ML15329A166: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:
GERLACH*ROSEY N          EMPL#:028401  CA#:  0363 Address: NUCSA2 Phone#:  254-3194 TRANSMITTAL INFORMATION:
GERLACH*ROSEY N          EMPL#:028401  CA#:  0363 Address: NUCSA2 Phone#:  254-3194 TRANSMITTAL INFORMATION:
TO:      GERLACH*ROSEY N      11/11/2015 LOCATION:    USNRC FROM:    NUCLEAR RECORDS DOCUMENT CONTROL CENTER  (NUCSA-2)
TO:      GERLACH*ROSEY N      11/11/2015 LOCATION:    USNRC FROM:    NUCLEAR RECORDS DOCUMENT CONTROL CENTER  (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL,  ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MNAL.        TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
.
TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL,  ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MNAL.        TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents,    Therefore no TOC will be issued with the updated material.
ATTENTION: "REPLACE" directions do not affect the Table of Contents,    Therefore no TOC will be issued with the updated material.
TRMI  - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS    DATE: 11/03/2015 ADD      MANUAL TABLE OF CONTENTS  DATE: 11/10/2015 CATEGORY:  DOCUMENTS  TYPE: TRM1 4oc2
TRMI  - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS    DATE: 11/03/2015 ADD      MANUAL TABLE OF CONTENTS  DATE: 11/10/2015 CATEGORY:  DOCUMENTS  TYPE: TRM1 4oc2
Line 26: Line 24:
Nov. 11, 2015 Page      2    of  2 ID:  TEXT 3.2.1 REMOVE:    REV:15 ADD:    REV:  16 CATEGORY:  DOCUMENTS  TYPE: TEMI ID:  TEXT 3.3.7 REMOVE:    REV:1 ADD:    REV:  2 CATEGORY:  DOCUMENTS  TYPE: TRMI ID:  TEXT B3.3.7 REMOVE:    REV:I1 ADD:    REV:  2 CATEGORY:  DOCUMENTS  TYPE: TRMI ID:  TEXT LOES REMOVE:    REV: 83 ADD:    REV:  84 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED,    CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.      FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
Nov. 11, 2015 Page      2    of  2 ID:  TEXT 3.2.1 REMOVE:    REV:15 ADD:    REV:  16 CATEGORY:  DOCUMENTS  TYPE: TEMI ID:  TEXT 3.3.7 REMOVE:    REV:1 ADD:    REV:  2 CATEGORY:  DOCUMENTS  TYPE: TRMI ID:  TEXT B3.3.7 REMOVE:    REV:I1 ADD:    REV:  2 CATEGORY:  DOCUMENTS  TYPE: TRMI ID:  TEXT LOES REMOVE:    REV: 83 ADD:    REV:  84 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED,    CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.      FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.


SSES MNUALm Manual Name:z  TRM1 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date:          1LI/I10/2 015 Procedure Name                    Rev  Issue Date        Change ID      Change Numiber TEXT LOES                          84  11/10 /2 015 Title: LIST OF EF:FECTIVE SECTIONS TEXT TOC                          25  04/28/2015 Title: TABLE OF CONTENTS TEXT 1.1                          1    01/31/2014 Title: USE AND APPLICATION DEFINITIONS TEXT 2.1                          2    04/28/2015 Title: PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2                          10  01/31/2014 Title: PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0                          5    03/05/2015 Title: TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY & SURVEILLANCE  (TRS)
SSES MNUALm Manual Name:z  TRM1 Manual
APPLICABILITY TEXT 3.1.1                        1    11/09/2007 Title: REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2                        0    11/18/2002 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE  (CRD) HOUSING SUPPORT TEXT 3.1.3                        5    04/16/2009 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4                        0    11/18/2002 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS  INSTRUMENTATION  &
CHECK VALVE TEXT 3.2.1                          16  11/10/2015 Title: CORE OPERATING LIMITS REPORT  (COLR)
Report Date:  11/11/15 Pagel Page !      of of  i~
16                                                        Report Date: 11/11/15


SSES MANUAL Manual Name:        TRMI Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1                        0    11/18/2002 Title: INSTRUMENTATION RADIATION MONITORING  INSTRUMENTATION TEXT 3.3.2                        3    03/31/2011 Title: INSTRUMENTATION  SEISMIC MONITORING  INSTRUMENTATION TEXT 3.3.3                        2    11/09/2007 Title: INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4                        8    10/14/2015 Title:  INSTRUMENTATION TRN POST-ACCIDENT MONITORING INSTRUMENTATION LDCN         4552 TEXT 3.3.5                        0    11/18/2002 Title: INSTRUMENTATION THIS PAGE INTENTIONALLY    LEFT BLANK TEXT 3.3.6                        4    04/29/2014 Title: INSTRUMENTATION  TRN ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7                        2     11/10/2015 Title: INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8                        1    10/22/2003 Title: INSTRUMENTATION TEN RPS INSTRUMENTATION TEXT 3.3.9                        3    04/17/2008 Title: OPEN INSTRUMENTATION CONFIGURATION TEXT 3.3.10                      1    12/14/2004 Title: INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11                      1    10/22/2003 Title: INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12                      1    03/05/2015 Title: WATER MONITORING INSTRUMENTATION Report Date: 11/11/15 Page 2     of of   16 I__66                                                    Report Date: 11/11/15
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date:          1LI/I10/2 015 Procedure Name                    Rev Issue Date       Change ID     Change Numiber TEXT LOES                          84   11/10 /2 015


                                                ~SES MANTJAIJ Manual Namue:      TRMI Manual Title: TECHNICAL REQUIREMENTS      MANUAL UNIT 1 TEXT 3.4.1                            1      04/26/2006 Title: REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2                          1      04/16/2009 Title:   REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3                            1      11/09/2007 Title:   REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4                           2      04/17/2008 Title:    REACTOR COOLANT SYSTEM REACTOR RECIRCULATION  FLOW AND ROD LINE LIMIT TEXT 3.4.5                          1      04/26/2006 Title:    REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6                          2      04/25/2013 Title:    REACTOR RECIRCULATION   SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1                          1      02/04/2005 Title: EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2                          1      11/09/2007 Title: EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3                          0      11/18/2002 Title: EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1                            0      11/18/2002 Title:    CONTAINMENT VENTING  OR  PURGING TEXT 3.6.2                            2      04/29/2014 Title: SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3                            0      11/18/2002 Title:    CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Report Date: 11/11/15 Page Page~*        of of  16 i_*6                                                        Report Date: 11/11/15
==Title:==
LIST OF EF:FECTIVE SECTIONS TEXT TOC                           25  04/28/2015


SSES MANUJAL Manual Name :      TE*I 21:Manual Title:     TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6.4                            0    11/18/2002 Titles CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1                           0    11/18/2002 Title: PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM      (ESW) SHUTDOWN TEXT 3.7.2                            0    11/18/2002 Title: PLANT SYSTEMS ULTIMATE HEAT SINK (UHS)    AND GROUND WATER LEVEL TEXT 3.7.3.1                         2    04/16/2009 Title: PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2                        3    04/16/2009 Title: PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3                        3    04/16/2009 Title:*  PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4                        2    04/16/2009 Title :  PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5                        2    04/16/2009 Title :  PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6                        2    04/16/2009 Title :  PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7                        1     04/26/2006 Title :  PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8                        10   09/27/2012 Title:. PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4                          1    04/26/2006 Title: PLANT SYSTEMS SOLID RADWASTE SYSTEM Report Date: 11/11/15 Page Page A4      of of  16 16
==Title:==
TABLE OF CONTENTS TEXT 1.1                           1    01/31/2014


SSES    MUANTAI
==Title:==
. IManual Title: TECHNICAL REQUIREMVENTS MANUAL UNIT 1 Manual Name:  TRJi1I TEXT 3.7.5.1                      1   03/05/2015 Title: PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2                     0    11/18/2002 Titleg PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3                      1    04/26/2006 Title: PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6                        3   06/04/2012 Title: PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7                        2    09/05/2008 Titles PLANT SYSTEMS MAIM CONDENSER 0FFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING TEXT 3.7.8                        5    03/05/2015 Title: PLANT SYSTEMS SNUBBERS TEXT 3.7.9                      2    01/31/2014 Title: PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10                      1    12/14/2004 Title: PLANT SYSTEMS SPENT FUEL STORAGE POOLS  (SFSPS)
USE AND APPLICATION DEFINITIONS TEXT 2.1                           2    04/28/2015
TEXT 3.7o11                      0    04/16/2009 Title: STRUCTURAL  INTEGRITY TEXT 3.8.1                      2    04/05/2010 Title: ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1                    2    11/09/2007 Title: ELECTRICAL POWER MOTOR OPERATED VALVES  (MOV)  THERMAL OVERLOAD PROTECTI( ON  -.
CONTINUOUS TEXT 3.8.2.2                    2    12/14/2004 Title: ELECTRICAL POWER MOTOR OPERATED VALVES  (MOV)  THERMAL OVERLOAD PROTECTICON -
AUTOMATIC Report Date:    11/11/15 Page 5 Page        of of  16 16                                                        Report Date: 11/11/15


SSES MANUAL Manual Name:*      TRNI SManual Title:       TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3                            2      03/05/2015 Title  : ELECTRICAL POWER DIESEL GENERATOR CDG) MAINTENANCE ACTIVITIES TEXT 3.8.4                            0      11/18/2002 Title:*  ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5                            1      11/14/2013 Title : ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6                            1      12/08/2011 Title : ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7                            1      06/15/2009 Title:    BATTERY MAINTENANCE AND MONITORING PROGRALM TEXT 3.9.1                            0      11/18/2002 Title:    REFUELING OPERATIONS  DECAY TIME TEXT 3.9.2                           0      11/18/2002 Title:    REFUELING OPERATIONS  COMMUNICATIONS TEXT 3.9.3                            0      11/18/2002 Title:    REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1                          1      04/26/2006 Title:    MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2                          2     08/08/2006 Title: MISCELLANEOUS    SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3                           2      06/15/2010 Title:    MISCELLANEOUS  INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
==Title:==
TEXT 3.10.4                          2      04/17/2008 Title:    MISCELLANEOUS LEADING EDGE FLOW METER    (LEFM)
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2                          10   01/31/2014
Report Date: 11/11/15 Page *6 Page          of of  16 16                                                        Report Date: 11/11/15


SSES MANUJAL
==Title:==
**    Manual Name:      TRN1
PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0                           5   03/05/2015
      - Manual Title:      TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.1                        1      04/26/2006 Title:    RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2                        1      04/26/2006 Title: RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3                        1      04/26/2006 Title: RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT        SYSTEM TEXT 3.11.1.4                        2      10109/2012 Title:   RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING      INSTRUMENTATION TEXT 3.11.1.5                        3      03/05/2015 Title:    RADIOACTIVE EFFLUENTS RADIOACTIVE    LIQUID PROCESS MONITORING INSTRUTMENTATION
    ... TEXT 3.11.2.1                        3      04/26/2006 Title:    RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2                        1      04/26/2006 Title: RADIOACTIVE EFFLUENTS DOSE      -  NOBLE GASES TEXT 3.11.2.3                        1      04/26/2006 Title: RADIOACTIVE EFFLUENTS DOSE      -  IODINE,  TRITIUM,  AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4                        0     11/18/2002 Title: RADIOACTIVE EFFLUENTS GASEOUS RAD WASTE TREATMENT SYSTEM TEXT 3.11.2.5                         4      07/03/2013 Title:    RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT      SYSTEM TEXT 3.11.2.6                        5      04/28/2015 Title:    RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION ac*    TEXT 3.11.3                          1 Title: RADIOACTIVE EFFLUENTS TOTAL DOSE 04/26/2006 Report Date:  11/11/15 Page *:i~      of of  16 I_66                                                          Report Date:  11/11/15


SSES MANUAL Manual Name :    TRMI Manual Title: TECHNICAL REQUIREMENTS      MANUAL UNIT 1 TEXT 3.11.4.1                        5      03/05 /2015 Title:    RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2                        2      04/26 /2006 Title:    RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3                      1     04/26/2006 Title:    RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1                        0      11/19/2002 Title:    LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2                        4      04/17 /2008 Title:   LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3                        0      11/19/2002                                        0 Title: LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4.1                            0      08/31/1998 Title: ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2                            0      08/31/1998 Title: ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3                            0      08/31/1998 Title: ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4                            1      12/18/2008 Title: ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5                            0      08/31/1998 Title: ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6                            0      08/31/1998 Title: ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM 16Reprt                                                          Dte:11/1/1 Page8.a Page          of  16                                                        Report Date: 11/11/15
==Title:==
TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY & SURVEILLANCE  (TRS)
APPLICABILITY TEXT 3.1.1                        1   11/09/2007


SSES MANUJAL
==Title:==
. 1-- Manual Name: TECHNICAL Manual Title:  TRMI      REQUIREMENTS MANUAL UNIT 1 TEXT 4.7                          0      08/31/1998 Title: ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0                          5      03/05/2015 Title: APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION    (TRO)    APPLICABILITY TEXT B3.1.1                        2      04/29/2014 Title: REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2                       0     11/19/2002 Title: REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE   (CRD)  HOUSING SUPPORT TEXT B3.1.3                        3      03/31/2006 Title: REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4                        0      11/19/2002 Title: REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMU/LATORS      INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1                        0      11/19/2002 Title: CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT      (COLR)
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2                         0    11/18/2002
TEXT B3.3.1                        1      01/31/2014 Title: INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2                        2      03/31/2011 Title: INSTRUMENTATION  BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3                        3      12/18/2008 Title: INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4                        5      10/14/2015 Title: INSTRUMENTATION BASES TEN POST ACCIDENT MONITORING  (PAM)  INSTRUMENTATION
. TEXT B3.3.5                        2      11/09/2007 Title: INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK Page        of  16                                                            Report Date: 11/11/15


9--I    *o        0--*D*d ST/TT/TT  :~~c1 ~od~a                                                                              ~T ;o              ~T  9.~2d sTZLVWH~*  THSS*HA HO&DVH S*Sva WNHJS2XS          d NWIOOD HO1DVZH *IL*
==Title:==
Z00Z/6T/TT              0                              S'9"[H J&X~H JLIWlI ZIlI UOH QNT    MO'EA NOllvqIflHIDZa HOJ*DV*        S*SVE NHLSAS LN-'IOOD HOLD*'d :eYZ; Z00Z/6T/TT              0                              9""H&H HOLINOW *D'f>VI-' HDV*aHJI aH~nSS*H      MO'I/HDIH S*SVH        *SXS INWIOOD          [ODV'H*I xE
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3                        5    04/16/2009
* LOOZ/60/TT              T
* hI~f00o      :xa:si*
VZD M A*IEIDJNI  I-*-hLDflHLS      SHSva NacISLS 600Z/9T/90              T
                                                                                        ~LNTWEOODT'O°DV      6 H      XTJ 2AJSIW*H3 NILSXS LN'IOOD HOLDOWN S*SVH W2.SAS Z00Z/6T/Tt              0 NOI1*N*WflHLSNI      DNIHOllINO      aH*NM        9!ZTI 600Z/9T/90              0                            ZTE"E*      HTX.*,T N01N~WfldJSNI NOIlWIosI JAW
                                                £00Z/ZZ/0T              T SaSvH NOILVNHXflaLSNI :eT;*.
0T''£H LXHL SJOIS LNS OW JNflJ NOI~VqlDOHIDHa HOLD*aH 010*/60/80              £ WOIL*N*WaaJSNI      WIHdO :9*;t*
800Z/LT/90              £ 6"V£H c*Xai NOIJNLN*rHLSNI      (Saa) wka&sXS NOILD*O&~d HOJ*Dv*Ha TaJ*
                                                £00*I/*IOT              T WkLS2S NOI DHLO'HJ    *HJSHAO      ~HNIEHf1L  NIVW SZSVH NOIJNN[IWnaL*SNI              S*IW*
NOI*LN*TIflqHSNI  NOIl*fDY      NOILVqosI WIHL S*S*a        NOILVN        &LOHSNJ      *!I1J&
9TOZ/T£/T0 TI ,,INfl    I~fl*  S,,*ZHf0*        rI\DINHD.&,T    :*~            y        I~r
                                          ~IVL1NVW S~S~


SSES    MATJi*
==Title:==
* Manual Name:      TRMI
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4                         0   11/18/2002
    =iManual Title: TECHNICAL REQUIREM'cENTS MANUAL UNIT 1 TEXT B3.4.6                        2    04/25/2013 Title: REACTOR RECIRCULATION SINGLE LOOP OPERATION  SLO FLOW RATE RESTRICTION TEXT B3.5.1                        0    11/19/2002 Title: ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2                        1    11/09/2007 Title: ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3                       1    11/09/2007 Title: ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1                       0    11/19/2002 Title: CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2                        0    11/19/2002 Title: CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL  VACUUM BREAKER POSITION INDICATION TEXT B3.6.3                        2    04/17/2008 Title: CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3o6.4                       1    12/14/2004 Title: CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1                        0     11/19/2002 Title: PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM    (SHUTDOWN)
TEXT B3.7.2                        0    11/19/2002 Title: PLANT SYSTEMS BASES ULTIMATE HEAT SINK  (UHS)  GROUND WATER LEVEL TEXT B3.7.3.1                    3      06/15/2010 Title: PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM
* TEXT B3.7.3.2                    2      04/26/2006 W.      Title: PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 1_1    of  i__66                                                        Report Date: 11/11/15


SSES    MANUAL Manual Name:        TRMI SManual Title*        TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.3                          0    11/19/2002 Title:* PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4                          3    04/29/2014 Title:*  PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5                          1    04/26/2006 Title : PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6                          1    04/26/2006 Title : PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7                          0    11/19/2002 Title : PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES STEXT B3.7.3.8                            3    09/27/2012 Title: PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3 7.4                            0    11/19/2002 Title : PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1                          0    11/19/2002 Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2                          0    11/19/2002 Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3                         0    11/19/2002 Title : PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6                            4    06/04/2013 Title : PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION
==Title:==
  . TEXT B3.7.7                            2     01/31/2008
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION   &
    ...-  Title :  PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Report Date: 11/11/15 Page 1/2 Page    12      of of  16 16                                                        Report Date: 11/11/15
CHECK VALVE TEXT 3.2.1                         16 11/10/2015


SSES MANTJAI~
==Title:==
Manual Name :      TPR41 Manual Title:     TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.8                          4      01/31/2 014 Title:    PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9                          2      12/08/2011 Title :  PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10                          1      12/14/2004 Title :  PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11                          1      04/14/2010 Title:    STRUCTURAL INTEGRITY TEXT B3.8.1                          2      03/10/2010 Title:    ELECTRICAL POWER BASES   PRIMARY  CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1                        0      11/19/2002 Title:    ELECTRICAL POWER BASES MOTOR OPERATED VALVES      (MOV) THERMAL OVERLOAD PROTECTION  -
CORE OPERATING LIMITS REPORT   (COLR)
CONTINUOUS TEXT B3.8.2.2                        1      09/17/2004 Title:    ELECTRICAL POWER BASES MOTOR OPERATED VALVES      (MOV) THERMAL OVERLOAD PROTECTION  -
Report Date:  11/11/15 Pagel Page !      of of  i~
AUTOMATIC TEXT B3.8.3                          0      11/19/2002 Title:    ELECTRICAL POWER BASES DIESEL GENERATOR    (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4                          0      11/19/2002 Title:    ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5                          1      11/14/2013 Title:    ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6                          2      12/08/2011 Title:    ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7                          2      06/04/2013 Title:    BATTERY MAINTENANCE AND MONITORING    PROGRAM Report Date:  11/11/15 Page i~
16                                                       Report Date: 11/11/15
Page  13      of of  ii 16                                                             Report Date: 11/11/15


S.~ES MM~AL
SSES MANUAL Manual Name:       TRMI Manual
  <?=Manual Name: TRMI
 
  "*Manual Titles&deg; TECHNICAL REQUIREMENTS MANUAL UNIT 1                                               0 TEXT B3.9.l                          0      11/19/2002 Title:    REFUELING OPERATIONS BASES DECAY TINE TEXT B3.9.2                          0      11/19/2002 Title:    REFUELING OPERATIONS BASES COMM4UNICATIONS TEXT B3.9.3                           0      11/19/2002 Title:    REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1                         0     11/19/2002 Title:     MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2                          1      03/31/2006 Title:    MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3                          0      11/19/2002 Title:    MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION  (ISFSI)
==Title:==
TEXT B3.10.4                          1      04/17/2 008 Title:     MISCELLANEOUS BASES LEADING EDGE FLOW METER  (LEFM)
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1                         0    11/18/2002
TEXT B3.ii.ioi                        0      11/19/2002 Title:    RADIOACTIVE  EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3ol.11Io2                      0      11/19/2002 Title:    RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.ii.i.3                        0      11/19/2002 Title:    RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT   SYSTEM TEXT B3.11.I.4                        0      11/19/2002 Title:    RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.I.5                       0      11/19/2002 Title:     RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION Report Date:  11/11/15 Page 14 Page  14        of of  ~i*                                                      Report Date:  11/11/15
 
==Title:==
INSTRUMENTATION RADIATION MONITORING   INSTRUMENTATION TEXT 3.3.2                       3     03/31/2011


SSES    MANUJAI O Manual Name:           TRMI
==Title:==
  ... Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.11.2.1                  1      12/14/2004 Title: RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2                    0    11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.11.2.3                   0    11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES DOSE  - IODINE, TRITIUM,  AND RADIONUCLIDES IN SPARTICULATES FORM TEXT B3.11.2.4                    0    11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5                  5      07/03/2013 Title: RADIOACTIVE EFFLUENTS BASES VENTILATION EXHqAUST  TREATMENT SYSTEM TEXT B3.11.2.6                  1      01/27/2004 Title: RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS  EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3                      0     11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1                  5      03/05/2015 Title: RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2                  0      11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3                  0      11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1                    1      10/04/2007 Title: LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2                    1      12/03/2010 Title: LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS Report Date:  11/11/15 Page i~.
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3                       2    11/09/2007
15      of of    16 I__66                                                    Report Date: 11/11/15


SSES MANUJAL
==Title:==
*-    Manual Name:     TRN1
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4                        8     10/14/2015
:*:Manual  Title:    TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3                         0. 11/19/2002 Title: LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Report Date: 11/11/15 Page 1616     of of    16 16                                              Report Date: 11/11/15


SUSQUEHANNA STEAM ELECTRIC STATION                                Rev. 64 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
==Title:==
Section  Titl__ee                                                Effective Date TOC      TABLE OF CONTENTS                                          04/23/2015 1.0      USE AND APPLICATION Page TRM / 1.0-1                                      10/04/2002 Page TRM / 1.0-2                                      01/21/2014 Page TRM / 1.0-3                                     10/04/2002 2.0      PLANT PROGRAMS Page TRM / 2.0-1                                      04/23/2015 Pages TRM / 2.0-2 and TRM / 2.0-3                     01/28/2005 Page TRM / 2.0-4                                      06/25/2002 Page TRM / 2.0-5                                     01/21/2014 Page TRM / 2.0-6                                      03/27/2008 Page TRM / 2.0-7                                      05/15/2008 Pages TRM / 2.0-8 and TRM / 2.0-9                    01/07/2011 Page TRM / 2.0-10                                    02/02/2010 Page TRM / 2.0-11                                    11/15/2004 Page TRM / 2.0- 12                                    03/27/2008 Pages TRM / 2.0-13 and TRM / 2.0-1*                  11/15/2004 Page TRM / 2.0-15                                    11/15/2005 3.0 PI"I"LI*.jp?.DILI I I Pages TRM / 3.0-1 and                                02/19/2015 Page TRM / 3.0-3                                      03/15/2002 Page TRM / 3.0-4                                      02/19/2015 REACTIVITY CON 3.1 Page TRM / 3.*                                        10/3112007 Pages TRM              an                            08/31/1998 Pages 3.                5                            08/31/1998 Page TR                                              03/22/2006 04/07/2009 03/27/2008 3.1-9 and TRM / 3.1,9a              02/18/1999
INSTRUMENTATION TRN POST-ACCIDENT MONITORING INSTRUMENTATION LDCN          4552 TEXT 3.3.5                       0     11/18/2002
                              .1-10                              02/18/1999 3.2 iERATING LIMITS REPORT                        07/07/1999 Pages TRM / 3.2-2 through TRM / 3.2-63                11/04/2015 3.3      INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3                07/16/1999 Page TRM / 3.3-4 and TRM / 3.3-5                      10/31/2007 Page TRM / 3.3-6                                    03/10/2011 SUSQUEHANNA-UNIT1                        TRM / LOES-1 SUSQEHANA UNT I RM LOS-1EFFECTIVE DATE 11/04/2015


SUSQUEHANNA STEAM ELECTRIC STATION                                Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
==Title:==
Section  Title                                                  Effective Date Page TRM / 3.3-7                                      10/31/2007 Page TRM / 3.3-8                                      08/31/1998 Page TRM / 3.3-9                                      10/07/2015 Page T'RM / 3.3-9a                                    06/30/2010 Page TRM / 3.3-10                                      10/31/2007 Page TRM /3.3-11                                      10/07/2015 Page TRM / 3.3-11a                                    10/07/2015 Page TRM I 3.3-12                                      03/30/2001 Page TRM / 3.3-13                                      01/07/2011 Page TRM / 3.3-14                                      12/1 4/1 998 Page TRM / 3.3-15,                                    04/11/2014 Page TRM I 3.3-16                                      01/07/2011 Page TRM / 3.3-17                                      11/04/2015 Page TRM / 3.3-17a                                    11/04/2015 Page TRM / 3.3-18                                      10/31/2007 Pages TRM / 3.3-19 through TRM / 3.3-21                10/22/2003 Page TRM / 3.3-22                                      03/27/2008 Page TRM / 3.3-22a                                    11/15/2004 Pages TRM / 3.3-22b through TRM / 3.3-22d              03/22/2006 Page TRM / 3.3-23                                      12/03/2004 Pages TRM / 3.3-24 and TRM I 3.3-25                    05/16/2003 Page, TRM / 3.3-26                                    10/22/2003 Page TRM / 3.3-27                                      02/19/2015 Page TRM / 3.3-28                                      04/07/2009 3.4      REACTOR COOLANT SYSTEM Page TRM / 3.4-1                                      03/31/2006 Pages TRM / 3.4-2 through TRM / 3.4-5                  10/23/11998 Pages TRM / 3.4-6 through TRM / 3.4-8                  04/01/2009 Page TRM / 3.4-9                                      08/31/1998 Page TRM / 3.4-10                                      10/31/2007 Page TRM / 3.4-11                                      08/31/1998 Page TRM / 3.4-12                                      03/27/2008 Page TRM / 3.4-13                                      03/31/2006 Pages TRM / 3.4-14 and TRM / 3.4-15                    04/25/2013 3.5      EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1                                      01/28/2005 Pages TRM / 3.5-2 and TRM / 3.5-3                      08/31/1998 Pages TRM / 3.5-4 and TRM / 3.5-5                      10/31/2007 Pages 3.5-6 and 3.5-7                                  08/31/1998 SUSQUEHANNA- UNIT 1                  TRM / LOES-2              LOS-2EFFECTIVE I RM UNT SUSQEHANADATE 11/04/2015
INSTRUMENTATION THIS PAGE INTENTIONALLY    LEFT BLANK TEXT 3.3.6                        4     04/29/2014


SUSQUEHANNA STEAM ELECTRIC STATION                                  Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
==Title:==
Section Title                                                    Effective Date 3.6      CONTAI NMENT Page 3.6-1                                              08/31/1998 Pages TRM / 3.6-2 and TRM I 3.6-2a                      04/16/2014 Page 3.6-3                                              08/31/1998 Page TRM / 3.6-4                                        01/07/2002 Page 3.6-5                                              08/31/1998 Pages TRM / 3.6-6 through TRM / 3.6-8                    12/31/2002 3.7      PLANT SYSTEMS Pages 3.7-1 through 3.7-3                                08/31/1998 Page TRM / 3.7-4                                        03/31/2006 Pages TRM / 3.7-5                                        04/07/2009 Pages TRM / 3.7-6 through TRM / 3.7-8                    08/02/1999 Pages TRM / 3.7-9 and TRM / 3.7-10                      04/07/2009 Page TRM / 3.7-11                                        12/29/1999 Page TRM / 3.7-12                                        08/02/1999 Page TRM / 3.7.13                                        04/07/2009 Page TRM / 3.7-14                                        08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16                      08/02/1999 Page TRM / 3.7-17                                        04/07/2009 Page TRM / 3.7-18                                        08/02/1999 Page TRM / 3.7-19                                        04/07/2009 Pages TRM / 3.7-20 through TRM / 3.7-22                  08/02/1999 Page TRM / 3.7-23                                        04/07/2 009 Page TRM / 3.7-24                                        03/31/2006 Page TRM / 3.7-25                                        08/02/1999 Page TRM / 3.7-26                                        09/25/2012 Page TRM / 3.7-27                                        11/24/2011 Pages TRM / 3.7-28 through TRM / 3.7-34a                09/25/2012 Page TRM / 3,7-35                                        03/31/2006 Pages TRM / 3.7-36 and TRM / 3.7-37                      02/01/1999 Page TRM / 3.7-38                                      02/19/2015 Page TRM / 3.7-39                                      08/31/1998 Page TRM / 3.7-40                                        03/31/2006 Page TRM / 3.7-41                                      05/24/2012 Pages TRM / 3.7-41a through TRM / 3.7-41c              05/24/2012 Page TRM / 3.7-42                                      09/04/2008 Page TRM / 3.7-43                                      08/31/1998 Page TRM / 3.7-44                                      02/19/2015 Pages TRM / 3.7-45 and TRM / 3.7-46                    10/05/2006 Page TRM / 3.7-47                                      06/07/2007 TRM / LOES-3    EFFECTIVE DATE 11/04/2015 SUSQUEHANNA-UNITI SUSQUEHANNA-UNIT1                    TRM / LOES-3    EFFECTIVE DATE 11/04/2015
INSTRUMENTATION TRN ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7                       2     11/10/2015


SUSQUEHANNA STEAM ELECTRIC STATION                                Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
==Title:==
Section  Title                                                  Effective Date Page                                                  10/05/2006 Page TRM TRM II 3.7-48 3.7-49                                  06/07/2007 Pages TRM / 3.7-49a and TRM / 3.7-49b                10/05/2006 Page TRM / 3.7-50                                    01/21/2014 Page TRM / 3.7-51                                    08/16/2006 Page TRM / 3.7-52                                    12/03/2004 Page TRM / 3.7-53                                    04/15/2003 Page TRM / 3.7-54                                    07/29/1999 Pages TRM / 3.7-55 through TRM / 3.7-57              04/01/2009 3.8      ELECTRICAL POWER Page TRM / 3.8-1                                     04/02/2002 Page TRM / 3.8-2                                      01/28/2005 Pages TRM / 3.8-3 and TRM /3.8-4                      03/25/2010 Pages TRM / 3.8-5 and TRM / 3.8-6                    04/02/2002 Page TRM / 3.8-7                                      10/31/2007 Pages TRM / 3.8-8 through TRM / 3.8-10                12/03/2004 Page TRM /3.8-11                                      09/03/2004 Page TRM / 3.8-12                                    12/03/2004 Page TRM / 3.8-13                                    02/19/2015 Page TRM / 3.8-14                                    08/31/1998 Pages TRM / 3.8-15 through TRM / 3.8-17              04/02/2002 Page 3.8-18                                          08/31/1998 Page TRM / 3.8-19                                    04/02/2002 Page 3.8-20                                          08/31/1998 Pages TRM / 3.8-21 and TRM / 3.8-22                  06/06/1999 Page TRM / 3.8-23                                    11/07/2013 Pages TRM / 3.8-24 and TRM / 3.8-25                  11/30/2011 Page TRM / 3.8-26                                    05/28/2009 Page TRM / 3.8-27                                    11/29/2006 Pages TRM / 3.8-28 and TRM / 3.8-29                  05/28/2009 3.9      REFUELING OPERATIONS Pages 3.9-1 through 3.9-3                            08/31/1998 3.10     MISCELLANEOUS Page TRM / 3.10-1                                    03/31/2006 Pages TRM / 3.10-2 and TRM / 3.10-3                  08/31/1998 Page TRM / 3.10-4                                    08/01/2006 Pages TRM / 3.10-5 and TRM / 3.10-6                  03/22/2006 Page TRM / 3.10-7                                    06/10/2010 Page TRM / 3.10-8                                    03/27/2008 SUSQUEHANNA - UNIT 1                  TRM / LOES-4  SUSQEHANA UNT I RM LOS-4EFFECTIVE DATE 11/04/2015
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8                       1    10/22/2003


SUSQUEHANNA STEAM ELECTRIC STATION                                Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
==Title:==
Section  Title                                                  Effective Date 3.11      RADIOACTIVE EFFLUENTS Page TRM / 3.11-1                                      03/31/2006 Pages TRM / 3.11-2 and TRM / 3.11-3                    08/31/1998 Page TRM / 3.11-4                                      03/31/2006 Page TRM / 3.11-5                                      08/31/1998 Page TRM / 3.11-6                                      03/31/2006 Pages TRM / 3.11-7 and TRM / 3.11-8                    08/31/1998 Pages TRM / 3.11-9 and TRM / 3.11-10                  10/09/2012 Pages TRM / 3.11-11 and TRM / 3.11-12                  08/31/1998 Page TRM /3.11-13                                      02/19/2015 Page TRM / 3.11-14                                    12/03/2004 Pages 3.11-15 and 3.11-16                              09/01/1998 Page TRM / 3.11-17                                     03/31/2006 Page 3.11-18                                          08/31/1998 Page TRM / 3.11-19                                    08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21                  03/31/2006 Page TRM / 3.11-22                                    04/02/2002 Page TRM / 3.11-23                                    11/14/2006 Page TRM / 3.11-24                                    06/18/2013 Page TRM / 3.11-25                                    04/12/2007 Pages TRM / 3.11-26 and TRM / 3.11-27                  01/21/2004 Page TRM /3.11-28                                      09/08/2009 Page TRM / 3.11-29                                    12/03/2004 Pages TRM / 3.11.30 and TRM / 3.11.31                  01/21/2004 Page TRM / 3.11.32                                    04/23/2015 Page TRM / 3.11-33                                    03/31/2006 Page TRM / 3.11-34                                    08/31/1998 Page TRM / 3.11-35                                    03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39              11/30/2005 Page TRM / 3.11-40                                    02/19/2015 Pages TRM / 3.11-41 through TRM / 3.11-43              08/31/1998 Page TRM / 3.11-44                                    08/01/2006 Page TRM / 3.11-45                                    03/31/2006 Page 3.11-46                                          08/31/1998 Page TRM / 3.11-47                                    03/31/2006 3.12      LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM /3.12-3                02/05/1999 Page TRM / 3.12-4                                      03/14/2008 Page TRM / 3.12-5                                      02/05/1999 4.0      ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-3                              08/31/1998 Page TRM / 4.0-4                                      12/11/2008 Pages 4.0-5 through 4.0-8                            08/31/1998 SUSQUEHANNA-UNIT1                    TRM/LOES-5      SUSQEHANA UNT I RM LOS-5EFFECTIVE DATE 11/04/2015
INSTRUMENTATION TEN RPS INSTRUMENTATION TEXT 3.3.9                       3     04/17/2008


SUSQUEHANNA STEAM ELECTRIC STATION                                      Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
==Title:==
Section  Title                                                        Effective Date B 3.0    APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3                  08/31/1998 Page TRM / B 3.0-4                                          02/19/2015 Page TRM / B 3.0-4a and TRM / B 3.0-4b                      02/19/2015 Page TRM / B 3.0-5                                          02/19/2015 Page TRM I B 3.0-6                                          08/31/1998 Page TRM I B 3.0-7                                          04/12/2007 Pages TRM / B 3.0-8 through TRM I B 3.0-10                 08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12                    03/15/2002 Pages TRM / B 3.0-13 through TRM / B 3.0-15                02/19/2015 B 3.1   REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1                                          07/13/1999 Page TRM / B 3.1-2                                          04/16/2014 Page TRM /B 3.1-3                                          10/31/2007 Page B 3.1-4                                                08/31/1998 Page TRM / B 3.1-5                                          11/15/2005 Pages TRM I B 3.1-6 and TRM / B 3.1-7                      03/22/2006 Page TRM / B 3.1-8                                        02/18/1999 B 3.2    CORE OPERATING LIMITS BASES Page B 3.2-1                                              08/31/1998 B 3.3    INSTRUMENTATION BASES Page TRM / B 3.3-1                                        01/21/2014 Page TRM / B 3.3-2                                        03/10/2011 Page TRM / B 3.3-2a                                        10/31/2007 Page TRM / B 3.3-3                                          12/11/2008 Page TRM / B 3.3-3a                                        10/31/2007 Page TRM / B 3.3-4                                        06/30/2010 Page TRM / B 3.3-5                                          10/07/2015 Page TRM I B 3:3-6                                          06/30/2010 Page TRM I B 3.3-7                                          10/07/2015 Page TRM / B. 3.3-8                                        06/30/2010 Page TRM I B 3.3-9                                          10/31./2007 Pages TRM / B 3.3-10 through TRM I B 3.3-12                01/07/2011 Page TRM / B 3.3-13                                        01/21/2014 Page TRM / B 3.3-14                                         06/25/2002 Page TRM / B 3.3-14a                                        11/04/2015 Page TRM I B 3.3-14b                                        11/04/2015 Page TRM / B 3.3-14c                                        11/04/2015 Pages TRM / B 3.3-15 and TRM I B 3.3-16                    10/22/2003 Page TRM / B 3.3-17                                        03/22/2006 Pages TRM / B 3.3-17a through TRM / B 3.3-17c              03/22/2006 Page TRM / B 3.3-17d                                        03/27/2008 TRM / LOES-6        EFFECTIVE DATE 11/04/2015 SUSQUEHANNA-UNITI SUSQUEHANNA - UNIT 1                TRM / LOES-6        EFFECTIVE DATE 11/04/2015
OPEN INSTRUMENTATION CONFIGURATION TEXT 3.3.10                       1     12/14/2004


