ML050320244: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 42: Line 42:
10  ML033090072        10/28/2003          Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 2, Extended Power Uprate - Grid Impact Study.
10  ML033090072        10/28/2003          Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 2, Extended Power Uprate - Grid Impact Study.
11  ML033100141        10/28/2003          Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 3, Extended Power Uprate - Updated Information.
11  ML033100141        10/28/2003          Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 3, Extended Power Uprate - Updated Information.
Accession Number Document Date Title/Description 12 MLO33040397      10/30/2003    10/30/2003 Meeting Handouts for Meeting With Entergy re: Issues for Alternate Source Term, Power Uprate & ACTS/MELLLA Application.
Accession Number Document Date Title/Description 12 MLO33040397      10/30/2003    10/30/2003 Meeting Handouts for Meeting With Entergy re: Issues for Alternate Source Term, Power Uprate & ACTS/MELLLA Application.
13 ML033100047      10/30/2003    Sign-in Sheet for 10/30/2003 Meeting With ENVY and ENO To Discuss ARTS/MELLLA, Alternate Source Term, and Extended Power Uprate Applications (TAC Nos. MB8070, MC0253, and MC0761).
13 ML033100047      10/30/2003    Sign-in Sheet for 10/30/2003 Meeting With ENVY and ENO To Discuss ARTS/MELLLA, Alternate Source Term, and Extended Power Uprate Applications (TAC Nos. MB8070, MC0253, and MC0761).
Line 55: Line 54:
22 ML042080410      1/14/2004    E-mail from B. Cosgrove of Vermont Yankee to VTY - All Users, regarding PSB Uprate Hearings - Focus on NRC Timetable.
22 ML042080410      1/14/2004    E-mail from B. Cosgrove of Vermont Yankee to VTY - All Users, regarding PSB Uprate Hearings - Focus on NRC Timetable.
23 ML040360118      1/31/2004    Vermont Yankee - Technical Specification Proposed Change No. 263, Supplement No. 4 Regarding Extended Power Uprate, NRC Acceptance Review.
23 ML040360118      1/31/2004    Vermont Yankee - Technical Specification Proposed Change No. 263, Supplement No. 4 Regarding Extended Power Uprate, NRC Acceptance Review.
Accession Number Document Date Title/Description 24 ML040480640      1/31/2004    Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263, Supplement No. 5 - Extended Power Uprate - Response to Request for Additional Information.
Accession Number Document Date Title/Description 24 ML040480640      1/31/2004    Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263, Supplement No. 5 - Extended Power Uprate - Response to Request for Additional Information.
25 ML042330094      2/9/2004      E-mail from Nichols to Timothy O'Hara re: Entergy VY EPU Mods.
25 ML042330094      2/9/2004      E-mail from Nichols to Timothy O'Hara re: Entergy VY EPU Mods.
Line 68: Line 66:
33 ML040410022      3/19/2004    Vermont Yankee Nuclear Power Station, Withholding From Public Disclosure, "Responses to Request for Additional Information" (Attachment 1 to letter BVY 04-008).
33 ML040410022      3/19/2004    Vermont Yankee Nuclear Power Station, Withholding From Public Disclosure, "Responses to Request for Additional Information" (Attachment 1 to letter BVY 04-008).
34 ML040840415      3/24/2004    03/31/2004 - Notice of Forthcoming Meeting with Vermont Yankee re: Information about the NRC's Review of Vermont Yankee's Power Uprate Application.
34 ML040840415      3/24/2004    03/31/2004 - Notice of Forthcoming Meeting with Vermont Yankee re: Information about the NRC's Review of Vermont Yankee's Power Uprate Application.
Accession Number Document Date Title/Description 35 ML042090271      3/2512004    E-mail from D. Pelton of USNRC to R. Daflucas of Vermont Yankee, regarding Previous E-mail from R. Daflucas of Vermont Yankee, re: Updated EPU Meeting with Bill Ruland, NRR.
Accession Number Document Date Title/Description 35 ML042090271      3/2512004    E-mail from D. Pelton of USNRC to R. Daflucas of Vermont Yankee, regarding Previous E-mail from R. Daflucas of Vermont Yankee, re: Updated EPU Meeting with Bill Ruland, NRR.
36 ML042080097      3/25/2004    E-mail from J. Thayer of Vermont Yankee to VTY - All Users, regarding Power Uprate Approval.
36 ML042080097      3/25/2004    E-mail from J. Thayer of Vermont Yankee to VTY - All Users, regarding Power Uprate Approval.
Line 80: Line 77:
45 ML042150149      6/1/2004      E-mail from Ronda Daflucas, Entergy, to Rick Ennis, NRC, re: NRR Reviewer EPU RAI Telecons.
45 ML042150149      6/1/2004      E-mail from Ronda Daflucas, Entergy, to Rick Ennis, NRC, re: NRR Reviewer EPU RAI Telecons.
46 ML042150127      6/1/2004      E-mail from Ronda Daflucas, Entergy, to Rick Ennis, NRC, re: RAls dated 5/28/04.
46 ML042150127      6/1/2004      E-mail from Ronda Daflucas, Entergy, to Rick Ennis, NRC, re: RAls dated 5/28/04.
Accession Number Document Date Title/Descriptlon 47 ML043560310      6/2/2004      E-Mail from Rick Ennis, NRR, to Ronda Daflucas, Entergy, re: SE Template for Vermont Yankee EPU.
Accession Number Document Date Title/Descriptlon 47 ML043560310      6/2/2004      E-Mail from Rick Ennis, NRR, to Ronda Daflucas, Entergy, re: SE Template for Vermont Yankee EPU.
48 ML042330183      6/2/2004      E-Mail from Ronda Daflucas, Entergy, to Rick Ennis, NRC, re: Vermont Yankee EPU Conference Calls.
48 ML042330183      6/2/2004      E-Mail from Ronda Daflucas, Entergy, to Rick Ennis, NRC, re: Vermont Yankee EPU Conference Calls.
Line 94: Line 90:
58 ML041670266      6/17/2004    07/22/2004 - Notice of Meeting with Entergy Nuclear Vermont Yankee, LLC (Entergy) and GE Nuclear Energy (Gene) to Discuss the Steam Dryer Analysis Associated with the Proposed Extended Power Uprate for Vermont Yankee Nuclear Power Station.
58 ML041670266      6/17/2004    07/22/2004 - Notice of Meeting with Entergy Nuclear Vermont Yankee, LLC (Entergy) and GE Nuclear Energy (Gene) to Discuss the Steam Dryer Analysis Associated with the Proposed Extended Power Uprate for Vermont Yankee Nuclear Power Station.
59 ML043030234      6/22/2004    Briefing Slides: Credit for Accident Pressure in Calculated NPSH for ECCS and Containment Heat Removal Pumps.
59 ML043030234      6/22/2004    Briefing Slides: Credit for Accident Pressure in Calculated NPSH for ECCS and Containment Heat Removal Pumps.
Accession Number Document Date Title/Description 60 ML043030245      6/23/2004    Briefing Slides: Credit for Accident Pressure in Calculated NPSH for ECCS and Containment Heat Removal Pumps.
Accession Number Document Date Title/Description 60 ML043030245      6/23/2004    Briefing Slides: Credit for Accident Pressure in Calculated NPSH for ECCS and Containment Heat Removal Pumps.
61 ML043070023      6/24/2004    E-mail from R. Dennig, NRR, to S. Black, re: Meeting with Jim Dyer 06/29 at 3:00 PM
61 ML043070023      6/24/2004    E-mail from R. Dennig, NRR, to S. Black, re: Meeting with Jim Dyer 06/29 at 3:00 PM
Line 109: Line 104:
71 ML041740039      7/6/2004      Vermont Nuclear Power Station, Request for Additional Information, Extended Power Uprate, TAC No. MC0761.
71 ML041740039      7/6/2004      Vermont Nuclear Power Station, Request for Additional Information, Extended Power Uprate, TAC No. MC0761.
72 ML043570508      7/8/2004      E-mail from Ward, NRR, to Daflucas, Entergy, re: RELAP5 Vermont Yankee Input Deck, First 11 Pages to Help Identify the Deck.
72 ML043570508      7/8/2004      E-mail from Ward, NRR, to Daflucas, Entergy, re: RELAP5 Vermont Yankee Input Deck, First 11 Pages to Help Identify the Deck.
Accession Number Document Date Title/Description 73 ML041910021      7/9/2004      07/21/2004 - Notice of Partially Closed Meeting with Entergy Nuclear Operations regarding Vermont Yankee Nuclear Power Station.
Accession Number Document Date Title/Description 73 ML041910021      7/9/2004      07/21/2004 - Notice of Partially Closed Meeting with Entergy Nuclear Operations regarding Vermont Yankee Nuclear Power Station.
74 ML043570221      7/20/2004      E-mail from Rick Ennis, NRR, to Ronda Daflucas, Entergy, re: EA for VY EPU, Accomplishments in Spring 2004 Outage.
74 ML043570221      7/20/2004      E-mail from Rick Ennis, NRR, to Ronda Daflucas, Entergy, re: EA for VY EPU, Accomplishments in Spring 2004 Outage.
Line 123: Line 117:
83 ML043570407      9/13/2004    E-mail - Ennis, NRR, to Ward, NRR, re: RELAP Nodalization, Diagram from Entergy for Vermont Yankee.
83 ML043570407      9/13/2004    E-mail - Ennis, NRR, to Ward, NRR, re: RELAP Nodalization, Diagram from Entergy for Vermont Yankee.
84 ML042540008      9/14/2004    09/29/2004 - Notice of Meeting with Entergy Nuclear Vermont Yankee, LLC (Entergy) to Discuss the Steam Dryer Analysis Associated with the Proposed Extended Power Uprate.
84 ML042540008      9/14/2004    09/29/2004 - Notice of Meeting with Entergy Nuclear Vermont Yankee, LLC (Entergy) to Discuss the Steam Dryer Analysis Associated with the Proposed Extended Power Uprate.
Accession Number Document Date    Title/Description 85 ML042640197      9/1412004        Vermont Yankee Nuclear Power Station - Technical Specification Proposed Change No. 263 - Supplement No. 13 Extended Power Uprate - Response to Steam Dryer Action Items.
Accession Number Document Date    Title/Description 85 ML042640197      9/1412004        Vermont Yankee Nuclear Power Station - Technical Specification Proposed Change No. 263 - Supplement No. 13 Extended Power Uprate - Response to Steam Dryer Action Items.
86 ML042860275      9/15/2004        Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information.
86 ML042860275      9/15/2004        Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information.
Line 136: Line 129:
94 ML042880351      10/7/2004        Vermont Yankee Nuclear Power Station - Technical Specification Proposed Change M.No. 263 - Supplement No. 19 Extended Power Uprate - Initial Plant Test Program.
94 ML042880351      10/7/2004        Vermont Yankee Nuclear Power Station - Technical Specification Proposed Change M.No. 263 - Supplement No. 19 Extended Power Uprate - Initial Plant Test Program.
95 ML042640055      10/13/2004        10/13/04 - Vermont Yankee Extended Power Uprate Schedule.
95 ML042640055      10/13/2004        10/13/04 - Vermont Yankee Extended Power Uprate Schedule.
Accession Number Document Date Title/Description 96 ML042680087      10/13/2004    Vermont Yankee Nuclear Power Station- Technical Audit of Steam Dryer Analysis in Support of Extended Power Uprate Request (TAC No MC0761).
Accession Number Document Date Title/Description 96 ML042680087      10/13/2004    Vermont Yankee Nuclear Power Station- Technical Audit of Steam Dryer Analysis in Support of Extended Power Uprate Request (TAC No MC0761).
97 ML042650265      10/15/2004    Vermont Yankee Nuclear Power Station - Extended Power Uprate Review Schedule (TAC No. MC0761).
97 ML042650265      10/15/2004    Vermont Yankee Nuclear Power Station - Extended Power Uprate Review Schedule (TAC No. MC0761).
Line 151: Line 143:
106 ML043570342      12/7/2004    E-mail from Ennis, NRR, to Daflucas, Entergy, re: VY EPU Draft RAIs, Round 5.
106 ML043570342      12/7/2004    E-mail from Ennis, NRR, to Daflucas, Entergy, re: VY EPU Draft RAIs, Round 5.
107 ML043510227      12/8/2004    Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 22 Extended Power Uprate - 10 CFR 50 Appendix R Timeline Verification.
107 ML043510227      12/8/2004    Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 22 Extended Power Uprate - 10 CFR 50 Appendix R Timeline Verification.
Accession Number    Document Date      Title/Description 108    ML043490173          12/9/2004          Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 21 Extended Power Uprate - Steam Dryer Power Ascension Testing.
Accession Number    Document Date      Title/Description 108    ML043490173          12/9/2004          Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 21 Extended Power Uprate - Steam Dryer Power Ascension Testing.
109    ML043370049          12/21/2004        Vermont Yankee, Request for Additional Information, Extended Power Uprate, (TAC No. MC0761).
109    ML043370049          12/21/2004        Vermont Yankee, Request for Additional Information, Extended Power Uprate, (TAC No. MC0761).
Line 159: Line 150:
113    ML032580103          9/30/2003          Safety Analysis Report for Vermont Yankee Nuclear Power Station Constant
113    ML032580103          9/30/2003          Safety Analysis Report for Vermont Yankee Nuclear Power Station Constant
__                                        Pressure Power Uprate.
__                                        Pressure Power Uprate.
Package - Vermont Yankee EPU Application, Suppleme nt 8 Accession Number    Document Date      Title/Description 114        ML042080464        7/2/2004            Letter Transmitting Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Supplement No. 8, Extended Power Uprate - Response to Request for Additional Information.
Package - Vermont Yankee EPU Application, Suppleme nt 8 Accession Number    Document Date      Title/Description 114        ML042080464        7/2/2004            Letter Transmitting Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Supplement No. 8, Extended Power Uprate - Response to Request for Additional Information.
115        ML042080475        7/2/2004            Vermont Yankee Nuclear Power Station Calculation VYC-2314, Revision 0 and CCN 01, "Minimum Containment Overpressure for Non-LOCA Events."
115        ML042080475        7/2/2004            Vermont Yankee Nuclear Power Station Calculation VYC-2314, Revision 0 and CCN 01, "Minimum Containment Overpressure for Non-LOCA Events."
Line 168: Line 158:
119      ML042260453        7/20/2004          Calculation VYC-2314, Rev. 0, CCN 02, "Minimum Containment Overpressure for Non-LOCA Events."
119      ML042260453        7/20/2004          Calculation VYC-2314, Rev. 0, CCN 02, "Minimum Containment Overpressure for Non-LOCA Events."
120      ML042250140        7/27/2004          Vermont Yankee Nuclear Power Station - Technical Specification Proposed Change No. 263 - Supplement No. 9, Extended Power Uprate - Revised Containment Overpressure Envelope.
120      ML042250140        7/27/2004          Vermont Yankee Nuclear Power Station - Technical Specification Proposed Change No. 263 - Supplement No. 9, Extended Power Uprate - Revised Containment Overpressure Envelope.
Package - Vermont Yankee EPU Application, Supplement 10 Accession Number      Document Date        Title/Description 121    ML042160195          7/30/2004            Vermont Yankee - Technical Specification Proposed Change No. 263, Supplement No. 10 Extended Power Uprate, Response to Request for Additional Information, Attachment 2.
Package - Vermont Yankee EPU Application, Supplement 10 Accession Number      Document Date        Title/Description 121    ML042160195          7/30/2004            Vermont Yankee - Technical Specification Proposed Change No. 263, Supplement No. 10 Extended Power Uprate, Response to Request for Additional Information, Attachment 2.
122    ML042160188          7/30/2004            Vermont Yankee - Technical Specification Proposed Change No. 263, Supplement No. 10 Extended Power Uprate, Response to Request for Additional Information.
122    ML042160188          7/30/2004            Vermont Yankee - Technical Specification Proposed Change No. 263, Supplement No. 10 Extended Power Uprate, Response to Request for Additional Information.
Line 177: Line 166:
126    ML042890410          10/7/2004            Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement
126    ML042890410          10/7/2004            Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement
                               .                      No. 20, Extended Power Uprate - Meeting on Steam Driver Analysis.
                               .                      No. 20, Extended Power Uprate - Meeting on Steam Driver Analysis.
ATTACHMENT 2                      VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - PROPRIETARY INFORMATION INITIAL DISCLOSURES - JANUARY 18, 2005 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain trade secrets, privileged or confidential commercial or financial information subject to withholding from public disclosure pursuant to 10 C.F.R. § 2.390. Pursuant to 10 C.F.R. § 2.336(b)(5), the Staff is providing this log to identify the following documents, designated "proprietary," and subject to protected status under Section 2.390.
ATTACHMENT 2                      VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - PROPRIETARY INFORMATION INITIAL DISCLOSURES - JANUARY 18, 2005 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain trade secrets, privileged or confidential commercial or financial information subject to withholding from public disclosure pursuant to 10 C.F.R. § 2.390. Pursuant to 10 C.F.R. § 2.336(b)(5), the Staff is providing this log to identify the following documents, designated "proprietary," and subject to protected status under Section 2.390.
Accession              Author            Title/Description    Document      Document          Addressee /            Comment          Page Number        Name/Affiliatlon                                Date          Type          Addressee                              'Count Affiliation ML032170343      Roberts C C,          Licensing Topical      7/31/2003    Topical                              Files contained on      309 General Electric      Report, Constant                    Report                              CD-ROMs Co.                    Pressure Power                                                            submitted with Uprate.                                                                  document were added to ADAMS.
Accession              Author            Title/Description    Document      Document          Addressee /            Comment          Page Number        Name/Affiliatlon                                Date          Type          Addressee                              'Count Affiliation ML032170343      Roberts C C,          Licensing Topical      7/31/2003    Topical                              Files contained on      309 General Electric      Report, Constant                    Report                              CD-ROMs Co.                    Pressure Power                                                            submitted with Uprate.                                                                  document were added to ADAMS.
Copies of the Public CD-ROM are available from the NRC Public Document Room and NRC File Center. Copies of the Proprietary CD-ROM are available to the NRC Staff through the NRC File Center.
Copies of the Public CD-ROM are available from the NRC Public Document Room and NRC File Center. Copies of the Proprietary CD-ROM are available to the NRC Staff through the NRC File Center.
Accession        Author        Title/Description  Document  Document Addressee I  Comment Page Number      Name/Affiliation                        Date      Type  Addressee            Count Affiliation ML032580111 Schrull, E. D.,  Attachment 4        9/30/2003 Topical                        214 General Electric  Vermont Yankee                Report Co.              Proposed Technical Specification Change No. 263 Extended Power Uprate NEDC-3390P (Proprietary Information).
Accession        Author        Title/Description  Document  Document Addressee I  Comment Page Number      Name/Affiliation                        Date      Type  Addressee            Count Affiliation ML032580111 Schrull, E. D.,  Attachment 4        9/30/2003 Topical                        214 General Electric  Vermont Yankee                Report Co.              Proposed Technical Specification Change No. 263 Extended Power Uprate NEDC-3390P (Proprietary Information).
ML040360119  Entergy Nuclear  GE-VYNPS-AEP-        1/29/2004 Topical                        123 Northeast,        308, Rev. 0, "GE              Report General Electric  Generic Disposition Co.              Matrix."
ML040360119  Entergy Nuclear  GE-VYNPS-AEP-        1/29/2004 Topical                        123 Northeast,        308, Rev. 0, "GE              Report General Electric  Generic Disposition Co.              Matrix."
Line 187: Line 174:
Supplement No. 5 -
Supplement No. 5 -
Responses to Request for Additional Information."
Responses to Request for Additional Information."
Accession      Author        Title/Description  Document  Document      Addressee I      Comment        Page Number    Name/Affiliation                        Date      Type        Addressee                      Count Affiliation ML040710572 Thayer, J. R.,    BVY 04-008,          3/4/2004 Letter        NRC/Document                      3 Entergy Nuclear  Attachment 1 -                              Control Desk Operations, Inc,  CPPU Submittal RAI Entergy Nuclear  Response Regarding Vermont Yankee,  Technical LLC              Specification Proposed Change No. 263 Supplement No.6, Extended Power Uprate.
Accession      Author        Title/Description  Document  Document      Addressee I      Comment        Page Number    Name/Affiliation                        Date      Type        Addressee                      Count Affiliation ML040710572 Thayer, J. R.,    BVY 04-008,          3/4/2004 Letter        NRC/Document                      3 Entergy Nuclear  Attachment 1 -                              Control Desk Operations, Inc,  CPPU Submittal RAI Entergy Nuclear  Response Regarding Vermont Yankee,  Technical LLC              Specification Proposed Change No. 263 Supplement No.6, Extended Power Uprate.
ML042090107 Thayer, J. K.,    Vermont Yankee        7/2/2004 Letter, Other NRC/Document  Document            65 Entergy Nuclear  Nuclear Power                                Control Desk  submitted for Operations, Inc,  Station, Proposed                                          scanning contained Entergy Nuclear  Technical                                                  poor quality Vermont Yankee,  Specification Change                                      page(s) and/or LLC              No. 263 -                                                  page(s) which Supplement No. 8,                                          appeared to be Extended Power                                            missing.
ML042090107 Thayer, J. K.,    Vermont Yankee        7/2/2004 Letter, Other NRC/Document  Document            65 Entergy Nuclear  Nuclear Power                                Control Desk  submitted for Operations, Inc,  Station, Proposed                                          scanning contained Entergy Nuclear  Technical                                                  poor quality Vermont Yankee,  Specification Change                                      page(s) and/or LLC              No. 263 -                                                  page(s) which Supplement No. 8,                                          appeared to be Extended Power                                            missing.
Uprate, Response to                                        Document is Request for                                                complete per Additional                                                submitter.
Uprate, Response to                                        Document is Request for                                                complete per Additional                                                submitter.
Information.
Information.
Accession      Author          Title/Description Document  Document    Addressee /  Comment Page Number    Name/Affiliation                          Date      Type      Addressee            Count Affiliation ML042650262 Hwang, H. R.,      Appendix D -        7/21/2004 Slides and                          21 General Electric    Technical Audit of            Viewgraphs Co.                Vermont Yankee Steam Dryer Analysis in Support of Extended Power Uprate Request (TAC MC0761).
Accession      Author          Title/Description Document  Document    Addressee /  Comment Page Number    Name/Affiliation                          Date      Type      Addressee            Count Affiliation ML042650262 Hwang, H. R.,      Appendix D -        7/21/2004 Slides and                          21 General Electric    Technical Audit of            Viewgraphs Co.                Vermont Yankee Steam Dryer Analysis in Support of Extended Power Uprate Request (TAC MC0761).
ML042160200 Entergy Nuclear    Vermont Yankee -    7/30/2004 Technical                          41 Northeast          Technical                    Specification Specification                - Bases Proposed Change              Change No. 263, Supplement No. 10 Extended Power Uprate, Response to
ML042160200 Entergy Nuclear    Vermont Yankee -    7/30/2004 Technical                          41 Northeast          Technical                    Specification Specification                - Bases Proposed Change              Change No. 263, Supplement No. 10 Extended Power Uprate, Response to
( Request for Additional Information, Attachment 1.                                      .
( Request for Additional Information, Attachment 1.                                      .
Accession        Author        TitlelDescription  Document      Document    Addressee /  Comment Page Number    NamelAffiliation                        Date        Type        Addressee          Count Affiliation ML042320084 Thayer, J. K.,    Attachment          8112/2004  Technical    NRC/Document          125 Entergy Nuclear  1,Vermont Yankee                Specification Control Desk Northeast,        Nuclear Power                    - Bases Entergy Nuclear  Station, Proposed                Change Operations, Inc  Technical Specification Change No. 263-Supplement No. 11, Extended Power Uprate Response to Request for Additional Information.
Accession        Author        TitlelDescription  Document      Document    Addressee /  Comment Page Number    NamelAffiliation                        Date        Type        Addressee          Count Affiliation ML042320084 Thayer, J. K.,    Attachment          8112/2004  Technical    NRC/Document          125 Entergy Nuclear  1,Vermont Yankee                Specification Control Desk Northeast,        Nuclear Power                    - Bases Entergy Nuclear  Station, Proposed                Change Operations, Inc  Technical Specification Change No. 263-Supplement No. 11, Extended Power Uprate Response to Request for Additional Information.
ML042650261 Wu, R., General  Appendix C -        8/24/2004  Slides and                            36 Electric Co.      Technical Audit of              Viewgraphs Vermont Yankee Steam Dryer Analysis in Support of Extended Power Uprate Request (TAC MC0761).                  .
ML042650261 Wu, R., General  Appendix C -        8/24/2004  Slides and                            36 Electric Co.      Technical Audit of              Viewgraphs Vermont Yankee Steam Dryer Analysis in Support of Extended Power Uprate Request (TAC MC0761).                  .
Accession        Author        Title/Description Document  Document    Addressee I      Comment        Page Number    NamelAffiliation                        Date      Type      Addressee                      Count Affiliation ML050060089 Wu, R., General  MFN 04-120,        8/24/2004 Audit Report              Proprietary          64 Electric Nuclear  'Technical Audit of                                    document Energy Owners    Vermont Yankee                                          submitted in paper Group            Steam Dryer                                            and electronic form Analysis in                                            on CD-ROM.
Accession        Author        Title/Description Document  Document    Addressee I      Comment        Page Number    NamelAffiliation                        Date      Type      Addressee                      Count Affiliation ML050060089 Wu, R., General  MFN 04-120,        8/24/2004 Audit Report              Proprietary          64 Electric Nuclear  'Technical Audit of                                    document Energy Owners    Vermont Yankee                                          submitted in paper Group            Steam Dryer                                            and electronic form Analysis in                                            on CD-ROM.
Support of Extended                                    Paper version was Power Uprate                                            scanned and Request."                                              added to ADAMS.
Support of Extended                                    Paper version was Power Uprate                                            scanned and Request."                                              added to ADAMS.
Line 205: Line 188:
Document submitted for scanning contained poor quality page(s) and/or page(s) which appeared to be missing.
Document submitted for scanning contained poor quality page(s) and/or page(s) which appeared to be missing.
Document is complete per submitter.
Document is complete per submitter.
Accession      Author            Title/Description Document  Document    Addressee I  Comment Page Number    Name/Affiliation                          Date      Type      Addressee          Count Affiliation ML042650263 Dreyfuss, J.;      Appendix F -        8/26/2004 Slides and                          23 Hobbs, B.;          Technical Audit of            Viewgraphs Johnson, D.;        Vermont Yankee Nichols, C.; Perez, Steam Dryer P.; Entergy        Analysis in Support Nuclear, Inc        of Extended Power Uprate Request (TAC MC0761).
Accession      Author            Title/Description Document  Document    Addressee I  Comment Page Number    Name/Affiliation                          Date      Type      Addressee          Count Affiliation ML042650263 Dreyfuss, J.;      Appendix F -        8/26/2004 Slides and                          23 Hobbs, B.;          Technical Audit of            Viewgraphs Johnson, D.;        Vermont Yankee Nichols, C.; Perez, Steam Dryer P.; Entergy        Analysis in Support Nuclear, Inc        of Extended Power Uprate Request (TAC MC0761).
ML042610382 NRC/NRR/DEI        Technical Audit of  8/26/2004 Audit Report                        102 EMCB                Vermont Yankee Steam Dryer Analysis in Support of Extended Power Uprate Request.
ML042610382 NRC/NRR/DEI        Technical Audit of  8/26/2004 Audit Report                        102 EMCB                Vermont Yankee Steam Dryer Analysis in Support of Extended Power Uprate Request.
Line 211: Line 193:
No.263 -                      Renewal)
No.263 -                      Renewal)
Supplement No. 13              DKT 50 Extended Power Uprate Response to Steam Dryer Action Items.
Supplement No. 13              DKT 50 Extended Power Uprate Response to Steam Dryer Action Items.
Accession      Author        Title/Description    Document    Document    Addressee /  Comment Page Number    NamelAffiliation                            Date      Type      Addressee            Count Affiliation ML042890419 Entergy Nuclear  Vermont Yankee          9/29/2004 License-                            140 Northeast        Nuclear Power                    Application Station - Proposed                for Facility Technical                        Operating Specification Change              License No. 263 -                        (Amend/
Accession      Author        Title/Description    Document    Document    Addressee /  Comment Page Number    NamelAffiliation                            Date      Type      Addressee            Count Affiliation ML042890419 Entergy Nuclear  Vermont Yankee          9/29/2004 License-                            140 Northeast        Nuclear Power                    Application Station - Proposed                for Facility Technical                        Operating Specification Change              License No. 263 -                        (Amend/
Supplement No. 20                Renewal)
Supplement No. 20                Renewal)
Extended Power                    DKT 50, Uprate - Meeting on              Slides and Steam Dryer                      Viewgraphs, Analysis, Meeting                Technical Presentation Slides -            Specification Proprietary                      - Bases Information.          .          Change
Extended Power                    DKT 50, Uprate - Meeting on              Slides and Steam Dryer                      Viewgraphs, Analysis, Meeting                Technical Presentation Slides -            Specification Proprietary                      - Bases Information.          .          Change ATTACHMENT 3                        VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS INITIAL DISCLOSURES - JANUARY 18, 2005 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.
 
