| number = ML13015A364
| number = ML13015A364
| issue date = 02/13/2013
| issue date = 02/13/2013
| title = 12/12/2012 - Summary of Conference Call on RAI 11A with Entergy Nuclear Operations, Inc
| title = Summary of Conference Call on RAI 11A with Entergy Nuclear Operations, Inc
| author name = Daily J
| author name = Daily J
| author affiliation = NRC/NRR/DLR/RPB1
| author affiliation = NRC/NRR/DLR/RPB1
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 February 13, 2013 LICENSEE:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 13, 2013 LICENSEE:             Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc. FACILITY:
FACILITY:             Indian Point Nuclear Generating Station, Units 2 and 3
Indian Point Nuclear Generating Station, Units 2 and 3  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF CONFERENCE CALL HELD ON DECEMBER 12, 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING THE REACTOR VESSEL INTERNALS PROGRAM AT INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 -RAI 11A Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff), and representatives of Entergy Nuclear Operations.
OF CONFERENCE CALL HELD ON DECEMBER 12, 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING THE REACTOR VESSEL INTERNALS PROGRAM AT INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 - RAI 11A Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff), and representatives of Entergy Nuclear Operations. Inc., (Entergy or the applicant), held a conference call on December 12, 2012, to provide clarification on a request for additional information (RAI) 11 a, related to the Indian Point (IP) Nuclear Generating Station, Units 2 and 3 license renewal application. The telephone conference call was useful in clarifying the response to the RAI. provides a listing of the participants and Enclosure 2 contains a summary of the discussion.
Inc., (Entergy or the applicant), held a conference call on December 12, 2012, to provide clarification on a request for additional information (RAI) 11 a, related to the Indian Point (IP) Nuclear Generating Station, Units 2 and 3 license renewal application.
The applicant had an opportunity to comment on this summary.
The telephone conference call was useful in clarifying the response to the RAI. Enclosure 1 provides a listing of the participants and Enclosure 2 contains a summary of the discussion.
Sincerely, John Daily, Senior Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
The applicant had an opportunity to comment on this summary. Sincerely, John Daily, Senior Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and Ust of cc w/encl.
 
February 13, 2013 LICENSEE:
==Enclosure:==
Entergy Nuclear Operations, Inc. FACILITY:
 
Indian Point Nuclear Generating Station, Units 2 and 3  
Ust of Participants cc w/encl. Ustserv
 
February 13, 2013 LICENSEE:               Entergy Nuclear Operations, Inc.
FACILITY:               Indian Point Nuclear Generating Station, Units 2 and 3


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF CONFERENCE CALL HELD ON DECEMBER 12,2012, BEIWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING THE REACTOR VESSEL INTERNALS PROGRAM AT INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 -RAI 11A Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff), and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant), held a conference call on December 12, 2012, to provide clarification on a request for additional information (RAI) 11a, related to the Indian Point (lP) Nuclear Generating Station, Units 2 and 3 license renewal application.
OF CONFERENCE CALL HELD ON DECEMBER 12,2012, BEIWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING THE REACTOR VESSEL INTERNALS PROGRAM AT INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 - RAI 11A Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff), and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant), held a conference call on December 12, 2012, to provide clarification on a request for additional information (RAI) 11a, related to the Indian Point (lP) Nuclear Generating Station, Units 2 and 3 license renewal application. The telephone conference call was useful in clarifying the response to the RAI. provides a listing of the participants and Enclosure 2 contains a summary of the discussion.
The telephone conference call was useful in clarifying the response to the RAI. Enclosure 1 provides a listing of the participants and Enclosure 2 contains a summary of the discussion.
The applicant had an opportunity to comment on this summary.
The applicant had an opportunity to comment on this summary. Sincerely, /ra! John Daily, Senior Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and List of cc w/encl:
Sincerely,
ADAMS Accession No.: ML13015A364  
                                              /ra!
*via OFFICE PM:DLRlRPBl LA:DLRlRPB1*
John Daily, Senior Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
BC:DLRlRPBl D:DLRlRPBl NAME JDaily YEdmonds DMorey JDaily DATE 2/4113 1123/13 2/12113 13 REQUEST FOR ADDITIONAL INFORMATION CONFERENCE INDIAN POINT ENERGY CENTER, LICENSE RENEWAL REACTOR VESSEL INTERNALS PROGRAM AND LIST OF December I PARTICIPANT AFFILIATION i John Daily Nuclear Regulatory Commission (NRC) I Jeff Poehler NRC i Pat Purtcher NRC i Roger Waters Nelson Azevedo Entergy Entergy Ted Ivy Entergy Bob Dolansky Cheryl Boggess Randy Lott -Entergy Westinghouse
 