SUSQUEHANNA STEAM ELECTRIC STATION                                    Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
==Title:==
Section Title                                                      Effective Date TRMI IBB3.3-19 Pages TRM / B 3.3-17e andTRM        3.3-17f              03/22/2006 Pages TRM / B 3.3-18 and                                  08/03/2010 Page TRM / B 3.3-20                                      10/22/2003 Page TRM / B 3.3-21                                      05/16/2003 Pages TRM / B 3.3-22 and TRM / B 3.3-23                  04/07/2009 B 3.4    REACTOR COOLANT SYSTEM BASES Page B 3.4-1                                              08/31/1998 Pages TRM / B 3.4-2 and TRM / B 3.4-3                    04/01/2009 Pages TRM 1 B 3.4-4 and TRM / B 3.4-4a                    10/31/2007 Page TRM / B 3.4-5                                        10/1 5/1 999 Page B 3.4-6                                              08/31/1998 Pages TRM / B 3.4-7 and TRM / B 3.4-8                    04/25/2013 B 3.5    ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2                                08/31/1998 Pages TRM / B 3.5-3 through TRM / B 3.5-5                10/31/2007 B 3.6    CONTAINMENT BASES Page TRM / B 3.6-1                                        07/26/2001 Page TRM / B 3.6-2                                        02/01/1999 Page B 3.6-3                                              08/31/1998 Page TRM / B 3.6-4                                        03/27/2008 Page TRM / B 3.6-5                                        04/04/2007 Page TRM / B 3.6-6                                        12/03/2004 Pages TRM / B.3.6-7 through TRM / B 3.6-11               12/31/2002 B 3.7    PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2                                08/31/1998 Page TRM/IB 3.7-3                                        06/10/2010 Page TRM / B 3.7-3a                                      12/27/2007 Page TRM / B 3.7-4                                        03/31/2006 Page TRM / B 3.7-5                                        08/02/1999 Page TRM / B 3.7-6                                        03/3"1/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a                    08/02/1999 Page TRM / B 3.7-8                                        O5/2 9/2013 Page TRM / B 3.7-9                                        04/11/2014 Page TRM / B 3.7-10                                      08/02/1999 Page TRM / B 3.7-I0a                                      03/31/2006 Page TRM / B 3.7-11                                      08/02/1999 Page TRM / B 3.7-11a                                      03/31/2006 Pages TRM / B 3.7-12 and TRM / B 3.7-13                  08/02/1999 Pages TRM / B 3.7-14 and TRM / B 3.7-14a                  09/25/20 12 EFFECTIVE DATE 11/04/2015 SUSQUEHANNA SUSQUEHANNA-UNIT1
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11                       1     10/22/2003
                - UNIT I              TRM // LOES-7 TRM    LOES-7      EFFECTIVE DATE 11/04/2015


SUSQUEHANNA STEAM ELECTRIC STATION                                      Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
==Title:==
Section  Title                                                        Effective Date Page TRM / B 3.7-14b                                        11/24/2011 Pages TRM / B 3.7-15 and TRM I B 3.7-16                    0210111999 Pages B 3.7-17 through B 3.7-20                            08/31/1998 Page TRM I B 3.7-21                                        05/29/2013 Pages TRM / B 3.7-21a through TRM / B 3.7-21d              05/24/2012 Pages TRM / B 3.7-21e through TRM / B 3.7-21g              05/29/2013 Page TRM / B 3.7-22 and TRM / B 3.7-23                      01/30/2008 Page TRM / B 3.7-24                                        10/05/2006 Page TRM / B 3.7-25                                        01/21/2014 Pages TRM / B 3.7-26 through TRM / B 3.7-28                10/05/2006 Pages TRM / B 3.7-29 and TRM I B 3.7-30                    06/07/2007 Page TRM / B 3.7-30a                                        10/05/2006 Page TRM / B 3.7-30b                                        01/21/2014 Page TRM / B 3.7-31                                        11/30/2011 Page TRM / B 3.7-32                                        03/09/2001 Page TRM / B 3.7-33                                        04/15/2003 Page TRM / B 3.7-34                                        12/03/2004 Page TRM / B 3.7-35                                        07/05/2000 Pages TRM / B 3.7-36 through TRM / B 3.7-39                04/01/2009 Page TRM / B 3.7-40                                        04/08/2010 ELECTRICAL POWER BASES B 3.8 Page TRM / B 3.8-1                                         04/02/2002 Page TRM / B 3.8-2                                          01/28/2005 Page TRM / B 3.8-2a                                        03/01/2010 Page TRM / B 3.8-3                                          04/02/2002 Page TRM / B 3.8-3a                                        04/02/2002 Page TRM / B 3.8-4                                          09/03/2004 Page TRM / B 3.8-4a                                        04/02/2002 Page B 3.8-5                                                08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-15                  04/02/2002 Page TRM / B 3.8-16                                        11/07/2013 Page TRM / B 3.8-17                                        11/30/2011 Pages TRM / B 3.8-17a and TRM / B 3.8-17b                  11/30/2011 Pages TRM / B 3.8-18 through TRM / B 3.8-20                05/29/2013 Pages TRM / B 3.8-21 and TRM I B 3.8-22                    05/28/2009 Page TRM I B 3.8-23                                        05/29/2013 Page TRM / B 3.8-24                                        05/28/2009 B.3.9    REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7                              08/31/1998 TRM  / LOES-8        EFFECTIVE DATE 11/04/2015 SUSQUEHANNA - UNIT
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12                       1     03/05/2015
                -
UNIT 1I            TRM / LOES-8          EFFECTIVE DATE 11/04/2015


SUSQUEHANNA STEAM ELECTRIC STATION                                          Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MAN UAL)
==Title:==
Section      Title                                                        Effective Date B 3.10        MISCELLANEOUS BASES Page B 3.10-1                                              08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3                    03/22/2006 Pages TRM / B 3.10-4 and TRM / B 3.10-5                    08/23/1999 Page TRM / B 3.10-6                                        03/27/2008 B 3.11         RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9                            08/30/1998 Page TRM / B 3.11-10                                      02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.1 1-11a                    04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13                      02/01/1999 Page TRM /B 3.11-14                                        12/03/2004 Page TRM / B3.11-15                                       02/01/1999 Pages B 3.11-16 through B 3.1 1-19                        08/30/1998 Page TRM / B 3.11-20                                      04/02/2002 Page TRM / B 3.1 1-20a                                    04/02/2002 Page TRM /B 3.11-21                                        05/13/2005 Pages TRM / B 3.11-22 and TRM / B 3.11-23                  11/14/2006 Pages TRM / B 3.1 1-23a and TRM / B 3.1 1-23b              06/18/2013 Pages TRM / B 3.11-24 and TRM / B 3.11-25                  01/21/2004 Pages B 3.11-26 and B 3.11-27                              08/30/1998 Page TRM / B3.11-28                                        11/30/2005 Page TRM / B 3.11-29                                      02/19/2015 Pages TRM / B3.1 1-30 and TRM / B 3.11-31                  05/29/2013 Page TRM /B 3.11-32                                        08/30/1 998 Page TRM / B 3.11-33                                      06/30/2010 Pages B 3.11-34 and B 3.11-35                              08/30/1998 Page TRM / B 3.11-36                                      02/12/1999 B.3.12        LOADS CONTROL PROGRAM BASES Page TRM / B3.12-1                                        09/19/2007 Page TRM / B 3.12-2                                       11/29/2010 Page TRM / B 3.12-3                                        02/05/1999 TRM1 text LOES 11/4/2015 SUSQUEHANNA - UNIT 1                      TRM / LOES-9          SUSQEHANA UNT I RM LOS-9EFFECTIVE DATE 11/04/2015
WATER MONITORING INSTRUMENTATION Report Date: 11/11/15 Page 2     of of  16 I__66                                                    Report Date: 11/11/15


Core Operating Limits Report (COLR)
                                                ~SES MANTJAIJ Manual Namue:      TRMI Manual
Rev. 16                                                                                      3.2.1 3.2    Core Operating Limits Report (COLR) 3.2.1     Core Operating Limits Report (COLR)
 
TRO 3.2.1       The Core Operating Limits specified in the attached COLR shall be met.
==Title:==
APPLI(CABILITY:     SPecified in the referenced Technical Specifications.
TECHNICAL REQUIREMENTS      MANUAL UNIT 1 TEXT 3.4.1                           1      04/26/2006
ACTIONS CONDITION                        REQUIRED ACTION                COMPLETION TIME" A. Core Operating Limits not       A,1  Perform action(s) described        Specified in met.                                in referenced Technical            referenced Specification.                      Technical Specifications.
 
TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE                                        FREQUENCY
==Title:==
                  ------ NOTE-.......... .............        ..                N/A No associated Surveillances. Surveillances are implemented in the applicable Technical Specificatiorns.
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2                           1       04/16/2009
SUSQUEHANNA-UNIT1                      TRM / 3.2-1           SUSQEHANA
 
                                                                    -UNI 1 TM/32-1EFFECTIVE DATE 0710711999
==Title:==
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3                            1     11/09/2007
 
==Title:==
REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4                          2       04/17/2008
 
==Title:==
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION  FLOW AND ROD LINE LIMIT TEXT 3.4.5                          1       04/26/2006


Rev. 16              PL-NF-14-001 Rev. 2 Page "i of 62 Susquehanna SES Unit I Cycle 19 CORE OPERATING LIMITS REPORT Nuclear Fuels Engineering September 2015 SUSQUEHANNA UNIT1    TRM!3.2-2 SUSQEHANA UNT I RM/32-2EFFECTIVE DATE 11/0412015
==Title:==
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6                          2       04/25/2013


Rev. 16                                PL-NF-14-001 Rev. 2 Page 2 of 62 CORE OPERATING LIMITS REPORT REVISION DESCRiPTiON INDEX Rev. Affected                                                          ,
==Title:==
No. Sections                            Description/Purpose of Revision 0      ALL          Issuance of this COLR is in support of Unit I Cycle 19 operation.
REACTOR RECIRCULATION  SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1                           1       02/04/2005
1      ALL          New COLR required due to Power/Flow Map revision.
2      ALL          New COLR required for the inclusion of operating limits regarding a Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) closure event.
~J.                  J FORM NFP-QA-008-2, Rev. 1 SUSQUEHANNA UNIT 1                   TRM/3.2-3            TRM/.2-3EFFECTIVE DATE 11/04/2015


Rev. 16                                                  PL-NF-14-00i Rev. 2 Page 3 of 62 SUSQUEHANNA STEAM ELECTRIC STATION Unit I Cycle 19 CORE OPERATING LIMITS REPORT Table of Contents
==Title:==
EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2                           1      11/09/2007


==1.0  INTRODUCTION==
==Title:==
............................................................................ 4 2.0  DEFINITIONS................................................................................6 3.0  SHUTDOWN MARGIN ....................................................................... 6 4.0  AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR).................. 7 6.0  MINIMUM CRITICAL POWER RATIO (MCPR)............................................ 9 6.0 LINEAR HEAT GENERATION RATE (LHGR) ......................................                    .......      27 7.0  ROD BLOCK MONITOR (RBM) SETPOINTS AND OPERABILITY REQUIREMENTS ............................................................................ 38 8.0  RECIRCULATION LOOPS - SINGLE LOOP OPERATION............................... 40 9.0  POWER I FLOW MAP ..............................................                :......................... 58 10.0 OPRM SETPOINTS.......................................................................... 60
EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3                           0       11/18/2002


==11.0 REFERENCES==
==Title:==
................        ................................................................ 61 SUSQUEHANNA UNIT 1               TRM/3.2-4                  SUSQEHANA NITTR/3..-4DATE 11/04/2015 EFFECTIVE
EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1                           0      11/18/2002


Rev. 16                                PL-NF-14-0O1 Rev. 2 Page 4 of 62 1.0 iNTRODUCTION This CORE OPERATING LIMITS REPORT for Susquehanna Unit t Cycle 19 is prepared in accordance with the requirements of Susquehanna Unit 1, Technical Specification 5.6.5. As required by Technical Specifications 5.6.5, core shutdown margin, the core operating limits, RBM setpoints, and OPRM setpoints presented herein were developed using NRC-approved methods and are established such that all applicable limits of the plant safety analysis are met.
==Title:==
SUSQUEHANNA UNIT 1                    TRM/3.2-5                UNT I RM/32-5 SUSQEHANA EFFECTIVE  DATE 11/04/2015
CONTAINMENT VENTING OR  PURGING TEXT 3.6.2                           2      04/29/2014


Rev. 16                                    PL-NF- 14-001 Rev. 2 Page 5 of 62 2.0 DEFINiTIONS Terms used in this COLR but not defined in Section 1.0 of the Technical Specifications or Section 1.1 of the Technical Requirements Manual are provided below.
==Title:==
2.1    The AVERAGE PLANAR EXPOSURE at a specified height shall be equal to the total energy produced per unit length at the specified height divided by the total initial weight of uranium per unit length at that height.
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3                            0      11/18/2002
2.2    The PELLET EXPOSURE shall be equal to the total energy produced per unit length of fuel rod at the specified height divided by the total initial weight of uranium per unit length of that rod at that height.
 
2.3     FDLRX is the ratio of the maximum LHGR calculated by the core monitoring system for each fuel bundle divided by the LHGR limit for the applicable fuel bundle type.
==Title:==
2.4    LHGRFACT is a multiplier applied to the LHGR limit when operating at less than 108 Mlbm/hr core flow. The LHGRFAC1 multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from core flows less than 108 Mlbmlhr.
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Report Date: 11/11/15 Page Page~*        of of  16 i_*6                                                        Report Date: 11/11/15
2.5    LHGRFACp is a multiplier applied to the LHGR limit when operating at less than RATED THERMAL POWER. The LHGRFACp multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from partial power conditions.
 
2.6    MFLCPR is the ratio of the applicable MCPR operating limit for the applicable fuel bundle type divided by the MCPR calculated by the core monitoring system for each fuel bundle.
SSES MANUJAL Manual Name :      TE*I 21:Manual
2.7     MAPRAT is the ratio of the maximum APLHGR calculated by the core monitoring system for each fuel bundle divided by the APLGHR limit for the applicable fuel bundle type.
 
2.8     OPRM is the Oscillation Power Range Monitor. The Oscillation Power Range Monitor (OPRM) will reliably detect and suppress anticipated stability related power oscillations while providing a high degree of confidence that the MCPR safety limit is not violated.
==Title:==
2.9     Np is the OPRM setpoint for the number of consecutive confirmations of oscillation half-cycles that will be considered evidence of a stability related power oscillation.
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6.4                           0     11/18/2002 Titles CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1                            0    11/18/2002
2.10    Sp is the OPRM trip setpoint for the peak to average OPRM signal.
 
2.11    Fp is the core flow, in Mlbm I hr, below which the OPRM RPS trip is activated.
==Title:==
SUSQUEHANNA UNIT 1                      TRM/3.2-6          SLJSUEHNNAUNITI EFFECTIVE TMI32-6 DATE 111/0412015
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM      (ESW) SHUTDOWN TEXT 3.7.2                           0     11/18/2002
 
==Title:==
PLANT SYSTEMS ULTIMATE HEAT SINK (UHS)     AND GROUND WATER LEVEL TEXT 3.7.3.1                        2    04/16/2009
 
==Title:==
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2                         3    04/16/2009


Rev. 16                                    PL-NF-1 4-001 Rev. 2 Page 6 of 62 3.0  SHUTDOWN MARGIN 3.1  Technical Specification Reference Technical Specification 3.1.1 3.2  Description The SHUTDOWN MARGIN shall be equal to or greater than:
==Title:==
a)    0.38% Ak/k with the highest worth rod analytically determined OR b)  0.28% Ak/k with the highest worth rod determined by test Since core reactivity will vary during the cycle as a function of fuel depletion and poison burnup, Beginning of Cycle (BOG) SHUTDOWN MARGIN (SDM) tests must also account for changes in core reactivty during the cycle. Therefore, the SUM measured at BOC must be equal to or greater than the applicable requirement from either 3.2.a or 3.2.b plus an adder, "R". The adder, "R", is the difference between the calculated value of maximum core reactivity (that is, minimum 8DM) during the operating cycle and the calculated BOG core reactivity. If the value of "R" is zero (that is, BOG is the most reactivepoint in the cycle) no correction to the BOG measured value is required.
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3                         3     04/16/2009
The SHUTDOWN MARGIN limits provided in 3.2a and 3.2b are applicable in MODES 1, 2, 3, 4, and 5. This includes core shuffling.
SUSQUEHANNA UNIT t                  TRM/3.2-7              SUSQEHANA UNTI RM/32-7 EFFECTIVE    DATE 11104/2015


Rev. 16                              PL-NF-14-O01 Rev. 2 Page?7 of 62 4.0  AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) 4.1 Technical Specification Reference Technical Specification 3.2.1 4.2  Description The APLHGRs for ATRIUMT'-10 fuel shall not exceed the limit shown in Figure 4.2-1.
==Title:==
The APLHGR limits in Figure 4.2-1 are valid for Main Turbine Bypass Operable
* PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4                         2    04/16/2009 Title : PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5                        2     04/16/2009 Title : PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6                        2     04/16/2009 Title :  PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7                        1     04/26/2006 Title :  PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8                         10   09/27/2012
        *and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Two Loop operation. The APLHGR limits for Single Loop operation are provided in Section 8.0.
SUSQUEHANNA UNIT 1               TRM/3.2-8           SUSQEHANA UNT I RM/32-8 EFFECTIVE   DATE 11/04/20 15


9!
==Title:==
02 SSES UNIT I CYCLE 19 C
. PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4                          1     04/26/2006
        *16.0 C                  , 1111 a     a      I      IIl
 
                                                          , I                1, I ,      1          111III Ia' II1 1,1                                                ,       ,    I.   .      III .                  .        la
==Title:==
                                                                                                                                                                                                                          .          .              ma
PLANT SYSTEMS SOLID RADWASTE SYSTEM Report Date: 11/11/15 Page Page A4       of of   16 16
                                                                                                                                                                                                                                                      .a rn                1    1    1a                    I      I        a        aIn                                    1    I II 4                                i      i    i  i      i          l   l      i  ___ 1    1    1        1      a 11__
 
.--                I    1    I    I      I      I      I        I          I    I      I      I    I    K    I      I      2                            iI      * - 1
SSES   MUANTAI
* 1I
. IManual
* l  O          = .                            I      2 z
 
z        1[4.0        I  1 K I 1 II        I            I I I-- I4 j a I --t-1                          . t. I I--1I-        . I    l
==Title:==
                                                                                                                      .. l 2lI            IlIIl
TECHNICAL REQUIREMVENTS MANUAL UNIT 1 Manual Name:  TRJi1I TEXT 3.7.5.1                     1   03/05/2015
                                                                                                                                                .. ...................          l
 
                                                                                                                                                                                    . . . . . . . . ' 4. i. . . .
==Title:==
I          a   al    U    I      I  I        I C
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2                      0    11/18/2002 Titleg PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3                      1    04/26/2006
                                    ,IIII2,                ,K,2,*,*,t*IaI*I
 
                                                                              ;!      IIlIt                                        I      i    i l
==Title:==
i                      a  a      a          a                    a      t II i      mi I      i I  2       II!                                                      i    i                        1      i   i          I 12.0          12 5 I00 a          . a: .*              5 0 ,1              .   .                                : .....        ..  ..              I              I                        1...                    I    ..    .2..      .    ..
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6                        3   06/04/2012
i    ~i            i                                          ll              I                                            i              i      iai                aii              i I     I I            II                              1 I              Il                                                        l              i        l          l            l            l              l
 
                          /   1    /1      1      11                                                                      l      l1Il        l1/                                                      I
==Title:==
                . .     1I  .1                                                               ._          ,    ,      .              .          I.      I      .I      I          !
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7                        2    09/05/2008 Titles PLANT SYSTEMS MAIM CONDENSER 0FFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING TEXT 3.7.8                        5    03/05/2015
II
 
                                                                                                                                                                                                                                                    /
==Title:==
I      I      I      I II        ii          iIa    i    i            i          i              i    i            1nIi    1    a1 1        0I                I i        iI      iI  1      iI      i      iI    i 11                                                            liii !1                      1*11I11111I1                                                                  .1              1111I                                    1                  ,<
PLANT SYSTEMS SNUBBERS TEXT 3.7.9                      2    01/31/2014
i    1  i i            i              i        i          i            iai      a                i1I
 
                                                                                                                                                                                                                                                                          ,-.
==Title:==
a    .    .    .      .      .      .       I          I    a      a        a                     a        a*,,. a    a              .a.a.a.a.a.a.a                                                                                          0)
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10                      1     12/14/2004
* I                IIaIaI                                                      IaI      IaIaI                  aI                al      IaI    a          Ia                                        l      l
 
    '-I
==Title:==
                                            ., ., ,*!        .                                                  !
PLANT SYSTEMS SPENT FUEL STORAGE POOLS  (SFSPS)
* I          I aI a      ,," ,a a                                        l                            I              a I          I1la.lal Il laimla.!
TEXT 3.7o11                     0     04/16/2009
a      m I        I        ~          ~            a        a        a                  i l          l',I    al I.           II                  l .a. "*        a
 
                                                                                                              **        I3l            lllam K    a    a    "        *a--a-- *    *:     II            ' Il i    iii l      liIa          1 a      i' a        l a    l a1    1a1        1        a1    a          g        all              1      1        1    11I            a        aI  aI      I    II          a      a    n      a          ai        i        a  a      a              Ia a    I
==Title:==
-I',
STRUCTURAL  INTEGRITY TEXT 3.8.1                      2    04/05/2010
"-1                I I I            I        I!                                                                                                          l                l                  Ii..               a                      ~
 
Cn-,                                aI /a
==Title:==
_          .
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1                    2    11/09/2007
ia                              li1 aII                                  alal a_
 
a a
==Title:==
aal a                iI__la1a1a1a1a1a l
ELECTRICAL POWER MOTOR OPERATED VALVES  (MOV)  THERMAL OVERLOAD PROTECTI( ON  -.
                                                                                                                                                                                        *                .
CONTINUOUS TEXT 3.8.2.2                    2    12/14/2004
i
 
                                                                                                                                                                                                                .*~* _L __*.
==Title:==
I                  a a
ELECTRICAL POWER MOTOR OPERATED VALVES  (MOV)  THERMAL OVERLOAD PROTECTICON -
                                                                                                                                                                                                                                                          .J aL2 tI 6.0                      la              la      aal      la
AUTOMATIC Report Date:    11/11/15 Page 5 Page        of of  16 16                                                        Report Date: 11/11/15
                                                                      ,    , , ,*H , ,
 
aal                      aal I    I              ,            I      ,                  I                    I        I.1._      3                                 -
SSES MANUAL Manual Name:*     TRNI SManual
.-t
 
-- I mr        4.0 0                        10000                                      20000                          30000                             40000 Average Planar Exposure (MWDIMTU) 50000                                                                              60000                            70000 0
==Title:==
                                                                                                                                                                                                                                                                      -*    ,r-SI)
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3                             2      03/05/2015 Title  : ELECTRICAL POWER DIESEL GENERATOR CDG) MAINTENANCE ACTIVITIES TEXT 3.8.4                            0     11/18/2002
AVERAGE            AVERAGE  PLANAR            LINEAREXPOSURE PLANAR            HEAT GENERATION RATE LIMIT VERSUS
                                                                                                                                                    -TWO LOOP OPERATION                                                                                              Coz ATRIUMTM-10 FUEL                                                                                                                              C:'(D7 FIGURE 4.2-1


Rev. 18                                PL-NF-14-001 Rev. 2 Page 9 of 62 5.0 .MINIMUM CRITICAL POWER RATIO (MCPR) 5.1  Technical Specification Reference Technical Specification 3.2.2, 3.3.4.1, 3.7.6, and 3.7.8 5.2  Technical Requirements Manual Reference Technical Requirements Manual 3.3.7 5.3  Description The MOPR limit is specified as a function of core power, core flow, average scram insertion time per Section 5.3 and plant equipment operability status. The MCPR limits for all fuel types (ATRIUM TM-1O) shall be the greater of the Flow-Dependent or the Power-Dependent MOPR, depending on the applicable equipment operability status.
==Title:==
a)  Main Turbine Bypass I EOO-RPT I Backup Pressure Regulator Operable Figure 5.2-1: Flow-Dependent MCPR value determined from BOO to EDOC Figure 5.2-2: Power-Dependent MOPR value determined from BOO to EGOC b)  Main Turbine Bypass lnoperable Figure 6.2-3: Flow-Dependent MCPR value determined from BOO to EDOC Figure 5.2-4: Power-Dependent MOPR value determined from BOO to EGOC c)  EOC-RPT Inoperable Figure 5.2-5: Flow-Dependent MCPR value determined from BOO to EOC Figure 5.2-6: Power-Dependent MCPR value determined from BOG to EOO d)  Backup Pressure Regulator Inoperable Figure 5.2-7: Flow-Dependent MCPR value determined from BOO to EDOC Figure 5.2-8: Power Dependent MCPR value determined from BOG to EDOC e)  One Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 5.2-0: Flow-Dependent MCPR value determined from BOO to EGG Figure 5.2-1 O:Power-Dependent MCPR value determined from BOO to EDO SUSQUEHANNA UNIT 1                 TRM/3.2-10            SUSQEHANA UITTRM3.2I EFFECTIVE    0DATE 11/04/2015
* ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5                           1     11/14/2013 Title : ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6                           1      12/08/2011 Title : ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7                            1     06/15/2009


Rev. 16                                  PL-NF-1 4-001 Rev. 2 Page 10 of 62 The MCPR limits in Figures 5.2-1 through 5.2-10 are valid for Two Loop operation.
==Title:==
The MCPR limits for Single Loop operation are provided in Section 8.0.
BATTERY MAINTENANCE AND MONITORING PROGRALM TEXT 3.9.1                           0      11/18/2002
5.4 Averauqe Scram Time Fraction Ifthe average measured scram times are greater than the Realistic Scram times listed in Table 5.3-1 then the MCPR operating limits corresponding to the Maximum Allowable Average Scram Insertion Time must be implemented. Determining MCPR operating limits based on interpolation between scram insertion times is not permitted. The evaluation of scram insertion time data, as it relates to the attached table should be performed per Reactor Engineering procedures.
 
SUSQUEHANNA UNIT1                  TRM/3.2-11           SUSQEHANA UITTRM3.21 EFFECTIVE    IDATE 11104/2015
==Title:==
REFUELING OPERATIONS  DECAY TIME TEXT 3.9.2                           0      11/18/2002


Rev. i6                      PL-NF-14-O01 Rev. 2 Page Iiof 62 Main Turbine Bypass I EOC-RPT I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 1  TRM/3.2-12    NITTR/32I 2DATE 1110412015 EFFECTIVE SUSQEHANA
==Title:==
REFUELING OPERATIONS  COMMUNICATIONS TEXT 3.9.3                            0      11/18/2002


C' SSES UNIT 1 CYCLE 19 C                  2.2 c,
==Title:==
2,1 z
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1                           1      04/26/2006
z 2.0 z
1.9
                                                ._E 1.8 1.7 CD k*        0.
CA        0o    1.6                                                                                                                                                                                                                            <)
1.5 m                1.4 Ill C)
H                1.3 rn ci              1.2 H                        30                          40                              50                            60                          70                        80                    90          100                  110 Total Core Flow (MLBIHR)
                                                                                                                                                                                                                                                                              -o     "o n,      I Ill                                                                                                                                                                                                                                    (.Q0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS 1 EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-1                                                                                    * -< 0
. . .. . . . .. .... . .. ..... ......  .... .... .. . ... ... . . . . .. . . . . .. . . .... . ..  ........ ,... .. .. .. .. . .. .. ,,,,,.. .. .. . .  . . . ...  ... .. 1...  .. . . . .. . .. . .... ... . .. . . .. . . . .. . I J . .. .... .  ,J , , =. .. ... .


cj SSES UNIT 1 CYCLE 19 0
==Title:==
z z
MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2                           2     08/08/2006
C z
1J H  0.
0 m
0 20 30        40          50          60          70      80        90 100 Core Power (% RATED)
                                                                                      "13    -O
                                                                                    *,      I-MCPR OPERATING LIMIT VERSUS CORE POWER 0"          MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE TWO LOOP OPERATION (BOO TO EOC)                      (3 "
n Ii --.
FIGURE 5.2-2


Rev. 16                  PL-NF- 14-001 Rev. 2 Page 14 of 62 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT1  TRM/3.2-15     UITTRM3.2l EFFECTIVE SUSQEHANA 5DATE 1 1/04/2015
==Title:==
MISCELLANEOUS    SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3                          2     06/15/2010


0 SSES UNIT 1 CYCLE 19 2.2 03 C
==Title:==
MISCELLANEOUS  INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4                          2     04/17/2008


===2.1 LEGENDA===
==Title:==
MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME
MISCELLANEOUS LEADING EDGE FLOW METER    (LEFM)
                                        -CURVE CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME z
Report Date: 11/11/15 Page *6 Page          of of  16 16                                                        Report Date: 11/11/15
C       2.0 z
 
-1 1.9                                      I                INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 1.8 H.     '1.7 0J o-01 1,6 1.5
SSES MANUJAL
-I"I    1.4
**    Manual Name:       TRN1
---            I EEENCE:_T.S. 3.7.6 and 3.2.2        ___________                                __________
      - Manual
        '1.3 m
 
Hr iii    1.2 30        40            50            60              70          80C          I0            100 110 Total Gore Flow (MLB/H-R)
==Title:==
--t                                                                                                                  "D    "
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.1                       1      04/26/2006
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS INOPERABLE TWO LOOP OPERATION (BOC TO EOC)
 
FIGURE 5.2-3                                       ,.-4 <
==Title:==
Q)"*
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2                         1     04/26/2006
0
 
==Title:==
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3                        1     04/26/2006
 
==Title:==
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT        SYSTEM TEXT 3.11.1.4                        2     10109/2012
 
==Title:==
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING      INSTRUMENTATION TEXT 3.11.1.5                         3     03/05/2015


CI, SSES UNIT 1 CYCLE 19 C      3.6 Ci, C
==Title:==
mR c
RADIOACTIVE EFFLUENTS RADIOACTIVE    LIQUID PROCESS MONITORING INSTRUTMENTATION
Z
     ... TEXT 3.11.2.1                        3      04/26/2006
-t
 
     .E_
==Title:==
-H 0
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2                        1      04/26/2006
                                                                          $o O.
 
-.4
==Title:==
-11 "51 m
RADIOACTIVE EFFLUENTS DOSE     - NOBLE GASES TEXT 3.11.2.3                        1      04/26/2006
z3
-H
<m Fi 20 30 40      50          60          70     80 90 100 Core Power (% RATED)
(73                                                                  -U 51 MCPR OPERATING LIMIT VERSUS CORE POWER          CD CD-
                      *MAIN TURBINE BYPASS INOPERABLE                    Z TWO LOOP OPERATION (BOC to EOC)                    77 FIGURE 5.2-4                      -- h 0)


Rev. 16                  PL-NF-14-001 Rev. 2 Page 17 of 62 EOC-RPT Inoperable SUSQUEHANNA UNIT 1  TRM/3,2-18 SUSQEHANA UITTRM3.2I EFFECTIVE 8DATE 11/04/2015
==Title:==
RADIOACTIVE EFFLUENTS DOSE      -  IODINE,  TRITIUM,  AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4                        0      11/18/2002


CD SSES UNIT 1 CYCLE 19 2.2 03 LEGEND C
==Title:==
m        2.1                                            CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM
RADIOACTIVE EFFLUENTS GASEOUS RAD WASTE TREATMENT SYSTEM TEXT 3.11.2.5                        4      07/03/2013
=
INSERTION TIME 2.0                                            CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME C
z 1.9                          4.                  SAFETY* ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2
-H  E                                                            I            I          IJ 1.8 L.
USED INDETER[MIN1NG MFLCPR I
-4.     1.7 0.
C0 o                                                                                                                CD 1.6                                                                                                            -3.
C) 1.5
-rr      1.4


==REFERENCE:==
==Title:==
T.S. 3.3.4.1 and 3.2.2
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT      SYSTEM TEXT 3.11.2.6                        5     04/28/2015
--Il
<r m        1.3 m
1.2 30        40              50          60            70            80        90            100  110 U                                                      Total Core Flow (MLBIHR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW EOC-RPT INOPERABLE                                        *QcD TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-5                                               0""


ci SSES UNIT 1 CYCLE 19 C
==Title:==
I z
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION ac*    TEXT 3.11.3                          1
z z
 
E 0
==Title:==
(D 0
RADIOACTIVE EFFLUENTS TOTAL DOSE 04/26/2006 Report Date:  11/11/15 Page *:i~      of of  16 I_66                                                          Report Date:  11/11/15
C) m n-I 0
 
H m
SSES MANUAL Manual Name :    TRMI Manual
0 50          60                    90 H*    20 30 40          Core Power  (% RATED) 70    80    100 n-MCPR OPERATING LIMIT VERSUS CORE POWER            *(D  Z EOC-RPT INOPERABLE TWO LOOP OPERATION (BOC to EQO)              O-"    -1 FIGURE 5.2-8                      (O1*--
 
==Title:==
TECHNICAL REQUIREMENTS      MANUAL UNIT 1 TEXT 3.11.4.1                       5     03/05 /2015
 
==Title:==
RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2                       2      04/26 /2006


Rev. 16                      PL-NF-14-0O1 Rev. 2 Page 20 of 62 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 1  TRM/3.2-21    NIT TR/3.-21 DATE 11/04/2015 EFFECTIVE SUSQEHANA
==Title:==
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3                       1      04/26/2006


SSES UNIT 1 CYCLE 19 Cn      2.2 LEGEND m
==Title:==
2.1            _____________                    -CURVE        A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME z
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1                         0      11/19/2002
C      2.0            ________                          -CURVE        B: REALISTIC AVERAGE SCRAM INSERTION TIME z
1.9              _______        _______          -      SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 1.8 I-1.7 r*o 0 A    BI
: 10.                                                                                                                              0, 1.6 1.5 m
"1     1.4 rri 0             


==IREFERENCE:==
==Title:==
TS. 3.7.8 and 3.2.2~
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2                         4     04/17 /2008
1.3                            I-~            {                4             1      ~~-f 108, 1.221 m      1.2 30          40          50              60              70            80        90          100      110 Total Core Flow (MVLB/HR)
                                                                                                                              "-D    "-
0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE                                                "'.)
0 o',                                                TWO LOOP OPERATION (BOC TO EQO)
FIGURE 5.2-7                                                  "*' <c 0 0)"


SSES UNIT I CYCLE 19 60 C
==Title:==
z 0,
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3                        0      11/19/2002                                        0
    .2
 
-Il CD C
==Title:==
                                                                            -3.
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4.1                            0     08/31/1998
0)
 
'i,,
==Title:==
100,1.35 m
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2                           0     08/31/1998
20 30 40      50          60 (% RATED) 70 Core Power                  80 90 100 o1                                                                    T1    T1
-L
                                                                      *Q2    Z~
MCPR OPERATING LIMIT VERSUS CORE POWER BACKUP PRESSURE REGULATOR INOPERABLE TWO LOOP OPERATION (BOO to EOC)
FIGURE 5.2-8                          -,h . 0 0)'  ,C


Rev. 16                      PL-NE-14-001 Rev. 2 Page 23 of 62 One TSV. or TCV Closed SUSQUEHANNA UNIT 1 TRM/3.2-24 SUSQEHANA UIT ITR IS.-24 EFFECTIVE      DATE 11104/2015
==Title:==
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3                            0      08/31/1998


SSES UNIT 1 CYCLE 19 2.2                                                                              I LEGEND 2,1                                                          CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 2.0                  _______
==Title:==
_______                      -CURVE        B: REALISTIC AVERAGE SCRAM INSERTION TIME
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4                           1     12/18/2008
-r" 1.9 130, 1.831                                              SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES NJ                                          I                                    ARE OPERABLE PER SR 3.7.5.1 AND 3.7.6.2 U'  .4-1.8
                                          *_                                        USED IN DETERMINING MFLCPR E2 1.7 C., 1.6                                                                                                                      CD 1.5 m
-I-1    1.4 m


==REFERENCE:==
==Title:==
T.S. 3.2.2 and TRM 3.3.71 0
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5                             0     08/31/1998
I-4 1.3
_ _  I            _  I_              _      _            _      _    _      _ _    _    _
1.2 m
30                40              50          60              70            80          90        100      110 Total Core Flow (MLBIHR) 0                                                MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW                                CD  Z N)
ONE TSV OR TCV CLOSED*
TWO LOOP OPERATION (BOC TO EOC)                                        -  ,-<
FIGURE 5.2-9                                            0
                  *Operatofl with one TSV or TCV closed is only supported at power levels -<75%rated power.


