ML19323B466: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 36: Line 36:
15                  O.
15                  O.
10                  0.
10                  0.
              -
1.15 - J
1.15 - J
                  .        .    ._-  __
_ _ _ . ._


    .      ._.          .-                                                -_.
'
      ,
                .
              '
OPERATING DATA REPORT DOCKET NO. 050-0324 DATC 05/01/89
OPERATING DATA REPORT DOCKET NO. 050-0324 DATC 05/01/89
:                  .                                                                      COMPLETED RY EULIS WILLIS l
:                  .                                                                      COMPLETED RY EULIS WILLIS l
                                                                              .
TELEPHONE 919-457-9521 OPERATING STATUS
TELEPHONE 919-457-9521 OPERATING STATUS
: 1. UtlIT NoiE: BRUNSWICK UNIT 2                                        I NOTES                                                          I
: 1. UtlIT NoiE: BRUNSWICK UNIT 2                                        I NOTES                                                          I
Line 68: Line 59:
: 19. UNIT SERVICE FACTJR                                                            0.0                    42.3                      53.7
: 19. UNIT SERVICE FACTJR                                                            0.0                    42.3                      53.7
:      20. Ulli AVAILAD'LITY FACTOR                                    .                  0.0                    42.3                      63.7
:      20. Ulli AVAILAD'LITY FACTOR                                    .                  0.0                    42.3                      63.7
;
: 21. U.117 CAPACITY FACTOR (USI':0 "DC :JE T)                                        0.0                    35.7                      47.8
: 21. U.117 CAPACITY FACTOR (USI':0 "DC :JE T)                                        0.0                    35.7                      47.8
: 22. UilIl CAPACIi/ FACrJR (USIN3 DER '!iT)                                          0.0                    35 .3                      45.0
: 22. UilIl CAPACIi/ FACrJR (USIN3 DER '!iT)                                          0.0                    35 .3                      45.0
Line 74: Line 64:
: 25. IF SHUTDJ 'N Ai E!!D JF REPORT PERIJD, ESTIMATED DATE 0.: STACT U?: 5 /22 /6 0
: 25. IF SHUTDJ 'N Ai E!!D JF REPORT PERIJD, ESTIMATED DATE 0.: STACT U?: 5 /22 /6 0
: 26. UNIiS I.i TEST STAiUS (PRIOR TO CD 'l.'ERICI AL GPERATIC'!): FORCAST                                                    ACHEIVED I:lliI AL CRITICALITY                                                            - - - - - - - -        - - - - - - - -
: 26. UNIiS I.i TEST STAiUS (PRIOR TO CD 'l.'ERICI AL GPERATIC'!): FORCAST                                                    ACHEIVED I:lliI AL CRITICALITY                                                            - - - - - - - -        - - - - - - - -
'
INIilAL ELECfRICITY                                                                --------              --------
INIilAL ELECfRICITY                                                                --------              --------
Cat.i!4ERICI AL CPERATICN                                                        --------                - - - - - - - - -
Cat.i!4ERICI AL CPERATICN                                                        --------                - - - - - - - - -
1.16 - 9 1
1.16 - 9 1
                                                                                              '
;
D**]D w
D**]D w
                                                                                       ]D 2 e A\ c Ju.              1        e
                                                                                       ]D 2 e A\ c Ju.              1        e
;                                                                                                                                                          ,
                                                                                                                                                           )
                                                                                                                                                           )
i
i
                                       - - . . _      ,..n_ . - . _ -                          -~                              -.
                                       - - . . _      ,..n_ . - . _ -                          -~                              -.


                . - _ _        _ __    ..  .__    _                                  __                              _
   ,                    .                                                                                                      5 F
   ,                    .                                                                                                      5
                                                                                                                                  -
F
  '                                                                                                                              ~
  '                                                                                                                              ~
AP:?ENDIX 4
AP:?ENDIX 4
Line 100: Line 83:
==SUMMARY==
==SUMMARY==


                                                                                                                                &
+                                                                        Brunswick No. 2 i
+                                                                        Brunswick No. 2 i
i Brunswick Unit No. 2 was shutdown for the entire month of April for refueling.
i Brunswick Unit No. 2 was shutdown for the entire month of April for refueling.
Line 108: Line 90:
J
J
                                       ~
                                       ~
                                                                                                                                      !
l i
l i
i
i
                                                                                                                                      !
                                                                                                                                      !
                                                                                                                            .
  --- - ---- -                    -
                                                . _ . - - _ . . _ _ .                _ _ _ _ _ _      .                _


_ __ . _ _ .            .___              __                    _        - _ _    _ _ _          _ . ._      _      _      _ _ _ _ _ _ . _ . . _
l i
l
l APPENDIX B AVERAGE DAILY POVER LEVEL
.,              .
  ;                                                                                                                DOCKET NO. 050-0325 UNIT SRUliSWICK U:!IT I DATE 05/01/01
'
  <                                                                                                                COMPLETED BY EULIS WILLI 5 i                                                                                                                AELEPHO'IE Viv-457-9521 APRIL c0 DAY        AVG. DAILY POWED LEVEL                                            DAY        AVG. DAILY P7MER LEVEL (MWE-NET)                                                          (M P:E ':ET) l                        l                                0.                                    17                      81.
i l
!;                                                                                                                                                                              '
APPENDIX B AVERAGE DAILY POVER LEVEL
  ;                                                                                                                DOCKET NO. 050-0325 UNIT SRUliSWICK U:!IT I
'
DATE 05/01/01
  <                                                                                                                COMPLETED BY EULIS WILLI 5 i                                                                                                                AELEPHO'IE Viv-457-9521 APRIL c0 DAY        AVG. DAILY POWED LEVEL                                            DAY        AVG. DAILY P7MER LEVEL (MWE-NET)                                                          (M P:E ':ET)
:
l                        l                                0.                                    17                      81.
2                                  0.                                    18                  359.
2                                  0.                                    18                  359.
3                      .        94                                      19                  471.
3                      .        94                                      19                  471.
4                              121.                                      27                  694.
4                              121.                                      27                  694.
5                                  O.                                    21                  686.
5                                  O.                                    21                  686.
                                                  .
.
6                              22o.                                      22                  598.
6                              22o.                                      22                  598.
7                              494                                      23                  425.
7                              494                                      23                  425.
.                        8                                118.                                    24                  663.
.                        8                                118.                                    24                  663.
!
9                                  0,                                    25                  714 t
9                                  0,                                    25                  714 t
10                                    0.                                    26                  606.
10                                    0.                                    26                  606.
Line 145: Line 109:
  ;                    12                                    0.                                    2d                  605.
  ;                    12                                    0.                                    2d                  605.
i                    13                                215.                                    -29                  652.
i                    13                                215.                                    -29                  652.
  ,
14                                501.                                      30                  607.
14                                501.                                      30                  607.
i 15                                232.
i 15                                232.
16                                    0.
16                                    0.
                                                                                                                                                                                ,
1 1.15 - 8 i
1 1.15 - 8
l
_
i l
                    . _ _ _      _ _ . . . . . _              ___                  __ _ . _ _ . .                                                                      . . _ ,
                                                                  .-_-,__.__-__,__-,,-...-_..,..-,._._,,,____-..-,_,
                                                                                                                                                            .
                            - _ - -                  .-.    .              _                                                              . - . . , _ , , _ . . - . - - _ ,


l l
l l
        '
l 4
l 4
:
OPERATING DATA REPORT                                                              )
OPERATING DATA REPORT                                                              )
DOCKET NO. 350-0125 DATE 05/0;/ W COVPLETED RY EULIS >!I;.LIS TELEPHQ*IE 919-457-9521 OPERATING STATUS
DOCKET NO. 350-0125 DATE 05/0;/ W COVPLETED RY EULIS >!I;.LIS TELEPHQ*IE 919-457-9521 OPERATING STATUS
                                                          ----_..--_-_------_-_------_-
: 1. U!!IT NAME: SRUISMICK UNIT I                        I t!OTES                                                  I
: 1. U!!IT NAME: SRUISMICK UNIT I                        I t!OTES                                                  I
: 2. REPORTI'!G PERICD: A?RIL 00                          I                                                        I
: 2. REPORTI'!G PERICD: A?RIL 00                          I                                                        I
Line 192: Line 146:
INITIAL ELECTRICITY                                              --------        - - - - - - -
INITIAL ELECTRICITY                                              --------        - - - - - - -
CO.4MERICIAL OPERATION                                            - - - - - -      ---          --
CO.4MERICIAL OPERATION                                            - - - - - -      ---          --
1.16 - 9 D**]D comomSN'o*]D
1.16 - 9 D**]D comomSN'o*]D L                                                                                                                ._
:
L                                                                                                                ._


