March 22, 2005 Administrative Judge Alex S. Karlin, Chair Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop: T-3F23 Washington, DC 20555-0001 Administrative Judge Anthony J. Baratta Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop: T-3F23 Washington, DC 20555-0001 Administrative Judge Lester S. Rubenstein Atomic Safety and Licensing Board Panel 4270 E Country Villa Drive Tucson, AZ 85718 In the Matter of ENTERGY NUCLEAR VERMONT YANKEE LLC and ENTERGY NUCLEAR OPERATIONS, INC.
(Vermont Yankee Nuclear Power Station)
Docket No. 50-271-OLA
Dear Administrative Judges:
Pursuant to 10 C.F.R. § 2.336(d), the NRC staff hereby provides notice that the Hearing File for this proceeding has been updated. As required by 10 C.F.R. § 2.336(b)(5), the staff is producing an update to the privilege log at this time. The staff is continuing to preserve and maintain all privileged documents during the pendency of this proceeding. Also enclosed is the Affidavit of John P. Boska.
Sincerely,
/RA/
Brooke D. Poole Counsel for NRC Staff
Enclosures:
Hearing File Supplement Privilege Log - Proprietary Privilege Log - Deliberative Process Affidavit of John P. Boska ENCLOSURE 1 VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX SUPPLEMENT 5 - March 22, 2005 Package - Meeting on VY Steam Dryer Accession Number Document Date Title/Description 132 ML050280373 02/14/2005 Summary of 09/29/2004 Meeting with Entergy on Steam Dryer Analysis for Vermont Yankee.
133 ML050590145 09/29/2004 Vermont Yankee Attendance List for Sept. 29, 2004 Meeting re:Steam Dryer Analysis.
134 ML042890417 09/29/2004 Vermont Yankee Nuclear Power Station - Proposed Technical Specification Change No. 263 - Supplement No. 20 Extended Power Uprate - Meeting on Steam Dryer Analysis Meeting Presentation Slides.
Package - Vermont Yankee EPU Supplement 24 Accession Number Document Date Title/Description 135 ML050750157 03/10/2005, Vermont Yankee - Proposed Technical Specification Change No. 263 -
Supplement No. 24 Extended Power Uprate Response to RAI SRXB-A-6.
136 ML050750140 03/10/2005 Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 24 Extended Power Uprate - Response to Request for Additional Information.
137 ML050750150 03/10/2005 VYC-1924, Rev 0, Exhibit 2, Vermont Yankee - Proposed Technical Specification Change No. 263 - Supplement No. 24 Extended Power Uprate Response to RAI SPSB-C-35.
138 ML050750145 03/10/2005 VYC-1959, Rev. 1, Exhibit 1, Vermont Yankee - Proposed Technical Specification Change No. 263 - Supplement No. 24 Extended Power Uprate Response to RAI SPSB-C-35.
Accession Number Document Date Title/Description 139 ML050630421 02/24/2005 E-mail, Gucwa, Entergy Nuclear Northeast, to Ennis, NRR, re: VY EPU Supplement 23.
ENCLOSURE 2 VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - PROPRIETARY INFORMATION SUPPLEMENT 5 - MARCH 22, 2005 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain trade secrets, privileged or confidential commercial or financial information subject to withholding from public disclosure pursuant to 10 C.F.R. § 2.390. Pursuant to 10 C.F.R. § 2.336(b)(5), the Staff is providing this log to identify the following documents, designated proprietary, and subject to protected status under Section 2.390.
Accession Number Author Name/Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count ML050750159 Entergy Nuclear Northeast, Entergy Nuclear Operations, Inc,
Vermont Yankee -
Proposed Technical Specification Change No. 263 -
Supplement No. 24 Extended Power Uprate Response to RAI SRXB-A-6.
03/10/2005 Technical Specifi-
- cation, Bases Change 25 ENCLOSURE 3 VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 5 - MARCH 22, 2005 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.
§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the deliberative process privilege.
Accession Number Author Name/Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count ML050630429 Tatum, J.E.,
NRC/NRR E-mail, Tatum, NRR, to Trimble, NRR, re:
VY EPU, Manual Actions to Isolate Service Water Leaks.
