ML102590604: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML102590604
| number = ML102590604
| issue date = 09/16/2010
| issue date = 09/16/2010
| title = Callaway Plant, Unit 1 - Acceptance Review E-mail License Amendment Request, Revise License Condition and Approve Cyber Security Plan (TAC ME4536)
| title = Acceptance Review E-mail License Amendment Request, Revise License Condition and Approve Cyber Security Plan
| author name = Thadani M C
| author name = Thadani M
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name = Elwood T B, Maglio S
| addressee name = Elwood T, Maglio S
| addressee affiliation = NRC/NRO/DE
| addressee affiliation = NRC/NRO/DE
| docket = 05000483
| docket = 05000483
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:From: Thadani, Mohan Sent: Thursday, September 16, 2010 3:44 PM To: Maglio, Scott A; Elwood, Thomas B Cc: Polickoski, James; Lingam, Siva; Feintuch, Karl; Lent, Susan  
{{#Wiki_filter:From:                       Thadani, Mohan Sent:                       Thursday, September 16, 2010 3:44 PM To:                         Maglio, Scott A; Elwood, Thomas B Cc:                         Polickoski, James; Lingam, Siva; Feintuch, Karl; Lent, Susan


==Subject:==
==Subject:==
ACCEPTANCE REVIEW FOR APPROVAL OF CYBER SECURITY PLAN AMENDMENT REQUEST.  
ACCEPTANCE REVIEW FOR APPROVAL OF CYBER SECURITY PLAN AMENDMENT REQUEST.
 
Scott/Tom:
Scott/Tom:  
In accordance with NRC office Instruction LIC-109, the subject NRC staffs acceptance review is provided below.
 
In accordance with NRC office Instruction LIC-109, the subject NRC staff's acceptance review is provided below.  
 
Mohan.
Mohan.
___________________________________________________________________________
Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251
 
Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251  


==SUBJECT:==
==SUBJECT:==
CALLAWAY PLANT, UNIT 1: ACCEPTANCE OF APPLICATION FOR APPROVAL OF CYBER SECURITY PLAN AMENDMENT (TAC NO. ME4536).  
CALLAWAY PLANT, UNIT 1: ACCEPTANCE OF APPLICATION FOR APPROVAL OF CYBER SECURITY PLAN AMENDMENT (TAC NO. ME4536).


==Dear Mr. Heflin:==
==Dear Mr. Heflin:==


By letter dated November 19, 2009 (non-publicly available), as supplemented by letters dated January 21 and June 9, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession Nos.
By letter dated November 19, 2009 (non-publicly available), as supplemented by letters dated January 21 and June 9, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession Nos.
ML100210818 and ML101610642, respectively), Union Electric Company (UE, licensee) requested an amendment to the Facility Operating License for Callaway Plant, Unit 1 Facility Operating License No. NPF-30. In its letter dated August 12, 2010 (ADAMS Accession No. ML102250075), UE stated that it withdraws the previously submitted amendment request and proposes, instead, the license amendment request as enclosed in its August 12, 2010 submittal.
ML100210818 and ML101610642, respectively), Union Electric Company (UE, licensee) requested an amendment to the Facility Operating License for Callaway Plant, Unit 1 Facility Operating License No.
The proposed License Amendment Request includes the cyber security plan, proposed changes to Section 2.E. of the Facility Operating License No. NPF-30, proposed Cyber Security Plan Implementation Schedule, evaluation of the proposed change, and a summary of deviations between the Callaway Plant Unit 1 Cyber Security Plan and the cyber security plan template presented in NEI 08-09, Revision 6. The proposed cyber security plan has been submitted in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Section 73.54, "Protection of digital computer and communication systems and networks.
NPF-30. In its letter dated August 12, 2010 (ADAMS Accession No. ML102250075), UE stated that it withdraws the previously submitted amendment request and proposes, instead, the license amendment request as enclosed in its August 12, 2010 submittal.
 
The proposed License Amendment Request includes the cyber security plan, proposed changes to Section 2.E. of the Facility Operating License No. NPF-30, proposed Cyber Security Plan Implementation Schedule, evaluation of the proposed change, and a summary of deviations between the Callaway Plant Unit 1 Cyber Security Plan and the cyber security plan template presented in NEI 08-09, Revision 6. The proposed cyber security plan has been submitted in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Section 73.54, Protection of digital computer and communication systems and networks.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of the Callaway Plant Unit 1 August 12, 2010 amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes desired, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of the Callaway Plant Unit 1 August 12, 2010 amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its
 
The NRC staff has reviewed your application and has determined that the application reasonably appears to contain sufficient technical information, both in scope and depth, for the NRC staff to complete the detailed technical review and render, in an appropriate time frame for the associated action, an independent assessment of the proposed action with regard to applicable regulatory requirements and the protection of public health, safety, and security. 


characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes desired, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and has determined that the application reasonably appears to contain sufficient technical information, both in scope and depth, for the NRC staff to complete the detailed technical review and render, in an appropriate time frame for the associated action, an independent assessment of the proposed action with regard to applicable regulatory requirements and the protection of public health, safety, and security.
If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact the Callaway Project Manager, Mr. Mohan Thadani, at (301) 415-1476 or via email at mohan.thadani@nrc.gov. Sincerely,
If you have any questions, please contact the Callaway Project Manager, Mr. Mohan Thadani, at (301) 415-1476 or via email at mohan.thadani@nrc.gov.
 