_ _ _  __    __
s DOCKET NO.          nsn nvs UNITSHUTDOWNS AND POWER REDUCTIONS                                                11rnnwi ck Mn. 1 UNIT NAME DATE      May 1980 COMPLETED BY            Foi t <: A_ Uqt;e, REPORT MONTil  Anril 1990                              TELEPilONE          (919) 457-95M '
                                                                                                                                                *
                                  '
s
                                                                                                                                                                        .
DOCKET NO.          nsn nvs UNITSHUTDOWNS AND POWER REDUCTIONS                                                11rnnwi ck Mn. 1 UNIT NAME DATE      May 1980 COMPLETED BY            Foi t <: A_ Uqt;e, REPORT MONTil  Anril 1990                              TELEPilONE          (919) 457-95M '
i "s                            -
i "s                            -
c s-        ei  i u. 3        Licensee    E .,      bn                          Cause & rorreciive g      5C          E    p E '4                              8. .g No.          p.n c y.!            .g s 5        Even      E@                                          Atinen in l-                                    p                  $
c s-        ei  i u. 3        Licensee    E .,      bn                          Cause & rorreciive g      5C          E    p E '4                              8. .g No.          p.n c y.!            .g s 5        Even      E@                                          Atinen in l-                                    p                  $
a:          :    Reporisr    40        9d                        Preveni Recurrence c ::::          a d :!
a:          :    Reporisr    40        9d                        Preveni Recurrence c ::::          a d :!
d                                  O 6
d                                  O 6
    .
009      800331            F        50.8        !!    3      N/A            EC      Transf      Reactor scram on low water level due to an apparent loss of "1D" bus. The "lD" bus feeder breaker from the start up auxiliary transformer was removed from the cabinet for preventative maintenance. The "lD" bus feeder breaker from the unit auxiliary trans-former tripped, causing a total loss of the ID bus. The bus loss caused a loss of several major components in the primary systems and the steam systems, causing a reactor scram due to low reactor vessel water levei The cause of the trip to the unit auxiliary transformer feeder breaker has not been determined. The breaker was inspected and checked out satis-factorily. This trip is being con-n 1,io rn,1 n .: n n e i n n u i n e 1,ir n r    (cnn t ',iL  ,
009      800331            F        50.8        !!    3      N/A            EC      Transf      Reactor scram on low water level due to an apparent loss of "1D" bus. The
                                                                            *
,
                                                                                                            "lD" bus feeder breaker from the start
  -
up auxiliary transformer was removed from the cabinet for preventative maintenance. The "lD" bus feeder breaker from the unit auxiliary trans-former tripped, causing a total loss of the ID bus. The bus loss caused
                                                                                                    ,
a loss of several major components in the primary systems and the steam systems, causing a reactor scram due to low reactor vessel water levei The cause of the trip to the unit auxiliary transformer feeder breaker has not been determined. The breaker
                                                                                              '
was inspected and checked out satis-factorily. This trip is being con-n 1,io rn,1 n .: n n e i n n u i n e 1,ir n r    (cnn t ',iL  ,
1                          2                                                3                                      4 f: Forced                Reason:                                            Method:                                  Exhibii G - Insitutisons S: Scheduled              A fquipment F.nlure(Explain)                      l Manual                                for pseparation of Data ll-Maintenance oi Test                            2 Manual Scram.                          Entr> Sheels for I.icemec C. Refueling                                      3 Automatic Scram.                      Event Report ILERIl'de INURLG-D Regulatory Resirietion                          4 Other (Explain)                        0161)
1                          2                                                3                                      4 f: Forced                Reason:                                            Method:                                  Exhibii G - Insitutisons S: Scheduled              A fquipment F.nlure(Explain)                      l Manual                                for pseparation of Data ll-Maintenance oi Test                            2 Manual Scram.                          Entr> Sheels for I.icemec C. Refueling                                      3 Automatic Scram.                      Event Report ILERIl'de INURLG-D Regulatory Resirietion                          4 Other (Explain)                        0161)
E-Operator Training & License Examination
E-Operator Training & License Examination
Line 223: Line 160:
e
e


                    - - - _ _ _ - - _ _ __
                                                                                                                                                                                                       .-3 DOCKET NO.        050-O'125 UNIT Sil01 DOWNS AND POWER REDUC 110NS                          UNIT N AME        Brunsuick No. 1 DATE      May 1980 COMPLETED ilY          I'n l i s ^_ Uillis REPORT MONTil    April 1980                                              (9191 457-os?1 TELEPilONE I
                                                                                                          -                    _                . _ _                                                      _
                                                                        .
                                                                                                                                                                                                       .-3
                                                                                                                                                                                                                  .
                                                                      ,
                                                                                                                                                                                                                    .
DOCKET NO.        050-O'125 UNIT Sil01 DOWNS AND POWER REDUC 110NS                          UNIT N AME        Brunsuick No. 1 DATE      May 1980 COMPLETED ilY          I'n l i s ^_ Uillis REPORT MONTil    April 1980                                              (9191 457-os?1
                                                                    '
TELEPilONE I
                                                                                                              ":.
                               ,                                              ,      .$'E          3        $        Licensee    $ r,              ,,                Cause & Corrective No.              DJte        g        }}            k    ,3 y y          [ vent    E]        n. $                            ALHun to l
                               ,                                              ,      .$'E          3        $        Licensee    $ r,              ,,                Cause & Corrective No.              DJte        g        }}            k    ,3 y y          [ vent    E]        n. $                            ALHun to l
                              ,
                                                                            *
                                                                                     $5            5                  ReporI #    nU u
                                                                                     $5            5                  ReporI #    nU u
                                                                                                                                               !O                        Prevent Recurrence 5
                                                                                                                                               !O                        Prevent Recurrence 5
                                                                                                         < 5 =t t
                                                                                                         < 5 =t t
                              '
6 and is not expected to liappen again.
                                          ,
6
                                                                                                                                                                                                              .
                              !
and is not expected to liappen again.
009 (C ant'd)
009 (C ant'd)
The outage duration was extended
The outage duration was extended
                              ,
* because of the detailed investigation                              ,
* because of the detailed investigation                              ,
l                                                                                                                          involved in determining a cause.                              ,
l                                                                                                                          involved in determining a cause.                              ,
s.
s.
                                                                                                                                                                                                                      .
                                                                                                                                                                                                                      ..
                                                                                                                                                                                                                          *
                              !.                                                                                                                                                                  .
                                                                                                                                                                                                                ..
                                                                                                                                                                                                                      .
                                                                                                                                                                                                                        .
                                                                                                                                                                  .:::
                                                                                                                                                                 ..~..              ..
                                                                                                                                                                 ..~..              ..
ll '.
ll '.
I                            2                                                      3                                    4 F: Fosced                    Reason:                                                Method:                                Exhibit G -Instructions S: Scheduled                A 1:yuipment Failure (Explain)                        1 Manual                              for Preparation of Data
I                            2                                                      3                                    4 F: Fosced                    Reason:                                                Method:                                Exhibit G -Instructions S: Scheduled                A 1:yuipment Failure (Explain)                        1 Manual                              for Preparation of Data D. Maintenance of Test                                2-Manual Scram.                        Entey Sheets for Licensee C.Itefueling                                          3 Autunutic Scram.                    Event Report ILER) Fde INURLG.
,
D. Maintenance of Test                                2-Manual Scram.                        Entey Sheets for Licensee C.Itefueling                                          3 Autunutic Scram.                    Event Report ILER) Fde INURLG.
D.Itegulatory Resiris. tion                            4-Other (Explain)                      0161)
D.Itegulatory Resiris. tion                            4-Other (Explain)                      0161)
E-Operator Training & License Examination F. Athninist rative                                                                      5 G Operational lirror (Explain)                                                                Exlubit 1 - Same Source las/77)                        11 Ot her (lixpl.iin)
E-Operator Training & License Examination F. Athninist rative                                                                      5 G Operational lirror (Explain)                                                                Exlubit 1 - Same Source las/77)                        11 Ot her (lixpl.iin)
. .
_ - _ _ - - - - - - - _ _ -                        _ - - - .


