ML052550069

From kanterella
Jump to navigation Jump to search
Vermont Yankee - Letter from Jason C. Zorn to Administrative Judges Enclosing Supplement 13 to the Hearing File Index, an Updated Privilege Log and the Affidavit of G. Edward Miller, Jr
ML052550069
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 09/06/2005
From: Zorn J
NRC/OGC
To: Anthony Baratta, Karlin A, Rubenstein L
Atomic Safety and Licensing Board Panel
Zorn, Jason 415-1797
References
50-271-OLA, ASLBP 04-832-02-OLA, RAS 10429
Download: ML052550069 (22)


Text

September 06, 2005 Administrative Judge Alex S. Karlin, Chair Administrative Judge Lester S. Rubenstein Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission 4760 East Country Villa Drive Mail Stop: T-3F23 Tucson, AZ 85718 Washington, DC 20555-0001 Administrative Judge Anthony J. Baratta Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of ENTERGY NUCLEAR VERMONT YANKEE LLC and ENTERGY NUCLEAR OPERATIONS, INC.

(Vermont Yankee Nuclear Power Station)

Docket No. 50-271-OLA

Dear Administrative Judges:

Pursuant to 10 C.F.R. § 2.336(d), the NRC staff hereby provides notice that the Hearing File for this proceeding has been updated. As required by 10 C.F.R. § 2.336(b)(5), the staff is producing an update to the privilege log at this time. The staff is continuing to preserve and maintain all privileged documents during the pendency of this proceeding. In accordance with the Licensing Boards Order of April 5, 2005, the Staff is producing the hearing file index supplement and the affidavit of G. Edward Miller, Jr. only to the other parties to this proceeding.

Sincerely,

/RA/

Jason C. Zorn Counsel for NRC Staff

Enclosures:

Hearing File Index Supplement (parties only)

Privilege Log - Proprietary Information Privilege Log - Deliberative Process Privilege Log - Sensitive/Personal Information Affidavit of G. Edward Miller, Jr. (parties only)

ENCLOSURE 1 VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX SUPPLEMENT 13 - September 6, 2005 Accession Number Document Date Title/Description:

325 ML052340066 8/18/2005 E-mail Daflucas, Entergy Nuclear Northeast, to Ennis, NRR, Re: VY EPU Conference Call.

326 ML052340141 8/18/2005 E-mail Ennis, NRR, to Daflucas, Entergy Nuclear Northeast, Re: VY EPU Conference Call.

327 ML052340039 8/18/2005 E-mail Scarbrough, NRR, to Shah, ANL, Re: VY EPU Steam Dryer Audit.

328 ML052360352 8/22/2005 E-mail Ennis, NRR, to Daflucas, Entergy Nuclear Northeast, Re: VY EPU RAIs.

329 ML052370289 8/24/2005 8/24/05 - Vermont Yankee - Letter to Administrative Judges.

330 ML052410277 8/25/2005 E-mail Ennis, NRR, to Gucwa, Entergy Nuclear Northeast, Re: VY EPU RAIs.

331 ML052420402 8/29/2005 Facsimile, Ennis, NRR, To Daflucas, Entergy Nuclear Northeast, Re: VY EPU RAIs.

332 ML052300033 8/29/2005 Vermont Yankee - Request for Withholding Information from Public Disclosure (TAC No. MC0761).

ENCLOSURE 2 VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - PROPRIETARY INFORMATION SUPPLEMENT 13 - September 6, 2005 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain trade secrets, privileged or confidential commercial or financial information subject to withholding from public disclosure pursuant to 10 C.F.R. § 2.390. Pursuant to 10 C.F.R. § 2.336(b)(5), the Staff is providing this log to identify the following documents, designated proprietary, and subject to protected status under Section 2.390.