ATTACHMENT 3                        VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS INITIAL DISCLOSURES - JANUARY 18, 2005 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.
§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.
§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.
Accession              Author              Title/Description      Document    Document        Addressee /            Comment        Page Number        Name/Affiliation                                    Date        Type          Addressee                            Count Affiliation ML043580020      Scarbrough, T. G.,      E-mail - Scarbrough,      10/17/2003  E-Mail          Wu, C.,                                  4 NRC/NRR                NRR, to Wu, NRR,                                      NRC/NRR Re: Vermont Yankee Power Uprate, Draft RAls.
Accession              Author              Title/Description      Document    Document        Addressee /            Comment        Page Number        Name/Affiliation                                    Date        Type          Addressee                            Count Affiliation ML043580020      Scarbrough, T. G.,      E-mail - Scarbrough,      10/17/2003  E-Mail          Wu, C.,                                  4 NRC/NRR                NRR, to Wu, NRR,                                      NRC/NRR Re: Vermont Yankee Power Uprate, Draft RAls.
Line 222: Line 201:
ML033300397      Lund, A. L.,            Request for                11/20/2003  Memoranda      Clifford, J. W.,                        3 NRC/NRR/DE/            Additional                                            NRC/NRR/
ML033300397      Lund, A. L.,            Request for                11/20/2003  Memoranda      Clifford, J. W.,                        3 NRC/NRR/DE/            Additional                                            NRC/NRR/
EMCB                    Information on                                        DLPM Extended Power Uprate in Vermont Yankee Nuclear Power Station.
EMCB                    Information on                                        DLPM Extended Power Uprate in Vermont Yankee Nuclear Power Station.
Accession      Author          Title/Descriptlon  Document    Document    Addressee /    Comment Page Number    Name/Affiliation                          Date        Type      Addressee              Count Affiliation ML033440043 Rubin, M. P.,      Request for          12/4/2003 Memoranda,  Clifford, J. W.,          5 NRC/NRR/DSSA/      Additional                      Request for NRC/NRR/
Accession      Author          Title/Descriptlon  Document    Document    Addressee /    Comment Page Number    Name/Affiliation                          Date        Type      Addressee              Count Affiliation ML033440043 Rubin, M. P.,      Request for          12/4/2003 Memoranda,  Clifford, J. W.,          5 NRC/NRR/DSSA/      Additional                      Request for NRC/NRR/
SPSB              Information (RAI)              Additional  DLPM/LPD1 Regarding Extended              Information Power Uprate (EPU)              (RAI) for Vermont Yankee (TAC MC0761).
SPSB              Information (RAI)              Additional  DLPM/LPD1 Regarding Extended              Information Power Uprate (EPU)              (RAI) for Vermont Yankee (TAC MC0761).
Line 228: Line 206:
EEIB              Uprate.                        Additional  DLPM/LPD1 Information (RAI)
EEIB              Uprate.                        Additional  DLPM/LPD1 Information (RAI)
ML043580035 Scarbrough, T. G., E-mail - Scarbrough,  2/5/2004  E-Mail      Ennis, R.,                2 NRC/NRR            NRR, to Ennis, NRR,                        NRC/NRR Re: Vermont Yankee EPU Submittal, Acceptance Review on Flow Effects.
ML043580035 Scarbrough, T. G., E-mail - Scarbrough,  2/5/2004  E-Mail      Ennis, R.,                2 NRC/NRR            NRR, to Ennis, NRR,                        NRC/NRR Re: Vermont Yankee EPU Submittal, Acceptance Review on Flow Effects.
Accession      Author          Title/Description Document  Document    Addressee I      Comment Page Number    Name/Affiliation                        Date      Type      Addressee              Count Affiliation ML043440386 Ennis, R. B.,    E-mail - Ennis, NRR,  3/4/2004 E-Mail      Bongarra, J. P.,            3 NRC/NRR          to Bongarra, NRR,                          Cai, J., Coyne, et. al., Re: Vermont                      K., Davis, R.,
Accession      Author          Title/Description Document  Document    Addressee I      Comment Page Number    Name/Affiliation                        Date      Type      Addressee              Count Affiliation ML043440386 Ennis, R. B.,    E-mail - Ennis, NRR,  3/4/2004 E-Mail      Bongarra, J. P.,            3 NRC/NRR          to Bongarra, NRR,                          Cai, J., Coyne, et. al., Re: Vermont                      K., Davis, R.,
Yankee EPU                                Elliot, B. J.,
Yankee EPU                                Elliot, B. J.,
Line 240: Line 217:
IROB              Information for              Additional  DLPM/LPD1 Vermont Yankee                Information Proposed Changes              (RAI) toTS.
IROB              Information for              Additional  DLPM/LPD1 Vermont Yankee                Information Proposed Changes              (RAI) toTS.
ML043580319 Helton, D. M.,    E-mail - Helton,    3/24/2004 E-Mail      Wu, C.,                    5 NRC/RES            RES, to Wu, NRR,                          NRC/NRR Re: VY Submittal, Comments on Steam Dryer Analysis.
ML043580319 Helton, D. M.,    E-mail - Helton,    3/24/2004 E-Mail      Wu, C.,                    5 NRC/RES            RES, to Wu, NRR,                          NRC/NRR Re: VY Submittal, Comments on Steam Dryer Analysis.
Accession      Author          Title/Description  Document  Document      Addressee      / Comment Page Number    Name/Affiliation                            Date      Type        Addressee              Count Affiliation ML040900523 Tappert, J. R.,    Request for          3/29/2004 Memoranda,  Clifford, J. W.,            3 NRC/NRR/DRIP/      Additional*                    Request for  NRC/NRR/
Accession      Author          Title/Description  Document  Document      Addressee      / Comment Page Number    Name/Affiliation                            Date      Type        Addressee              Count Affiliation ML040900523 Tappert, J. R.,    Request for          3/29/2004 Memoranda,  Clifford, J. W.,            3 NRC/NRR/DRIP/      Additional*                    Request for  NRC/NRR/
RLEP                Information (RAI) to            Additional  DLPM/LPD1 Support the Staff's            Information Environmental                  (RAI)
RLEP                Information (RAI) to            Additional  DLPM/LPD1 Support the Staff's            Information Environmental                  (RAI)
Line 255: Line 231:
Commissioner                                Zimmerman, J.
Commissioner                                Zimmerman, J.
Assistants; From: W.                        I., NRC/OCM M. Dean).
Assistants; From: W.                        I., NRC/OCM M. Dean).
S
S Accession        Author        Title/Description  Document    Document          Addressee /      Comment Page Number    Name/Affiliation                        Date        Type            Addressee                Count Affiliation ML043440401 Ennis, R. B.,    E-mail - Ennis, NRR, 4/16/2004  E-Mail          Barrett, R.,                  6 NRC/NRR          to Wang, NRR, et.                                Beckner, W. D.,
 
Accession        Author        Title/Description  Document    Document          Addressee /      Comment Page Number    Name/Affiliation                        Date        Type            Addressee                Count Affiliation ML043440401 Ennis, R. B.,    E-mail - Ennis, NRR, 4/16/2004  E-Mail          Barrett, R.,                  6 NRC/NRR          to Wang, NRR, et.                                Beckner, W. D.,
al., Re: Vermont                                  Borchardt, R.
al., Re: Vermont                                  Borchardt, R.
Yankee Steam Dryer                                W., Burnell, S.
Yankee Steam Dryer                                W., Burnell, S.
Line 279: Line 253:
Wang, A., Wu, C., NRC/NRR
Wang, A., Wu, C., NRC/NRR
                                                             £  _ _ _ _ _ _ _ I _  _ _ _  _ _ _ _ _
                                                             £  _ _ _ _ _ _ _ I _  _ _ _  _ _ _ _ _
Accession        Author        Title/Description  Document  Document  Addressee I          Comment        Page Number    Name/Affiliation                          Date      Type    Addressee                          Count Affiliation ML043440407 Terao, D.,        E-mail - Terao, NRR,  4/19/2004 E-Mail    Clifford, J. W.,                      3 NRC/NRR          to Clifford, NRR, Re:                    NRC/NRR Vermont Yankee Steam Dryer Crack Info.
Accession        Author        Title/Description  Document  Document  Addressee I          Comment        Page Number    Name/Affiliation                          Date      Type    Addressee                          Count Affiliation ML043440407 Terao, D.,        E-mail - Terao, NRR,  4/19/2004 E-Mail    Clifford, J. W.,                      3 NRC/NRR          to Clifford, NRR, Re:                    NRC/NRR Vermont Yankee Steam Dryer Crack Info.
ML043560254 Ennis, R. B.,    E-Mail - Ennis, NRR,  4/20/2004 E-Mail    Lobel, R. M.,                          4 NRC/NRR          to Lobel, NRR re:                        NRC/NRR RAls for VY Power Uprate on Containment Effects.
ML043560254 Ennis, R. B.,    E-Mail - Ennis, NRR,  4/20/2004 E-Mail    Lobel, R. M.,                          4 NRC/NRR          to Lobel, NRR re:                        NRC/NRR RAls for VY Power Uprate on Containment Effects.
ML043570364 Stutzke, M. A.,  E-mail - Stutzke,    4/21/2004 E-Mail    Lobel, R. M.,    E-mail envelope      2 NRC/NRR          NRR, to Lobel, NRR,                      NRC/NRR          properties page not re: Risk RAI related                                      available.
ML043570364 Stutzke, M. A.,  E-mail - Stutzke,    4/21/2004 E-Mail    Lobel, R. M.,    E-mail envelope      2 NRC/NRR          NRR, to Lobel, NRR,                      NRC/NRR          properties page not re: Risk RAI related                                      available.
to credit for containment pressure for ECCS pump NPSH.
to credit for containment pressure for ECCS pump NPSH.
Accession      Author        Title/Description  Document  Document  Addressee/        Comment        Page Number    Name/Affiliation                          Date      Type    Addressee                        Count Affiliation ML043440426 Ennis, R. B.,    E-mail - Ennis, NRR,  4/22/2004 E-Mail    Florek, D.,                          3 NRC/NRR/DLPM/    to McMurtray, NRR,                        Gray, E. H.,
Accession      Author        Title/Description  Document  Document  Addressee/        Comment        Page Number    Name/Affiliation                          Date      Type    Addressee                        Count Affiliation ML043440426 Ennis, R. B.,    E-mail - Ennis, NRR,  4/22/2004 E-Mail    Florek, D.,                          3 NRC/NRR/DLPM/    to McMurtray, NRR,                        Gray, E. H.,
LPD1              et. al., re: Followup                    Hernandez, J.,
LPD1              et. al., re: Followup                    Hernandez, J.,
Line 298: Line 270:
MC0761).
MC0761).
ML043440412 Anderson, C. J.,  E-mail - Anderson,    4/30/2004 E-Mail    Howe, A. G.,                        3 NRC/RGN-l        RGN-I, to Howe,                          NRC/NRR NRR, re: VY Analysis Reviews on Steam Dryer Cracks.
ML043440412 Anderson, C. J.,  E-mail - Anderson,    4/30/2004 E-Mail    Howe, A. G.,                        3 NRC/RGN-l        RGN-I, to Howe,                          NRC/NRR NRR, re: VY Analysis Reviews on Steam Dryer Cracks.
Accession        Author        Title/Description  Document  Document    Addressee /          Comment    Page Number    Name/Affiliation                        Date      Type      Addressee                      Count Affiliation ML041340510 Manoly, K. A.,    Request for          5/3/2004 Request for Clifford, J. W.,                  7 NRC/NRR/DE        Additional                    Additional  NRC/NRR/
Accession        Author        Title/Description  Document  Document    Addressee /          Comment    Page Number    Name/Affiliation                        Date      Type      Addressee                      Count Affiliation ML041340510 Manoly, K. A.,    Request for          5/3/2004 Request for Clifford, J. W.,                  7 NRC/NRR/DE        Additional                    Additional  NRC/NRR/
Information -Vermont          Information DLPM/LPD1 Yankee Nuclear                (RAI)
Information -Vermont          Information DLPM/LPD1 Yankee Nuclear                (RAI)
Line 307: Line 278:
ML043570344 Lobel, R. M.,    E-mail - Lobel, NRR, 5/18/2004 E-Mail      Dennig, R. L.,  E-mail envelope  3 NRC/NRR          to Dennig, NRR, re:                        NRC/NRR          properties not NPSH Calculation                                            available.
ML043570344 Lobel, R. M.,    E-mail - Lobel, NRR, 5/18/2004 E-Mail      Dennig, R. L.,  E-mail envelope  3 NRC/NRR          to Dennig, NRR, re:                        NRC/NRR          properties not NPSH Calculation                                            available.
Conservatisms.
Conservatisms.
Accession        Author        Title/Description      Document  Document  Addressee /    Comment Page Number    Name/Affiliation                              Date      Type      Addressee            Count Affiliation ML043560267 Ennis, R. B.,      E-mail - Ennis, NRR,    5/20/2004 E-Mail    Elliot, B. J.,          25 NRC/NRR            to Elliot, NRR, et. al,                      Imboden, S.,
Accession        Author        Title/Description      Document  Document  Addressee /    Comment Page Number    Name/Affiliation                              Date      Type      Addressee            Count Affiliation ML043560267 Ennis, R. B.,      E-mail - Ennis, NRR,    5/20/2004 E-Mail    Elliot, B. J.,          25 NRC/NRR            to Elliot, NRR, et. al,                      Imboden, S.,
re: Vermont Yankee                          Kendrick, E.,
re: Vermont Yankee                          Kendrick, E.,
Line 315: Line 285:
ML043580042 Scarbrough, T. G.,  E-mail - Scarbrough,    5/26/2004 E-Mail    Terao, D.,                4 NRC/NRR            NRR, to Terao, NRR,                          NRC/NRR re: EPU Next Steps Table - revised, on EPU Flow Effects.
ML043580042 Scarbrough, T. G.,  E-mail - Scarbrough,    5/26/2004 E-Mail    Terao, D.,                4 NRC/NRR            NRR, to Terao, NRR,                          NRC/NRR re: EPU Next Steps Table - revised, on EPU Flow Effects.
ML043570362 Stutzke, M. A.,    E-mail - Stutzke,        6/4/2004 E-Mail    Lobel, R. M.,            3 NRC/NRR            NRR, to Lobel, NRR,                          NRC/NRR Re: VY Containment Overpressure Risk Assessment.
ML043570362 Stutzke, M. A.,    E-mail - Stutzke,        6/4/2004 E-Mail    Lobel, R. M.,            3 NRC/NRR            NRR, to Lobel, NRR,                          NRC/NRR Re: VY Containment Overpressure Risk Assessment.
Accession        Author        Title/Description  Document    Document    Addressee /        Comment        Page Number    Name/Affiliation                        Date        Type      Addressee                        Count Affiliation ML043560380 Ennis, R. B.,    E-mail - Ennis, NRR,  6/8/2004  E-Mail      Lobel, R. M.,                        2 NRC/NRR          to Lobel, NRR, re:                          NRC/NRR Overpressure &
Accession        Author        Title/Description  Document    Document    Addressee /        Comment        Page Number    Name/Affiliation                        Date        Type      Addressee                        Count Affiliation ML043560380 Ennis, R. B.,    E-mail - Ennis, NRR,  6/8/2004  E-Mail      Lobel, R. M.,                        2 NRC/NRR          to Lobel, NRR, re:                          NRC/NRR Overpressure &
Appendix J, for VY containment.
Appendix J, for VY containment.
Line 324: Line 293:
ML043440436 Yerokun, J. T.,  E-mail - Yerokun,    6/21/2004  E-Mail      Howe, A.,                            6 NRC/NRR          NRR to Howe, NRR,                          NRC/NRR re: Additional RAIs VY Extended Power Uprate.
ML043440436 Yerokun, J. T.,  E-mail - Yerokun,    6/21/2004  E-Mail      Howe, A.,                            6 NRC/NRR          NRR to Howe, NRR,                          NRC/NRR re: Additional RAIs VY Extended Power Uprate.
ML043560473 Ennis, R. B.,    E-mail - Ennis, NRR, 6/21/2004  E-Mail      Howe, A. G.,                          3 NRC/NRR          to Howe, NRR, re:                          NRC/NRR Independent Calcs/Audits, for VY EPU.
ML043560473 Ennis, R. B.,    E-mail - Ennis, NRR, 6/21/2004  E-Mail      Howe, A. G.,                          3 NRC/NRR          to Howe, NRR, re:                          NRC/NRR Independent Calcs/Audits, for VY EPU.
Accession        Author        Title/Description  Document    Document    Addressee /        Comment        Page Number    Name/Affiliation                          Date        Type      Addressee                        Count Affiliation ML043560455 Ennis, R. B.,    E-mail - Ennis, NRR,  6/21/2004  E-Mail,    Lobel, R. M.,                        12 NRC/NRR          to Reddy, NRR and                Letter,    Reddy, D.,
Accession        Author        Title/Description  Document    Document    Addressee /        Comment        Page Number    Name/Affiliation                          Date        Type      Addressee                        Count Affiliation ML043560455 Ennis, R. B.,    E-mail - Ennis, NRR,  6/21/2004  E-Mail,    Lobel, R. M.,                        12 NRC/NRR          to Reddy, NRR and                Letter,    Reddy, D.,
Lobel, NRR, re:                  Request for NRC/NRR Vermont Yankee                  Additional RAls, Draft RAI for              Information Review.                          (RAI)
Lobel, NRR, re:                  Request for NRC/NRR Vermont Yankee                  Additional RAls, Draft RAI for              Information Review.                          (RAI)
Line 333: Line 301:
with Containment                            Tschiltz, M.,
with Containment                            Tschiltz, M.,
Overpressure.                                NRC ML043560470 Lobel, R. M.,    E-mail - Lobel, NRR,  6/24/2004  E-Mail      Black, S. C.,                        3 NRC/NRR          to Black, NRR, Re:                          NRC/NRR Vermont Yankee Audit Calculations on Containment Conditions for NPSH. __.
Overpressure.                                NRC ML043560470 Lobel, R. M.,    E-mail - Lobel, NRR,  6/24/2004  E-Mail      Black, S. C.,                        3 NRC/NRR          to Black, NRR, Re:                          NRC/NRR Vermont Yankee Audit Calculations on Containment Conditions for NPSH. __.
Accession        Author        Title/Description  Document    Document  Addressee /          Comment        Page Number    Name/Affiliation                          Date      Type    Addressee                          Count Affiliation ML043570488 Lobel, R. M.,      E-mail - Lobel, NRR, 6/30/2004  E-Mail    Ennis, R. B.,    E-mail envelope        4 NRC/NRR            to Ennis, NRR, re:                        NRC/NRR          properties page not Request for                                                available.
Accession        Author        Title/Description  Document    Document  Addressee /          Comment        Page Number    Name/Affiliation                          Date      Type    Addressee                          Count Affiliation ML043570488 Lobel, R. M.,      E-mail - Lobel, NRR, 6/30/2004  E-Mail    Ennis, R. B.,    E-mail envelope        4 NRC/NRR            to Ennis, NRR, re:                        NRC/NRR          properties page not Request for                                                available.
Additional Information, TAC MC0761, Vermont Yankee EPU and NPSH.
Additional Information, TAC MC0761, Vermont Yankee EPU and NPSH.
ML043570468 Notafrancesco, A., E-mail -            6/30/2004  E-Mail    Lobel, R. M.,                          5 NRC/RES            Notafrancesco, RES                        NRC/NRR to Lobel, NRR, re:
ML043570468 Notafrancesco, A., E-mail -            6/30/2004  E-Mail    Lobel, R. M.,                          5 NRC/RES            Notafrancesco, RES                        NRC/NRR to Lobel, NRR, re:
Vermont Yankee Input List for LBLOCA Containment NPSH Calculations.
Vermont Yankee Input List for LBLOCA Containment NPSH Calculations.
ML041840232 Jenkins, R. V.,    Vermont Yankee        7/1/2004  Memoranda Clifford, J. W., Memorandum            9 NRC/NRR/DE/        Thermal Power                            NRC/NRR/        contains draft input EMCB              Uprate.                                  DLPM/LPDI        to safety evaluation regarding electrical system and environmental qualification of electrical components
ML041840232 Jenkins, R. V.,    Vermont Yankee        7/1/2004  Memoranda Clifford, J. W., Memorandum            9 NRC/NRR/DE/        Thermal Power                            NRC/NRR/        contains draft input EMCB              Uprate.                                  DLPM/LPDI        to safety evaluation regarding electrical system and environmental qualification of electrical components Accession        Author        Title/Description  Document  Document  Addressee I      Comment Page Number    Name/Affiliation                          Date      Type      Addressee              Count Affiliation ML043580311 Helton, D. M.,    E-mail - Helton, RES, 7/19/2004 E-Mail    Wu, C.,                    2 NRC/RES            to Wu, NRR, re: VY                        NRC/NRR RAI Responses, Comments on Steam Dryer Analysis.
 