l
l DOCKET NO.        050-0325 l                                                                      UNIT SilU1 DOWNS AND POWER REDUCTIONS
                                      ,
                                    ,
DOCKET NO.        050-0325 l                                                                      UNIT SilU1 DOWNS AND POWER REDUCTIONS
!                                                                                                                              UNIT NAM E      Ilrunswick No. 1 DATE      Flay 1980 COMPLETED BY          Enlis A. Willis REPORT MONTil Aprf1 1980                        TELEPilONE        (914) 457-9521 e
!                                                                                                                              UNIT NAM E      Ilrunswick No. 1 DATE      Flay 1980 COMPLETED BY          Enlis A. Willis REPORT MONTil Aprf1 1980                        TELEPilONE        (914) 457-9521 e
          '
r.
r.
_    E                            c
_    E                            c
                                           -,        .$g      3    $ h* 5      Litensee    p,        ja.                  Cause & C.nrective i
                                           -,        .$g      3    $ h* 5      Litensee    p,        ja.                  Cause & C.nrective i
          '
N. .        Date        i        5g        j  js5            Event    g mO pO                        Action to 4                Repori #                                    Present Recurrence t-fE              e~o ;y, :g:
N. .        Date        i        5g        j  js5            Event    g mO pO                        Action to 4                Repori #                                    Present Recurrence t-fE              e~o ;y, :g:
o o
o o
o e
o e
010      800403        F        42.0        B    1      N/A          SF      Turbin    Power limited to approximately 25% of full power because of problems with
010      800403        F        42.0        B    1      N/A          SF      Turbin    Power limited to approximately 25% of full power because of problems with the llPCI automat.ic start test and
* the llPCI automat.ic start test and
  .                                                                                                              a steam leak on llPCI steam trap bypass valve.
  .                                                                                                              a steam leak on llPCI steam trap bypass valve.
The hydraulics for the llPCI turbine
The hydraulics for the llPCI turbine
:                                                                                                                stop valve were adjusted for proper timing, thus correcting the auto-matic start test problem. The steam
:                                                                                                                stop valve were adjusted for proper timing, thus correcting the auto-matic start test problem. The steam
         ,                                                                                                      leaks on the steam trap bypass valve
         ,                                                                                                      leaks on the steam trap bypass valve were repaired allowing the unit to return to full power.
* were repaired allowing the unit to return to full power.
I                      2                                                3 .                              4 F: Forced              Reason:                                          Method:                          Exlubit G Instructions S: Scheduled          A Equipment Failure (Explain)                      1 -Manual                        for Pseparation of Data
I                      2                                                3 .                              4 F: Forced              Reason:                                          Method:                          Exlubit G Instructions S: Scheduled          A Equipment Failure (Explain)                      1 -Manual                        for Pseparation of Data
        ,
         .                                  II. Maintenance of Test                          2 Manual Scram.                  Entry Sheets for Licensee C Refueling                                        3 Automatic Scram.                Event Repost ILERI Fde (NURI G-D Regulatory Restriction                          4-Other (Explain)                0161)
         .                                  II. Maintenance of Test                          2 Manual Scram.                  Entry Sheets for Licensee C Refueling                                        3 Automatic Scram.                Event Repost ILERI Fde (NURI G-D Regulatory Restriction                          4-Other (Explain)                0161)
E-Operator Training & IJcense Examination F Administrative                                                                $
E-Operator Training & IJcense Examination F Administrative                                                                $
G Operational Le or (Explain)                                                      Exhibii 1 - Same Source
G Operational Le or (Explain)                                                      Exhibii 1 - Same Source es/77)                    ll Other (Explain)
        ,
        '
es/77)                    ll Other (Explain)
                                                                                                                                                                  ,
___ _ _ __.


_ _ _ _ _ _ _ _ _ _                  .-      --
                                                                                                                                                                                            -
                                                                                                                                                                                                          .
                                                                                '
                                                                                                                                                                                                                    .
050-0325            -
050-0325            -
I        T UNIT SilUTDOWNS AND POWER REDUCTIONS                              A E      Brunswick No. 1 tiay 1980 DATE COMPLETED BY          Eulis A. 11fIlis REPORT MONTil  April 1980                                          (919) 457-9521 TELEPil0NE "L                              -
I        T UNIT SilUTDOWNS AND POWER REDUCTIONS                              A E      Brunswick No. 1 tiay 1980 DATE COMPLETED BY          Eulis A. 11fIlis REPORT MONTil  April 1980                                          (919) 457-9521 TELEPil0NE "L                              -
Line 314: Line 203:
e Repost #
e Repost #
v o
v o
Q
Q ILI      Valvex    Reactor scrammed after a turbine trip.
'
                                                                                                                                                                                                                  .
ILI      Valvex    Reactor scrammed after a turbine trip.
011                              800405                F      30.2        B        3      N/A                                The turbine tripped because of high
011                              800405                F      30.2        B        3      N/A                                The turbine tripped because of high
                                                                                                                                 -                              vibration. A control valve periodic                  -
                                                                                                                                 -                              vibration. A control valve periodic                  -
Line 328: Line 214:
for Pseparaimn uI Data S: Ss heduled                                    A liguipment failure (Explain)                      1 Manual H. Maintenance of Test                              2-Manual Scram.                  Entr> Sheets for Licensee 3 Automatic Scram.                I.ent Repon 11 ERIl' ele INURI G-C.Refochng D. Regulatory Restriction                          4 Other (Explain)                  0161:
for Pseparaimn uI Data S: Ss heduled                                    A liguipment failure (Explain)                      1 Manual H. Maintenance of Test                              2-Manual Scram.                  Entr> Sheets for Licensee 3 Automatic Scram.                I.ent Repon 11 ERIl' ele INURI G-C.Refochng D. Regulatory Restriction                          4 Other (Explain)                  0161:
I?opeiaior Tsaining& License Examination 5
I?opeiaior Tsaining& License Examination 5
* F Atinunistrative G-Operational Enor (Explain)                                                          Eshibit I Same Source l*l/77 )                                            Il-Othes (Explain)
F Atinunistrative G-Operational Enor (Explain)                                                          Eshibit I Same Source l*l/77 )                                            Il-Othes (Explain)
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                                    . - _ _ _


              . _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _                    _ _ _ _
                                                                                                                                                                                             ~.
                                                                                                                                                                                             ~.
0 t
0 t
                                  *
                                                              .'                                                                                                                                      .
DOCKET NO.        050-0325              -
DOCKET NO.        050-0325              -
UNIT SilUIDOWNS AND POWER REDUCTIONS                      UNIT NAME        Brunswick No. 1 DATE      !!d Y 1980 COMPLETED BY          Eulis A. Uf111s
UNIT SilUIDOWNS AND POWER REDUCTIONS                      UNIT NAME        Brunswick No. 1 DATE      !!d Y 1980 COMPLETED BY          Eulis A. Uf111s
                                                               '                                              REPOR T MONTil Anri1 1980                        TELEPii0NE          (919) 457-9521 m
                                                               '                                              REPOR T MONTil Anri1 1980                        TELEPii0NE          (919) 457-9521 m
                                                                                                   .. E                              E
                                                                                                   .. E                              E
                                                                     -              jg  3      y $5          Licensee    [ r,,      {wl,                Cause & Corecctive No.                                            Date          h            15 g  @    js$            Event      gg        g3o                      Action to H            gE    e      j;g          iteport a    mO g                    Pievent Recursence c5
                                                                     -              jg  3      y $5          Licensee    [ r,,      {wl,                Cause & Corecctive No.                                            Date          h            15 g  @    js$            Event      gg        g3o                      Action to H            gE    e      j;g          iteport a    mO g                    Pievent Recursence c5 Eleco a    Reactor scram from a turbine trip.
  '
                                                                                                                                                                                                  .
Eleco a    Reactor scram from a turbine trip.
012                                            800408        F              124.6  B        3      N/A            EC The turbine trip occurred immediately
012                                            800408        F              124.6  B        3      N/A            EC The turbine trip occurred immediately
                                                                                                                 -                              following a " Quick Start" periodic test on #2 Diesel Generator. An ex-tene.ive investigation revealed the problem to be an electrical ground on
                                                                                                                 -                              following a " Quick Start" periodic test on #2 Diesel Generator. An ex-tene.ive investigation revealed the problem to be an electrical ground on
                                                                                                                                                 #2 Diesel Generator in conjunction with the low electrical ground on the distribution system, causing a spike
                                                                                                                                                 #2 Diesel Generator in conjunction with the low electrical ground on the distribution system, causing a spike on the D.C. bus which energized a                            .
                                                                                                                                                                                                    -
relay in the turbine safety system and
on the D.C. bus which energized a                            .
* tripped the turbine.          (1) The grounds Identified during the investigation                      -
relay in the turbine safety system and               *
                                                                                                                                                                                                          ,,
tripped the turbine.          (1) The grounds Identified during the investigation                      -
scere cleared. (2) Test were performed to assiire starting of Diesel Generator
scere cleared. (2) Test were performed to assiire starting of Diesel Generator
                                                                                                                                                 #2 would not cause transients on the D.C. bus.    (3) Turbine trip circuits were checked for proper operation.
                                                                                                                                                 #2 would not cause transients on the D.C. bus.    (3) Turbine trip circuits were checked for proper operation.
(4) Visual inspections of the (Cont'd )
(4) Visual inspections of the (Cont'd )
I                                                          2                                                      3                                4 F: Forced                                                  Reason:                                              Mediod:                            Exhibit G Inst uce ns 5: Scheduled                                                A l'quipment Failure (Explain)                        1 -Manual                        for P ceasauon f I!aia B-Maintenance of Test                                2 Manual Scram.                    Ento St cess for Licensee C Itclocling                                          3 Automatic Scram.                Event Iteport (LER) l'ile (NURI G-D llegulatory itestriction                            4-Other ( Explain)                0161) 1 -Operator Training & Uanse Examination F-Adnunistrative                                                                    5 G Operational l.ison (Explain)                                                          Exhibit 1 Same Sousee p8/77)                                                          li-Othes (Esplain)
I                                                          2                                                      3                                4 F: Forced                                                  Reason:                                              Mediod:                            Exhibit G Inst uce ns 5: Scheduled                                                A l'quipment Failure (Explain)                        1 -Manual                        for P ceasauon f I!aia B-Maintenance of Test                                2 Manual Scram.                    Ento St cess for Licensee C Itclocling                                          3 Automatic Scram.                Event Iteport (LER) l'ile (NURI G-D llegulatory itestriction                            4-Other ( Explain)                0161) 1 -Operator Training & Uanse Examination F-Adnunistrative                                                                    5 G Operational l.ison (Explain)                                                          Exhibit 1 Same Sousee p8/77)                                                          li-Othes (Esplain)
_  -_  _


