ML113260280
Letter Sequence Acceptance Review | |
---|---|
TAC:ME7046, (Approved, Closed) | |
MONTHYEARML1124200222011-08-29029 August 2011
[Table View]Request for License Amendment to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (License Amendment Request Ldcn 11-0012) Project stage: Request ULNRC-05823, Clarification of Information Contained in Request for License Amendment to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (LDCN 11-0012)2011-11-0909 November 2011 Clarification of Information Contained in Request for License Amendment to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (LDCN 11-0012) Project stage: Request ML1132602802011-11-22022 November 2011 Acceptance Review Email, Request for License Amendment to Adopt National Fire Protection Association (NFPA) Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) Project stage: Acceptance Review ML1132604512011-11-22022 November 2011 Correction Acceptance Review Email, Request for License Amendment to Adopt National Fire Protection Association (NFPA) Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) Project stage: Acceptance Review ML1201804512012-01-19019 January 2012 Regulatory Audit Plan for License Amendment Request to Implement NFPA 805, Risk-Informed, Performance-Based, Fire Protection Program Pursuant to 10 CFR 50.48(c) Project stage: Other ML1206004022012-02-15015 February 2012 Email, Request for Additional Information, Request to Adopt National Fire Protection Association (NFPA) Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) Project stage: RAI ML1206004072012-02-15015 February 2012 Email, Request for Additional Information, Request to Adopt National Fire Protection Association (NFPA) Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) Project stage: RAI ML1206001862012-03-0202 March 2012 Request for Additional Information, Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) Project stage: RAI ML12108A2402012-04-17017 April 2012 Enclosure 1 to ULNRC-05851, Request for Additional Information (RAI) with Callaway Plant Response Project stage: Request ULNRC-05851, Response to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 8052012-04-17017 April 2012 Response to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 Project stage: Response to RAI ML12159A0942012-06-0606 June 2012 Email Request for Additional Information Round 2, Request to Adopt National Fire Protection Association Standard NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) Project stage: Request ML12159A1032012-06-0606 June 2012 PRA Requests for Additional Information, Request to Adopt National Fire Protection Association Standard NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) Project stage: RAI ML12159A1112012-06-0606 June 2012 Fire Modeling Requests for Additional Information, Request to Adopt National Fire Protection Association Standard NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) Project stage: RAI ML1217104322012-06-19019 June 2012 Email, Request for Additional Information Round 3, Request to Adopt National Fire Protection Association Standard NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) Project stage: RAI ML1217104442012-06-19019 June 2012 Apla, Request for Additional Information Round 3, Request to Adopt National Fire Protection Association Standard NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) Project stage: RAI ML1217104392012-06-19019 June 2012 Afpb, Request for Additional Information Round 3, Request to Adopt National Fire Protection Association Standard NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) Project stage: RAI ULNRC-05876, Response to Request for Additional Information Re Adoption of National Fire Protection Association Standard NFPA 8052012-07-12012 July 2012 Response to Request for Additional Information Re Adoption of National Fire Protection Association Standard NFPA 805 Project stage: Response to RAI ML12335A2322012-12-11011 December 2012 Request for Additional Information, Round 2, Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) Project stage: RAI ML13008A3542013-01-0303 January 2013 Email Request for Additional Information,License Amendment Request to Adopt NFPA 805 Project stage: RAI ML13008A3502013-01-0808 January 2013 Email, Request for Additional Information License Amendment Request to Adopt NFPA 805 Project stage: RAI ML13022A0242013-01-22022 January 2013 Email, Two Revised Requests