ML14245A200: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/02/2014
| issue date = 09/02/2014
| title = V.C. Summer Mid-Cycle Ltr 2014
| title = V.C. Summer Mid-Cycle Ltr 2014
| author name = King M F
| author name = King M
| author affiliation = NRC/RGN-II/DRP/RPB5
| author affiliation = NRC/RGN-II/DRP/RPB5
| addressee name = Gatlin T D
| addressee name = Gatlin T
| addressee affiliation = South Carolina Electric & Gas Co
| addressee affiliation = South Carolina Electric & Gas Co
| docket = 05000395
| docket = 05000395
Line 14: Line 14:
| page count = 5
| page count = 5
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 2, 2014 Mr. Thomas D. Gatlin Vice President - Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065
==SUBJECT:==
MID-CYCLE LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 -
NRC ASSESSMENT REPORT 05000395/2014006
==Dear Mr. Gatlin:==
On August 12, 2014, the NRC completed its mid-cycle performance review of V.C. Summer Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2013, through June 30, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, V.C. Summer, Unit 1, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined that the performance at V.C. Summer Nuclear Station, Unit 1, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310.
Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.
The enclosed inspection plan lists the inspections scheduled through December 31, 2015.
Routine inspections performed by resident inspectors are not included in the inspection plan The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
T. Gatlin                                        2 In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4511 with any questions you may have regarding this letter.
Sincerely,
                                                  /Mark Franke RA for/
Michael F. King, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No.: 50-395 License No.: NPF-12
==Enclosure:==
V.C. Summer Inspection/Activity Plan (09/01/2014 - 12/31/2015) cc Distribution via ListServ
________________        SUNSI REVIEW COMPLETE    FORM 665 ATTACHED OFFICE              RII:DRP        RII:DRP          RII:DRP SIGNATURE          BDB /RA/      SON /RA/        MEF /RA for/
NAME                BBishop        SNinh            MKing DATE                    8/27/2014      8/27/2014        9/02/2014 E-MAIL COPY?          YES    NO    YES      NO      YES      NO    YES  NO T. Gatlin                                  3 Letter to Thomas D. Gatlin from Michael F. King dated September 2, 2014.
==SUBJECT:==
MID-CYCLE LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 -
NRC ASSESSMENT REPORT 05000395/2014006 DISTRIBUTION:
D. Gamberoni, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSummer Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
Page 1 of 1                                                                                Summer 09/02/2014    09:49:27                                                        Inspection / Activity Plan Report 22 09/01/2014 - 12/31/2015 Unit          Planned Dates                                                                                                                                  No. of Staff Number          Start      End    Inspection Activity                                                          Title                                          on Site EP            - EP PROGRAM INSPECTION                                                                                              3 1          09/08/2014  09/12/2014  IP 7111402              Alert and Notification System Testing 1          09/08/2014  09/12/2014  IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System 1          09/08/2014  09/12/2014  IP 7111404              Emergency Action Level and Emergency Plan Changes 1          09/08/2014  09/12/2014  IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 1          09/08/2014  09/12/2014  IP 71151                Performance Indicator Verification CDBI          - COMPONENT DESIGN BASES INSPECTION                                                                                  7 1          09/08/2014  09/12/2014  IP 7111121              Component Design Bases Inspection 1          10/06/2014  10/10/2014  IP 7111121              Component Design Bases Inspection 1          10/20/2014  10/24/2014  IP 7111121              Component Design Bases Inspection 1          11/03/2014  11/07/2014  IP 7111121              Component Design Bases Inspection TFPI          - TRIENNIAL FIRE PROTECTION INSP                                                                                      4 1          04/20/2015  04/24/2015  IP 7111105T            Fire Protection [Triennial]
1          05/04/2015  05/08/2015  IP 7111105T            Fire Protection [Triennial]
RP            - RP PUBLIC RAD SAFETY BASELINE                                                                                      3 1          07/27/2015  07/31/2015  IP 71124.06            Radioactive Gaseous and Liquid Effluent Treatment 1          07/27/2015  07/31/2015  IP 71124.07            Radiological Environmental Monitoring Program 1          07/27/2015  07/31/2015  IP 71124.08            Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1          07/27/2015  07/31/2015  IP 71151                Performance Indicator Verification OL RQ        - REQUAL INSP                                                                                                        2 1          08/10/2015  08/14/2015  IP 7111111B            Licensed Operator Requalification Program RP            - RP RAD HAZARDS ASSESSMENT                                                                                          1 1          10/05/2015  10/09/2015  IP 71124.01            Radiological Hazard Assessment and Exposure Controls EP            - EP EXERCISE                                                                                                        5 1          10/12/2015  10/16/2015  IP 7111401              Exercise Evaluation 1          10/12/2015  10/16/2015  IP 7111404              Emergency Action Level and Emergency Plan Changes 1          10/12/2015  10/16/2015  IP 71151                Performance Indicator Verification ISI          - UNIT 1 IN-SERVICE INSPECTION                                                                                        1 1          10/12/2015  10/16/2015  IP 7111108P            Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.                                                          Enclosure This report shows only on-site and announced inspection procedures.}}