  -_  _ _ _ _ _
4 DOCKET NO.          MO-01? S UNITS!!UTDOWNS AND POWER REDUCTIONS                    UNIT N AME        krnneu t ri- *'n 1
                                        .
DATE        Flav 1990 COMPLETEI) BY          Eulis A. Utills REPORT MONTil  April 1980 TELEPilONE          M10 As7-os?1
                                      '
                                                                                                                                                                        .
4
                                                                                                                                                                          '
DOCKET NO.          MO-01? S UNITS!!UTDOWNS AND POWER REDUCTIONS                    UNIT N AME        krnneu t ri- *'n
                                                                                                                                                                  -
1 DATE        Flav 1990 COMPLETEI) BY          Eulis A. Utills REPORT MONTil  April 1980 TELEPilONE          M10 As7-os?1
                                                                            ":.
                                             .,      jg        3        E        Licensec  ,E r,        ,                Cause & Corrective No.          Date          g      3g        s    j5$            Event    3y        gO3                      Atenen to H      y          5    ji 53 =S e.
                                             .,      jg        3        E        Licensec  ,E r,        ,                Cause & Corrective No.          Date          g      3g        s    j5$            Event    3y        gO3                      Atenen to H      y          5    ji 53 =S e.
Repori #    mO        o v
Repori #    mO        o v
Prevent Recurrence 6
Prevent Recurrence 6
    .
012    (<:ont'd,                                                                                  relays and cabinets of the turbine trip circuits were made and revealed no anomalies. The unit was returned to service.
                                                                                                                                                                    .
012    (<:ont'd,                                                                                  relays and cabinets of the turbine trip circuits were made and revealed
                                                                                    -
no anomalies. The unit was returned to service.
                                                              .
I                        2                                                  3                              4 F: Forced                Reason:                                            Method:                          Exhibit G-Instructineis S. Scheduled            A.Iquipment Failure (Explain)                      1. Manual                        for Preparation of Dara li-Maintenance of Test                            2. Manual Scram.                Entry Sheets for Licensee C. Refueling                                      3 Automatic Scram.              Event Report ILERI File int >RI G.
I                        2                                                  3                              4 F: Forced                Reason:                                            Method:                          Exhibit G-Instructineis S. Scheduled            A.Iquipment Failure (Explain)                      1. Manual                        for Preparation of Dara li-Maintenance of Test                            2. Manual Scram.                Entry Sheets for Licensee C. Refueling                                      3 Automatic Scram.              Event Report ILERI File int >RI G.
l                                                                                              4-Other (Explain)                0161)
l                                                                                              4-Other (Explain)                0161)
Line 384: Line 246:
19/77)                      ll-Olher (E xplain)
19/77)                      ll-Olher (E xplain)


_ _ _ - _ _ _ -            _
                                                                              . _                      ._                  - _ _ _ _ _ .                    - -_            _    . _. _
                                                                                                                                                                                       ^
                                                                                                                                                                                       ^
                                -                                                            .
                                                                                                       ^
                                                                                                       ^
l DOCKETNO.
l DOCKETNO.
050-0325 UNIT SilUTDOWNS AND POWER REDUCTIONS                                        UNI f NA\tE        Brunswick No. 1
050-0325 UNIT SilUTDOWNS AND POWER REDUCTIONS                                        UNI f NA\tE        Brunswick No. 1
* D t1 E  May 1980 COMPLE1ED BY          fulis A. Uillis REPORT MONT!! Anrfl 1980                                          TELEP!!ONE          (019) 457-4s21 e.
* D t1 E  May 1980 COMPLE1ED BY          fulis A. Uillis REPORT MONT!! Anrfl 1980                                          TELEP!!ONE          (019) 457-4s21 e.
                                            -
                                                                             -_      E                                  E
                                                                             -_      E                                  E
                                                   ,        .! ?        3y  $ E' E        Liecusec          [-r,      j'''L                            Cause & Curressive                    +
                                                   ,        .! ?        3y  $ E' E        Liecusec          [-r,      j'''L                            Cause & Curressive                    +
No.        Date      g        3g              ,j y y          Event            gg        pg                                    Assion to 80            O
No.        Date      g        3g              ,j y y          Event            gg        pg                                    Assion to 80            O
                                                *
                                                           $E          5  55=g e
                                                           $E          5  55=g e
Report a                    5 u
Report a                    5 u
Prevent Resurrence C
Prevent Resurrence C
Elecon                Reactor scram from a turbine trip. The 013        800415      F        50.5          B      3      N/A                  EC
Elecon                Reactor scram from a turbine trip. The 013        800415      F        50.5          B      3      N/A                  EC turbine tripped when starting #2 Diesel Generator. The problem was a replica of an earlier outage (see Outage No.
                                                              ,                                      ,
turbine tripped when starting #2 Diesel
                                                                                                -
Generator. The problem was a replica
* of an earlier outage (see Outage No.
80-01-1) when an electrical ground on
80-01-1) when an electrical ground on
,
                                                                                                                                             #2 Diesel Generator caused a turbine
                                                                                                                                             #2 Diesel Generator caused a turbine
;                                                                                                                                            trip. The ground fault was cleared and the unit was returned to service. A program was instituted to closely
;                                                                                                                                            trip. The ground fault was cleared and the unit was returned to service. A program was instituted to closely
                                       -                                                                                                      monitor D.C. bus grounds. A modifica-tion was made to the turbine protective
                                       -                                                                                                      monitor D.C. bus grounds. A modifica-tion was made to the turbine protective
                                                                                               -                                              relay system to prevent. spikes from causing trips. Improved relays are
                                                                                               -                                              relay system to prevent. spikes from causing trips. Improved relays are being designed which will be installed in the turbine protective relay circuit:
                    '
being designed which will be installed in the turbine protective relay circuit:
during the forthcoming refueling outage 1                    2                                                        3                                              4 F: Forced          Reason:                                                      Method:                                      Exh: bit C Instrussions S: Sehedu!ed        A l .pnpment Faiture (Explain)                              14f anual                                    for Preparation of Data
during the forthcoming refueling outage 1                    2                                                        3                                              4 F: Forced          Reason:                                                      Method:                                      Exh: bit C Instrussions S: Sehedu!ed        A l .pnpment Faiture (Explain)                              14f anual                                    for Preparation of Data
: 11. 4 ut. ten:.nce of Test                        .
: 11. 4 ut. ten:.nce of Test                        .
24tanual Serarn.                              Entr> 5!iee:5 for Licen>ce C.R::ec!mg                                                  3-Automatic Serain.                          Eveni Repuri (LERI Fi!c (NURLG-D Regutato:y Remitienion                                    f0ther (Explain)                              0161)
24tanual Serarn.                              Entr> 5!iee:5 for Licen>ce C.R::ec!mg                                                  3-Automatic Serain.                          Eveni Repuri (LERI Fi!c (NURLG-D Regutato:y Remitienion                                    f0ther (Explain)                              0161)
E 0;.cn:ror T:ainm 1 L: cense Exainin tion F-AJ:cuusir :ive                                                                                      5 G Operational 1:gror (Exp!ain)                                                                            Eshibit I Same Sousee ps!?7)                !!-0;her (E splam)
E 0;.cn:ror T:ainm 1 L: cense Exainin tion F-AJ:cuusir :ive                                                                                      5 G Operational 1:gror (Exp!ain)                                                                            Eshibit I Same Sousee ps!?7)                !!-0;her (E splam)
___


