ML042330094
| ML042330094 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 02/09/2004 |
| From: | Nichols C Entergy Nuclear Operations |
| To: | O'Hara T Division of Reactor Safety I |
| References | |
| FOIA/PA-2004-0267 | |
| Download: ML042330094 (13) | |
Text
"Nichols, Craig, <cnichol Gentergy.com>
To:
tlolt inrc.gov>
Date:
2/9/04 3:52PM
Subject:
Here is an Excel file containing the present list of EPU mods and an Adobe version as well. Please feel free to contact me with any questions.
<<EPU Mod LIst.pdf>> <<5 Year Plan - EPU Mods.xls>>
- Thanx, Craig J. Nichols Entergy Nuclear Operations, Inc. (Vermont Yankee)
Project Manager - Power Uprate This small and any attachments thereto are Intended only for the use by the addressee(s) named herein and contain proprietary and confidential Information. If you are not the Intended recipient of this e-mail, you are hereby notified that any dissemination, distribution, or copying of this e-mail and any attachments thereto is strictly prohibited. If you have received this e-mail In error, please notify me and permanently delete the original and any copy of any e-mail and any printout thereof.
EPU Modifications Title/Cycle Number Safety Class (YIN)
Comments L1:024 (MaYaOO4I Feedwater Heater Level Control Upgrade VYD 2003-004 N
Generator Rewnd/Flux Probe VYDC 2002-006 N
Generator Thermocouple and RTD Monitoring VYDC 2003-003 N
Install Filtered Condemin Bypass Line MM 2003-024 N
Low Feedwater Suction Pressure Trip MM 2003-015 N
Stake Condenser Tubes.
MM 2003-025 N
AST Mods (Install SJAE Une Check Valve)
MM 2003-026 Y
Upgrade NSSS Supports MM 2003-005 y
Add Main Steam Sae Valve VYDC 2003-013 Y
Main Steam Safety Valve Capadiy Increase MM 2003-030 Y
Recirc Pump Runback (Feedwater Pump Trip)
MM 2003-016 N
Replace HP Turbine VYDC 2003-006 N
Replace Gen Hyd gen Cooler MM 2003-006 N
EQ Upgrade Post Accident Monitor (CIrcuit Relocatlon)
MM 2003-037 Y
HP Feedwater Heater Replacement VYDC 2003-002 N
AST License Implementation (paperwork onlY)
VYDC 2003-016 Y
Upgrade Isophase Bus Duct Cooling/Gen Disconnect Switch VYDC 2003-018 N
CARV Piping Replacement MM 2003-043 N
APRM FRow Controlled Trip Reference Card (A/M)
MM 2003-028 Y
Turbine Vibration Trip Upgrades VYDC 2003-001 N
ARTS/IMELLLA Ucense Implementation (paperwork only)
VYDC 2003-015 y
Steam Dryer Strengthening VYDC 2003-012 N
NSSS/BOP Instruments (Main Steam High Flow Trip)
MM 2003-039 Generator Out of Step Protection MM 2003-048 N
Generator-Rotor Reinsulation NON-MOD N
Ughtning Arrestor Improvement Mods TBD N
345kv North Bus Backup Diff Prot MM 2003-055 N
GSU Backup Differental Protectlon MM 2003-049 N
345kv 381 Une Overload Relay Setting MM 2003-053 N
Flow Induced Vibration Monitoring TM 2003-022 Y
02f9/2004
EPU Modifications Title/Cycle Number Safety Class IY/N)
Comments CYCIO 24 Non-Outage (June 2004-Segt 2005)
EPU License Implementation (paperwvork only)
VYDC 2003-008 FCTR Card Replacement (EPU)
MM 2003-028 Y
Part of MM 2003-028 for A/M RHRSW Motor Cooling Une Reroute MM 2003-017, 018 Y
Cooling Tower Upgrades (Motors and Blades)
MM 2003-042 N
115KV Capacitor Bank Installation TBD N
345kv 381 Breaker ReplacementISIn if Pole TRIng VYDC 2003-020 N
Appendix R Cable Reroute (Torus Vent Valve)
T8D Y
RF2 October 2005_
MELLLA+ License Implementation TBD Y
LP Turbine 8th Stage Diaphragm Replacement TBD N
Genertor Bushing CT Upgde TBD N
MELLLA+ FCRK Card Replacement TBD Y
Feedwater Heater Level Control (Phase 2)
TBD N_
Condenser Backpressure Instruments TBD N
T/G Bearing Vibration Probes (Phase 2)
TBD N
02/O9/2OM
IMarvn Svkes - 5 Year Plan - EPU Mods.)ds
'Paae 1.