cj SSES UNIT 1 CYCLE 19 C
==Title:==
m
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6                            0      08/31/1998
--
 
z C
==Title:==
z S
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM 16Reprt                                                          Dte:11/1/1 Page8.a Page          of  16                                                        Report Date: 11/11/15
0.-
 
-I 0m
SSES MANUJAL
*0 CD m
. 1-- Manual Name: TECHNICAL Manual
-n m
 
m C)
==Title:==
-9 20 30    40              50            60  70 80
TRMI      REQUIREMENTS MANUAL UNIT 1 TEXT 4.7                          0     08/31/1998
                      *Core Power (% RATED)
 
MCPR OPERATING LIMIT VERSUS CORE POWER
==Title:==
                      *ONE TSV OR TCV CLOSED              Co  I TWO LOOP OPERATION (BOC TO EOC)
ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0                          5      03/05/2015
FIGURE 5.2-10
 
==Title:==
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION     (TRO)   APPLICABILITY TEXT B3.1.1                        2     04/29/2014


Rev. 16                            PL-NF-14-O01 Rev. 2 Page 26 of 62 Table 5.3-1 Average Scram Time Fraction Table For Use With Scram Time Dependent MCPR Operating Limits Control Rod              Average Scram Time to Position (seconds)
==Title:==
Position 45          0.470                                              0.520 39        0.630                                              0.860 25        1.500                                              1.910 5      -    oo70                                            3.440 Average Scram    Realistic                                          Maximum Insertion Time                                                      Allowable SUSQUEHANNA UNIT 1                SUQEAN NTITRM/3.2-27  EFFECTIVE DATE 11/0412015
REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2                       0      11/19/2002
: 1. .    . .1 I * ... A...    .    . - -- a L.~cgaa. . .. .. * .1 L. * -- .  .*... ..&. aaau  I  1S  a. .  .... aJ L&...aa......a..n.
Rev. 16                                          PL-NF- 14-001 Rev. 2 Page 27 of 62 6.0      LINEAR HEAT GENERATION RA*TE (LHGR) 6.1          Technical Specification Reference Technical Specification 3.2.3, 3.3.4.1, 3.7.6, and 3.7.8 6.2          Technical Requirements Manual Reference Technical Requirements Manual 3.3.7 6.3          Description The maximum LHGR for ATRIUMTZ-I 0 fuel shall not exceed the LHGR limit determiined from Figure 6.2-1. The LHGR limit in Figure 6.2-1 is valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
To protect against both fuel centerline melting and cladding strain during anticipated system transients initiated from reduced power and flow conditions, power and flow dependent LHGR limit multipliers are provided in the following figures:
a)  Main Turbine Bypass Operable Figure 6.2-2: Flow-Dependent LHGR Uimit Multiplier Figure 6.2-3: Power-Dependent LHGR Limit Multipiier b)  Main Turbine Bypass Inoperable Figure 6.2-4: Flow-Dependent LHGR Limit Multiplier Figure 6.2-5: Power-Dependent LHGR Limit Multiplier c)  One Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 6.2-6: Flow-Dependent LHGR Limit Multiplier Figure 6.2-7: Power-Dependent LHGR Limit Multiplier
* The LHGR limits and LHGR limit multipliers in Figures 6.2-2 and 6.2-3 are applicable to EOC-RPT Operable and Inoperable and Backup Pressure Regulator Operable and Inoperable.
* The LGHR limits and LHGR limit multipliers in Figures 6.2-1 through 6.2-7 are valid for both Two Loop and Single Loop operation.
SUSQUEHANNA UNIT 1                              TRM/3.2-28              SUSQEHANA EFFECTIVE  NITTRI3.-28 DATE 11/04/2015


C,)
==Title:==
SSES UNIT 1                               CYCLE 19 C        16.0 Ii                    Ii                                                        II ii                                                                                                                                                                  i iI ii ii a          ili a                      iI l Ii i                                                                !i Co                                                                                                                                                                                        a              a                  la a        a    l        la      l     a      l 0                a a
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE    (CRD) HOUSING SUPPORT TEXT B3.1.3                        3      03/31/2006
a a
 
a a                                                I            I                                                                        I                    I El 11111                  '        I*            I I
==Title:==
C                                                                                      I              !
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4                        0      11/19/2002
m                                                                  lala                                                                                  al                  ala        a        alalala                        alIlal                  al    a      la aa a a              a a              L       +/- Z        ....         L      1 - - .....t....J......-
 
=                                                                                                                                                                                                                                                                     -
==Title:==
z        '14.0          0.,3.---- f=--I--+ I 900                                                          ,-I--S-I--..
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMU/LATORS       INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1                       0      11/19/2002
4                                    ..J-                              REFERENCE; T.S 3.2.3 z                  L- i- - - I              I I a a a. a . . a . .a . .a .                                                              .a .        I     &    a                    1          a    a        a a                                                                I a I a. I. ~ alala IaI-aI I I                      IaIaI l      aI                  IaI                  a    Ial          al                l                        lalal                                            lala C
 
a[
==Title:==
a a
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT      (COLR)
a aI la a al  ia              I    Ia a a a ia a I alalalala I    a    la   alaa a            a    a a
TEXT B3.3.1                        1      01/31/2014
a la a
 
l n
==Title:==
a        .a .a      a              l    la    aal                                          .    .    .    .      1I          t.          t.      .1 I            ..      .       ..        .      ..          .....                ..        .
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2                       2      03/31/2011
4" z    La-Ial lal                        la"1a1                      aI          1ajj                                            ~ I                   i                jII                              !i            i    l 12.0 al    a      lala                                      alalal                        aI    a                    i    l                                                                a      a          /aaa        a           a1 1          a      a1 2          a    .     .a.                          a. a        a      a      a, a            a                                      Iaf                a    a      I a      at         aIa                          aI                  a    a.a.a. a. a aIa          a          ala              aIalal                  lii      l                      al    al    l      al    a      l 0
 
Cu          ~II        I I II Ia I      I      I    I    I Ia 1      1            11 1        11                  1          ~I      I    Ia   I aaI a    I    I a
==Title:==
I l
INSTRUMENTATION  BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3                        3      12/18/2008
aaI Ia         a. I a       a I
 
al I        a          I      I II a
==Title:==
H    C a          I    l      lall                          l    la                                                                  iala                                                    lalala                              al                    aialaIa                  a
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4                        5     10/14/2015
     'a"  10.0 Cu a-          ta          l al            la a      al
 
                                                                      -- al--          aI a 4aIaa      a- a-   a aIaI a      aI a--a a- a                    a--        a- a a aI IIaa a a              IIaI I           aa aIa a4 - I *              -
==Title:==
0            aa          a      a      a       a a                a            a aia  a aIa a            Iaaatai                                  i     iiaa    a a                    ,aaa      a        a        a                    ,aaa aa a                  Il
INSTRUMENTATION BASES TEN POST ACCIDENT MONITORING  (PAM)   INSTRUMENTATION
                                                                                                                                                                                                                                                                                ,      ,            CD a Ia     a            la     a            alalI              a                                  a    a    a            a      a    a    a      a          a    a              a         a             l        a                           a a Ialal .a  .       .a.aa                .a    .a      a    a      a a a                a a a            a    a    a Ia                      aIa                                    a      aI      aI    .a        a      .a.. a a N)    V          aI    a                                                al    i    lalalala                                                                                    a    a        alal                              aI             a      a1                                    C I    l  l l  l l1-Ta-TaII l        l                                                            I    I-I                    I-yi                                          rw-              l      l l- .            .      .
. TEXT B3.3.5                        2     11/09/2007
N)  CD          a    a     i      a      a lalala a      la          a      a    a      a            a al a
 
la.
==Title:==
a"a a
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK Page       of  16                                                            Report Date: 11/11/15
a a
 
a ai a     a alal a
9--I   *o        0--*D*d ST/TT/TT  :~~c1 ~od~a                                                                             ~T ;o              ~T  9.~2d sTZLVWH~*  THSS*HA HO&DVH S*Sva WNHJS2XS         d NWIOOD HO1DVZH *IL*
a a
Z00Z/6T/TT              0                               S'9"[H J&X~H JLIWlI ZIlI UOH QNT   MO'EA NOllvqIflHIDZa HOJ*DV*         S*SVE NHLSAS LN-'IOOD HOLD*'d :eYZ; Z00Z/6T/TT              0                              9""H&H HOLINOW *D'f>VI-'  HDV*aHJI aH~nSS*H       MO'I/HDIH S*SVH         *SXS INWIOOD          [ODV'H*I xE
a a
* LOOZ/60/TT              T
a a
* hI~f00o     :xa:si*
a a
VZD M A*IEIDJNI   I-*-hLDflHLS      SHSva NacISLS 600Z/9T/90             T
l a
                                                                                        ~LNTWEOODT'O&deg;DV       6 H     XTJ 2AJSIW*H3 NILSXS LN'IOOD HOLDOWN S*SVH W2.SAS Z00Z/6T/Tt              0 NOI1*N*WflHLSNI     DNIHOllINO     aH*NM         9!ZTI 600Z/9T/90             0                           ZTE"E*       HTX.*,T N01N~WfldJSNI NOIlWIosI JAW
ia a      a l     la       la a
                                                &#xa3;00Z/ZZ/0T             T SaSvH NOILVNHXflaLSNI :eT;*.
a   la l
0T''&#xa3;H LXHL SJOIS LNS OW JNflJ NOI~VqlDOHIDHa HOLD*aH 010*/60/80              &#xa3; WOIL*N*WaaJSNI     WIHdO :9*;t*
a l
800Z/LT/90              &#xa3; 6"V&#xa3;H c*Xai NOIJNLN*rHLSNI     (Saa) wka&sXS NOILD*O&~d HOJ*Dv*Ha TaJ*
a la a
                                                &#xa3;00*I/*IOT              T WkLS2S NOI DHLO'HJ     *HJSHAO       ~HNIEHf1L  NIVW SZSVH NOIJNN[IWnaL*SNI              S*IW*
l i
NOI*LN*TIflqHSNI   NOIl*fDY      NOILVqosI WIHL S*S*a       NOILVN        &LOHSNJ      *!I1J&
4-a Co    0          aI   a      I       Ia    I      Ia I          a            a      Ia    a       Ia  a   a    a    la  a    a             l    la    l    la    a          a              al                Ia a          la      a      la  a      a      a      l            0) 0 I-   8.0 0                            I I    I        Ill                                  I      I      I                                                  a      I                iII            Ia                                Il                    I      *l       lll ali C
9TOZ/T&#xa3;/T0 TI ,,INfl   I~fl*  S,,*ZHf0*       rI\DINHD.&,T   :*~             y        I~r
Ial          a      lI            ll        l  a     1           l    i      l        lI        l    .           a.           al
                                          ~IVL1NVW S~S~
                                                                                                                                                      .a.                                                 l                1       l                                7        l iI                                                      al~
 
l l      l        l1l                  l          l    lal                      lal                        l              lanl                                    l            l      i mm                                              I  I    I      II            I                                              I          I                I        I          I            I          I        I        I      I    I        I      I
SSES   MATJi*
-I-        6.0 rn                                            .a..                                     .a..            a      a j      ,    ,    I    a                  ,    ,    t            ,    ,I              a a                       ,iI,                    a a            I        !
* Manual Name:       TRMI
<-
     =iManual
H                                      11              11              1             1      11           1111                                                                                                            ai lal                                a all    a      a al  a aI                                                                1                                      I            a              I      a  a      a C        4.0 0                      10000                              20000                              30000                      40000                          50000                              60000                                    70000                              80000 H
 
Pellet Exposure (MWDIMTU) rr                                                                                                                                                                                                                                                                                            T-0  "
==Title:==
-I-                                                                UNEAR HEAT GENERATION RATETMLIMIT VERSUS PELLET EXPOSURE ATRIUM -10 FUEL FIGURE 6.2-1                                                                                                                                               Oco  a-0")'  0
TECHNICAL REQUIREM'cENTS MANUAL UNIT 1 TEXT B3.4.6                        2    04/25/2013
 
==Title:==
REACTOR RECIRCULATION SINGLE LOOP OPERATION  SLO FLOW RATE RESTRICTION TEXT B3.5.1                       0    11/19/2002
 
==Title:==
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2                        1    11/09/2007
 
==Title:==
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3                       1     11/09/2007
 
==Title:==
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1                       0     11/19/2002


Rev. 16                      PL-NF-'I4-001 Rev. 2 Page 29 of 62 Main Turbine Bypass Operable SUSQUEHANNA UNIT 1  TRM/3.2-30 SUSQEHANA NITTR/3.-30 DATE 11/04/2015 EFFECTIVE
==Title:==
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2                       0    11/19/2002


C,,
==Title:==
SSES UNIT 1 CYCLE 19 Co        1.10 1.00 z
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL  VACUUM BREAKER POSITION INDICATION TEXT B3.6.3                       2    04/17/2008
z 0.90
    -I--
0.80
-._1
('3      0.70 a,                                                                    <D
('3
                                                                            ._)
0.60 0,50
-n r-n m        0.40 m
0.30
-I            30 40 50      60            70            80  90 100 110 m:                              Total Core Flow (MLB/hr)
: 0)                    FLOW DEPENDENT LHGR LIMIT MULTIPLIER NJ                        MAIN TURBINE BYPASS OPERABLE (03 ATRIUMT*-10 FUEL FIGURE 8.2-2


SSES UNIT 1 CYCLE 19 1.10                  L            I                  &          "" 'U"' ........... * "          '
==Title:==
* m                L                4           4 *
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3o6.4                       1    12/14/2004
* A            A            i C
 
m3
==Title:==
                ..  .. .
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1                        0    11/19/2002
LEGEND
 
                            .. "            '                  '
==Title:==
* t              I            "                I                I i
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM    (SHUTDOWN)
I                                    ii Fji o T                                                                                                                                                                                  ----   ,-------~.------.I-------,                     9 CURVE A: BASE CURVE 1.00 CURVE B: CORE POWER __26% AND CORE FLOW <_.0 MLBM1HR
TEXT B3.7.2                        0    11/19/2002
* I                TI              rS                I      1            31                                    1                        ---      I - .       ..-  j.          a          .I     -    *      --  -
 
0.90                              I                    I            I                                            I                                a            I                                      i          I                          I
==Title:==
"-I II                            l              l*                                            i            I  [                aI          I                  li                                          l            i k                              I
PLANT SYSTEMS BASES ULTIMATE HEAT SINK   (UHS)  GROUND WATER LEVEL TEXT B3.7.3.1                     3      06/15/2010
                                *. _    _
 
I
==Title:==
_ _     _        . _ ..
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM
I
* TEXT B3.7.3.2                    2     04/26/2006 W.
                                                                                                    .1_J IIS
 
_   _ J.         _
==Title:==
I
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 1_1     of  i__66                                                        Report Date: 11/11/15
                                                                                                                                                  '-
 
                                                                                                                                                      .       1 IJ          ;
SSES   MANUAL Manual Name:        TRMI SManual Title*        TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.3                          0     11/19/2002
1                    _1          J                          LI z
 
                                                                                                                                                                                                                                                                    .
==Title:==
I--
* PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4                          3     04/29/2014
0.80                  I            I                I                I                I                                                            1            1                  5 I            I                I                  I                                          I                                  1                            I                  I          I            I            I
 
    ,.I I                                                                              l              ARE OPRAL                              PE        SR                        ANI37lI...
==Title:==
0.70                        .          .    ..._
* PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5                          1    04/26/2006 Title :  PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6                          1    04/26/2006 Title : PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7                          0    11/19/2002 Title : PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES STEXT B3.7.3.8                           3     09/27/2012
* 1*.         1.               *              *        ._        ._    .        .              .      .  .          .            .    .      .
 
C)                                  /II                      I                I              1                          I                    ___              _  _        ___              ___                __    ___        ___          _
==Title:==
1_-
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3 7.4                            0    11/19/2002 Title : PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1                          0     11/19/2002 Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2                          0    11/19/2002 Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3                          0    11/19/2002 Title : PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6                            4     06/04/2013 Title : PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION
H    0.
   . TEXT B3.7.7                            2    01/31/2008
0 0.60
    ...-  Title :  PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Report Date: 11/11/15 Page 1/2 Page     12      of of  16 16                                                        Report Date: 11/11/15
__..,.     . IL.__J._.I  *                                ..-                                1          REOERABENCE:                       TSR 3.2.3,1 3.A4N                           3.7.6 an            8            I I
 
iH i          _  1i_
SSES MANTJAI~
                                                                                                                ; /
Manual Name :       TPR41 Manual
                                                                                                                            ,,_,,
 
.-.
==Title:==
0.50 -
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.8                          4      01/31/2 014
03 iL  I yr                i
 
                                              !
==Title:==
I"      '-- ""    '                          "- -          !        .    .. .... ..    .   .   ..   .-. -- -          '-    -  -l . -          -      *      *     -      ;  '    ..      .    .
PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9                          2      12/08/2011 Title :  PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10                          1      12/14/2004 Title :  PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11                          1      04/14/2010
l    26       04 N,3      0.40
 
                      --
==Title:==
23 I -" -
STRUCTURAL INTEGRITY TEXT B3.8.1                           2       03/10/2010
0.0.
I I...
II -'-I....
I
                                                                          .. F - I-'
                                                                                ,            ~l,        I-
* I
                                                                                                                      -
I    * --I - - - - -l-I
                                                                                                                              ,              ,                I
                                                                                                                                                                      -- - It - -
                                                                                                                                                                            ,
* 3I        -        *
                                                                                                                                                                                                                /     -    f - I- -
I            ,
                                                                                                                                                                                                                                                -I - d        - -
i      I                  I                      I              I                                    I                I            I                                    I          I            I            I
                      ! ,,    IJ, J            I                I              I              I              I            r                                                                                    I          I            I            I I            I                  I                              -                                                                                                                3          I            I 0        0.30                                                    I              I              II              I            r                                I            I                1 2,0                          30                              40                                50 Core Power                60 (% RATED) 70                                                    80                      90                            100 POWER DEPENDENT LHGR LIMIT MULTIPLIER MAIN TURBINE BYPASS OPERABLE                                                                                                                                  o ,z AT*iUMTM-10 FUEL FIGURE 6.2-3


Rev. 16                      PL-NF-14-O01 Rev. 2 Page 32 of 62 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT I  TRM/3.2-33 SUSQEHANA NITTR/3.-33 DATE 11t10412015 EFFECTIVE
==Title:==
ELECTRICAL POWER BASES  PRIMARY  CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1                        0      11/19/2002


SSES UNIT 1 CYCLE 19 Co      1.10 I
==Title:==
z        1.00 C:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES      (MOV) THERMAL OVERLOAD PROTECTION -
Z        0.90 0.
CONTINUOUS TEXT B3.8.2.2                        1      09/17/2004
0.80
 
.-I "-J C;, ._  0.70 C;o 0,
==Title:==
C),. 0) 03  0.60 0o Ct 0.50 m
ELECTRICAL POWER BASES MOTOR OPERATED VALVES      (MOV) THERMAL OVERLOAD PROTECTION -
C)
AUTOMATIC TEXT B3.8.3                          0      11/19/2002
  -H m1      0.40 0
 
H-1 m]       0.30 30 40 50      60 Total Core Flow 70          80  90 100 110 (MLB/HR)
==Title:==
                                                                      "0  "-
ELECTRICAL POWER BASES DIESEL GENERATOR    (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4                           0       11/19/2002
nD FLOW DEPENDENT LHGR LIMIT MULTIPLIER            C.D z MAIN TURBINE BYPASS INOPERABLE 01                                ATRIUMTMea-t FUEL                        -Il 0O FIGURE 6.2-4                         0


CO,                        SSES UNIT 1 CYCLE 19 C          1.10 03 m
==Title:==
=
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5                           1      11/14/2013
z z
C z
a..
      .5.
      .5 0
--I  -I
!:
a, 1'3    a,                                                                        oD 0
I..
a) 0 0.
m m
0
.-I m
0 4>              20 30 40      50          60 (% RATED) 70 Core Power                    80 90 100
--I, 01" POWER DEPENDENT LH-GR LIMIT MULTIPLIER MAIN TURBINE BYPASS INOPERABLE                Co C?                                  ATRIUMTM.-10 FUEL FIGURE 6.2-,5 0"C*


Rev. 16                      PL-NF-14-00l Rev. 2 Page 35 of 62 One TSV or TCV Closed SUSQUEHANNA UNIT 1 TRM/3.2-36    NITTR/3.-36DATE 11/04/2015 EFFECTIVE SUSQEHANA
==Title:==
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6                          2       12/08/2011


0                                                                                                                    O SSES UNIT 1 CYCLE 19 1.10 C
==Title:==
i"1 1.00 C
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7                          2       06/04/2013
z      0.90 a,
        -H1    0.80
            -_J 0.70 CD CD
        ",4 0.60 U..
0.50
        -T1
        -IT 0.40 m
m       0.30 0          30            40            50            60 Total Core 70Flow (MLB/hr) 80            90  100 110 rl3 FLOW DEPENDENT LHGR LIMIT MULTIPLIER 0                                                          ONE TSV OR TCV CLOSED*                                0-" 0 ATRIUMTM-t10 FUEL                                D' I, -=
FIGURE 6.2-6
                        *Operation with one TSV or TCV closed is only supported at power [evels
* 75% rated power.
n ,, n


C',
==Title:==
SSES UNIT 1 CYCLE 19 C
BATTERY MAINTENANCE AND MONITORING    PROGRAM Report Date:  11/11/15 Page i~
03 m
Page 13       of of  ii 16                                                            Report Date: 11/11/15
C z
13
{.i
--I ,-J
       .1_
C,)
0 cc    0L                                                        0) mT "rn ml 0
<
m1 H3 20 30  40              50 (% RATED)
Core Power            60    70 80 rn
-I POWER DEPENDENT LHGR LIMIT MULTIPLIER      CD  Z ONE TSV OR TCV CLOSED ATRIUMTM-10 FUEL                  *i-- n FIGURE 6,2-7                      c0*


Rev. 16                                      PL-NF-14-OO1 Rev. 2 Page 38 of 82 7.0 ROD BLOCK MONITOR (RBM SETFOINTS AND OPERABILITY REQUIREMENTS 7.1  Technical Specification Reference Technical Specification 3.3.2.1 7.2  Description The RBM Allowable Value and Trip Setpoints for; a)  Low Power Range Setpoint, b)  intermediate Power Range Setpoint, c)  High Power Range Setpoint, d) Low Power Range - Upscale, e) Intermediate Power Range - Upscale, and I) High Power Range - Upscale shall be established as specified in Table 7.2-1. The RBM setpoints are valid for Two Loop and Single Loop Operation, Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
S.~ES MM~AL
The RBM system design objective is to block erroneous control rod withdrawal initiated by the operator before fuel design limits are violated. Ifthe full withdrawal of any control rod would not violate a fuel design limit, then the RBM system is not required to be operable. Table 7.2-2 provides RBM system operability requirements to ensure that fuel design limits are not violated.
  <?=Manual Name: TRMI
SUSQUEHANNA UNIT 1                 TRM/3.2-39                    NITTRIS.-39 DATE 11/04/2015 SUSQEHANA EFFECTIVE
  "*Manual Titles&deg; TECHNICAL REQUIREMENTS MANUAL UNIT 1                                              0 TEXT B3.9.l                          0     11/19/2002
 
==Title:==
REFUELING OPERATIONS BASES DECAY TINE TEXT B3.9.2                          0      11/19/2002
 
==Title:==
REFUELING OPERATIONS BASES COMM4UNICATIONS TEXT B3.9.3                          0      11/19/2002
 
==Title:==
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1                         0      11/19/2002
 
==Title:==
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2                         1     03/31/2006
 
==Title:==
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3                          0      11/19/2002


Rev. 16                                      PL-NF-14-001 Rev. 2 Page 39 of 62 Table 7.2-I RBM Setpoints Allowable            Nominal Trip Function                        Value( 1 )            Setpoint Low Power Range Setpoint                              28.0                  24.9 Intermediate Power Range Setpoint                      63.0                  61.0 High Power Range Setpoint                              83.0                  81.0 Low Power Range - Upscale                            123.4                  123.0 Intermediate Power Range - Upscale                    117.4                  117.0 High Power Range - Upscale                            107.6                  107.2 (1)   Power setpoint function (Low, Intermediate, and High Power Range Setpoints) determined in percent of RATED THERMAL POWER. Upscale trip setpoint function (Low, Intermediate, and High Power Range - Upscale) determined in percent of reference level.
==Title:==
Table 7.2-2 RBM System Operability Requirements Thermal Power                                MCPR    (2.3)
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION   (ISFSI)
(% of Rated)
TEXT B3.10.4                         1     04/17/2 008
                         > 28 andc<90                                  < 1.76
                        ~90 and <95                                    <1.47
                              >_95                                    < 1.70 (2)  Applicable to Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
(3 Applicable to both Two Loop and Single Loop Operation.
SUSQUEHANNA UN]T 1                  TRMI3.2-40          SUSQEHANA NITTRI3.-40 DATE 11/04/201 5 EFFECTIVE


Rev. 18                                    PL-NF-1 4-001 Rev. 2 Page 40 of 62 8.0  REGIRCULATION LOOPS - SINGLE LOOP OPERATION 8.1  Technical Specification Reference Technical Specification 3.2.1, 3.2.2, 3.2.3, 3.3.4,1, 3.4.1,3.7.6, and 3.7.8 8.2  Technical Req~uirements Manual Reference Technical Requirements Manual 3.3.7 8.3  Description APLHGR The APLHGR limit for ATRlUMTM-I 0 fuel shall be equal to the APLHGR Limit from Figure 8.2-1.
==Title:==
The APLHGR limits in Figure 8.2-1 are valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Single Loop operation.
MISCELLANEOUS BASES LEADING EDGE FLOW METER  (LEFM)
Minimum Critical Power Ratio Limit-The MCPR limit is specified as a function of core power, core flow, and plant equipment operability status. The MCPR limits for all fuel types (ATRIUM TM-10) shall be the greater of the Flow-Dependent or the Power-Dependent MCPR, depending on the applicable equipment operability status.
TEXT B3.ii.ioi                        0      11/19/2002
a)  Main Turbine Bypass I EOC-RPT / Backup Pressure Regulator Operable Figure 8.2-2: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-3: Power-Dependent MCPR value determined from BOC to EOC b)  Main Turbine Bypass [noperable Figure 8.2-4: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-5: Power-Dependent MCPR value determined from BOC to IEOC c)  EOC-RPT Inoperable Figure 8.2-6: Flow-Dependent MCPR value determined from BOG to EOC Figure 8.2-7: Power-Dependent MCPR value determined from BOC to EOC SUSQUEHANNA UNIT 1                  TRMI3.2-41                    NIT TRI3.-41EFFECTIVE SUSQEHANA      DATE 11/04/2015


Rev. 18                                    PL-NF-14-OO1 Rev. 2 Page 4l of 62 d)  Backup Pressure Regulator Inoperable Figure 8.2-8: Flow-Dependent MCPR value determined from BOO to EGOC Figure 8.2-9: Power-Dependent MCPR value determined from BOO to EDO e) One Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 8.2-1O:Flow-Dependent MOPR value determined from BOO to EDO Figure 8.2-11 :Power-Dependent MOPR value determined from BOO to EOC The MOPR limits in Figures 8.2-2 through 8.2-1 1 are valid only for Single Loop operation.
==Title:==
Linear Heat Generation Rate Limit The LHGR limits for Single Loop Operation are defined in Section 6.0.
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3ol.11Io2                      0      11/19/2002
RBM Setpoints andOperabilityRequirem~ents The RBM setpoints and operability requirements for Single Loop Operation are defined in Section 7.0.
SUSQUEHANNA UNIT 1              TRM/3.2-42                NITTRI3.-42 DATE 1110412015 EFFECTIVE SUSQEHANA


C            16.0        T                  T                    T                    r                T            ~                      T                  ~                        u              1                      1                  ~                  I                  r QI                      I      I  '                I                                  I            l              Il      l        t                I        I        la            1                  l                        l 9      i0 1                                    '
==Title:==
I      E      lI        I                              I  Ii    l    l                                                    l                llI                                                lI                                                    l
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.ii.i.3                       0     11/19/2002
: z.                                          1. .1.                          II                    .11                                            ..                                  II1lIti1                                                                                                  1 I,    i  I    s I  i    I  r  I,.i        m      i    .              m        m        m    ii.m                                                                                                  n  l4...4      mm~~u            mm.4.*"
I11I    1    I    I            Ii      lIlC              Il                  IlIII1I                            I1I1      l      i        l                                                                                                                1 Il      l                            l        ~l      t                                                l                      I!                    ~            l      l                  l        O              l                    1              1 I      I    I    l    I                                  I      I        I      Ii ~ll          I    I                        l1                1      1I tltitjilt                                  SED IND*ERINIG0
            *      --    J-      I---. ii!                            I      I-I.--    --            I--  j--i-..J..-,Lf                                                                                                                        lf...f                                          I I1                                                                                                              1'I II&#xa3;            I Ii 1                        I I
I          I I
1 I1                                                                                                                        I1                  1      1        1        1                I*      I          I        1 I  IIlli  I                                                                  l        II      l                                              I      I                       I                I    I 0l3l                                                                      l                        l          l                  l                                  l                l                                                  I      1                    1
        =                    *oo                ,              Ioo  I            IO  ll .I                                    ,                                  II                              I      II                          I, 1I I        I                                I                I            I        I    I      I        I        I                                            l      l3    l                                            I      [                    II II                                                                      IIII    l    Il     l        lI                            I          1        1    1        I mI.._1111l1                                                                                I          I        lllll1                                    :11!                                l111                            l1!.                        1                  l11l Iiii                      II              !              II                      11                11          lll                                ll                      l                          Il                                  I        ll HI I I I I ,        l      l      l        l I      ,
I I I I I" I      l    l II I l        l~ll
                                                                                                                                                    ,I l        li
                                                                                                                                                                    ,      ,    I l      l            l:l I
l1 1
:l    l        l 67000,5.6 l
1o                              1                    11 1111              1              Il                                                        liIljlIlIIIIIl                                                                                          l    l        ll II                                      l                l    l            Illl                        I          l      l                      I                                                I            Il                          l 4.0      L U'                    i41--                        LI4l2                    M - -L --                    ~L-              AJ-J                                        L..L
                                                                                                                                                                                          ...........                          ...            --  ,                  I          ,      ,.        ,    I 0.0                  l1000.                          l              2000.0                ll                    000.                                4000.08000.06000.07000.
        -L~l                                                                      l                l            l              l                  l    l                  lI                                        l                l              i                l            l Averag PlanalEpour                                                        MWIMTU)l o    =          a      l                l              l                l                l            l              l                  l2l                                        l                                l                i              t            l                l A                                                                                    '        I      I    I    I        l                                                                          *                    .                .                                                                        Ca AVRAEPLNR                                      INA                  HA              GENERATION RAELMITlERSUtll o                                                            AERAE PANA                                        EPOSRE..SIGL.LOP.OERAIO ATRIUMTMAOll FUELll                                                l                                                                                  l                          owlll FIGURE 8.2-1ll          l        l      l    l                  l      l        lI                              I
......                    , , J2J***
                                    .....    . . . ..    . .. .... .....*.. ....................... . ..... ..... .....                ..........      ... * . ....      .......... ... ... ................. ......    ................... ......... ....... . ..... . ..      .. r*, i, . ... .. ... . .. ... .... .. .


Rev. 16                  PL-NF.-14-001 Rev. 2 Page 43 of 62 Main Turbine Bypass I EOC-RPT/I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 1  TRM/3.2-44    UITTRM3.2-44 SUSQEHANA EFFECTIVE DATE 11/0412.015
==Title:==
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT  SYSTEM TEXT B3.11.I.4                        0      11/19/2002


9 SSES UNIT 1 CYCLE 19 3.6                                                        I            I                        I LEGEND m          3.4            4.                          a-    CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM z                                                                        INSERTION TIME z          3.2            +              I            4-C                                                            CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME z
==Title:==
3.0 t                            1--i.
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.I.5                        0     11/19/2002
m I II II . . I H0 4-.
D.1 o~
2.8 2.6 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES L
ARE OPERABLE PER SR 3.7.6.t AND 3.7.6.2 I            I              Ii USED INDETERMINING MFLCPR K
0,  2.4 0
2.2 2.0 i'1
-m        '.8 rI,           


==REFERENCE:==
==Title:==
" T.S. 3.4.1 and 3.2.21                                                              108, 1.49' 1.6 H
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION Report Date:  11/11/15 Page 14 Page  14        of of   ~i*                                                      Report Date: 11/11/15
   -m 0        '1.4 1N1                                                                  70          80            90        100          110 0              30        40            50          60 Total Core Flow (MLB/HR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW                                      Co MAIN TURBINE BYPASS 1 EOC-RPT / BACKUP PRESSURE REGULATOR OPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-2


9                                                                                    0 SSES UNIT I CYCLE 19 4.6 o0 4.4                                        ___      LEGEND 4.2
SSES   MANUJAI O Manual Name:          TRMI
________CURVE                                        A: MAXIMUM ALLOWABLE AVERAGE SCRAM
... Manual
____INSERTION                        TIME z      4.0      ____________CURVE                                    B: REALISTIC AVERAGE SCRAM INSERTION TIME
 
                                                      ~-CURVE C: CORE POWER _<26% AND coRE FLOW
==Title:==
* 50 MLBM/HR 3.6
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.11.2.1                   1      12/14/2004
__                          ------
 
S  3.4
==Title:==
                                                                                --fl!SAFETY  ANALYSES ASSUME THAT F~OUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.2 Ho  03 3.0                      _____USED                                                            IN DETERMINING MFLCPR 1.
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2                   0     11/19/2002
N)
CD 0  2.8 0);
0) 2.6
_                                        _
2.4 2.2 f                                      140. 2.08!
                                                *-
                          ,4 0A-B-BT*
4  -.--------        ~    I "t100, '
2.0             F                                                                          *,                              ... .. . .. .
  -Iil m
t 1.8 0              REEEC: T.S. 3.4.1 and 3.2.2                                                          "Z 1.6 Hr o      1.4 20                                                                                                                              100 mn                              2040                                50co              60*( RAE70                80          90 "0  "
MCPR OPERATING LIMIT VERSUS CORE POWER                                                  CD MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-3                                                  &deg;<  I
                                                                                                                                                      "*  O 0)' C


Rev. 16                        PL-NF-14-OO1 Rev. 2 Page 46 of 62 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT1  TRM/3.2-47 SUSQEHANA NITTR/3.-47 DATE 1110412015 EFFECTIVE
==Title:==
RADIOACTIVE EFFLUENTS BASES DOSE  - NOBLE GASES TEXT B3.11.2.3                    0    11/19/2002


C' SSES UNIT 1 CYCLE 19 4.2                                                                  I            I          II C-
==Title:==
_______
RADIOACTIVE EFFLUENTS BASES DOSE  - IODINE, TRITIUM, AND RADIONUCLIDES IN SPARTICULATES FORM TEXT B3.11.2.4                   0    11/19/2002
________                ________            LEGEND 4.0 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM 3.8                                                        -          INSERTION TIME z
z
________________CURVE                              B: REALISTIC AVERAGE SCRAM iNSERTiON TIME 3.6 z
3.4
                                                                -   SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS        -
    ,4D 3.2 VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 o* 3.0 H0 0
CD co3 0) 2.4.
2.2 m      2.0 "I1 m                                                                                                                        .
1.8     -1


==REFERENCE:==
==Title:==
T.S. 3.4.1, 3.7.6,, and22                                            -- _,118 0
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5                  5      07/03/2013
m      1.6      _  _          _        _        _I            _      _            _-_-_-_
 
1.4 m
==Title:==
30          40                   50            60 Total Core 70            80        90          t00        110 Flow (MLB/HR) 0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW                                    CD  Z
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHqAUST  TREATMENT SYSTEM TEXT B3.11.2.6                  1     01/27/2004
-J.                                                       MAIN TURBINE BYPASS INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)
 
FIGURE 8,2-4                                                0 o)"
==Title:==
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS  EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3                      0     11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1                   5      03/05/2015
 
==Title:==
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2                   0     11/19/2002


C, SSES UNIT I CYCLE 19 4.2    123,4A41                                        *              =*                      *l "1 I    " m                                                            l C-Cin                              I                        LEGEND 4.0 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM F                                                        INSERTION TIME z        3.8 z                                                          CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME
==Title:==
              ~, 3,61              ____________  4-Z
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3                   0     11/19/2002
-I      3.6                                              CURVE C: CORE POWER_*26% AND CORE F~LOW _<50 MLBMIHR
                                                .t-l 3.4                                     I        m
    .1.a                1I~Z~38 I--.*-                  4.              I-I E
-I  Cu 3.2 ISAFETY VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6,2 ANALYSES ASSUME THAT TWO OR MORE BYPASS w 3.0                                                                           USED IN DETERMINING MFLCPR I-
_____
0.
1~oi C~) 0
                                        .41 CD N)
: a. 2.8 CO 0                                                ______      _                                          ________                0) 2.6 2.4 2,2 m
2.0 0r           


==REFERENCE:==
==Title:==
T.S. ,3.4.1, 3.7.6, and 3.2.2                                  ..
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1                     1     10/04/2007
-I      1.8 20                30              40                    6060 Power (%o o70RATED)            80          90  100 50Core "0  "T CD MCPR OPERATING LIMIT VERSUS CORE POWER                              Com    I N)                                                            MAIN TURBINE BYPASS INOPERABLE                                  .CD SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8,2-5                                      ow.
: h. h< .-