  -_-- -
                                --        .-            _ . _ _ _                              __ _            . --        - - - _      _      -      -_-
e                                                                      .      ^
e                                                                      .      ^
                                                                                                                                                                                .
DOCKET NO.        nsn-n17s            ,
DOCKET NO.        nsn-n17s            ,
UNIT SIIUTDOWNS AND POWER REDUCTIONS UNI r NAM E Brunswick No. _1          '
UNIT SIIUTDOWNS AND POWER REDUCTIONS UNI r NAM E Brunswick No. _1          '
D g1E    *by 1(Hn COMPLETED BY Fulfr A- Utilis REPORT MONTl! Anril 1980                                TELEP!IONE          (9141 457-45?1 I
D g1E    *by 1(Hn COMPLETED BY Fulfr A- Utilis REPORT MONTl! Anril 1980                                TELEP!IONE          (9141 457-45?1 I
e.
e.
                                                                      -
E                                        c g            jg      3                $ Y 5'        Licensee            Eg          D,                Cause 1 Corrective                        +
E                                        c g            jg      3                $ Y 5'        Licensee            Eg          D,                Cause 1 Corrective                        +
No.        Date      i        3 ij      d              js$            Event              gy            gO3                    Assionto 6-fE      $              35g a      t Report #            mO uo Prevent Recurrence 6
No.        Date      i        3 ij      d              js$            Event              gy            gO3                    Assionto 6-fE      $              35g a      t Report #            mO uo Prevent Recurrence 6
                                                                                                                                                                              .
014      800422      F        35      A                  1      N/A                    IIC    llTEXCil    Reduced power to perform condenser waterbox work.                      .
014      800422      F        35      A                  1      N/A                    IIC    llTEXCil    Reduced power to perform condenser
                                                .
waterbox work.                      .
                                                                                              .
IA south and IB north conder ser water-boxes were chected for leaks using the helium Icak detection method. Leaks                      .
IA south and IB north conder ser water-boxes were chected for leaks using the helium Icak detection method. Leaks                      .
were identified and repaired in lA south. No leaks were found in 111 north
were identified and repaired in lA south. No leaks were found in 111 north 1
                        .
I                  2 3                                4 i              F: Forced          Reason:                                                              Methud:                          Ex!nbit G. Instsuctions S: Scheduled        A 1:iiuipment Failure (Explain)                                        I-Manual                          for Preparation of Dasa lisiintenance of Test                                  .
                                                                                        .
        .
1
                                                                                                .
                                                                    .
                                                                        ..
                                                                                      '
I                  2
                                                                              -
3                                4 i              F: Forced          Reason:                                                              Methud:                          Ex!nbit G. Instsuctions
>
S: Scheduled        A 1:iiuipment Failure (Explain)                                        I-Manual                          for Preparation of Dasa lisiintenance of Test                                  .
2 Manual Seram.                  Entr> Sheets for Licensee C R:fuc!m;;                                                            3 Automatic Scram.                Esent Report tLERI Fde (NURLG-D-Regul.ito:y Resttietion                                            4 Other (Explain)                01611 E Operator T:ammel License Examinariam a
2 Manual Seram.                  Entr> Sheets for Licensee C R:fuc!m;;                                                            3 Automatic Scram.                Esent Report tLERI Fde (NURLG-D-Regul.ito:y Resttietion                                            4 Other (Explain)                01611 E Operator T:ammel License Examinariam a
F Admumtrative                                                                                    5 1
F Admumtrative                                                                                    5 1
G Operational Error (Explain)                                                                          Eshtbii ! Same Source Pa!77)                  Il-Other (Explam)
G Operational Error (Explain)                                                                          Eshtbii ! Same Source Pa!77)                  Il-Other (Explam)


_ - . . _ . _ _ _ - - _ _                ___        _ __                                                    ___ .            _ _ . _ _ . _        _ _ _ . _            _        _ _ _ _ . _          - . .
                                                                                                                                                                                                                        .
DOCK ET NO.                050-0325              ,-
DOCK ET NO.                050-0325              ,-
UNIT StIUTDOWNS AND POWER REDUCTIONS                                                                          Ilrunswick No. 1 UNIf NAME                                        '
UNIT StIUTDOWNS AND POWER REDUCTIONS                                                                          Ilrunswick No. 1 UNIf NAME                                        '
Line 469: Line 295:
dE        U  <~ Ig =f Report #              iE C        $U u
dE        U  <~ Ig =f Report #              iE C        $U u
Psegen Rc6urrence O
Psegen Rc6urrence O
                                                                                                                                                                                                                      .
015      800'.26        F        19.7      A      1      N/A                    SA        Valvex              Unit separated from the grid because
015      800'.26        F        19.7      A      1      N/A                    SA        Valvex              Unit separated from the grid because
                                                                    -
                                                                                                           .                                        of excessive drywell leakage. An investigation revealed a packing leak on the recirculation line sample valve.
                                                                                                           .                                        of excessive drywell leakage. An investigation revealed a packing leak on the recirculation line sample valve.
The packing was replaced and adjust-ments'to the valve were made.
The packing was replaced and adjust-ments'to the valve were made.
                                          .
1 I                      2                                                        3                                                  4
                                                                                                    .
                          .
                                                  '
!
,
  '
                                                                                          .
                                                                                                            -
,
1
                                                                                                '
I                      2                                                        3                                                  4
                                                                                                              *
:                                F: For ed              Reamn:                                                        Method:                                          Exlubis G. Insieuetions S: Scheduled          A l'iguipment Failure (Explain)                                I-Manual                                        for Preparation of Data ll M.iir.:enance or Test                      ,              2 Manual Scram.                                  I:rit) Stices, for t.ieen>ce C Refue!ing                                                  3 Automatie Scram.                                Esent Repose (LER) Fa!c (NURLC-D Regularory Restriction                                    4 O:hcr (Explain)                                0161)
:                                F: For ed              Reamn:                                                        Method:                                          Exlubis G. Insieuetions S: Scheduled          A l'iguipment Failure (Explain)                                I-Manual                                        for Preparation of Data ll M.iir.:enance or Test                      ,              2 Manual Scram.                                  I:rit) Stices, for t.ieen>ce C Refue!ing                                                  3 Automatie Scram.                                Esent Repose (LER) Fa!c (NURLC-D Regularory Restriction                                    4 O:hcr (Explain)                                0161)
                                                                                                                                                                                                    -
;                                                      E Operator Training 1 License Examination F Administrative                                                                                          5 i                                                      G Operational Error (Explain)          -
;                                                      E Operator Training 1 License Examination
-
F Administrative                                                                                          5 i                                                      G Operational Error (Explain)          -
Estubii I Same Source                        ,
Estubii I Same Source                        ,
Pl!77)                    !!-Other (Explain)
Pl!77)                    !!-Other (Explain)
                                                                                                        .
S i'
S i'
_


              -.                            . . _ _ __        .- . __    -                                    - -        _ - _ _ _          . _ .    .--  . ._
     .s    .
     .s    .
j                                                                                APPENDIX i
j                                                                                APPENDIX i
DOCKET NO: 050-0325
DOCKET NO: 050-0325 UNIT: Brunswick No. 1 DATE: May 1980 COMPLETED BY:            Eulis A. Willis      i 1
'
UNIT: Brunswick No. 1 DATE: May 1980 COMPLETED BY:            Eulis A. Willis      i 1
-'                                                                        OPERATIONS  
-'                                                                        OPERATIONS  


Line 520: Line 323:
                                                         #2 diesel generator.
                                                         #2 diesel generator.
April 22:                                      Power reduced to perform condenser waterbox work.
April 22:                                      Power reduced to perform condenser waterbox work.
April 26:                                      Excessive drywell leakage caused a unit separation to repack a
April 26:                                      Excessive drywell leakage caused a unit separation to repack a valve.
,
valve.
'
Total "down time" was 275.8 hours resulting in a 61.6% Availability Factor. For aore detailed information on individual outages, see the Unit Shutdowns and i        Power Reductions Log (Appendix D) for this month.
Total "down time" was 275.8 hours resulting in a 61.6% Availability Factor. For aore detailed information on individual outages, see the Unit Shutdowns and i        Power Reductions Log (Appendix D) for this month.
!
i l
i l
   -    -    -. - - - . - - - - , _ . - - . .                --          _    _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __        __,            _ __}}
   -    -    -. - - - . - - - - , _ . - - . .                --          _    _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __        __,            _ __}}

Latest revision as of 19:44, 18 February 2020

Monthly Operating Repts for Apr 1980
ML19323B466
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 05/06/1980
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML19323B464 List:
References
NUDOCS 8005120406
Download: ML19323B466 (15)


Text

--

v 8005IJRp Yo lo I

APPE!! DIX 5 AVERAGE DAILY P0vr' LEVEL DCCKET 'IO. 050-0324 UtlIT E RU'iS WIOK U'!I T 2 DATE 05/01/d1 CO.'.!PLETED 3Y EULIS ?ILLIS TELEPH0!!E 9 Iv-457-9521 APRIL do DAY AV3. DAIL/ POWE0 LEVEL DAY AVG. D A ILY ?CER '.E /EL

( UWE-!!ET) (.UE '!ET) 1 0. 17 0.