MarvinSykes-5 Yer Pla
-.EP.Modsxls Pr1-1 Tltle/Cycle l
Number Safety Class (Y/N) l Comments RFO24 Illayv2004)
Feedwater Heater Level Control Upgrade VYDC 2003-004 N
Generator Rewind/Flux Probe VYDC 2002-006 N
Generator Thermocouple and RTD Monitorlng VYDC 2003-003 N
Install Filtered Condemin Bypass Une MM 2003-024 N
Low Feedwater Suction Pressure Trip MM 2003-015 N
Stake Condenser Tubes MM 2003-025 N
AST Mods (Install SJAE Une Check Valve)
MM 2003-026 Y
Upgrade NSSS Supports MM 2003-005 V
Add Main Steam Safety Valve VYDO 2003-013 Y
Main Steam Safety Valve Capacity Increase MM 2003-030 Recire Pump Runback (Feedwater Pump Trip)
MM 2003-016 N
Replace HP Turbine VYDC 2003-006 N
Replace Gen Hydrogen Cooler MM 2003-006 N
EO Upgrade Post Accident Monitor (Circult Relocation)
MM 2003-037 Y
HP Feedwater Heater Replacement VYDO 2003-002 N
AST Ucense Implementation (paperwork only)
VYDO 2003-016 Jpgrade Isophase Bus Duct Cooling/Gen Disconnect Switch WDC 2003-018 N
ARV Piping Replacement_
MM 2003-043 N
PRM Flow Controlled Trip Reference Card (AIM)
MM 2003-028 _
urbine Vibration Trip Upgrades VYDC 2003-001 N
ARTSiMELLLA Ucense Implementation (paperwork only)
VYDO 2003-015 V
rteam Dryer Strengthening VYDC 2003-012 N
NSSS/BOP Instruments (Main Steam High Flow Trip)
MM 2003-039 Y
3enerator Out of Step Protection MM 2003-048 N_
Generator Rotor Reinsulatlon NON-MOD N
LIghtnIng Arrestor Improvement Mods TBO N
345kv North Bus Backup Dffl Prot MM 2003-055 N
SU Backup Differential Protection MM 2003-049 N
45wkv 381 Une Overload Relay Setting MM 2003-053 N_
Flow Induced Vibration Monitoring TM 2003-.022 y
-I----
W.,
- -, .
I.-
" .:, --
z -
-. --
, -
-. I - - -
.....I-I -
Marvin Sykes - 5 Year Plan - EPU Mods.Xds Pame 2 I ---------.
l 1 Cvcle 24 Non-Outage (June 2004-Sept 20051 EPU Ucense Implementation (paperwork only)
VYDC 2003-008 Y
CTR Card Replacement (EPU)
MM 2003-028
'art of MM 2003-028 for A/M RHRSW Motor Cooling Une Reroute MM 2003-017, 018 Y
Ooollng Tower Upgrades (Motors and Blades)
MM 2003-042 N
115iKV Capacitor Bank Installation TBD N
345kv 381 Breaker Replacement/Sinale Pole Tripina VDC 2003-020 N
Appendix R Cable Reroute (Torus Vent Valve)
TBD Y
RF025 (October 2005)
MELLLA+ Ucense Implementation TBD LP Turbine 8th Stage Diaphragm Replacement TBD N
Generator Bushing CT Upgrade TBD N
MELLLA+ FCTR Card Replacement TED V
Feedwater Heater Level Control (Phase 2)
TBD N
Condenser BackPressure Instruments TBD N
TIG Bearing Vibration Probes (Phase 2)
TBD N
Mrn ye-5 ea Pa -
EPUMad xi Pa.e 3_.