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052410401 Ennis R B, E-mail Ennis, NRR, 8/25/2005 E-Mail, Gucwa L T, Document 20 NRC/NRR to Gucwa Entergy Request for Entergy transmits requests Nuclear Northeast, Additional Nuclear for additional Re: VY EPU RAIs. Information Northeast information (RAI) containing information proprietary to Entergy regarding code uncertainty values ML052420349 Abdullahi Z, E-mail Abdullahi, 8/26/2005 E-Mail Ennis R B, Document NRC/NRR NRR, to Akstulewicz, NRC/NRR transmits requests NRR, Re: VY EPU for additional RAIs. information containing information proprietary to Entergys contractors regarding the void reactivity coefficien ENCLOSURE 3 VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 - September 6, 2005 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.

§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the deliberative process privilege.

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052230210 Razzaque M M, E-mail Razzaque, 8/10/2005 E-Mail Ennis R B, Contains draft 3 NRC/NRR NRR, to Ennis, NRR NRC/NRR requests for Re: VY EPU RAIs. information regarding the the effect of the EPU on new and spent fuel storage ML052230209 Razzaque M M, E-mail Razzaque, 8/10/2005 E-Mail Ennis R B, Contains draft 3 NRC/NRR NRR, to Ennis, NRR, NRC/NRR requests for Re: VY EPU RAIs. information regarding single loop operation of shutdown cooling and clarification of terms in previous responses to RAIs PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052230204 Reddy D K, E-mail Reddy, NRR, 8/10/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR to Ennis, NRR, Re: NRC/NRR discussion of VY EPU RAIs. responses to RAIs regarding stability and reliability of condensate and feedwater system ML052310065 Ennis R B, E-mail Ennis, NRR, 8/15/2005 E-Mail Pal A N, Contains staff 2 NRC/NRR to Pal, NRR, Re: VY NRC/NRR recommendations EPU SBO Response. to draft safety evaluation regarding station blackout analysis ML052310072 Jacobson J, E-mail Jacobson, 8/15/2005 E-Mail Ennis R, Pal A, Contains staff 2 NRC/NRR NRR, To Ennis, NRC/NRR recommendations NRR, Re: VY EPU to draft safety SBO Response. evaluation regarding station blackout analysis PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052340120 Ennis R B, E-mail Ennis, NRR, 8/17/2005 E-Mail Pal A N, Contains 9 NRC/NRR to Pal and Razzaque M M, information Razzaque, NRR, Re: NRC/NRR regarding NRCs VY EPU RAIs. staffs internal scheduling practices and several pages of previously disclosed requests for additional information ML052340040 Pal A N, E-mail Pal, NRR, to 8/17/2005 E-Mail Ennis R B, Contains 2 NRC/NRR/ADPT Ennis, NRR, Re: VY NRC/NRR information EPU RAIs. regarding NRCs staffs internal scheduling practices ML052340037 Ennis R B, E-mail Ennis, NRR, 8/18/2005 E-Mail Pal A N, Contains 2 NRC/NRR/ADPT to Razzaque and Razzaque M M, information Pal, NRR, Re: VY NRC/NRR/ADP regarding NRCs EPU Conference T staffs internal Call. scheduling practices PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052340101 Ennis R B, E-mail Ennis, NRR, 8/18/2005 E-Mail Reddy D K, Contains draft 5 NRC/NRR to Reddy, NRR, Re: NRC/NRR requests for VY EPU RAIs. additional information regarding condensate and feedwater system ML052340038 Razzaque M M, E-mail Razzaque, 8/18/2005 E-Mail Ennis R B, Contains 2 NRC/NRR NRR, to Ennis, NRR, NRC/NRR information Re: VY EPU regarding NRCs Conference CAll. staffs internal scheduling practices ML052310075 Reddy D K, E-mail Reddy, NRR, 8/18/2005 E-Mail Ennis R B, Contains staff 5 NRC/NRR to Ennis, NRR, Re: NRC/NRR discussion of VY EPU RAIs. response to request for additional information regarding condensate and feedwater system PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052340089 Reddy D K, E-mail Reddy, NRR, 8/18/2005 E-Mail Ennis R B, Contains staff 5 NRC/NRR to Ennis, NRR, Re: NRC/NRR discussion of VY EPU RAIs. response to request for additional information regarding condensate and feedwater system ML052340108 Thomas G, E-mail Thomas, 8/18/2005 E-Mail Ennis R B, Contains draft 2 NRC/NRR NRR, to Ennis, NRR, NRC/NRR request for Re: VY EPU Review. additional information regarding accident and transient analyses ML052340239 Ennis R B, E-mail Ennis, NRR, 8/19/2005 E-Mail Jones S R, Contains staff 2 NRC/NRR to Jones, NRR, Re: NRC/NRR discussion of VY EPU RAIs. response to request for additional information regarding condensate and feedwater system PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052340258 Ennis R B, E-mail Ennis, NRR, 8/19/2005 E-Mail Thomas G, Contains draft 3 NRC/NRR to Thomas, NRR, NRC/NRR request for Re: VY EPU RAIs. additional information regarding accident and transient analyses ML052340262 Jones S R, E-mail Jones, NRR, 8/19/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR to Ennis, NRR, Re: NRC/NRR discussion of VY EPU RAIs. response to request for additional information regarding condensate and feedwater system ML052340251 Jones S R, E-mail Jones, NRR, 8/19/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR to Ennis, NRR, Re: NRC/NRR discussion of VY EPU RAIs. response to request for additional information regarding condensate and feedwater system PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052360313 Ennis R B, E-mail Ennis, NRR, 8/22/2005 E-Mail, Pal A N, Contains 9 NRC/NRR to Razzaque, NRR, Request for Razzaque M M, information Et. Al., ReL VY EPU Additional Thomas G, regarding NRC RAIs. Information NRC/NRR staffs internal (RAI) scheduling practices ML052360320 Thomas G, E-Mail Thomas, 8/22/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR NRR, to Ennis, NRR, NRC/NRR recommendations Re: VY EPU RAI. to changes to request for additional information ML052410318 Abdullahi Z, E-mail Abdullahi, 8/25/2005 E-Mail Ennis R B, Contains staff 9 NRC/NRR NRR, to Ennis, NRR, NRC/NRR recommendations Re: VY EPU RAIs. to changes to request for additional information regarding linear heat generation rate PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052410385 Abdullahi Z, E-mail Abdullahi, 8/25/2005 E-Mail Ennis R B, Contains staff 18 NRC/NRR NRR, to Ennis, NRR, NRC/NRR recommendations Re: VY EPU RAIs. to changes to request for additional information regarding linear heat generation rate ML052410296 Ennis R B, E-mail Ennis, NRR, 8/25/2005 E-Mail Holden C F, Contains staff 4 NRC/NRR to Holden, NRR, Re: NRC/NRR recommendations VY EPU & regarding internal Conference Call. procedures for following up responses to requests for additional information PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052410379 Ennis R B, E-mail Ennis, NRR, 8/25/2005 E-Mail Jones S R, Contains staff 6 NRC/NRR to Jones, NRR, Re: NRC/NRR recommendations VY EPU RAIs. to changes to request for additional information regarding condensate and feedwater system ML052410310 Marsh L B, E-mail Marsh, NRR, 8/25/2005 E-Mail Ennis R B, Contains staff 3 NRC/NRR to Ennis, NRR, Re: NRC/NRR recommendations VY EPU Conference regarding internal Call. procedures for following up responses to requests for additional information PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052410383 Razzaque M M, E-mail Razzaque, 8/25/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR NRR, to Ennis, NRR, NRC/NRR recommendations Re: VY EPU RAIs. to changes to request for additional information regarding maximum and average power densities ML052410391 Reddy D K, E-mail