2 0. 18 0.

3 0. 19 0.

4 0. 29 0.

5 0. 21 0.

6 0. 22 0.

7 0. 23 0.

8 0. 24 0.

9 0. 25 O.

10 C. 26 0.

ll 0. 27 0.

12 0. 2a 0.

13 0. 29 0.

14 0. 30 0.

15 O.

10 0.

1.15 - J

OPERATING DATA REPORT DOCKET NO. 050-0324 DATC 05/01/89

. COMPLETED RY EULIS WILLIS l

TELEPHONE 919-457-9521 OPERATING STATUS

1. UtlIT NoiE: BRUNSWICK UNIT 2 I NOTES I
2. REPORTING PERIn0: APRIL 00 I I
3. LICE:: SED THE.TiAL P0"IER (MWT): 2435 I I 4 NAMEPLATE RATING (GRJSS MP.E): 357.0 I I
5. DESIGil ELECTR IC AL R ATI'IG ('1ET 'iWE) : 821.0 I I
6. l4AX DEPEdDA6LE CAPACIfY (GROSS t.tvE): o!5.9 I I
7. MAX DEPE::DABLE CA?ACITY (NET enE): 790.0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
d. IF CHAD 3ES JCCUR I:1 CAPACITY RATI:GS (ITEMS 3 THRU 7) SINCE LA5T REPORT, GIVE REASO:!S
9. PO^ER LEVEL TO WHICH REST 3I^TED IP A':Y . rit:1 ?.mb ) : Nuri$:
10. JEASONS FOR RESTRICTIO:I IF ANY:

THIS YR TO CU1UL ,

MONTH OtTE ATIVE II. HOURS IV REPORTING PERIOD 719.0 2903.0 39384.0

12. NU."9ER OF HCURS REACTOR .TAS CRITICAL 0.0 136d . 7 26639.7
13. REACTOR RESERVE SHUTDJ'11 HOURS 0.0 3.0 0.0 14 HJURS GEdERATJD 0.4 LINE 0.0 1220.1 25102.2
15. UNIi RESERVE SHUTDOWN HJUR5 0.0 2.0 0.0
16. 3905S THEq!!AL E.' ERGY GE'IE9 ATED (;.'. H ) 0.0 2604959.4 45339422.6
17. GROSS ELECTR ICAL 3:fER3Y GE lER ATED (*.i?9) 0.0 372513.0 15437537.0 id. :lET ELECTRICI AL E'!ERGY 3E5iER ATEJ ( .T*H) 0.0 842125.0 14832593.0 i
19. UNIT SERVICE FACTJR 0.0 42.3 53.7
20. Ulli AVAILAD'LITY FACTOR . 0.0 42.3 63.7
21. U.117 CAPACITY FACTOR (USI':0 "DC :JE T) 0.0 35.7 47.8
22. UilIl CAPACIi/ FACrJR (USIN3 DER '!iT) 0.0 35 .3 45.0
23. U'!I f FORCEU OUTAGE RAfE O.7 s.1 12.7 24 SHUTD0'?!.15 SCHEDULED OVER tiEXT $ 'A nifHS ( r(PE, DATE. AMD DUR ATIO
I 0F EACH):
25. IF SHUTDJ 'N Ai E!!D JF REPORT PERIJD, ESTIMATED DATE 0.: STACT U?: 5 /22 /6 0
26. UNIiS I.i TEST STAiUS (PRIOR TO CD 'l.'ERICI AL GPERATIC'!): FORCAST ACHEIVED I:lliI AL CRITICALITY - - - - - - - - - - - - - - - -

INIilAL ELECfRICITY -------- --------

Cat.i!4ERICI AL CPERATICN -------- - - - - - - - - -

1.16 - 9 1

D**]D w

]D 2 e A\ c Ju. 1 e

)

i

- - . . _ ,..n_ . - . _ - -~ -.

, . 5 F

' ~

AP:?ENDIX 4

DOCKET NO: 050-0324 -

UNIT: Brunswick No. 2 -

DATE: May 1980 COMPLETED BY: Eulis A. Willis .

OPERATIONS

SUMMARY

+ Brunswick No. 2 i

i Brunswick Unit No. 2 was shutdown for the entire month of April for refueling.

The unit is expected back on line May 22, 1980. A more detailed description of the refueling outage will be provided in the Monthly Operating Report for

! the month the unit returns to service.

1 1

J

~

l i

i

l i

l APPENDIX B AVERAGE DAILY POVER LEVEL

DOCKET NO. 050-0325 UNIT SRUliSWICK U
!IT I DATE 05/01/01

< COMPLETED BY EULIS WILLI 5 i AELEPHO'IE Viv-457-9521 APRIL c0 DAY AVG. DAILY POWED LEVEL DAY AVG. DAILY P7MER LEVEL (MWE-NET) (M P:E ':ET) l l 0. 17 81.

2 0. 18 359.

3 . 94 19 471.

4 121. 27 694.

5 O. 21 686.

6 22o. 22 598.

7 494 23 425.

. 8 118. 24 663.

9 0, 25 714 t

10 0. 26 606.

!I O. 27 21.

12 0. 2d 605.

i 13 215. -29 652.

14 501. 30 607.

i 15 232.

16 0.

1 1.15 - 8 i

l

l l

l 4

OPERATING DATA REPORT )

DOCKET NO. 350-0125 DATE 05/0;/ W COVPLETED RY EULIS >!I;.LIS TELEPHQ*IE 919-457-9521 OPERATING STATUS

1. U!!IT NAME: SRUISMICK UNIT I I t!OTES I
2. REPORTI'!G PERICD: A?RIL 00 I I
3. LICENSED THER'!AL PCeER ('JWT): 2436 I I
4. NA.'iEPLATE RATIfiG G F9 MME): c67.0 I I
5. DESIGN ELECiR ICAL R! TING ("ET ' DIE): 821.7 I I
6. MAX DEPE?!DABLE CA? AUiTY (GROSS W!i): c15.0 I I
7. MAX DEPi NA9LE CAPACITY ( ?!ET CE ) : 793.0 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
d. IF CHAifGES GCCUR I?! CAPACITY RATI'IGS (I fEMS 3 THPU 7 ) SINCE LAS E REPORT, GIVE REASCI15:

t 9 POWER LEVEL TO ;fHICH RESTPICTED IF ANY ( 'IET !PTE ) : !!O"E

'n. REASGNS FCR RESTRICTION IF A!!Y:

THIS YR TO CUMUL VO:ITH D *.TE ATIVE II. riOURS IN REPORTING PERIOD 719.0 2903.0 27350.0

12. NUuSER OF HJURS REACTOR VAS CRITICAL 516.9 2655.I 20044.7
13. REACTOR RESERVE SHUiDC!'l HOURS 0.0 J.0 1647.1
14. iOURS GENERATOR Oil LIliE 443.2 2533.0 18865.9
15. UNIf RESERVE SHUTDO'I'! HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GE'IERATED (.-bH) 669') A5 . 4 5292731.9 39122223.9
17. GROSS ELECTRICAL ENERJY GE?IERATED (lDM) 2305E0.0 1771230.0 1301n049.0 Id. NET ELECTRICI AL ENERGY GE'IER ATED (.MH) 215417.0 1707732.0 12515542.0
19. UNIT SERVICE FACTOR 61.6 67.3 69.0
20. U:llT AVAILA3!LITY FACTOR 6I.6 37 .3 69.0
21. U'JIT CAP ACliY F ACTOR ( US ING '!DC NE T) 36.5 74.5 57.9
22. UNIf CAPACITY FACT 3R (USI:!G DER nit) 37.0 71.7 55.7
23. U' LIT FORCED OUTAGE RATE 38.4 12.7 20.4 24 SHUTDO.i:IS SCHEDULED OVER tiEXT 5 M]NTHS (TYPE, DATE. AND DUR ATIO I OF E ACH):