for Additional Information from 12/11/12 Ltr, Request to Adopt National Fire Protection Association Standard NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants. Project stage: RAI ULNRC-05952, Regarding Adoption of National Fire Protection Association Standard NFPA 8052013-02-19019 February 2013 Regarding Adoption of National Fire Protection Association Standard NFPA 805 Project stage: Other ML13051A4502013-02-19019 February 2013 Enclosure 1, W/Attachments to ULNRC-05952 - Request for Additional Information (RAI) with Callaway Plant, Response Project stage: Request ML13204A2232013-07-30030 July 2013 Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) Project stage: RAI ML13260A5912013-08-16016 August 2013 Request for Additional Information Email, Nrr/Dra/Afpb 18.01, License Amendment Request to Adopt NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) Project stage: RAI ML13296A5302013-10-23023 October 2013 NRR E-mail Capture - Callaway - Request for NFPA 805 License Amendment Factual Accuracy Review Project stage: Acceptance Review ML13246A3502013-10-31031 October 2013 NFPA-805 LAR F&O Table Project stage: Other ML13318A1222013-11-14014 November 2013 NRR E-mail Capture - FW: Callaway NFPA 805 LAR, Fpe RAI 20 Project stage: RAI ML13274A5962014-01-13013 January 2014 Issuance of Amendment No. 206, Adopt National Fire Protection Association Standard 805, Performance Based Standard for Fire Protection for LWR Generating Plants Project stage: Approval ML14045A2842014-02-14014 February 2014 Amendment 31 to License Renewal Application Regarding Fire Protection Project stage: Other 2012-07-12 |
ML113260280 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 11/22/2011 |
From: | Thadani M Plant Licensing Branch IV |
To: | Elwood T, Maglio S Union Electric Co |
Thadani, M C, NRR/DORL/LP4, 415-1476 | |
References | |
TAC ME7046 | |
Download: ML113260280 (2) | |
Similar Documents at Callaway | |
---|---|
Category:Acceptance Review Letter
MONTHYEARML24008A0552024-01-19019 January 2024
[Table view]Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML22348A1162022-12-21021 December 2022 Acceptance of Requested Licensing Actions Application for License Amendment & Regulatory Exemptions for TS Change & Exemption Request Regarding Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150 & EPID L-2022-LLE-0030) ML22301A1812022-11-0808 November 2022 Acceptance of Requested Licensing Actions License Amendment Regarding Proposed Technical Specification Changes for Spent Fuel Storage ML21342A3332021-12-10010 December 2021 Acceptance of Requested Licensing Actions License Amendment for Adoption of Alternate Source Term and Revision of Technical Specifications ML21160A1482021-06-10010 June 2021 Acceptance of Requested Licensing Actions License Amendment and Regulatory Exemptions for a Risk Informed Approach to Address Generic Safety Issue 191 and Respond to Generic Letter 2004-02 ML19130A0442019-04-16016 April 2019 Acceptance Review for (EPID L-2019-LLA-0054) TS Change Main Turbine Control Slave Relay LAR ML15294A2322015-10-28028 October 2015 Acceptance of Requested Licensing Action, Review and Approval of Quality Assurance Plan Change Per Nuclear Energy Institute (NEI) 14-05A, Revision 1 ML13281A4232013-10-0808 October 2013 Acceptance Review Email, Requests for Relief PR-04 and PR-06, ASME OM Code Requirements for Frequency for Relief Valves and Devices, Fourth 10-Year Inservice Testing Interval ML13281A4212013-10-0808 October 2013 Acceptance Review Email, Requests for Relief PR-01, PR-02, PR-03, and PR-05, ASME OM Code Cases for Group a and B Pumps for Fourth 10-Year Inservice Testing Interval ML13039A0932013-02-0808 February 2013 Acceptance Review Email, License Amendment Request to Revise Final Safety Analysis Report FSAR-SP Sections 3.7(B) and 3.7(N), Seismic Design to Use Regulatory Guide 1.61 Revision 1 ML1132604512011-11-22022 November 2011 Correction Acceptance Review Email, Request for License Amendment to Adopt National Fire Protection Association (NFPA) Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML1132602802011-11-22022 November 2011 Acceptance Review Email, Request for License Amendment to Adopt National Fire Protection Association (NFPA) Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML1129804802011-10-25025 October 2011 Acceptance Review Email, Revise Technical Specification 3.3.6, Containment Purge Isolation