Reddy, NRR, 8/25/2005 E-Mail Ennis R B, Contains staff 3 NRC/NRR to Ennis, NRR Re: NRC/NRR recommendations VY EPU RAIs. to changes to request for additional information regarding performance of safety relief valves PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052410316 Reddy D K, E-mail Reddy, NRR, 8/25/2005 E-Mail Ennis R B, Contains staff 5 NRC/NRR to Ennis, NRR, Re: NRC/NRR recommendations VY EPU RAIs. to changes to request for additional information regarding condensate and feedwater system ML052410395 Tatum J E, E-mail Tatum, NRR, 8/25/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR to Ennis, NRR, Re: NRC/NRR recommendations VY EPU RAIs. to changes to request for additional information regarding condensate and feedwater system PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052420358 Jones S R, E-Mail Jones, NRR, 8/26/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR to Ennis, NRR, Re: NRC/NRR recommendations VY EPU RAs. to changes to request for additional information regarding condensate and feedwater system ML052420371 Jones S R, E-mail Jones, NRR, 8/26/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR to Ennis, NRR, Re: NRC/NRR recommendations VY EPU RAI. to changes to request for additional information regarding condensate and feedwater system PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052420376 Jones S R, E-mail Jones, NRR, 8/26/2005 E-Mail Ennis R B, Contains staff 3 NRC/NRR to Ennis, NRR, Re: NRC/NRR recommendations VY EPU RAI. to changes to request for additional information regarding performance of safety relief valves ML052420401 Razzaque M M, E-mail Pazzaque, 8/26/2005 E-Mail Ennis R B, Contains staff 3 NRC/NRR NRR, to PAL, NRR, NRC/NRR recommendations Re: VY EPU SBO to draft safety Input. evaluation regarding station blackout analysis ML052420384 Tatum J E, E-mail Tatum, NRR, 8/26/2005 E-Mail Ennis R B, Contains staff 2 NRC/NRR to Ennis, NRR, Re: NRC/NRR recommendations VY EPU RAIs. to changes to request for additional information regarding condensate and feedwater system PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052420409 Ennis R B, E-mail Ennis, NRR, 8/29/2005 E-Mail Holden C F, Contains 3 NRC/NRR to Holden, NRR, Et. NRC/NRR information Al., Re: VY EPU regarding NRC Conference Call. staff internal scheduling practices ML052420408 Ennis R B, E-mail, Ennis, NRR, 8/29/2005 E-Mail Holden C F, Contains 3 NRC/NRR to Holden, NRR, Et. NRC/NRR information Al., Re: VY EPU regarding NRC Conference Call. staff internal scheduling practices ML052440380 Ennis R B, E-mail Ennis, NRR, 8/30/2005 E-Mail Abdullahi Z, Contains 3 NRC/NRR to Wermiel, NRR, Et. Akstulewicz F information AL., Re: VY EPU GE M, Wermiel J regarding NRC Audit. S, NRC/NRR staff internal scheduling practices ML052440378 Ennis R B, E-mail Ennis, NRR, 8/31/2005 E-Mail Thomas G, Contains 2 NRC/NRR to Thomas, Re: VY NRC/NRR information EPU Question. regarding NRC staff internal scheduling practices PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 13 09/06/05 Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052440373 Ennis R B, E-mail Ennis, NRR, 8/31/2005 E-Mail Wermiel J S, Contains 3 NRC/NRR to Wermiel, NRR, NRC/NRR information Re: VY EPU Audit. regarding NRC staff internal scheduling practices ENCLOSURE 4 VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - SENSITIVE - PERSONAL INFORMATION SUPPLEMENT 13 - September 6, 2005 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as personal information constituting a clearly unwarranted invasion of personal privacy pursuant to 10 C.F.R. § 2.390. In accordance with 10 C.F.R.§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld as sensitive personal information.