Rev. 16                  PL-NF-14-O0l Rev. 2 Page 49 of 62 EOC-RPT Inoperable SUSQUEHANNA UNIT 1   TRM/3.2-50 SUSQEHANA NIT TR/3.-5OEFFECTIVE DATE 11/0412015
==Title:==
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2                     1     12/03/2010


p SSES UNIT 1 CYCLE 19 4.0 LEGEND m      3.8 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM~
==Title:==
z      3.6              ________________INSERTION                                    TIME z
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS Report Date11/11/15 Page i~.
C                                                                CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 3.4 z
15      of of   16 I__66                                                    Report Date: 11/11/15
3,2 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVESl E 3.0                                                      -        ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2
   ,U
-1  I-2,8                                                                    USED IN DETERMINING MFLCPR 4,
0.
2.6 0
N, 0I 2.4                                                                                                                                0) 2.2 2.0 m      1.8 0
<           


==REFERENCE:==
SSES MANUJAL
T.S 3..,.341              and 3.2.2                                      _            "_-_-_-[_08t" 1.6 1.4 m          30        40                    50          60              70          80        9t0          100              110 Total Core Flow (MLB/HR)
*-   Manual Name:      TRN1
                                                                                                                                    *,      ,I-0                                              MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW 4*                                                            EOC-RPT INOPERABLE                                                  -Q* .:
:*:Manual
SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-6


C*
==Title:==
SSES UNIT 1 CYCLE 19 Cb 0*
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3                         0. 11/19/2002
z
.-I C.'
CD C.,
N)
C,'                                                                    0)
'-I"1
['11
-IT m
1-1 20 30 40          5060 Power' (% RATED) 70 80Core                         80 90 100 m                                                                  -U  -D MCPR OPERATING LIMIT VERSUS CORE POWER          Co  z EOC-RPT INOPERABLE 0,-
SINGLE LOOP OPERATION (BOC to EOC)                  ,C FIGURE 8.2-7                      ow' 0


Rev. 15                       PL-NF-14-OO1 Rev. 2 Page 52 of 62 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 1  TRM/3.2-53 SUSQEHANA NITTRIS.-53 DATE 11/04/2016 EFFECTIVE
==Title:==
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Report Date: 11/11/15 Page 1616    of of   16 16                                              Report Date: 11/11/15


C',
SUSQUEHANNA STEAM ELECTRIC STATION                                Rev. 64 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
SSES UNIT I CYCLE 19 CO                  4.0 I                                     I                       I                                I m                  3.8
Section  Titl__ee                                                Effective Date TOC      TABLE OF CONTENTS                                          04/23/2015 1.0      USE AND APPLICATION Page TRM / 1.0-1                                      10/04/2002 Page TRM / 1.0-2                                      01/21/2014 Page TRM / 1.0-3                                      10/04/2002 2.0      PLANT PROGRAMS Page TRM / 2.0-1                                      04/23/2015 Pages TRM / 2.0-2 and TRM / 2.0-3                    01/28/2005 Page TRM / 2.0-4                                     06/25/2002 Page TRM / 2.0-5                                      01/21/2014 Page TRM / 2.0-6                                      03/27/2008 Page TRM / 2.0-7                                      05/15/2008 Pages TRM / 2.0-8 and TRM / 2.0-9                    01/07/2011 Page TRM / 2.0-10                                    02/02/2010 Page TRM / 2.0-11                                    11/15/2004 Page TRM / 2.0- 12                                    03/27/2008 Pages TRM / 2.0-13 and TRM / 2.0-1*                  11/15/2004 Page TRM / 2.0-15                                    11/15/2005 3.0 PI"I"LI*.jp?.DILI I I Pages TRM / 3.0-1 and                                 02/19/2015 Page TRM / 3.0-3                                      03/15/2002 Page TRM / 3.0-4                                      02/19/2015 REACTIVITY CON 3.1 Page TRM / 3.*                                       10/3112007 Pages TRM              an                            08/31/1998 Pages 3.                5                            08/31/1998 Page TR                                              03/22/2006 04/07/2009 03/27/2008 3.1-9 and TRM / 3.1,9a              02/18/1999
                                                                                                                                                                *:MAXIMUM ALLOWABLE AVERAGE SCRAM z
                              .1-10                              02/18/1999 3.2 iERATING LIMITS REPORT                        07/07/1999 Pages TRM / 3.2-2 through TRM / 3.2-63                11/04/2015 3.3      INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3                07/16/1999 Page TRM / 3.3-4 and TRM / 3.3-5                      10/31/2007 Page TRM / 3.3-6                                     03/10/2011 SUSQUEHANNA-UNIT1                        TRM / LOES-1 SUSQEHANA UNT I RM LOS-1EFFECTIVE DATE 11/04/2015
3.6                                                                                                                                   INSERTION TIME V
 
I                                                                  .
SUSQUEHANNA STEAM ELECTRIC STATION                                Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
C                                                                                                                                                    I: REALISTIC AVERAGE SCRAM INSERTION TIME z                  3.4                                                           4                                     4.-
Section  Title                                                  Effective Date Page TRM / 3.3-7                                      10/31/2007 Page TRM / 3.3-8                                      08/31/1998 Page TRM / 3.3-9                                      10/07/2015 Page T'RM / 3.3-9a                                    06/30/2010 Page TRM / 3.3-10                                      10/31/2007 Page TRM /3.3-11                                      10/07/2015 Page TRM / 3.3-11a                                    10/07/2015 Page TRM I 3.3-12                                      03/30/2001 Page TRM / 3.3-13                                      01/07/2011 Page TRM / 3.3-14                                      12/1 4/1 998 Page TRM / 3.3-15,                                    04/11/2014 Page TRM I 3.3-16                                      01/07/2011 Page TRM / 3.3-17                                      11/04/2015 Page TRM / 3.3-17a                                    11/04/2015 Page TRM / 3.3-18                                      10/31/2007 Pages TRM / 3.3-19 through TRM / 3.3-21                10/22/2003 Page TRM / 3.3-22                                      03/27/2008 Page TRM / 3.3-22a                                     11/15/2004 Pages TRM / 3.3-22b through TRM / 3.3-22d              03/22/2006 Page TRM / 3.3-23                                      12/03/2004 Pages TRM / 3.3-24 and TRM I 3.3-25                    05/16/2003 Page, TRM / 3.3-26                                    10/22/2003 Page TRM / 3.3-27                                      02/19/2015 Page TRM / 3.3-28                                      04/07/2009 3.4      REACTOR COOLANT SYSTEM Page TRM / 3.4-1                                      03/31/2006 Pages TRM / 3.4-2 through TRM / 3.4-5                  10/23/11998 Pages TRM / 3.4-6 through TRM / 3.4-8                  04/01/2009 Page TRM / 3.4-9                                      08/31/1998 Page TRM / 3.4-10                                      10/31/2007 Page TRM / 3.4-11                                      08/31/1998 Page TRM / 3.4-12                                      03/27/2008 Page TRM / 3.4-13                                      03/31/2006 Pages TRM / 3.4-14 and TRM / 3.4-15                    04/25/2013 3.5      EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1                                       01/28/2005 Pages TRM / 3.5-2 and TRM / 3.5-3                      08/31/1998 Pages TRM / 3.5-4 and TRM / 3.5-5                      10/31/2007 Pages 3.5-6 and 3.5-7                                  08/31/1998 SUSQUEHANNA- UNIT 1                  TRM / LOES-2              LOS-2EFFECTIVE I RM UNT SUSQEHANADATE 11/04/2015
3.2                                                                                                                                      f          ,      ,    .. ,I.,,.I,, I ,                      "                                "
S C
3.0 2,8 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR 2
H* C)    a.
0 2,6                                                                                                                                                                                                                                                                            CD 0~
C,          2.4 2,2 2.0 r-n
        -n' rni                1.8                                                                                                                        A-
__---_    _          _      ___            __                                                                  B
                                            ._


==REFERENCE:==
SUSQUEHANNA STEAM ELECTRIC STATION                                  Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
T.S. 3.4.1, 3.7.8, and 3.2.2[                                                                      ____.__                                  ..        _. _        _                                  .J._108, 1.48 1.6 m
Section  Title                                                    Effective Date 3.6      CONTAI NMENT Page 3.6-1                                               08/31/1998 Pages TRM / 3.6-2 and TRM I 3.6-2a                      04/16/2014 Page 3.6-3                                              08/31/1998 Page TRM / 3.6-4                                         01/07/2002 Page 3.6-5                                              08/31/1998 Pages TRM / 3.6-6 through TRM / 3.6-8                    12/31/2002 3.7     PLANT SYSTEMS Pages 3.7-1 through 3.7-3                                08/31/1998 Page TRM / 3.7-4                                        03/31/2006 Pages TRM / 3.7-5                                        04/07/2009 Pages TRM / 3.7-6 through TRM / 3.7-8                    08/02/1999 Pages TRM / 3.7-9 and TRM / 3.7-10                      04/07/2009 Page TRM / 3.7-11                                        12/29/1999 Page TRM / 3.7-12                                        08/02/1999 Page TRM / 3.7.13                                        04/07/2009 Page TRM / 3.7-14                                        08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16                      08/02/1999 Page TRM / 3.7-17                                        04/07/2009 Page TRM / 3.7-18                                        08/02/1999 Page TRM / 3.7-19                                        04/07/2009 Pages TRM / 3.7-20 through TRM / 3.7-22                  08/02/1999 Page TRM / 3.7-23                                        04/07/2 009 Page TRM / 3.7-24                                        03/31/2006 Page TRM / 3.7-25                                        08/02/1999 Page TRM / 3.7-26                                        09/25/2012 Page TRM / 3.7-27                                        11/24/2011 Pages TRM / 3.7-28 through TRM / 3.7-34a                09/25/2012 Page TRM / 3,7-35                                        03/31/2006 Pages TRM / 3.7-36 and TRM / 3.7-37                      02/01/1999 Page TRM / 3.7-38                                      02/19/2015 Page TRM / 3.7-39                                      08/31/1998 Page TRM / 3.7-40                                        03/31/2006 Page TRM / 3.7-41                                      05/24/2012 Pages TRM / 3.7-41a through TRM / 3.7-41c              05/24/2012 Page TRM / 3.7-42                                      09/04/2008 Page TRM / 3.7-43                                      08/31/1998 Page TRM / 3.7-44                                      02/19/2015 Pages TRM / 3.7-45 and TRM / 3.7-46                    10/05/2006 Page TRM / 3.7-47                                      06/07/2007 TRM / LOES-3    EFFECTIVE DATE 11/04/2015 SUSQUEHANNA-UNITI SUSQUEHANNA-UNIT1                    TRM / LOES-3    EFFECTIVE DATE 11/04/2015
1,4 30                      40                        50                                  60                                  70                                    80                        90                              100                  110 Total Core Flow (MLBJHR) w  r 0*
MOPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE                                                                                                                                              01 SINGLE LOOP OPERATION (BOC to EGOC)
FIGURE 8.2-8                                                                                                                          0O" 0
' I * . ...... .... .......  "..............  ... ...... . ... .  .. ... .  .  . ............  ......  ..............  .........................      .................   .................  .. ..    * ..  . .    =. . ... * " *LZ*:*  I* *,.,. L*** ............   .....


CD SSES UNIT 1 CYCLE 19 C                                                                                                                  "  'I-0*
SUSQUEHANNA STEAM ELECTRIC STATION                                Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
C      4.4                                ---- LEGEND m                                                                UM ALLOWABLE AVERAGE SCRAM
Section  Title                                                  Effective Date Page                                                  10/05/2006 Page TRM TRM II 3.7-48 3.7-49                                  06/07/2007 Pages TRM / 3.7-49a and TRM / 3.7-49b                10/05/2006 Page TRM / 3.7-50                                    01/21/2014 Page TRM / 3.7-51                                    08/16/2006 Page TRM / 3.7-52                                    12/03/2004 Page TRM / 3.7-53                                    04/15/2003 Page TRM / 3.7-54                                    07/29/1999 Pages TRM / 3.7-55 through TRM / 3.7-57              04/01/2009 3.8      ELECTRICAL POWER Page TRM / 3.8-1                                     04/02/2002 Page TRM / 3.8-2                                      01/28/2005 Pages TRM / 3.8-3 and TRM /3.8-4                      03/25/2010 Pages TRM / 3.8-5 and TRM / 3.8-6                    04/02/2002 Page TRM / 3.8-7                                      10/31/2007 Pages TRM / 3.8-8 through TRM / 3.8-10                12/03/2004 Page TRM /3.8-11                                      09/03/2004 Page TRM / 3.8-12                                    12/03/2004 Page TRM / 3.8-13                                    02/19/2015 Page TRM / 3.8-14                                    08/31/1998 Pages TRM / 3.8-15 through TRM / 3.8-17              04/02/2002 Page 3.8-18                                          08/31/1998 Page TRM / 3.8-19                                   04/02/2002 Page 3.8-20                                          08/31/1998 Pages TRM / 3.8-21 and TRM / 3.8-22                  06/06/1999 Page TRM / 3.8-23                                    11/07/2013 Pages TRM / 3.8-24 and TRM / 3.8-25                  11/30/2011 Page TRM / 3.8-26                                    05/28/2009 Page TRM / 3.8-27                                    11/29/2006 Pages TRM / 3.8-28 and TRM / 3.8-29                  05/28/2009 3.9      REFUELING OPERATIONS Pages 3.9-1 through 3.9-3                            08/31/1998 3.10     MISCELLANEOUS Page TRM / 3.10-1                                    03/31/2006 Pages TRM / 3.10-2 and TRM / 3.10-3                  08/31/1998 Page TRM / 3.10-4                                   08/01/2006 Pages TRM / 3.10-5 and TRM / 3.10-6                  03/22/2006 Page TRM / 3.10-7                                    06/10/2010 Page TRM / 3.10-8                                    03/27/2008 SUSQUEHANNA - UNIT 1                  TRM / LOES-4  SUSQEHANA UNT I RM LOS-4EFFECTIVE DATE 11/04/2015
-i-    4.2                                      CURVE A: MAXIM z                    ____
 
_  __ ___
SUSQUEHANNA STEAM ELECTRIC STATION                                Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
___ ___INSERi                      nION TIME z
Section  Title                                                  Effective Date 3.11      RADIOACTIVE EFFLUENTS Page TRM / 3.11-1                                      03/31/2006 Pages TRM / 3.11-2 and TRM / 3.11-3                    08/31/1998 Page TRM / 3.11-4                                     03/31/2006 Page TRM / 3.11-5                                      08/31/1998 Page TRM / 3.11-6                                     03/31/2006 Pages TRM / 3.11-7 and TRM / 3.11-8                   08/31/1998 Pages TRM / 3.11-9 and TRM / 3.11-10                  10/09/2012 Pages TRM / 3.11-11 and TRM / 3.11-12                  08/31/1998 Page TRM /3.11-13                                      02/19/2015 Page TRM / 3.11-14                                    12/03/2004 Pages 3.11-15 and 3.11-16                              09/01/1998 Page TRM / 3.11-17                                    03/31/2006 Page 3.11-18                                          08/31/1998 Page TRM / 3.11-19                                    08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21                  03/31/2006 Page TRM / 3.11-22                                    04/02/2002 Page TRM / 3.11-23                                    11/14/2006 Page TRM / 3.11-24                                    06/18/2013 Page TRM / 3.11-25                                    04/12/2007 Pages TRM / 3.11-26 and TRM / 3.11-27                  01/21/2004 Page TRM /3.11-28                                      09/08/2009 Page TRM / 3.11-29                                    12/03/2004 Pages TRM / 3.11.30 and TRM / 3.11.31                  01/21/2004 Page TRM / 3.11.32                                    04/23/2015 Page TRM / 3.11-33                                    03/31/2006 Page TRM / 3.11-34                                    08/31/1998 Page TRM / 3.11-35                                    03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39              11/30/2005 Page TRM / 3.11-40                                    02/19/2015 Pages TRM / 3.11-41 through TRM / 3.11-43              08/31/1998 Page TRM / 3.11-44                                    08/01/2006 Page TRM / 3.11-45                                    03/31/2006 Page 3.11-46                                          08/31/1998 Page TRM / 3.11-47                                     03/31/2006 3.12      LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM /3.12-3                02/05/1999 Page TRM / 3.12-4                                      03/14/2008 Page TRM / 3.12-5                                      02/05/1999 4.0      ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-3                              08/31/1998 Page TRM / 4.0-4                                      12/11/2008 Pages 4.0-5 through 4.0-8                             08/31/1998 SUSQUEHANNA-UNIT1                    TRM/LOES-5      SUSQEHANA UNT I RM LOS-5EFFECTIVE DATE 11/04/2015
C      4.0                                     CURVE B: REALI*
STIC AVERAGE SCRAM INSERTION TiME 3._____,_.__1CURVE                        C: CORE POWER < 26% AND CORE FLOW < 60 MLBMIHR I
I                   I rY ANALYSES      ASSUME THAT FOUR BYPASS VALVES  l---
ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.0          26.01, 2.90 E
USED IN DETERMINING MFLCPR CD 0.= 2.6                                     A                                                  *1*
0)
O-                                                             60, 2.18 U*                                                                                            4         4 1100 "
                                                                                                                    -
2.2                                                          1 m
2.0 m
1.8  


==REFERENCE:==
SUSQUEHANNA STEAM ELECTRIC STATION                                      Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
T.S. 3.4.1, 3.7.8, and 3.2.2J11ii 1.4
Section  Title                                                        Effective Date B 3.0    APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3                  08/31/1998 Page TRM / B 3.0-4                                         02/19/2015 Page TRM / B 3.0-4a and TRM / B 3.0-4b                      02/19/2015 Page TRM / B 3.0-5                                          02/19/2015 Page TRM I B 3.0-6                                          08/31/1998 Page TRM I B 3.0-7                                         04/12/2007 Pages TRM / B 3.0-8 through TRM I B 3.0-10                  08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12                    03/15/2002 Pages TRM / B 3.0-13 through TRM / B 3.0-15                02/19/2015 B 3.1    REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1                                          07/13/1999 Page TRM / B 3.1-2                                         04/16/2014 Page TRM /B 3.1-3                                          10/31/2007 Page B 3.1-4                                               08/31/1998 Page TRM / B 3.1-5                                          11/15/2005 Pages TRM I B 3.1-6 and TRM / B 3.1-7                      03/22/2006 Page TRM / B 3.1-8                                        02/18/1999 B 3.2    CORE OPERATING LIMITS BASES Page B 3.2-1                                              08/31/1998 B 3.3    INSTRUMENTATION BASES Page TRM / B 3.3-1                                        01/21/2014 Page TRM / B 3.3-2                                        03/10/2011 Page TRM / B 3.3-2a                                        10/31/2007 Page TRM / B 3.3-3                                          12/11/2008 Page TRM / B 3.3-3a                                        10/31/2007 Page TRM / B 3.3-4                                        06/30/2010 Page TRM / B 3.3-5                                          10/07/2015 Page TRM I B 3:3-6                                          06/30/2010 Page TRM I B 3.3-7                                          10/07/2015 Page TRM / B. 3.3-8                                        06/30/2010 Page TRM I B 3.3-9                                          10/31./2007 Pages TRM / B 3.3-10 through TRM I B 3.3-12                01/07/2011 Page TRM / B 3.3-13                                        01/21/2014 Page TRM / B 3.3-14                                        06/25/2002 Page TRM / B 3.3-14a                                        11/04/2015 Page TRM I B 3.3-14b                                        11/04/2015 Page TRM / B 3.3-14c                                        11/04/2015 Pages TRM / B 3.3-15 and TRM I B 3.3-16                    10/22/2003 Page TRM / B 3.3-17                                        03/22/2006 Pages TRM / B 3.3-17a through TRM / B 3.3-17c              03/22/2006 Page TRM / B 3.3-17d                                        03/27/2008 TRM / LOES-6        EFFECTIVE DATE 11/04/2015 SUSQUEHANNA-UNITI SUSQUEHANNA - UNIT 1                TRM / LOES-6        EFFECTIVE DATE 11/04/2015
.-I         20          30             40            60  ...     ... 60 ...   .. .. 70        80        90            100 m                                                          uore r'ower rio KAIi )uJ MCPR OPERATING LIMIT VERSUS CORE POWER                                        CD J\)                                            BACKUP PRESSURE REGULATOR INOPERABLE                                                  "11 0J                                                SINGLE LOOP OPERATION (BOO to EOC)
FIGURE 8.2-9                                                  (:I' .Q DO O--


Rev. 16                       PL-NF-14-001 Rev. 2 Page 55 of 62 One TSV or TCV CloSed SUSQUEHANNA UNIT 1 TRM/3.2-56    NITTR/3.-56 DATE 11/04/2015 EFFECTIVE SUSQEHANA
SUSQUEHANNA STEAM ELECTRIC STATION                                    Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section  Title                                                      Effective Date TRMI IBB3.3-19 Pages TRM / B 3.3-17e andTRM        3.3-17f              03/22/2006 Pages TRM / B 3.3-18 and                                  08/03/2010 Page TRM / B 3.3-20                                      10/22/2003 Page TRM / B 3.3-21                                      05/16/2003 Pages TRM / B 3.3-22 and TRM / B 3.3-23                  04/07/2009 B 3.4    REACTOR COOLANT SYSTEM BASES Page B 3.4-1                                              08/31/1998 Pages TRM / B 3.4-2 and TRM / B 3.4-3                    04/01/2009 Pages TRM 1 B 3.4-4 and TRM / B 3.4-4a                    10/31/2007 Page TRM / B 3.4-5                                        10/1 5/1 999 Page B 3.4-6                                              08/31/1998 Pages TRM / B 3.4-7 and TRM / B 3.4-8                    04/25/2013 B 3.5    ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2                                08/31/1998 Pages TRM / B 3.5-3 through TRM / B 3.5-5                10/31/2007 B 3.6    CONTAINMENT BASES Page TRM / B 3.6-1                                        07/26/2001 Page TRM / B 3.6-2                                        02/01/1999 Page B 3.6-3                                              08/31/1998 Page TRM / B 3.6-4                                        03/27/2008 Page TRM / B 3.6-5                                        04/04/2007 Page TRM / B 3.6-6                                        12/03/2004 Pages TRM / B.3.6-7 through TRM / B 3.6-11                12/31/2002 B 3.7    PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2                                 08/31/1998 Page TRM/IB 3.7-3                                        06/10/2010 Page TRM / B 3.7-3a                                      12/27/2007 Page TRM / B 3.7-4                                        03/31/2006 Page TRM / B 3.7-5                                        08/02/1999 Page TRM / B 3.7-6                                        03/3"1/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a                    08/02/1999 Page TRM / B 3.7-8                                        O5/2 9/2013 Page TRM / B 3.7-9                                        04/11/2014 Page TRM / B 3.7-10                                      08/02/1999 Page TRM / B 3.7-I0a                                      03/31/2006 Page TRM / B 3.7-11                                      08/02/1999 Page TRM / B 3.7-11a                                      03/31/2006 Pages TRM / B 3.7-12 and TRM / B 3.7-13                  08/02/1999 Pages TRM / B 3.7-14 and TRM / B 3.7-14a                  09/25/20 12 EFFECTIVE DATE 11/04/2015 SUSQUEHANNA SUSQUEHANNA-UNIT1
                - UNIT I              TRM // LOES-7 TRM    LOES-7      EFFECTIVE DATE 11/04/2015


S SSES UNIT 1 CYCLE 19 3,6 0o C
SUSQUEHANNA STEAM ELECTRIC STATION                                      Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
  -i-       3.4 z
Section Title                                                        Effective Date Page TRM / B 3.7-14b                                        11/24/2011 Pages TRM / B 3.7-15 and TRM I B 3.7-16                    0210111999 Pages B 3.7-17 through B 3.7-20                            08/31/1998 Page TRM I B 3.7-21                                        05/29/2013 Pages TRM / B 3.7-21a through TRM / B 3.7-21d              05/24/2012 Pages TRM / B 3.7-21e through TRM / B 3.7-21g              05/29/2013 Page TRM / B 3.7-22 and TRM / B 3.7-23                      01/30/2008 Page TRM / B 3.7-24                                        10/05/2006 Page TRM / B 3.7-25                                        01/21/2014 Pages TRM / B 3.7-26 through TRM / B 3.7-28                10/05/2006 Pages TRM / B 3.7-29 and TRM I B 3.7-30                    06/07/2007 Page TRM / B 3.7-30a                                        10/05/2006 Page TRM / B 3.7-30b                                        01/21/2014 Page TRM / B 3.7-31                                        11/30/2011 Page TRM / B 3.7-32                                        03/09/2001 Page TRM / B 3.7-33                                        04/15/2003 Page TRM / B 3.7-34                                        12/03/2004 Page TRM / B 3.7-35                                        07/05/2000 Pages TRM / B 3.7-36 through TRM / B 3.7-39                04/01/2009 Page TRM / B 3.7-40                                        04/08/2010 ELECTRICAL POWER BASES B 3.8 Page TRM / B 3.8-1                                          04/02/2002 Page TRM / B 3.8-2                                         01/28/2005 Page TRM / B 3.8-2a                                        03/01/2010 Page TRM / B 3.8-3                                          04/02/2002 Page TRM / B 3.8-3a                                        04/02/2002 Page TRM / B 3.8-4                                         09/03/2004 Page TRM / B 3.8-4a                                        04/02/2002 Page B 3.8-5                                                08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-15                  04/02/2002 Page TRM / B 3.8-16                                        11/07/2013 Page TRM / B 3.8-17                                        11/30/2011 Pages TRM / B 3.8-17a and TRM / B 3.8-17b                  11/30/2011 Pages TRM / B 3.8-18 through TRM / B 3.8-20                05/29/2013 Pages TRM / B 3.8-21 and TRM I B 3.8-22                    05/28/2009 Page TRM I B 3.8-23                                        05/29/2013 Page TRM / B 3.8-24                                        05/28/2009 B.3.9    REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7                              08/31/1998 TRM  / LOES-8        EFFECTIVE DATE 11/04/2015 SUSQUEHANNA - UNIT UNIT 1I            TRM / LOES-8          EFFECTIVE DATE 11/04/2015
z        3.2 z
3.0 2.8 E
0.
2.6
-*1 2.4 k*                                                                                                                        *0 0-C, 2.2 2.0 rri "11 1.8 m
1.6 m
1.4 r'ri                                                                                                            110 30             40            50            60              70              80          90  100 Total Core Flow (MLB/HR)
C 0*                                            MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW                            o ,-n ONE TSV OR TCV CLOSED*
cj                                                    SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-10                                o~
1'r%-h*
* Operation with one TSV or TCV closed is only supported at power levels -<75% rated power.


0 oi)
SUSQUEHANNA STEAM ELECTRIC STATION                                          Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MAN UAL)
SSES UNIT 1 CYCLE 19 4.6I                                                                                                                                    I    I                  I 4.4                                                                    LEGEND m
Section      Title                                                        Effective Date B 3.10        MISCELLANEOUS BASES Page B 3.10-1                                             08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3                    03/22/2006 Pages TRM / B 3.10-4 and TRM / B 3.10-5                    08/23/1999 Page TRM / B 3.10-6                                        03/27/2008 B 3.11        RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9                            08/30/1998 Page TRM / B 3.11-10                                      02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.1 1-11a                    04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13                      02/01/1999 Page TRM /B 3.11-14                                        12/03/2004 Page TRM / B3.11-15                                        02/01/1999 Pages B 3.11-16 through B 3.1 1-19                         08/30/1998 Page TRM / B 3.11-20                                      04/02/2002 Page TRM / B 3.1 1-20a                                    04/02/2002 Page TRM /B 3.11-21                                        05/13/2005 Pages TRM / B 3.11-22 and TRM / B 3.11-23                  11/14/2006 Pages TRM / B 3.1 1-23a and TRM / B 3.1 1-23b              06/18/2013 Pages TRM / B 3.11-24 and TRM / B 3.11-25                  01/21/2004 Pages B 3.11-26 and B 3.11-27                              08/30/1998 Page TRM / B3.11-28                                        11/30/2005 Page TRM / B 3.11-29                                      02/19/2015 Pages TRM / B3.1 1-30 and TRM / B 3.11-31                  05/29/2013 Page TRM /B 3.11-32                                        08/30/1 998 Page TRM / B 3.11-33                                      06/30/2010 Pages B 3.11-34 and B 3.11-35                              08/30/1998 Page TRM / B 3.11-36                                      02/12/1999 B.3.12        LOADS CONTROL PROGRAM BASES Page TRM / B3.12-1                                        09/19/2007 Page TRM / B 3.12-2                                        11/29/2010 Page TRM / B 3.12-3                                        02/05/1999 TRM1 text LOES 11/4/2015 SUSQUEHANNA - UNIT 1                      TRM / LOES-9          SUSQEHANA UNT I RM LOS-9EFFECTIVE DATE 11/04/2015
4.2      ______                                                                        CURVE *: MAXIMUM ALLOWABLE AVERAGE SCRAM z                                                                                                                        INSERTION TIME z          4.0                                                                                      CURVE E3: REALISTIC AVERAGE SCRAM INSERTION TIME C
z              23 .61            23,3.7                                                            CURVE c.: CORE                  POWER < 26% AND CORE FLOW < 50 MLBM/HR 3.6
                                                                "* 26, 3.56-"
C......SAFETY                                                                                          ANALYSES ASSUMEtt      THAT FOUR BYPASS VALVES t 3.4                              26,C    3.33                                                                                ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.2
                            --                                                   ___________USED                                                                              IN DETERMINING MFLCPR 3.0 C,i CJ1 2.8 CD 0) 2.6
___      _    _ __      _      _      _    __        _    _    _      _6,19 2.4 2.2            _________                6.01, 2.40_____                                                                                          _________          -     519 2.0 n
                          .-.
1.8 1.6 m
1.4 20                                    30                                            40                            50                60                  70            80 Core Power (%RATED)
                                                                                                                                                                                                                          -0    7ci MCPR OPERATING LIMIT VERSUS CORE POWER                                                              w"I-ONE TSV OR TCV CLOSED 01 SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-11                                                 0)'
* i jq L. . ... *....... . . .....    .    ...        .  . .......... . . .. .......... ........ T.. .. ............. .... ...... * * * * * ... ... .... -:-.!
                                                                                                                                                            ..                                            ... .=


Rev. 16                                   PL-NF-14-OO1 Rev. 2 Page 58 of 62 9.0  POWERI/FLOW MAP 9.1 Technical Specification Reference Technical Specification 3.3.1.1 9.2 Description Monitor reactor conditions to maintain THERMAL POWER / core flow outside of Stability Regions I and II of the Power/IFlow map, Figure 9.1.
Core Operating Limits Report (COLR)
Ifthe OPRM Instrumentation is OPERABLE per TS 3.3.1.1, Region I of the Power! Flow map is considered an immediate exit region.
Rev. 16                                                                                     3.2.1 3.2    Core Operating Limits Report (COLR) 3.2.1     Core Operating Limits Report (COLR)
If the OPRM Instrumentation is inoperable perT"S 3.3.1.1, Region I of the Power!
TRO 3.2.1       The Core Operating Limits specified in the attached COLR shall be met.
Flow map is considered an immediate sca      region.
APPLI(CABILITY:      SPecified in the referenced Technical Specifications.
Region Ilof the Power!/Flow map is considered an immediate exit region regardless of the operability of the OPRM Instrumentation.
ACTIONS CONDITION                        REQUIRED ACTION                COMPLETION TIME" A. Core Operating Limits not      A,1   Perform action(s) described        Specified in met.                                 in referenced Technical            referenced Specification.                      Technical Specifications.
SUSQUEHANNA UNIT1                 TRM/3.2-59           SUSQEHANA NITTR/3.-59 DATE 11104/2015 EFFECTIVE
TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE                                        FREQUENCY
                  ------ NOTE-.......... .............         ..               N/A No associated Surveillances. Surveillances are implemented in the applicable Technical Specificatiorns.
SUSQUEHANNA-UNIT1                       TRM / 3.2-1           SUSQEHANA
                                                                    -UNI 1 TM/32-1EFFECTIVE DATE 0710711999


Rev. 16                                     PL-NF-14-O01 Rev. 2 Page 59 of 62 120 Purpose:
Rev. 16               PL-NF-14-001 Rev. 2 Page "i of 62 Susquehanna SES Unit I Cycle 19 CORE OPERATING LIMITS REPORT Nuclear Fuels Engineering September 2015 SUSQUEHANNA UNIT1    TRM!3.2-2 SUSQEHANA UNT I RM/32-2EFFECTIVE DATE 11/0412015
* 120 110*
InitialI/Date: "        I 1100 100 9o.                                                                                          90 80 70 L.
60 0
fi-50 40 If 30 201 10
                                                                                      -H-I-I-4--]l- 0*-
0        10      20      30    40      50    50    70    80    90        100      110 Total Core Flow (Mlbmlhr)
(for SLO <75% Pump Speed Use Form GO-100-009-2)
Figure 9.1 SSES Unit 1 Cycle 19 Power/IFlow Map SUSQUEHANNA UNIT 1                            TRM/3.2-60            SUSQEHANA NITTR/3.-60 DATE 11104/2015 EFFECTIVE


Rev. 16                                   PL-NF-14-001 Rev. 2 Page 60 of 62 10.0 OPRM SETPOINTS 10.1 Technical Specification Reference Technical Specification 3.3.1.1 10.2 Description Setpoints for the OPRM Instrumentation are established that will reliably detect and suppress anticipated stability related power oscillations while providing a high degree of confidence that the MCPR Safety limit is not violated. The setpoints are described in Section 2.0 and are fisted below:
Rev. 16                                 PL-NF-14-001 Rev. 2 Page 2 of 62 CORE OPERATING LIMITS REPORT REVISION DESCRiPTiON INDEX Rev. Affected                                                          ,
SF      =      1.11 Np =      15 Fp =      60OMlbm /hr SUSQUEHANNA UNIT !                  TRM/3.2-61                  UNT SUSQEHANA      DATE 11/04/20 15 I RM/32-61EFFECTIVE
No. Sections                            Description/Purpose of Revision 0     ALL          Issuance of this COLR is in support of Unit I Cycle 19 operation.
 
