds the EPRI Guidance (Reference 1) requirement of a 10% to 25% sample.
Table F.3-1. Table of SWC and AWC Samples from Seismic Walkdown Equipment ID Description Equipment Class Location Observations (Applicable Area Walkby) 0AV64 D/G Building (09) Fans Diesel Generator No issues with the (AWC UO-9)
Vent Supply Fan Building, Room SWC or AWC D/G.-19, El. 151' applicable to this equipment or its conclusions were identified.
PO-0-40F-Master for El (10) Air Handlers Diesel Generator No issues with the 00272-01 EDG Building Building, Room SWC or AWC (AWC UO-9)
Vent Supply Fan D/G--19, El. 151' applicable to this Outside Air equipment or its Damper conclusions were identified.
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 F-9
Table F.3-1. Table of SWC and AWC Samples from Seismic Walkdown Equipment ID Description Equipment Class Location Observations (Applicable Area Walkby)
PO-0-40F-Master for El (10) Air Handlers Diesel Generator No issues with the 00272-02 EDG Building Building, Room SWC or AWC (AWC U0-9)
Vent Supply Fan D/G-19, El. 151' applicable to this Return Air equipment or its Damper conclusions were identified.
0DE377 E4 Diesel (21) Tanks or Heat Diesel Generator No issues with the (AWC UO-11)
Generator Lube Exchangers Building, Room SWC or AWC Oil Cooler DIG-9, El. 127' applicable to this equipment or its conclusions were identified.
0HT95 E4 Diesel (21) Tanks or Heat Diesel Generator No issues with the (AWC UO-11)
Generator Exchangers Building, Room SWC or AWC Starting Air DIG-9, El. 127' applicable to this Reservoir equipment or its conclusions were identified.
ODT40 E4 Diesel (21) Tanks or Heat Diesel Generator No issues with the (AWC UO-11)
Generator Fuel Exchangers Building, Room SWC or AWC Oil Day Tank DIG-9, El. 127' applicable to this equipment or its conclusions were identified.
ODG012 E4 Standby (17) Engine Diesel Generator No issues with the (AWC U0-1 1)
Diesel Generators Building, Room SWC or AWC Generator
.D/G-9, El. 127' applicable to this equipment or its conclusions were identified.
AO-33-0241 D ESW Outlet (07) Fluid Valves Diesel Generator No issues with the (AWC U0-11)
Block Valve Building, Room SWC orAWC from Diesel DIG-9, El. 127' applicable to this Generator from equipment or its Diesel conclusions were Generator E4 identified.
Coolers Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 F-10
Table F.3-1. Table of SWC and AWC Samples from Seismic Walkdown Equipment ID Description Equipment Class Location Observations (Applicable Area Walkby) 0DP060 E4 DIG Fuel Oil (05) Horizontal Diesel Generator No issues with the (AWC U0-11)
Transfer Pump Pumps Building, Room SWC or AWC D/G-9, El. 127' applicable to this equipment or its conclusions were identified.
2AV060 HPSW Pump (09) Fans Pump Structure, No issues with the (AWC U2-18)
Room Supply Room P/H-6, El.
SWC or AWC Fan A 112' applicable to this equipment or its conclusions were identified.
POD-2-40H-HPSW Pump (10) Air Handler Pump Structure, No issues with the 20223-04 Room Outside Room P/H-6, El.
Air Supply 112' applicable to this Damper equipment or its conclusions were identified.
0BP057 Emergency (06) Vertical Pump Structure, No issues with the (AWC U3-3)
Service Water Pumps Room P/H-9, El.
SWC or AWC Pump B 112' applicable to this equipment or its conclusions were identified.
2BDO1 125V DC (15) Batteries Turbine Building, No issues with the (AWC U2-14)
Battery 2B Room T2-169, El.
SWC orAWC 135' applicable to this equipment or its conclusions were identified.
2AD01 125V DC (15) Batteries Turbine Building, No issues with the (AWC U2-15)
Battery 2A Room T2-70, El.
SWC or AWC 135' applicable to this equipment or its conclusions were identified.
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 F-11
Table F.3-1. Table of SWC and AWC Samples from Seismic Walkdown Equipment ID Description Equipment Class Location Observations (Applicable Area Walkby) 20X133 Panel 20Y33 (04) Transformers Turbine Building, No issues with the (AWC U2-9)
Transformer Room T2-171, El.
SWC or AWC 135' applicable to this equipment or its conclusions were identified.
2AD03 Battery Charger (16) Battery Turbine Building, No issues with the (AWC U2-23) 2A Chargers and Room T2-170, El.
SWC or AWC Inverters 135' applicable to this equipment or its conclusions were identified.
2DD03 Battery Charger (16) Battery Turbine Building, No issues with the (AWC U2-13) 2D Chargers and Room T2-172, El.
SWC orAWC Inverters 135' applicable to this equipment or its conclusions were identified.
20D37 Static Inverter (16) Battery Turbine Building, No issues with the (AWC U2-12)
Chargers and Room T2-73, El.
