ML051240318
| ML051240318 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 05/03/2005 |
| From: | Poole B NRC/OGC |
| To: | Anthony Baratta, Karlin A, Rubenstein L Atomic Safety and Licensing Board Panel |
| Poole, Brooke 415-1556 | |
| References | |
| 50-271-OLA, ASLBP 04-832-02-OLA, RAS 9933 | |
| Download: ML051240318 (13) | |
Text
May 3, 2005 Administrative Judge Alex S. Karlin, Chair Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop: T-3F23 Washington, DC 20555-0001 Administrative Judge Anthony J. Baratta Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop: T-3F23 Washington, DC 20555-0001 Administrative Judge Lester S. Rubenstein Atomic Safety and Licensing Board Panel 4760 East Country Villa Drive Tucson, AZ 85718 In the Matter of ENTERGY NUCLEAR VERMONT YANKEE LLC and ENTERGY NUCLEAR OPERATIONS, INC.
(Vermont Yankee Nuclear Power Station)
Docket No. 50-271-OLA
Dear Administrative Judges:
Pursuant to 10 C.F.R. § 2.336(d), the NRC staff hereby provides notice that the Hearing File for this proceeding has been updated. As required by 10 C.F.R. § 2.336(b)(5), the staff is producing an update to the privilege log at this time. The staff is continuing to preserve and maintain all privileged documents during the pendency of this proceeding. In accordance with the Licensing Boards Order of April 5, 2005, the Staff is producing the hearing file index supplement and the affidavit of John P. Boska only to the other parties to this proceeding.
Sincerely,
/RA/
Brooke D. Poole Counsel for NRC Staff
Enclosures:
Hearing File Index Supplement (parties only)
Privilege Log - Proprietary Privilege Log - Deliberative Process Affidavit of John P. Boska (parties only)
ENCLOSURE 1 VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX SUPPLEMENT 7 - May 3, 2005 Accession Number Document Date Title/Description 149 ML051110206 04/01/2005 E-Mail Daflucas, Entergy, & Ennis, NRR, re: Corrected Attachment 5 Cover Sheet, Supplement 26 to Vermont Yankee EPU.
150 ML051110269 04/01/2005 E-mail Daflucas, Entergy, to Ennis, NRR, re: Attachment Cover Sheets, Supplement 26 to Vermont Yankee EPU.
151 ML051110321 04/01/2005 E-mail Daflucas, Entergy, to Ennis, NRR, re: BVY 05-034 Attachment 5, Supplement 26 to Vermont Yankee EPU.
152 ML051110279 04/01/2005 E-mail Daflucas, Entergy, to Ennis, NRR, re: BVY 05-034 Attachment 6, Supplement 26 to Vermont Yankee EPU.
153 ML051110302 04/01/2005 E-Mail Daflucas, Entergy, to Ennis, NRR, re: BVY 05-034 Attachment 3, Supplement 26 to Vermont Yankee EPU.
154 ML051110309 04/01/2005 E-mail Daflucas, Entergy, to Ennis, NRR, re: BVY 05-034, Supplement 26 to Vermont Yankee EPU.
155 ML051110290 04/01/2005 E-mail Daflucas, Entergy, to Ennis, NRR, re: BVY 05-034, Supplement 26, Attachments 7 & 8, to Vermont Yankee EPU.
156 ML051110193 04/05/2005 E-mail Daflucas, Entergy, to Ennis, NRR, re: BVY 05-038, Supplement 27 To Vermont Yankee EPU.
157 ML051110186 04/06/2005 E-mail Ennis, NRR, to Daflucas, Entergy, re: EPU Draft SPLB RAIs.
158 ML051110202 04/07/2005 E-mail Ennis, NRR, to Daflucas, Entergy, re: Additional EPU Draft SPLB RAIs.
159 ML050980167 04/12/2005 Vermont Yankee Nuclear Power Station - Request for Withholding Information from Public Disclosure (TAC No. MC0761).
160 ML051110191 04/13/2005 E-mail Ennis, NRR, to Gucwa, Entergy, re: EPU RAI 4/18 Conference Call Bridge Number.
Accession Number Document Date Title/Description 161 ML051110184 04/13/2005 Email Gucwa, Entergy, to Ennis, NRR, re: EPU RAI 4/18 Conference Call Bridge Number.