Instrumentation. ML1121505412011-08-0303 August 2011 Acceptance Review E-mail, License Amendment Request to Revise Technical Specification 3.6.6, Containment Spray and Cooling Systems, ML1101408492011-01-14014 January 2011 Acceptance Review Email, License Amendment Request to Add New Surveillance Requirement 3.3.8.6 to Technical Specification 3.3.8, Emergency Exhaust System (EES) Actuation Instrumentation ML1025905882010-09-16016 September 2010 Acceptance Review E-mail, License Amendment Request, Revise TSs to Adopt TSTF-425 Rev. 3, Relocate Surveillance Frequencies to Licensee Control-Risk Informed Technical Specification Task Force Initiative 5 ML1025906042010-09-16016 September 2010 Acceptance Review E-mail License Amendment Request, Revise License Condition and Approve Cyber Security Plan ML1014600722010-06-16016 June 2010 License Amendment Request for Approval of the Cyber Security Plan ML1009603372010-04-0606 April 2010 Acceptance Review Email, License Amendment Request (Exigent Circumstances), Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, for Function 6.G in TS Table 3.3.2-1 ML1001415002010-01-14014 January 2010 Acceptance Review Email, License Amendment Request, Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, for Extension of Completion Times ML0920901462009-07-28028 July 2009 Acceptance Review Email, License Amendment Request, Technical Specification Changes Consistent with TSTF-447, Revision 1, Elimination of Hydrogen Recombiner and Change to Hydrogen and Oxygen Monitors ML0917403962009-06-23023 June 2009 Acceptance Review Email, License Amendment Request, Revise Technical Specification 3.3.9, Boron Dilution Mitigation System (Bdms) ML0914105822009-05-21021 May 2009 Acceptance Review Email, Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0914105692009-05-21021 May 2009 Acceptance Review Email, Revise Technical Specification (TS) 3.7.3, Main Feedwater Regulating Valves (Mfivs) and Main Feedwater Regulating Valve Bypass Valves (Mfrvbvs), and TS 3.3.2, ESFAS Instrumentation ML0914104732009-05-21021 May 2009 Acceptance Review Email, Revise Technical Specification (TS) 3.7.2, Main Steam Isolation Valves (Msivs), and TS 3.3.2, ESFAS Instrumentation, and Add New TS 3.7.19, Secondary System Isolation Valves (Ssivs) ML0909701582009-04-0707 April 2009 Acceptance Review Email, Modify Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for One-time Extension of Integrated Leak Rate Test Interval ML0907504882009-03-16016 March 2009 Acceptance Review E-mail, License Amendment Request, Revise TS 3.8.4, DC Sources - Operating, & TS 3.8.5, DC Sources - Shutdown, to Revise Battery Connection Resistance Limits Surveillance Requirements-TAC ME0292 2024-01-19 Category:E-Mail MONTHYEARML24355A0042024-12-19019 December 2024
[Table view]NRR E-mail Capture - LIC-109 Acceptance Email - Callaway - Adoption of TSTF-591, RICT Program (CLIIP) - EPID L-2024-LLA-0165 ML24318C2562024-11-13013 November 2024 NRR E-mail Capture - Final - Request for Confirmation of Information - Callaway License Renewal Commitments 34 & 35 - EPID L-2024-LRO-0009 ML24193A0362024-07-10010 July 2024 NRR E-mail Capture - LIC-109 Acceptance Email - Callaway Plant, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition - EPID L-2024-LLA-0076 ML23362A0572023-12-28028 December 2023 NRR E-mail Capture - Callaway Plant, Unit 1 - SUNSI Review of the Final Safety Analysis Report (FSAR) Revision OL-26 ML23338A0392023-12-0101 December 2023 NRR E-mail Capture - LIC-109 Acceptance Review - Unacceptable with Opportunity to Supplement - Callaway - RR from Requirements of ASME BPV Code, Section Xl, Subsect IWL-Exam & Test-Unbonded Post Tensioning System - EPID L-2023-LLR-0061 ML23208A1052023-07-27027 July 2023 NRR E-mail Capture - Callaway Plant, Unit No. 1 - Regulatory Audit Questions - LAR to Clarify Support System Requirements for the Residual Heat Removal & Control Room Air Conditioning Systems ML23200A2982023-07-19019 July 2023 NRR E-mail Capture - Callaway Plant, Unit 1 - Final Request for Additional Information (RAI) - Request for Approval of Oqam, Revision 36a - EPID L-2023-LLQ-0000 ML23121A0112023-04-28028 April 2023 NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of License Amendment Request to Revise TS to Adopt TSTF-501-A Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control - EPID L-2023-LLA-0046 ML23114A2302023-04-24024 April 2023 NRR E-mail Capture - Regulatory