Latest revision as of 18:55, 5 February 2020

V.C. Summer Mid-Cycle Ltr 2014
ML14245A200
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 09/02/2014
From: Mark King
NRC/RGN-II/DRP/RPB5
To: Gatlin T
South Carolina Electric & Gas Co
References
IR-2014-006
Download: ML14245A200 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 2, 2014 Mr. Thomas D. Gatlin Vice President - Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065

SUBJECT:

MID-CYCLE LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 -

NRC ASSESSMENT REPORT 05000395/2014006

Dear Mr. Gatlin:

On August 12, 2014, the NRC completed its mid-cycle performance review of V.C. Summer Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2013, through June 30, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, V.C. Summer, Unit 1, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined that the performance at V.C. Summer Nuclear Station, Unit 1, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310.

Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.

The enclosed inspection plan lists the inspections scheduled through December 31, 2015.

Routine inspections performed by resident inspectors are not included in the inspection plan The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

T. Gatlin 2 In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4511 with any questions you may have regarding this letter.

Sincerely,

/Mark Franke RA for/

Michael F. King, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No.: 50-395 License No.: NPF-12

Enclosure:

V.C. Summer Inspection/Activity Plan (09/01/2014 - 12/31/2015) cc Distribution via ListServ

________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE BDB /RA/ SON /RA/ MEF /RA for/

NAME BBishop SNinh MKing DATE 8/27/2014 8/27/2014 9/02/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO T. Gatlin 3 Letter to Thomas D. Gatlin from Michael F. King dated September 2, 2014.

SUBJECT:

MID-CYCLE LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 -

NRC ASSESSMENT REPORT 05000395/2014006 DISTRIBUTION:

D. Gamberoni, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSummer Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 1 Summer 09/02/2014 09:49:27 Inspection / Activity Plan Report 22 09/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP PROGRAM INSPECTION 3 1 09/08/2014 09/12/2014 IP 7111402 Alert and Notification System Testing 1 09/08/2014 09/12/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 09/08/2014 09/12/2014 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 09/08/2014 09/12/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 09/08/2014 09/12/2014 IP 71151 Performance Indicator Verification CDBI - COMPONENT DESIGN BASES INSPECTION 7 1 09/08/2014 09/12/2014 IP 7111121 Component Design Bases Inspection 1 10/06/2014 10/10/2014 IP 7111121 Component Design Bases Inspection 1 10/20/2014 10/24/2014 IP 7111121 Component Design Bases Inspection 1 11/03/2014 11/07/2014 IP 7111121 Component Design Bases Inspection TFPI - TRIENNIAL FIRE PROTECTION INSP 4 1 04/20/2015 04/24/2015 IP 7111105T Fire Protection [Triennial]

1 05/04/2015 05/08/2015 IP 7111105T Fire Protection [Triennial]

RP - RP PUBLIC RAD SAFETY BASELINE 3 1 07/27/2015 07/31/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 07/27/2015 07/31/2015 IP 71124.07 Radiological Environmental Monitoring Program 1 07/27/2015 07/31/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1 07/27/2015 07/31/2015 IP 71151 Performance Indicator Verification OL RQ - REQUAL INSP 2 1 08/10/2015 08/14/2015 IP 7111111B Licensed Operator Requalification Program RP - RP RAD HAZARDS ASSESSMENT 1 1 10/05/2015 10/09/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls EP - EP EXERCISE 5 1 10/12/2015 10/16/2015 IP 7111401 Exercise Evaluation 1 10/12/2015 10/16/2015 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 10/12/2015 10/16/2015 IP 71151 Performance Indicator Verification ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 10/12/2015 10/16/2015 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.