Schedule Priority Grade SMRC Number Sponsor Load DE lhpl Dept l BBdge ludget Year Top Ton Comments ninanca hopV ntlaton A
r 20004041 FluIds I r-__
RU U.15 & 15 Sin91eUt B r 2W0475 Fud I
h ar Work PlloimC Muds C
1199-023 llSD 1S 2 Intall Stearn PPrheat Coil 2000-053 f luids
-YES lGK bo onlrrn Top 10 6581 Fire Pump Control Panel A
2000 ELC 1
uel Plaform Camenr Upgrade 20024007 OI&C SW h Decing Gate B
2002417 FRlds YES T Inatnarntation Repl acrent B
1999-038 IC
=
SCM-i-a2 Control nwerntatlon)
A 2000452 1C
'YES KW to nfirm Top 10 vect Ive
-e 200-04 7
R C nuem bk Materid EvaluatIon B
20034-8 USD e2S MUDS Reverse Oseoats System Wmsar Fluids C 25 Swthyard bkromvwont Mods A
2003- 0012
.3 E1C h-plenlaton Plan
.25 ISFSI (Dry Cask Storae)
A Hoffman pce Monitor on CR P "elb TIP Control Units B
2003-009 10II&C place Anal Mai Geri
'Iegawat Mater C
2003-012 E1-C NMSatra kReplacenmnt E-C
-nto Budget dnste Punp MFlw Val" FCV4 Repair
_=
Fluids required V
so Drlan ne lobleon Vave Replacerent 2001-033 R
idds
_s Ingeny TM Comlete H2AI r
2001-043
_I1C Malnt Cond Retun VentNot App-iable Fuids Projects CW Motor ILines Sillcaton 2003-015 Wlenboki Fluids Projects
_ng I spital heail Live Load Palddig for RHR Containnunt Isolation I B
2003-021 Wohbwntkl fluids Marit
-R FO 25 CWGate Hdulles I
A 2003-024 IWIWrrvsti I Fuluds I for Scoping Only Novf H2-02 An er as alowd by10CFR50.54 A
2003-025 Lpinski I Fluids I nmouk nly post RF024 Iturbine Building Crane Remt Rgtdlo Controhs I
C I
1 200342S Crbtt I EI&C I
aw I PMes RFO 24
Marvin Sykes -ear Plan - EPU Mods.xs Page 4 1 1
Electrical Instrument Fluids Mechanical Project System Engineer Engineer Engineer Engineer Engineer Engineer TOTAL Cycle 24 Non-Outage (June 2004-Sept 2005)
Cond Demin Control Panel Upgrade 0
GE Elementary Diagrams o
Reactor Building Radiation Monitor 0
RHRSW PP Can Replacement 0
ISFSI Pad and Underground Utility Mods 0
ISFSI Haul Path Upgrade 0
ISFSI Reactor Building Rallpath Strengthening 0
iSFSI CAB Access Mod 0
ISFSI Reactor Building Rallpath Mod for Roller System 0
RWCU Canned Rotor Pump 0
RWCU Low-Low Level Isolation 0
RWCU System Pressurization Bypass Unes 0
RWCU Lo Flow Time Delay 0
MCC 89AIB Obsolesence 0
HPCI Turbine Trip Test Device 0
EPU Ucense Implementat'on 0
EPU FCTR Card Replacement 0
EPU RlRSSW Motor Coollng Line Reroute 0
EPU Cooling Tower Upgrades 0
EPU So Ireaker ReplacementVSlngle Pole Tripping 0
4KV Breaker Raccing Iiprovements 0
Intake Structure Modificatfon 0
MUDS Raw Water Mrs & CWCDlaZIcn Pump 0
Marvin Sykes-5 Year Plan - EPU Modsxd s Page 5 Total 0
0 0
0 0
0 0
Electrical Instrument Fluids Mechanical Project System Engineer Engineer Engineer Engineer Engineer Engineer TOTAL RFO 25 FPC Demineralizer PLC 0
CondenserTube Evlauation (PuWPlug) o Replacement of CW Temp. Measure. RTDs 0
4KV Breaker Racking Improvements a
EPU MELLA+ License Implementation a
EPU ID Turbine 8th Stage Diaphragm Replacement 0
EPU Generator Bushing Upgrade 0
EPU MELLLA+ FCTR Card Replacement 0
EPU Feedwater Heater Level Control (Phase 2) 0 EPU Condenser Backpressure Instruments o
EPU T/G Bearing Vibration Probes (Phase 2) 0 O
Total 0
0 0
0 0
0 0
Electrical Instrument Fluids Mechanical Project System Engineer Engineer Engineer Engineer Engineer Engineer TOTAL Cycle 25 Non-Outge (November 2005 - April 2006) 4KV Breaker Racldng Improvements 0
Marvin Sykes -5 Year Plan - EPU Mods.xis Page 6i, Low Pressure C02 Mechanical Timer Modification Maint Bypass for JDOG Auto Transfer Switch House Heating Auto Setback Contrls RHR Corner Room Sump Level Alarm 0
0 0
0 0
0 0
0 0
0 0
0 Total
Marvin Sykes - 5 Year Plan - EPU Mods.xis Page 7.