==Enclosure:==
 
List of Participants cc w/encl: Listserv ADAMS Accession No.: ML13015A364                                     *via email OFFICE           PM:DLRlRPBl       LA:DLRlRPB1*         BC:DLRlRPBl       D:DLRlRPBl NAME             JDaily             YEdmonds             DMorey           JDaily DATE             2/4113             1123/13               2/12113               13
 
REQUEST FOR ADDITIONAL INFORMATION CONFERENCE CALL INDIAN POINT ENERGY CENTER, LICENSE RENEWAL APPLICATION REACTOR VESSEL INTERNALS PROGRAM AND MRP-227-A RAI11A LIST OF PARTICIPANTS December 12,2012 I               PARTICIPANT                             AFFILIATION i John Daily                           Nuclear Regulatory Commission (NRC)
I Jeff Poehler                         NRC i Pat Purtcher                         NRC i Roger Waters                         Entergy f---
Nelson Azevedo                       Entergy Ted Ivy                               Entergy Bob Dolansky                         Entergy                            I Cheryl Boggess                       Westinghouse I
Randy Lott                           Westinghouse Joshua McKinley                      Westinghouse                        i Karli Szweda                              ingl
 
REQUEST FOR ADDITIONAL INFORMATION CONFERENCE CALL INDIAN POINT ENERGY CENTER, UNITS 2 AND 3 LICENSE RENEWAL APPLICATION REACTOR VESSEL INTERNALS PROGRAM AND MRP-227-A RAI11A December 12, 2012 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc. (Entergy or the applicant) held a telephone conference call on December 12,2012, to discuss staff aging management questions related to the applicant's Reactor Vessel Internals Aging Management Program, in the Indian Point Energy Center (lPEC), Units 2 and 3, license renewal application (LRA). The telephone conference call was useful in clarifying the requests for additional information (RAls) on the issue.
RAI-11a, Reactor Vessel Internals Program and MRP-227-A The staff noted that it had requested additional information on the approach to be used for the plant-specific evaluation of the lower support column bodies. The applicant's response indicates it plans to use an approach using the screening criteria for thermal aging embrittlement susceptibility from the staff's letter "License Renewal Issue No. 98-0030, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel Components," dated May 19, 2000 (NRC ADAMS Accession No. ML003717179). The applicant had provided a table of screening criteria based on chemistry, casting method, and delta ferrite content. The staff also noted its recommendation that, in order to account for a potential synergistic effect on loss of fracture toughness due to the combined effects of thermal embrittlement (TE) and neutron irradiation embrittlement (IE), the applicant should perform component-specific assessments for components that will experience neutron fluence of 1x1017 neutrons per square centimeter (n/cm 2) or greater. Finally, the staff noted that MRP-191 indicates a threshold value that is significantly different from this recommendation.
The staff and Entergy discussed these issues and agreed to clarify the RAI in that, if the applicant desired to use a fluence value other than 1x1017 n/cm 2, then it will add justification as to why its stated threshold value is appropriate for Units 2 and 3.
In addition, in view of an expected industry template response to this issue due to be released in January 2013, the staff and Entergy agreed that the reply window for this RAI set would be 90 days from date of issue so the applicant can take the template into account in its response.
The applicant agreed that it would take the staff's questions into account as it prepares its response to RAI 11a. Both the staff and the applicant agreed that the discussion was useful in clarifying the RAI.
(Note: subsequent to the call it was determined to combine RAls 11 a and 15a into one issue letter, in January 2013.)