Refueling 800508 1920 hours0.0222 days <br />0.533 hours <br />0.00317 weeks <br />7.3056e-4 months <br />

25. IF SHUT 00Mi Af END JF REPORT PERI 1D, ESTIMATED DATE OF START UP: O/ 9/ 0
26. U'!IiS IN TEST STAfUS (PRIOR TJ COiMERICIAL OPERATIC'!): FORCAST ACHEIVED INITIAL CRITICALIfY - - - - - - - -------_

INITIAL ELECTRICITY -------- - - - - - - -

CO.4MERICIAL OPERATION - - - - - - --- --

1.16 - 9 D**]D comomSN'o*]D L ._

s DOCKET NO. nsn nvs UNITSHUTDOWNS AND POWER REDUCTIONS 11rnnwi ck Mn. 1 UNIT NAME DATE May 1980 COMPLETED BY Foi t <: A_ Uqt;e, REPORT MONTil Anril 1990 TELEPilONE (919) 457-95M '

i "s -

c s- ei i u. 3 Licensee E ., bn Cause & rorreciive g 5C E p E '4 8. .g No. p.n c y.! .g s 5 Even E@ Atinen in l- p $

a:  : Reporisr 40 9d Preveni Recurrence c :::: a d :!

d O 6

009 800331 F 50.8  !! 3 N/A EC Transf Reactor scram on low water level due to an apparent loss of "1D" bus. The "lD" bus feeder breaker from the start up auxiliary transformer was removed from the cabinet for preventative maintenance. The "lD" bus feeder breaker from the unit auxiliary trans-former tripped, causing a total loss of the ID bus. The bus loss caused a loss of several major components in the primary systems and the steam systems, causing a reactor scram due to low reactor vessel water levei The cause of the trip to the unit auxiliary transformer feeder breaker has not been determined. The breaker was inspected and checked out satis-factorily. This trip is being con-n 1,io rn,1 n .: n n e i n n u i n e 1,ir n r (cnn t ',iL ,

1 2 3 4 f: Forced Reason: Method: Exhibii G - Insitutisons S: Scheduled A fquipment F.nlure(Explain) l Manual for pseparation of Data ll-Maintenance oi Test 2 Manual Scram. Entr> Sheels for I.icemec C. Refueling 3 Automatic Scram. Event Report ILERIl'de INURLG-D Regulatory Resirietion 4 Other (Explain) 0161)

E-Operator Training & License Examination

~

F-Admunsivative 5 G Operational I rear (Explain) Esinbis 1 - Same Source 19/77) Il Olher (Explain t i

e

.-3 DOCKET NO. 050-O'125 UNIT Sil01 DOWNS AND POWER REDUC 110NS UNIT N AME Brunsuick No. 1 DATE May 1980 COMPLETED ilY I'n l i s ^_ Uillis REPORT MONTil April 1980 (9191 457-os?1 TELEPilONE I

, , .$'E 3 $ Licensee $ r, ,, Cause & Corrective No. DJte g k ,3 y y [ vent E] n. $ ALHun to l

                                                                                    $5            5                   ReporI #     nU u
                                                                                                                                              !O                        Prevent Recurrence 5
                                                                                                        < 5 =t t

6 and is not expected to liappen again. 009 (C ant'd) The outage duration was extended

  • because of the detailed investigation ,

l involved in determining a cause. , s.

                                                                                                                                                                ..~..               ..

ll '. I 2 3 4 F: Fosced Reason: Method: Exhibit G -Instructions S: Scheduled A 1:yuipment Failure (Explain) 1 Manual for Preparation of Data D. Maintenance of Test 2-Manual Scram. Entey Sheets for Licensee C.Itefueling 3 Autunutic Scram. Event Report ILER) Fde INURLG. D.Itegulatory Resiris. tion 4-Other (Explain) 0161) E-Operator Training & License Examination F. Athninist rative 5 G Operational lirror (Explain) Exlubit 1 - Same Source las/77) 11 Ot her (lixpl.iin)

l DOCKET NO. 050-0325 l UNIT SilU1 DOWNS AND POWER REDUCTIONS ! UNIT NAM E Ilrunswick No. 1 DATE Flay 1980 COMPLETED BY Enlis A. Willis REPORT MONTil Aprf1 1980 TELEPilONE (914) 457-9521 e r. _ E c

                                          -,        .$g       3     $ h* 5       Litensee     p,        ja.                  Cause & C.nrective i

N. . Date i 5g j js5 Event g mO pO Action to 4 Repori # Present Recurrence t-fE e~o ;y, :g: o o o e 010 800403 F 42.0 B 1 N/A SF Turbin Power limited to approximately 25% of full power because of problems with the llPCI automat.ic start test and

.                                                                                                               a steam leak on llPCI steam trap bypass valve.

The hydraulics for the llPCI turbine

stop valve were adjusted for proper timing, thus correcting the auto-matic start test problem. The steam
        ,                                                                                                       leaks on the steam trap bypass valve were repaired allowing the unit to return to full power.

I 2 3 . 4 F: Forced Reason: Method: Exlubit G Instructions S: Scheduled A Equipment Failure (Explain) 1 -Manual for Pseparation of Data

       .                                   II. Maintenance of Test                           2 Manual Scram.                   Entry Sheets for Licensee C Refueling                                        3 Automatic Scram.                Event Repost ILERI Fde (NURI G-D Regulatory Restriction                          4-Other (Explain)                 0161)

E-Operator Training & IJcense Examination F Administrative $ G Operational Le or (Explain) Exhibii 1 - Same Source es/77) ll Other (Explain)

050-0325 - I T UNIT SilUTDOWNS AND POWER REDUCTIONS A E Brunswick No. 1 tiay 1980 DATE COMPLETED BY Eulis A. 11fIlis REPORT MONTil April 1980 (919) 457-9521 TELEPil0NE "L - Cause & Conective

                                                                                       -,       3g         3          $        Licensee     [ r,,          ,

Action to No. Date Q ~g 5 js5 Event 3, y pO 5 mO Prevens Recurrence F

                                                                                                $E                3 ;f3 :$

e Repost # v o Q ILI Valvex Reactor scrammed after a turbine trip. 011 800405 F 30.2 B 3 N/A The turbine tripped because of high

                                                                                                                               -                               vibration. A control valve periodic                   -

test was in progress. The outage was extended approximately 16 hours due to " indicated" leakage inside the dry-well exceeding the amount of leakage allowed by Technical Specifications. The " indication" was determined to be a spurious - elec':rical signal

                                                                                                                                                         -     instead of actual Icakage. The periodic test was revised to bypass a high vibration trip when the control valve periodic test is run.             By re-placing a flow transmitter which had a faulty bellows assembly, the "indi-
                                                                  '                                                                                            cated" high drywell leakage problem
                                                                                                                                                  -            was resolved and the unit returned to service.                                               ,

3 4 1 2 Method: Exlubit G -Instructions F: Forced Reason: for Pseparaimn uI Data S: Ss heduled A liguipment failure (Explain) 1 Manual H. Maintenance of Test 2-Manual Scram. Entr> Sheets for Licensee 3 Automatic Scram. I.ent Repon 11 ERIl' ele INURI G-C.Refochng D. Regulatory Restriction 4 Other (Explain) 0161: I?opeiaior Tsaining& License Examination 5 F Atinunistrative G-Operational Enor (Explain) Eshibit I Same Source l*l/77 ) Il-Othes (Explain)

                                                                                                                                                                                           ~.

0 t DOCKET NO. 050-0325 - UNIT SilUIDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick No. 1 DATE  !!d Y 1980 COMPLETED BY Eulis A. Uf111s

                                                             '                                              REPOR T MONTil Anri1 1980                        TELEPii0NE          (919) 457-9521 m
                                                                                                 .. E                               E
                                                                    -               jg   3       y $5          Licensee     [ r,,      {wl,                 Cause & Corecctive No.                                             Date           h            15 g   @     js$             Event      gg         g3o                       Action to H             gE    e      j;g           iteport a    mO g                    Pievent Recursence c5 Eleco a    Reactor scram from a turbine trip.