162 ML050940230 04/13/2005 Vermont Yankee Nuclear Power Station, Withholding From Public Disclosure, CDI.
[Continuum Dynamics, Inc.] Report No.04-09P, Revision 6, dated March 2005 (Attachment 3 to Entergy letter BVY 05-034) TAC MC0761.
163 ML050960126 04/14/2005 Vermont Yankee RAI - Extended Power Uprate (TAC No. MC0761).
164 ML051110178 04/15/2005 E-mail Ennis, NRR, to Gucwa, Entergy, re: VY EPU RAIs dated 04/14/05.
165 ML051110169 04/18/2005 E-mail Ennis, NRR, to Gucwa, Entergy, re: Steam Dryer Conference Call Bridge Number.
166 ML050940242 04/19/2005 Vermont Yankee Nuclear Power Station, Withholding from Public Disclosure, GE Report GE-NE-0000-0038-0936P, dated March 2005 (Attachment 5 to Entergy letter BVY 05-034) TAC MC0761.
167 ML051180428 04/22/2005 Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 28 Extended Power Uprate - Response to Request for Additional Information.
168 ML051160389 04/25/2005 E-mail Daflucas, Entergy, to Ennis, NRR, re: Requested Meeting on Vermont Yankees EPU Application.
169 ML051160397 04/25/2005 E-mail Daflucas, Entergy, to Ennis, NRR, re: Requested Meeting on Vermont Yankees EPU Application.
170 ML051160063 04/26/2005 05/09/2005 Notice of Forthcoming Meeting with Entergy Nuclear Vermont Yankee, LLC Re: Purpose Extended Power Uprate.
Package - Vermont Yankee EPU Application Supplement 26 Accession Number Document Date Title/Description 171 ML050960052 03/31/2005, Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 263 - Supplement No. 26 Extended Power Uprate Steam Dryer Analyses and Monitoring, GE-NE-0000-0038-0936-NP.
172 ML050960049 03/31/2005 Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 26 Extended Power Uprate - Steam Dryer Analyses and Monitoring.
Package - Vermont Yankee EPU Application Supplement 27 Accession Number Document Date Title/Description 173 ML051010185 04/05/2005, Vermont Yankee - Technical Specification Proposed Change No. 263 -
Supplement No. 27 Extended Power Uprate - Dryer Acoustic Load Methodology Benchmark, VY-RPT-05-00006 VYNPS Acoustic Model Benchmark-Dryer Acoustic Load.
174 ML051010177 04/05/2005 Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 27 Extended Power Uprate - Dryer Acoustic Load Methodology Benchmark.
ENCLOSURE 2 VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - PROPRIETARY INFORMATION SUPPLEMENT 7 - MAY 3, 2005 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain trade secrets, privileged or confidential commercial or financial information subject to withholding from public disclosure pursuant to 10 C.F.R. § 2.390. Pursuant to 10 C.F.R. § 2.336(b)(5), the Staff is providing this log to identify the following documents, designated proprietary, and subject to protected status under Section 2.390.
Accession Number Author Name/Affiliation Title/Description Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count ML051010187 Betti, E.J., Hobbs, B., Perez, P.B.,
Entergy Nuclear Northeast,
Vermont Yankee -
Technical Specification Proposed Change No. 263 -
Supplement No. 27 Extended Power Uprate - Dryer Acoustic Load Methodology Benchmark VY-RPT-05-00006 VYNPS Acoustic Model Benchmark 03/29/2005 License Application for Facility Operating License (Amendment
/Renewal)
DKT 50, Technical Speci-
- fication, Bases Change 230
Accession Number Author Name/Affiliation Title/Description Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count ML050960054 Continuum Dynamics, Inc. and,
Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 263 -
Supplement No. 26 Extended Power Uprate Steam Dryer Analyses &
Monitoring, Methodology to Determine Unsteady Pressure Loading on Components 03/31/2005 License Application for Facility Operating License (Amendment
/Renewal)
DKT 50,
- Report, Miscell-
- aneous, Technical Speci-
- fication, Bases Change 105
ENCLOSURE 3 VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS SUPPLEMENT 7 - MAY 3, 2005 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.