SWC or AWC Inverters 135' applicable to this equipment or its conclusions were identified.
0AV036 Battery Room (09) Fans Radwaste Building, No issues with the (AWC U0-10)
Exhaust Fan A Room R/W-32, El.
SWC or AWC 165' applicable to this equipment or its conclusions were identified.
20C87 HPCI Instrument (18) Instruments Reactor Building, No issues with the (AWC U2-1 1)
Rack on Racks/Not on Room R2-15, El.
SWC or AWC Racks 88' applicable to this equipment or its conclusions were identified.
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 F-12
Table F.3-1. Table of SWC and AWC Samples from Seismic Walkdown Equipment ID Description Equipment Class Location Observations (Applicable Area Walkby) 2C095 RCIC Instrument (18) Instruments Reactor Building, No issues with the (AWC U2-1 1)
Rack on Racks/Not on Room R2-115, El.
SWC or AWC Racks 88' applicable to this equipment or its conclusions were identified.
0AP163 Emergency (05) Horizontal Diesel Generator No issues with the (AWC U0-1)
Service Water Pump Building, Room SWC or AWC Booster Pump A D/G-I, El. 121' applicable to this equipment or its conclusions were identified.
MO-0-33-0498 ESW Return to (08a) Motor Diesel Generator No issues with the (AWC U0-1)
Discharge Pond Operated Valves Building, Room SWC or AWC DIG-2, El. 121' applicable to this equipment or its conclusions were identified.
MO-2-32-2486 HPSW Return (08a) Motor Diesel Generator No issues with the (AWC U0-1)
Valve to Operated Valves Building, Room SWC or AWC Discharge Pond D/G.-2, El. 121' applicable to this equipment or its conclusions were identified.
OAP060 El D/G Fuel Oil (05) Horizontal Diesel Generator No issues with the (AWC U2-2)
Transfer Pump Pumps Building, Room SWC or AWC D/G-3, El. 127' applicable to this equipment or its conclusions were identified.
TCV-052E-D/G Jacket (07) Fluid Diesel Generator No issues with the 7239A Coolant 3-Way (Air/Hyd) Valves Building, Room SWC or AWC (AWC UO-2)
Thermostatic D/G-3, El. 127' applicable to this Control Valves equipment or its conclusions were identified.
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 F-13
Table F.3-1. Table of SWC and AWC Samples from Seismic Walkdown Equipment ID Description Equipment Class Location Observations (Applicable Area Walkby) 0AC097 Diesel (20) Control Diesel Generator No issues with the (AWC U0-2)
Generator Panels & Cabinets Building, Room SWC orAWC OAG12 Control DIG-3, El. 127' applicable to this Panel equipment or its conclusions were identified.
0AT096 El Diesel (21) Tanks or Heat Diesel Generator No issues with the (AWC U0-2)
Generator Lube Exchangers Building, Room SWC or AWC Oil Storage DIG-3, El. 127' applicable to this Tank equipment or its conclusions were identified.
0BK032 Emergency (09) Fans Emergency Cooling No issues with the (AWC U0-3)
Cooling Tower Towers, Room SWC or AWC Fan B ECT-6, El. 195' applicable to this equipment or its conclusions were identified.
MO-48-0501A ESW A Inlet to (08a) Motor Emergency Cooling No issues with the (AWC U0-4)
ECT Reservoir Operated Valves Towers, Room SWC or AWC ECT-1, El. 114' applicable to this equipment or its conclusions were identified.
M02-48-2804A HPSW (08a) Motor Emergency Cooling No issues with the (AWC U0-5)
Discharge Inlet Operated Valves Towers, Room SWC or AWC Outer Valve ECT-1, El. 114' applicable to this equipment or its conclusions were identified.
20Y050 120V AC (14) Distribution Turbine Building, No issues with the (AWC U2-1)
Distribution Panels Room T2-81, El.
SWC or AWC Panel 2C 150' applicable to this equipment or its conclusions were identified.
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 F-14
Table F.3-1. Table of SWC and AWC Samples from Seismic Walkdown Equipment ID Description Equipment Class Location Observations (Applicable Area Walkby) 20C722A Accident (20) Control Turbine Building, No issues with the (AWC U2-2)
Monitoring Panels & Cabinets Room T2-81, El.
SWC or AWC Instrumentation 150' applicable to this Panel equipment or its conclusions were identified.
2AD025 125VDC (14) Distribution Turbine Building, No issues with the (AWC U2-2)
Distribution Panels Room T2-81, El.
SWC or AWC Panel 150' applicable to this equipment or its conclusions were identified.
20C39 HPCI Relay (20) Control Turbine Building, No issues with the (AWC U2-2)
Cabinet Panels & Cabinets Room T2-81, El.
SWC or AWC 150' applicable to this equipment or its conclusions were identified.