1     ALL          New COLR required due to Power/Flow Map revision.
Rev. 16                                 PL-NF-14-001 Rev. 2 Page 61 of 82
2     ALL          New COLR required for the inclusion of operating limits regarding a Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) closure event.
~J.                   J FORM NFP-QA-008-2, Rev. 1 SUSQUEHANNA UNIT 1                    TRM/3.2-3            TRM/.2-3EFFECTIVE DATE 11/04/2015
 
Rev. 16                                                 PL-NF-14-00i Rev. 2 Page 3 of 62 SUSQUEHANNA STEAM ELECTRIC STATION Unit I Cycle 19 CORE OPERATING LIMITS REPORT Table of Contents
 
==1.0  INTRODUCTION==
............................................................................ 4 2.0  DEFINITIONS................................................................................6 3.0  SHUTDOWN MARGIN ....................................................................... 6 4.0  AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR).................. 7 6.0  MINIMUM CRITICAL POWER RATIO (MCPR)............................................ 9 6.0  LINEAR HEAT GENERATION RATE (LHGR) ......................................                    .......      27 7.0  ROD BLOCK MONITOR (RBM) SETPOINTS AND OPERABILITY REQUIREMENTS ............................................................................ 38 8.0  RECIRCULATION LOOPS - SINGLE LOOP OPERATION............................... 40 9.0  POWER I FLOW MAP ..............................................                :......................... 58 10.0 OPRM SETPOINTS.......................................................................... 60


==11.0 REFERENCES==
==11.0 REFERENCES==
................        ................................................................ 61 SUSQUEHANNA UNIT 1                TRM/3.2-4                  SUSQEHANA NITTR/3..-4DATE 11/04/2015 EFFECTIVE


11.1 The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
Rev. 16                                PL-NF-14-0O1 Rev. 2 Page 4 of 62 1.0  iNTRODUCTION This CORE OPERATING LIMITS REPORT for Susquehanna Unit t Cycle 19 is prepared in accordance with the requirements of Susquehanna Unit 1, Technical Specification 5.6.5. As required by Technical Specifications 5.6.5, core shutdown margin, the core operating limits, RBM setpoints, and OPRM setpoints presented herein were developed using NRC-approved methods and are established such that all applicable limits of the plant safety analysis are met.
: 1. XN-NF-81-58(P)(A), Revision 2 and Supplements I and 2, "RQDEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model," Exxon Nuclear Company, March 1984.
SUSQUEHANNA UNIT 1                    TRM/3.2-5                UNT I RM/32-5 SUSQEHANA EFFECTIVE   DATE 11/04/2015
: 2. EMF-2361 (P)(A), Revision 0, "EXEM BWR-2000 ECCS Evaluation Model,"
Framatome ANP, May 2001.
: 3. EMF-2292(P)(A), Revision 0, "ATRlUMW-10: Appendix K Spray Heat Transfer Coefficients," Siemens Power Corporation, September 2000.
: 4. XN-NF-84-105(P)(A), Volume 1 and Volume I Supplements 1 and 2, lJXCOBRA-T: A Computer Code for BWR Transient Thermal-Hydraulic Core Analysis," Exxon Nuclear Company, February 1987.
: 5. XN-NF-80-19(P)(A), Volume 1 and Supplements I and 2, "Exxon Nuclear Methodology for Boiling Water Reactors: Neutronic Methods for Design and Analysis," Exxon Nuclear Company, March 1983.
: 6. XN-NF-80-19(P)(A), Volumes 2, 2A, 2B, and 2C "Exxon Nuclear Methodology for Boiling Water Reactors: EXEM BWR ECCS Evaluation Model, t' Exxon Nuclear Company, September 1982.
: 7. XN-NF-80-19(P)(A), Volume 3 Revision 2 "Exxon Nuclear Methodology for Boiling Water Reactors Thermex: Thermal Limits Methodology Summary Description," Exxon Nuclear Company, January 1987.
: 8. XN-NF-80-1 9(P)(A), Volume 4, Revision 1, "Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads," Exxon Nuclear Company, June 1986.
: 9. XN-NF-85-67(P)(A), Revision 1, "Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel," Exxon Nuclear Company, Inc.,
September 1986.
: 10. ANF-524(P)(A), Revision 2 and Supplements 1 and 2, "Advanced Nuclear Fuels Corporation Critical Power Methodology for Boiling Water Reactors1 "
November 1990.
: 11. NE-092-001A, Revision 1, "Licensing Topical Report for Power Uprate With increased Core Flow," Pennsylvania Power & Light Company, December 1992 and NRC SER (November 30, 1993).
: 12. ANF-89-98(P)(A) Revision 1 and Supplement 1, "Generic Mechanical Design Criteria for BWR Fuel Designs," Advanced Nuclear Fuels Corporation, May 1995.
SUSQUEHANNA UNiT1                    TRM/3.2-62            EFFECTIVE DATE 11/04/2015


Rev. 16                                    PL-NF-14-001 Rev. 2 Page 62 of 62
Rev. 16                                    PL-NF- 14-001 Rev. 2 Page 5 of 62 2.0  DEFINiTIONS Terms used in this COLR but not defined in Section 1.0 of the Technical Specifications or Section 1.1 of the Technical Requirements Manual are provided below.
: 13. EMF-22O9(P)(A), Revision 3, "SPCB Critical Power Correlation," AREVA NP, September 2009.
2.1    The AVERAGE PLANAR EXPOSURE at a specified height shall be equal to the total energy produced per unit length at the specified height divided by the total initial weight of uranium per unit length at that height.
: 14. EMF-85-74(P)(A), Revision 0, Supplement 1(P)(A) and Supplement 2(P)(A),
2.2     The PELLET EXPOSURE shall be equal to the total energy produced per unit length of fuel rod at the specified height divided by the total initial weight of uranium per unit length of that rod at that height.
            "RQDEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model,"
2.3    FDLRX is the ratio of the maximum LHGR calculated by the core monitoring system for each fuel bundle divided by the LHGR limit for the applicable fuel bundle type.
Siemens Power Corporation, February 1998.
2.4     LHGRFACT is a multiplier applied to the LHGR limit when operating at less than 108 Mlbm/hr core flow. The LHGRFAC1 multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from core flows less than 108 Mlbmlhr.
: 15. EMF-2168(P)(A), Revision 0, "Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASMO-4/Microburn-B2," Siemens Power Corporation, October 1999.
2.5    LHGRFACp is a multiplier applied to the LHGR limit when operating at less than RATED THERMAL POWER. The LHGRFACp multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from partial power conditions.
: 16. EMF-CC-074(P)(A), Volume 4, Revision 0, "BWR Stability Analysis -
2.6    MFLCPR is the ratio of the applicable MCPR operating limit for the applicable fuel bundle type divided by the MCPR calculated by the core monitoring system for each fuel bundle.
Assessment of STAiF with Input from MICROBURN-B2," Siemens Power Corporation, August 2000.
2.7    MAPRAT is the ratio of the maximum APLHGR calculated by the core monitoring system for each fuel bundle divided by the APLGHR limit for the applicable fuel bundle type.
: 17. NEDO-32465-A, "BWROG Reactor Core Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications," August 1996.
2.8    OPRM is the Oscillation Power Range Monitor. The Oscillation Power Range Monitor (OPRM) will reliably detect and suppress anticipated stability related power oscillations while providing a high degree of confidence that the MCPR safety limit is not violated.
: 18. ANF-913(P)(A), Volume t Revision I and Volume I Supplements 2, 3, and 4, "COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses," Advanced Nuclear Fuels Corporation, August 1990.
2.9    Np is the OPRM setpoint for the number of consecutive confirmations of oscillation half-cycles that will be considered evidence of a stability related power oscillation.
: 19. ANF-1 358(P)(A), Revision 3, "The Loss of Feedwater Heating Transient in Boiling Water Reactors," Framatome ANP, September 2005.
2.10    Sp is the OPRM trip setpoint for the peak to average OPRM signal.
SUSQUEHANNA UNIT1                TRM/3.2-63          SUSQEHANA EFFECTIVE NITTR/3.-63 DATE 11/04/2015
2.11    Fp is the core flow, in Mlbm I hr, below which the OPRM RPS trip is activated.
SUSQUEHANNA UNIT 1                      TRM/3.2-6          SLJSUEHNNAUNITI EFFECTIVE TMI32-6 DATE 111/0412015


Main Turbine Overspeed Protection System Rev. 2                                                                                   3.3.7 3.3    Instrumentation 3.3.7    Main Turbine Overspeed Protection System TRO 3.3.7      One Main Turbine Overspeed Protection System shall be OPERABLE.
Rev. 16                                    PL-NF-1 4-001 Rev. 2 Page 6 of 62 3.0  SHUTDOWN MARGIN 3.1  Technical Specification Reference Technical Specification 3.1.1 3.2  Description The SHUTDOWN MARGIN shall be equal to or greater than:
APPLICABILITY:          MODES I and 2 ACTIONS CONDITION                        REQUIRED ACTION              COMPLETION TIME A. Two of eight stop valves      A.1.1 Close one of the inoperable      72 hours and control valves                  valves.
a)    0.38% Ak/k with the highest worth rod analytically determined OR b)  0.28% Ak/k with the highest worth rod determined by test Since core reactivity will vary during the cycle as a function of fuel depletion and poison burnup, Beginning of Cycle (BOG) SHUTDOWN MARGIN (SDM) tests must also account for changes in core reactivty during the cycle. Therefore, the SUM measured at BOC must be equal to or greater than the applicable requirement from either 3.2.a or 3.2.b plus an adder, "R". The adder, "R", is the difference between the calculated value of maximum core reactivity (that is, minimum 8DM) during the operating cycle and the calculated BOG core reactivity. If the value of "R" is zero (that is, BOG is the most reactivepoint in the cycle) no correction to the BOG measured value is required.
inoperable.
The SHUTDOWN MARGIN limits provided in 3.2a and 3.2b are applicable in MODES 1, 2, 3, 4, and 5. This includes core shuffling.
AND A.1 .2 Limit THERMAL POWER            12 hours following
SUSQUEHANNA UNIT t                  TRM/3.2-7              SUSQEHANA UNTI RM/32-7 EFFECTIVE    DATE 11104/2015
                                        < 75% RTP.                      closure of the inoperable valve AND A.1.3 Apply the following limits for a 12 hours following closed Turbine Stop Valve or    closure of the Turbine Control Valve as        inoperable valve specified in the COLR:
: a. LCO 3.2.2, 'MINIMUM CRITICAL POWER RATIO (MCPR),"
: b. LCO 3.2.3, 'LINEAR HEAT GENERATION RATE (LHGR)."
OR A.2    Isolate main turbine from the  72 hours steam supply.
(continued)
SUSQUEHANNA-UNIT1                    TRM / 3.3-17            SUSQEHANA-UITITRM 3.-17EFFECTIVE DATE 11/04/2015


Main Turbine Overspeed Protection System Rev. 2                                                                                   3.3.7 ACTIONS (continued)
Rev. 16                              PL-NF-14-O01 Rev. 2 Page?7 of 62 4.0  AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) 4.1  Technical Specification Reference Technical Specification 3.2.1 4.2  Description The APLHGRs for ATRIUMT'-10 fuel shall not exceed the limit shown in Figure 4.2-1.
CONDITION                      REQUIRED ACTION                  COMPLETION TIME B. Two of twelve intercept      B.1   Close either the intercept          72 hours valves and intermediate            valve or the intermediate stop stop valves inoperable,            valve within one of the affected combined intermediate valves.
The APLHGR limits in Figure 4.2-1 are valid for Main Turbine Bypass Operable
OR 8.2   Isolate main turbine from the      72 hours steam supply.
        *and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Two Loop operation. The APLHGR limits for Single Loop operation are provided in Section 8.0.
C. Turbine Overspeed            C.1  Isolate main turbine from the      6 hours Protection System                  steam supply.
SUSQUEHANNA UNIT 1                TRM/3.2-8          SUSQEHANA UNT I RM/32-8 EFFECTIVE    DATE 11/04/20 15
inoperable for reasons other than Condition A or B.
SUSQUEHANNA-UNIT1                  TRM / 3.3-17a            SUSQEHANA
                                                                  -UNI I RM DATE 11/04/2015 I3.317aEFFECTIVE


Main Turbine Overspeed Protection System Rev. 2                                                                                              3.3.7 TECHNICAL REQUIREMENT SURVEILLANCE
9!
                        -------------            ~NOTE----              --------
02 SSES UNIT I CYCLE 19 C
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed up to 6 hours provided the redundant overspeed trip device is OPERABLE.
        *16.0 C                  , 1111 a    a       I      IIl
SURVEILLANCE                                              FREQUENCY
                                                          , I                1, I ,      1          111III Ia' II1 1,1                                                ,      ,    I.   .     III .                 .       la
                          --       NOTE--..........----......
                                                                                                                                                                                                                          .         .               ma
The provisions of TRS 3.0.4 are not applicable TRS 3.3.7.1   Cycle each high pressure turbine control valve from the              92 days running position and observe valve closure.
                                                                                                                                                                                                                                                      .a rn                1    1    1a                    I      I        a        aIn                                    1    I II 4                                i      i    i  i      i          l    l      i  ___ 1    1    1        1      a 11__
                        -- -- NOTE--...............................
.--               I    1    I    I      I      I      I        I          I    I      I      I    I    K    I      I      2                            iI      * - 1
The provisions of TRS 3.0.4 are not applicable TRS 3.3.7.2    Cycle each low pressure turbine combined intermediate                92 days valve from the running position and observe valve closure.
* 1I
                         ------...................
* l  O          = .                           I      2 z
NOTE---------------------.....
z        1[4.0       I  1 K I 1 II        I            I I I-- I4 j a I --t-1                          . t. I I--1I-         . I    l
The provisions of TRS 3.0.4 are not applicable TRS 3.3.7.3   Cycle each high pressure turbine stop valves from the                92 days running position and observe valve closure.
                                                                                                                      .. l 2lI            IlIIl
TRS 3.3.7.4   Perform a CHANNEL CALIBRATION of main turbine                        24 months overspeed protection instrumentation.
                                                                                                                                                .. ...................           l
TRS 3.3.7.5   Disassemble one of each type valve identified in                     40 months on a TRS 3.3.7.1, TRS 3.3.7.2, and TRS 3.3.7.3, perform a                  STAGGERED TEST visual and surface inspection of valve seats, disks and              BASIS stems and verify no unacceptable flaws or corrosion.
                                                                                                                                                                                    . . . . . . . . ' 4. i. . . .
SUSQUEHANNA-UNIT1                              TRM / 3.3-18               SUSQEHANA UNT I RM3.-18EFFECTIVE DATE 10/31/2007
I          a    al    U    I      I  I        I C
 
                                    ,IIII2,                ,K,2,*,*,t*IaI*I
Main Turbine Overspeed Protection System Rev. 2                                                                                      B 3.3.7 B 3.3.7 Main Turbine Overspeed Protection System BASES TRO              The Main Turbine Overspeed Protection System is designed to protect the main turbine from excessive overspeed by initiating a turbine trip by fast closure of the turbine control valves and closure of the intercept valves to essentially secure all steam flow to the turbine (Ref. 1).
                                                                              ;!      IIlIt                                        I      i   i l
To protect the turbine generator from overspeed conditions, two trip devices are provided. Either device, when initiated, will close the main stop valves, control valves, and combined intermediate valves thus isolating the turbine (Ref. 2).
i                      a  a      a          a                    a      t II i      mi I      i I  2      II!                                                      i    i                         1      i    i          I 12.0          12 5 I00 a          . a: .*              5 0 ,1              .   .                                 : .....       ..   ..             I              I                        1...                     I    ..     .2..       .   ..
These two trip devices are as follows:
i    ~i            i                                          ll              I                                            i              i      iai                aii              i I    I I            II                              1 I              Il                                                        l              i        l          l            l            l              l
                *A    mechanical overspeed trip which is initiated ifthe turbine speed reaches approximately 10% above rated speed, and o    An electrical overspeed trip which serves as a backup to the mechanical trip and is initiated at approximately 12% above rated speed.
                          /    1    /1      1      11                                                                      l      l1Il        l1/                                                      I
OPERABILITY of at least I of the 2 overspeed protection systems is required for the Turbine Overspeed Protection System to be considered OPERABLE.
                . .     1I  .1                                                              ._          ,   ,      .             .         I.     I      .I      I          !
Main Turbine Overspeed Protection System (MTOPS) OPERABILITY is also based upon the ability of the valves that control steam flow to the turbine to close following the receipt of a closure signal. The 4 stop valves, 4 control valves, 6 intermediate stop valves, and 6 intercept valves make up a system of 20 valves. A single failure to any one of the above system of 20 valves will not prevent a turbine trip (Ref. 2). Hence, if 19 of the 20 noted valves are OPERABLE, the MTOPS is OPERABLE. Note that for this statement to be true, the intermediate stop valves and intercept valves are considered separate valves. Overspeed protection is only disabled on a CIV failure if both valves within a CIV are inoperable. Failure of only one valve in a CIV does not prevent an overspeed trip, and does not affect operability. Actions to close one inoperable valve if two valves are inoperable maintain the unit within the analysis in Ref. 2. However, redundancy is reduced and repairs should be completed in accordance with the corrective action program.
II
Excessive turbine overspeed could generate potentially damaging missiles that could present a personnel and equipment hazard. MTOPS is not necessary to provide adequate protection of the public health and safety and is not required to obviate the possibility of an abnormal situation or event giving rise to an immediate threat to the public health and safety.
                                                                                                                                                                                                                                                    /
(continued)
I      I      I      I II        ii          iIa    i    i            i          i              i    i            1nIi   1   a1 1        0I                I i        iI      iI  1      iI      i      iI    i 11                                                            liii !1                     1*11I11111I1                                                                  .1               1111I                                    1                  ,<
SUSQUEHANNA - UNIT 1                   TRM / B 3.3-14           SUSQEHANA
i    1  i i            i              i        i          i            iai      a                i1I a    .     .     .       .       .     .       I          I    a      a        a                      a        a*,,. a    a               .a.a.a.a.a.a.a                                                                                          0)
                                                                      -UNI I TM
* I                IIaIaI                                                      IaI      IaIaI                  aI                al      IaI    a          Ia                                        l      l
                                                                              /BDATE 3.-14EFFECTIVE 06/25/2002
    '-I
 
                                            ., ., ,*!        .                                                   !
Main Turbine Overspeed Protection System Rev. 2                                                                                    B 3.3.7 B 3.3.7 Main Turbine Overspeed Protection System BASES (continued)
* I         I aI a     ,," ,a a                                         l                            I              a I          I1la.lal Il laimla.!
ACTIONS          The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.
a      m I        I        ~          ~            a         a         a                   i l          l',I    al I.           II                  l .a. "*        a
A.1.l, A.1.2, A.1.3 and A.2 If two of eight stop valves and control valves are inoperable, action must be taken to restore at least one of the valves to OPERABLE status in 72 hours.
                                                                                                              **        I3l            lllam K    a     a    "        *a--a-- *    *:    II            ' Il i    iii l      liIa          1 a      i' a        l a    l a1    1a1        1        a1    a          g        all              1      1        1   11I           a        aI  aI      I    II          a      a    n      a          ai        i        a  a      a              Ia a    I
This action ensures steam isolation to the turbine in the event of an overspeed condition, and maintains the unit within the bounds of the FSAR analysis. The 72-hour Completion Time provides a reasonable time to troubleshoot the problem, make repairs, and reduce power in an orderly manner if required without challenging plant systems. The required action if the problem is not resolved is to close one of the inoperable valves, or to isolate the main turbine from the steam supply. If one of the inoperable valves is closed, then limit thermal power to less than or equal to 75% of rated power, and apply Minimum Critical Power Ratio (MCPR) and Linear Heat Generation Rate (LHGR) limits as specified in the COLR within 12 hours. Restricting thermal power to less than or equal to 75% of rated power eliminates possible shock loads to the turbine blades that could occur from a non-uniform circumferential steam flow distribution entering the HP turbine for this configuration. If the MCPR and LHGR limits are not in compliance with the applicable requirements at the end of this period, the ACTIONS required by the applicable specifications must be implemented.
-I',
This time is provided to stabilize operation with a closed Turbine Stop Valve or Turbine Control Valve.
"-1                I I I            I        I!                                                                                                          l                l                  Ii..               a                      ~
B.1 and B.2 If two of twelve intercept valves and intermediate stop valves are inoperable, action must be taken to restore at least one of these valves to OPERABLE status in 72 hours. This action ensures steam isolation to the turbine in the event of an overspeed condition. The 72-hour Completion Time provides a reasonable time to troubleshoot the problem, make repairs, and reduce power in an orderly manner ifrequired without challenging plant systems.
Cn-,                                aI /a ia                              li1 aII                                  alal a_
The required action ifthe problem is not resolved is to close either the intercept valve or the intermediate stop valve within one of the affected combined intermediate valves, or to isolate the main turbine from the steam supply.
a a
(continued)
aal a                iI__la1a1a1a1a1a l
SUSQUEHANNA-UNIT1                  TRM / B 3.3-14a             SUSQEHANA-NITI TR
i
                                                                            / 3.314aEFFECTIVE DATE 11/04/2015
                                                                                                                                                                                                                .*~* _L __*.
I                  a a
                                                                                                                                                                                                                                                          .J aL2 tI 6.0                      la              la      aal      la
                                                                      ,    , , ,*H , ,
aal                      aal I    I              ,           I      ,                   I                    I        I.1._      3                                -
.-t
-- I mr        4.0 0                        10000                                      20000                          30000                            40000 Average Planar Exposure (MWDIMTU) 50000                                                                              60000                            70000 0
                                                                                                                                                                                                                                                                      -*    ,r-SI)
AVERAGE            AVERAGE  PLANAR             LINEAREXPOSURE PLANAR            HEAT GENERATION RATE LIMIT VERSUS
                                                                                                                                                    -TWO LOOP OPERATION                                                                                              Coz ATRIUMTM-10 FUEL                                                                                                                              C:'(D7 FIGURE 4.2-1


Main Turbine Overspeed Protection System Rev. 2                                                                                   B 3.3.7 B 3.3.7 Main Turbine Overspeed Protection System BASES ACTIONS          C.1 (continued)
Rev. 18                                PL-NF-14-001 Rev. 2 Page 9 of 62 5.0 .MINIMUM CRITICAL POWER RATIO (MCPR) 5.1  Technical Specification Reference Technical Specification 3.2.2, 3.3.4.1, 3.7.6, and 3.7.8 5.2  Technical Requirements Manual Reference Technical Requirements Manual 3.3.7 5.3  Description The MOPR limit is specified as a function of core power, core flow, average scram insertion time per Section 5.3 and plant equipment operability status. The MCPR limits for all fuel types (ATRIUM TM-1O) shall be the greater of the Flow-Dependent or the Power-Dependent MOPR, depending on the applicable equipment operability status.
If the MTOPS is inoperable for reasons other than conditions A or B, then action must be taken to isolate the main turbine from the steam supply.
a)  Main Turbine Bypass I EOO-RPT I Backup Pressure Regulator Operable Figure 5.2-1: Flow-Dependent MCPR value determined from BOO to EDOC Figure 5.2-2: Power-Dependent MOPR value determined from BOO to EGOC b)  Main Turbine Bypass lnoperable Figure 6.2-3: Flow-Dependent MCPR value determined from BOO to EDOC Figure 5.2-4: Power-Dependent MOPR value determined from BOO to EGOC c)  EOC-RPT Inoperable Figure 5.2-5: Flow-Dependent MCPR value determined from BOO to EOC Figure 5.2-6: Power-Dependent MCPR value determined from BOG to EOO d)   Backup Pressure Regulator Inoperable Figure 5.2-7: Flow-Dependent MCPR value determined from BOO to EDOC Figure 5.2-8: Power Dependent MCPR value determined from BOG to EDOC e)  One Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 5.2-0: Flow-Dependent MCPR value determined from BOO to EGG Figure 5.2-1 O:Power-Dependent MCPR value determined from BOO to EDO SUSQUEHANNA UNIT 1                 TRM/3.2-10            SUSQEHANA UITTRM3.2I EFFECTIVE    0DATE 11/04/2015
6 hours allows a reasonable amount of time to complete the plant shutdown associated with isolating the main turbine from the steam supply.
TRS              The TRSs are performed at the specified Frequency to ensure that the turbine overspeed protection function is maintained OPERABLE.
The TRSs are modified by a Note to indicate that when a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the redundant overspeed trip device is OPERABLE. Upon completion of the Surveillance, or expiration of the 6 hour allowance, the channel must be returned to OPERABLE status or the applicable Condition entered and Required Actions taken. This Note is based on the average time required to perform channel Surveillance. The 6 hour testing allowance does not significantly reduce the probability that the Main Turbine Overspeed Protection System will function when necessary.
TRS 3.3.7.1, TRS 3.3.7.2, and TRS 3.3.7.3 Verification of the movement of each of the four high pressure turbine control valves, six low pressure turbine combined intermediate valves (composed of 6 intermediate stop valves and 6 intercept valves), and four high pressure turbine stop valves ensures the OPERABILITY of each valve and that it will be able to close in the event of a turbine trip condition. The 92 day Frequency is based upon current surveillance practice as recommended by the turbine vendor and described in the FSAR (Ref. 3).
(continued)
SUSQUEHANNA - UNIT 1               TRM / B 3.3-14b              SUSQEHANA-NIT TRM/
B3.314bEFFECTIVE DATE 11/04/2015


Main Turbine Overspeed Protection System Rev. 2                                                                                     B 3.3.7 B 3.3.7 Main Turbine Overspeed Protection System BASES TRS              TRS 3.3.7.4 (continued)
Rev. 16                                  PL-NF-1 4-001 Rev. 2 Page 10 of 62 The MCPR limits in Figures 5.2-1 through 5.2-10 are valid for Two Loop operation.
This TRS is for the performance of a CHANNEL CALIBRATION of the required main turbine overspeed protection instrumentation. The calibration is a complete check of the instrument channel from the sensing device to main turbine trip initiation. The Frequency of 24 months is a typical refueling cycle and considers channel reliability.
The MCPR limits for Single Loop operation are provided in Section 8.0.
TRS 3.3.7.5 The disassembly and inspection of the valves referenced ensures that abnormal wear is not occurring which could result in the valves inability to close upon receipt of a close signal. The Frequency is such that only one of each type valve (i.e., high pressure turbine stop; high pressure turbine control; and low pressure turbine combined intermediate), is required to be inspected within a 40 month period. If unacceptable flaws or excessive corrosion are found in a valve, all valves of its type are inspected (Ref. 3).
5.4 Averauqe Scram Time Fraction Ifthe average measured scram times are greater than the Realistic Scram times listed in Table 5.3-1 then the MCPR operating limits corresponding to the Maximum Allowable Average Scram Insertion Time must be implemented. Determining MCPR operating limits based on interpolation between scram insertion times is not permitted. The evaluation of scram insertion time data, as it relates to the attached table should be performed per Reactor Engineering procedures.
Valve bushings are inspected and cleaned, and bore diameters are checked for proper clearance.
SUSQUEHANNA UNIT1                 TRM/3.2-11          SUSQEHANA UITTRM3.21 EFFECTIVE    IDATE 11104/2015
REFERENCES      1. FSAR Section 7.7:1.5
: 2. FSAR Section 10.2.2.6.
: 3. FSAR Section 10.2.3.6.
SUSQUEHANNA-UNIT1                   TRM / B 3.3-14c            SUSQEHANA
                                                                      -UNITI TR
                                                                              / 3.314cEFFECTIVE DATE 11/04/2015


Nov. 11, 2015 Page      1    of  2 MANIJAL HARD COPY DISTRIBUTION DOCUMENT TRANMSMITTAL 2015-45734 USER INFORMATION:
Rev. i6                      PL-NF-14-O01 Rev. 2 Page Iiof 62 Main Turbine Bypass I EOC-RPT I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 1 TRM/3.2-12     NITTR/32I 2DATE 1110412015 EFFECTIVE SUSQEHANA
GERLACH*ROSEY N          EMPL#:028401  CA#:  0363 Address: NUCSA2 Phone#:  254-3194 TRANSMITTAL INFORMATION:
TO:      GERLACH*ROSEY N      11/11/2015 LOCATION:    USNRC FROM:    NUCLEAR RECORDS DOCUMENT CONTROL CENTER  (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED
.
TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MNAL.         TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents,    Therefore no TOC will be issued with the updated material.
TRMI  - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS     DATE: 11/03/2015 ADD      MANUAL TABLE OF CONTENTS  DATE: 11/10/2015 CATEGORY:  DOCUMENTS  TYPE: TRM1 4oc2


Nov. 11, 2015 Page      2   of  2 ID:  TEXT 3.2.1 REMOVE:    REV:15 ADD:    REV:  16 CATEGORY:  DOCUMENTS  TYPE: TEMI ID:  TEXT 3.3.7 REMOVE:     REV:1 ADD:    REV:  2 CATEGORY:  DOCUMENTS  TYPE: TRMI ID:  TEXT B3.3.7 REMOVE:    REV:I1 ADD:    REV:  2 CATEGORY:   DOCUMENTS  TYPE: TRMI ID:  TEXT LOES REMOVE:    REV: 83 ADD:    REV: 84 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED,   CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.     FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
C' SSES UNIT 1 CYCLE 19 C                  2.2 c,
2,1 z
z 2.0 z
1.9
                                                ._E 1.8 1.7 CD k*        0.
CA        0o     1.6                                                                                                                                                                                                                            <)
1.5 m                1.4 Ill C)
H                1.3 rn ci              1.2 H                        30                          40                              50                            60                          70                        80                    90          100                  110 Total Core Flow (MLBIHR)
                                                                                                                                                                                                                                                                              -o      "o n,      I Ill                                                                                                                                                                                                                                    (.Q0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS 1 EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-1                                                                                    * -< 0
. . .. . . . .. .... . .. ..... ......   .... .... .. . ... ... . . . . .. . . . . .. . . .... . .. ........ ,... .. .. .. .. . .. .. ,,,,,.. .. .. . .  . . . ...  ... .. 1...  .. . . . .. . .. . .... ... . .. . . .. . . . .. . I J . .. .... .  ,J , , =. .. ... .


SSES MNUALm Manual Name:z  TRM1 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date:          1LI/I10/2 015 Procedure Name                    Rev  Issue Date        Change ID      Change Numiber TEXT LOES                          84   11/10 /2 015 Title: LIST OF EF:FECTIVE SECTIONS TEXT TOC                          25  04/28/2015 Title: TABLE OF CONTENTS TEXT 1.1                          1    01/31/2014 Title: USE AND APPLICATION DEFINITIONS TEXT 2.1                          2    04/28/2015 Title: PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2                          10  01/31/2014 Title: PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0                           5    03/05/2015 Title: TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY & SURVEILLANCE  (TRS)
cj SSES UNIT 1 CYCLE 19 0
APPLICABILITY TEXT 3.1.1                        1   11/09/2007 Title: REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2                        0   11/18/2002 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE  (CRD) HOUSING SUPPORT TEXT 3.1.3                        5   04/16/2009 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4                        0    11/18/2002 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS  INSTRUMENTATION  &
z z
CHECK VALVE TEXT 3.2.1                          16  11/10/2015 Title: CORE OPERATING LIMITS REPORT  (COLR)
C z
Report Date:  11/11/15 Pagel Page !      of of  i~
1J H   0.
16                                                        Report Date: 11/11/15
0 m
0 20 30        40          50          60          70      80        90 100 Core Power (% RATED)
                                                                                      "13   -O
                                                                                    *,      I-MCPR OPERATING LIMIT VERSUS CORE POWER 0"          MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE TWO LOOP OPERATION (BOO TO EOC)                       (3 "
n Ii --.
FIGURE 5.2-2


SSES MANUAL Manual Name:        TRMI Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1                        0    11/18/2002 Title: INSTRUMENTATION RADIATION MONITORING   INSTRUMENTATION TEXT 3.3.2                        3    03/31/2011 Title: INSTRUMENTATION  SEISMIC MONITORING  INSTRUMENTATION TEXT 3.3.3                        2     11/09/2007 Title: INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4                        8    10/14/2015 Title:  INSTRUMENTATION TRN POST-ACCIDENT MONITORING INSTRUMENTATION LDCN          4552 TEXT 3.3.5                        0     11/18/2002 Title: INSTRUMENTATION THIS PAGE INTENTIONALLY    LEFT BLANK TEXT 3.3.6                        4    04/29/2014 Title: INSTRUMENTATION  TRN ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7                        2    11/10/2015 Title: INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8                        1     10/22/2003 Title: INSTRUMENTATION TEN RPS INSTRUMENTATION TEXT 3.3.9                        3    04/17/2008 Title: OPEN INSTRUMENTATION CONFIGURATION TEXT 3.3.10                      1    12/14/2004 Title: INSTRUMENTATION  REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11                      1    10/22/2003 Title: INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12                      1    03/05/2015 Title: WATER MONITORING INSTRUMENTATION Report Date: 11/11/15 Page 2      of of  16 I__66                                                    Report Date: 11/11/15
Rev. 16                  PL-NF- 14-001 Rev. 2 Page 14 of 62 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT1   TRM/3.2-15     UITTRM3.2l EFFECTIVE SUSQEHANA 5DATE 1 1/04/2015


                                                ~SES MANTJAIJ Manual Namue:      TRMI Manual Title: TECHNICAL REQUIREMENTS      MANUAL UNIT 1 TEXT 3.4.1                            1      04/26/2006 Title: REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2                          1      04/16/2009 Title:    REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3                            1      11/09/2007 Title:    REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4                          2      04/17/2008 Title:    REACTOR COOLANT SYSTEM REACTOR RECIRCULATION  FLOW AND ROD LINE LIMIT TEXT 3.4.5                          1      04/26/2006 Title:    REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6                          2      04/25/2013 Title:    REACTOR RECIRCULATION  SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1                          1      02/04/2005 Title: EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2                           1      11/09/2007 Title: EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3                          0      11/18/2002 Title: EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1                            0      11/18/2002 Title:    CONTAINMENT VENTING  OR  PURGING TEXT 3.6.2                           2      04/29/2014 Title: SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3                            0      11/18/2002 Title:    CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Report Date: 11/11/15 Page Page~*        of of  16 i_*6                                                        Report Date: 11/11/15
0 SSES UNIT 1 CYCLE 19 2.2 03 C


SSES MANUJAL Manual Name :     TE*I 21:Manual Title:    TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6.4                            0     11/18/2002 Titles CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1                           0    11/18/2002 Title: PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM      (ESW) SHUTDOWN TEXT 3.7.2                            0    11/18/2002 Title: PLANT SYSTEMS ULTIMATE HEAT SINK (UHS)    AND GROUND WATER LEVEL TEXT 3.7.3.1                         2    04/16/2009 Title: PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2                         3    04/16/2009 Title: PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3                        3    04/16/2009 Title:*  PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4                         2    04/16/2009 Title : PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5                        2    04/16/2009 Title :  PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6                        2     04/16/2009 Title :  PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7                        1    04/26/2006 Title :  PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8                        10   09/27/2012 Title:. PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4                           1    04/26/2006 Title: PLANT SYSTEMS SOLID RADWASTE SYSTEM Report Date: 11/11/15 Page Page A4      of of  16 16
===2.1 LEGENDA===
MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME
                                        -CURVE CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME z
C      2.0 z
-1 1.9                                      I                INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 1.8 H.     '1.7 0J o-01 1,6 1.5
-I"I    1.4
---            I EEENCE:_T.S. 3.7.6 and 3.2.2        ___________                                __________
        '1.3 m
Hr iii    1.2 30        40            50            60              70          80C          I0            100 110 Total Gore Flow (MLB/H-R)
--t                                                                                                                  "D   "
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS INOPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-3                                       ,.-4 <
Q)"*
0


SSES   MUANTAI
CI, SSES UNIT 1 CYCLE 19 C      3.6 Ci, C
. IManual Title: TECHNICAL REQUIREMVENTS MANUAL UNIT 1 Manual Name:  TRJi1I TEXT 3.7.5.1                      1    03/05/2015 Title: PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2                      0    11/18/2002 Titleg PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3                      1    04/26/2006 Title: PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6                       3    06/04/2012 Title: PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7                        2    09/05/2008 Titles PLANT SYSTEMS MAIM CONDENSER 0FFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING TEXT 3.7.8                        5    03/05/2015 Title: PLANT SYSTEMS SNUBBERS TEXT 3.7.9                      2     01/31/2014 Title: PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10                      1    12/14/2004 Title: PLANT SYSTEMS SPENT FUEL STORAGE POOLS  (SFSPS)
mR c
TEXT 3.7o11                      0     04/16/2009 Title: STRUCTURAL  INTEGRITY TEXT 3.8.1                      2    04/05/2010 Title: ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1                    2    11/09/2007 Title: ELECTRICAL POWER MOTOR OPERATED VALVES  (MOV) THERMAL OVERLOAD PROTECTI( ON  -.
Z
CONTINUOUS TEXT 3.8.2.2                     2    12/14/2004 Title: ELECTRICAL POWER MOTOR OPERATED VALVES  (MOV) THERMAL OVERLOAD PROTECTICON -
-t
AUTOMATIC Report Date:    11/11/15 Page 5 Page        of of  16 16                                                        Report Date: 11/11/15
     .E_
-H 0
                                                                          $o O.
-.4
-11 "51 m
z3
-H
<m Fi 20 30 40      50          60          70      80 90 100 Core Power (% RATED)
(73                                                                  -U 51 MCPR OPERATING LIMIT VERSUS CORE POWER          CD CD-
                      *MAIN TURBINE BYPASS INOPERABLE                     Z TWO LOOP OPERATION (BOC to EOC)                   77 FIGURE 5.2-4                      -- h 0)


SSES MANUAL Manual Name:*      TRNI SManual Title:      TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3                            2     03/05/2015 Title   : ELECTRICAL POWER DIESEL GENERATOR CDG) MAINTENANCE ACTIVITIES TEXT 3.8.4                            0      11/18/2002 Title:*  ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5                            1      11/14/2013 Title : ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6                            1      12/08/2011 Title : ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7                            1      06/15/2009 Title:    BATTERY MAINTENANCE AND MONITORING PROGRALM TEXT 3.9.1                            0      11/18/2002 Title:    REFUELING OPERATIONS  DECAY TIME TEXT 3.9.2                           0      11/18/2002 Title:    REFUELING OPERATIONS  COMMUNICATIONS TEXT 3.9.3                            0      11/18/2002 Title:    REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1                          1      04/26/2006 Title:    MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2                          2      08/08/2006 Title: MISCELLANEOUS    SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3                          2      06/15/2010 Title:    MISCELLANEOUS  INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
Rev. 16                  PL-NF-14-001 Rev. 2 Page 17 of 62 EOC-RPT Inoperable SUSQUEHANNA UNIT 1   TRM/3,2-18 SUSQEHANA UITTRM3.2I EFFECTIVE 8DATE 11/04/2015
TEXT 3.10.4                          2      04/17/2008 Title:    MISCELLANEOUS LEADING EDGE FLOW METER    (LEFM)
Report Date: 11/11/15 Page *6 Page          of of  16 16                                                        Report Date: 11/11/15


SSES MANUJAL
CD SSES UNIT 1 CYCLE 19 2.2 03 LEGEND C
**    Manual Name:      TRN1
m        2.1                                             CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM
      - Manual Title:      TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.1                       1      04/26/2006 Title:   RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2                         1      04/26/2006 Title: RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3                        1      04/26/2006 Title: RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT        SYSTEM TEXT 3.11.1.4                         2      10109/2012 Title:    RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING      INSTRUMENTATION TEXT 3.11.1.5                        3     03/05/2015 Title:    RADIOACTIVE EFFLUENTS RADIOACTIVE    LIQUID PROCESS MONITORING INSTRUTMENTATION
=
    ... TEXT 3.11.2.1                         3      04/26/2006 Title:    RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2                         1     04/26/2006 Title: RADIOACTIVE EFFLUENTS DOSE      -  NOBLE GASES TEXT 3.11.2.3                        1     04/26/2006 Title: RADIOACTIVE EFFLUENTS DOSE      -  IODINE,  TRITIUM,  AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4                        0     11/18/2002 Title: RADIOACTIVE EFFLUENTS GASEOUS RAD WASTE TREATMENT SYSTEM TEXT 3.11.2.5                        4      07/03/2013 Title:    RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT      SYSTEM TEXT 3.11.2.6                        5      04/28/2015 Title:    RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION ac*    TEXT 3.11.3                          1 Title: RADIOACTIVE EFFLUENTS TOTAL DOSE 04/26/2006 Report Date:  11/11/15 Page *:i~      of of  16 I_66                                                          Report Date:  11/11/15
INSERTION TIME 2.0                                            CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME C
z 1.9                          4.                 SAFETY* ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2
-H  E                                                            I            I          IJ 1.8 L.
USED INDETER[MIN1NG MFLCPR I
-4.     1.7 0.
C0 o                                                                                                                CD 1.6                                                                                                            -3.
C) 1.5
-rr     1.4