Westinghouse I I Joshua McKinley Westinghouse i Karli Szweda ingl REQUEST FOR ADDITIONAL INFORMATION CONFERENCE INDIAN POINT ENERGY CENTER, UNITS 2 AND LICENSE RENEWAL REACTOR VESSEL INTERNALS PROGRAM AND December 12, The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc. (Entergy or the applicant) held a telephone conference call on December 12,2012, to discuss staff aging management questions related to the applicant's Reactor Vessel Internals Aging Management Program, in the Indian Point Energy Center (lPEC), Units 2 and 3, license renewal application (LRA). The telephone conference call was useful in clarifying the requests for additional information (RAls) on the issue. RAI-11a, Reactor Vessel Internals Program and MRP-227-A The staff noted that it had requested additional information on the approach to be used for the plant-specific evaluation of the lower support column bodies. The applicant's response indicates it plans to use an approach using the screening criteria for thermal aging embrittlement susceptibility from the staff's letter "License Renewal Issue No. 98-0030, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel Components," dated May 19, 2000 (NRC ADAMS Accession No. ML003717179).
SUB..IECT:  
The applicant had provided a table of screening criteria based on chemistry, casting method, and delta ferrite content. The staff also noted its recommendation that, in order to account for a potential synergistic effect on loss of fracture toughness due to the combined effects of thermal embrittlement (TE) and neutron irradiation embrittlement (IE), the applicant should perform component-specific assessments for components that will experience neutron fluence of 1x1017 neutrons per square centimeter (n/cm 2) or greater. Finally, the staff noted that MRP-191 indicates a threshold value that is significantly different from this recommendation.
The staff and Entergy discussed these issues and agreed to clarify the RAI in that, if the applicant desired to use a fluence value other than 1x1017 n/cm 2 , then it will add justification as to why its stated threshold value is appropriate for Units 2 and 3. In addition, in view of an expected industry template response to this issue due to be released in January 2013, the staff and Entergy agreed that the reply window for this RAI set would be 90 days from date of issue so the applicant can take the template into account in its response.
The applicant agreed that it would take the staff's questions into account as it prepares its response to RAI 11a. Both the staff and the applicant agreed that the discussion was useful in clarifying the RAI. (Note: subsequent to the call it was determined to combine RAls 11 a and 15a into one issue letter, in January 2013.)
SUB..


==SUMMARY==
==SUMMARY==
OF CONFERENCE CALL HELD ON DECEMBER 12, 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING THE REACTOR VESSEL INTERNALS PROGRAM AT INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 -RAI 11A DISTRIBUTION:
OF CONFERENCE CALL HELD ON DECEMBER 12, 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING THE REACTOR VESSEL INTERNALS PROGRAM AT INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 - RAI 11A DISTRIBUTION:
HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDeEvib Resource RidsOgcMailCenter Resource DWrona GMeyer, RI KGreen RConte, RI JPoehler JBoska PCataldo, RI DScrenci, RI OPA NMcNamara, RI NSheehan, RI OPA DJackson, RI BWelling, RI BMizuno, OGC OAvegbusi, RI STurk,OGC MCatts, RI SBurnell, OPA MHalter, RI DMclntyre, OPA EDacus,OCA}}
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDeEvib Resource RidsOgcMailCenter Resource DWrona               GMeyer, RI KGreen               RConte, RI JPoehler             JBoska PCataldo, RI         DScrenci, RI OPA NMcNamara, RI         NSheehan, RI OPA DJackson, RI         BWelling, RI BMizuno, OGC         OAvegbusi, RI STurk,OGC             MCatts, RI SBurnell, OPA         MHalter, RI DMclntyre, OPA EDacus,OCA}}

Latest revision as of 09:09, 6 February 2020

Summary of Conference Call on RAI 11A with Entergy Nuclear Operations, Inc
ML13015A364
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 02/13/2013
From: Daily J
License Renewal Projects Branch 1
To:
Daily, J, 415-3873
References
Download: ML13015A364 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 13, 2013 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Indian Point Nuclear Generating Station, Units 2 and 3

SUBJECT:

SUMMARY

OF CONFERENCE CALL HELD ON DECEMBER 12, 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING THE REACTOR VESSEL INTERNALS PROGRAM AT INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 - RAI 11A Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff), and representatives of Entergy Nuclear Operations. Inc., (Entergy or the applicant), held a conference call on December 12, 2012, to provide clarification on a request for additional information (RAI) 11 a, related to the Indian Point (IP) Nuclear Generating Station, Units 2 and 3 license renewal application. The telephone conference call was useful in clarifying the response to the RAI. provides a listing of the participants and Enclosure 2 contains a summary of the discussion.

The applicant had an opportunity to comment on this summary.

Sincerely, John Daily, Senior Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

Ust of Participants cc w/encl. Ustserv

February 13, 2013 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Indian Point Nuclear Generating Station, Units 2 and 3

SUBJECT:

SUMMARY

OF CONFERENCE CALL HELD ON DECEMBER 12,2012, BEIWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING THE REACTOR VESSEL INTERNALS PROGRAM AT INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 - RAI 11A Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff), and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant), held a conference call on December 12, 2012, to provide clarification on a request for additional information (RAI) 11a, related to the Indian Point (lP) Nuclear Generating Station, Units 2 and 3 license renewal application. The telephone conference call was useful in clarifying the response to the RAI. provides a listing of the participants and Enclosure 2 contains a summary of the discussion.