Accession        Author        Title/Description  Document  Document  Addressee I      Comment Page Number    Name/Affiliation                          Date      Type      Addressee              Count Affiliation ML043580311 Helton, D. M.,    E-mail - Helton, RES, 7/19/2004 E-Mail    Wu, C.,                    2 NRC/RES            to Wu, NRR, re: VY                        NRC/NRR RAI Responses, Comments on Steam Dryer Analysis.
ML043570255 Ennis, R. B.,      E-mail - Ennis, NRR,  7/21/2004 E-Mail    Manoly, K. A.,              2 NRC/NRR            to Manoly, NRR, re:                      NRC/NRR EPU Review Standard SE Section for Steam Dryer.                                          .
ML043570255 Ennis, R. B.,      E-mail - Ennis, NRR,  7/21/2004 E-Mail    Manoly, K. A.,              2 NRC/NRR            to Manoly, NRR, re:                      NRC/NRR EPU Review Standard SE Section for Steam Dryer.                                          .
ML043440453 Holden, C. F.,    E-Mail - Holden,      7/21/2004 E-Mail    Ennis, R. B.,              2 NRC/NRR            NRR, to Ennis, NRR,                      NRC/NRR et. al., re: Summary of VY Steam Dryer Analysis Meeting.
ML043440453 Holden, C. F.,    E-Mail - Holden,      7/21/2004 E-Mail    Ennis, R. B.,              2 NRC/NRR            NRR, to Ennis, NRR,                      NRC/NRR et. al., re: Summary of VY Steam Dryer Analysis Meeting.
ML043570270 Elliot, B. J.,    E-mail - Elliot, NRR, 7/26/2004 E-Mail    Ennis, R. B.,              2 NRC/NRR            to Ennis, NRR, re:                        NRC/NRR VYNPS EPU Confirmatory Items.
ML043570270 Elliot, B. J.,    E-mail - Elliot, NRR, 7/26/2004 E-Mail    Ennis, R. B.,              2 NRC/NRR            to Ennis, NRR, re:                        NRC/NRR VYNPS EPU Confirmatory Items.
ML043580048 Scarbrough, T. G., E-mail - Scarbrough,  7/26/2004 E-Mail    Elliot, B. J.,              2 NRC/NRR            NRR, to Elliot, NRR,                      NRC/NRR re: Vermont Yankee EPU, Cracks InThe Steam Dryer.
ML043580048 Scarbrough, T. G., E-mail - Scarbrough,  7/26/2004 E-Mail    Elliot, B. J.,              2 NRC/NRR            NRR, to Elliot, NRR,                      NRC/NRR re: Vermont Yankee EPU, Cracks InThe Steam Dryer.
Accession        Author        Title/Description  Document    Document    Addressee /  Comment  Page Number    Name/Affiliation                          Date      Type      Addressee            Count Affiliation ML043580119 Scarbrough, T. G., E-mail - Scarbrough,  7/27/2004  E-Mail    Imbro, G.,              13 NRC/NRR            NRR, to Imbro, NRR,                        NRC/NRR re: VY EPU Flow Effect Slides.
Accession        Author        Title/Description  Document    Document    Addressee /  Comment  Page Number    Name/Affiliation                          Date      Type      Addressee            Count Affiliation ML043580119 Scarbrough, T. G., E-mail - Scarbrough,  7/27/2004  E-Mail    Imbro, G.,              13 NRC/NRR            NRR, to Imbro, NRR,                        NRC/NRR re: VY EPU Flow Effect Slides.
ML043580306 Helton, D. M.,    E-mail - Helton, RES, 7/30/2004  E-Mail    Malik, S. N.,            5 NRC/RES            to Malik, RES, re:                          NRC/RES Thoughts on 07/21-22/04 Meetings with GE/Entergy on Steam Dryer Analysis for VY EPU.
ML043580306 Helton, D. M.,    E-mail - Helton, RES, 7/30/2004  E-Mail    Malik, S. N.,            5 NRC/RES            to Malik, RES, re:                          NRC/RES Thoughts on 07/21-22/04 Meetings with GE/Entergy on Steam Dryer Analysis for VY EPU.
Line 351: Line 315:
SPLB              Vermont Yankee                  Evaluation DLPM/LPD1 Extended Power Uprate.
SPLB              Vermont Yankee                  Evaluation DLPM/LPD1 Extended Power Uprate.
ML043510106 Chen, S. S.,      Review of the          8/6/2004  Report,                            10 Mulcahy, T. M.,    Vermont Yankee                  Technical Shah, V. N.,      Steam Dryer Integrity Argonne National  Issue Associated Lab (ANL)          with Uprated Power Operation Licensing Actions.
ML043510106 Chen, S. S.,      Review of the          8/6/2004  Report,                            10 Mulcahy, T. M.,    Vermont Yankee                  Technical Shah, V. N.,      Steam Dryer Integrity Argonne National  Issue Associated Lab (ANL)          with Uprated Power Operation Licensing Actions.
Accession          Author      Title/Description  Document    Document    Addressee /  Comment Page Number    Name/Affiliation                          Date      Type      Addressee          Count Affiliation ML043620145 Elliot, B. J.,    E-mail - Elliot, NRR,  8/9/2004  E-Mail    Ennis, R.,              3 NRC/NRR          to Ennis, NRR, re:                          NRC/NRR Vermont Yankee Power Uprate, License Condition for Vessel Test Capsules.
Accession          Author      Title/Description  Document    Document    Addressee /  Comment Page Number    Name/Affiliation                          Date      Type      Addressee          Count Affiliation ML043620145 Elliot, B. J.,    E-mail - Elliot, NRR,  8/9/2004  E-Mail    Ennis, R.,              3 NRC/NRR          to Ennis, NRR, re:                          NRC/NRR Vermont Yankee Power Uprate, License Condition for Vessel Test Capsules.
ML042290204 Chan, T. L.,      Safety Evaluation on  8/9/2004  Memoranda, Howe A G,                5 NRC/NRR/DE/      License Amendment                Safety    NRC/NRR/
ML042290204 Chan, T. L.,      Safety Evaluation on  8/9/2004  Memoranda, Howe A G,                5 NRC/NRR/DE/      License Amendment                Safety    NRC/NRR/
EMCB              Request for 20                  Evaluation DLPMILPD1 Percent Power Uprate for Vermont Yankee Nuclear Power Station (TAC No. MC0761).
EMCB              Request for 20                  Evaluation DLPMILPD1 Percent Power Uprate for Vermont Yankee Nuclear Power Station (TAC No. MC0761).
ML043570245 Ennis, R. B.,    E-mail - Ennis, NRR,  8/16/2004  E-Mail    Notafrancesco,          3 NRC/NRR          to Notafrancesco,                          A., NRC/RES RES, Re: Vermont Yankee EPU Supplement 11.
ML043570245 Ennis, R. B.,    E-mail - Ennis, NRR,  8/16/2004  E-Mail    Notafrancesco,          3 NRC/NRR          to Notafrancesco,                          A., NRC/RES RES, Re: Vermont Yankee EPU Supplement 11.
Accession        Author        TitlelDescription  Document  Document    Addressee I    Comment Page Number    Name/Affiliation                          Date      Type      Addressee              Count Affiliation ML043570229 Ennis, R. B.,      E-mail - Ennis, NRR, 8/16/2004 E-Mail      Scarbrough, T.            2 NRC/NRR            to Scarbrough, NRR,                        G., NRC/NRR re: ANL Reports on Vermont Yankee Dryers.
Accession        Author        TitlelDescription  Document  Document    Addressee I    Comment Page Number    Name/Affiliation                          Date      Type      Addressee              Count Affiliation ML043570229 Ennis, R. B.,      E-mail - Ennis, NRR, 8/16/2004 E-Mail      Scarbrough, T.            2 NRC/NRR            to Scarbrough, NRR,                        G., NRC/NRR re: ANL Reports on Vermont Yankee Dryers.
ML043580130 Scarbrough, T. G., E-mail - Scarbrough, 8/16/2004 E-Mail      Ennis, R. B.,              2 NRC/NRR            NRR, to Ennis, NRR,                        NRC/NRR Re: GE Audit of Analysis for EPU Flow Effects at VY.
ML043580130 Scarbrough, T. G., E-mail - Scarbrough, 8/16/2004 E-Mail      Ennis, R. B.,              2 NRC/NRR            NRR, to Ennis, NRR,                        NRC/NRR Re: GE Audit of Analysis for EPU Flow Effects at VY.
ML043570357 Manoly, K. A.,    E-mail - Manoly,    8/16/2004 E-Mail      Ennis, R. B.,              2 NRC/NRR            NRR, to Ennis, NRR,                        NRC/NRR re: ANL Reports on Vermont Yankee Dryers.
ML043570357 Manoly, K. A.,    E-mail - Manoly,    8/16/2004 E-Mail      Ennis, R. B.,              2 NRC/NRR            NRR, to Ennis, NRR,                        NRC/NRR re: ANL Reports on Vermont Yankee Dryers.
ML042310744 Tappert, J. R.,    Draft Environmental  8/18/2004 Environ-    Clifford, J. W.,          27 NRC/NRR/DRIP/      Assessment of                  mental      NRC/NRR/
ML042310744 Tappert, J. R.,    Draft Environmental  8/18/2004 Environ-    Clifford, J. W.,          27 NRC/NRR/DRIP/      Assessment of                  mental      NRC/NRR/
RLEP              Extended Power                Assessment, DLPM/LPD1 Uprate for Vermont            Federal Yankee Nuclear                Register Power Station.                Notice, Memoranda
RLEP              Extended Power                Assessment, DLPM/LPD1 Uprate for Vermont            Federal Yankee Nuclear                Register Power Station.                Notice, Memoranda Accession        Author        Title/Description    Document  Document  Addressee /      Comment Page Number    Name/Affiliation                            Date      Type    Addressee              Count Affiliation ML043570272 Ennis, R. B.,      E-mail - Ennis, NRR,    8/18/2004 E-Mail    Elliot, B. J.,              2 NRC/NRR            to Elliot, NRR, re:                        NRC/NRR Vermont Yankee Power Uprate, License Condition for Vessel Test Capsules.
 