012 800408 F 124.6 B 3 N/A EC The turbine trip occurred immediately

                                                                                                               -                               following a " Quick Start" periodic test on #2 Diesel Generator. An ex-tene.ive investigation revealed the problem to be an electrical ground on
                                                                                                                                               #2 Diesel Generator in conjunction with the low electrical ground on the distribution system, causing a spike on the D.C. bus which energized a                             .

relay in the turbine safety system and

  • tripped the turbine. (1) The grounds Identified during the investigation -

scere cleared. (2) Test were performed to assiire starting of Diesel Generator

                                                                                                                                               #2 would not cause transients on the D.C. bus.    (3) Turbine trip circuits were checked for proper operation.

(4) Visual inspections of the (Cont'd ) I 2 3 4 F: Forced Reason: Mediod: Exhibit G Inst uce ns 5: Scheduled A l'quipment Failure (Explain) 1 -Manual for P ceasauon f I!aia B-Maintenance of Test 2 Manual Scram. Ento St cess for Licensee C Itclocling 3 Automatic Scram. Event Iteport (LER) l'ile (NURI G-D llegulatory itestriction 4-Other ( Explain) 0161) 1 -Operator Training & Uanse Examination F-Adnunistrative 5 G Operational l.ison (Explain) Exhibit 1 Same Sousee p8/77) li-Othes (Esplain)

4 DOCKET NO. MO-01? S UNITS!!UTDOWNS AND POWER REDUCTIONS UNIT N AME krnneu t ri- *'n 1 DATE Flav 1990 COMPLETEI) BY Eulis A. Utills REPORT MONTil April 1980 TELEPilONE M10 As7-os?1

                                            .,       jg         3         E         Licensec   ,E r,         ,                Cause & Corrective No.          Date           g       3g         s    j5$            Event     3y         gO3                      Atenen to H       y          5     ji 53 =S e.

Repori # mO o v Prevent Recurrence 6 012 (<:ont'd, relays and cabinets of the turbine trip circuits were made and revealed no anomalies. The unit was returned to service. I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructineis S. Scheduled A.Iquipment Failure (Explain) 1. Manual for Preparation of Dara li-Maintenance of Test 2. Manual Scram. Entry Sheets for Licensee C. Refueling 3 Automatic Scram. Event Report ILERI File int >RI G. l 4-Other (Explain) 0161) D Regulatory Restriction

1. Oper.itor Trainmg & License Examination F. Ailnunist rative 5

. G Operanonal Earor (Explain) Esinbit I - Same Source 4 19/77) ll-Olher (E xplain)

                                                                                                                                                                                      ^
                                                                                                      ^

l DOCKETNO. 050-0325 UNIT SilUTDOWNS AND POWER REDUCTIONS UNI f NA\tE Brunswick No. 1

  • D t1 E May 1980 COMPLE1ED BY fulis A. Uillis REPORT MONT!! Anrfl 1980 TELEP!!ONE (019) 457-4s21 e.
                                                                           -_       E                                  E
                                                 ,        .! ?        3y   $ E' E         Liecusec           [-r,      jL                             Cause & Curressive                     +

No. Date g 3g ,j y y Event gg pg Assion to 80 O

                                                          $E           5   55=g e

Report a 5 u Prevent Resurrence C Elecon Reactor scram from a turbine trip. The 013 800415 F 50.5 B 3 N/A EC turbine tripped when starting #2 Diesel Generator. The problem was a replica of an earlier outage (see Outage No. 80-01-1) when an electrical ground on

                                                                                                                                            #2 Diesel Generator caused a turbine
trip. The ground fault was cleared and the unit was returned to service. A program was instituted to closely
                                     -                                                                                                      monitor D.C. bus grounds. A modifica-tion was made to the turbine protective
                                                                                             -                                              relay system to prevent. spikes from causing trips. Improved relays are being designed which will be installed in the turbine protective relay circuit:

during the forthcoming refueling outage 1 2 3 4 F: Forced Reason: Method: Exh: bit C Instrussions S: Sehedu!ed A l .pnpment Faiture (Explain) 14f anual for Preparation of Data

11. 4 ut. ten:.nce of Test .

24tanual Serarn. Entr> 5!iee:5 for Licen>ce C.R::ec!mg 3-Automatic Serain. Eveni Repuri (LERI Fi!c (NURLG-D Regutato:y Remitienion f0ther (Explain) 0161) E 0;.cn:ror T:ainm 1 L: cense Exainin tion F-AJ:cuusir :ive 5 G Operational 1:gror (Exp!ain) Eshibit I Same Sousee ps!?7)  !!-0;her (E splam)

e . ^ DOCKET NO. nsn-n17s , UNIT SIIUTDOWNS AND POWER REDUCTIONS UNI r NAM E Brunswick No. _1 ' D g1E *by 1(Hn COMPLETED BY Fulfr A- Utilis REPORT MONTl! Anril 1980 TELEP!IONE (9141 457-45?1 I e. E c g jg 3 $ Y 5' Licensee Eg D, Cause 1 Corrective + No. Date i 3 ij d js$ Event gy gO3 Assionto 6-fE $ 35g a t Report # mO uo Prevent Recurrence 6 014 800422 F 35 A 1 N/A IIC llTEXCil Reduced power to perform condenser waterbox work. . IA south and IB north conder ser water-boxes were chected for leaks using the helium Icak detection method. Leaks . were identified and repaired in lA south. No leaks were found in 111 north 1 I 2 3 4 i F: Forced Reason: Methud: Ex!nbit G. Instsuctions S: Scheduled A 1:iiuipment Failure (Explain) I-Manual for Preparation of Dasa lisiintenance of Test . 2 Manual Seram. Entr> Sheets for Licensee C R:fuc!m;; 3 Automatic Scram. Esent Report tLERI Fde (NURLG-D-Regul.ito:y Resttietion 4 Other (Explain) 01611 E Operator T:ammel License Examinariam a F Admumtrative 5 1 G Operational Error (Explain) Eshtbii ! Same Source Pa!77) Il-Other (Explam)

DOCK ET NO. 050-0325 ,- UNIT StIUTDOWNS AND POWER REDUCTIONS Ilrunswick No. 1 UNIf NAME ' DATE Pfav 1980 COMPLETED tiY . Eulis A. Wi11is REPORT MONTl! Anri1 l ')R0 TELEP!!ONE (919) 457-9321 l l

                                                                                       ~.
                                                   .                                    =                                        -

C. eB .3 traO . ,. 6 'l,

                                                          ;,      2e         =   , s _;       Licemcc                  = -r,     c'                                 Cause 1 Conective                                     .

Na- Date i, ~@ i .E s E Event ;7 E-3 Asi,on sa H dE U <~ Ig =f Report # iE C $U u Psegen Rc6urrence O 015 800'.26 F 19.7 A 1 N/A SA Valvex Unit separated from the grid because

                                                                                                         .                                         of excessive drywell leakage. An investigation revealed a packing leak on the recirculation line sample valve.

The packing was replaced and adjust-ments'to the valve were made. 1 I 2 3 4

F: For ed Reamn: Method: Exlubis G. Insieuetions S: Scheduled A l'iguipment Failure (Explain) I-Manual for Preparation of Data ll M.iir.:enance or Test , 2 Manual Scram. I:rit) Stices, for t.ieen>ce C Refue!ing 3 Automatie Scram. Esent Repose (LER) Fa!c (NURLC-D Regularory Restriction 4 O:hcr (Explain) 0161)
E Operator Training 1 License Examination F Administrative 5 i G Operational Error (Explain) -

Estubii I Same Source , Pl!77)  !!-Other (Explain) S i'

    .s    .

j APPENDIX i DOCKET NO: 050-0325 UNIT: Brunswick No. 1 DATE: May 1980 COMPLETED BY: Eulis A. Willis i 1 -' OPERATIONS

SUMMARY

l Brunswick No. 1 l Brunswick Unit No.1 operated at a 38.5% capacity factor for the month of  ! April. The following power changes and shutdowns occurred during the month: March 31: A trip of the unit auxiliary transformer feeder breaker caused a reactor scram. April 3: Power limited because of probicms with the HPCI automatic start test. April 5: High vibration during a control valve periodic test caused a turbine trip and a reactor scram. April 8: Problems with electrical grounds on #2 diesel generator caused a turbine trip and reactor scram. J I j April 15: A replica of the April 8th outage. Problems with the grounds on

                                                        #2 diesel generator.

April 22: Power reduced to perform condenser waterbox work. April 26: Excessive drywell leakage caused a unit separation to repack a valve. Total "down time" was 275.8 hours resulting in a 61.6% Availability Factor. For aore detailed information on individual outages, see the Unit Shutdowns and i Power Reductions Log (Appendix D) for this month. i l

  -    -    -. - - - . - - - - , _ . - - . .                 --          _     _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __         __,             _ __}}