Peer Reviewer:
Date 10/16/2012 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 F-15
F.4 Review of Licensing Basis Evaluations There were no instances identified during the walkdowns where evaluated components could not readily be shown to meet the plant seismic licensing basis. Accordingly, no licensing basis evaluations to determine if equipment complied with current seismic licensing basis requirements were required. However, there were some anomalies or conditions adverse to quality that were identified during the walkdowns. Tables 5-2 and 5-3 in the main body of the report provide a list of the anomalies encountered during the Unit 2 seismic walkdown inspections and how they were addressed.
-Vx"-BUAL Peer Reviewer:
Date 10/16/2012 Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 F-16
F.5 References
- 1.
EPRI Technical Report 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, dated June 2012.
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 F-17
- Peer Review Checklist for SWEL Peer Review Checklist for SWEL - Peach Bottom Atomic Power Station Unit 2 Instructions for Completing Checklist This peer review checklist may be used to document the review of the Seismic Walkdown Equipment List (SWEL) in accordance with Section 6: Peer Review. The space below each question in this checklist should be used to describe any findings identified during the peer review process and how the SWEL may have changed to address those findings. Additional space is provided at the end of this checklist for documenting other comments.
- 1. Were the five safety functions adequately represented in the SWEL 1 selection?
YZ NEI All five safety functions were included in the SWEL Selection.
- 2. Does SWEL 1 include an appropriate representation of items having the following sample selection attributes:
- a. Various types of systems?
YE NEI A wide variety of systems were represented including Residual Heat Removal, Reactor Core Isolation Cooling, Core Spray, High Pressure Coolant Injection, Control Drive Hydraulic, High Pressure Service Water, 125 VDC, 120 VAC, 480 VA C.
- b. Major new and replacement equipment?
YO NEI Due to the significant number of modifications performed in the late 1990's as part of the USI A-46 (SQUG) and IPEEE programs, PBAPS Unit 2 has not made significant modifications to Seismic Class I equipment within the last several years.
Accordingly, SWEL I does not identify any new or replacement components.
- c. Various types of equipment?
YZ NEI All of the EPRI equipment classes are represented with the exception of Classes
- 11 Chillers, #12 Air Compressors, and #13 Motor Generators. No Seismic Class I equipment in these three classes were identified at PBAPS Unit 2. There is no Class 2, Low Voltage Switchgear (LVS) equipment in the Unit 2 SWEL, but there is one Class 2 LVS in the Unit 0 (common) SWEL, which has been deferred.
- d. Various environments?
YZ NDI Equipment in various environments including the Reactor Building, Control Structure, Screen House, Pump Structure, Turbine Building, Diesel Generator Building and Drywell are included.
- e. Equipment enhanced based on the findings of the IPEEE (or equivalent)
YZ NEI program?
The Unit 2 SWEL includes a sample of equipment items that were enhanced based on findings of the USI A-46 (SQUG) and IPEEE programs (see Sections 4.2 and 7 of the Report).
Peach Bottom Atomic Power Station Unit 2 F-18 MPR-3815, Revision 3 Correspondence No.: RS-12-173
Peer Review Checklist for SWEL - Peach Bottom Atomic Power Station Unit 2
- f. Were risk insights considered in the development of SWEL 1?
The plant Probabilistic Risk Assessment (PRA) was reviewed and used to guide selection of the components on SWEL 1. Specifically, the relative risk significance of candidate components including the Risk Achievement Worth (RAW) and Fussell-Vesely importance for a Loss of Off-Site Power (LOOP) scenario from the internal plant PRA were used (See Section 4.2 of the report).
YE NEI
- 3. For SWEL 2:
- a. Were spent fuel pool related items considered, and if applicable included in SWEL 2?
Both parts of SWEL 2, assessment of Seismic Class I spent fuel pool (SFP) related equipment and equipment that could potentially result in rapid drain-down of the SFP were considered. There is no equipment in either category. See documentation of SFP item review in Section 4.3 of the Report.
- b. Was an appropriate justification documented for spent fuel pool related items not included in SWEL 2?
As noted in Section 4.3 of the report, there is no Seismic Class I spent fuel pool related equipment.
Section 4.3 also includes appropriate justification that there are no items of equipment that could cause rapid drain-down due to lack of penetrations within about 10 feet above the top of the fuel racks, and there are adequate anti-syphon features included in piping that terminate within a few feet of the tops of the fuel racks.
YE NEI YO NO
- 4. Provide any other comments related to the peer review of the SWELs.
The Peer Review team had no comments on the SWEL.
- 5. Have all peer review comments been adequately addressed in the final SWEL?
YE NO Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 F-19
Peer Review Checklist for SWEL - Peach Bottom Atomic Power Station Unit 2 Patrick Butler, P.E.
Peer Reviewer
- 1:
"IJLt"U IL, Date: 10/16/2012 Craig Swanner, RE.
Peer Reviewer
- 2:
Peach Bottom Atomic Power Station Unit 2 MPR-3815, Revision 3 Correspondence No.: RS-12-173 Date: 10/16/2012 F-20