Accession        Author        Title/Description    Document  Document  Addressee /      Comment Page Number    Name/Affiliation                            Date      Type    Addressee              Count Affiliation ML043570272 Ennis, R. B.,      E-mail - Ennis, NRR,    8/18/2004 E-Mail    Elliot, B. J.,              2 NRC/NRR            to Elliot, NRR, re:                        NRC/NRR Vermont Yankee Power Uprate, License Condition for Vessel Test Capsules.
ML043570248 Ennis, R. B.,      E-mail - Ennis, NRR,    8/18/2004 E-Mail    Elliot, B. J.,              2 NRC/NRR            to Elliot,NRR, re:                          NRC/NRR Vermont Yankee Power Uprate, License Condition for Vessel Test Capsules.                                                  .
ML043570248 Ennis, R. B.,      E-mail - Ennis, NRR,    8/18/2004 E-Mail    Elliot, B. J.,              2 NRC/NRR            to Elliot,NRR, re:                          NRC/NRR Vermont Yankee Power Uprate, License Condition for Vessel Test Capsules.                                                  .
ML043580137 Scarbrough, T. G., E-mail - Scarbrough,    8/18/2004 E-Mail    Ennis, R. B.,              3 NRC/NRR            NRR, to Ennis, NRR,                        NRC/NRR re: GE Audit of Analysis for EPU Flow Effects at VY.
ML043580137 Scarbrough, T. G., E-mail - Scarbrough,    8/18/2004 E-Mail    Ennis, R. B.,              3 NRC/NRR            NRR, to Ennis, NRR,                        NRC/NRR re: GE Audit of Analysis for EPU Flow Effects at VY.
ML043580143 Scarbrough, T. G., E-mail - Scarbrough,    8/18/2004 E-Mail    Wu, C.,                    3 NRC/NRR            NRR, to Wu, NRR,                            NRC/NRR et. al., re: GE Steam Dryer Analysis.      .
ML043580143 Scarbrough, T. G., E-mail - Scarbrough,    8/18/2004 E-Mail    Wu, C.,                    3 NRC/NRR            NRR, to Wu, NRR,                            NRC/NRR et. al., re: GE Steam Dryer Analysis.      .
Accession      Author        Title/Description  Document  Document  Addressee /      Comment Page Number    NamelAffiliation                          Date      Type      Addressee              Count Affiliation ML043620017 Ennis, R. B.,    E-mail - Ennis, NRR,  8/19/2004 E-Mail    Elliot, B. J.,              5 NRC/NRR          to Elliot, NRR, re:                      NRC/NRR Vermont Yankee Power Uprate, License Condition on Vessel Test Capsules.
Accession      Author        Title/Description  Document  Document  Addressee /      Comment Page Number    NamelAffiliation                          Date      Type      Addressee              Count Affiliation ML043620017 Ennis, R. B.,    E-mail - Ennis, NRR,  8/19/2004 E-Mail    Elliot, B. J.,              5 NRC/NRR          to Elliot, NRR, re:                      NRC/NRR Vermont Yankee Power Uprate, License Condition on Vessel Test Capsules.
ML043580150 Helton, D. M.,    E-mail - Helton, RES, 8/19/2004 E-Mail    Wu, C.,                    5 NRC/RES          to Wu, NRR, re: GE,                      NRC/NRR Audit Trip on Flow Effects and Steam Dryers for VY EPU.
ML043580150 Helton, D. M.,    E-mail - Helton, RES, 8/19/2004 E-Mail    Wu, C.,                    5 NRC/RES          to Wu, NRR, re: GE,                      NRC/NRR Audit Trip on Flow Effects and Steam Dryers for VY EPU.
Line 373: Line 332:
ML043440464 Jacobson, J. B.,  E-mail - Jacobson,    8/19/2004 E-Mail    Ennis, R. B.,              1 NRC/NRR          NRR, to Ennis, NRR,                      NRC/NRR re: Vermont Yankee Engineering Inspection -
ML043440464 Jacobson, J. B.,  E-mail - Jacobson,    8/19/2004 E-Mail    Ennis, R. B.,              1 NRC/NRR          NRR, to Ennis, NRR,                      NRC/NRR re: Vermont Yankee Engineering Inspection -
Installation of Capacitors.                                              .
Installation of Capacitors.                                              .
Accession      Author          Title/Description  Document  Document  Addressee /  Comment Page Number    Name/Affiliation                          Date      Type    Addressee            Count Affiliation ML043620045 Wu, C., NRC/NRR    E-mail Wu, NRR, to    8/20/2004 E-Mail    Imbro, E. V.,            7 Imbro, NRR, Re:                          NRC/NRR August 23-27, GE Audit for Vermont Yankee EPU Submittals.
Accession      Author          Title/Description  Document  Document  Addressee /  Comment Page Number    Name/Affiliation                          Date      Type    Addressee            Count Affiliation ML043620045 Wu, C., NRC/NRR    E-mail Wu, NRR, to    8/20/2004 E-Mail    Imbro, E. V.,            7 Imbro, NRR, Re:                          NRC/NRR August 23-27, GE Audit for Vermont Yankee EPU Submittals.
ML043580347 Wu, C., NRC/NRR    E-mail Wu, NRR, to    8/20/2004 E-Mail    Imbro, E. V.,          10 Imbro, NRR, re:                          NRC/NRR August 23-27 GE Audit for Vermont Yankee EPU Submittals on Flow Effects and the Steam Dryer.
ML043580347 Wu, C., NRC/NRR    E-mail Wu, NRR, to    8/20/2004 E-Mail    Imbro, E. V.,          10 Imbro, NRR, re:                          NRC/NRR August 23-27 GE Audit for Vermont Yankee EPU Submittals on Flow Effects and the Steam Dryer.
Line 379: Line 337:
ML043440495 Ennis, R. B.,      E-mail - Ennis, NRR,  8/23/2004 E-Mail    Jacobson, J.
ML043440495 Ennis, R. B.,      E-mail - Ennis, NRR,  8/23/2004 E-Mail    Jacobson, J.
NRC/NRR            to Jacobson, NRR,                        B., NRC/NRR re: CST Temperature and NPSH.
NRC/NRR            to Jacobson, NRR,                        B., NRC/NRR re: CST Temperature and NPSH.
Accession      Author        Title/Description    Document  Document  Addressee /      Comment Page Number    Name/Affiliation                          Date      Type    Addressee              Count Affiliation ML043650384 Dennis, S.,      E-mail from Steven    8/23/2004 E-Mail    Anderson, C.,              3 NRC/RGN-I        Dennis (Region I) to                      Bower, F. L.,
Accession      Author        Title/Description    Document  Document  Addressee /      Comment Page Number    Name/Affiliation                          Date      Type    Addressee              Count Affiliation ML043650384 Dennis, S.,      E-mail from Steven    8/23/2004 E-Mail    Anderson, C.,              3 NRC/RGN-I        Dennis (Region I) to                      Bower, F. L.,
Cliff Anderson                            Doerflein, L. T.,
Cliff Anderson                            Doerflein, L. T.,
Line 390: Line 347:
re: Vermont Yankee                        NRC/NRR Engineering Inspection Update.
re: Vermont Yankee                        NRC/NRR Engineering Inspection Update.
ML050050093 Howe, A. G.,      E-mail - Howe, NRR,    8/23/2004 E-Mail    Akstulewicz, F.            2 NRC/NRR          to Akstulewicz, NRR,                      M., NRC/NRR Re: MELLA + and CPPU Topical, Possible Impact on Vermont Yankee EPU.
ML050050093 Howe, A. G.,      E-mail - Howe, NRR,    8/23/2004 E-Mail    Akstulewicz, F.            2 NRC/NRR          to Akstulewicz, NRR,                      M., NRC/NRR Re: MELLA + and CPPU Topical, Possible Impact on Vermont Yankee EPU.
Accession      Author        Title/Description  Document  Document  Addressee /    Comment Page Number    Name/Affiliation                        Date      Type    Addressee            Count Affiliation ML043570291 Ennis, R. B.,    E-mail - Ennis, NRR,  8/25/2004 E-Mail    Stutzke, M. A.,          3 NRC/NRR          to Stutzke, NRR, re:                      NRC/NRR Comment to VY EPU PRA & Review on Operator Actions.
Accession      Author        Title/Description  Document  Document  Addressee /    Comment Page Number    Name/Affiliation                        Date      Type    Addressee            Count Affiliation ML043570291 Ennis, R. B.,    E-mail - Ennis, NRR,  8/25/2004 E-Mail    Stutzke, M. A.,          3 NRC/NRR          to Stutzke, NRR, re:                      NRC/NRR Comment to VY EPU PRA & Review on Operator Actions.
ML043440532 Jacobson, J. B.,  E-mail - Jacobson,    8/25/2004 E-Mail    Howe, A. G.,              5 NRC/NRR          NRR, to Howe, NRR,                        NRC/NRR re: VY Engineering Inspection Briefing Notes.                                                        _
ML043440532 Jacobson, J. B.,  E-mail - Jacobson,    8/25/2004 E-Mail    Howe, A. G.,              5 NRC/NRR          NRR, to Howe, NRR,                        NRC/NRR re: VY Engineering Inspection Briefing Notes.                                                        _
Line 397: Line 353:
re: Questions on GE                      NRC/NRR codes for CPPU/EPU.
re: Questions on GE                      NRC/NRR codes for CPPU/EPU.
ML043570297 Ennis, R. B.,    E-mail - Ennis, NRR,  8/30/2004 E-Mail    Manoly, K. A.,            4 NRC/NRR          to Manoly, NRR, re:                      NRC/NRR Steam Dryer Writeup, for Vermont Yankee EPU.
ML043570297 Ennis, R. B.,    E-mail - Ennis, NRR,  8/30/2004 E-Mail    Manoly, K. A.,            4 NRC/NRR          to Manoly, NRR, re:                      NRC/NRR Steam Dryer Writeup, for Vermont Yankee EPU.
Accession        Author        Title/Description  Document    Document  Addressee /  Comment Page Number    Name/Affiliation                          Date      Type    Addressee            Count Affiliation ML043570301 Ennis, R. B.,      E-mail - Ennis, NRR, 8/31/2004  E-Mail    Jacobson, J.B.          3 NRC/NRR            to Jacobson, NRR,                        NRC/NRR re: Containment Overpressure &
Accession        Author        Title/Description  Document    Document  Addressee /  Comment Page Number    Name/Affiliation                          Date      Type    Addressee            Count Affiliation ML043570301 Ennis, R. B.,      E-mail - Ennis, NRR, 8/31/2004  E-Mail    Jacobson, J.B.          3 NRC/NRR            to Jacobson, NRR,                        NRC/NRR re: Containment Overpressure &
EOPs.
EOPs.
Line 406: Line 361:
Vermont Yankee LT -
Vermont Yankee LT -
NPSH, Draft Analysis Results.
NPSH, Draft Analysis Results.
Accession      Author          Title/Description  Document      Document  Addressee I    Comment Page Number    Name/Affiliation                          Date        Type    Addressee            Count Affiliation ML043440580 Ennis, R. B.,      E-mail - Ennis, NRR,  9/2/2004    E-Mail    Howe, A. G.,              4 NRC/NRR            to Howe, NRR, re:                            NRC/NRR Draft Status Bullets for the Dyer/Ellis Brief on VY EPU.
Accession      Author          Title/Description  Document      Document  Addressee I    Comment Page Number    Name/Affiliation                          Date        Type    Addressee            Count Affiliation ML043440580 Ennis, R. B.,      E-mail - Ennis, NRR,  9/2/2004    E-Mail    Howe, A. G.,              4 NRC/NRR            to Howe, NRR, re:                            NRC/NRR Draft Status Bullets for the Dyer/Ellis Brief on VY EPU.
ML043440598 Imbro, E. V.,      E-mail - Imbro, NRR,  9/2/2004    E-Mail    Howe, A. G.,              3 NRC/NRR            to How, NRR, re:                            NRC/NRR Draft Status Bullets for the Dyer/Ellis Brief re VY Dryer Issue.
ML043440598 Imbro, E. V.,      E-mail - Imbro, NRR,  9/2/2004    E-Mail    Howe, A. G.,              3 NRC/NRR            to How, NRR, re:                            NRC/NRR Draft Status Bullets for the Dyer/Ellis Brief re VY Dryer Issue.
Line 417: Line 371:
NRC, NRC/NRR, NRC/RGN-I ML043440595 Scarbrough, T. G., E-mail -              9/2/2004    E-Mail    Ennis, R. B.,            4 NRC/NRR            Scarborough, NRR,                            NRC/NRR to Ennis, NRR, re:
NRC, NRC/NRR, NRC/RGN-I ML043440595 Scarbrough, T. G., E-mail -              9/2/2004    E-Mail    Ennis, R. B.,            4 NRC/NRR            Scarborough, NRR,                            NRC/NRR to Ennis, NRR, re:
Vermont Yankee Steam Dryer Issues.              .
Vermont Yankee Steam Dryer Issues.              .
Accession        Author        Title/Description Document    Document  Addressee I      Comment      Page Number    Name/Affiliation                        Date      Type    Addressee                    Count Affiliation ML043440569 Terao, D.,        E-Mail - Terao, NRR,  9/2/2004  E-Mail    Ennis, R. B.,                    4 NRC/NRR          to Ennis, NRR, re:                        NRC/NRR Steam Dryer Writeup for the EPU Safety Evaluation.
Accession        Author        Title/Description Document    Document  Addressee I      Comment      Page Number    Name/Affiliation                        Date      Type    Addressee                    Count Affiliation ML043440569 Terao, D.,        E-Mail - Terao, NRR,  9/2/2004  E-Mail    Ennis, R. B.,                    4 NRC/NRR          to Ennis, NRR, re:                        NRC/NRR Steam Dryer Writeup for the EPU Safety Evaluation.
ML043650350 Dennis, S,        E-mail - Steven      9/9/2004  E-Mail    Bower, F. L., Subject of          2 NRC/RGN-l        Dennis (Region I) to                      NRC/RGN-I    message: timeline Fred Bower (Region                                      for RCIC I) and Others Dated                                    operability 09/09/04 re:
ML043650350 Dennis, S,        E-mail - Steven      9/9/2004  E-Mail    Bower, F. L., Subject of          2 NRC/RGN-l        Dennis (Region I) to                      NRC/RGN-I    message: timeline Fred Bower (Region                                      for RCIC I) and Others Dated                                    operability 09/09/04 re:
Line 423: Line 376:
ML043580115 Shah, V., Argonne E-mail - Shah, ANL,  9/9/2004  E-Mail    Wu, C.,                          24 National Lab      to Wu, NRR, re: Trip                      NRC/NRR (ANL)            Report of Audit of GE Steam Dryer Analysis for VY EPU.
ML043580115 Shah, V., Argonne E-mail - Shah, ANL,  9/9/2004  E-Mail    Wu, C.,                          24 National Lab      to Wu, NRR, re: Trip                      NRC/NRR (ANL)            Report of Audit of GE Steam Dryer Analysis for VY EPU.
ML043580123 Malik, S. N.,    E-mail - Malik, RES,  9/9/2004  E-Mail    Wu, C. I.,                        2 NRC/RES          to Wu, NRR, re: My                        NRC/NRR Comments from Vermont Yankee Steam Dryer Analysis Audit at GENE (Aug. 24-26).
ML043580123 Malik, S. N.,    E-mail - Malik, RES,  9/9/2004  E-Mail    Wu, C. I.,                        2 NRC/RES          to Wu, NRR, re: My                        NRC/NRR Comments from Vermont Yankee Steam Dryer Analysis Audit at GENE (Aug. 24-26).
Accession        Author        Title/Description  Document    Document    Addressee /    Comment  Page Number    Name/Affiliation                        Date      Type      Addressee              Count Affiliation ML042540482 Lund, A. L.,      Safety Evaluation of  9/9/2004  Memoranda, Clifford, J. W.,            5 NRC/NRRIDE/      Request for License            Safety    NRC/NRR/
Accession        Author        Title/Description  Document    Document    Addressee /    Comment  Page Number    Name/Affiliation                        Date      Type      Addressee              Count Affiliation ML042540482 Lund, A. L.,      Safety Evaluation of  9/9/2004  Memoranda, Clifford, J. W.,            5 NRC/NRRIDE/      Request for License            Safety    NRC/NRR/
EMCB              Amendment in                    Evaluation DLPM/LPD1 Support of Application for the Extended Power Uprate in Vermont Yankee Nuclear Power Station (TAC No. MC0761).
EMCB              Amendment in                    Evaluation DLPM/LPD1 Support of Application for the Extended Power Uprate in Vermont Yankee Nuclear Power Station (TAC No. MC0761).
Line 430: Line 382:
ML043580141 Shah, V., Argonne E-mail - Shah, ANL,  9/13/2004  E-Mail    Mulcahy, T. M.,              3 National Lab      to Mulcahy, ANL, re:                      Argonne (ANL)            Audit Report Redraft                      National Lab 9-12-04, of the                            (ANL)
ML043580141 Shah, V., Argonne E-mail - Shah, ANL,  9/13/2004  E-Mail    Mulcahy, T. M.,              3 National Lab      to Mulcahy, ANL, re:                      Argonne (ANL)            Audit Report Redraft                      National Lab 9-12-04, of the                            (ANL)
Report on GE Steam Dryer Analyses.
Report on GE Steam Dryer Analyses.
Accession        Author          Title/Description Document  Document      Addressee /  Comment Page Number      Name/Affiliation                        Date      Type        Addressee          Count Affiliation ML042610110  Scarbrough, T. G., Memo - Technical    9/14/2004 Memoranda    Imbro, E. V.,          3 NRC/NRR/DE/        Audit of Vermont                            NRC/NRR/DE/
Accession        Author          Title/Description Document  Document      Addressee /  Comment Page Number      Name/Affiliation                        Date      Type        Addressee          Count Affiliation ML042610110  Scarbrough, T. G., Memo - Technical    9/14/2004 Memoranda    Imbro, E. V.,          3 NRC/NRR/DE/        Audit of Vermont                            NRC/NRR/DE/
EMCB              Yankee Steam Dryer                          EMCB Analysis in Support of Extended Power Uprate Request (TAC MC0761).
EMCB              Yankee Steam Dryer                          EMCB Analysis in Support of Extended Power Uprate Request (TAC MC0761).
Line 438: Line 389:
ML042650340  Scarbrough, T. G., Proprietary Info    9/14/2004 Memoranda    Imbro, E. V.,          4 NRC/NRR/DE/        Removed - Technical                        NRC/NRR/DE/
ML042650340  Scarbrough, T. G., Proprietary Info    9/14/2004 Memoranda    Imbro, E. V.,          4 NRC/NRR/DE/        Removed - Technical                        NRC/NRR/DE/
EMEB              Audit of Vermont                            EMEB Yankee Steam Dryer Analysis in Support of Extended Power Uprate Request (TAC MC0761).
EMEB              Audit of Vermont                            EMEB Yankee Steam Dryer Analysis in Support of Extended Power Uprate Request (TAC MC0761).
Accession      Author          Title/Description  Document  Document  Addressee I  Comment Page Number    Name/Affiliation                          Date      Type    Addressee          Count Affiliation ML043650338 Scarbrough, T. G., E-mail - Thomas      9/15/2004 E-Mail    Bower, F. L.,          4 NRC/NRR            Scarborough (NRR)                        NRC/RGN-I to Fred Bower (Region I) dated 09/15/04 re: Vermont Yankee EPU RAI response on MOVs and AOVs.
Accession      Author          Title/Description  Document  Document  Addressee I  Comment Page Number    Name/Affiliation                          Date      Type    Addressee          Count Affiliation ML043650338 Scarbrough, T. G., E-mail - Thomas      9/15/2004 E-Mail    Bower, F. L.,          4 NRC/NRR            Scarborough (NRR)                        NRC/RGN-I to Fred Bower (Region I) dated 09/15/04 re: Vermont Yankee EPU RAI response on MOVs and AOVs.
ML043650330 Scarbrough, T. G., E-mail - Thomas      9/15/2004 E-Mail    Bower, F. L.,          4 NRC/NRR            Scarbrough (NRR) to                      NRC/RGN-I Fred Bower (Region
ML043650330 Scarbrough, T. G., E-mail - Thomas      9/15/2004 E-Mail    Bower, F. L.,          4 NRC/NRR            Scarbrough (NRR) to                      NRC/RGN-I Fred Bower (Region
Line 445: Line 395:
ML043580078 Scarbrough, T. G., E-mail - Scarbrough,  9/15/2004 E-Mail    Bower, F. L.,          3 NRC/NRR            NRR, to Bower,                            NRC/RGN-I RGNI, re: Vermont Yankee EPU RAI Response on MOVs and AOVs.
ML043580078 Scarbrough, T. G., E-mail - Scarbrough,  9/15/2004 E-Mail    Bower, F. L.,          3 NRC/NRR            NRR, to Bower,                            NRC/RGN-I RGNI, re: Vermont Yankee EPU RAI Response on MOVs and AOVs.
ML043580096 Scarbrough, T. G., E-mail - Scarbrough,  9/20/2004 E-Mail    Ennis, R. B.,          2 NRC/NRR            NRR, to Ennis, NRR,                      NRC/NRR re: VY EPU Schedule - Draft Memo & Letter, on Steam Dryer Analysis.
ML043580096 Scarbrough, T. G., E-mail - Scarbrough,  9/20/2004 E-Mail    Ennis, R. B.,          2 NRC/NRR            NRR, to Ennis, NRR,                      NRC/NRR re: VY EPU Schedule - Draft Memo & Letter, on Steam Dryer Analysis.
Accession        Author        Title/Description    Document  Document  Addressee I  Comment Page Number    Name/Affiliation                            Date      Type    Addressee          Count Affiliation ML043580085 Scarbrough, T. G., E-mail - Scarbrough,    9/20/2004 E-Mail    Bower, F. L.,          3 NRC/NRR            NRR, to Bower,                              NRC/RGN-l RGN-I, re:
Accession        Author        Title/Description    Document  Document  Addressee I  Comment Page Number    Name/Affiliation                            Date      Type    Addressee          Count Affiliation ML043580085 Scarbrough, T. G., E-mail - Scarbrough,    9/20/2004 E-Mail    Bower, F. L.,          3 NRC/NRR            NRR, to Bower,                              NRC/RGN-l RGN-I, re:
Documenting TI 158-MOV-Findings, for the Engineering Inspection at VY.
Documenting TI 158-MOV-Findings, for the Engineering Inspection at VY.
ML043580341 Helton, D. M.,    E-mail - Helton, RES,  9/22/2004 E-Mail    Wu, C.,                3 NRC/RES            to Wu, NRR, Re:                            NRC/NRR Comments on Follow-ups from July 21-22 Meeting, on VY EPU Steam Dryer Analysis.      .
ML043580341 Helton, D. M.,    E-mail - Helton, RES,  9/22/2004 E-Mail    Wu, C.,                3 NRC/RES            to Wu, NRR, Re:                            NRC/NRR Comments on Follow-ups from July 21-22 Meeting, on VY EPU Steam Dryer Analysis.      .
Accession      Author        Title/Description:  Document  Document  Addressee /        Comment        Page Number    Name/Affiliation:                          Date      Type    Addressee                        Count Affiliation ML043580324 Helton, D. M.,    E-mail - Helton, RES, 9/23/2004 E-Mail    Parks, B. T.,                        4 NRC/RES          to Parks, NRR, re:                        NRC/NRR Comments on Follow-ups from July 21-22 Meeting, on VY EPU Steam Dryer Analysis.
Accession      Author        Title/Description:  Document  Document  Addressee /        Comment        Page Number    Name/Affiliation:                          Date      Type    Addressee                        Count Affiliation ML043580324 Helton, D. M.,    E-mail - Helton, RES, 9/23/2004 E-Mail    Parks, B. T.,                        4 NRC/RES          to Parks, NRR, re:                        NRC/NRR Comments on Follow-ups from July 21-22 Meeting, on VY EPU Steam Dryer Analysis.
ML043580330 Parks, B. T.,    E-mail - Parks, NRR,  9/23/2004 E-Mail    Helton, D. M.,                        3 NRC/NRR          to Helton, RES, re:                      NRC/RES Comments on Follow-ups from July 21-22 Meeting, on VY EPU Steam Dryer Analysis.
ML043580330 Parks, B. T.,    E-mail - Parks, NRR,  9/23/2004 E-Mail    Helton, D. M.,                        3 NRC/NRR          to Helton, RES, re:                      NRC/RES Comments on Follow-ups from July 21-22 Meeting, on VY EPU Steam Dryer Analysis.
Line 455: Line 403:
ML043570412 Ennis, R. B.,    E-mail- Ennis, NRR,  9/28/2004 E-Mail    Lobel, R. M.,  Message pertains      20 NRC/NRR          to Lobel, NRR, re:                        NRC/NRR        to containment Comments re: VY                                          overpressure and State of                                            issue.
ML043570412 Ennis, R. B.,    E-mail- Ennis, NRR,  9/28/2004 E-Mail    Lobel, R. M.,  Message pertains      20 NRC/NRR          to Lobel, NRR, re:                        NRC/NRR        to containment Comments re: VY                                          overpressure and State of                                            issue.
Vermont.
Vermont.
Accession      Author          Title/Description:  Document  Document  Addressee /  Comment Page Number    Name/Affiliation:                          Date      Type      Addressee          Count Affiliation ML042780185 Dennig, R. L.,    Safety Evaluation    10/4/2004 Memoranda, Howe, A. G.,            4 NRC/NRR/DSSA/      Input for Vermont              Safety    NRC/NRRI SPSB              Yankee Extended                Evaluation DLPM Power Uprate (TAC MC0761).
Accession      Author          Title/Description:  Document  Document  Addressee /  Comment Page Number    Name/Affiliation:                          Date      Type      Addressee          Count Affiliation ML042780185 Dennig, R. L.,    Safety Evaluation    10/4/2004 Memoranda, Howe, A. G.,            4 NRC/NRR/DSSA/      Input for Vermont              Safety    NRC/NRRI SPSB              Yankee Extended                Evaluation DLPM Power Uprate (TAC MC0761).
ML043650324 Scarbrough, T. G., E-mail - Thomas      10/5/2004 E-Mail    Bower, F. L.,          3 NRC/NRR            Scarbrough (NRR) to                        NRC/RGN-I Fred Bower (Region I) Dated 10/05/04 re:
ML043650324 Scarbrough, T. G., E-mail - Thomas      10/5/2004 E-Mail    Bower, F. L.,          3 NRC/NRR            Scarbrough (NRR) to                        NRC/RGN-I Fred Bower (Region I) Dated 10/05/04 re:
Line 461: Line 408:
ML050050032 Howe, A. G.,      E-Mail - Howe, NRR,  10/5/2004 E-Mail    Ennis, R. B.,          4 NRC/NRR            to Ennis, NRR, re:.                        NRC/NRR Briefing for Brian Sheron, on Vermont Yankee Containment Overpressure Issue.
ML050050032 Howe, A. G.,      E-Mail - Howe, NRR,  10/5/2004 E-Mail    Ennis, R. B.,          4 NRC/NRR            to Ennis, NRR, re:.                        NRC/NRR Briefing for Brian Sheron, on Vermont Yankee Containment Overpressure Issue.
ML043580161 Scarbrough, T. G., E-mail - Scarbrough,  10/5/2004    E-Mail  Bower, F. L.,          3 NRC/NRR            NRR, to Bower,                            NRC/RGN-I RGN1, Re: Vermont Yankee EPU Supplements 16 and 17, Commitment on MOV Testing.
ML043580161 Scarbrough, T. G., E-mail - Scarbrough,  10/5/2004    E-Mail  Bower, F. L.,          3 NRC/NRR            NRR, to Bower,                            NRC/RGN-I RGN1, Re: Vermont Yankee EPU Supplements 16 and 17, Commitment on MOV Testing.
Accession        Author        Title/Description: Document    Document  Addressee /  Comment Page Number    Name/Affiliation:                          Date        Type    Addressee            Count Affiliation ML043570305 Ennis, R. B.,      E-mail - Ennis, NRR,  10/6/2004 E-Mail    Malik, S. N.,            3 NRC/NRR            to Malik, RES, re:                        NRC/RES Detail Drawings of Modified Steam Dryer for Vermont Yankee Plant.
Accession        Author        Title/Description: Document    Document  Addressee /  Comment Page Number    Name/Affiliation:                          Date        Type    Addressee            Count Affiliation ML043570305 Ennis, R. B.,      E-mail - Ennis, NRR,  10/6/2004 E-Mail    Malik, S. N.,            3 NRC/NRR            to Malik, RES, re:                        NRC/RES Detail Drawings of Modified Steam Dryer for Vermont Yankee Plant.
ML042810511 Dennig, R. L.,    Safety Evaluation    10/6/2004  Memoranda, Howe, A. G.,            12 NRC/NRR            Input for Vermont              Safety    NRC/NRR/
ML042810511 Dennig, R. L.,    Safety Evaluation    10/6/2004  Memoranda, Howe, A. G.,            12 NRC/NRR            Input for Vermont              Safety    NRC/NRR/
Yankee Nuclear                  Evaluation DLPM/LPD1 Power Station Technical Specification Proposed Change No. 263, Extended Power Uprate.
Yankee Nuclear                  Evaluation DLPM/LPD1 Power Station Technical Specification Proposed Change No. 263, Extended Power Uprate.
ML043580167 Scarbrough, T. G., E-mail - Scarbrough, 10/12/2004 E-Mail    Duvigneaud, D.          20 NRC/NRR            NRR, to Duvigneaud,                        D., NRC/NRR NRR, re: Brian Sheron Briefing 10/13/04, on Power Uprate Flow Effects and Steam Dryers.
ML043580167 Scarbrough, T. G., E-mail - Scarbrough, 10/12/2004 E-Mail    Duvigneaud, D.          20 NRC/NRR            NRR, to Duvigneaud,                        D., NRC/NRR NRR, re: Brian Sheron Briefing 10/13/04, on Power Uprate Flow Effects and Steam Dryers.
Accession        Author        Title/Description: Document    Document  Addressee /  Comment Page Number    Name/Affiliation:                          Date      Type    Addressee            Count Affiliation ML043570479 Notafrancesco, A., E-mail -            10/13/2004 E-Mail    Lobel, R. M.,            3 NRC/RES            Notafrancesco, RES,                      NRC/NRR to Lobel, NRR, re:
Accession        Author        Title/Description: Document    Document  Addressee /  Comment Page Number    Name/Affiliation:                          Date      Type    Addressee            Count Affiliation ML043570479 Notafrancesco, A., E-mail -            10/13/2004 E-Mail    Lobel, R. M.,            3 NRC/RES            Notafrancesco, RES,                      NRC/NRR to Lobel, NRR, re:
Vermont Yankee Latest Results on Containment LOCA Parameter for NPSH.
Vermont Yankee Latest Results on Containment LOCA Parameter for NPSH.
Line 473: Line 418:
ML043570495 Stutzke, M. A.,    E-mail - Stutzke,    10/29/2004 E-Mail    Lobel, R. M.,            2 NRC/NRR            NRR, to Lobel, NRR,                      NRC/NRR re: VY Containment Overpressure Credit
ML043570495 Stutzke, M. A.,    E-mail - Stutzke,    10/29/2004 E-Mail    Lobel, R. M.,            2 NRC/NRR            NRR, to Lobel, NRR,                      NRC/NRR re: VY Containment Overpressure Credit
                               - Another PRA Issue.
                               - Another PRA Issue.
Accession        Author        Title/Description:  Document    Document  Addressee /    Comment Page Number    Name/Affiliation:                          Date      Type      Addressee            Count Affiliation ML043570487 Stutzke, M. A.,    E-mail - Stutzke,    10/29/2004 E-Mail    Lobel, R. M.,              2 NRC/NRR            NRR, to Lobel, NRR,                        NRC/NRR re: VY NPSH Best Estimate Calculation, and PRA Success Criteria.
Accession        Author        Title/Description:  Document    Document  Addressee /    Comment Page Number    Name/Affiliation:                          Date      Type      Addressee            Count Affiliation ML043570487 Stutzke, M. A.,    E-mail - Stutzke,    10/29/2004 E-Mail    Lobel, R. M.,              2 NRC/NRR            NRR, to Lobel, NRR,                        NRC/NRR re: VY NPSH Best Estimate Calculation, and PRA Success Criteria.
ML043620006 Dixon-Herrity, J., E-mail - Dixon-        11/1/2004 E-Mail    Thatcher, D. F.,          4 NRC/NRR            Herrity, NRR, to                          NRC/NRR Thatcher, NRR, re:
ML043620006 Dixon-Herrity, J., E-mail - Dixon-        11/1/2004 E-Mail    Thatcher, D. F.,          4 NRC/NRR            Herrity, NRR, to                          NRC/NRR Thatcher, NRR, re:
Line 480: Line 424:
ML043620030 Pederson, R. L.,  E-mail - Pederson,    11/1/2004 E-Mail    Ennis, R. B.,              3 NRC/NRR            NRR, to Ennis, NRR,                        NRC/NRR re: Comments on the VY EPU Environmental Assessment.
ML043620030 Pederson, R. L.,  E-mail - Pederson,    11/1/2004 E-Mail    Ennis, R. B.,              3 NRC/NRR            NRR, to Ennis, NRR,                        NRC/NRR re: Comments on the VY EPU Environmental Assessment.
ML043570309 Ennis, R. B.,      E-mail - Ennis, NRR,  11/2/2004 E-Mail    Jacobson, J.              3 NRC/NRR            to Jacobson, NRR,                          B., NRC/NRR and Doerflein, RGN1, re: VY SBO, Issue from the Engineering Inspection.
ML043570309 Ennis, R. B.,      E-mail - Ennis, NRR,  11/2/2004 E-Mail    Jacobson, J.              3 NRC/NRR            to Jacobson, NRR,                          B., NRC/NRR and Doerflein, RGN1, re: VY SBO, Issue from the Engineering Inspection.
Accession      Author          Title/Description: Document    Document  Addressee /    Comment Page Number    Name/Affiliation:                        Date      Type      Addressee            Count Affiliation ML043620020 Lyons, J. E.,      E-mail - Lyons, NRR,  11/5/2004 E-Mail    Duvigneaud, D.            7 NRC/NRR            to Duvigneand, NRR,                        D., NRC/NRR et. al., re:
Accession      Author          Title/Description: Document    Document  Addressee /    Comment Page Number    Name/Affiliation:                        Date      Type      Addressee            Count Affiliation ML043620020 Lyons, J. E.,      E-mail - Lyons, NRR,  11/5/2004 E-Mail    Duvigneaud, D.            7 NRC/NRR            to Duvigneand, NRR,                        D., NRC/NRR et. al., re:
GENE/GNF-A Analytical Methods Review Update, Concerns with BWR Core Exit Void Conditions.
GENE/GNF-A Analytical Methods Review Update, Concerns with BWR Core Exit Void Conditions.
Line 489: Line 432:
Questions on BWR Sump Closure.
Questions on BWR Sump Closure.
ML043150224 Quay, T. R.,      Vermont Yankee      11/10/2004 Memoranda, Collins, D. S.,          7 NRC/NRR/DIPM/      EPU SE Input                    Safety    NRC/NRR/
ML043150224 Quay, T. R.,      Vermont Yankee      11/10/2004 Memoranda, Collins, D. S.,          7 NRC/NRR/DIPM/      EPU SE Input                    Safety    NRC/NRR/
IPSB              Section 2.10.                  Evaluation DLPMILPD1
IPSB              Section 2.10.                  Evaluation DLPMILPD1 Accession        Author        Title/Description:  Document    Document    Addressee /        Comment    Page Number    Name/Affiliation:                          Date        Type      Addressee                      Count Affiliation ML043570336 Ennis, R. B.,      E-mail - Ennis, NRR,  11/16/2004 E-Mail,    Pettis, R. L.,  Transmits draft    5 NRC/NRR            to Pettis, NRR, re:              Request for NRC/NRR        requests for SPLB - VY EPU                    Additional                  additional RAIs Set 3.                      Information                information from (RAI)                      Plant Systems Branch ML043580301 Helton, D. M.,    E-mail- Helton, RES,  11/16/2004 E-Mail      Wu, C.,                            6 NRC/RES            to Wu, NRR, re: VY                          NRC/NRR Supplement 20 -
 