Sincerely, Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation E-mail Properties Mail Envelope Properties (0A64B42AAA8FD4418CE1EB5240A6FED11E224A9C61)
Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation E-mail Properties Mail Envelope Properties (0A64B42AAA8FD4418CE1EB5240A6FED11E224A9C61)  


==Subject:==
==Subject:==
ACCEPTANCE REVIEW FOR APPROVAL OF CYBER SECURITY PLAN AMENDMENT REQUEST.
ACCEPTANCE REVIEW FOR APPROVAL OF CYBER SECURITY PLAN AMENDMENT REQUEST.
Sent Date:        9/16/2010 3:43:48 PM Received Date:       9/16/2010 3:43:48 PM From:               Thadani, Mohan  
Sent Date:        9/16/2010 3:43:48 PM Received Date:         9/16/2010 3:43:48 PM From:             Thadani, Mohan Created By:        Mohan.Thadani@nrc.gov Recipients:
 
Created By:        Mohan.Thadani@nrc.gov  
 
Recipients:
SMaglio@ameren.com (Maglio, Scott A)
SMaglio@ameren.com (Maglio, Scott A)
Tracking Status: None TElwood@ameren.com (Elwood, Thomas B)
Tracking Status: None TElwood@ameren.com (Elwood, Thomas B)
Tracking Status: None James.Polickoski@nrc.gov (Polickoski, James)
Tracking Status: None James.Polickoski@nrc.gov (Polickoski, James)
Tracking Status: None        Siva.Lingam@nrc.gov (Lingam, Siva)
Tracking Status: None
Karl.Feintuch@nrc.gov (Feintuch, Karl)                Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan)
Tracking Status: None
Post Office:
HQCLSTR02.nrc.gov
Files                Size        Date & Time
MESSAGE        10659        9/16/2010
Options Expiration Date:
Priority:                        olImportanceNormal ReplyRequested:        False Return Notification:        False


Sensitivity:         olNormal Recipients received:}}
Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)
Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl)
Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan)
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files          Size      Date & Time MESSAGE          10659      9/16/2010 Options Expiration Date:
Priority:              olImportanceNormal ReplyRequested:      False Return Notification:      False Sensitivity:     olNormal Recipients received:}}

Latest revision as of 18:36, 11 March 2020

Acceptance Review E-mail License Amendment Request, Revise License Condition and Approve Cyber Security Plan
ML102590604
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/16/2010
From: Thadani M
Plant Licensing Branch IV
To: Elwood T, Maglio S
NRC/NRO/DE
Thadani, M C, NRR/DORL/LP4, 415-1476
References
TAC ME4536
Download: ML102590604 (3)


Text

From: Thadani, Mohan Sent: Thursday, September 16, 2010 3:44 PM To: Maglio, Scott A; Elwood, Thomas B Cc: Polickoski, James; Lingam, Siva; Feintuch, Karl; Lent, Susan

Subject:

ACCEPTANCE REVIEW FOR APPROVAL OF CYBER SECURITY PLAN AMENDMENT REQUEST.

Scott/Tom:

In accordance with NRC office Instruction LIC-109, the subject NRC staffs acceptance review is provided below.

Mohan.

Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251

SUBJECT:

CALLAWAY PLANT, UNIT 1: ACCEPTANCE OF APPLICATION FOR APPROVAL OF CYBER SECURITY PLAN AMENDMENT (TAC NO. ME4536).

Dear Mr. Heflin:

By letter dated November 19, 2009 (non-publicly available), as supplemented by letters dated January 21 and June 9, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession Nos.

ML100210818 and ML101610642, respectively), Union Electric Company (UE, licensee) requested an amendment to the Facility Operating License for Callaway Plant, Unit 1 Facility Operating License No.

NPF-30. In its letter dated August 12, 2010 (ADAMS Accession No. ML102250075), UE stated that it withdraws the previously submitted amendment request and proposes, instead, the license amendment request as enclosed in its August 12, 2010 submittal.

The proposed License Amendment Request includes the cyber security plan, proposed changes to Section 2.E. of the Facility Operating License No. NPF-30, proposed Cyber Security Plan Implementation Schedule, evaluation of the proposed change, and a summary of deviations between the Callaway Plant Unit 1 Cyber Security Plan and the cyber security plan template presented in NEI 08-09, Revision 6. The proposed cyber security plan has been submitted in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Section 73.54, Protection of digital computer and communication systems and networks.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of the Callaway Plant Unit 1 August 12, 2010 amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its

characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes desired, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and has determined that the application reasonably appears to contain sufficient technical information, both in scope and depth, for the NRC staff to complete the detailed technical review and render, in an appropriate time frame for the associated action, an independent assessment of the proposed action with regard to applicable regulatory requirements and the protection of public health, safety, and security.

If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact the Callaway Project Manager, Mr. Mohan Thadani, at (301) 415-1476 or via email at mohan.thadani@nrc.gov.

Sincerely, Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation E-mail Properties Mail Envelope Properties (0A64B42AAA8FD4418CE1EB5240A6FED11E224A9C61)

Subject:

ACCEPTANCE REVIEW FOR APPROVAL OF CYBER SECURITY PLAN AMENDMENT REQUEST.

Sent Date: 9/16/2010 3:43:48 PM Received Date: 9/16/2010 3:43:48 PM From: Thadani, Mohan Created By: Mohan.Thadani@nrc.gov Recipients:

SMaglio@ameren.com (Maglio, Scott A)

Tracking Status: None TElwood@ameren.com (Elwood, Thomas B)

Tracking Status: None James.Polickoski@nrc.gov (Polickoski, James)

Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)

Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl)

Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan)

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 10659 9/16/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: