Acceptance Review E-mail, License Amendment Request, Revise TS 3.8.4, DC Sources - Operating, & TS 3.8.5, DC Sources - Shutdown, to Revise Battery Connection Resistance Limits Surveillance Requirements-TAC ME0292
ML090750488
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/16/2009
From: Thadani M
Plant Licensing Branch IV
To: Maglio S
Ameren Corp
Thadani, M C, NRR/DORL/LP4, 415-1476
References
TAC ME0292
Download: ML090750488 (1)


Text

From: Mohan Thadani Sent: Monday, March 16, 2009 11:56 AM To: Internet:smaglio@ameren.com; Internet:telwood@ameren.com Cc: Mohan Thadani; Janet Burkhardt; Susan Lent; Marshall David

Subject:

CALLAWAY PLANT, UNIT 1-ACCEPTANCE OF APPLICATION DATED DECEMBER 29, 2008 (ME0295)

Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251

SUBJECT:

CALLAWAY PLANT, UNIT 1 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: REVISION TO TECHNICAL SPECIFICATIONS 3.8.4 AND 3.8.5(TAC NO. ME0292).

Dear Mr. Heflin:

By letter dated December 29, 2008 Union Electric Company (the licensee) requested the U.S.

Nuclear Regulatory Commission (NRC) staff for approval of a revision to Callaway Plant, Unit 1 Technical Specifications (TS) 3.8.4 and 3.8.5, "DC Sources-Operating" and "DC Sources-Shutdown" respectively.

The proposed amendment would revise the battery connection resistance limits in Surveillance Requirements (SR) 3.8.4.2 and 3.8.4.5 from 150 micro-ohms (150E-6 ohms) 69 micro-ohms (69E-6 ohms). TS 3.8.5 is affected by virtue of SR 3.8.5.1 invoking both SR 3.8.4.2 and SR 3.8.4.5 for DC sources that are required to be operable in Modes 5 and 6.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed the application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed revision to TS 3.8.4 and 3.8.5 in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised of it by separate correspondence.

If you have any questions, please contact me at (301) 415-1476 or email Mohan.Thadani@nrc.gov.

Mohan C Thadani Senior Project Manager Plant Licensing Branch IV

Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-1476 Mohan.Thadani@nrc.gov