& 07/22/2004 Summary of Meeting with Entergy Nuclear Operations, Inc., on Steam Dryer Analysis
ML042220022
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 09/02/2004
From: Richard Ennis
NRC/NRR/DLPM/LPD1
To:
Ennis R, NRR/DLPM, 415-1420
References
TAC MC0761
Download: ML042220022 (8)


Text

September 2, 2004 LICENSEE:

Entergy Nuclear Operations, Inc.

FACILITY:

Vermont Yankee Nuclear Power Station

SUBJECT:

SUMMARY

OF JULY 21 and 22, 2004, MEETINGS WITH ENTERGY NUCLEAR OPERATIONS, INC. ON STEAM DRYER ANALYSIS FOR VERMONT YANKEE NUCLEAR POWER STATION (TAC NO. MC0761)

On July 21 and 22, 2004, Category 1 meetings were held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Entergy Nuclear Operations, Inc. (Entergy) at NRC Headquarters in Rockville, Maryland.

The purpose of the July 21, 2004, meeting was to discuss the methodology being used by Entergys contractor, General Electric Nuclear Energy (GENE), for the structural analysis of the Vermont Yankee Nuclear Power Station (VYNPS) steam dryer. This analysis is being used to support Entergys license amendment request for a 20% power uprate at VYNPS. The power uprate request was submitted by Entergy to the NRC on September 10, 2003. The purpose of the July 22, 2004, meeting was to discuss some of the specific issues related to the VYNPS steam dryer analysis, including the steam dryer inspection and modifications performed during the Spring 2004 outage, and testing and monitoring planned for the steam dryer. A portion of each meeting was closed to the public in order to discuss proprietary information associated with GENEs analysis. The lists of attendees for the July 21 and 22, 2004, meetings are provided as Attachments 1 and 2, respectively.

Open Portion of Meeting on July 21, 2004 Mr. Richard Ennis, Project Manager for VYNPS in the NRCs Office of Nuclear Reactor Regulation (NRR) Division of Licensing Project Management (DLPM), provided introductory remarks. Mr. Ennis explained that although the steam dryer is a non safety-related component, industry experience with steam dryer cracking has raised concerns because of the potential for loose dryer parts to impact the performance of safety-related components. Mr. Ennis emphasized that the NRC needs to fully understand the analysis, design, and monitoring that Entergy plans for the VYNPS steam dryer as part of the staff's evaluation of the request to operate at a higher power level.

Mr. Craig Nichols, Entergy's VYNPS power uprate Project Manager, provided an overview of the information to be discussed during both meetings.

Mr. Dan Pappone, of GENE, presented information regarding the steam dryer structural analysis methodology as shown in slides 1 through 14 of Attachment 3. Mr. Pappone emphasized that industry experience with steam dryer failures is that steam line velocity is a good indicator of the pressure loads on the dryer. He noted that the VYNPS steam line velocities after the proposed power uprate would be about the same as the steam line velocities before power uprate at the Quad Cities and Dresden plants.

Members of the public were in attendance. There were no comments or questions from the public and no Public Meeting Feedback forms were received by the NRC staff. There were no action items resulting from this meeting.

Open Portion of Meeting on July 22, 2004 Mr. Ennis provided introductory remarks similar in nature to his introductory remarks during the meeting on July 21, 2004.

Mr. Nichols presented information regarding the VYNPS steam dryer activities related to the proposed power uprate as shown in the Attachment 4 slides. The following major topics were discussed during the presentation:



Mr. Nichols discussed the VYNPS steam dryer inspection and steam dryer modifications that were performed during the Spring 2004 refueling outage. The same type inspection (i.e., consistent with GENE SIL-644 recommendations) will be performed during the next refueling outage. The modifications that were performed to strengthen the dryer incorporated the latest GENE modifications consistent with the lessons-learned from Quad Cities.



Mr. Nichols stated that VYNPS steam dryer monitoring would take measurements consistent with GENE SIL-644 recommendations.



Mr. Nichols discussed an acoustical monitoring program that will be used to get VYNPS specific data in order to show the GENE analysis is bounded by the VYNPS specific data.

Entergy is using the same vendors as Exelon for this effort. Instrumentation was installed for the acoustic monitoring program during the recent forced outage. Data was collected during the subsequent plant startup for power levels between 80% and 100% power.

Additional data would be collected following the proposed power uprate at power levels above the current 100% level during a controlled power ascension program.