Accession        Author        Title/Description:  Document    Document    Addressee /        Comment    Page Number    Name/Affiliation:                          Date        Type      Addressee                      Count Affiliation ML043570336 Ennis, R. B.,      E-mail - Ennis, NRR,  11/16/2004 E-Mail,    Pettis, R. L.,  Transmits draft    5 NRC/NRR            to Pettis, NRR, re:              Request for NRC/NRR        requests for SPLB - VY EPU                    Additional                  additional RAIs Set 3.                      Information                information from (RAI)                      Plant Systems Branch ML043580301 Helton, D. M.,    E-mail- Helton, RES,  11/16/2004 E-Mail      Wu, C.,                            6 NRC/RES            to Wu, NRR, re: VY                          NRC/NRR Supplement 20 -
September 29 VY Presentation Slides, Comments on Steam Dryer Analysis.
September 29 VY Presentation Slides, Comments on Steam Dryer Analysis.
ML043650345 Snell, M.,        E-mail - Snell        11/18/2004 E-Mail      Barron, C.,                        3 NRC/RGN-I          (Region 1) to Barron                        NRC/RGN-I (Region I) and Others Dated 11/18/04 re: VY Final Review.
ML043650345 Snell, M.,        E-mail - Snell        11/18/2004 E-Mail      Barron, C.,                        3 NRC/RGN-I          (Region 1) to Barron                        NRC/RGN-I (Region I) and Others Dated 11/18/04 re: VY Final Review.
ML043580173 Scarbrough, T. G., E-mail - Scarbrough,  11/23/2004 E-Mail      Koenick, S. S.,                  15 NRC/NRR            NRR, to Koenick,                            NRC/NRR NRR, re: Background Paper for Commission Briefing, on Power Uprate Flow Effects and Steam Dryers.
ML043580173 Scarbrough, T. G., E-mail - Scarbrough,  11/23/2004 E-Mail      Koenick, S. S.,                  15 NRC/NRR            NRR, to Koenick,                            NRC/NRR NRR, re: Background Paper for Commission Briefing, on Power Uprate Flow Effects and Steam Dryers.
Accession        Author        Title/Description:  Document    Document    Addressee I        Comment        Page Number    Name/Affiliation:                          Date        Type      Addressee                        Count Affiliation ML043380300 Coffin, S. M.,    Vermont Yankee        11/24/2004 Memoranda,  Howe, A. G.,  This document        15 NRC/NRR/DE/      Nuclear Power                    Safety      NRC/NRR/      provides draft EMCB              Station - License                Evaluation  DLPMILPD1      safety evaluation Amendment Request                                          input regarding for a 20-Percent                                            structural integrity Extended Power                                              of the reactor Uprate (TAC No.                                            vessel and reactor MC0761).                                                    vessel internals.
Accession        Author        Title/Description:  Document    Document    Addressee I        Comment        Page Number    Name/Affiliation:                          Date        Type      Addressee                        Count Affiliation ML043380300 Coffin, S. M.,    Vermont Yankee        11/24/2004 Memoranda,  Howe, A. G.,  This document        15 NRC/NRR/DE/      Nuclear Power                    Safety      NRC/NRR/      provides draft EMCB              Station - License                Evaluation  DLPMILPD1      safety evaluation Amendment Request                                          input regarding for a 20-Percent                                            structural integrity Extended Power                                              of the reactor Uprate (TAC No.                                            vessel and reactor MC0761).                                                    vessel internals.
ML043370068 Akstulewicz, F. Request for          12/1/2004  Memoranda,  Howe, A. G.,  This documents        2 M.,              Additional                      Request for NRC/NRR/      includes draft NRC/NRR/DSSAt    Information for the              Additional  DLPM/LPD1      requests for SRXB              Vermont Yankee                  Information                additional Extended Power                  (RAI)                      information from Uprate (TAC No.                                            the reactor MC0761).                                                    systems branch.
ML043370068 Akstulewicz, F. Request for          12/1/2004  Memoranda,  Howe, A. G.,  This documents        2 M.,              Additional                      Request for NRC/NRR/      includes draft NRC/NRR/DSSAt    Information for the              Additional  DLPM/LPD1      requests for SRXB              Vermont Yankee                  Information                additional Extended Power                  (RAI)                      information from Uprate (TAC No.                                            the reactor MC0761).                                                    systems branch.
ML043620011 Marsh, L. B.,    E-mail - Marsh, NRR,  12/8/2004  E-Mail      Sheron, B. W.,                        4 NRC/NRR          to Sheron, NRR, et.                          NRC/NRR al., re: Q&A on VY EPU Schedule.
ML043620011 Marsh, L. B.,    E-mail - Marsh, NRR,  12/8/2004  E-Mail      Sheron, B. W.,                        4 NRC/NRR          to Sheron, NRR, et.                          NRC/NRR al., re: Q&A on VY EPU Schedule.
ML043570349 Lobel, R. M.,      E-mail - Lobel, NRR, 12/15/2004 E-Mail      Ennis, R. B.,                        5 NRC/NRR          to Ennis, NRR, re:                          NRC/NRR Round Two VY RAls, With Edits.
ML043570349 Lobel, R. M.,      E-mail - Lobel, NRR, 12/15/2004 E-Mail      Ennis, R. B.,                        5 NRC/NRR          to Ennis, NRR, re:                          NRC/NRR Round Two VY RAls, With Edits.
Accession        Author        Title/Description: Document    Document  Addressee /          Comment        Page Number      Name/Affiliation:                        Date      Type    Addressee                          Count Affiliation ML043510174  Jenkins, R. V.,    Vermont Yankee:      12/15/2004 Memoranda Clifford, J. W., This document        10 NRC/NRR/DE/        Thermal Power                            NRC/NRR/        provides draft EEIB              Uprate, Revision 1.                      DLPM/LPD1        safety evaluation input regarding the electrical system and environmental qualification of electrical components.
Accession        Author        Title/Description: Document    Document  Addressee /          Comment        Page Number      Name/Affiliation:                        Date      Type    Addressee                          Count Affiliation ML043510174  Jenkins, R. V.,    Vermont Yankee:      12/15/2004 Memoranda Clifford, J. W., This document        10 NRC/NRR/DE/        Thermal Power                            NRC/NRR/        provides draft EEIB              Uprate, Revision 1.                      DLPM/LPD1        safety evaluation input regarding the electrical system and environmental qualification of electrical components.
ML050070193  Skay, D. M.,      E-mail - Skay, NRR,  12/21/2004 E-Mail    Ennis, R. B.,                          2 NRC/NRR            to Ennis, NRR, re:                        NRC/NRR 12/21 Teleconference with VY on Steam Dryer Issues.
ML050070193  Skay, D. M.,      E-mail - Skay, NRR,  12/21/2004 E-Mail    Ennis, R. B.,                          2 NRC/NRR            to Ennis, NRR, re:                        NRC/NRR 12/21 Teleconference with VY on Steam Dryer Issues.
ML050110201 Ward, L. W.,      E-mail - Ward, NRR,  12/27/2004 E-Mail    Lobel, R. M.,                          2 NRC/NRR            to Lobel, NRR, re:                        NRC/NRR VY RELAPS Plots, Showing LOCA Break Flow and Energy.
ML050110201 Ward, L. W.,      E-mail - Ward, NRR,  12/27/2004 E-Mail    Lobel, R. M.,                          2 NRC/NRR            to Lobel, NRR, re:                        NRC/NRR VY RELAPS Plots, Showing LOCA Break Flow and Energy.
Accession        Author        Title/Description:  Document    Document  Addressee I  Comment Page Number    Name/Affiliation:                          Date      Type    Addressee          Count Affiliation ML050110011 Notafrancesco, A., E-mail -              12/29/2004 E-Mail    Lobel, R. M.,          6 NRC/RES            Notafrancesco, RES                        NRC/NRR to Lobel, NRR re:
Accession        Author        Title/Description:  Document    Document  Addressee I  Comment Page Number    Name/Affiliation:                          Date      Type    Addressee          Count Affiliation ML050110011 Notafrancesco, A., E-mail -              12/29/2004 E-Mail    Lobel, R. M.,          6 NRC/RES            Notafrancesco, RES                        NRC/NRR to Lobel, NRR re:
Draft VM Input Using CONTAIN Software to Analyze the Vermont Yankee Containment Response.
Draft VM Input Using CONTAIN Software to Analyze the Vermont Yankee Containment Response.
ML050070182 Ennis, R. B.,      E-mail - Ennis, NRR,  1/3/2005  E-Mail    Wu, C.,                4 NRC/NRR            to Wu, NRR, et. al.,                      NRC/NRR re: Proposed VY License Condition, on Steam Dryer Integrity at EPU Power Level.
ML050070182 Ennis, R. B.,      E-mail - Ennis, NRR,  1/3/2005  E-Mail    Wu, C.,                4 NRC/NRR            to Wu, NRR, et. al.,                      NRC/NRR re: Proposed VY License Condition, on Steam Dryer Integrity at EPU Power Level.
ML050070186 Sheron, B. W.,    E-mail - Sheron,      1/3/2005  E-Mail    Howe, A. G.,            2 NRC/NRR            NRR, to Howe, NRR,                        NRC/NRR et. al., re: Proposed VY License Condition, on Steam Dryer Integrity at EPU Power Level.
ML050070186 Sheron, B. W.,    E-mail - Sheron,      1/3/2005  E-Mail    Howe, A. G.,            2 NRC/NRR            NRR, to Howe, NRR,                        NRC/NRR et. al., re: Proposed VY License Condition, on Steam Dryer Integrity at EPU Power Level.
Accession      Author          Title/Description: Document    Document  Addressee /  Comment Page Number    Name/Affiliation:                          Date      Type    Addressee            Count Affiliation ML050070210 Holden, C. F.,    E-mail - Holden,      1/3/2005  E-Mail    Sheron, B. W.,          2 NRC/NRR            NRR, to Sheron,                          NRC/NRR NRR, et. al., re:
Accession      Author          Title/Description: Document    Document  Addressee /  Comment Page Number    Name/Affiliation:                          Date      Type    Addressee            Count Affiliation ML050070210 Holden, C. F.,    E-mail - Holden,      1/3/2005  E-Mail    Sheron, B. W.,          2 NRC/NRR            NRR, to Sheron,                          NRC/NRR NRR, et. al., re:
Proposed VY License Condition, on Steam Dryer Integrity at EPU Power Level.
Proposed VY License Condition, on Steam Dryer Integrity at EPU Power Level.
ML050070205 Scarbrough, T. G., E-mail - Scarbrough,  1/4/2005  E-Mail    Ennis, R. B.,            2 NRC/NRR            NRR, to Ennis, NRR,                      NRC/NRR re: Proposed VY License Condition, on Steam Dryer Integrity at EPU Power Level.
ML050070205 Scarbrough, T. G., E-mail - Scarbrough,  1/4/2005  E-Mail    Ennis, R. B.,            2 NRC/NRR            NRR, to Ennis, NRR,                      NRC/NRR re: Proposed VY License Condition, on Steam Dryer Integrity at EPU Power Level.
January 12,2005 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                    )
January 12,2005 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                    )
ENTERGY NUCLEAR VERMONT YANKEE                      )          Docket No. 50-271-OLA LLC and ENTERGY NUCLEAR                          )
ENTERGY NUCLEAR VERMONT YANKEE                      )          Docket No. 50-271-OLA LLC and ENTERGY NUCLEAR                          )

Latest revision as of 04:52, 15 March 2020

Vermont Yankee - Letter from Brooke D. Poole to Administrative Judges Enclosing Hearing File Index, Privilege Log, and Affidavit of John P. Boska
ML050320244
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/18/2005
From: Poole B
NRC/OGC
To: Anthony Baratta, Karlin A, Rubenstein L
Atomic Safety and Licensing Board Panel
Byrdsong A T
References
50-271-OLA, ASLBP 04-832-02-OLA, RAS 9192
Download: ML050320244 (63)


Text

-. o UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 18, 2005 Administrative Judge Alex S. Karlin, Chair Administrative Judge Lester S. Rubenstein Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission 4270 E Country Villa Drive Mail Stop: T-3F23 Tucson, AZ.85718 Washington, DC 20555-0001 Administrative Judge Anthony J. Baratta Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of ENTERGY NUCLEAR VERMONT YANKEE LLC and ENTERGY NUCLEAR OPERATIONS; INC.

(Vermont Yankee Nuclear Power Station)

Docket No. 50-271 -OLA

Dear Administrative Judges:

Pursuant to 10 C.F.R. § 2.1203(a), the staff of the Nuclear Regulatory Commission ("Staff") herein notifies the Licensing Board and the parties that a hearing file has been created for this proceeding.

The hearing file includes materials required pursuant to 10 C.F.R. § 2.1203, as well as the Staff's mandatory disclosures produced pursuant to 10 C.F.R. § 2.336(b). Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System ("ADAMS").

An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1. In addition, on or about Wednesday, January 19, 2005, the hearing file will be made available via the Electronic Hearing Docket ("EHD"), which may be accessed atthefollowing URL: /http://www.nrc.gov/reading-rmfehd.htmV/. The hearing file will be contained in a sub-folder entitled, 'Vermont Yankee EPU Hearing File" in the 'Vermont Yankee 271" folder of the EHD.

In addition, as required by 10 C.F.R. § 2.336(b)(5),the Staff is producing privilege logs at this time, which are appended hereto as Attachments 2 and 3. The Staff will preserve and maintain all privileged documents during the pendency of this proceeding. Also attached, as required by 10 C.F.R. § 2.336(c), is the Affidavit of John P. Boska.

Sincerely, Brooke D. Poole Counsel for NRC Staff

Enclosures:

Hearing File Index Privilege Log - Deliberative Process Privilege Log - Proprietary Information Affidavit of John P. Boska

ATTACHMENT 1 VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX INITIAL DISCLOSURES - JANUARY 18, 2005 Accession Number Document Date Title/Description 1 ML043310029 7/11/1967 Proposed General Design Criteria, 10 C.F.R. Part 50, Appendix A.

2 ML003740249 5/31/1996 Regulatory Guide 1.82 (Draft was issued as DG-1 038), Revision 2, Water Sources for Long-Term Recirculation Cooling Following Loss-Of-Coolant Accident.

3 ML003771958 12/14/2000 Vermont Yankee Nuclear Power Station-Safety Evaluation of Licensee Response to Generic Letter 96-05 (TAC No. M97114).

4 ML023440030 12/31/2002 NUREG-0800, Standard Review Plan, Section 14.2.1, Draft Revision 0, Generic Guidelines for Extended Power Uprate Testing Programs.

5 ML032170332 7/31/2003 Licensing Topical Report, Constant Pressure Power Uprate.

6 ML042090232 9/11/2003 E-mail from R. Williams of Vermont Yankee to VY All Users, regarding VY News Release on Uprate Filing.

7 ML042090261 9/23/2003 E-mail from T. Williams of Vermont Yankee to VY All Users, regarding VY Letter to Vermont PSB.

8 ML032810447 10/1/2003 Vermont Yankee - Technical Specification Proposed Change No. 263, Supplement No. 1 Regarding Extended Power Uprate, Technical Review Guidance.

9 ML042090273 10/8/2003 E-mail from J. Thayer of Vermont Yankee to VTY - All Users, regarding Power Uprate News.

10 ML033090072 10/28/2003 Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 2, Extended Power Uprate - Grid Impact Study.

11 ML033100141 10/28/2003 Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 3, Extended Power Uprate - Updated Information.

Accession Number Document Date Title/Description 12 MLO33040397 10/30/2003 10/30/2003 Meeting Handouts for Meeting With Entergy re: Issues for Alternate Source Term, Power Uprate & ACTS/MELLLA Application.

13 ML033100047 10/30/2003 Sign-in Sheet for 10/30/2003 Meeting With ENVY and ENO To Discuss ARTS/MELLLA, Alternate Source Term, and Extended Power Uprate Applications (TAC Nos. MB8070, MC0253, and MC0761).

14 ML042080354 11/5/2003 E-mail from J. Thayer of Vermont Yankee to VTY - All Users, regarding Power Uprate Project Announcement.

15 ML033100023 11/19/2003 10/30/2003 Meeting with Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc Regarding ARTS/MELLLA, Alternate Source Term, and Extended Power Uprate Applications (TAC Nos. MB8070, MC0253, and MC0761).

16 ML033140347 11/30/2003 Regulatory Guide 1.82, Revision 3, Water Sources for Long-Term Recirculation Cooling Following a Loss-Of-Coolant Accident.

17 ML033180088 12/15/2003 Vermont Yankee Nuclear Power Station - Extended Power Uprate Acceptance Review.

18 ML033160187 12/16/2003 Vermont Yankee Nuclear Power Station, Withholding From Public Disclosure, NEDC-33090P, Revision 0, (TAC MC0761).

19 ML033640024 12/24/2003 Review Standard RS-001, Revision 0, "Review Standard for Extended Power Uprates".

20 ML033640138 12/30/2003 Vermont Yankee, Draft Request for Additional Information (TAC No. MC0761).

21 ML040090411 1/9/2004 NPSH for BWR Extended Power Upgrades (EPU).

22 ML042080410 1/14/2004 E-mail from B. Cosgrove of Vermont Yankee to VTY - All Users, regarding PSB Uprate Hearings - Focus on NRC Timetable.

23 ML040360118 1/31/2004 Vermont Yankee - Technical Specification Proposed Change No. 263, Supplement No. 4 Regarding Extended Power Uprate, NRC Acceptance Review.

Accession Number Document Date Title/Description 24 ML040480640 1/31/2004 Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263, Supplement No. 5 - Extended Power Uprate - Response to Request for Additional Information.

25 ML042330094 2/9/2004 E-mail from Nichols to Timothy O'Hara re: Entergy VY EPU Mods.

26 ML040400161 2/19/2004 Vermont Yankee Nuclear Power Station, Request for Withholding Information from Public Disclosure (TAC No. MC0761).

27 ML040500302 2/20/2004 Vermont Yankee Nuclear Power Station - Extended Power Uprate Acceptance Review (TAC No. MC0761).

28 ML040630192 3/2/2004 2003-04 Annual Assessment Letter - Vermont Yankee.

29 ML042080446 3/3/2004 E-mail from B. Cosgrove of Vermont Yankee to VTY - All Users, regarding Leahy -

Jeffords Letter.