§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the deliberative process privilege.
Accession Number Author Name/Affiliation Title/Description Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count ML051110100 Ennis, R.B.,
NRC/NRR E-mail - Ennis, NRR, to Wu, NRR, and Scarbrough, NRR, re: Fwd: Vermont Yankee EPU Supplement 26 -
Steam Dryer Analysis.
04/01/2005 E-Mail Scarbrough, T.G., Wu, C.,
NRC/NRR 5
ML051110128 Ennis, R.B.,
NRC/NRR E-mail - Ennis, NRR, to Dennig, NRR, re:
Fwd: Vermont Yankee - Station Blackout review.
04/05/2005 E-Mail Dennig, R.L.,
NRC/NRR 3
ML051110120 Lobel, R.M.,
NRC/NRR E-mail - Lobel, NRR, to Walker, NRR, and Dennig, NRR, re:
Fwd: Vermont Yankee - Station Blackout review.
04/05/2005 E-Mail Dennig, R.L.,
Walker, H.,
NRC/NRR 2
Accession Number Author Name/Affiliation Title/Description Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count ML051110109 Tatum, J.E.,
NRC/NRR E-mail - Tatum, NRR, to Ennis, NRR, re: Need Clarification on Draft RAI Question on Spent Fuel Pool Cooling.
04/05/2005 E-Mail Ennis, R.B.,
NRC/NRR 3
ML051110114 Walker, H.,
NRC/NRR E-mail - Walker, NRR, to Ennis, NRR, re: Fwd: Vermont Yankee - Station Blackout review.
04/05/2005 E-Mail Dennig, R.L.,
NRC/NRR 2
ML051110149 Ennis, R.B.,
NRC/NRR E-mail - Ennis, NRR, to Scarbrough, NRR, re: Vermont Yankee EPU Supplement 27
- Steam Dryer Acoustic Load Methodology.
04/06/2005 E-Mail Scarbrough, T.G.,
NRC/NRR 4
ML051110132 Ennis, R.B.,
NRC/NRR E-mail-Ennis, NRR, to Tatum, NRR, re:
Need Clarification on Draft RAI Question, on Spent Fuel Pool Cooling.
04/06/2005 E-Mail Tatum, J.E.,
NRC/NRR 5
Accession Number Author Name/Affiliation Title/Description Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count ML051110141 Ennis, R.B.,
NRC/NRR E-mail - Ennis, NRR, to Wu, NRR, and Scarbrough, NRR, re: Vermont Yankee EPU Supplement 27
- Steam Dryer Acoustic Load Methodology.
04/06/2005 E-Mail Scarbrough, T.G., Wu, C.,
NRC/NRR 3
ML051110152 Jones, S.R.,
NRC/NRR E-mail - Jones, NRR, to Ennis, NRR, re:
Fwd: Remaining Questions for VY EPU, from SPLB.
04/07/2005 E-Mail Ennis, R.B.,
NRC/NRR 4
ML051110536 Jones, S.R.,
NRC/NRR E-mail - Jones, NRR, to Ennis, NRR, re:
Fwd: Remaining Questions for VY EPU, from SPLB.
04/07/2005 E-Mail Ennis, R.B.,
NRC/NRR 3
ML051110544 Reddy, D.K.,
NRC/NRR E-mail - Reddy, NRR, to Tatum, NRR, and Ennis, NRR, re: Fwd:
Remaining Questions for VY EPU, from SPLB.
04/07/2005 E-Mail Ennis, R.B.,
Tatum, J.E.,
NRC/NRR 3
Accession Number Author Name/Affiliation Title/Description Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count ML051110561 Akstulewicz, F.M.,
NRC/NRR E-mail - Akstulewicz, NRR, to Gill, NRR, et. al., re: Response Required - Vermont Yankee EPU Schedule.
04/13/2005 E-Mail Gill, A.S.,
NRC/NRR 3
ML051110554 Ennis, R.B.,
NRC/NRR E-mail - Ennis, NRR, to Gill, NRR, et. al.,
re: Response Required - Vermont Yankee EPU Schedule.
04/13/2005 E-Mail Gill, A.S.,
NRC/NRR 5
ML051110176 Pettis, R.L.,
NRC/NRR E-mail - Pettis, NRR, to Ennis, NRR, re:
Response Required -
04/13/2005 E-Mail Ennis, R.B.,
NRC/NRR 2
ML051110165 Reddy, D.K.,
NRC/NRR E-mail - Reddy, NRR, to Ennis, NRR, re: Response Required - Vermont Yankee EPU Schedule.
04/13/2005 E-Mail Ennis, R.B.,
NRC/NRR 2
ML051110162 Lobel, R.M.,
NRC/NRR E-mail - Lobel, NRR, to Ennis, NRR, re:
Response Required -
04/20/2005 E-Mail Ennis, R.B.,
NRC/NRR 2
April 27, 2005 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
ENTERGY NUCLEAR VERMONT YANKEE
)
Docket No. 50-271-OLA LLC and ENTERGY NUCLEAR
)
OPERATIONS, INC.
)
ASLBP No. 04-832-02-OLA
)
(Vermont Yankee Nuclear Power Station)
)
AFFIDAVIT OF JOHN P. BOSKA CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(d)
I, John P. Boska, being first duly sworn, do hereby state as follows:
1.
I am employed as a Senior Project Manager in the Division of Licensing Project Management in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Vermont Yankee Nuclear Power Station. Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the extended power uprate license amendment request at issue in this proceeding.
2.
I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §2.336 (b) and (d) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.
3.
I hereby certify that the foregoing is true and complete to the best of my knowledge, information and belief.
/RA/
John P. Boska
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
ENTERGY NUCLEAR VERMONT YANKEE
)
Docket No. 50-271-OLA LLC and ENTERGY NUCLEAR
)
OPERATIONS, INC.
)
ASLBP No. 04-832-02-OLA
)
(Vermont Yankee Nuclear Power Station)
)
CERTIFICATE OF SERVICE I hereby certify that copies of the NRC Staff letter dated May 3, 2005, providing notice of the availability of the hearing file, together with attachments, in the captioned proceeding have been served on the following by deposit in the United States mail, first class; or as indicated by an asterisk (*), by deposit in the Nuclear Regulatory Commissions internal mail system; and by e-mail as indicated by a double asterisk (**), this 3rd day of May, 2005.
Alex S. Karlin, Chair**
Administrative Judge Atomic Safety and Licensing Board Panel Mail Stop T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ask2@nrc.gov Dr. Anthony J. Baratta**
Administrative Judge Atomic Safety and Licensing Board Panel Mail Stop T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ajb5@nrc.gov Lester S. Rubenstein**
Administrative Judge Atomic Safety and Licensing Board Panel 4760 East Country Villa Drive Tucson, AZ 85718 E-mail: lesrrr@comcast.net Office of the Secretary**
ATTN: Rulemaking and Adjudications Staff Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: HEARINGDOCKET@nrc.gov Office of Commission Appellate Adjudication*
Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 John M. Fulton, Esq.
Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Jay E. Silberg, Esq.**
Matias Travieso-Diaz, Esq.**
Douglas Rosinski, Esq.**
Pillsbury Winthrop Shaw Pittman, LLP 2300 N St., NW Washington, DC 20037-1128 E-mail: jay.silberg@pillsburylaw.com matias.travieso-diaz@pillsburylaw.com douglas.rosinski@pillsburylaw.com Raymond Shadis**
Staff Technical Advisor New England Coalition P.O. Box 98 Edgecomb, ME 04556 E-mail: shadis@prexar.com shadis@ime.net Sarah Hofmann, Esq.**
Special Counsel Department of Public Service 112 State Street - Drawer 20 Montpelier, VT 05620-2601 E-mail: sarah.hofmann@state.vt.us Anthony Z. Roisman, Esq.**
National Legal Scholars Law Firm 84 East Thetford Rd.
Lyme, NH 03768 E-mail: aroisman@valley.net Jonathan M. Block, Esq.**
94 Main Street P.O. Box 566 Putney, VT 05346-0566 E-mail: jonb@sover.net Jonathan M. Rund, Esq.
Law Clerk Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: jmr3@nrc.gov)
/RA/
Brooke D. Poole Counsel for NRC Staff