02/16/2005 E-Mail Trimble, D.C.,
NRC/NRR 2
ML050630408 Ennis, R.B.,
NRC/NRR E-mail, Ennis, NRR, to Trimble, NRR, re:
VY EPU, Manual Actions to Isolate Service Water Leaks.
03/03/2005 E-Mail Trimble, D.C.,
NRC/NRR 3
ML050630402 Tatum, J.E.,
NRC/NRR E-mail, Tatum, NRR, to Trimble, NRR, and Ennis, NRR, re: VY EPU, Manual Actions to Isolate Service Water Leaks.
03/03/2005 E-Mail Ennis, R.,
Trimble, D.C.,
NRC/NRR 4
March 16, 2005 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
ENTERGY NUCLEAR VERMONT YANKEE
)
Docket No. 50-271-OLA LLC and ENTERGY NUCLEAR
)
OPERATIONS, INC.
)
ASLBP No. 04-832-02-OLA
)
(Vermont Yankee Nuclear Power Station)
)
AFFIDAVIT OF JOHN P. BOSKA CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(d)
I, John P. Boska, being first duly sworn, do hereby state as follows:
1.
I am employed as a Senior Project Manager in the Division of Licensing Project Management in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Vermont Yankee Nuclear Power Station. Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the extended power uprate license amendment request at issue in this proceeding.
2.
I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R.
§2.336 (b) and (d) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.
3.
I hereby certify that the foregoing is true and complete to the best of my knowledge, information and belief.
/RA/
John P. Boska
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
ENTERGY NUCLEAR VERMONT YANKEE
)
Docket No. 50-271-OLA LLC and ENTERGY NUCLEAR
)
OPERATIONS, INC.
)
ASLBP No. 04-832-02-OLA
)
(Vermont Yankee Nuclear Power Station)
)
CERTIFICATE OF SERVICE I hereby certify that copies of the NRC Staff letter dated March 22, 2005, providing notice of the availability of the hearing file, with attachment, together with the affidavit of John P. Boska, in the captioned proceeding have been served on the following by deposit in the United States mail, first class; or as indicated by an asterisk (*), by deposit in the Nuclear Regulatory Commissions internal mail system; and by e-mail as indicated by a double asterisk (**), this 22nd day of March, 2005.
Alex S. Karlin, Chair**
Administrative Judge Atomic Safety and Licensing Board Panel Mail Stop T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ask2@nrc.gov Dr. Anthony J. Baratta**
Administrative Judge Atomic Safety and Licensing Board Panel Mail Stop T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ajb5@nrc.gov Lester S. Rubenstein**
Administrative Judge Atomic Safety and Licensing Board Panel 4270 E Country Villa Drive Tucson, AZ 85718 E-mail: lesrrr@comcast.net Office of the Secretary**
ATTN: Rulemaking and Adjudications Staff Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: HEARINGDOCKET@nrc.gov Office of Commission Appellate Adjudication*
Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 John M. Fulton, Esq.
Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Jay E. Silberg, Esq.**
Matias Travieso-Diaz, Esq.**
Douglas Rosinski, Esq.**
Shaw Pittman, LLP 2300 N St., NW Washington, DC 20037-1128 E-mail: jay.silberg@shawpittman.com matias.travieso-diaz@shawpittman.com douglas.rosinski@shawpittman.com Raymond Shadis**
Staff Technical Advisor New England Coalition P.O. Box 98 Edgecomb, ME 04556 E-mail: shadis@prexar.com shadis@ime.net Sarah Hofmann, Esq.**
Special Counsel Department of Public Service 112 State Street - Drawer 20 Montpelier, VT 05620-2601 E-mail: sarah.hofmann@state.vt.us Anthony Z. Roisman, Esq.**
National Legal Scholars Law Firm 84 East Thetford Rd.
Lyme, NH 03768 E-mail: aroisman@valley.net Jonathan M. Block, Esq.**
94 Main Street P.O. Box 566 Putney, VT 05346-0566 E-mail: jonb@sover.net Jonathan M. Rund, Esq.
Law Clerk Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: jmr3@nrc.gov)
Christopher M. Wachter, Esq.
Law Clerk Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: cmw@nrc.gov)
/RA/
Robert M. Weisman Counsel for NRC Staff