30 ML040710568 3/4/2004 Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Supplement No. 6 Extended Power Uprate - Withholding Proprietary Information.

31 ML041130149 3/5/2004 G20040084/LTR-04-0240 - Independent Safety Assessment for Vermont Yankee Uprate.

32 ML040850076 3/15/2004 G20040206/LTR-04-0168 - Letter - Rep. Michael Dworkin re: Independent Safety Assessment of Vermont Yankee.

33 ML040410022 3/19/2004 Vermont Yankee Nuclear Power Station, Withholding From Public Disclosure, "Responses to Request for Additional Information" (Attachment 1 to letter BVY 04-008).

34 ML040840415 3/24/2004 03/31/2004 - Notice of Forthcoming Meeting with Vermont Yankee re: Information about the NRC's Review of Vermont Yankee's Power Uprate Application.

Accession Number Document Date Title/Description 35 ML042090271 3/2512004 E-mail from D. Pelton of USNRC to R. Daflucas of Vermont Yankee, regarding Previous E-mail from R. Daflucas of Vermont Yankee, re: Updated EPU Meeting with Bill Ruland, NRR.

36 ML042080097 3/25/2004 E-mail from J. Thayer of Vermont Yankee to VTY - All Users, regarding Power Uprate Approval.

37 ML040850352 3/25/2004 Press Release-1-04-015: NRC to Hold Meetings On Vermont Yankee Nuclear Plant Performance and Power Uprate Review.

38 ML041040352 3/31/2004 LTR-04-0223 - Letter - Michael H. Dworkin, David C. Coen and John D. Burke, State of Vermont, Public Service Board Request for Independent Engineering Assessment of Vermont Yankee.

39 ML041170438 514/2004 G20040206/LTR-04-0168 - Michael Dworkin Letter re: Vermont Public Service Board Request for Independent Engineering Assessment of Vermont Yankee 40 ML041260114 5/5/2004 Press Release-04-055: NRC Provides Update On Review Process For Vermont Yankee Uprate Request.

41 ML043560272 5/25/2004 E-mail from Rick Ennis, NRR, to Ronda Daflucas, Entergy, re: Draft RAls for Vermont Yankee EPU.

42 ML043020539 5/27/2004 E-mail from M. Johnson, NRR, to R. Dennig, NRR, et al., re: Credit for Overpressure.

43 ML043560296 5/28/2004 E-mail from Rick Ennis, NRR, to Ronda Daflucas, Entergy, re: RAls dated 5/28/04, on Vermont Yankee EPU.

44 ML041450020 5/28/2004 Vermont Yankee - Request for Additional Information - Extended Power Uprate.

45 ML042150149 6/1/2004 E-mail from Ronda Daflucas, Entergy, to Rick Ennis, NRC, re: NRR Reviewer EPU RAI Telecons.

46 ML042150127 6/1/2004 E-mail from Ronda Daflucas, Entergy, to Rick Ennis, NRC, re: RAls dated 5/28/04.

Accession Number Document Date Title/Descriptlon 47 ML043560310 6/2/2004 E-Mail from Rick Ennis, NRR, to Ronda Daflucas, Entergy, re: SE Template for Vermont Yankee EPU.

48 ML042330183 6/2/2004 E-Mail from Ronda Daflucas, Entergy, to Rick Ennis, NRC, re: Vermont Yankee EPU Conference Calls.

49 ML043560361 6/3/2004 E-mail from Rick Ennis, NRR, to Ronda Daflucas, Entergy, re: Additional RAI for Vermont Yankee EPU, on HVAC systems.

50 ML042150060 6/3/2004 E-mail from Ronda Daflucas, Entergy, to Rick Ennis, NRC, re: Additional RAI.

51 ML043020459 6/4/2004 E-mail M. Stutzke, NRR, to B. Mozafari, NRR, re: VY Containment Overpressure Risk Assessment.

52 ML043020488 6/8/2004 E-mail from R. Ennis, NRR, to R. Lobel, NRR, re: Overpressure & Appendix J.

53 ML043020497 6/9/2004 Briefing Slides: Credit for Accident Pressure in Calculated NPSH for ECCS and Containment Heat Removal Pumps.

54 ML042330193 6/9/2004 E-Mail from Jim Devincentis, Entergy, to Rick Ennis, NRC, re: Comments on EPU and AST.

55 ML042150067 6/9/2004 E-mail from Ronda Daflucas, Entergy, to Rick Ennis, NRC, re: Comments on EPU and AST.

56 ML050050060 6/9/2004 Email from Ennis, NRR, to DeVicentis, Entergy, re: Comments on EPU and AST.

57 ML043560387 6/10/2004 E-mail from Ennis, NRR, to Pettis, NRR, re: VY EPU, Original Startup Test Report.

58 ML041670266 6/17/2004 07/22/2004 - Notice of Meeting with Entergy Nuclear Vermont Yankee, LLC (Entergy) and GE Nuclear Energy (Gene) to Discuss the Steam Dryer Analysis Associated with the Proposed Extended Power Uprate for Vermont Yankee Nuclear Power Station.

59 ML043030234 6/22/2004 Briefing Slides: Credit for Accident Pressure in Calculated NPSH for ECCS and Containment Heat Removal Pumps.

Accession Number Document Date Title/Description 60 ML043030245 6/23/2004 Briefing Slides: Credit for Accident Pressure in Calculated NPSH for ECCS and Containment Heat Removal Pumps.

61 ML043070023 6/24/2004 E-mail from R. Dennig, NRR, to S. Black, re: Meeting with Jim Dyer 06/29 at 3:00 PM

- Sherman Letter Comments.

62 ML043030254 6/24/2004 E-mail from S. Black, NRR, to F. Eltawila, RES, re: VY Calculations.

63 ML033140025 6/25/2004 Vermont, Notice of Consideration of Issuance of Amendment to Facility Operating License for Extended Power Uprate and Opportunity for Hearing (TAC No. MC0761).

64 ML043070024 6/28/2004 E-mail from R. Ennis, NRR, to J. Dyer, NRR, re: Changes to Sherman Letter.

65 ML041800049 6/28/2004 Press Release-04-079: NRC Updates Vermont Public Service Board On Status Of Vermont Yankee Uprate Review.

66 ML043030269 6/29/2004 Briefing Slides: Credit for Accident Pressure in Calculated NPSH for ECCS and Containment Heat Removal Pumps.

67 ML043030274 6/29/2004 Briefing Slides: Credit for Accident Pressure in Calculated NPSH for ECCS and Containment Heat Removal Pumps.

68 ML041810433 6/29/2004 Vermont Yankee, 06/29/04 E-mail - Compliance with NRC Regulatory Compliance (TAC MC0761).

69 ML040800004 6/29/2004 Y020030194 - William K. Sherman Letter re: Vermont Yankee Nuclear Power Station Extended Power Uprate - Questions.

70 ML043570209 6/30/2004 E-mail from Rick Ennis, NRR, to Ronda Daflucas, Entergy, re: New RAI Questions on Vermont Yankee EPU.

71 ML041740039 7/6/2004 Vermont Nuclear Power Station, Request for Additional Information, Extended Power Uprate, TAC No. MC0761.

72 ML043570508 7/8/2004 E-mail from Ward, NRR, to Daflucas, Entergy, re: RELAP5 Vermont Yankee Input Deck, First 11 Pages to Help Identify the Deck.

Accession Number Document Date Title/Description 73 ML041910021 7/9/2004 07/21/2004 - Notice of Partially Closed Meeting with Entergy Nuclear Operations regarding Vermont Yankee Nuclear Power Station.

74 ML043570221 7/20/2004 E-mail from Rick Ennis, NRR, to Ronda Daflucas, Entergy, re: EA for VY EPU, Accomplishments in Spring 2004 Outage.

75 ML043570278 7/28/2004 E-mail from Rick Ennis, NRR, to Ronda Daflucas, Entergy, re: Vermont Yankee Steam Dryer, Commitments for Inspection of Flaws.

76 ML042160026 8/11/2004 Summary of July 7, 2004, Phone Call with Entergy Nuclear re: Vermont Yankee.

77 ML042320605 8/12/2004 Vermont Yankee Nuclear Power Station - RELAP5/MOD3 Computer Code.

78 ML042320080 8/12/2004 Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Supplement No. 11 Extended Power Uprate - Response to Request for Additional Information.

79 ML042180463 8/31/2004 Vermont Yankee Nuclear Power Station, Withholding From Public Disclosure (TAC No. MC0761).

80 ML042440537 9/1/2004 Vermont Yankee Nuclear Power Station, Request for Additional Information -

Extended Power Uprate (TAC No. MC0761).

81 ML042220022 9/2/2004 07/21/2004 & 07/22/2004 - Summary of Meeting with Entergy Nuclear Operations, Inc., on Steam Dryer Analysis (TAC No. MC0761).

82 ML042510395 9/2/2004 Attachments 1 through 4 of 07/21/2004 & 07/22/2004 Summary of Meeting with Entergy Nuclear Operations, Inc., on Steam Dryer Analysis (TAC No. MC0761).

83 ML043570407 9/13/2004 E-mail - Ennis, NRR, to Ward, NRR, re: RELAP Nodalization, Diagram from Entergy for Vermont Yankee.

84 ML042540008 9/14/2004 09/29/2004 - Notice of Meeting with Entergy Nuclear Vermont Yankee, LLC (Entergy) to Discuss the Steam Dryer Analysis Associated with the Proposed Extended Power Uprate.

Accession Number Document Date Title/Description 85 ML042640197 9/1412004 Vermont Yankee Nuclear Power Station - Technical Specification Proposed Change No. 263 - Supplement No. 13 Extended Power Uprate - Response to Steam Dryer Action Items.

86 ML042860275 9/15/2004 Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information.

87 ML042360228 9/17/2004 Y020040126 - David O'Brien Letter re: Vermont Yankee Nuclear Power Station regarding Extended Power Uprate.

88 ML050050064 9/22/2004 E-mail from Howe, NRR, to Ennis, NRR, re: Action: Note to File on Call with Vermont Yankee Staff on Steam Dryer Issues.

89 ML042720217 9/23/2004 Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 15 Extended Power Uprate - Response to Steam Dryer Action Item No. 2.

90 ML042820142 9/30/2004 Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 17 Extended Power Uprate - Response to Request for Additional Information related to the 10 CFR 50 Appendix R Timeline.

91 ML042820137 9/30/2004 Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 16 Extended Power Uprate - Additional Information Related to Request for Additional Information EMEB-B-5.

92 ML042870195 10/5/2004 Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement

____ _No. 18 Extended Power Uprate - ECCS Pump Net Positive Suction Head Margin.

93 ML043020491 10/7/2004 Informal Staff Calculation of Risk of Losing Containment Overpressure.

94 ML042880351 10/7/2004 Vermont Yankee Nuclear Power Station - Technical Specification Proposed Change M.No. 263 - Supplement No. 19 Extended Power Uprate - Initial Plant Test Program.

95 ML042640055 10/13/2004 10/13/04 - Vermont Yankee Extended Power Uprate Schedule.

Accession Number Document Date Title/Description 96 ML042680087 10/13/2004 Vermont Yankee Nuclear Power Station- Technical Audit of Steam Dryer Analysis in Support of Extended Power Uprate Request (TAC No MC0761).

97 ML042650265 10/15/2004 Vermont Yankee Nuclear Power Station - Extended Power Uprate Review Schedule (TAC No. MC0761).

98 ML042950139 10/28/2004 Vermont Yankee- Summary of September 21, 2004 Conference Call with Entergy re:

Vermont Yankee Steam Dryer.

99 ML043030404 10/29/2004 11/09/2004 - Vermont Yankee Meeting between the NRC and Entergy to Present the Results of NRC's Engineering Team Inspection.

100 ML043100470 11/5/2004 Vermont Yankee Nuclear Power Station - Preliminary Results of the August 2004, Engineering Team Inspection.

101 ML050040048 11/9/2004 GE Services Information Letter No. 644, Revision 1, BWR Steam Dryer Integrity.

102 ML050060086 11/12/2004 Content of VY Steam Dryer Audit Report, Non-Proprietary.

103 ML043130318 12/1/2004 Request for Withholding Information From Public Disclosure, Vermont Yankee (TAC No. MC0761).

104 ML043130347 12/1/2004 Request for Withholding Information From Public Disclosure, Vermont Yankee (TAC

__ No. MC0761).

105 ML043340269 12/2/2004 IR 05000271-04-008; 08/09/2004-09/03/2004; Vermont Yankee Nuclear Generating Station; Functional Review of Low Margin/Risk Significant Components and Human Actions.

106 ML043570342 12/7/2004 E-mail from Ennis, NRR, to Daflucas, Entergy, re: VY EPU Draft RAIs, Round 5.

107 ML043510227 12/8/2004 Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 22 Extended Power Uprate - 10 CFR 50 Appendix R Timeline Verification.

Accession Number Document Date Title/Description 108 ML043490173 12/9/2004 Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 21 Extended Power Uprate - Steam Dryer Power Ascension Testing.

109 ML043370049 12/21/2004 Vermont Yankee, Request for Additional Information, Extended Power Uprate, (TAC No. MC0761).

110 ML050070201 1/6/2005 E-mail from Daflucas, Entergy, to Ennis, NRR, re: Agenda for NRC Meeting, to Discuss Steam Dryer Analyses.

111 ML050070196 1/6/2005 E-mail from Ennis, NRR, to Daflucas, Entergy, re: Agenda for NRC Meeting, to Discuss Steam Dryer Analyses.

ackage - Vermont Yankee EPU Original Application Accession Number Document Date Title/Description 112 ML032580089 9/10/2003 Vermont Yankee, Technical Specification Proposed Change No. 263 Extended Power Uprate.

113 ML032580103 9/30/2003 Safety Analysis Report for Vermont Yankee Nuclear Power Station Constant

__ Pressure Power Uprate.

Package - Vermont Yankee EPU Application, Suppleme nt 8 Accession Number Document Date Title/Description 114 ML042080464 7/2/2004 Letter Transmitting Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Supplement No. 8, Extended Power Uprate - Response to Request for Additional Information.

115 ML042080475 7/2/2004 Vermont Yankee Nuclear Power Station Calculation VYC-2314, Revision 0 and CCN 01, "Minimum Containment Overpressure for Non-LOCA Events."

116 ML042090103 7/2/2004 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 263 Extended Power Uprate - Supplement No. 8 Response to Request for Additional Information.

117 ML042080469 7/2/2004 Vermont Yankee Nuclear Power Station, Calculation VYC-808, Revision 6 and CCNs 01, 03, 04 and 05, "Core Spray and Residual Heat Removal Pump Net Positive Suction Head Margin Following a Loss of Coolant Accident with Fibrous Debris on the

.I __ . Intake...."

Package - Vermont Yankee EPU Application, Supplement 9 Accession Number Document Date Title/Descriptlon 118 ML042260451 7/20/2004 Calculation VYC-0808, Rev. 6, CCN 06, "Core Spray and Residual Heat Removal Pump Net Positive Suction Head Margin Following a Loss of Coolant Accident or Anticipated Transient Without Scram."

119 ML042260453 7/20/2004 Calculation VYC-2314, Rev. 0, CCN 02, "Minimum Containment Overpressure for Non-LOCA Events."

120 ML042250140 7/27/2004 Vermont Yankee Nuclear Power Station - Technical Specification Proposed Change No. 263 - Supplement No. 9, Extended Power Uprate - Revised Containment Overpressure Envelope.

Package - Vermont Yankee EPU Application, Supplement 10 Accession Number Document Date Title/Description 121 ML042160195 7/30/2004 Vermont Yankee - Technical Specification Proposed Change No. 263, Supplement No. 10 Extended Power Uprate, Response to Request for Additional Information, Attachment 2.

122 ML042160188 7/30/2004 Vermont Yankee - Technical Specification Proposed Change No. 263, Supplement No. 10 Extended Power Uprate, Response to Request for Additional Information.

Package - Vermont Yankee EPU Application, Supplement 12 Accession Number Document Date Title/Description 123 ML042430573 11/11/2003 Attachment 2, Vermont Yankee - Proposed Technical Specification Change No. 263 -

Supplement No. 12 Extended Power Uprate - Revised Grid Impact Study.

124 ML042430566 8/25/2004 Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 12, Extended Power Uprate - Revised Grid Impact Study.

Package - Vermont Yankee EPU pplication, Supplement 20 Accession Number Document Date Title/Description 125 ML042890417 9/29/2004 Vermont Yankee Nuclear Power Station - Proposed Technical Specification Change No. 263 - Supplement No. 20 Extended Power Uprate - Meeting on Steam Dryer Anarysis Meeting Presentation Slides.

126 ML042890410 10/7/2004 Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement

. No. 20, Extended Power Uprate - Meeting on Steam Driver Analysis.

ATTACHMENT 2 VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - PROPRIETARY INFORMATION INITIAL DISCLOSURES - JANUARY 18, 2005 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain trade secrets, privileged or confidential commercial or financial information subject to withholding from public disclosure pursuant to 10 C.F.R. § 2.390. Pursuant to 10 C.F.R. § 2.336(b)(5), the Staff is providing this log to identify the following documents, designated "proprietary," and subject to protected status under Section 2.390.

Accession Author Title/Description Document Document Addressee / Comment Page Number Name/Affiliatlon Date Type Addressee 'Count Affiliation ML032170343 Roberts C C, Licensing Topical 7/31/2003 Topical Files contained on 309 General Electric Report, Constant Report CD-ROMs Co. Pressure Power submitted with Uprate. document were added to ADAMS.

Copies of the Public CD-ROM are available from the NRC Public Document Room and NRC File Center. Copies of the Proprietary CD-ROM are available to the NRC Staff through the NRC File Center.

Accession Author Title/Description Document Document Addressee I Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML032580111 Schrull, E. D., Attachment 4 9/30/2003 Topical 214 General Electric Vermont Yankee Report Co. Proposed Technical Specification Change No. 263 Extended Power Uprate NEDC-3390P (Proprietary Information).

ML040360119 Entergy Nuclear GE-VYNPS-AEP- 1/29/2004 Topical 123 Northeast, 308, Rev. 0, "GE Report General Electric Generic Disposition Co. Matrix."

ML040360124 Entergy Nuclear Attachment 1, 1/31/2004 Report, 122 Northeast "Vermont Yankee Technical Nuclear Power Station Proposed Technical Specification Change No. 263, Extended Power Uprate -

Supplement No. 5 -

Responses to Request for Additional Information."

Accession Author Title/Description Document Document Addressee I Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML040710572 Thayer, J. R., BVY 04-008, 3/4/2004 Letter NRC/Document 3 Entergy Nuclear Attachment 1 - Control Desk Operations, Inc, CPPU Submittal RAI Entergy Nuclear Response Regarding Vermont Yankee, Technical LLC Specification Proposed Change No. 263 Supplement No.6, Extended Power Uprate.

ML042090107 Thayer, J. K., Vermont Yankee 7/2/2004 Letter, Other NRC/Document Document 65 Entergy Nuclear Nuclear Power Control Desk submitted for Operations, Inc, Station, Proposed scanning contained Entergy Nuclear Technical poor quality Vermont Yankee, Specification Change page(s) and/or LLC No. 263 - page(s) which Supplement No. 8, appeared to be Extended Power missing.

Uprate, Response to Document is Request for complete per Additional submitter.

Information.

Accession Author Title/Description Document Document Addressee / Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML042650262 Hwang, H. R., Appendix D - 7/21/2004 Slides and 21 General Electric Technical Audit of Viewgraphs Co. Vermont Yankee Steam Dryer Analysis in Support of Extended Power Uprate Request (TAC MC0761).

ML042160200 Entergy Nuclear Vermont Yankee - 7/30/2004 Technical 41 Northeast Technical Specification Specification - Bases Proposed Change Change No. 263, Supplement No. 10 Extended Power Uprate, Response to

( Request for Additional Information, Attachment 1. .

Accession Author TitlelDescription Document Document Addressee / Comment Page Number NamelAffiliation Date Type Addressee Count Affiliation ML042320084 Thayer, J. K., Attachment 8112/2004 Technical NRC/Document 125 Entergy Nuclear 1,Vermont Yankee Specification Control Desk Northeast, Nuclear Power - Bases Entergy Nuclear Station, Proposed Change Operations, Inc Technical Specification Change No. 263-Supplement No. 11, Extended Power Uprate Response to Request for Additional Information.

ML042650261 Wu, R., General Appendix C - 8/24/2004 Slides and 36 Electric Co. Technical Audit of Viewgraphs Vermont Yankee Steam Dryer Analysis in Support of Extended Power Uprate Request (TAC MC0761). .

Accession Author Title/Description Document Document Addressee I Comment Page Number NamelAffiliation Date Type Addressee Count Affiliation ML050060089 Wu, R., General MFN 04-120, 8/24/2004 Audit Report Proprietary 64 Electric Nuclear 'Technical Audit of document Energy Owners Vermont Yankee submitted in paper Group Steam Dryer and electronic form Analysis in on CD-ROM.

Support of Extended Paper version was Power Uprate scanned and Request." added to ADAMS.

Copies of the CD-ROM are available to the NRC Staff through the NRC File Center.

Document submitted for scanning contained poor quality page(s) and/or page(s) which appeared to be missing.

Document is complete per submitter.

Accession Author Title/Description Document Document Addressee I Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML042650263 Dreyfuss, J.; Appendix F - 8/26/2004 Slides and 23 Hobbs, B.; Technical Audit of Viewgraphs Johnson, D.; Vermont Yankee Nichols, C.; Perez, Steam Dryer P.; Entergy Analysis in Support Nuclear, Inc of Extended Power Uprate Request (TAC MC0761).

ML042610382 NRC/NRR/DEI Technical Audit of 8/26/2004 Audit Report 102 EMCB Vermont Yankee Steam Dryer Analysis in Support of Extended Power Uprate Request.

ML042640199 Thayer, J. K., Attachment 1 to 9/14/2004 License- NRC/Document 27 Entergy Nuclear Vermont Yankee Application Control Desk Northeast Nuclear Power for Facility Station - Proposed Operating Technical License Specification Change (Amend/

No.263 - Renewal)

Supplement No. 13 DKT 50 Extended Power Uprate Response to Steam Dryer Action Items.

Accession Author Title/Description Document Document Addressee / Comment Page Number NamelAffiliation Date Type Addressee Count Affiliation ML042890419 Entergy Nuclear Vermont Yankee 9/29/2004 License- 140 Northeast Nuclear Power Application Station - Proposed for Facility Technical Operating Specification Change License No. 263 - (Amend/

Supplement No. 20 Renewal)

Extended Power DKT 50, Uprate - Meeting on Slides and Steam Dryer Viewgraphs, Analysis, Meeting Technical Presentation Slides - Specification Proprietary - Bases Information. . Change ATTACHMENT 3 VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS INITIAL DISCLOSURES - JANUARY 18, 2005 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.

§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.