Audit Question - Callaway LAR and Exemption for Fuel Transition to Framatome Gaia Fuel - EPIDs - L-2022-LLA-0150 and L-2022-LLE-0030 ML23107A1812023-04-17017 April 2023 NRR E-mail Capture - Regulatory Audit Questions - Callaway LAR and Exemption for Fuel Transition to Framatome Gaia Fuel - EPIDs - L-2022-LLA-0150 and L-2022-LLE-0030 ML23096A0072023-04-0505 April 2023 NRR E-mail Capture - Final Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request to Revise TS 5.5.16 for Permanent Extension of Integrated Leak Rate Testing - EPID L-2022-LLA-0165 ML23073A0262023-03-13013 March 2023 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - SG Inspection Report Review - EPID L-2022-LRO-0143 ML23037A7092023-02-0606 February 2023 April 2023 Emergency Preparedness Exercise Inspection - Request for Information ML23037A0022023-02-0303 February 2023 NRR E-mail Capture - Callaway - LAR to Adopt AST - EPID L-2021-LLA-0177 - Revised Schedule for Completion of the Project ML23026A0212023-01-24024 January 2023 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - LAR for Proposed Changes to TS for SFP - ML23010A2902023-01-10010 January 2023 NRR E-mail Capture - LIC-109 Acceptance Review - Callaway Plant, Unit 1 - License Amendment Request to Clarify Support System Requirements for the RHR & Crac Systems - ML22346A0132022-12-0909 December 2022 NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of LAR to Revise TS 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies - EPID L-2022-LLA-0165 ML22322A0062022-11-17017 November 2022 NRR E-mail Capture - Final - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) Callaway - LAR for Proposed Changes to TS and Exemption Request Use of Framatome Gaia Fuel - L-2022-LLA-0150 & L-2022-LLE-0030 ML22287A0952022-10-14014 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 ML22280A1322022-10-0707 October 2022 NRR E-mail Capture - Final - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) - Callaway - License Amendment Request for Proposed Changes to Tech Spec Changes for Spent Fuel Pool Storage - EPID L-2022-LLA-0 ML22278A0122022-10-0404 October 2022 NRR E-mail Capture - Draft - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) - Callaway License Amendment Request for Proposed Changes to Tech Spec Changes for Spent Fuel Pool Storage - EPID L-2022-LLA-013 ML22269A4312022-09-26026 September 2022 November 2022 Emergency Preparedness Program Inspection - Request for Information NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22251A0122022-09-0707 September 2022 NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of License Amendment Request for Application to Revise TS to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections - EPID L-2022-LLA-0110 NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22216A0072022-07-0808 July 2022 NRR E-mail Capture - Callaway Plant, Unit No. 1 - Draft Acceptance Review (Unacceptable for Review with Opportunity to Supplement) for Framatome Fuel Transition LAR and Exemption - EPIDs L-2022-LLA-0083 and L-2022-LLE-0019) ML22167A0252022-06-15015 June 2022 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - LAR for Proposed Revision to Radiological Emergency Response Plan Regarding Response & Notification Goals - EPID L-2022-LLA-0024 ML22157A0102022-06-0303 June 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood Ultimate Heat Sink Temporary Temperature Increase to 102.8 Degrees Fahrenheit ML22154A0122022-06-0202 June 2022 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 ML22151A0512022-05-27027 May 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22137A0292022-05-16016 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 ML22096A0232022-04-0505 April 2022 NRR E-mail Capture - Callaway Plant - Final RAIs - License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address Generic Safety Issue - 191 and Respond to GL 2004-02 (EPIDs L-2021-LLA-0059 and L-2021-LLE-0021) ML22089A0222022-03-29029 March 2022 NRR E-mail Capture - Callaway Plant, Unit 1 - LAR to Adopt TSTF-505 and TSTF-439 - Follow Up Clarifications for the Audit Questions - EPID L-2021-LLA-0197 ML22087A4022022-03-28028 March 2022 NRR E-mail Capture - Callaway - Draft RAIs - License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address Generic Safety Issue - 191 and Respond to Generic Letter 2004-02 (EPIDs L-2021-LLA-0059 and L-2021-LLE-0021) ML22070A1362022-03-10010 March 2022 NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of License Amendment Request for Proposed Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals - EPID L-2022-LLA-0024 ML22047A2312022-02-11011 February 2022 Email Between NRC NSIR and FEMA Regarding Callaway Sirens 021122 ML22003A0852022-01-0303 January 2022 NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of License Amendment Request to Adopt TSTF-529, Clarify Use and Application Rules - EPID L-2021-LLA-0225 ML21334A5172021-11-30030 November 2021 NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of Requested Licensing Action - Application to Adopt TSTF-439 and TSTF-505 - EPID L-2021-LLA-0197 ML21335A0172021-11-30030 November 2021 NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of Requested Licensing Action - Application to Adopt TSTF-439 and TSTF-505 - EPID L-2021-LLA-0197 ML21308A0692021-11-0404 November 2021 NRR E-mail Capture - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) - Callaway Unit 1 - License Amendment Request - Adoption of Alternate Source Term and Revision of TSs - ML21258A0382021-09-14014 September 2021 NRR E-mail Capture - Final - Request for Additional Information - Callaway, Unit 1 - LAR to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors- EPID L-2020-LLA-023 ML21195A0252021-07-13013 July 2021 Email 7-13-21 Request for Information - Callaway EP Exercise Inspection - Sept 2021 ML21125A0452021-05-0404 May 2021 NRR E-mail Capture - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) - Callaway Plant, Unit 1 - License Amendment Request - Final Resolution to Address Concerns of GSI-191 - EPID L-2021-LLA-0059 ML21007A1622021-01-0606 January 2021 NRR E-mail Capture - Final - Request for Additional Information - (COVID-19) Callaway Plant, Unit 1 - Additional Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs - EPID L-2021-LLE-0242 ML20342A1802020-12-0606 December 2020 NRR E-mail Capture - Callaway - LIC-109 Acceptance Requested Licensing Action - Application to Adopt 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors EPID L-2020-LLA-0235 ML20296A6332020-10-22022 October 2020 NRR E-mail Capture - Callaway Plant, Unit 1 - Exemption from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Section VI (EPID L 2020 Lle 0140 (Covid 19)) - Revised Completion Schedule ML20205L4252020-07-22022 July 2020 NRR E-mail Capture - Callaway Plant, Unit 1 - Acceptance of Requested Licensing Action Request for One-Time License Amendment to Defer Upcoming Steam Generator Inspection (EPID L-2020-LLA-0142)(COVID-19) ML20203M3682020-07-21021 July 2020 NRR E-mail Capture - Draft Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request - Revision to Technical Specification (TS) 5.3.1 and Deletion of TS 5.3.1.1 and 5.3.1.2 - EPID L-2020-LLA-0046 ML20162A1882020-06-10010 June 2020 Request for Supporting Information for the Callaway SPRA Audit Review - Draft Supplement ML20153A7902020-05-29029 May 2020 Emai: RFI for Callaway EP Program Inspection 2024-07-10 |
Text
From: Thadani, Mohan Sent: Tuesday, November 22, 2011 11:10 AM To: Maglio, Scott A; Elwood, Thomas B Cc: Lingam, Siva; Thadani, Mohan; Burkhardt, Janet; Harrison, Donnie; Klein, Alex; Lent, Susan
Subject:
Acceptance Review for August 29, 2011 Request for Amendment to Adopt Fire Protection Standard NFPA-805(TAC NO. ME7046).
Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251
SUBJECT:
CALLAWAY PLANT, UNIT 1: AMENDMENT TO ADOPT NFPA-805, PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATION STATION. (TAC NO. ME7046).
Dear Mr. Heflin:
By letter dated August 29, 2011, (ADAMS Accession No.ML112420020), Union Electric Company (the licensee) requested the U.S. Nuclear Regulatory Commission (NRC) staffs approval of an amendment to the Callaway Plant, Unit 1.
The proposed amendment would permit the licensee to adopt a new fire protection licensing basis that complies with the requirements of Title 10 of the Code of Federal Regulations (CFR) 50.48(a) and (c). and the guidance in Revision 1 of Regulatory Guide 1.205, Risk Informed Performance-Based Fire Protection for Existing Light-Water Nuclear Power Plants.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with of 10 CFR 50.90, an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an
independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me.
Mohan C Thadani Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-1476 Mohan.Thadani@nrc.gov