Following the presentation by Mr. Nichols, the NRC staff provided the following questions and comments:



Mr. Tad Marsh, Director of DLPM in the NRCs Office of NRR, raised concerns regarding the acoustic monitoring program use of data external to the dryer (e.g., main steam lines) in predicting the effects on the steam dryer. He asked if Entergy had considered instrumenting the steam dryer. Mr. Nichols stated that Entergy believes that the acoustic model can predict the pressure wave going back to the dryer. He stated that instrumenting the existing dryer would be difficult due to ALARA concerns. He said that during the modifications performed to strengthen the dryer during the Spring 2004 outage, underwater welding was performed and the dose to workers was approximately 15 rem. In addition, he stated it would be difficult to route new wiring out of the reactor vessel due to a lack of electrical penetrations.



Mr. Gene Imbro, Chief of the Mechanical and Civil Engineering Branch (EMEB) in the Division of Engineering (DE) in the NRCs Office of NRR, stated that the staff still needs more information to have reasonable assurance that the steam dryer analysis is acceptable.

Some of the specific concerns relate to the extrapolation of data from 100% power to 120%

power, the adequacy of the GENE steam dryer scale model testing, and the lack of existing plant data on the face of the steam dryer hood. Mr. Imbro also stated that the NRC was considering whether, if the VYNPS power uprate was approved, the NRC may require a mid-cycle inspection of the dryer. Mr. Marsh discussed that the NRC was also considering if hold points, with interaction between the NRC and the licensee, may be required during a controlled power ascension.



Mr. Tom Scarbrough, NRC Senior Mechanical Engineer in NRR/DE/EMEB, asked what work still needs to be done to support the VYNPS power uprate evaluation of the steam dryer. Mr. Nichols stated that the GENE analysis is done and Entergy will continue to evaluate any industry experience for applicability to VYNPS. Plant testing and monitoring of the steam dryer would be done during power ascension at uprated power conditions.



Mr. John McCann, Entergy Director of Licensing, stated that Entergy would supplement the power uprate application with information regarding the acoustic monitoring program and power ascension program. They will not wait for an NRC request for additional information to provide this information.



Mr. Gene Imbro stated that the NRCs contractor, Argonne National Labs, was reviewing the recent Entergy submittals related to the steam dryer analysis and that the staff and the contractors were still planning a trip to San Jose to audit the GENE analysis for VYNPS.



Mr. Bill Ruland, the NRCs Program Manager for power uprates in NRR/DLPM, stated that Entergy should consider defining the specific acceptance criteria for what is acceptable in terms of steam dryer cracking. The criteria should be developed to provide clear justification of why certain type of cracking may be acceptable to be left in service following a steam dryer inspection. The criteria should define what is considered an unacceptable failure of the dryer.

Members of the public were in attendance. There were no comments or questions from the public. Public Meeting Feedback forms were not received.

The following are the action items resulting from this meeting:

1. Entergy noted that they are currently developing a plant specific acoustic analysis model for use in validating that the load definition for the steam dryer in the analysis of record is sufficiently conservative. This effort is scheduled for completion by the end of August, 2004. Entergy agreed to provide the results to the NRC and schedule a meeting to discuss with the NRC.
2. Entergy agreed to provide additional details on the power ascension test plan including plans for monitoring the steam dryer, as well as other plant systems and components, for flow induced vibration (FIV). This would include the acceptance criteria that will be used.
3. Entergy agreed to supply computational fluid dynamic output plots showing velocity profiles and streamlines.
4. Energy agreed to provide a discussion of the effects of potential bi-stable flow on the steam dryer dynamics.
5. Entergy agreed to supply the basis for the stress intensity limit of 5 ksi-in1/2 limit for the drain channel cracks.
6. Entergy agreed to supply a discussion of the FIV and extended power uprate operating condition effect on crack growth.
7. Entergy agreed to provide a commitment to perform detailed inspections of the steam dryer during the next two refueling outages, in accordance with SIL-644, Supplement 1.
8. Entergy agreed to provide the results of the inspections scheduled for the next two outages to the NRC and discuss any changes to the long term monitoring plan once these inspections are completed.
9. Entergy agreed to supply the acceptance criteria that will be used in evaluating the structural integrity of the dryer.
10. A number of technical questions associated with the GENE analysis (e.g. damping values) were discussed and it was agreed that additional discussions would occur during the NRCs audit in San Jose.

Please direct any inquires concerning this meeting to me. I can be reached at (301) 415-1420, or rxe@nrc.gov.

/RA/

Richard B. Ennis, Senior Project Manager, VY Section Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-271 Attachments:

1. List of Attendees for July 21, 2004
2. List of Attendees for July 22, 2004
3. GENE Slides for July 21, 2004
4. Entergy Slides for July 22, 2004 cc w/atts: See next page
3. Entergy agreed to supply computational fluid dynamic output plots showing velocity profiles and streamlines.
4. Energy agreed to provide a discussion of the effects of potential bi-stable flow on the steam dryer dynamics.
5. Entergy agreed to supply the basis for the stress intensity limit of 5 ksi-in1/2 limit for the drain channel cracks.
6. Entergy agreed to supply a discussion of the FIV and extended power uprate operating condition effect on crack growth.
7. Entergy agreed to provide a commitment to perform detailed inspections of the steam dryer during the next two refueling outages, in accordance with SIL-644, Supplement 1.
8. Entergy agreed to provide the results of the inspections scheduled for the next two outages to the NRC and discuss any changes to the long term monitoring plan once these inspections are completed.
9. Entergy agreed to supply the acceptance criteria that will be used in evaluating the structural integrity of the dryer.
10. A number of technical questions associated with the GENE analysis (e.g. damping values) were discussed and it was agreed that additional discussions would occur during the NRCs audit in San Jose.

Please direct any inquires concerning this meeting to me. I can be reached at (301) 415-1420, or rxe@nrc.gov.

/RA/

Richard B. Ennis, Senior Project Manager, VY Section Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-271 Attachments:

1. List of Attendees for July 21, 2004
2. List of Attendees for July 22, 2004
3. GENE Slides for July 21, 2004
4. Entergy Slides for July 22, 2004 cc w/atts: See next page DISTRIBUTION:

PUBLIC SDembek RCaruso, ACRS WRuland PDI-2 Reading BPham CSantos, ACRS JStang JDyer LRossbach TKim, EDO JLamb BSheron CGrimes CMiller, EDO GMiller RBorchardt EImbro VBucci, OIG MFields TMarsh KManoly OGC VThomas, RES JLyons DTerao ACRS DHelton, RES CHolden TScarbrough BHolian, RGN-I SMalik, RES AHowe JWu CAnderson, RGN-I DKalinousky, RES REnnis JHernandez DPelton, RGN-I CRaynor BElliot LDoerflein, RGN-I DSkay MYoung JJacobson Package Accession No.: ML Meeting Summary Accession No.: ML042220022 OFFICE PDI-VY/PM EMEB/BC EMCB/SC PDIV/D PDI-VY/SC PDI/D DLPM/D NAME REnnis EImbro SCoffin WRuland AHowe CHolden TMarsh DATE 8/23/04 8/24/04 8/25/04 8/27/04 8/30/04 8/31/04 9/1/04 OFFICIAL RECORD COPY

Vermont Yankee Nuclear Power Station cc:

Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. David R. Lewis Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.

Washington, DC 20037-1128 Ms. Christine S. Salembier, Commissioner Vermont Department of Public Service 112 State Street Montpelier, VT 05620-2601 Mr. Michael H. Dworkin, Chairman Public Service Board State of Vermont 112 State Street Montpelier, VT 05620-2701 Chairman, Board of Selectmen Town of Vernon P.O. Box 116 Vernon, VT 05354-0116 Operating Experience Coordinator Vermont Yankee Nuclear Power Station 320 Governor Hunt Road Vernon, VT 05354 G. Dana Bisbee, Esq.

Deputy Attorney General 33 Capitol Street Concord, NH 03301-6937 Chief, Safety Unit Office of the Attorney General One Ashburton Place, 19th Floor Boston, MA 02108 Ms. Deborah B. Katz Box 83 Shelburne Falls, MA 01370 Ms. Carla A. White, RRPT, CHP Radiological Health Vermont Department of Health P.O. Box 70, Drawer #43 108 Cherry Street Burlington, VT 05402-0070 Mr. James M. DeVincentis Manager, Licensing Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500 Resident Inspector Vermont Yankee Nuclear Power Station U. S. Nuclear Regulatory Commission P.O. Box 176 Vernon, VT 05354 Director, Massachusetts Emergency Management Agency ATTN: James Muckerheide 400 Worcester Rd.

Framingham, MA 01702-5399 Jonathan M. Block, Esq.

Main Street P.O. Box 566 Putney, VT 05346-0566 Mr. John F. McCann Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213

Vermont Yankee Nuclear Power Station cc:

Mr. John T. Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Danny L. Pace Vice President, Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Brian OGrady Vice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John M. Fulton Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Jay K. Thayer Site Vice President Entergy Nuclear Operations, Inc.

Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500 Mr. Kenneth L. Graesser 38832 N. Ashley Drive Lake Villa, IL 60046 Mr. James Sniezek 5486 Nithsdale Drive Salisbury, MD 21801 Mr. Ronald Toole 1282 Valley of Lakes Box R-10 Hazelton, PA 18202 Ms. Stacey M. Lousteau Treasury Department Entergy Services, Inc.

639 Loyola Avenue New Orleans, LA 70113 Mr. Raymond Shadis New England Coalition Post Office Box 98 Edgecomb, ME 04556 Mr. James P. Matteau Executive Director Windham Regional Commission 139 Main Street, Suite 505 Brattleboro, VT 05301 Mr. William K. Sherman Vermont Department of Public Service 112 State Street Drawer 20 Montpelier, VT 05620-2601