Accession Author Title/Description Document Document Addressee / Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043580020 Scarbrough, T. G., E-mail - Scarbrough, 10/17/2003 E-Mail Wu, C., 4 NRC/NRR NRR, to Wu, NRR, NRC/NRR Re: Vermont Yankee Power Uprate, Draft RAls.

ML043580028 Scarbrough, T. G., E-mail - Scarbrough, 10/28/2003 E-Mail Terao, D., 2 NRC/NRR NRR, to Terao, NRR, NRC/NRR Re: Vermont Yankee Power Uprate Vibration Problems.

ML033300397 Lund, A. L., Request for 11/20/2003 Memoranda Clifford, J. W., 3 NRC/NRR/DE/ Additional NRC/NRR/

EMCB Information on DLPM Extended Power Uprate in Vermont Yankee Nuclear Power Station.

Accession Author Title/Descriptlon Document Document Addressee / Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML033440043 Rubin, M. P., Request for 12/4/2003 Memoranda, Clifford, J. W., 5 NRC/NRR/DSSA/ Additional Request for NRC/NRR/

SPSB Information (RAI) Additional DLPM/LPD1 Regarding Extended Information Power Uprate (EPU) (RAI) for Vermont Yankee (TAC MC0761).

ML033460249 Jenkins, R. V., Vermont Yankee RAI 12/12/2003 Memoranda, Clifford, J. W., 3 NRC/NRR/DE/ For Thermal Power Request for NRC/NRR/

EEIB Uprate. Additional DLPM/LPD1 Information (RAI)

ML043580035 Scarbrough, T. G., E-mail - Scarbrough, 2/5/2004 E-Mail Ennis, R., 2 NRC/NRR NRR, to Ennis, NRR, NRC/NRR Re: Vermont Yankee EPU Submittal, Acceptance Review on Flow Effects.

Accession Author Title/Description Document Document Addressee I Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043440386 Ennis, R. B., E-mail - Ennis, NRR, 3/4/2004 E-Mail Bongarra, J. P., 3 NRC/NRR to Bongarra, NRR, Cai, J., Coyne, et. al., Re: Vermont K., Davis, R.,

Yankee EPU Elliot, B. J.,

Schedule (TAC No. Gallucci, R.,

MC0761). Garg, H., Hart, M., Imboden, S., Kendrick, E., Lobel, R.

M., Parczewski, K., Pedersen, R. A., Pettis, R.

L., Reddy, D.,

Stutzke, M. A.,

Trehan, N.,

Walker, H., Wu, C., NRC/NRR ML040640591 Boyce, T. H., Request for 3/4/2004 Memoranda, Laufer, R.J., 16 NRC/NRR/DIPM/ Additional Request for NRC/NRR/

IROB Information for Additional DLPM/LPD1 Vermont Yankee Information Proposed Changes (RAI) toTS.

ML043580319 Helton, D. M., E-mail - Helton, 3/24/2004 E-Mail Wu, C., 5 NRC/RES RES, to Wu, NRR, NRC/NRR Re: VY Submittal, Comments on Steam Dryer Analysis.

Accession Author Title/Description Document Document Addressee / Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML040900523 Tappert, J. R., Request for 3/29/2004 Memoranda, Clifford, J. W., 3 NRC/NRR/DRIP/ Additional* Request for NRC/NRR/

RLEP Information (RAI) to Additional DLPM/LPD1 Support the Staff's Information Environmental (RAI)

Review for the Extended Power Uprate for Vermont Yankee Nuclear Power Station.

ML043440396 Ennis, R. B., E-mail - Ennis, NRR, 4/8/2004 E-Mail Clifford, J. W., 5 NRC/NRR to Howe, NRR, Re: Howe, A. G.,

D-Note to Leeds, E. J.,

Commissioner Marsh, T.,

Assistants on NRC/NRR Vermont Yankee EPU and AST.

ML041050140 Dean, W. M., 04/12/04 - Recent 4/12/2004 Note (draft) Beall, J. E.,

NRC/EDO/AO Staff Interactions Croteau, R. P.,

with Entergy on Holahan, G. M.,

Vermont Yankee Lopez-Otin, M.

Licensing Issues (To: E.,

Commissioner Zimmerman, J.

Assistants; From: W. I., NRC/OCM M. Dean).

S Accession Author Title/Description Document Document Addressee / Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043440401 Ennis, R. B., E-mail - Ennis, NRR, 4/16/2004 E-Mail Barrett, R., 6 NRC/NRR to Wang, NRR, et. Beckner, W. D.,

al., Re: Vermont Borchardt, R.

Yankee Steam Dryer W., Burnell, S.

Crack Info. R., Clifford, J.

W., Craig, C.,

Dyer, J. E.,

Grimes, C.,

Howe, A.,

Imbro, E. V.,

Jolicoeur, J.,

Kim, T., Leeds, E. J., Manoly, K. A.,

McMurtray, A.,

Reis, T.,

Ruland ,W.,

Scarbrough, T.

G., Screnci, D.,

Sheehan, N.,

Sheron, B.,

Skay, D.,

Terao, D.,

Wang, A., Wu, C., NRC/NRR

£ _ _ _ _ _ _ _ I _ _ _ _ _ _ _ _ _

Accession Author Title/Description Document Document Addressee I Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043440407 Terao, D., E-mail - Terao, NRR, 4/19/2004 E-Mail Clifford, J. W., 3 NRC/NRR to Clifford, NRR, Re: NRC/NRR Vermont Yankee Steam Dryer Crack Info.

ML043560254 Ennis, R. B., E-Mail - Ennis, NRR, 4/20/2004 E-Mail Lobel, R. M., 4 NRC/NRR to Lobel, NRR re: NRC/NRR RAls for VY Power Uprate on Containment Effects.

ML043570364 Stutzke, M. A., E-mail - Stutzke, 4/21/2004 E-Mail Lobel, R. M., E-mail envelope 2 NRC/NRR NRR, to Lobel, NRR, NRC/NRR properties page not re: Risk RAI related available.

to credit for containment pressure for ECCS pump NPSH.

Accession Author Title/Description Document Document Addressee/ Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043440426 Ennis, R. B., E-mail - Ennis, NRR, 4/22/2004 E-Mail Florek, D., 3 NRC/NRR/DLPM/ to McMurtray, NRR, Gray, E. H.,

LPD1 et. al., re: Followup Hernandez, J.,

to VY Steam Dryer Lorson, R.,

Call. Manoly, K. A.,

McMurtay, A.,

Scarbrough, T.

G., Sheng, C.,

Terao, D.,

NRC/NRR, NRC/NRR/DE/

EMCB, NRC/NRR/

DLPM, NRC/RGN-l ML050100304 Reddy, D. K., E-mail - Reddy, 4/26/2004 E-Mail Ennis, R. B., E-mail envelope 3 NRC/NRR NRR, to Ennis, NRR, NRC/NRR properties page not re: VY RAIs (TAC available.

MC0761).

ML043440412 Anderson, C. J., E-mail - Anderson, 4/30/2004 E-Mail Howe, A. G., 3 NRC/RGN-l RGN-I, to Howe, NRC/NRR NRR, re: VY Analysis Reviews on Steam Dryer Cracks.

Accession Author Title/Description Document Document Addressee / Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML041340510 Manoly, K. A., Request for 5/3/2004 Request for Clifford, J. W., 7 NRC/NRR/DE Additional Additional NRC/NRR/

Information -Vermont Information DLPM/LPD1 Yankee Nuclear (RAI)

Power Station, Technical Specification Proposed Change No. 263, Extended Power Uprate (TAC No. MC0761)

ML041330159 Akstulewicz, F. RAI Regarding 5/7/2004 Memoranda, Ennis, R. B., 3 M., Vermont Yankee Request for NRC/NRR/

NRC/NRR/DSSA/ Nuclear Power Additional DLPM/LPD1 SRXB Station License Information Amendment Request (RAI)

- Proposed Technical Specification Change No. 263- Extended Power Uprate (TAC No. MC0761).

ML043570344 Lobel, R. M., E-mail - Lobel, NRR, 5/18/2004 E-Mail Dennig, R. L., E-mail envelope 3 NRC/NRR to Dennig, NRR, re: NRC/NRR properties not NPSH Calculation available.

Conservatisms.

Accession Author Title/Description Document Document Addressee / Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043560267 Ennis, R. B., E-mail - Ennis, NRR, 5/20/2004 E-Mail Elliot, B. J., 25 NRC/NRR to Elliot, NRR, et. al, Imboden, S.,

re: Vermont Yankee Kendrick, E.,

RAIs - draft for Lobel, R. M.,

review. Pettis, R. L.,

Reddy, D., Wu, C., NRC/NRR ML050050021 Howe, A. G., E-mail - Howe, NRR, 5/25/2004 E-Mail Elliot, B. J., 4 NRC/NRR to Elliot, NRR, et. al., NRC/NRR re: Briefing for Brian Sheron - 5/26 1:00 PM - VY Steam Dryers.

ML043580042 Scarbrough, T. G., E-mail - Scarbrough, 5/26/2004 E-Mail Terao, D., 4 NRC/NRR NRR, to Terao, NRR, NRC/NRR re: EPU Next Steps Table - revised, on EPU Flow Effects.

ML043570362 Stutzke, M. A., E-mail - Stutzke, 6/4/2004 E-Mail Lobel, R. M., 3 NRC/NRR NRR, to Lobel, NRR, NRC/NRR Re: VY Containment Overpressure Risk Assessment.

Accession Author Title/Description Document Document Addressee / Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043560380 Ennis, R. B., E-mail - Ennis, NRR, 6/8/2004 E-Mail Lobel, R. M., 2 NRC/NRR to Lobel, NRR, re: NRC/NRR Overpressure &

Appendix J, for VY containment.

ML043560422 Ennis, R. B., E-Mail - Ennis, NRR, 6/16/2004 E-Mail Lobel, R. M., 2 NRC/NRR to Stutzke, NRR, re: Stutzke, M. A.,

RAI for VY on ECCS NRC/NRR Pump NPSH.

ML043570372 Lobel R. M., E-mail - Lobel, NRR, 6/16/2004 E-Mail, Ennis, R. B., E-mail envelope 5 NRC/NRR to Ennis, NRR, re: Request for NRC/NRR properties page not RAIs for VY on the Additional available.

NPSH issue. Information (RAI)

ML043440436 Yerokun, J. T., E-mail - Yerokun, 6/21/2004 E-Mail Howe, A., 6 NRC/NRR NRR to Howe, NRR, NRC/NRR re: Additional RAIs VY Extended Power Uprate.

ML043560473 Ennis, R. B., E-mail - Ennis, NRR, 6/21/2004 E-Mail Howe, A. G., 3 NRC/NRR to Howe, NRR, re: NRC/NRR Independent Calcs/Audits, for VY EPU.

Accession Author Title/Description Document Document Addressee / Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043560455 Ennis, R. B., E-mail - Ennis, NRR, 6/21/2004 E-Mail, Lobel, R. M., 12 NRC/NRR to Reddy, NRR and Letter, Reddy, D.,

Lobel, NRR, re: Request for NRC/NRR Vermont Yankee Additional RAls, Draft RAI for Information Review. (RAI)

ML043560462 Ennis, R. B., E-mail - Ennis, NRR, 6/23/2004 E-Mail Stutzke, M. A., 2 NRC/NRR to Stutzke, NRR and NRC/NRR Lobel, NRR, re:

RAls, for VY, Review of Progress on RAI on Loss of NPSH.

ML043570173 Black, S., E-mail - Black, NRR, 6/24/2004 E-Mail Dennig, R. L., E-mail envelope 2 NRC/NRR to Lobel, NRR, et. Ennis, R., properties page not al., re: VY calcs., Johnson, M., available.

Research Assistance Lobel, R. M.,

with Containment Tschiltz, M.,

Overpressure. NRC ML043560470 Lobel, R. M., E-mail - Lobel, NRR, 6/24/2004 E-Mail Black, S. C., 3 NRC/NRR to Black, NRR, Re: NRC/NRR Vermont Yankee Audit Calculations on Containment Conditions for NPSH. __.

Accession Author Title/Description Document Document Addressee / Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043570488 Lobel, R. M., E-mail - Lobel, NRR, 6/30/2004 E-Mail Ennis, R. B., E-mail envelope 4 NRC/NRR to Ennis, NRR, re: NRC/NRR properties page not Request for available.

Additional Information, TAC MC0761, Vermont Yankee EPU and NPSH.

ML043570468 Notafrancesco, A., E-mail - 6/30/2004 E-Mail Lobel, R. M., 5 NRC/RES Notafrancesco, RES NRC/NRR to Lobel, NRR, re:

Vermont Yankee Input List for LBLOCA Containment NPSH Calculations.

ML041840232 Jenkins, R. V., Vermont Yankee 7/1/2004 Memoranda Clifford, J. W., Memorandum 9 NRC/NRR/DE/ Thermal Power NRC/NRR/ contains draft input EMCB Uprate. DLPM/LPDI to safety evaluation regarding electrical system and environmental qualification of electrical components Accession Author Title/Description Document Document Addressee I Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043580311 Helton, D. M., E-mail - Helton, RES, 7/19/2004 E-Mail Wu, C., 2 NRC/RES to Wu, NRR, re: VY NRC/NRR RAI Responses, Comments on Steam Dryer Analysis.

ML043570255 Ennis, R. B., E-mail - Ennis, NRR, 7/21/2004 E-Mail Manoly, K. A., 2 NRC/NRR to Manoly, NRR, re: NRC/NRR EPU Review Standard SE Section for Steam Dryer. .

ML043440453 Holden, C. F., E-Mail - Holden, 7/21/2004 E-Mail Ennis, R. B., 2 NRC/NRR NRR, to Ennis, NRR, NRC/NRR et. al., re: Summary of VY Steam Dryer Analysis Meeting.

ML043570270 Elliot, B. J., E-mail - Elliot, NRR, 7/26/2004 E-Mail Ennis, R. B., 2 NRC/NRR to Ennis, NRR, re: NRC/NRR VYNPS EPU Confirmatory Items.

ML043580048 Scarbrough, T. G., E-mail - Scarbrough, 7/26/2004 E-Mail Elliot, B. J., 2 NRC/NRR NRR, to Elliot, NRR, NRC/NRR re: Vermont Yankee EPU, Cracks InThe Steam Dryer.

Accession Author Title/Description Document Document Addressee / Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043580119 Scarbrough, T. G., E-mail - Scarbrough, 7/27/2004 E-Mail Imbro, G., 13 NRC/NRR NRR, to Imbro, NRR, NRC/NRR re: VY EPU Flow Effect Slides.

ML043580306 Helton, D. M., E-mail - Helton, RES, 7/30/2004 E-Mail Malik, S. N., 5 NRC/RES to Malik, RES, re: NRC/RES Thoughts on 07/21-22/04 Meetings with GE/Entergy on Steam Dryer Analysis for VY EPU.

ML042050427 Weerakkody, S., Fire Protection 7/31/2004 Memoranda, Howe, A. G., 4 NRC/NRR/DSSA/ Safety Evaluation for Safety NRC/NRR/

SPLB Vermont Yankee Evaluation DLPM/LPD1 Extended Power Uprate.

ML043510106 Chen, S. S., Review of the 8/6/2004 Report, 10 Mulcahy, T. M., Vermont Yankee Technical Shah, V. N., Steam Dryer Integrity Argonne National Issue Associated Lab (ANL) with Uprated Power Operation Licensing Actions.

Accession Author Title/Description Document Document Addressee / Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043620145 Elliot, B. J., E-mail - Elliot, NRR, 8/9/2004 E-Mail Ennis, R., 3 NRC/NRR to Ennis, NRR, re: NRC/NRR Vermont Yankee Power Uprate, License Condition for Vessel Test Capsules.

ML042290204 Chan, T. L., Safety Evaluation on 8/9/2004 Memoranda, Howe A G, 5 NRC/NRR/DE/ License Amendment Safety NRC/NRR/

EMCB Request for 20 Evaluation DLPMILPD1 Percent Power Uprate for Vermont Yankee Nuclear Power Station (TAC No. MC0761).

ML043570245 Ennis, R. B., E-mail - Ennis, NRR, 8/16/2004 E-Mail Notafrancesco, 3 NRC/NRR to Notafrancesco, A., NRC/RES RES, Re: Vermont Yankee EPU Supplement 11.

Accession Author TitlelDescription Document Document Addressee I Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043570229 Ennis, R. B., E-mail - Ennis, NRR, 8/16/2004 E-Mail Scarbrough, T. 2 NRC/NRR to Scarbrough, NRR, G., NRC/NRR re: ANL Reports on Vermont Yankee Dryers.

ML043580130 Scarbrough, T. G., E-mail - Scarbrough, 8/16/2004 E-Mail Ennis, R. B., 2 NRC/NRR NRR, to Ennis, NRR, NRC/NRR Re: GE Audit of Analysis for EPU Flow Effects at VY.

ML043570357 Manoly, K. A., E-mail - Manoly, 8/16/2004 E-Mail Ennis, R. B., 2 NRC/NRR NRR, to Ennis, NRR, NRC/NRR re: ANL Reports on Vermont Yankee Dryers.

ML042310744 Tappert, J. R., Draft Environmental 8/18/2004 Environ- Clifford, J. W., 27 NRC/NRR/DRIP/ Assessment of mental NRC/NRR/

RLEP Extended Power Assessment, DLPM/LPD1 Uprate for Vermont Federal Yankee Nuclear Register Power Station. Notice, Memoranda Accession Author Title/Description Document Document Addressee / Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043570272 Ennis, R. B., E-mail - Ennis, NRR, 8/18/2004 E-Mail Elliot, B. J., 2 NRC/NRR to Elliot, NRR, re: NRC/NRR Vermont Yankee Power Uprate, License Condition for Vessel Test Capsules.

ML043570248 Ennis, R. B., E-mail - Ennis, NRR, 8/18/2004 E-Mail Elliot, B. J., 2 NRC/NRR to Elliot,NRR, re: NRC/NRR Vermont Yankee Power Uprate, License Condition for Vessel Test Capsules. .

ML043580137 Scarbrough, T. G., E-mail - Scarbrough, 8/18/2004 E-Mail Ennis, R. B., 3 NRC/NRR NRR, to Ennis, NRR, NRC/NRR re: GE Audit of Analysis for EPU Flow Effects at VY.

ML043580143 Scarbrough, T. G., E-mail - Scarbrough, 8/18/2004 E-Mail Wu, C., 3 NRC/NRR NRR, to Wu, NRR, NRC/NRR et. al., re: GE Steam Dryer Analysis. .

Accession Author Title/Description Document Document Addressee / Comment Page Number NamelAffiliation Date Type Addressee Count Affiliation ML043620017 Ennis, R. B., E-mail - Ennis, NRR, 8/19/2004 E-Mail Elliot, B. J., 5 NRC/NRR to Elliot, NRR, re: NRC/NRR Vermont Yankee Power Uprate, License Condition on Vessel Test Capsules.

ML043580150 Helton, D. M., E-mail - Helton, RES, 8/19/2004 E-Mail Wu, C., 5 NRC/RES to Wu, NRR, re: GE, NRC/NRR Audit Trip on Flow Effects and Steam Dryers for VY EPU.

ML043570521 Ward, L. W., E-mail - Ward, NRR, 8/19/2004 E-Mail Lobel, R. M., 2 NRC/NRR to Lobel, NRR, re: NRC/NRR Very Preliminary Results, of RELAP5 Model of Vermont Yankee.

ML043440464 Jacobson, J. B., E-mail - Jacobson, 8/19/2004 E-Mail Ennis, R. B., 1 NRC/NRR NRR, to Ennis, NRR, NRC/NRR re: Vermont Yankee Engineering Inspection -

Installation of Capacitors. .

Accession Author Title/Description Document Document Addressee / Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043620045 Wu, C., NRC/NRR E-mail Wu, NRR, to 8/20/2004 E-Mail Imbro, E. V., 7 Imbro, NRR, Re: NRC/NRR August 23-27, GE Audit for Vermont Yankee EPU Submittals.

ML043580347 Wu, C., NRC/NRR E-mail Wu, NRR, to 8/20/2004 E-Mail Imbro, E. V., 10 Imbro, NRR, re: NRC/NRR August 23-27 GE Audit for Vermont Yankee EPU Submittals on Flow Effects and the Steam Dryer.

ML043580061 Scarbrough, T. G., E-mail - Scarbrough, 8/21/2004 E-Mail Terao, D., 3 NRC/NRR NRR, to Terao, NRR, NRC/NRR et. al., re: GE Audit Entrance Meeting for VY EPU Flow Effects and Steam Dryer.

ML043440495 Ennis, R. B., E-mail - Ennis, NRR, 8/23/2004 E-Mail Jacobson, J.

NRC/NRR to Jacobson, NRR, B., NRC/NRR re: CST Temperature and NPSH.

Accession Author Title/Description Document Document Addressee / Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043650384 Dennis, S., E-mail from Steven 8/23/2004 E-Mail Anderson, C., 3 NRC/RGN-I Dennis (Region I) to Bower, F. L.,

Cliff Anderson Doerflein, L. T.,

(Region I) and Jacobson, J.,

Others Dated NRC/RGN-I 08/23/04 re: State's Potential Issues for a Hearing Request.

ML043650371 Lanning, W. D., E-mail from Wayne 8/23/2004 E-Mail Rogge, J. F., 4 NRC/RGN-I Lanning (Region I) to NRC/RGN-I John Rogge (Region I) Dated 08/23/04 re:

VY Engineering Inspection -

Installation of Capacitors.

ML043450141 Holden, C. F., E-mail - Holden, 8/23/2004 E-Mail Howe, A., 4 NRC/NRR NRR, to Howe, NRR, Miller, C.,

re: Vermont Yankee NRC/NRR Engineering Inspection Update.

ML050050093 Howe, A. G., E-mail - Howe, NRR, 8/23/2004 E-Mail Akstulewicz, F. 2 NRC/NRR to Akstulewicz, NRR, M., NRC/NRR Re: MELLA + and CPPU Topical, Possible Impact on Vermont Yankee EPU.

Accession Author Title/Description Document Document Addressee / Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043570291 Ennis, R. B., E-mail - Ennis, NRR, 8/25/2004 E-Mail Stutzke, M. A., 3 NRC/NRR to Stutzke, NRR, re: NRC/NRR Comment to VY EPU PRA & Review on Operator Actions.

ML043440532 Jacobson, J. B., E-mail - Jacobson, 8/25/2004 E-Mail Howe, A. G., 5 NRC/NRR NRR, to Howe, NRR, NRC/NRR re: VY Engineering Inspection Briefing Notes. _

ML043440487 Akstulewicz, F. E-mail - Akstuiewicz, 8/26/2004 E-Mail Marsh, L. B., 2 M., NRC/NRR NRR, to Marsh, NRC/NRR NRR, re GE Part 21 Report on SLMCPR Part 21.

ML043440478 Berkow, H. N., E-mail - Berkow, 8/27/2004 E-Mail Howe, A. G., 4 NRC/NRR NRR, to Howe, NRR, Ruland, W.,

re: Questions on GE NRC/NRR codes for CPPU/EPU.

ML043570297 Ennis, R. B., E-mail - Ennis, NRR, 8/30/2004 E-Mail Manoly, K. A., 4 NRC/NRR to Manoly, NRR, re: NRC/NRR Steam Dryer Writeup, for Vermont Yankee EPU.

Accession Author Title/Description Document Document Addressee / Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043570301 Ennis, R. B., E-mail - Ennis, NRR, 8/31/2004 E-Mail Jacobson, J.B. 3 NRC/NRR to Jacobson, NRR, NRC/NRR re: Containment Overpressure &

EOPs.

ML050050084 Howe, A.G. E-mail - Howe, NRR, 9/1/2004 E-Mail Holden, C. F., 4 NRC/NRR to Holden, NRR, re: NRC/NRR Steam Dryer Writeup, Related to the Vermont Yankee EPU review.

ML043580069 Scarbrough, T. G., E-mail - Scarbrough, 9/1/2004 E-Mail Bower, F. L., 4 NRC/NRR NRR, to Bower, NRC/RGN-1 RGN1, re: VY's Failure to Follow-up on Commitments -

As Discussed, for Engineering Inspection on MOVS.

ML043570403 Notafrancesco, A., E-mail - 9/1/2004 E-Mail Lobel, R. M., 6 NRC/RES Notafrancesco, RES, NRC/NRR to Lobel, NRR, re:

Vermont Yankee LT -

NPSH, Draft Analysis Results.

Accession Author Title/Description Document Document Addressee I Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043440580 Ennis, R. B., E-mail - Ennis, NRR, 9/2/2004 E-Mail Howe, A. G., 4 NRC/NRR to Howe, NRR, re: NRC/NRR Draft Status Bullets for the Dyer/Ellis Brief on VY EPU.

ML043440598 Imbro, E. V., E-mail - Imbro, NRR, 9/2/2004 E-Mail Howe, A. G., 3 NRC/NRR to How, NRR, re: NRC/NRR Draft Status Bullets for the Dyer/Ellis Brief re VY Dryer Issue.

ML043440586 Jacobson, J., E-mail - Jacobson, 9/2/2004 E-Mail Blough, A. R., 5 NRC/NRR NRR, to Blough, Collins, S.,

RGN-I, et. al., re: Crlenjak, R.,

Briefing Notes for VY Holian, B.,

Engineering Jacobson, J.,\

Inspection. Lanning, W. D.,

Wiggins, J.,

NRC, NRC/NRR, NRC/RGN-I ML043440595 Scarbrough, T. G., E-mail - 9/2/2004 E-Mail Ennis, R. B., 4 NRC/NRR Scarborough, NRR, NRC/NRR to Ennis, NRR, re:

Vermont Yankee Steam Dryer Issues. .

Accession Author Title/Description Document Document Addressee I Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043440569 Terao, D., E-Mail - Terao, NRR, 9/2/2004 E-Mail Ennis, R. B., 4 NRC/NRR to Ennis, NRR, re: NRC/NRR Steam Dryer Writeup for the EPU Safety Evaluation.

ML043650350 Dennis, S, E-mail - Steven 9/9/2004 E-Mail Bower, F. L., Subject of 2 NRC/RGN-l Dennis (Region I) to NRC/RGN-I message: timeline Fred Bower (Region for RCIC I) and Others Dated operability 09/09/04 re:

Followup on Today's Phone Call.

ML043580115 Shah, V., Argonne E-mail - Shah, ANL, 9/9/2004 E-Mail Wu, C., 24 National Lab to Wu, NRR, re: Trip NRC/NRR (ANL) Report of Audit of GE Steam Dryer Analysis for VY EPU.

ML043580123 Malik, S. N., E-mail - Malik, RES, 9/9/2004 E-Mail Wu, C. I., 2 NRC/RES to Wu, NRR, re: My NRC/NRR Comments from Vermont Yankee Steam Dryer Analysis Audit at GENE (Aug. 24-26).

Accession Author Title/Description Document Document Addressee / Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML042540482 Lund, A. L., Safety Evaluation of 9/9/2004 Memoranda, Clifford, J. W., 5 NRC/NRRIDE/ Request for License Safety NRC/NRR/

EMCB Amendment in Evaluation DLPM/LPD1 Support of Application for the Extended Power Uprate in Vermont Yankee Nuclear Power Station (TAC No. MC0761).

ML043580131 Mulcahy, T. M., E-mail - Mulcahy, 9/10/2004 E-Mail Scarbrough, T. 9 Argonne National ANL, to Scarbrough, G., NRC/NRR Lab (ANL) NRR, re: TMM Comments on Section C. of the Audit Report on GE Steam Dryer Analysis. _

ML043440602 Jacobson, J. B., E-Mail - Jacobson, 9/13/2004 E-Mail Howe, A. G., 2 NRC/NRR NRR, to Howe, NRR, NRC/NRR re: SBO Issue at VY.

ML043580141 Shah, V., Argonne E-mail - Shah, ANL, 9/13/2004 E-Mail Mulcahy, T. M., 3 National Lab to Mulcahy, ANL, re: Argonne (ANL) Audit Report Redraft National Lab 9-12-04, of the (ANL)

Report on GE Steam Dryer Analyses.

Accession Author Title/Description Document Document Addressee / Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML042610110 Scarbrough, T. G., Memo - Technical 9/14/2004 Memoranda Imbro, E. V., 3 NRC/NRR/DE/ Audit of Vermont NRC/NRR/DE/

EMCB Yankee Steam Dryer EMCB Analysis in Support of Extended Power Uprate Request (TAC MC0761).

ML042650258 Scarbrough, T. G., Memo w/Attachment, 9/14/2004 Audit Report, Imbro, E. V., 25 NRC/NRR/DE/ Appendices A, B, E, Memoranda NRC/NRR/DE/

EMEB G - Technical Audit EMEB of Vermont Yankee Steam Dryer Analysis in Support of Extended Power Uprate Request

._ (TAC MC0761).

ML042650340 Scarbrough, T. G., Proprietary Info 9/14/2004 Memoranda Imbro, E. V., 4 NRC/NRR/DE/ Removed - Technical NRC/NRR/DE/

EMEB Audit of Vermont EMEB Yankee Steam Dryer Analysis in Support of Extended Power Uprate Request (TAC MC0761).

Accession Author Title/Description Document Document Addressee I Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043650338 Scarbrough, T. G., E-mail - Thomas 9/15/2004 E-Mail Bower, F. L., 4 NRC/NRR Scarborough (NRR) NRC/RGN-I to Fred Bower (Region I) dated 09/15/04 re: Vermont Yankee EPU RAI response on MOVs and AOVs.

ML043650330 Scarbrough, T. G., E-mail - Thomas 9/15/2004 E-Mail Bower, F. L., 4 NRC/NRR Scarbrough (NRR) to NRC/RGN-I Fred Bower (Region

1) Dated 09/15/04 re:

Vermont Yankee EPU RAI Response on MOVs and AOVs.

ML043580078 Scarbrough, T. G., E-mail - Scarbrough, 9/15/2004 E-Mail Bower, F. L., 3 NRC/NRR NRR, to Bower, NRC/RGN-I RGNI, re: Vermont Yankee EPU RAI Response on MOVs and AOVs.

ML043580096 Scarbrough, T. G., E-mail - Scarbrough, 9/20/2004 E-Mail Ennis, R. B., 2 NRC/NRR NRR, to Ennis, NRR, NRC/NRR re: VY EPU Schedule - Draft Memo & Letter, on Steam Dryer Analysis.

Accession Author Title/Description Document Document Addressee I Comment Page Number Name/Affiliation Date Type Addressee Count Affiliation ML043580085 Scarbrough, T. G., E-mail - Scarbrough, 9/20/2004 E-Mail Bower, F. L., 3 NRC/NRR NRR, to Bower, NRC/RGN-l RGN-I, re:

Documenting TI 158-MOV-Findings, for the Engineering Inspection at VY.

ML043580341 Helton, D. M., E-mail - Helton, RES, 9/22/2004 E-Mail Wu, C., 3 NRC/RES to Wu, NRR, Re: NRC/NRR Comments on Follow-ups from July 21-22 Meeting, on VY EPU Steam Dryer Analysis. .

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML043580324 Helton, D. M., E-mail - Helton, RES, 9/23/2004 E-Mail Parks, B. T., 4 NRC/RES to Parks, NRR, re: NRC/NRR Comments on Follow-ups from July 21-22 Meeting, on VY EPU Steam Dryer Analysis.

ML043580330 Parks, B. T., E-mail - Parks, NRR, 9/23/2004 E-Mail Helton, D. M., 3 NRC/NRR to Helton, RES, re: NRC/RES Comments on Follow-ups from July 21-22 Meeting, on VY EPU Steam Dryer Analysis.

ML042710051 Marinos, E. C., LAR to Increase 9/27/2004 Memoranda Howe, A. G., Memorandum 5 NRC/NRR/DE/ Vermont Yankee NRC/NRR/ provides draft input EEIB Reactor Power from DLPMILPD1 into safety 1593 Mwtto 1912 evaluation MWI. regarding instrumentation and controls.

ML043570412 Ennis, R. B., E-mail- Ennis, NRR, 9/28/2004 E-Mail Lobel, R. M., Message pertains 20 NRC/NRR to Lobel, NRR, re: NRC/NRR to containment Comments re: VY overpressure and State of issue.

Vermont.

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML042780185 Dennig, R. L., Safety Evaluation 10/4/2004 Memoranda, Howe, A. G., 4 NRC/NRR/DSSA/ Input for Vermont Safety NRC/NRRI SPSB Yankee Extended Evaluation DLPM Power Uprate (TAC MC0761).

ML043650324 Scarbrough, T. G., E-mail - Thomas 10/5/2004 E-Mail Bower, F. L., 3 NRC/NRR Scarbrough (NRR) to NRC/RGN-I Fred Bower (Region I) Dated 10/05/04 re:

Vermont Yankee EPU Supplements 16 and 17.

ML050050032 Howe, A. G., E-Mail - Howe, NRR, 10/5/2004 E-Mail Ennis, R. B., 4 NRC/NRR to Ennis, NRR, re:. NRC/NRR Briefing for Brian Sheron, on Vermont Yankee Containment Overpressure Issue.

ML043580161 Scarbrough, T. G., E-mail - Scarbrough, 10/5/2004 E-Mail Bower, F. L., 3 NRC/NRR NRR, to Bower, NRC/RGN-I RGN1, Re: Vermont Yankee EPU Supplements 16 and 17, Commitment on MOV Testing.

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML043570305 Ennis, R. B., E-mail - Ennis, NRR, 10/6/2004 E-Mail Malik, S. N., 3 NRC/NRR to Malik, RES, re: NRC/RES Detail Drawings of Modified Steam Dryer for Vermont Yankee Plant.

ML042810511 Dennig, R. L., Safety Evaluation 10/6/2004 Memoranda, Howe, A. G., 12 NRC/NRR Input for Vermont Safety NRC/NRR/

Yankee Nuclear Evaluation DLPM/LPD1 Power Station Technical Specification Proposed Change No. 263, Extended Power Uprate.

ML043580167 Scarbrough, T. G., E-mail - Scarbrough, 10/12/2004 E-Mail Duvigneaud, D. 20 NRC/NRR NRR, to Duvigneaud, D., NRC/NRR NRR, re: Brian Sheron Briefing 10/13/04, on Power Uprate Flow Effects and Steam Dryers.

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML043570479 Notafrancesco, A., E-mail - 10/13/2004 E-Mail Lobel, R. M., 3 NRC/RES Notafrancesco, RES, NRC/NRR to Lobel, NRR, re:

Vermont Yankee Latest Results on Containment LOCA Parameter for NPSH.

ML050050047 Black, S. C., E-mail - Black, NRR, 10/21/2004 E-Mail Sheron, B. W., 2 NRC/NRR to Sheron, NRR, re: NRC/NRR VY and Overpressure, for NPSH When Pumping from Containment.

ML050050044 Lobel, R. M., E-mail - Lobel, NRR, 10/25/2004 E-Mail Black, S. C., 2 NRC/NRR to Black, NRR, re: NRC/NRR VY and Overpressure, for NPSH When Pumping from Containment.

ML043570495 Stutzke, M. A., E-mail - Stutzke, 10/29/2004 E-Mail Lobel, R. M., 2 NRC/NRR NRR, to Lobel, NRR, NRC/NRR re: VY Containment Overpressure Credit

- Another PRA Issue.

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML043570487 Stutzke, M. A., E-mail - Stutzke, 10/29/2004 E-Mail Lobel, R. M., 2 NRC/NRR NRR, to Lobel, NRR, NRC/NRR re: VY NPSH Best Estimate Calculation, and PRA Success Criteria.

ML043620006 Dixon-Herrity, J., E-mail - Dixon- 11/1/2004 E-Mail Thatcher, D. F., 4 NRC/NRR Herrity, NRR, to NRC/NRR Thatcher, NRR, re:

EPU Review Standard and Draft SRP 14.2.1 re:

Large-Scale Transient Testing.

ML043620030 Pederson, R. L., E-mail - Pederson, 11/1/2004 E-Mail Ennis, R. B., 3 NRC/NRR NRR, to Ennis, NRR, NRC/NRR re: Comments on the VY EPU Environmental Assessment.

ML043570309 Ennis, R. B., E-mail - Ennis, NRR, 11/2/2004 E-Mail Jacobson, J. 3 NRC/NRR to Jacobson, NRR, B., NRC/NRR and Doerflein, RGN1, re: VY SBO, Issue from the Engineering Inspection.

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML043620020 Lyons, J. E., E-mail - Lyons, NRR, 11/5/2004 E-Mail Duvigneaud, D. 7 NRC/NRR to Duvigneand, NRR, D., NRC/NRR et. al., re:

GENE/GNF-A Analytical Methods Review Update, Concerns with BWR Core Exit Void Conditions.

ML043100510 Jacobson, J. B., Engineering 11/5/2004 Memoranda Lanning, W. D., 9 NRC/NRR/DRIP Inspection NRC/

Preliminary Results. RGN-I/DRS ML050050026 Holden, C. F., E-mail - Holden, 11/7/2004 E-Mail Ennis, R. B., 4 NRC/NRR NRR, to Ennis, NRR, NRC/NRR2 re: Vermont Yankee

- Setpoint Methodology.

ML050050104 Hannon, J. N., E-mail - Hannon, 11/9/2004 E-Mail Akstulewicz, F. 3 NRC/NRR NRR, to Akstulewicz, M., NRC/NRR NRR, et. al., re:

Questions on BWR Sump Closure.

ML043150224 Quay, T. R., Vermont Yankee 11/10/2004 Memoranda, Collins, D. S., 7 NRC/NRR/DIPM/ EPU SE Input Safety NRC/NRR/

IPSB Section 2.10. Evaluation DLPMILPD1 Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML043570336 Ennis, R. B., E-mail - Ennis, NRR, 11/16/2004 E-Mail, Pettis, R. L., Transmits draft 5 NRC/NRR to Pettis, NRR, re: Request for NRC/NRR requests for SPLB - VY EPU Additional additional RAIs Set 3. Information information from (RAI) Plant Systems Branch ML043580301 Helton, D. M., E-mail- Helton, RES, 11/16/2004 E-Mail Wu, C., 6 NRC/RES to Wu, NRR, re: VY NRC/NRR Supplement 20 -

September 29 VY Presentation Slides, Comments on Steam Dryer Analysis.

ML043650345 Snell, M., E-mail - Snell 11/18/2004 E-Mail Barron, C., 3 NRC/RGN-I (Region 1) to Barron NRC/RGN-I (Region I) and Others Dated 11/18/04 re: VY Final Review.

ML043580173 Scarbrough, T. G., E-mail - Scarbrough, 11/23/2004 E-Mail Koenick, S. S., 15 NRC/NRR NRR, to Koenick, NRC/NRR NRR, re: Background Paper for Commission Briefing, on Power Uprate Flow Effects and Steam Dryers.

Accession Author Title/Description: Document Document Addressee I Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML043380300 Coffin, S. M., Vermont Yankee 11/24/2004 Memoranda, Howe, A. G., This document 15 NRC/NRR/DE/ Nuclear Power Safety NRC/NRR/ provides draft EMCB Station - License Evaluation DLPMILPD1 safety evaluation Amendment Request input regarding for a 20-Percent structural integrity Extended Power of the reactor Uprate (TAC No. vessel and reactor MC0761). vessel internals.

ML043370068 Akstulewicz, F. Request for 12/1/2004 Memoranda, Howe, A. G., This documents 2 M., Additional Request for NRC/NRR/ includes draft NRC/NRR/DSSAt Information for the Additional DLPM/LPD1 requests for SRXB Vermont Yankee Information additional Extended Power (RAI) information from Uprate (TAC No. the reactor MC0761). systems branch.

ML043620011 Marsh, L. B., E-mail - Marsh, NRR, 12/8/2004 E-Mail Sheron, B. W., 4 NRC/NRR to Sheron, NRR, et. NRC/NRR al., re: Q&A on VY EPU Schedule.

ML043570349 Lobel, R. M., E-mail - Lobel, NRR, 12/15/2004 E-Mail Ennis, R. B., 5 NRC/NRR to Ennis, NRR, re: NRC/NRR Round Two VY RAls, With Edits.

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML043510174 Jenkins, R. V., Vermont Yankee: 12/15/2004 Memoranda Clifford, J. W., This document 10 NRC/NRR/DE/ Thermal Power NRC/NRR/ provides draft EEIB Uprate, Revision 1. DLPM/LPD1 safety evaluation input regarding the electrical system and environmental qualification of electrical components.

ML050070193 Skay, D. M., E-mail - Skay, NRR, 12/21/2004 E-Mail Ennis, R. B., 2 NRC/NRR to Ennis, NRR, re: NRC/NRR 12/21 Teleconference with VY on Steam Dryer Issues.

ML050110201 Ward, L. W., E-mail - Ward, NRR, 12/27/2004 E-Mail Lobel, R. M., 2 NRC/NRR to Lobel, NRR, re: NRC/NRR VY RELAPS Plots, Showing LOCA Break Flow and Energy.

Accession Author Title/Description: Document Document Addressee I Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML050110011 Notafrancesco, A., E-mail - 12/29/2004 E-Mail Lobel, R. M., 6 NRC/RES Notafrancesco, RES NRC/NRR to Lobel, NRR re:

Draft VM Input Using CONTAIN Software to Analyze the Vermont Yankee Containment Response.

ML050070182 Ennis, R. B., E-mail - Ennis, NRR, 1/3/2005 E-Mail Wu, C., 4 NRC/NRR to Wu, NRR, et. al., NRC/NRR re: Proposed VY License Condition, on Steam Dryer Integrity at EPU Power Level.

ML050070186 Sheron, B. W., E-mail - Sheron, 1/3/2005 E-Mail Howe, A. G., 2 NRC/NRR NRR, to Howe, NRR, NRC/NRR et. al., re: Proposed VY License Condition, on Steam Dryer Integrity at EPU Power Level.

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML050070210 Holden, C. F., E-mail - Holden, 1/3/2005 E-Mail Sheron, B. W., 2 NRC/NRR NRR, to Sheron, NRC/NRR NRR, et. al., re:

Proposed VY License Condition, on Steam Dryer Integrity at EPU Power Level.

ML050070205 Scarbrough, T. G., E-mail - Scarbrough, 1/4/2005 E-Mail Ennis, R. B., 2 NRC/NRR NRR, to Ennis, NRR, NRC/NRR re: Proposed VY License Condition, on Steam Dryer Integrity at EPU Power Level.

January 12,2005 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

ENTERGY NUCLEAR VERMONT YANKEE ) Docket No. 50-271-OLA LLC and ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 04-832-02-OLA

)

(Vermont Yankee Nuclear Power Station) )

AFFIDAVIT OF JOHN P. BOSKA CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. 6 2.336(c)

I, John P. Boska, being first duly sworn, do hereby state as follows:

1. I am employed as a Senior Project Manager in the Division of Licensing Project Management in the Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation. I serve as a project manager for the Vermont Yankee Nuclear Power Station. Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the extended power uprate license amendment request at issue in this proceeding.
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R.

§2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.

3. I hereby certify that the foregoing is true and complete to the best of my knowledge, information and belief.

j7 P. Boska

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR VERMONT YANKEE ) Docket No. 50-271-OLA LLC and ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 04-832-02-OLA

)

(Vermont Yankee Nuclear Power Station) )

CERTIFICATE OF SERVICE I hereby certify that copies of the NRC Staff letter dated January 18, 2005, providing notice of the availability of the hearing file, with attachments, together with the affidavit of John P. Boska, in the captioned proceeding have been served on the following by deposit in the United States mail, first class; or as indicated by an asterisk (*), by deposit in the Nuclear Regulatory Commission's internal mail system; and by e-mail as indicated by a double asterisk (**), this 18th day of January, 2005.

Alex S. Karlin, Chair** Dr. Anthony J. Baratta*"

Administrative Judge Administrative Judge Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3F23 Mail Stop T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: ask2@nrc.gov E-mail: ajb5@nrc.gov Lester S. Rubenstein** Office of the Secretary**

Administrative Judge ATTN: Rulemaking and Adjudications Staff Atomic Safety and Licensing Board Panel Mail Stop: 0-1 6C1 4270 E Country Villa Drive U.S. Nuclear Regulatory Commission Tucson, AZ 85718 Washington, DC 20555-0001 E-mail: lesrrr@comcast.net E-mail: HEARINGDOCKET@nrc.gov Office of Commission Appellate John M. Fulton, Esq.

Adjudication* Assistant General Counsel Mail Stop: O-16C1 Entergy Nuclear Operations, Inc.

U.S. Nuclear Regulatory Commission 440 Hamilton Avenue Washington, DC 20555-0001 White Plains, NY 10601

Jay E. Silberg, Esq.** Sarah Hofmann, Esq.**

Matias Travieso-Diaz, Esq.** Special Counsel Douglas Rosinski, Esq.** Department of Public Service Shaw Pittman, LLP 112 State Street - Drawer 20 2300 N St., NW Montpelier, VT 05620-2601 Washington, DC 20037-1128 E-mail: sarah.hofmann@state.vt.us E-mail: jay.silberg @shawpittman.com matias.travieso-diaz @shawpittman.com douglas.rosinski @shawpittman.com Anthony Z. Roisman, Esq.** Raymond Shadis**

National Legal Scholars Law Firm Staff Technical Advisor 84 East Thetford Rd. New England Coalition Lyme, NH 03768 P.O. Box 98 E-mail: aroisman~valley.net Edgecomb, ME 04556 E-mail: shadis@prexar.com shadis @ime.net Jonathan M. Block, Esq.**

94 Main Street P.O. Box 566 Putney, VT 05346-0566 E-mail: jonb soVer.net Respectfully submitted, Brooke D. Poole Counsel for NRC Staff