Accession Author Title/Description: Document Document Addressee / Comment Page Number Name/Affiliation: Date Type Addressee Count Affiliation ML052160157 Ennis R B, E-mail Ennis, NRR, 8/2/2005 E-Mail Daflucas R, Contains personal 5 NRC/NRR to Daflucas, Entergy Entergy information related Nuclear Northeast, Nuclear to travel of NRC Re: VY EPU Steam Northeast consultant Dryer Audit.

ML052160161 Wu C I, NRC/NRR E-mail Wu, NRR, to 8/2/2005 E-Mail Ennis R B, Contains personal 4 Ennis, NRR, Re: VU NRC/NRR information related EPU Steam Dryer to travel of NRC Audit. consultant August 31, 2005 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR VERMONT YANKEE ) Docket No. 50-271-OLA LLC and ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 04-832-02-OLA

)

(Vermont Yankee Nuclear Power Station) )

AFFIDAVIT OF G. EDWARD MILLER, JR. CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(d)

I, G. Edward Miller, Jr., being first duly sworn, do hereby state as follows:

1. I am employed as a Project Engineer in the Division of Licensing Project Management in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation (NRR). I serve as a project engineer for NRR Project Directorate I, Section 2. Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the extended power uprate license amendment request at issue in this proceeding.
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §2.336 (b) and (d) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.
3. I hereby certify that the foregoing is true and complete to the best of my knowledge, information and belief.

/RA/

G. Edward Miller, Jr.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR VERMONT YANKEE ) Docket No. 50-271-OLA LLC and ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 04-832-02-OLA

)

(Vermont Yankee Nuclear Power Station) )

CERTIFICATE OF SERVICE I hereby certify that copies of the NRC Staff letter dated September 6, 2005, providing notice of the availability of the hearing file, together with attachments, in the captioned proceeding have been served on the following by deposit in the United States mail, first class; or as indicated by an asterisk (*), by deposit in the Nuclear Regulatory Commissions internal mail system; and by e-mail as indicated by a double asterisk (**), this 6th day of September, 2005.

Alex S. Karlin, Chair** Dr. Anthony J. Baratta**

Administrative Judge Administrative Judge Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3F23 Mail Stop T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 (E-mail: ask2@nrc.gov) (E-mail: ajb5@nrc.gov)

Lester S. Rubenstein** Office of the Secretary**

Administrative Judge ATTN: Rulemaking and Adjudications Staff Atomic Safety and Licensing Board Panel Mail Stop: O-16C1 4760 East Country Villa Drive U.S. Nuclear Regulatory Commission Tucson, AZ 85718 Washington, DC 20555-0001 (E-mail: lesrrr@comcast.net) (E-mail: HEARINGDOCKET@nrc.gov)

Office of Commission Appellate John M. Fulton, Esq.

Adjudication* Assistant General Counsel Mail Stop: O-16C1 Entergy Nuclear Operations, Inc.

U.S. Nuclear Regulatory Commission 440 Hamilton Avenue Washington, DC 20555-0001 White Plains, NY 10601

Jay E. Silberg, Esq.** Raymond Shadis**

Matias Travieso-Diaz, Esq.** Staff Technical Advisor Douglas Rosinski, Esq.** New England Coalition Pillsbury Winthrop Shaw Pittman, LLP P.O. Box 98 2300 N St., NW Edgecomb, ME 04556 Washington, DC 20037-1128 (E-mail: shadis@prexar.com (E-mail: jay.silberg@pillsburylaw.com shadis@ime.net) matias.travieso-diaz@pillsburylaw.com douglas.rosinski@pillsburylaw.com)

Sarah Hofmann, Esq.** Anthony Z. Roisman, Esq.**

Special Counsel National Legal Scholars Law Firm Department of Public Service 84 East Thetford Rd.

112 State Street - Drawer 20 Lyme, NH 03768 Montpelier, VT 05620-2601 (E-mail:

(E-mail: sarah.hofmann@state.vt.us) aroisman@nationallegalscholars.com)

Jonathan M. Block, Esq.** Jonathan M. Rund, Esq.**

94 Main Street Law Clerk P.O. Box 566 Atomic Safety and Licensing Board Panel Putney, VT 05346-0566 Mail Stop: T-3F23 (E-mail: jonb@sover.net) U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: jmr3@nrc.gov)

/RA/

Jason C. Zorn Counsel for NRC Staff