SSES MANUAL Manual Name :     TRMI Manual Title: TECHNICAL REQUIREMENTS      MANUAL UNIT 1 TEXT 3.11.4.1                        5      03/05 /2015 Title:    RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2                        2      04/26 /2006 Title:    RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3                      1     04/26/2006 Title:    RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1                         0      11/19/2002 Title:    LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2                        4      04/17 /2008 Title:    LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3                         0      11/19/2002                                        0 Title: LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4.1                           0      08/31/1998 Title: ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2                           0      08/31/1998 Title: ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3                            0      08/31/1998 Title: ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4                            1      12/18/2008 Title: ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5                             0     08/31/1998 Title: ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6                            0      08/31/1998 Title: ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM 16Reprt                                                          Dte:11/1/1 Page8.a Page          of  16                                                        Report Date: 11/11/15
==REFERENCE:==
T.S. 3.3.4.1 and 3.2.2
--Il
<r m        1.3 m
1.2 30        40              50          60            70            80        90            100  110 U                                                      Total Core Flow (MLBIHR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW EOC-RPT INOPERABLE                                        *QcD TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-5                                               0""


SSES MANUJAL
ci SSES UNIT 1 CYCLE 19 C
. 1-- Manual Name: TECHNICAL Manual Title:  TRMI      REQUIREMENTS MANUAL UNIT 1 TEXT 4.7                          0     08/31/1998 Title: ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0                         5      03/05/2015 Title: APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION    (TRO)    APPLICABILITY TEXT B3.1.1                        2      04/29/2014 Title: REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2                        0      11/19/2002 Title: REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE   (CRD)  HOUSING SUPPORT TEXT B3.1.3                        3      03/31/2006 Title: REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4                        0      11/19/2002 Title: REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMU/LATORS      INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1                        0      11/19/2002 Title: CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT      (COLR)
I z
TEXT B3.3.1                       1      01/31/2014 Title: INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2                       2      03/31/2011 Title: INSTRUMENTATION  BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3                        3      12/18/2008 Title: INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4                        5      10/14/2015 Title: INSTRUMENTATION BASES TEN POST ACCIDENT MONITORING  (PAM)  INSTRUMENTATION
z z
. TEXT B3.3.5                        2      11/09/2007 Title: INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK Page        of  16                                                            Report Date: 11/11/15
E 0
(D 0
C) m n-I 0
H m
0 50          60                    90 H*   20 30 40          Core Power (% RATED) 70    80   100 n-MCPR OPERATING LIMIT VERSUS CORE POWER            *(D  Z EOC-RPT INOPERABLE TWO LOOP OPERATION (BOC to EQO)             O-"    -1 FIGURE 5.2-8                      (O1*--


9--I    *o        0--*D*d ST/TT/TT  :~~c1 ~od~a                                                                              ~T ;o              ~T  9.~2d sTZLVWH~*  THSS*HA HO&DVH S*Sva WNHJS2XS          d NWIOOD HO1DVZH *IL*
Rev. 16                      PL-NF-14-0O1 Rev. 2 Page 20 of 62 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 1   TRM/3.2-21    NIT TR/3.-21 DATE 11/04/2015 EFFECTIVE SUSQEHANA
Z00Z/6T/TT              0                              S'9"[H J&X~H JLIWlI ZIlI UOH QNT    MO'EA NOllvqIflHIDZa HOJ*DV*        S*SVE NHLSAS LN-'IOOD HOLD*'d :eYZ; Z00Z/6T/TT              0                              9""H&H HOLINOW *D'f>VI-'  HDV*aHJI aH~nSS*H      MO'I/HDIH S*SVH        *SXS INWIOOD          [ODV'H*I xE
* LOOZ/60/TT              T
* hI~f00o      :xa:si*
VZD M A*IEIDJNI   I-*-hLDflHLS      SHSva NacISLS 600Z/9T/90              T
                                                                                        ~LNTWEOODT'O&deg;DV      6 H      XTJ 2AJSIW*H3 NILSXS LN'IOOD HOLDOWN S*SVH W2.SAS Z00Z/6T/Tt              0 NOI1*N*WflHLSNI      DNIHOllINO      aH*NM        9!ZTI 600Z/9T/90              0                            ZTE"E*      HTX.*,T N01N~WfldJSNI NOIlWIosI JAW
                                                &#xa3;00Z/ZZ/0T              T SaSvH NOILVNHXflaLSNI :eT;*.
0T''&#xa3;H LXHL SJOIS LNS OW JNflJ NOI~VqlDOHIDHa HOLD*aH 010*/60/80              &#xa3; WOIL*N*WaaJSNI      WIHdO :9*;t*
800Z/LT/90              &#xa3; 6"V&#xa3;H c*Xai NOIJNLN*rHLSNI      (Saa) wka&sXS NOILD*O&~d HOJ*Dv*Ha TaJ*
                                                &#xa3;00*I/*IOT              T WkLS2S NOI DHLO'HJ    *HJSHAO      ~HNIEHf1L  NIVW SZSVH NOIJNN[IWnaL*SNI              S*IW*
NOI*LN*TIflqHSNI  NOIl*fDY      NOILVqosI WIHL S*S*a        NOILVN        &LOHSNJ      *!I1J&
9TOZ/T&#xa3;/T0 TI ,,INfl    I~fl*  S,,*ZHf0*        rI\DINHD.&,T    :*~            y        I~r
                                          ~IVL1NVW S~S~


SSES   MATJi*
SSES UNIT 1 CYCLE 19 Cn      2.2 LEGEND m
* Manual Name:      TRMI
2.1            _____________                    -CURVE        A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME z
    =iManual Title: TECHNICAL REQUIREM'cENTS MANUAL UNIT 1 TEXT B3.4.6                        2     04/25/2013 Title: REACTOR RECIRCULATION SINGLE LOOP OPERATION  SLO FLOW RATE RESTRICTION TEXT B3.5.1                        0     11/19/2002 Title: ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2                        1     11/09/2007 Title: ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3                        1    11/09/2007 Title: ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1                       0    11/19/2002 Title: CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2                        0    11/19/2002 Title: CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL  VACUUM BREAKER POSITION INDICATION TEXT B3.6.3                        2     04/17/2008 Title: CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3o6.4                        1     12/14/2004 Title: CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1                        0    11/19/2002 Title: PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM    (SHUTDOWN)
C      2.0             ________                          -CURVE        B: REALISTIC AVERAGE SCRAM INSERTION TIME z
TEXT B3.7.2                        0     11/19/2002 Title: PLANT SYSTEMS BASES ULTIMATE HEAT SINK  (UHS)  GROUND WATER LEVEL TEXT B3.7.3.1                     3     06/15/2010 Title: PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM
1.9              _______        _______          -      SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 1.8 I-1.7 r*o 0 A     BI
* TEXT B3.7.3.2                    2      04/26/2006 W.      Title: PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 1_1    of  i__66                                                        Report Date: 11/11/15
: 10.                                                                                                                               0, 1.6 1.5 m
"1      1.4 rri 0             


SSES    MANUAL Manual Name:       TRMI SManual Title*        TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.3                          0    11/19/2002 Title:* PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4                          3    04/29/2014 Title:*  PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5                          1     04/26/2006 Title :  PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6                          1     04/26/2006 Title : PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7                          0    11/19/2002 Title : PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES STEXT B3.7.3.8                            3     09/27/2012 Title: PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3 7.4                            0     11/19/2002 Title : PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1                          0     11/19/2002 Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2                         0     11/19/2002 Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3                          0     11/19/2002 Title : PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6                            4    06/04/2013 Title : PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION
==IREFERENCE:==
  . TEXT B3.7.7                            2    01/31/2008
TS. 3.7.8 and 3.2.2~
    ...-  Title :  PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Report Date: 11/11/15 Page 1/2 Page    12      of of  16 16                                                        Report Date: 11/11/15
1.3                           I-~            {                4            1      ~~-f 108, 1.221 m      1.2 30          40          50              60              70            80        90          100      110 Total Core Flow (MVLB/HR)
                                                                                                                              "-D     "-
0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE                                                "'.)
0 o',                                                TWO LOOP OPERATION (BOC TO EQO)
FIGURE 5.2-7                                                  "*' <c 0 0)"


SSES MANTJAI~
SSES UNIT I CYCLE 19 60 C
Manual Name :      TPR41 Manual Title:     TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.8                          4      01/31/2 014 Title:    PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9                          2      12/08/2011 Title :  PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10                          1      12/14/2004 Title :  PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11                          1      04/14/2010 Title:    STRUCTURAL INTEGRITY TEXT B3.8.1                          2      03/10/2010 Title:    ELECTRICAL POWER BASES  PRIMARY  CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1                        0       11/19/2002 Title:    ELECTRICAL POWER BASES MOTOR OPERATED VALVES      (MOV) THERMAL OVERLOAD PROTECTION  -
z 0,
CONTINUOUS TEXT B3.8.2.2                        1      09/17/2004 Title:    ELECTRICAL POWER BASES MOTOR OPERATED VALVES      (MOV) THERMAL OVERLOAD PROTECTION  -
     .2
AUTOMATIC TEXT B3.8.3                          0       11/19/2002 Title:    ELECTRICAL POWER BASES DIESEL GENERATOR    (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4                          0      11/19/2002 Title:    ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5                          1      11/14/2013 Title:    ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6                          2      12/08/2011 Title:    ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7                          2      06/04/2013 Title:    BATTERY MAINTENANCE AND MONITORING   PROGRAM Report Date:  11/11/15 Page i~
-Il CD C
Page  13      of of  ii 16                                                            Report Date:  11/11/15
                                                                            -3.
 
0)
S.~ES MM~AL
'i,,
  <?=Manual Name: TRMI
100,1.35 m
  "*Manual Titles&deg; TECHNICAL REQUIREMENTS MANUAL UNIT 1                                              0 TEXT B3.9.l                          0      11/19/2002 Title:    REFUELING OPERATIONS BASES DECAY TINE TEXT B3.9.2                          0      11/19/2002 Title:    REFUELING OPERATIONS BASES COMM4UNICATIONS TEXT B3.9.3                          0      11/19/2002 Title:    REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1                          0      11/19/2002 Title:    MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2                          1      03/31/2006 Title:   MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3                          0      11/19/2002 Title:    MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION  (ISFSI)
20 30 40       50          60 (% RATED) 70 Core Power                  80 90 100 o1                                                                    T1   T1
TEXT B3.10.4                          1      04/17/2 008 Title:    MISCELLANEOUS BASES LEADING EDGE FLOW METER  (LEFM)
-L
TEXT B3.ii.ioi                        0      11/19/2002 Title:    RADIOACTIVE  EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3ol.11Io2                      0      11/19/2002 Title:    RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.ii.i.3                        0      11/19/2002 Title:    RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT  SYSTEM TEXT B3.11.I.4                        0      11/19/2002 Title:    RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.I.5                       0      11/19/2002 Title:    RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION Report Date:  11/11/15 Page 14 Page  14        of of  ~i*                                                      Report Date:  11/11/15
                                                                      *Q2   Z~
 
MCPR OPERATING LIMIT VERSUS CORE POWER BACKUP PRESSURE REGULATOR INOPERABLE TWO LOOP OPERATION (BOO to EOC)
SSES    MANUJAI O Manual Name:          TRMI
FIGURE 5.2-8                          -,h . 0 0)'   ,C
... Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.11.2.1                  1      12/14/2004 Title: RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2                    0    11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES DOSE  - NOBLE GASES TEXT B3.11.2.3                    0    11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES DOSE  - IODINE, TRITIUM,  AND RADIONUCLIDES IN SPARTICULATES FORM TEXT B3.11.2.4                    0     11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5                  5      07/03/2013 Title: RADIOACTIVE EFFLUENTS BASES VENTILATION EXHqAUST  TREATMENT SYSTEM TEXT B3.11.2.6                  1      01/27/2004 Title: RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS   EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3                      0    11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1                  5      03/05/2015 Title: RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2                  0      11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3                  0      11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1                    1      10/04/2007 Title: LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2                    1      12/03/2010 Title: LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS Report Date:  11/11/15 Page i~.
15      of of    16 I__66                                                    Report Date: 11/11/15


SSES MANUJAL
Rev. 16                      PL-NE-14-001 Rev. 2 Page 23 of 62 One TSV. or TCV Closed SUSQUEHANNA UNIT 1 TRM/3.2-24 SUSQEHANA UIT ITR IS.-24 EFFECTIVE      DATE 11104/2015
*-   Manual Name:      TRN1
:*:Manual  Title:    TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3                        0. 11/19/2002 Title: LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Report Date: 11/11/15 Page 1616    of of    16 16                                              Report Date: 11/11/15


SUSQUEHANNA STEAM ELECTRIC STATION                                Rev. 64 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
SSES UNIT 1 CYCLE 19 2.2                                                                              I LEGEND 2,1                                                           CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 2.0                   _______
Section  Titl__ee                                                Effective Date TOC      TABLE OF CONTENTS                                          04/23/2015 1.0      USE AND APPLICATION Page TRM / 1.0-1                                      10/04/2002 Page TRM / 1.0-2                                      01/21/2014 Page TRM / 1.0-3                                      10/04/2002 2.0      PLANT PROGRAMS Page TRM / 2.0-1                                     04/23/2015 Pages TRM / 2.0-2 and TRM / 2.0-3                     01/28/2005 Page TRM / 2.0-4                                      06/25/2002 Page TRM / 2.0-5                                     01/21/2014 Page TRM / 2.0-6                                      03/27/2008 Page TRM / 2.0-7                                     05/15/2008 Pages TRM / 2.0-8 and TRM / 2.0-9                    01/07/2011 Page TRM / 2.0-10                                    02/02/2010 Page TRM / 2.0-11                                    11/15/2004 Page TRM / 2.0- 12                                    03/27/2008 Pages TRM / 2.0-13 and TRM / 2.0-1*                  11/15/2004 Page TRM / 2.0-15                                    11/15/2005 3.0 PI"I"LI*.jp?.DILI I I Pages TRM / 3.0-1 and                                02/19/2015 Page TRM / 3.0-3                                      03/15/2002 Page TRM / 3.0-4                                      02/19/2015 REACTIVITY CON 3.1 Page TRM / 3.*                                        10/3112007 Pages TRM              an                            08/31/1998 Pages 3.                5                             08/31/1998 Page TR                                              03/22/2006 04/07/2009 03/27/2008 3.1-9 and TRM / 3.1,9a              02/18/1999
_______                      -CURVE        B: REALISTIC AVERAGE SCRAM INSERTION TIME
                              .1-10                              02/18/1999 3.2 iERATING LIMITS REPORT                        07/07/1999 Pages TRM / 3.2-2 through TRM / 3.2-63                11/04/2015 3.3      INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3                07/16/1999 Page TRM / 3.3-4 and TRM / 3.3-5                      10/31/2007 Page TRM / 3.3-6                                    03/10/2011 SUSQUEHANNA-UNIT1                        TRM / LOES-1 SUSQEHANA UNT I RM LOS-1EFFECTIVE DATE 11/04/2015
-r" 1.9 130, 1.831                                              SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES NJ                                          I                                    ARE OPERABLE PER SR 3.7.5.1 AND 3.7.6.2 U'  .4-1.8
                                          *_                                        USED IN DETERMINING MFLCPR E2 1.7 C., 1.6                                                                                                                      CD 1.5 m
-I-1     1.4 m


SUSQUEHANNA STEAM ELECTRIC STATION                                Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
==REFERENCE:==
Section  Title                                                  Effective Date Page TRM / 3.3-7                                      10/31/2007 Page TRM / 3.3-8                                      08/31/1998 Page TRM / 3.3-9                                      10/07/2015 Page T'RM / 3.3-9a                                    06/30/2010 Page TRM / 3.3-10                                      10/31/2007 Page TRM /3.3-11                                      10/07/2015 Page TRM / 3.3-11a                                    10/07/2015 Page TRM I 3.3-12                                      03/30/2001 Page TRM / 3.3-13                                      01/07/2011 Page TRM / 3.3-14                                      12/1 4/1 998 Page TRM / 3.3-15,                                    04/11/2014 Page TRM I 3.3-16                                      01/07/2011 Page TRM / 3.3-17                                      11/04/2015 Page TRM / 3.3-17a                                    11/04/2015 Page TRM / 3.3-18                                      10/31/2007 Pages TRM / 3.3-19 through TRM / 3.3-21                10/22/2003 Page TRM / 3.3-22                                      03/27/2008 Page TRM / 3.3-22a                                    11/15/2004 Pages TRM / 3.3-22b through TRM / 3.3-22d              03/22/2006 Page TRM / 3.3-23                                      12/03/2004 Pages TRM / 3.3-24 and TRM I 3.3-25                    05/16/2003 Page, TRM / 3.3-26                                    10/22/2003 Page TRM / 3.3-27                                      02/19/2015 Page TRM / 3.3-28                                      04/07/2009 3.4     REACTOR COOLANT SYSTEM Page TRM / 3.4-1                                       03/31/2006 Pages TRM / 3.4-2 through TRM / 3.4-5                  10/23/11998 Pages TRM / 3.4-6 through TRM / 3.4-8                  04/01/2009 Page TRM / 3.4-9                                      08/31/1998 Page TRM / 3.4-10                                      10/31/2007 Page TRM / 3.4-11                                      08/31/1998 Page TRM / 3.4-12                                      03/27/2008 Page TRM / 3.4-13                                      03/31/2006 Pages TRM / 3.4-14 and TRM / 3.4-15                    04/25/2013 3.5     EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1                                      01/28/2005 Pages TRM / 3.5-2 and TRM / 3.5-3                      08/31/1998 Pages TRM / 3.5-4 and TRM / 3.5-5                      10/31/2007 Pages 3.5-6 and 3.5-7                                  08/31/1998 SUSQUEHANNA- UNIT 1                  TRM / LOES-2              LOS-2EFFECTIVE I RM UNT SUSQEHANADATE 11/04/2015
T.S. 3.2.2 and TRM 3.3.71 0
 
I-4 1.3
SUSQUEHANNA STEAM ELECTRIC STATION                                  Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
_ _  I           _  I_              _      _            _      _    _     _ _    _    _
Section  Title                                                    Effective Date 3.6      CONTAI NMENT Page 3.6-1                                              08/31/1998 Pages TRM / 3.6-2 and TRM I 3.6-2a                      04/16/2014 Page 3.6-3                                              08/31/1998 Page TRM / 3.6-4                                         01/07/2002 Page 3.6-5                                              08/31/1998 Pages TRM / 3.6-6 through TRM / 3.6-8                    12/31/2002 3.7      PLANT SYSTEMS Pages 3.7-1 through 3.7-3                                08/31/1998 Page TRM / 3.7-4                                        03/31/2006 Pages TRM / 3.7-5                                       04/07/2009 Pages TRM / 3.7-6 through TRM / 3.7-8                    08/02/1999 Pages TRM / 3.7-9 and TRM / 3.7-10                      04/07/2009 Page TRM / 3.7-11                                        12/29/1999 Page TRM / 3.7-12                                        08/02/1999 Page TRM / 3.7.13                                        04/07/2009 Page TRM / 3.7-14                                        08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16                      08/02/1999 Page TRM / 3.7-17                                        04/07/2009 Page TRM / 3.7-18                                        08/02/1999 Page TRM / 3.7-19                                        04/07/2009 Pages TRM / 3.7-20 through TRM / 3.7-22                  08/02/1999 Page TRM / 3.7-23                                        04/07/2 009 Page TRM / 3.7-24                                        03/31/2006 Page TRM / 3.7-25                                        08/02/1999 Page TRM / 3.7-26                                        09/25/2012 Page TRM / 3.7-27                                        11/24/2011 Pages TRM / 3.7-28 through TRM / 3.7-34a                09/25/2012 Page TRM / 3,7-35                                        03/31/2006 Pages TRM / 3.7-36 and TRM / 3.7-37                      02/01/1999 Page TRM / 3.7-38                                      02/19/2015 Page TRM / 3.7-39                                      08/31/1998 Page TRM / 3.7-40                                        03/31/2006 Page TRM / 3.7-41                                      05/24/2012 Pages TRM / 3.7-41a through TRM / 3.7-41c              05/24/2012 Page TRM / 3.7-42                                      09/04/2008 Page TRM / 3.7-43                                      08/31/1998 Page TRM / 3.7-44                                      02/19/2015 Pages TRM / 3.7-45 and TRM / 3.7-46                    10/05/2006 Page TRM / 3.7-47                                      06/07/2007 TRM / LOES-3    EFFECTIVE DATE 11/04/2015 SUSQUEHANNA-UNITI SUSQUEHANNA-UNIT1                    TRM / LOES-3    EFFECTIVE DATE 11/04/2015
1.2 m
30                40              50          60              70            80          90        100     110 Total Core Flow (MLBIHR) 0                                                MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW                                CD  Z N)
ONE TSV OR TCV CLOSED*
TWO LOOP OPERATION (BOC TO EOC)                                        - ,-<
FIGURE 5.2-9                                             0
                  *Operatofl with one TSV or TCV closed is only supported at power levels -<75%rated power.


SUSQUEHANNA STEAM ELECTRIC STATION                                Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
cj SSES UNIT 1 CYCLE 19 C
Section  Title                                                  Effective Date Page                                                  10/05/2006 Page TRM TRM II 3.7-48 3.7-49                                  06/07/2007 Pages TRM / 3.7-49a and TRM / 3.7-49b                10/05/2006 Page TRM / 3.7-50                                     01/21/2014 Page TRM / 3.7-51                                    08/16/2006 Page TRM / 3.7-52                                    12/03/2004 Page TRM / 3.7-53                                    04/15/2003 Page TRM / 3.7-54                                    07/29/1999 Pages TRM / 3.7-55 through TRM / 3.7-57               04/01/2009 3.8      ELECTRICAL POWER Page TRM / 3.8-1                                      04/02/2002 Page TRM / 3.8-2                                      01/28/2005 Pages TRM / 3.8-3 and TRM /3.8-4                      03/25/2010 Pages TRM / 3.8-5 and TRM / 3.8-6                    04/02/2002 Page TRM / 3.8-7                                      10/31/2007 Pages TRM / 3.8-8 through TRM / 3.8-10                12/03/2004 Page TRM /3.8-11                                      09/03/2004 Page TRM / 3.8-12                                    12/03/2004 Page TRM / 3.8-13                                    02/19/2015 Page TRM / 3.8-14                                    08/31/1998 Pages TRM / 3.8-15 through TRM / 3.8-17              04/02/2002 Page 3.8-18                                          08/31/1998 Page TRM / 3.8-19                                    04/02/2002 Page 3.8-20                                          08/31/1998 Pages TRM / 3.8-21 and TRM / 3.8-22                  06/06/1999 Page TRM / 3.8-23                                    11/07/2013 Pages TRM / 3.8-24 and TRM / 3.8-25                  11/30/2011 Page TRM / 3.8-26                                    05/28/2009 Page TRM / 3.8-27                                    11/29/2006 Pages TRM / 3.8-28 and TRM / 3.8-29                  05/28/2009 3.9      REFUELING OPERATIONS Pages 3.9-1 through 3.9-3                            08/31/1998 3.10    MISCELLANEOUS Page TRM / 3.10-1                                    03/31/2006 Pages TRM / 3.10-2 and TRM / 3.10-3                  08/31/1998 Page TRM / 3.10-4                                    08/01/2006 Pages TRM / 3.10-5 and TRM / 3.10-6                  03/22/2006 Page TRM / 3.10-7                                    06/10/2010 Page TRM / 3.10-8                                    03/27/2008 SUSQUEHANNA - UNIT 1                  TRM / LOES-4  SUSQEHANA UNT I RM LOS-4EFFECTIVE DATE 11/04/2015
m z
C z
S 0.-
-I 0m
*0 CD m
-n m
m C)
-9 20 30    40              50             60  70 80
                      *Core Power (% RATED)
MCPR OPERATING LIMIT VERSUS CORE POWER
                      *ONE TSV OR TCV CLOSED               Co  I TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-10


SUSQUEHANNA STEAM ELECTRIC STATION                                Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Rev. 16                            PL-NF-14-O01 Rev. 2 Page 26 of 62 Table 5.3-1 Average Scram Time Fraction Table For Use With Scram Time Dependent MCPR Operating Limits Control Rod              Average Scram Time to Position (seconds)
Section  Title                                                  Effective Date 3.11      RADIOACTIVE EFFLUENTS Page TRM / 3.11-1                                      03/31/2006 Pages TRM / 3.11-2 and TRM / 3.11-3                    08/31/1998 Page TRM / 3.11-4                                      03/31/2006 Page TRM / 3.11-5                                     08/31/1998 Page TRM / 3.11-6                                      03/31/2006 Pages TRM / 3.11-7 and TRM / 3.11-8                    08/31/1998 Pages TRM / 3.11-9 and TRM / 3.11-10                  10/09/2012 Pages TRM / 3.11-11 and TRM / 3.11-12                  08/31/1998 Page TRM /3.11-13                                      02/19/2015 Page TRM / 3.11-14                                    12/03/2004 Pages 3.11-15 and 3.11-16                              09/01/1998 Page TRM / 3.11-17                                    03/31/2006 Page 3.11-18                                          08/31/1998 Page TRM / 3.11-19                                    08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21                  03/31/2006 Page TRM / 3.11-22                                    04/02/2002 Page TRM / 3.11-23                                    11/14/2006 Page TRM / 3.11-24                                    06/18/2013 Page TRM / 3.11-25                                    04/12/2007 Pages TRM / 3.11-26 and TRM / 3.11-27                  01/21/2004 Page TRM /3.11-28                                      09/08/2009 Page TRM / 3.11-29                                    12/03/2004 Pages TRM / 3.11.30 and TRM / 3.11.31                  01/21/2004 Page TRM / 3.11.32                                    04/23/2015 Page TRM / 3.11-33                                    03/31/2006 Page TRM / 3.11-34                                    08/31/1998 Page TRM / 3.11-35                                    03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39              11/30/2005 Page TRM / 3.11-40                                    02/19/2015 Pages TRM / 3.11-41 through TRM / 3.11-43              08/31/1998 Page TRM / 3.11-44                                    08/01/2006 Page TRM / 3.11-45                                    03/31/2006 Page 3.11-46                                          08/31/1998 Page TRM / 3.11-47                                    03/31/2006 3.12      LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM /3.12-3                02/05/1999 Page TRM / 3.12-4                                      03/14/2008 Page TRM / 3.12-5                                      02/05/1999 4.0      ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-3                              08/31/1998 Page TRM / 4.0-4                                      12/11/2008 Pages 4.0-5 through 4.0-8                            08/31/1998 SUSQUEHANNA-UNIT1                    TRM/LOES-5      SUSQEHANA UNT I RM LOS-5EFFECTIVE DATE 11/04/2015
Position 45          0.470                                              0.520 39        0.630                                              0.860 25        1.500                                              1.910 5      -     oo70                                            3.440 Average Scram    Realistic                                          Maximum Insertion Time                                                      Allowable SUSQUEHANNA UNIT 1                SUQEAN NTITRM/3.2-27  EFFECTIVE DATE 11/0412015
 
: 1. .     . .1  I * ... A...   .   . - -- a L.~cgaa. . .. .. * .1 L. * -- . .*... ..&. aaau  I  1S  a. . .... aJ L&...aa......a..n.
SUSQUEHANNA STEAM ELECTRIC STATION                                      Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Rev. 16                                         PL-NF- 14-001 Rev. 2 Page 27 of 62 6.0     LINEAR HEAT GENERATION RA*TE (LHGR) 6.1          Technical Specification Reference Technical Specification 3.2.3, 3.3.4.1, 3.7.6, and 3.7.8 6.2           Technical Requirements Manual Reference Technical Requirements Manual 3.3.7 6.3           Description The maximum LHGR for ATRIUMTZ-I 0 fuel shall not exceed the LHGR limit determiined from Figure 6.2-1. The LHGR limit in Figure 6.2-1 is valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
Section  Title                                                        Effective Date B 3.0    APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3                  08/31/1998 Page TRM / B 3.0-4                                          02/19/2015 Page TRM / B 3.0-4a and TRM / B 3.0-4b                      02/19/2015 Page TRM / B 3.0-5                                         02/19/2015 Page TRM I B 3.0-6                                          08/31/1998 Page TRM I B 3.0-7                                          04/12/2007 Pages TRM / B 3.0-8 through TRM I B 3.0-10                  08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12                    03/15/2002 Pages TRM / B 3.0-13 through TRM / B 3.0-15                02/19/2015 B 3.1    REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1                                          07/13/1999 Page TRM / B 3.1-2                                          04/16/2014 Page TRM /B 3.1-3                                          10/31/2007 Page B 3.1-4                                                08/31/1998 Page TRM / B 3.1-5                                          11/15/2005 Pages TRM I B 3.1-6 and TRM / B 3.1-7                     03/22/2006 Page TRM / B 3.1-8                                         02/18/1999 B 3.2   CORE OPERATING LIMITS BASES Page B 3.2-1                                              08/31/1998 B 3.3    INSTRUMENTATION BASES Page TRM / B 3.3-1                                        01/21/2014 Page TRM / B 3.3-2                                        03/10/2011 Page TRM / B 3.3-2a                                        10/31/2007 Page TRM / B 3.3-3                                          12/11/2008 Page TRM / B 3.3-3a                                        10/31/2007 Page TRM / B 3.3-4                                        06/30/2010 Page TRM / B 3.3-5                                          10/07/2015 Page TRM I B 3:3-6                                         06/30/2010 Page TRM I B 3.3-7                                          10/07/2015 Page TRM / B. 3.3-8                                        06/30/2010 Page TRM I B 3.3-9                                          10/31./2007 Pages TRM / B 3.3-10 through TRM I B 3.3-12                01/07/2011 Page TRM / B 3.3-13                                        01/21/2014 Page TRM / B 3.3-14                                        06/25/2002 Page TRM / B 3.3-14a                                        11/04/2015 Page TRM I B 3.3-14b                                        11/04/2015 Page TRM / B 3.3-14c                                        11/04/2015 Pages TRM / B 3.3-15 and TRM I B 3.3-16                    10/22/2003 Page TRM / B 3.3-17                                        03/22/2006 Pages TRM / B 3.3-17a through TRM / B 3.3-17c              03/22/2006 Page TRM / B 3.3-17d                                        03/27/2008 TRM / LOES-6        EFFECTIVE DATE 11/04/2015 SUSQUEHANNA-UNITI SUSQUEHANNA - UNIT 1                 TRM / LOES-6        EFFECTIVE DATE 11/04/2015
To protect against both fuel centerline melting and cladding strain during anticipated system transients initiated from reduced power and flow conditions, power and flow dependent LHGR limit multipliers are provided in the following figures:
a)  Main Turbine Bypass Operable Figure 6.2-2: Flow-Dependent LHGR Uimit Multiplier Figure 6.2-3: Power-Dependent LHGR Limit Multipiier b)  Main Turbine Bypass Inoperable Figure 6.2-4: Flow-Dependent LHGR Limit Multiplier Figure 6.2-5: Power-Dependent LHGR Limit Multiplier c)  One Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 6.2-6: Flow-Dependent LHGR Limit Multiplier Figure 6.2-7: Power-Dependent LHGR Limit Multiplier
* The LHGR limits and LHGR limit multipliers in Figures 6.2-2 and 6.2-3 are applicable to EOC-RPT Operable and Inoperable and Backup Pressure Regulator Operable and Inoperable.
* The LGHR limits and LHGR limit multipliers in Figures 6.2-1 through 6.2-7 are valid for both Two Loop and Single Loop operation.
SUSQUEHANNA UNIT 1                               TRM/3.2-28              SUSQEHANA EFFECTIVE   NITTRI3.-28 DATE 11/04/2015


SUSQUEHANNA STEAM ELECTRIC STATION                                    Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
C,)
Section  Title                                                      Effective Date TRMI IBB3.3-19 Pages TRM / B 3.3-17e andTRM       3.3-17f               03/22/2006 Pages TRM / B 3.3-18 and                                  08/03/2010 Page TRM / B 3.3-20                                      10/22/2003 Page TRM / B 3.3-21                                      05/16/2003 Pages TRM / B 3.3-22 and TRM / B 3.3-23                  04/07/2009 B 3.4    REACTOR COOLANT SYSTEM BASES Page B 3.4-1                                              08/31/1998 Pages TRM / B 3.4-2 and TRM / B 3.4-3                    04/01/2009 Pages TRM 1 B 3.4-4 and TRM / B 3.4-4a                    10/31/2007 Page TRM / B 3.4-5                                        10/1 5/1 999 Page B 3.4-6                                              08/31/1998 Pages TRM / B 3.4-7 and TRM / B 3.4-8                    04/25/2013 B 3.5    ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2                                08/31/1998 Pages TRM / B 3.5-3 through TRM / B 3.5-5                10/31/2007 B 3.6    CONTAINMENT BASES Page TRM / B 3.6-1                                        07/26/2001 Page TRM / B 3.6-2                                        02/01/1999 Page B 3.6-3                                              08/31/1998 Page TRM / B 3.6-4                                        03/27/2008 Page TRM / B 3.6-5                                        04/04/2007 Page TRM / B 3.6-6                                        12/03/2004 Pages TRM / B.3.6-7 through TRM / B 3.6-11                12/31/2002 B 3.7    PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2                                08/31/1998 Page TRM/IB 3.7-3                                        06/10/2010 Page TRM / B 3.7-3a                                      12/27/2007 Page TRM / B 3.7-4                                        03/31/2006 Page TRM / B 3.7-5                                        08/02/1999 Page TRM / B 3.7-6                                        03/3"1/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a                    08/02/1999 Page TRM / B 3.7-8                                        O5/2 9/2013 Page TRM / B 3.7-9                                        04/11/2014 Page TRM / B 3.7-10                                      08/02/1999 Page TRM / B 3.7-I0a                                      03/31/2006 Page TRM / B 3.7-11                                      08/02/1999 Page TRM / B 3.7-11a                                      03/31/2006 Pages TRM / B 3.7-12 and TRM / B 3.7-13                  08/02/1999 Pages TRM / B 3.7-14 and TRM / B 3.7-14a                  09/25/20 12 EFFECTIVE DATE 11/04/2015 SUSQUEHANNA SUSQUEHANNA-UNIT1
SSES UNIT 1                                CYCLE 19 C        16.0 Ii                    Ii                                                        II ii                                                                                                                                                                  i iI ii ii a          ili a                      iI l Ii i                                                                !i Co                                                                                                                                                                                        a              a                  la a        a    l        la      l      a      l 0                a a
                - UNIT I              TRM // LOES-7 TRM    LOES-7      EFFECTIVE DATE 11/04/2015
a a
 
a a                                                I            I                                                                        I                    I El 11111                  '        I*            I I
SUSQUEHANNA STEAM ELECTRIC STATION                                      Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
C                                                                                      I              !
Section  Title                                                        Effective Date Page TRM / B 3.7-14b                                        11/24/2011 Pages TRM / B 3.7-15 and TRM I B 3.7-16                    0210111999 Pages B 3.7-17 through B 3.7-20                            08/31/1998 Page TRM I B 3.7-21                                        05/29/2013 Pages TRM / B 3.7-21a through TRM / B 3.7-21d              05/24/2012 Pages TRM / B 3.7-21e through TRM / B 3.7-21g              05/29/2013 Page TRM / B 3.7-22 and TRM / B 3.7-23                     01/30/2008 Page TRM / B 3.7-24                                        10/05/2006 Page TRM / B 3.7-25                                        01/21/2014 Pages TRM / B 3.7-26 through TRM / B 3.7-28                 10/05/2006 Pages TRM / B 3.7-29 and TRM I B 3.7-30                    06/07/2007 Page TRM / B 3.7-30a                                        10/05/2006 Page TRM / B 3.7-30b                                        01/21/2014 Page TRM / B 3.7-31                                        11/30/2011 Page TRM / B 3.7-32                                        03/09/2001 Page TRM / B 3.7-33                                        04/15/2003 Page TRM / B 3.7-34                                        12/03/2004 Page TRM / B 3.7-35                                        07/05/2000 Pages TRM / B 3.7-36 through TRM / B 3.7-39                04/01/2009 Page TRM / B 3.7-40                                        04/08/2010 ELECTRICAL POWER BASES B 3.8 Page TRM / B 3.8-1                                          04/02/2002 Page TRM / B 3.8-2                                          01/28/2005 Page TRM / B 3.8-2a                                        03/01/2010 Page TRM / B 3.8-3                                          04/02/2002 Page TRM / B 3.8-3a                                        04/02/2002 Page TRM / B 3.8-4                                          09/03/2004 Page TRM / B 3.8-4a                                        04/02/2002 Page B 3.8-5                                                08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-15                  04/02/2002 Page TRM / B 3.8-16                                        11/07/2013 Page TRM / B 3.8-17                                        11/30/2011 Pages TRM / B 3.8-17a and TRM / B 3.8-17b                   11/30/2011 Pages TRM / B 3.8-18 through TRM / B 3.8-20                05/29/2013 Pages TRM / B 3.8-21 and TRM I B 3.8-22                    05/28/2009 Page TRM I B 3.8-23                                        05/29/2013 Page TRM / B 3.8-24                                        05/28/2009 B.3.9   REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7                              08/31/1998 TRM  / LOES-8       EFFECTIVE DATE 11/04/2015 SUSQUEHANNA - UNIT
m                                                                  lala                                                                                  al                  ala        a       alalala                        alIlal                  al    a      la aa a a               a a              L      +/- Z        ....         L      1 - - .....t....J......-
                -
=                                                                                                                                                                                                                                                                    -
UNIT 1I            TRM / LOES-8          EFFECTIVE DATE 11/04/2015
z        '14.0          0.,3.---- f=--I--+ I 900                                                          ,-I--S-I--..
 