Mar-vin.
Sykes Y---
ln-EP od~l P~
Electrical Instrument Fluids Mechanical Project Engineer Engineer Engineer Engineer Engineer Cycle 22 Non-Outage Reactor Water Chemistry 100 491 240 191 2571 RWCU System/Component Performance 30 400 200 720 Relaxed TB Door Cntrl 350 80 0
SACC-1A Head Pressure Controls 300 80 100 300 SCH-1 -1 & 2 Controls 300 110 80 300 Rpl Cntrl Brds VA Dryers 20 40 Pwr Distrib at IS Improvements 350 100 FP Press Relief Valve 300 120 300 One Line Diagram Update 200 Hi Dry Well Level Alarm Switch 39 104 Power Panel Enhancements 920 Coatings Program 60 Main Station Battery Charger 76 RATS Replacement 300 80 280 Security Door Mod 0
80 RHRSW ADZ Pump High DP 500 150 350 CRP 9-21 Recorder Replacement 165 358 BMO 9836 Loss of CR Cooling 152 90 MS Une Rad Monitor 450 300 Cable and Raceway Database Development 376 Removal of IA PCV (ACS Press Reg) 20 40 2061 2075 2192 1001 5933 RF23 (October2002)
Vac Brk Line Exp Bellow Assem Cover 450 300 RRU 7&8 Engineering Study 200 Elim HPCI 20 Dm Line To Torus 80 350 300 Undes Cond Loss DC 450 80 120 300 Generator Rewind 1800 500 500 Main Turbine EPR Replacement 440 150 490 FW Flow Control Upgrade 500 120 180 300 HPCVRCIC Check Valve 500 150 350 Main Transformer 440 RBCCW MM 150 150 2690 940 1479 2049 2192 Cycle 23 Non-Outage ERFIS/GEPAC Field Term Detail Enhancement 500 RePower Battery Room Fan Off Vital AC 430 40 200 Emergency Diesel Fire Pump Control Panel 350 250 250 SW Program Document 200 50 Maintenance Shop Ventilation 60 400 200 300 SACC 1 &2 Stm Preheat Coil 300 80 0
RWCU Pump Low Flow Trip Delay 350 100 80 300 Lube Oil Rm Sprinkler Upgrade 150 150 300 RRU 14/15/16 Single Unit 60 550 300 300
75
~
_ al _ _ -
_ ~
Hi~
- O _
-__ti
_f S a
.1 Marvin Sykes - 5 Year Plan - F=PU Mocls.xis Page 81I Marvin YKS
- b Year Plan - EPU Mods.xls Paae 8 TRU-5 Coil Replacement Coolidge Line Relays Stack Lighting Replacement Rosemount Transmitter Replacement DG Transient Analysis Condemin Control Panel Install Work Platforms 0 MUDS HB Condensate Return Vent RF24 (May2004)
Condensor Tube Plugging Install Key Lock Switch MSIV Bypass Turbine Trip PDCR 91 -12 Cycle 24 Non-Outage RHR Comer Room Sump Level Alarmn RB Rad Monitor Sec Sys Integr ERFIS Control Panel Light Indicating Circuitry Fuse List Verification Swtchgr Rm Fire Dmpr Alarm HH Auto Setback Controls SBGT Instrumentation Replacement Cycle 25 Non-Outage Change RWCU Isolation to LOW LOW Level 300 120 0
250 200 501 400 350 0
80 150 300 150 300 120 300 1850 1599 2341 1580 2399 350 150 300 600 120 160 1200 950 120 310 1500 300 150 300 450 199 300 300 280 300 280 180 300 300 300 40 300 600 50 250 700 480 2250 90 600 2460 450 30 100 300 450 30 100 300 7082 8265 6252 5641 14783
'arvin S s -5 Year Plan -EPU Mods.xls i
Page9 System Engineer TOTAL 20 3613 1349 430 780 791 60 450 720 200 143 920 60 76 660 80 1000 523 242 750 376 60 20 13283 750 200 730 951 2799 1080 1100 1000 440 300 0
9350 500 670 60 910 300 550 960 380 829 600 1209
vIarvin Sykes - 5 Year Plan - EPU Mods.xls Page 420 250 200 400 501 730 300 720 360 10130 303 303 800 2080 303 3183 750 950 580 580 180 600 640 1600 5880 880 880 683 42705