From: Mohan Thadani Sent: Thursday, May 21, 2009 1:18 PM To: Internet:smaglio@ameren.com; Internet:telwood@ameren.com Cc: Mohan Thadani; Janet Burkhardt; Susan Lent; Marshall David

Subject:

CALLAWAY PLANT, UNIT 1-ACCEPTANCE OF APPLICATION DATED MAY 4, 2009 (ME1324)

RESENT TO CORRECT THE EMAIL SUBJECT LINE ERROR OF DATE AND TAC NO.

Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251

SUBJECT:

CALLAWAY PLANT, UNIT 1 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: REVISION TO TECHNICAL SPECIFICATIONS 3.7.2 AND 3.3.2 AND ADDITION OF NEW TECHNICAL SPESIFICATION 3.7.19 (TAC NO.

ME1324),

Dear Mr. Heflin:

By letter dated May 4, 2009 Union Electric Company (the licensee) requested the U.S. Nuclear Regulatory Commission (NRC) staff for approval of a revision to Callaway Plant, Unit 1 Technical Specifications (TS).

The proposed amendment would revise (TS) 3.7.2, "Main Steam Isolation Vales (MSIVs)" to add main steam isolation valve bypass valves (MSIVBVs) and main steam low point drain isolation valve bypass valves (MSLPDIVs) to the scope of TS3.7.2. In addition, the titles of TS 3.7.2 and the header of each page of TS 3.7.2 would be revised.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed the application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed revision to TS 3.7.2, 3.3.2, and addition of new TS 3.7.19, in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised of it by separate correspondence.

If you have any questions, please contact me at (301) 415-1476 or email Mohan.Thadani@nrc.gov.

Mohan C Thadani

Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-1476 Mohan.Thadani@nrc.gov