ML14134A031: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(10 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML14134A031 | | number = ML14134A031 | ||
| issue date = 05/22/2014 | | issue date = 05/22/2014 | ||
| title = Summary of May 16, 2014, Meeting with Southern Nuclear Operating Company to Discuss the Joseph M. Farley Flooding Hazard Reevaluation Extension Request | | title = Summary of May 16, 2014, Meeting with Southern Nuclear Operating Company to Discuss the Joseph M. Farley Flooding Hazard Reevaluation Extension Request | ||
| author name = Williams S | | author name = Williams S | ||
| author affiliation = NRC/NRR/DORL/LPLII-1 | | author affiliation = NRC/NRR/DORL/LPLII-1 | ||
| addressee name = | | addressee name = | ||
Line 14: | Line 14: | ||
| page count = 4 | | page count = 4 | ||
| project = TAC:MF0285, TAC:MF1112 | | project = TAC:MF0285, TAC:MF1112 | ||
| stage = Meeting | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:LICENSEE: Southern Nuclear Operating Company FACILITY: Joseph M. Farley, Units 1 and 2 SUBJECT: SUMMARY OF MAY 16,2014, MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY TO DISCUSS THE JOSEPH M. FARLEY FLOODING HAZARD REEVALUATION EXTENSTION REQUEST (TAC NOS. MF0285, MF1112) On May 16, 2014, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Southern Nuclear Operating Company (SNC) via teleconference. The purpose of the meeting was to discuss the Joseph M. Farley Flooding Hazard reevaluation extension request dated February 28, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. | {{#Wiki_filter:LICENSEE: Southern Nuclear Operating Company FACILITY: Joseph M. Farley, Units 1 and 2 | ||
==SUBJECT:== | |||
}} | |||
==SUMMARY== | |||
OF MAY 16,2014, MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY TO DISCUSS THE JOSEPH M. FARLEY FLOODING HAZARD REEVALUATION EXTENSTION REQUEST (TAC NOS. MF0285, MF1112) | |||
On May 16, 2014, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Southern Nuclear Operating Company (SNC) via teleconference. The purpose of the meeting was to discuss the Joseph M. Farley Flooding Hazard reevaluation extension request dated February 28, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14072A486). The meeting notice and agenda, dated May 6, 2014, is available at ADAMS Accession No. ML14126A100. A meeting handout is available at ADAMS Accession No. ML14135A173. A list of participants is provided in Enclosure 1. | |||
In the February 28, 2014, letter, SNC requested an extension to the Flood Hazard reevaluation report of 120 days after the U.S. Army Corps of Engineers (USACE) provides information necessary to complete the revaluation as documented in letter dated September 26, 2013 (ADAMS Accession No. ML13274A343). The February 28, 2014, letter included a breakdown, of five tasks with approximate times for completion. | |||
During the teleconference, SNC discussed the details that went into the approximate time frame to complete the five tasks that resulted in the 120 day extension request. There was a discussion on the flooding evaluations that were analyzed to date, without the USACE data . | |||
.The licensee provided verbal information regarding the local intense precipitation evaluation. | |||
Staff requested the licensee submit a supplement to the February 28, 2014, letter that includes a description of the SNC's current and planned activities, with time frames, that have or will be taken as a result of the flood evaluations that have been performed to date. The licensee agreed to supplement the February 28, 2014, letter as requested. | |||
* There were no other commitments or regulatory decisions made during the meeting. | |||
Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 | |||
==Enclosure:== | |||
List of Attendees cc w/encl: Distribution via Listserv | |||
LIST OF ATTENDEES MAY 16,2014, MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY FLOODING HAZARD REEVALUATION EXTENSTION REQUEST Nuclear Regulatory Commission Staff Shawn Williams, NRR/DORL Ed Miller, NRR/DORL Robert Kuntz, NRRIJLD Ken Erwin, NRO/DSEA Matthew Mitchell, NRRIJLD Licensee Participants John Giddens, SNC Terry Mitchell, SNC Stacey Graham, SNC Ben Zoeller, AMEC Michael Crouch, AMEC Peter Masopust, AMEC | |||
*Enclosure | |||
ML14134A031 OFFICE LPL2-1/PM LPL2-1/LA LPL2-1/BC LPL2-1/PM NAME SWilliams SFigueroa RPascarelli SWilliams DATE 05/16/14 05/22/14 05/22/14 05/22/14}} |
Latest revision as of 20:46, 19 March 2020
ML14134A031 | |
Person / Time | |
---|---|
Site: | Farley |
Issue date: | 05/22/2014 |
From: | Shawn Williams Plant Licensing Branch II |
To: | Southern Nuclear Operating Co |
Williams S | |
References | |
TAC MF0285, TAC MF1112 | |
Download: ML14134A031 (4) | |
Text
LICENSEE: Southern Nuclear Operating Company FACILITY: Joseph M. Farley, Units 1 and 2
SUBJECT:
SUMMARY
OF MAY 16,2014, MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY TO DISCUSS THE JOSEPH M. FARLEY FLOODING HAZARD REEVALUATION EXTENSTION REQUEST (TAC NOS. MF0285, MF1112)
On May 16, 2014, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Southern Nuclear Operating Company (SNC) via teleconference. The purpose of the meeting was to discuss the Joseph M. Farley Flooding Hazard reevaluation extension request dated February 28, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14072A486). The meeting notice and agenda, dated May 6, 2014, is available at ADAMS Accession No. ML14126A100. A meeting handout is available at ADAMS Accession No. ML14135A173. A list of participants is provided in Enclosure 1.
In the February 28, 2014, letter, SNC requested an extension to the Flood Hazard reevaluation report of 120 days after the U.S. Army Corps of Engineers (USACE) provides information necessary to complete the revaluation as documented in letter dated September 26, 2013 (ADAMS Accession No. ML13274A343). The February 28, 2014, letter included a breakdown, of five tasks with approximate times for completion.
During the teleconference, SNC discussed the details that went into the approximate time frame to complete the five tasks that resulted in the 120 day extension request. There was a discussion on the flooding evaluations that were analyzed to date, without the USACE data .
.The licensee provided verbal information regarding the local intense precipitation evaluation.
Staff requested the licensee submit a supplement to the February 28, 2014, letter that includes a description of the SNC's current and planned activities, with time frames, that have or will be taken as a result of the flood evaluations that have been performed to date. The licensee agreed to supplement the February 28, 2014, letter as requested.
- There were no other commitments or regulatory decisions made during the meeting.
Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATTENDEES MAY 16,2014, MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY FLOODING HAZARD REEVALUATION EXTENSTION REQUEST Nuclear Regulatory Commission Staff Shawn Williams, NRR/DORL Ed Miller, NRR/DORL Robert Kuntz, NRRIJLD Ken Erwin, NRO/DSEA Matthew Mitchell, NRRIJLD Licensee Participants John Giddens, SNC Terry Mitchell, SNC Stacey Graham, SNC Ben Zoeller, AMEC Michael Crouch, AMEC Peter Masopust, AMEC
- Enclosure
ML14134A031 OFFICE LPL2-1/PM LPL2-1/LA LPL2-1/BC LPL2-1/PM NAME SWilliams SFigueroa RPascarelli SWilliams DATE 05/16/14 05/22/14 05/22/14 05/22/14