The applicant had an opportunity to comment on this summary.

Sincerely,

/ra!

John Daily, Senior Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

List of Participants cc w/encl: Listserv ADAMS Accession No.: ML13015A364 *via email OFFICE PM:DLRlRPBl LA:DLRlRPB1* BC:DLRlRPBl D:DLRlRPBl NAME JDaily YEdmonds DMorey JDaily DATE 2/4113 1123/13 2/12113 13

REQUEST FOR ADDITIONAL INFORMATION CONFERENCE CALL INDIAN POINT ENERGY CENTER, LICENSE RENEWAL APPLICATION REACTOR VESSEL INTERNALS PROGRAM AND MRP-227-A RAI11A LIST OF PARTICIPANTS December 12,2012 I PARTICIPANT AFFILIATION i John Daily Nuclear Regulatory Commission (NRC)

I Jeff Poehler NRC i Pat Purtcher NRC i Roger Waters Entergy f---

Nelson Azevedo Entergy Ted Ivy Entergy Bob Dolansky Entergy I Cheryl Boggess Westinghouse I

Randy Lott Westinghouse Joshua McKinley Westinghouse i Karli Szweda ingl

REQUEST FOR ADDITIONAL INFORMATION CONFERENCE CALL INDIAN POINT ENERGY CENTER, UNITS 2 AND 3 LICENSE RENEWAL APPLICATION REACTOR VESSEL INTERNALS PROGRAM AND MRP-227-A RAI11A December 12, 2012 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc. (Entergy or the applicant) held a telephone conference call on December 12,2012, to discuss staff aging management questions related to the applicant's Reactor Vessel Internals Aging Management Program, in the Indian Point Energy Center (lPEC), Units 2 and 3, license renewal application (LRA). The telephone conference call was useful in clarifying the requests for additional information (RAls) on the issue.

RAI-11a, Reactor Vessel Internals Program and MRP-227-A The staff noted that it had requested additional information on the approach to be used for the plant-specific evaluation of the lower support column bodies. The applicant's response indicates it plans to use an approach using the screening criteria for thermal aging embrittlement susceptibility from the staff's letter "License Renewal Issue No. 98-0030, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel Components," dated May 19, 2000 (NRC ADAMS Accession No. ML003717179). The applicant had provided a table of screening criteria based on chemistry, casting method, and delta ferrite content. The staff also noted its recommendation that, in order to account for a potential synergistic effect on loss of fracture toughness due to the combined effects of thermal embrittlement (TE) and neutron irradiation embrittlement (IE), the applicant should perform component-specific assessments for components that will experience neutron fluence of 1x1017 neutrons per square centimeter (n/cm 2) or greater. Finally, the staff noted that MRP-191 indicates a threshold value that is significantly different from this recommendation.

The staff and Entergy discussed these issues and agreed to clarify the RAI in that, if the applicant desired to use a fluence value other than 1x1017 n/cm 2, then it will add justification as to why its stated threshold value is appropriate for Units 2 and 3.

In addition, in view of an expected industry template response to this issue due to be released in January 2013, the staff and Entergy agreed that the reply window for this RAI set would be 90 days from date of issue so the applicant can take the template into account in its response.

The applicant agreed that it would take the staff's questions into account as it prepares its response to RAI 11a. Both the staff and the applicant agreed that the discussion was useful in clarifying the RAI.

(Note: subsequent to the call it was determined to combine RAls 11 a and 15a into one issue letter, in January 2013.)

SUB..IECT:

SUMMARY

OF CONFERENCE CALL HELD ON DECEMBER 12, 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING THE REACTOR VESSEL INTERNALS PROGRAM AT INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 - RAI 11A DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDeEvib Resource RidsOgcMailCenter Resource DWrona GMeyer, RI KGreen RConte, RI JPoehler JBoska PCataldo, RI DScrenci, RI OPA NMcNamara, RI NSheehan, RI OPA DJackson, RI BWelling, RI BMizuno, OGC OAvegbusi, RI STurk,OGC MCatts, RI SBurnell, OPA MHalter, RI DMclntyre, OPA EDacus,OCA