4                                    ..J-                             REFERENCE; T.S 3.2.3 z                  L- i- - - I              I I a a a. a . . a . .a . .a .                                                             .a .         I      &    a                    1          a    a        a a                                                                I a I a. I. ~ alala IaI-aI I I                     IaIaI l      aI                  IaI                  a    Ial          al                 l                        lalal                                            lala C
SUSQUEHANNA STEAM ELECTRIC STATION                                          Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MAN UAL)
a[
Section      Title                                                        Effective Date B 3.10       MISCELLANEOUS BASES Page B 3.10-1                                              08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3                    03/22/2006 Pages TRM / B 3.10-4 and TRM / B 3.10-5                    08/23/1999 Page TRM / B 3.10-6                                        03/27/2008 B 3.11        RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9                            08/30/1998 Page TRM / B 3.11-10                                      02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.1 1-11a                   04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13                      02/01/1999 Page TRM /B 3.11-14                                        12/03/2004 Page TRM / B3.11-15                                        02/01/1999 Pages B 3.11-16 through B 3.1 1-19                        08/30/1998 Page TRM / B 3.11-20                                      04/02/2002 Page TRM / B 3.1 1-20a                                    04/02/2002 Page TRM /B 3.11-21                                        05/13/2005 Pages TRM / B 3.11-22 and TRM / B 3.11-23                  11/14/2006 Pages TRM / B 3.1 1-23a and TRM / B 3.1 1-23b              06/18/2013 Pages TRM / B 3.11-24 and TRM / B 3.11-25                  01/21/2004 Pages B 3.11-26 and B 3.11-27                             08/30/1998 Page TRM / B3.11-28                                        11/30/2005 Page TRM / B 3.11-29                                      02/19/2015 Pages TRM / B3.1 1-30 and TRM / B 3.11-31                  05/29/2013 Page TRM /B 3.11-32                                        08/30/1 998 Page TRM / B 3.11-33                                      06/30/2010 Pages B 3.11-34 and B 3.11-35                              08/30/1998 Page TRM / B 3.11-36                                      02/12/1999 B.3.12        LOADS CONTROL PROGRAM BASES Page TRM / B3.12-1                                        09/19/2007 Page TRM / B 3.12-2                                        11/29/2010 Page TRM / B 3.12-3                                        02/05/1999 TRM1 text LOES 11/4/2015 SUSQUEHANNA - UNIT 1                      TRM / LOES-9          SUSQEHANA UNT I RM LOS-9EFFECTIVE DATE 11/04/2015
a a
 
a aI la a al  ia              I    Ia a a a ia a I alalalala I   a    la  alaa a            a    a a
Core Operating Limits Report (COLR)
a la a
Rev. 16                                                                                      3.2.1 3.2     Core Operating Limits Report (COLR) 3.2.1     Core Operating Limits Report (COLR)
l n
TRO 3.2.1      The Core Operating Limits specified in the attached COLR shall be met.
a        .a .a      a              l    la    aal                                          .   .     .     .     1I          t.         t.     .1 I            ..     .       ..       .       ..         .....               ..       .
APPLI(CABILITY:     SPecified in the referenced Technical Specifications.
4" z    La-Ial lal                        la"1a1                      aI          1ajj                                            ~ I                   i                jII                              !i            i    l 12.0 al    a      lala                                      alalal                        aI    a                    i    l                                                                a      a          /aaa        a            a1 1          a      a1 2          a    .     .a.                           a. a        a      a      a, a            a                                      Iaf                a    a      I a      at          aIa                          aI                  a    a.a.a. a. a aIa          a          ala              aIalal                  lii      l                      al   al    l      al    a      l 0
ACTIONS CONDITION                        REQUIRED ACTION                COMPLETION TIME" A. Core Operating Limits not       A,1   Perform action(s) described        Specified in met.                                in referenced Technical            referenced Specification.                      Technical Specifications.
Cu          ~II        I I II Ia I      I      I    I    I Ia 1      1            11 1        11                   1          ~I      I    Ia    I aaI a    I    I a
TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE                                        FREQUENCY
I l
                  ------ NOTE-.......... .............        ..               N/A No associated Surveillances. Surveillances are implemented in the applicable Technical Specificatiorns.
aaI Ia        a. I a      a I
SUSQUEHANNA-UNIT1                      TRM / 3.2-1            SUSQEHANA
al I        a          I      I II a
                                                                    -UNI 1 TM/32-1EFFECTIVE DATE 0710711999
H    C a          I    l      lall                          l    la                                                                  iala                                                    lalala                              al                    aialaIa                  a
 
    'a"  10.0 Cu a-           ta          l al            la a      al
Rev. 16              PL-NF-14-001 Rev. 2 Page "i of 62 Susquehanna SES Unit I Cycle 19 CORE OPERATING LIMITS REPORT Nuclear Fuels Engineering September 2015 SUSQUEHANNA UNIT1    TRM!3.2-2 SUSQEHANA UNT I RM/32-2EFFECTIVE DATE 11/0412015
                                                                      -- al--         aI a 4aIaa      a- a-   a aIaI a      aI a--a a- a                   a--       a- a a aI IIaa a a              IIaI I            aa aIa a4 - I *              -
 
0            aa          a      a      a      a a                a            a aia  a aIa a            Iaaatai                                  i      iiaa    a a                    ,aaa      a        a        a                    ,aaa aa a                  Il
Rev. 16                                PL-NF-14-001 Rev. 2 Page 2 of 62 CORE OPERATING LIMITS REPORT REVISION DESCRiPTiON INDEX Rev. Affected                                                          ,
                                                                                                                                                                                                                                                                                ,      ,            CD a Ia      a            la      a            alalI              a                                  a    a    a            a      a    a    a      a          a    a              a        a              l        a                            a a Ialal ..       .a.aa                .a    .a      a    a      a a a                a a a            a    a    a Ia                      aIa                                    a      aI      aI    .a        a      .a.. a a N)    V          aI    a                                                al    i    lalalala                                                                                    a    a        alal                             aI              a      a1                                    C I    l  l l  l l1-Ta-TaII l        l                                                            I    I-I                    I-yi                                          rw-               l      l l- .             .     .
No. Sections                            Description/Purpose of Revision 0     ALL          Issuance of this COLR is in support of Unit I Cycle 19 operation.
N)   CD          a     a      i      a      a lalala a      la          a      a     a      a            a al a
1      ALL          New COLR required due to Power/Flow Map revision.
la.
2      ALL          New COLR required for the inclusion of operating limits regarding a Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) closure event.
a"a a
  ~J.                  J FORM NFP-QA-008-2, Rev. 1 SUSQUEHANNA UNIT 1                    TRM/3.2-3            TRM/.2-3EFFECTIVE DATE 11/04/2015
a a
a ai a     a alal a
a a
a a
a a
a a
l a
ia a      a l    la       la a
a   la l
a l
a la a
l i
4-a Co    0          aI    a      I      Ia    I      Ia I          a            a      Ia    a        Ia  a    a    a    la  a    a            l    la    l    la    a          a              al                Ia a          la      a      la  a      a      a      l            0) 0 I-   8.0 0                            I I    I         Ill                                  I      I      I                                                  a      I               iII            Ia                                Il                    I      *l      lll ali C
Ial          a      lI            ll        l  a      1            l    i      l        lI        l    .           a.           al
                                                                                                                                                      .a.                                                 l                1       l                                7        l iI                                                      al~
l l      l        l1l                  l          l    lal                      lal                        l              lanl                                    l            l      i mm                                              I  I    I      II           I                                              I          I                I        I          I            I          I        I        I      I    I        I      I
-I-       6.0 rn                                            .a..                                     .a..           a      a j     ,    ,    I    a                  ,    ,    t            ,    ,I              a a                        ,iI,                    a a            I         !
H                                      11              11              1              1      11          1111                                                                                                            ai lal                                a all    a      a al  a aI                                                                1                                       I            a              I     a  a      a C        4.0 0                      10000                              20000                              30000                      40000                          50000                              60000                                    70000                              80000 H
Pellet Exposure (MWDIMTU) rr                                                                                                                                                                                                                                                                                            T-0  "
  -I-                                                                 UNEAR HEAT GENERATION RATETMLIMIT VERSUS PELLET EXPOSURE ATRIUM -10 FUEL FIGURE 6.2-1                                                                                                                                              Oco  a-0")'  0


Rev. 16                                                 PL-NF-14-00i Rev. 2 Page 3 of 62 SUSQUEHANNA STEAM ELECTRIC STATION Unit I Cycle 19 CORE OPERATING LIMITS REPORT Table of Contents
Rev. 16                       PL-NF-'I4-001 Rev. 2 Page 29 of 62 Main Turbine Bypass Operable SUSQUEHANNA UNIT 1  TRM/3.2-30 SUSQEHANA NITTR/3.-30 DATE 11/04/2015 EFFECTIVE


==1.0 INTRODUCTION==
C,,
............................................................................ 4 2.0 DEFINITIONS................................................................................6 3.0 SHUTDOWN MARGIN ....................................................................... 6 4.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR).................. 7 6.0 MINIMUM CRITICAL POWER RATIO (MCPR)............................................ 9 6.0 LINEAR HEAT GENERATION RATE (LHGR) ......................................                    .......      27 7.0 ROD BLOCK MONITOR (RBM) SETPOINTS AND OPERABILITY REQUIREMENTS ............................................................................ 38 8.0 RECIRCULATION LOOPS - SINGLE LOOP OPERATION............................... 40 9.0  POWER I FLOW MAP ..............................................                :......................... 58 10.0 OPRM SETPOINTS.......................................................................... 60
SSES UNIT 1 CYCLE 19 Co        1.10 1.00 z
 
z 0.90
==11.0 REFERENCES==
    -I--
................        ................................................................ 61 SUSQUEHANNA UNIT 1                TRM/3.2-4                  SUSQEHANA NITTR/3..-4DATE 11/04/2015 EFFECTIVE
0.80
-I  ._1
('3      0.70 a,                                                                    <D
('3
                                                                            ._)
0.60 0,50
-n r-n m        0.40 m
0.30
-I            30 40 50     60            70            80 90 100 110 m:                              Total Core Flow (MLB/hr)
: 0)                    FLOW DEPENDENT LHGR LIMIT MULTIPLIER NJ                        MAIN TURBINE BYPASS OPERABLE (03 ATRIUMT*-10 FUEL FIGURE 8.2-2


Rev. 16                                PL-NF-14-0O1 Rev. 2 Page 4 of 62 1.0 iNTRODUCTION This CORE OPERATING LIMITS REPORT for Susquehanna Unit t Cycle 19 is prepared in accordance with the requirements of Susquehanna Unit 1, Technical Specification 5.6.5. As required by Technical Specifications 5.6.5, core shutdown margin, the core operating limits, RBM setpoints, and OPRM setpoints presented herein were developed using NRC-approved methods and are established such that all applicable limits of the plant safety analysis are met.
SSES UNIT 1 CYCLE 19 1.10                  L            I                  &          "" 'U"' ...........  * "          '
SUSQUEHANNA UNIT 1                    TRM/3.2-5                UNT I RM/32-5 SUSQEHANA EFFECTIVE  DATE 11/04/2015
* m                L                4            4 *
 
* A            A            i C
Rev. 16                                    PL-NF- 14-001 Rev. 2 Page 5 of 62 2.0  DEFINiTIONS Terms used in this COLR but not defined in Section 1.0 of the Technical Specifications or Section 1.1 of the Technical Requirements Manual are provided below.
m3 LEGEND
2.1    The AVERAGE PLANAR EXPOSURE at a specified height shall be equal to the total energy produced per unit length at the specified height divided by the total initial weight of uranium per unit length at that height.
                            .. "            '                  '
2.2    The PELLET EXPOSURE shall be equal to the total energy produced per unit length of fuel rod at the specified height divided by the total initial weight of uranium per unit length of that rod at that height.
* t              I            "                I                I i
2.3    FDLRX is the ratio of the maximum LHGR calculated by the core monitoring system for each fuel bundle divided by the LHGR limit for the applicable fuel bundle type.
I                                    ii Fji o T                                                                                                                                                                                  ----  ,-------~.------.I-------,                    9 CURVE A: BASE CURVE 1.00 CURVE B: CORE POWER __26% AND CORE FLOW <_.0 MLBM1HR
2.4    LHGRFACT is a multiplier applied to the LHGR limit when operating at less than 108 Mlbm/hr core flow. The LHGRFAC1 multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from core flows less than 108 Mlbmlhr.
* I                TI              rS                I      1            31                                    1                         ---      I - .       ..-  j.         a          .I      -    *      --  -
2.5    LHGRFACp is a multiplier applied to the LHGR limit when operating at less than RATED THERMAL POWER. The LHGRFACp multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from partial power conditions.
0.90                              I                    I            I                                            I                                a            I                                      i          I                          I
2.6    MFLCPR is the ratio of the applicable MCPR operating limit for the applicable fuel bundle type divided by the MCPR calculated by the core monitoring system for each fuel bundle.
"-I II                            l              l*                                            i            I  [                aI          I                  li                                          l            i k                              I I
2.7    MAPRAT is the ratio of the maximum APLHGR calculated by the core monitoring system for each fuel bundle divided by the APLGHR limit for the applicable fuel bundle type.
I
2.8     OPRM is the Oscillation Power Range Monitor. The Oscillation Power Range Monitor (OPRM) will reliably detect and suppress anticipated stability related power oscillations while providing a high degree of confidence that the MCPR safety limit is not violated.
                                                                                                    .1_J IIS
2.9     Np is the OPRM setpoint for the number of consecutive confirmations of oscillation half-cycles that will be considered evidence of a stability related power oscillation.
_    _ J.          _
2.10    Sp is the OPRM trip setpoint for the peak to average OPRM signal.
I
2.11    Fp is the core flow, in Mlbm I hr, below which the OPRM RPS trip is activated.
                                                                                                                                                      .       1 IJ          ;
SUSQUEHANNA UNIT 1                       TRM/3.2-6          SLJSUEHNNAUNITI EFFECTIVE TMI32-6 DATE 111/0412015
1                    _1          J                          LI z
 
I--
Rev. 16                                    PL-NF-1 4-001 Rev. 2 Page 6 of 62 3.0 SHUTDOWN MARGIN 3.1 Technical Specification Reference Technical Specification 3.1.1 3.2  Description The SHUTDOWN MARGIN shall be equal to or greater than:
0.80                  I            I                I                I                I                                                            1            1                  5 I            I                I                  I                                          I                                  1                            I                  I          I            I            I
a)    0.38% Ak/k with the highest worth rod analytically determined OR b)  0.28% Ak/k with the highest worth rod determined by test Since core reactivity will vary during the cycle as a function of fuel depletion and poison burnup, Beginning of Cycle (BOG) SHUTDOWN MARGIN (SDM) tests must also account for changes in core reactivty during the cycle. Therefore, the SUM measured at BOC must be equal to or greater than the applicable requirement from either 3.2.a or 3.2.b plus an adder, "R". The adder, "R", is the difference between the calculated value of maximum core reactivity (that is, minimum 8DM) during the operating cycle and the calculated BOG core reactivity. If the value of "R" is zero (that is, BOG is the most reactivepoint in the cycle) no correction to the BOG measured value is required.
    ,.I I                                                                              l              ARE OPRAL                              PE        SR                        ANI37lI...
The SHUTDOWN MARGIN limits provided in 3.2a and 3.2b are applicable in MODES 1, 2, 3, 4, and 5. This includes core shuffling.
0.70                        .         .   ..._
SUSQUEHANNA UNIT t                  TRM/3.2-7              SUSQEHANA UNTI RM/32-7 EFFECTIVE    DATE 11104/2015
* 1*.         1.               *              *        ._        ._    .       .             .       .   .         .             .    .     .
 
C)                                   /II                      I                I              1                          I                    ___              _  _        ___              ___                __    ___        ___          _
Rev. 16                               PL-NF-14-O01 Rev. 2 Page?7 of 62 4.0  AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) 4.1  Technical Specification Reference Technical Specification 3.2.1 4.2  Description The APLHGRs for ATRIUMT'-10 fuel shall not exceed the limit shown in Figure 4.2-1.
1_-
The APLHGR limits in Figure 4.2-1 are valid for Main Turbine Bypass Operable
H     0.
        *and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Two Loop operation. The APLHGR limits for Single Loop operation are provided in Section 8.0.
0 0.60
SUSQUEHANNA UNIT 1                TRM/3.2-8          SUSQEHANA UNT I RM/32-8 EFFECTIVE   DATE 11/04/20 15
__..,.      . IL.__J._.I *                                ..-                                1           REOERABENCE:                        TSR 3.2.3,1 3.A4N                            3.7.6 an            8            I I
iH i         _  1i_
                                                                                                                ; /
0.50 -
03 iL  I yr                i I"      '-- ""    '                          "- -           !        .    ..  .... ..    .  .  ..  .-. -- -          '-    - -l . -          -      *      -  *    -      ; '    ..      .   .
l    26      04 N,3     0.40 23 I -" -
0.0.
I I...
II -'-I....
I
                                                                          .. F - I-'
                                                                                ,           ~l,       I-
* I I    * --I - - - - -l-I
                                                                                                                              ,               ,                 I
                                                                                                                                                                      -- - It - -
3I        -        *
                                                                                                                                                                                                                /     -    f - I- -
I            ,
                                                                                                                                                                                                                                                -I - d        - -
i      I                  I                      I              I                                    I                I            I                                    I          I            I            I
                      ! ,,    IJ, J            I                I              I              I              I            r                                                                                    I          I            I            I I            I                  I                              -                                                                                                                3           I            I 0        0.30                                                    I              I              II              I            r                                I            I                1 2,0                          30                              40                                50 Core Power                60 (% RATED) 70                                                    80                      90                            100 POWER DEPENDENT LHGR LIMIT MULTIPLIER MAIN TURBINE BYPASS OPERABLE                                                                                                                                  o ,z AT*iUMTM-10 FUEL FIGURE 6.2-3
 
Rev. 16                       PL-NF-14-O01 Rev. 2 Page 32 of 62 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT TRM/3.2-33 SUSQEHANA NITTR/3.-33 DATE 11t10412015 EFFECTIVE


9!
SSES UNIT 1 CYCLE 19 Co      1.10 I
02 SSES UNIT I CYCLE 19 C
z        1.00 C:
        *16.0 C                  , 1111 a    a      I       IIl
Z       0.90 0.
                                                          , I                1, I ,      1          111III Ia' II1 1,1                                                ,      ,    I.  .      III .                  .        la
0.80
                                                                                                                                                                                                                          .         .               ma
.-I "-J C;, ._   0.70 C;o 0,
                                                                                                                                                                                                                                                      .a rn                1    1    1a                    I      I        a        aIn                                    1    I II 4                                i      i    i  i      i          l    l      i  ___ 1    1    1        1      a 11__
C),. 0) 03 0.60 0o Ct 0.50 m
.--                I     1    I    I      I      I      I        I          I    I      I      I    I    K    I      I      2                            iI      * - 1
C)
* 1I
  -H m1       0.40 0
* l   O          = .                           I      2 z
H-1 m]       0.30 30 40 50     60 Total Core Flow 70          80   90 100 110 (MLB/HR)
z        1[4.0       I 1 K I 1 II        I            I I I-- I4 j a I --t-1                          . t. I I--1I-        . I    l
                                                                      "0  "-
                                                                                                                      .. l 2lI            IlIIl
nD FLOW DEPENDENT LHGR LIMIT MULTIPLIER            C.D z MAIN TURBINE BYPASS INOPERABLE 01                                ATRIUMTMea-t FUEL                        -Il 0O FIGURE 6.2-4                          0
                                                                                                                                                .. ...................          l
 
                                                                                                                                                                                    . . . . . . . . ' 4. i. . . .
CO,                        SSES UNIT 1 CYCLE 19 C         1.10 03 m
I          a    al    U    I      I  I        I C
=
                                    ,IIII2,                ,K,2,*,*,t*IaI*I
z z
                                                                              ;!      IIlIt                                        I      i    i l
C z
i                      a a      a          a                    a      t II i      mi I       i I  2      II!                                                      i    i                        1      i    i          I 12.0           12 5 I00 a          . a: .*              5 0 ,1              .    .                                : .....        ..  ..              I              I                        1...                    I    ..    .2..      .    ..
a..
i    ~i            i                                          ll              I                                            i              i      iai                aii              i I    I I            II                              1 I              Il                                                        l              i        l          l            l            l              l
      .5.
                          /    1    /1      1      11                                                                      l      l1Il        l1/                                                      I
       .5 0
                . .      1I   .1                                                              ._          ,    ,      .              .          I.      I      .I      I          !
--I   -I a,
II
1'3   a,                                                                        oD 0
                                                                                                                                                                                                                                                    /
I..
I      I      I      I II        ii         iIa    i    i            i          i              i    i            1nIi    1    a1 1        0I                I i        iI      iI  1     iI      i      iI    i 11                                                            liii !1                      1*11I11111I1                                                                  .1              1111I                                    1                  ,<
a) 0 0.
i    1  i i            i              i        i          i            iai      a                i1I
m m
                                                                                                                                                                                                                                                                          ,-.
0
a     .     .     .       .      .     .        I           I   a       a        a                      a        a*,,. a   a               .a.a.a.a.a.a.a                                                                                          0)
.-I m
* I               IIaIaI                                                      IaI      IaIaI                  aI                al     IaI    a          Ia                                        l      l
0 4>              20 30 40     50          60 (% RATED) 70 Core Power                    80 90 100
    '-I
--I, 01" POWER DEPENDENT LH-GR LIMIT MULTIPLIER MAIN TURBINE BYPASS INOPERABLE                Co C?                                  ATRIUMTM.-10 FUEL FIGURE 6.2-,5 0"C*
                                            ., ., ,*!        .                                                  !
 
* I          I aI a      ,," ,a a                                        l                            I              a I          I1la.lal Il laimla.!
Rev. 16                      PL-NF-14-00l Rev. 2 Page 35 of 62 One TSV or TCV Closed SUSQUEHANNA UNIT 1 TRM/3.2-36     NITTR/3.-36DATE 11/04/2015 EFFECTIVE SUSQEHANA
a      m I        I        ~          ~            a        a        a                  i l          l',I    al I.            II                  l .a. "*       a
 
                                                                                                              **        I3l            lllam K    a    a    "        *a--a-- *    *:     II            ' Il i    iii l      liIa          1 a      i' a        l a    l a1    1a1        1       a1    a          g        all              1     1        1    11I            a        aI  aI       I    II          a      a    n      a          ai        i        a  a      a              Ia a     I
0                                                                                                                    O SSES UNIT 1 CYCLE 19 1.10 C
-I',
i"1 1.00 C
"-1                I I I            I        I!                                                                                                          l                l                  Ii..                a                      ~
z       0.90 a,
Cn-,                                aI /a
        -H1    0.80
_         .
            -_J 0.70 CD CD
ia                              li1 aII                                  alal a_
         ",4 0.60 U..
a a
0.50
aal a                iI__la1a1a1a1a1a l
        -T1
                                                                                                                                                                                        *                .
        -IT 0.40 m
i
m      0.30 0           30            40            50            60 Total Core 70Flow (MLB/hr) 80             90 100 110 rl3 FLOW DEPENDENT LHGR LIMIT MULTIPLIER 0                                                          ONE TSV OR TCV CLOSED*                                0-" 0 ATRIUMTM-t10 FUEL                                 D' I, -=
                                                                                                                                                                                                                .*~* _L __*.
FIGURE 6.2-6
I                  a a
                        *Operation with one TSV or TCV closed is only supported at power [evels
                                                                                                                                                                                                                                                          .J aL2 tI 6.0                       la              la      aal      la
* 75% rated power.
                                                                      ,    , , ,*H , ,
n ,, n
aal                      aal I    I              ,            I      ,                  I                    I        I.1._      3                                -
.-t
-- I mr        4.0 0                       10000                                      20000                          30000                            40000 Average Planar Exposure (MWDIMTU) 50000                                                                              60000                            70000 0
                                                                                                                                                                                                                                                                      -*    ,r-SI)
AVERAGE             AVERAGE PLANAR            LINEAREXPOSURE PLANAR            HEAT GENERATION RATE LIMIT VERSUS
                                                                                                                                                    -TWO LOOP OPERATION                                                                                              Coz ATRIUMTM-10 FUEL                                                                                                                             C:'(D7 FIGURE 4.2-1


Rev. 18                                PL-NF-14-001 Rev. 2 Page 9 of 62 5.0 .MINIMUM CRITICAL POWER RATIO (MCPR) 5.1  Technical Specification Reference Technical Specification 3.2.2, 3.3.4.1, 3.7.6, and 3.7.8 5.2  Technical Requirements Manual Reference Technical Requirements Manual 3.3.7 5.3   Description The MOPR limit is specified as a function of core power, core flow, average scram insertion time per Section 5.3 and plant equipment operability status. The MCPR limits for all fuel types (ATRIUM TM-1O) shall be the greater of the Flow-Dependent or the Power-Dependent MOPR, depending on the applicable equipment operability status.
C',
a)  Main Turbine Bypass I EOO-RPT I Backup Pressure Regulator Operable Figure 5.2-1: Flow-Dependent MCPR value determined from BOO to EDOC Figure 5.2-2: Power-Dependent MOPR value determined from BOO to EGOC b)   Main Turbine Bypass lnoperable Figure 6.2-3: Flow-Dependent MCPR value determined from BOO to EDOC Figure 5.2-4: Power-Dependent MOPR value determined from BOO to EGOC c)  EOC-RPT Inoperable Figure 5.2-5: Flow-Dependent MCPR value determined from BOO to EOC Figure 5.2-6: Power-Dependent MCPR value determined from BOG to EOO d)  Backup Pressure Regulator Inoperable Figure 5.2-7: Flow-Dependent MCPR value determined from BOO to EDOC Figure 5.2-8: Power Dependent MCPR value determined from BOG to EDOC e)  One Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 5.2-0: Flow-Dependent MCPR value determined from BOO to EGG Figure 5.2-1 O:Power-Dependent MCPR value determined from BOO to EDO SUSQUEHANNA UNIT 1                 TRM/3.2-10            SUSQEHANA UITTRM3.2I EFFECTIVE    0DATE 11/04/2015
SSES UNIT 1 CYCLE 19 C
 
03 m
Rev. 16                                  PL-NF-1 4-001 Rev. 2 Page 10 of 62 The MCPR limits in Figures 5.2-1 through 5.2-10 are valid for Two Loop operation.
C z
The MCPR limits for Single Loop operation are provided in Section 8.0.
13
5.4 Averauqe Scram Time Fraction Ifthe average measured scram times are greater than the Realistic Scram times listed in Table 5.3-1 then the MCPR operating limits corresponding to the Maximum Allowable Average Scram Insertion Time must be implemented. Determining MCPR operating limits based on interpolation between scram insertion times is not permitted. The evaluation of scram insertion time data, as it relates to the attached table should be performed per Reactor Engineering procedures.
{.i
SUSQUEHANNA UNIT1                  TRM/3.2-11          SUSQEHANA UITTRM3.21 EFFECTIVE    IDATE 11104/2015
--I  ,-J
      .1_
C,)
0 cc    0L                                                        0) mT "rn ml 0
m1 H3 20 30   40              50 (% RATED)
Core Power             60    70 80 rn
-I POWER DEPENDENT LHGR LIMIT MULTIPLIER      CD   Z ONE TSV OR TCV CLOSED ATRIUMTM-10 FUEL                 *i-- n FIGURE 6,2-7                      c0*


Rev. i6                      PL-NF-14-O01 Rev. 2 Page Iiof 62 Main Turbine Bypass I EOC-RPT I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 1 TRM/3.2-12    NITTR/32I 2DATE 1110412015 EFFECTIVE SUSQEHANA
Rev. 16                                      PL-NF-14-OO1 Rev. 2 Page 38 of 82 7.0  ROD BLOCK MONITOR (RBM SETFOINTS AND OPERABILITY REQUIREMENTS 7.1  Technical Specification Reference Technical Specification 3.3.2.1 7.2  Description The RBM Allowable Value and Trip Setpoints for; a)  Low Power Range Setpoint, b)  intermediate Power Range Setpoint, c)  High Power Range Setpoint, d) Low Power Range - Upscale, e) Intermediate Power Range - Upscale, and I) High Power Range - Upscale shall be established as specified in Table 7.2-1. The RBM setpoints are valid for Two Loop and Single Loop Operation, Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
The RBM system design objective is to block erroneous control rod withdrawal initiated by the operator before fuel design limits are violated. Ifthe full withdrawal of any control rod would not violate a fuel design limit, then the RBM system is not required to be operable. Table 7.2-2 provides RBM system operability requirements to ensure that fuel design limits are not violated.
SUSQUEHANNA UNIT 1                 TRM/3.2-39                    NITTRIS.-39 DATE 11/04/2015 SUSQEHANA EFFECTIVE


C' SSES UNIT 1 CYCLE 19 C                  2.2 c,
Rev. 16                                      PL-NF-14-001 Rev. 2 Page 39 of 62 Table 7.2-I RBM Setpoints Allowable            Nominal Trip Function                        Value( 1 )            Setpoint Low Power Range Setpoint                              28.0                   24.9 Intermediate Power Range Setpoint                      63.0                  61.0 High Power Range Setpoint                              83.0                   81.0 Low Power Range - Upscale                            123.4                  123.0 Intermediate Power Range - Upscale                    117.4                 117.0 High Power Range - Upscale                            107.6                  107.2 (1)   Power setpoint function (Low, Intermediate, and High Power Range Setpoints) determined in percent of RATED THERMAL POWER. Upscale trip setpoint function (Low, Intermediate, and High Power Range - Upscale) determined in percent of reference level.
2,1 z
Table 7.2-2 RBM System Operability Requirements Thermal Power                                MCPR    (2.3)
z 2.0 z
(% of Rated)
1.9
                        > 28 andc<90                                  < 1.76
                                                ._E 1.8 1.7 CD k*        0.
                        ~90 and <95                                    <1.47
CA        0o    1.6                                                                                                                                                                                                                            <)
                              >_95                                    < 1.70 (2)   Applicable to Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
1.5 m                1.4 Ill C)
(3 Applicable to both Two Loop and Single Loop Operation.
H                1.3 rn ci              1.2 H                        30                          40                              50                            60                          70                        80                    90          100                  110 Total Core Flow (MLBIHR)
SUSQUEHANNA UN]T 1                   TRMI3.2-40          SUSQEHANA NITTRI3.-40 DATE 11/04/201 5 EFFECTIVE
                                                                                                                                                                                                                                                                              -o      "o n,     I Ill                                                                                                                                                                                                                                    (.Q0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS 1 EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-1                                                                                     * -< 0
. . .. . . . .. .... . .. ..... ......   .... .... .. . ... ... . . . . .. . . . . .. . . .... . ..  ........ ,... .. .. .. .. . .. .. ,,,,,.. .. .. . .  . . . ...  ... .. 1...  .. . . . .. . .. . .... ... . .. . . .. . . . .. . I J . .. .... .  ,J , , =. .. ... .


cj SSES UNIT 1 CYCLE 19 0
Rev. 18                                    PL-NF-1 4-001 Rev. 2 Page 40 of 62 8.0 REGIRCULATION LOOPS - SINGLE LOOP OPERATION 8.1  Technical Specification Reference Technical Specification 3.2.1, 3.2.2, 3.2.3, 3.3.4,1, 3.4.1,3.7.6, and 3.7.8 8.2  Technical Req~uirements Manual Reference Technical Requirements Manual 3.3.7 8.3  Description APLHGR The APLHGR limit for ATRlUMTM-I 0 fuel shall be equal to the APLHGR Limit from Figure 8.2-1.
z z
The APLHGR limits in Figure 8.2-1 are valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Single Loop operation.
C z
Minimum Critical Power Ratio Limit-The MCPR limit is specified as a function of core power, core flow, and plant equipment operability status. The MCPR limits for all fuel types (ATRIUM TM-10) shall be the greater of the Flow-Dependent or the Power-Dependent MCPR, depending on the applicable equipment operability status.
1J H  0.
a)  Main Turbine Bypass I EOC-RPT / Backup Pressure Regulator Operable Figure 8.2-2: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-3: Power-Dependent MCPR value determined from BOC to EOC b)   Main Turbine Bypass [noperable Figure 8.2-4: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-5: Power-Dependent MCPR value determined from BOC to IEOC c)  EOC-RPT Inoperable Figure 8.2-6: Flow-Dependent MCPR value determined from BOG to EOC Figure 8.2-7: Power-Dependent MCPR value determined from BOC to EOC SUSQUEHANNA UNIT 1                  TRMI3.2-41                    NIT TRI3.-41EFFECTIVE SUSQEHANA      DATE 11/04/2015
0 m
0 20 30        40          50          60          70      80        90 100 Core Power (% RATED)
                                                                                      "13    -O
                                                                                    *,      I-MCPR OPERATING LIMIT VERSUS CORE POWER 0"          MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE TWO LOOP OPERATION (BOO TO EOC)                       (3 "
n Ii --.
FIGURE 5.2-2


Rev. 16                  PL-NF- 14-001 Rev. 2 Page 14 of 62 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT1  TRM/3.2-15    UITTRM3.2l EFFECTIVE SUSQEHANA 5DATE 1 1/04/2015
Rev. 18                                    PL-NF-14-OO1 Rev. 2 Page 4l of 62 d)  Backup Pressure Regulator Inoperable Figure 8.2-8: Flow-Dependent MCPR value determined from BOO to EGOC Figure 8.2-9: Power-Dependent MCPR value determined from BOO to EDO e)  One Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 8.2-1O:Flow-Dependent MOPR value determined from BOO to EDO Figure 8.2-11 :Power-Dependent MOPR value determined from BOO to EOC The MOPR limits in Figures 8.2-2 through 8.2-1 1 are valid only for Single Loop operation.
Linear Heat Generation Rate Limit The LHGR limits for Single Loop Operation are defined in Section 6.0.
RBM Setpoints andOperabilityRequirem~ents The RBM setpoints and operability requirements for Single Loop Operation are defined in Section 7.0.
SUSQUEHANNA UNIT 1              TRM/3.2-42                NITTRI3.-42 DATE 1110412015 EFFECTIVE SUSQEHANA


0 SSES UNIT 1 CYCLE 19 2.2 03 C
C            16.0        T                  T                    T                    r                T            ~                      T                  ~                        u              1                      1                  ~                  I                  r QI                      I      I  '                I                                  I            l              Il      l        t                I        I        la            1                  l                        l 9      i0 1                                    '
I      E      lI        I                              I  Ii    l    l                                                    l                llI                                                lI                                                    l
: z.                                          1. .1.                          II                    .11                                            ..                                  II1lIti1                                                                                                  1 I,    i  I    s I  i    I  r  I,.i        m      i    .              m        m        m    ii.m                                                                                                  n  l4...4      mm~~u            mm.4.*"
I11I    1    I    I            Ii      lIlC              Il                  IlIII1I                            I1I1      l      i        l                                                                                                                1 Il      l                            l        ~l      t                                                l                      I!                    ~            l      l                  l        O              l                    1              1 I      I    I    l    I                                  I      I        I      Ii ~ll          I    I                        l1                1      1I tltitjilt                                  SED IND*ERINIG0
            *      --    J-      I---. ii!                            I      I-I.--    --            I--  j--i-..J..-,Lf                                                                                                                        lf...f                                          I I1                                                                                                              1'I II&#xa3;            I Ii 1                        I I
I          I I
1 I1                                                                                                                        I1                  1      1        1        1                I*      I          I        1 I  IIlli  I                                                                  l        II      l                                              I      I                        I                I    I 0l3l                                                                      l                        l          l                  l                                  l                l                                                  I      1                    1
        =                    *oo                ,              Ioo  I            IO  ll .I                                    ,                                  II                              I      II                          I, 1I I        I                                I                I            I        I    I      I        I        I                                            l      l3    l                                            I      [                    II II                                                                      IIII    l    Il      l        lI                            I          1        1    1        I mI.._1111l1                                                                                I          I        lllll1                                    :11!                                l111                            l1!.                        1                  l11l Iiii                      II              !              II                      11                11          lll                                ll                      l                          Il                                  I        ll HI I I I I ,        l      l      l        l I      ,
I I I I I" I      l    l II I l        l~ll
                                                                                                                                                    ,I l        li
                                                                                                                                                                    ,      ,    I l      l            l:l I
l1 1
:l    l        l 67000,5.6 l
1o                              1                    11 1111              1              Il                                                        liIljlIlIIIIIl                                                                                          l    l        ll II                                      l                l    l            Illl                        I          l      l                      I                                                I            Il                          l 4.0      L U'                    i41--                        LI4l2                    M - -L --                    ~L-              AJ-J                                        L..L
                                                                                                                                                                                          ...........                          ...            --  ,                  I          ,      ,.        ,    I 0.0                 l1000.                          l              2000.0                ll                    000.                                4000.08000.06000.07000.
        -L~l                                                                      l                l            l              l                  l    l                  lI                                        l                l              i                l            l Averag PlanalEpour                                                        MWIMTU)l o    =          a      l                l              l                l                l            l              l                  l2l                                        l                                l                i              t            l                l A                                                                                    '        I      I    I    I        l                                                                          *                    .                .                                                                        Ca AVRAEPLNR                                      INA                  HA              GENERATION RAELMITlERSUtll o                                                            AERAE PANA                                        EPOSRE..SIGL.LOP.OERAIO ATRIUMTMAOll FUELll                                                l                                                                                  l                          owlll FIGURE 8.2-1ll          l        l      l    l                  l      l        lI                              I
......                    , , J2J***
                                    .....    . . . ..    . .. .... .....*.. ....................... . ..... ..... .....                ..........      ... * . ....      .......... ... ... ................. ......    ................... ......... ....... . ..... . ..      .. r*, i, . ... .. ... . .. ... .... .. .
 
Rev. 16                  PL-NF.-14-001 Rev. 2 Page 43 of 62 Main Turbine Bypass I EOC-RPT/I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 1 TRM/3.2-44    UITTRM3.2-44 SUSQEHANA EFFECTIVE DATE 11/0412.015


===2.1 LEGENDA===
9 SSES UNIT 1 CYCLE 19 3.6                                                        I            I                        I LEGEND m          3.4            4.                           a-    CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM z                                                                        INSERTION TIME z          3.2            +              I            4-C                                                            CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME z
MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME
3.0 t                            1--i.
                                        -CURVE CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME z
m I II II . . I H0 4-.
C      2.0 z
D.1 o~
-1 1.9                                      I                INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 1.8 H.     '1.7 0J o-01 1,6 1.5
2.8 2.6 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES L
-I"I    1.4
ARE OPERABLE PER SR 3.7.6.t AND 3.7.6.2 I            I              Ii USED INDETERMINING MFLCPR K
---            I EEENCE:_T.S. 3.7.6 and 3.2.2        ___________                                __________
0,  2.4 0
        '1.3 m
2.2 2.0 i'1
Hr iii    1.2 30       40           50           60               70          80C          I0            100 110 Total Gore Flow (MLB/H-R)
-m        '.8 rI,            
--t                                                                                                                  "D    "
 
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS INOPERABLE TWO LOOP OPERATION (BOC TO EOC)
==REFERENCE:==
FIGURE 5.2-3                                        ,.-4 <
" T.S. 3.4.1 and 3.2.21                                                              108, 1.49' 1.6 H
Q)"*
  -m 0        '1.4 1N1                                                                  70          80            90        100          110 0              30         40             50           60 Total Core Flow (MLB/HR)
0
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW                                     Co MAIN TURBINE BYPASS 1 EOC-RPT / BACKUP PRESSURE REGULATOR OPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-2


CI, SSES UNIT 1 CYCLE 19 C      3.6 Ci, C
9                                                                                    0 SSES UNIT I CYCLE 19 4.6 o0 4.4                                        ___      LEGEND 4.2
mR c
________CURVE                                        A: MAXIMUM ALLOWABLE AVERAGE SCRAM
Z
____INSERTION                        TIME z      4.0      ____________CURVE                                    B: REALISTIC AVERAGE SCRAM INSERTION TIME
-t
                                                      ~-CURVE C: CORE POWER _<26% AND coRE FLOW
    .E_
* 50 MLBM/HR 3.6 S  3.4
-H 0
                                                                                --fl!SAFETY  ANALYSES ASSUME THAT F~OUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.2 Ho  03 3.0                     _____USED                                                            IN DETERMINING MFLCPR 1.
                                                                          $o O.
N)
-.4
CD 0  2.8 0);
-11 "51 m
0) 2.6 2.4 2.2 f                                      140. 2.08!
z3
                          ,4 0A-B-BT*
-H
-.--------        ~    I "t100, '
<m Fi 20 30 40      50          60          70      80 90 100 Core Power (% RATED)
2.0              F                                                                          *,                              ... .. . .. .
(73                                                                  -U 51 MCPR OPERATING LIMIT VERSUS CORE POWER           CD CD-
  -Iil m
                      *MAIN TURBINE BYPASS INOPERABLE                    Z TWO LOOP OPERATION (BOC to EOC)                   77 FIGURE 5.2-4                      -- h 0)
t 1.8 0              REEEC: T.S. 3.4.1 and 3.2.2                                                          "Z 1.6 Hr o      1.4 20                                                                                                                               100 mn                              2040                                50co              60*( RAE70                80         90 "0  "
MCPR OPERATING LIMIT VERSUS CORE POWER                                                 CD MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-3                                                  &deg;<  I
                                                                                                                                                      "*  O 0)' C


Rev. 16                 PL-NF-14-001 Rev. 2 Page 17 of 62 EOC-RPT Inoperable SUSQUEHANNA UNIT 1   TRM/3,2-18 SUSQEHANA UITTRM3.2I EFFECTIVE 8DATE 11/04/2015
Rev. 16                       PL-NF-14-OO1 Rev. 2 Page 46 of 62 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT1   TRM/3.2-47 SUSQEHANA NITTR/3.-47 DATE 1110412015 EFFECTIVE


CD SSES UNIT 1 CYCLE 19 2.2 03 LEGEND C
C' SSES UNIT 1 CYCLE 19 4.2                                                                 I            I          II C-
m        2.1                                            CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM
________                ________            LEGEND 4.0 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM 3.8                                                        -          INSERTION TIME z
=
z
INSERTION TIME 2.0                                            CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME C
________________CURVE                              B: REALISTIC AVERAGE SCRAM iNSERTiON TIME 3.6 z
z 1.9                          4.                  SAFETY* ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2
3.4
-H  E                                                            I            I          IJ 1.8 L.
                                                                -  SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS       -
USED INDETER[MIN1NG MFLCPR I
    ,4D 3.2 VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 o* 3.0 H0 0
-4.     1.7 0.
CD co3 0) 2.4.
C0 o                                                                                                                CD 1.6                                                                                                            -3.
2.2 m      2.0 "I1 m                                                                                                                        .
C) 1.5
1.8    -1
-rr      1.4


==REFERENCE:==
==REFERENCE:==
T.S. 3.3.4.1 and 3.2.2
T.S. 3.4.1, 3.7.6,, and22                                            -- _,118 0
--Il
m       1.6      _  _          _       _        _I            _      _            _-_-_-_
<r m        1.3 m
1.4 m
1.2 30       40             50           60           70            80        90             100  110 U                                                      Total Core Flow (MLBIHR)
30         40                   50             60 Total Core 70            80        90           t00        110 Flow (MLB/HR) 0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW                                   CD  Z
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW EOC-RPT INOPERABLE                                         *QcD TWO LOOP OPERATION (BOC TO EOC)
-J.                                                        MAIN TURBINE BYPASS INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 5.2-5                                                0""
FIGURE 8,2-4                                                0 o)"


ci SSES UNIT 1 CYCLE 19 C
C, SSES UNIT I CYCLE 19 4.2    123,4A41                                        *              =*                      *l "1 I    " m                                                            l C-Cin                              I                         LEGEND 4.0 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM F                                                        INSERTION TIME z       3.8 z                                                         CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME
I z
              ~, 3,61              ____________  4-Z
z z
-I      3.6                                              CURVE C: CORE POWER_*26% AND CORE F~LOW _<50 MLBMIHR
E 0
                                                .t-l 3.4                                    I       m
(D 0
     .1.a                1I~Z~38 I--.*-                  4.              I-I E
C) m n-I 0
-I   Cu 3.2 ISAFETY VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6,2 ANALYSES ASSUME THAT TWO OR MORE BYPASS w 3.0                                                                          USED IN DETERMINING MFLCPR I-0.
H m
1~oi C~) 0
0 50          60                    90 H*    20 30 40          Core Power  (% RATED) 70     80    100 n-MCPR OPERATING LIMIT VERSUS CORE POWER            *(D   Z EOC-RPT INOPERABLE TWO LOOP OPERATION (BOC to EQO)              O-"    -1 FIGURE 5.2-8                     (O1*--
                                        .41 CD N)
: a. 2.8 CO 0                                                ______      _                                          ________                0) 2.6 2.4 2,2 m
2.0 0r           


Rev. 16                      PL-NF-14-0O1 Rev. 2 Page 20 of 62 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 1   TRM/3.2-21    NIT TR/3.-21 DATE 11/04/2015 EFFECTIVE SUSQEHANA
==REFERENCE:==
T.S. ,3.4.1, 3.7.6, and 3.2.2                                  ..
-I      1.8 20                 30              40                    6060 Power (%o o70RATED)            80          90  100 50Core "0   "T CD MCPR OPERATING LIMIT VERSUS CORE POWER                              Com    I N)                                                            MAIN TURBINE BYPASS INOPERABLE                                  .CD SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8,2-5                                      ow.
: h. h< .-


SSES UNIT 1 CYCLE 19 Cn      2.2 LEGEND m
Rev. 16                  PL-NF-14-O0l Rev. 2 Page 49 of 62 EOC-RPT Inoperable SUSQUEHANNA UNIT 1   TRM/3.2-50 SUSQEHANA NIT TR/3.-5OEFFECTIVE DATE 11/0412015
2.1            _____________                    -CURVE        A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME z
C      2.0            ________                          -CURVE        B: REALISTIC AVERAGE SCRAM INSERTION TIME z
1.9              _______        _______          -       SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 1.8 I-1.7 r*o 0 A    BI
: 10.                                                                                                                              0, 1.6 1.5 m
"1      1.4 rri 0             


==IREFERENCE:==
p SSES UNIT 1 CYCLE 19 4.0 LEGEND m      3.8 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM~
TS. 3.7.8 and 3.2.2~
z      3.6              ________________INSERTION                                    TIME z
1.3                            I-~            {                4            1      ~~-f 108, 1.221 m      1.2 30           40          50              60              70           80        90           100       110 Total Core Flow (MVLB/HR)
C                                                                CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 3.4 z
                                                                                                                              "-D    "-
3,2 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVESl E  3.0                                                      -        ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2
0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE                                                 "'.)
  ,U
0 o',                                                TWO LOOP OPERATION (BOC TO EQO)
-1  I-2,8                                                                    USED IN DETERMINING MFLCPR 4,
FIGURE 5.2-7                                                  "*' <c 0 0)"
0.
2.6 0
N, 0I 2.4                                                                                                                                0) 2.2 2.0 m      1.8 0
 
==REFERENCE:==
T.S 3..,.341              and 3.2.2                                       _            "_-_-_-[_08t" 1.6 1.4 m          30         40                   50           60              70           80        9t0           100             110 Total Core Flow (MLB/HR)
                                                                                                                                    *,      ,I-0                                             MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW 4*                                                            EOC-RPT INOPERABLE                                                   -Q* .:
SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-6


SSES UNIT I CYCLE 19 60 C
C*
z 0,
SSES UNIT 1 CYCLE 19 Cb 0*
    .2
z
-Il CD C
.-I C.'
                                                                            -3.
CD C.,
0)
N)
'i,,
C,'                                                                    0)
100,1.35 m
'-I"1
20 30 40       50         60 (% RATED) 70 Core Power                  80 90 100 o1                                                                    T1    T1
['11
-L
-IT m
                                                                      *Q2    Z~
1-1 20 30 40          5060 Power' (% RATED) 70 80Core                        80 90 100 m                                                                  -U  -D MCPR OPERATING LIMIT VERSUS CORE POWER           Co  z EOC-RPT INOPERABLE 0,-
MCPR OPERATING LIMIT VERSUS CORE POWER BACKUP PRESSURE REGULATOR INOPERABLE TWO LOOP OPERATION (BOO to EOC)
SINGLE LOOP OPERATION (BOC to EOC)                 ,C FIGURE 8.2-7                      ow' 0
FIGURE 5.2-8                          -,h . 0 0)'  ,C


Rev. 16                       PL-NE-14-001 Rev. 2 Page 23 of 62 One TSV. or TCV Closed SUSQUEHANNA UNIT 1 TRM/3.2-24 SUSQEHANA UIT ITR IS.-24 EFFECTIVE      DATE 11104/2015
Rev. 15                       PL-NF-14-OO1 Rev. 2 Page 52 of 62 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 1   TRM/3.2-53 SUSQEHANA NITTRIS.-53 DATE 11/04/2016 EFFECTIVE
 
 
SSES UNIT 1 CYCLE 19 2.2                                                                              I LEGEND 2,1                                                          CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 2.0                  _______
C',
_______                      -CURVE        B: REALISTIC AVERAGE SCRAM INSERTION TIME
SSES UNIT I CYCLE 19 CO                  4.0 I                                    I                        I                                I m                  3.8
-r" 1.9 130, 1.831                                              SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES NJ                                          I                                    ARE OPERABLE PER SR 3.7.5.1 AND 3.7.6.2 U'  .4-1.8
                                                                                                                                                                *:MAXIMUM ALLOWABLE AVERAGE SCRAM z
                                          *_                                        USED IN DETERMINING MFLCPR E2 1.7 C., 1.6                                                                                                                      CD 1.5 m
3.6                                                                                                                                    INSERTION TIME V
-I-1     1.4 m
I                                                                  .
C                                                                                                                                                    I: REALISTIC AVERAGE SCRAM INSERTION TIME z                  3.4                                                          4                                    4.-
3.2                                                                                                                                      f          ,      ,    .. ,I.,,.I,, I ,                      "                                "
S C
3.0 2,8 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR 2
H* C)    a.
0 2,6                                                                                                                                                                                                                                                                            CD 0~
C,          2.4 2,2 2.0 r-n
        -n' rni                1.8                                                                                                                        A-
__---_     _          _      ___            __                                                                  B


==REFERENCE:==
==REFERENCE:==
T.S. 3.2.2 and TRM 3.3.71 0
T.S. 3.4.1, 3.7.8, and 3.2.2[                                                                      ____.__                                  ..         _. _       _                                   .J._108, 1.48 1.6 m
I-4 1.3
1,4 30                       40                       50                                   60                                   70                                   80                       90                             100                   110 Total Core Flow (MLBJHR) w  r 0*
_ _ I            _ I_              _      _            _      _    _      _ _    _    _
MOPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE                                                                                                                                              01 SINGLE LOOP OPERATION (BOC to EGOC)
1.2 m
FIGURE 8.2-8                                                                                                                          0O" 0
30               40             50         60               70           80           90       100     110 Total Core Flow (MLBIHR) 0                                                 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW                                 CD  Z N)
' I * . ...... .... .......  "..............  ... ...... . ... .  .. ... .  .  . ............  ......  ..............  .........................      .................  .................  .. ..    * ..  . .    =. . ... * " *LZ*:*  I* *,.,. L*** ............  .....
ONE TSV OR TCV CLOSED*
TWO LOOP OPERATION (BOC TO EOC)                                         -  ,-<
FIGURE 5.2-9                                            0
                  *Operatofl with one TSV or TCV closed is only supported at power levels -<75%rated power.


cj SSES UNIT 1 CYCLE 19 C
CD SSES UNIT 1 CYCLE 19 C                                                                                                                 "  'I-0*
m
C      4.4                                ----  LEGEND m                                                                 UM ALLOWABLE AVERAGE SCRAM
--
-i-     4.2                                      CURVE A: MAXIM z                     ____
z C
___ ___INSERi                      nION TIME z
z S
C      4.0                                     CURVE B: REALI*
0.-
STIC AVERAGE SCRAM INSERTION TiME 3._____,_.__1CURVE                        C: CORE POWER < 26% AND CORE FLOW < 60 MLBMIHR I
-I 0m
I                    I rY ANALYSES      ASSUME THAT FOUR BYPASS VALVES  l---
*0 CD m
ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.0          26.01, 2.90 E
-n m
USED IN DETERMINING MFLCPR CD 0.= 2.6                                    A                                                  *1*
m C)
0)
-9 20 30   40               50            60  70 80
O-                                                             60, 2.18 U*                                                                                            4          4 1100 "
                      *Core Power (% RATED)
2.2                                                          1 m
MCPR OPERATING LIMIT VERSUS CORE POWER
2.0 m
                      *ONE TSV OR TCV CLOSED              Co  I TWO LOOP OPERATION (BOC TO EOC)
1.8   
FIGURE 5.2-10
 
==REFERENCE:==
T.S. 3.4.1, 3.7.8, and 3.2.2J11ii 1.4
.-I        20           30             40           60   ...    ... 60 ...  .. .. 70       80         90            100 m                                                          uore r'ower rio KAIi )uJ MCPR OPERATING LIMIT VERSUS CORE POWER                                         CD J\)                                            BACKUP PRESSURE REGULATOR INOPERABLE                                                  "11 0J                                                SINGLE LOOP OPERATION (BOO to EOC)
FIGURE 8.2-9                                                  (:I' .Q DO O--


Rev. 16                             PL-NF-14-O01 Rev. 2 Page 26 of 62 Table 5.3-1 Average Scram Time Fraction Table For Use With Scram Time Dependent MCPR Operating Limits Control Rod              Average Scram Time to Position (seconds)
Rev. 16                       PL-NF-14-001 Rev. 2 Page 55 of 62 One TSV or TCV CloSed SUSQUEHANNA UNIT 1 TRM/3.2-56    NITTR/3.-56 DATE 11/04/2015 EFFECTIVE SUSQEHANA
Position 45          0.470                                              0.520 39        0.630                                              0.860 25        1.500                                              1.910 5      -    oo70                                            3.440 Average Scram    Realistic                                          Maximum Insertion Time                                                      Allowable SUSQUEHANNA UNIT 1                SUQEAN NTITRM/3.2-27  EFFECTIVE DATE 11/0412015
: 1. .    . .1  I * ... A...    .    . - -- a L.~cgaa. . ..  .. * .1 L. * -- .  .*... ..&. aaau  I  1S  a. .  .... aJ L&...aa......a..n.
Rev. 16                                          PL-NF- 14-001 Rev. 2 Page 27 of 62 6.0      LINEAR HEAT GENERATION RA*TE (LHGR) 6.1          Technical Specification Reference Technical Specification 3.2.3, 3.3.4.1, 3.7.6, and 3.7.8 6.2          Technical Requirements Manual Reference Technical Requirements Manual 3.3.7 6.3          Description The maximum LHGR for ATRIUMTZ-I 0 fuel shall not exceed the LHGR limit determiined from Figure 6.2-1. The LHGR limit in Figure 6.2-1 is valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
To protect against both fuel centerline melting and cladding strain during anticipated system transients initiated from reduced power and flow conditions, power and flow dependent LHGR limit multipliers are provided in the following figures:
a)  Main Turbine Bypass Operable Figure 6.2-2: Flow-Dependent LHGR Uimit Multiplier Figure 6.2-3: Power-Dependent LHGR Limit Multipiier b)  Main Turbine Bypass Inoperable Figure 6.2-4: Flow-Dependent LHGR Limit Multiplier Figure 6.2-5: Power-Dependent LHGR Limit Multiplier c)  One Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 6.2-6: Flow-Dependent LHGR Limit Multiplier Figure 6.2-7: Power-Dependent LHGR Limit Multiplier
* The LHGR limits and LHGR limit multipliers in Figures 6.2-2 and 6.2-3 are applicable to EOC-RPT Operable and Inoperable and Backup Pressure Regulator Operable and Inoperable.
* The LGHR limits and LHGR limit multipliers in Figures 6.2-1 through 6.2-7 are valid for both Two Loop and Single Loop operation.
SUSQUEHANNA UNIT 1                               TRM/3.2-28              SUSQEHANA EFFECTIVE  NITTRI3.-28 DATE 11/04/2015


C,)
S SSES UNIT 1 CYCLE 19 3,6 0o C
SSES UNIT 1                               CYCLE 19 C        16.0 Ii                    Ii                                                        II ii                                                                                                                                                                  i iI ii ii a           ili a                      iI l Ii i                                                                !i Co                                                                                                                                                                                        a              a                  la a        a    l        la      l      a      l 0                 a a
-i-      3.4 z
a a
z         3.2 z
a a                                                I             I                                                                        I                    I El 11111                   '        I*             I I
3.0 2.8 E
C                                                                                     I              !
0.
m                                                                  lala                                                                                  al                  ala        a        alalala                        alIlal                  al    a      la aa a a               a a              L      +/- Z        ....         L      1 - - .....t....J......-
2.6
=                                                                                                                                                                                                                                                                    -
-*1 2.4 k*                                                                                                                        *0 0-C, 2.2 2.0 rri "11 1.8 m
z        '14.0           0.,3.---- f=--I--+ I 900                                                          ,-I--S-I--..
1.6 m
4                                    ..J-                              REFERENCE; T.S 3.2.3 z                  L- i- - - I              I I a a a. a . . a . .a . .a .                                                             .a .         I      &    a                    1          a    a        a a                                                                I a I a. I. ~ alala IaI-aI I I                      IaIaI l      aI                  IaI                  a     Ial          al                l                        lalal                                            lala C
1.4 r'ri                                                                                                            110 30              40            50            60              70              80           90  100 Total Core Flow (MLB/HR)
a[
C 0*                                            MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW                            o ,-n ONE TSV OR TCV CLOSED*
a a
cj                                                    SINGLE LOOP OPERATION (BOC to EOC)
a aI la a al  ia              I    Ia a a a ia a I alalalala I   a    la   alaa a            a    a a
FIGURE 8.2-10                                o~
a la a
1'r%-h*
l n
* Operation with one TSV or TCV closed is only supported at power levels -<75% rated power.
a        .a .a      a              l    la    aal                                          .   .     .     .     1I          t.         t.     .1 I            ..     .       ..       .       ..         .....               ..       .
 
4" z    La-Ial lal                        la"1a1                      aI          1ajj                                            ~ I                  i                jII                              !i            i    l 12.0 al    a      lala                                      alalal                        aI    a                    i    l                                                                a      a          /aaa        a            a1 1          a      a1 2          a    .     .a.                           a. a        a      a      a, a            a                                      Iaf                a    a      I a      at          aIa                          aI                  a    a.a.a. a. a aIa          a          ala              aIalal                  lii      l                      al    al    l      al    a      l 0
0 oi)
Cu          ~II        I I II Ia I      I      I    I    I Ia 1      1            11 1        11                  1          ~I      I    Ia    I aaI a    I    I a
SSES UNIT 1 CYCLE 19 4.6I                                                                                                                                    I     I                  I 4.4                                                                    LEGEND m
I l
4.2      ______                                                                        CURVE *: MAXIMUM ALLOWABLE AVERAGE SCRAM z                                                                                                                        INSERTION TIME z          4.0                                                                                      CURVE E3: REALISTIC AVERAGE SCRAM INSERTION TIME C
aaI Ia        a. I a      a I
z               23 .61            23,3.7                                                            CURVE c.: CORE                  POWER < 26% AND CORE FLOW < 50 MLBM/HR 3.6
al I        a          I      I II a
                                                                "* 26, 3.56-"
H    C a          I    l      lall                          l    la                                                                  iala                                                    lalala                              al                    aialaIa                  a
C......SAFETY                                                                                          ANALYSES ASSUMEtt      THAT FOUR BYPASS VALVES t 3.4                              26,C    3.33                                                                                ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.2
    'a"  10.0 Cu a-          ta          l al            la a      al
                            --                                                   ___________USED                                                                              IN DETERMINING MFLCPR 3.0 C,i CJ1 2.8 CD 0) 2.6
                                                                      -- al--          aI a 4aIaa      a- a-  a aIaI a      aI a--a a- a                    a--        a- a a aI IIaa a a              IIaI I            aa aIa a4 - I *              -
___      _    _ __      _      _      _    __        _    _    _      _6,19 2.4 2.2            _________                6.01, 2.40_____                                                                                          _________          -     519 2.0 n
0            aa          a      a      a      a a                a            a aia  a aIa a            Iaaatai                                  i      iiaa    a a                    ,aaa      a        a        a                    ,aaa aa a                  Il
1.8 1.6 m
                                                                                                                                                                                                                                                                                ,      ,            CD a Ia      a            la      a            alalI              a                                  a    a    a            a      a    a    a      a          a    a              a        a              l        a                            a a Ialal ..       .a.aa                .a    .a      a    a      a a a                a a a            a    a    a Ia                      aIa                                    a      aI      aI    .a        a      .a.. a a N)    V          aI    a                                                al    i    lalalala                                                                                    a    a        alal                              aI              a      a1                                    C I    l  l l  l l1-Ta-TaII l        l                                                            I    I-I                    I-yi                                          rw-              l      l l- .             .     .
1.4 20                                    30                                            40                            50                60                  70            80 Core Power (%RATED)
N)  CD          a    a      i      a      a lalala a      la          a      a    a      a            a al a
                                                                                                                                                                                                                          -0    7ci MCPR OPERATING LIMIT VERSUS CORE POWER                                                              w"I-ONE TSV OR TCV CLOSED 01 SINGLE LOOP OPERATION (BOC to EOC)
la.
FIGURE 8.2-11                                                  0)'
a"a a
* i jq L. . ... *....... . . .....    .   ...        .   . .......... . . .. .......... ........ T.. .. ............. .... ...... * * * * * ... ... .... -:-.!
a a
                                                                                                                                                            ..                                            ... .=
a ai a      a alal a
a a
a a
a a
a a
l a
ia a      a l    la      la a
a  la l
a l
a la a
l i
4-a Co    0          aI    a      I      Ia    I      Ia I          a            a      Ia    a        Ia  a    a    a    la  a    a            l    la    l    la    a          a              al                Ia a          la      a      la  a      a      a      l            0) 0 I-    8.0 0                            I I    I        Ill                                  I      I      I                                                  a      I                iII            Ia                                Il                    I      *l      lll ali C
Ial          a      lI            ll        l  a      1            l    i      l        lI        l    .           a.           al
                                                                                                                                                      .a.                                                 l                1        l                                7        l iI                                                      al~
l l      l        l1l                  l          l    lal                      lal                        l              lanl                                    l            l      i mm                                              I  I    I      II            I                                              I          I                I        I          I            I          I        I        I      I    I        I      I
-I-        6.0 rn                                            .a..                                     .a..           a      a j      ,    ,    I    a                  ,    ,    t            ,    ,I              a a                        ,iI,                    a a            I        !
<-
H                                      11              11              1              1      11          1111                                                                                                            ai lal                                a all    a      a al  a aI                                                                1                                      I            a              I      a  a      a C        4.0 0                      10000                              20000                              30000                      40000                          50000                              60000                                    70000                              80000 H
Pellet Exposure (MWDIMTU) rr                                                                                                                                                                                                                                                                                            T-0  "
-I-                                                                UNEAR HEAT GENERATION RATETMLIMIT VERSUS PELLET EXPOSURE ATRIUM -10 FUEL FIGURE 6.2-1                                                                                                                                              Oco  a-0")'  0


Rev. 16                       PL-NF-'I4-001 Rev. 2 Page 29 of 62 Main Turbine Bypass Operable SUSQUEHANNA UNIT 1  TRM/3.2-30 SUSQEHANA NITTR/3.-30 DATE 11/04/2015 EFFECTIVE
Rev. 16                                   PL-NF-14-OO1 Rev. 2 Page 58 of 62 9.0  POWERI/FLOW MAP 9.1 Technical Specification Reference Technical Specification 3.3.1.1 9.2 Description Monitor reactor conditions to maintain THERMAL POWER / core flow outside of Stability Regions I and II of the Power/IFlow map, Figure 9.1.
Ifthe OPRM Instrumentation is OPERABLE per TS 3.3.1.1, Region I of the Power! Flow map is considered an immediate exit region.
If the OPRM Instrumentation is inoperable perT"S 3.3.1.1, Region I of the Power!
Flow map is considered an immediate sca      region.
Region Ilof the Power!/Flow map is considered an immediate exit region regardless of the operability of the OPRM Instrumentation.
SUSQUEHANNA UNIT1                TRM/3.2-59            SUSQEHANA NITTR/3.-59 DATE 11104/2015 EFFECTIVE


C,,
Rev. 16                                    PL-NF-14-O01 Rev. 2 Page 59 of 62 120
SSES UNIT 1 CYCLE 19 Co        1.10 1.00 z
z 0.90
    -I--
0.80
-I  ._1
('3      0.70 a,                                                                    <D
('3
                                                                            ._)
0.60 0,50
-n r-n m        0.40 m
0.30
-I            30 40 50      60            70            80  90 100 110 m:                              Total Core Flow (MLB/hr)
: 0)                    FLOW DEPENDENT LHGR LIMIT MULTIPLIER NJ                        MAIN TURBINE BYPASS OPERABLE (03 ATRIUMT*-10 FUEL FIGURE 8.2-2


SSES UNIT 1 CYCLE 19 1.10                  L            I                  &          "" 'U"' ...........  * "          '
==Purpose:==
* m                L                4            4 *
* 120 110*
* A            A            i C
InitialI/Date: "        I 1100 100 9o.                                                                                           90 80 70 L.
m3
60 0
                ..  .. .
fi-50 40 If 30 201 10
LEGEND
                                                                                      -H-I-I-4--]l- 0*-
                            .. "            '                  '
0        10      20      30    40      50    50    70    80    90        100      110 Total Core Flow (Mlbmlhr)
* t              I            "                I                I i
(for SLO <75% Pump Speed Use Form GO-100-009-2)
I                                    ii Fji o T                                                                                                                                                                                  ----   ,-------~.------.I-------,                    9 CURVE A: BASE CURVE 1.00 CURVE B: CORE POWER __26% AND CORE FLOW <_.0 MLBM1HR
Figure 9.1 SSES Unit 1 Cycle 19 Power/IFlow Map SUSQUEHANNA UNIT 1                            TRM/3.2-60            SUSQEHANA NITTR/3.-60 DATE 11104/2015 EFFECTIVE
* I                TI              rS                I      1           31                                    1                        ---      I - .       ..-  j.         a         .I     -    *       --  -
 
0.90                              I                    I            I                                            I                                a            I                                      i          I                          I
Rev. 16                                  PL-NF-14-001 Rev. 2 Page 60 of 62 10.0 OPRM SETPOINTS 10.1 Technical Specification Reference Technical Specification 3.3.1.1 10.2 Description Setpoints for the OPRM Instrumentation are established that will reliably detect and suppress anticipated stability related power oscillations while providing a high degree of confidence that the MCPR Safety limit is not violated. The setpoints are described in Section 2.0 and are fisted below:
"-I II                            l              l*                                            i            I  [                aI          I                 li                                          l            i k                              I
SF      =     1.11 Np =      15 Fp =       60OMlbm /hr SUSQUEHANNA UNIT !                  TRM/3.2-61                 UNT SUSQEHANA      DATE 11/04/20 15 I RM/32-61EFFECTIVE
                                *. _    _
 
I
Rev. 16                                  PL-NF-14-001 Rev. 2 Page 61 of 82
_ _    _        . _ ..
 
I
==11.0 REFERENCES==
                                                                                                    .1_J IIS
 
_    _ J.          _
11.1 The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
I
: 1. XN-NF-81-58(P)(A), Revision 2 and Supplements I and 2, "RQDEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model," Exxon Nuclear Company, March 1984.
                                                                                                                                                  '-
: 2. EMF-2361 (P)(A), Revision 0, "EXEM BWR-2000 ECCS Evaluation Model,"
                                                                                                                                                      .       1 IJ          ;
Framatome ANP, May 2001.
1                     _1          J                          LI z
: 3. EMF-2292(P)(A), Revision 0, "ATRlUMW-10: Appendix K Spray Heat Transfer Coefficients," Siemens Power Corporation, September 2000.
                                                                                                                                                                                                                                                                    .
: 4. XN-NF-84-105(P)(A), Volume 1 and Volume I Supplements 1 and 2, lJXCOBRA-T: A Computer Code for BWR Transient Thermal-Hydraulic Core Analysis," Exxon Nuclear Company, February 1987.
I--
: 5. XN-NF-80-19(P)(A), Volume 1 and Supplements I and 2, "Exxon Nuclear Methodology for Boiling Water Reactors: Neutronic Methods for Design and Analysis," Exxon Nuclear Company, March 1983.
0.80                  I             I                I                I                I                                                            1            1                  5 I            I                I                  I                                          I                                  1                            I                  I          I            I            I
: 6. XN-NF-80-19(P)(A), Volumes 2, 2A, 2B, and 2C "Exxon Nuclear Methodology for Boiling Water Reactors: EXEM BWR ECCS Evaluation Model, t' Exxon Nuclear Company, September 1982.
    ,.I I                                                                              l              ARE OPRAL                              PE        SR                        ANI37lI...
: 7. XN-NF-80-19(P)(A), Volume 3 Revision 2 "Exxon Nuclear Methodology for Boiling Water Reactors Thermex: Thermal Limits Methodology Summary Description," Exxon Nuclear Company, January 1987.
0.70                        .          .    ..._
: 8. XN-NF-80-1 9(P)(A), Volume 4, Revision 1, "Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads," Exxon Nuclear Company, June 1986.
* 1*.          1.              *              *        ._        ._    .        .              .      .  .          .            .    .      .
: 9. XN-NF-85-67(P)(A), Revision 1, "Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel," Exxon Nuclear Company, Inc.,
C)                                   /II                      I                I              1                          I                    ___              _  _        ___              ___                __    ___        ___          _
September 1986.
1_-
: 10. ANF-524(P)(A), Revision 2 and Supplements 1 and 2, "Advanced Nuclear Fuels Corporation Critical Power Methodology for Boiling Water Reactors1 "
H    0.
November 1990.
0 0.60
: 11. NE-092-001A, Revision 1, "Licensing Topical Report for Power Uprate With increased Core Flow," Pennsylvania Power & Light Company, December 1992 and NRC SER (November 30, 1993).
__..,.      . IL.__J._.I *                                ..-                               1          REOERABENCE:                       TSR 3.2.3,1 3.A4N                            3.7.6 an            8            I I
: 12. ANF-89-98(P)(A) Revision 1 and Supplement 1, "Generic Mechanical Design Criteria for BWR Fuel Designs," Advanced Nuclear Fuels Corporation, May 1995.
iH i          _  1i_
SUSQUEHANNA UNiT1                    TRM/3.2-62            EFFECTIVE DATE 11/04/2015
                                                                                                                ; /
 
                                                                                                                            ,,_,,
Rev. 16                                    PL-NF-14-001 Rev. 2 Page 62 of 62
.-.
: 13. EMF-22O9(P)(A), Revision 3, "SPCB Critical Power Correlation," AREVA NP, September 2009.
0.50 -
: 14. EMF-85-74(P)(A), Revision 0, Supplement 1(P)(A) and Supplement 2(P)(A),
03 iL  I yr                i
            "RQDEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model,"
                                              !
Siemens Power Corporation, February 1998.
I"      '-- ""   '                          "- -          !        .    ..  .... ..     .  .  ..  .-. -- -          '-    -  -l . -         -      *      -   *    -       ;  '    ..      .    .
: 15. EMF-2168(P)(A), Revision 0, "Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASMO-4/Microburn-B2," Siemens Power Corporation, October 1999.
l    26      04 N,3      0.40
: 16. EMF-CC-074(P)(A), Volume 4, Revision 0, "BWR Stability Analysis -
                      --
Assessment of STAiF with Input from MICROBURN-B2," Siemens Power Corporation, August 2000.
23 I -" -
: 17. NEDO-32465-A, "BWROG Reactor Core Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications," August 1996.
0.0.
: 18. ANF-913(P)(A), Volume t Revision I and Volume I Supplements 2, 3, and 4, "COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses," Advanced Nuclear Fuels Corporation, August 1990.
I I...
: 19. ANF-1 358(P)(A), Revision 3, "The Loss of Feedwater Heating Transient in Boiling Water Reactors," Framatome ANP, September 2005.
II -'-I....
SUSQUEHANNA UNIT1                TRM/3.2-63          SUSQEHANA EFFECTIVE NITTR/3.-63 DATE 11/04/2015
I
                                                                          .. F - I-'
                                                                                ,           ~l,       I-
* I
                                                                                                                      -
I    * --I - - - - -l-I
                                                                                                                              ,               ,                 I
                                                                                                                                                                      -- - It - -
                                                                                                                                                                            ,
* 3I        -       *
                                                                                                                                                                                                                /     -   f - I- -
I            ,
                                                                                                                                                                                                                                                -I - d        - -
i      I                 I                       I              I                                    I                I            I                                    I          I            I            I
                      ! ,,     IJ, J            I                I              I              I              I            r                                                                                    I          I            I            I I            I                  I                              -                                                                                                               3          I            I 0        0.30                                                    I              I              II              I            r                                I            I                1 2,0                          30                              40                                50 Core Power                60 (% RATED) 70                                                    80                      90                            100 POWER DEPENDENT LHGR LIMIT MULTIPLIER MAIN TURBINE BYPASS OPERABLE                                                                                                                                  o ,z AT*iUMTM-10 FUEL FIGURE 6.2-3


Rev. 16                      PL-NF-14-O01 Rev. 2 Page 32 of 62 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT I  TRM/3.2-33 SUSQEHANA NITTR/3.-33 DATE 11t10412015 EFFECTIVE
Main Turbine Overspeed Protection System Rev. 2                                                                                    3.3.7 3.3    Instrumentation 3.3.7    Main Turbine Overspeed Protection System TRO 3.3.7      One Main Turbine Overspeed Protection System shall be OPERABLE.
APPLICABILITY:          MODES I and 2 ACTIONS CONDITION                        REQUIRED ACTION              COMPLETION TIME A. Two of eight stop valves      A.1.1 Close one of the inoperable      72 hours and control valves                  valves.
inoperable.
AND A.1 .2 Limit THERMAL POWER            12 hours following
                                        < 75% RTP.                      closure of the inoperable valve AND A.1.3 Apply the following limits for a 12 hours following closed Turbine Stop Valve or    closure of the Turbine Control Valve as        inoperable valve specified in the COLR:
: a. LCO 3.2.2, 'MINIMUM CRITICAL POWER RATIO (MCPR),"
: b. LCO 3.2.3, 'LINEAR HEAT GENERATION RATE (LHGR)."
OR A.2    Isolate main turbine from the  72 hours steam supply.
(continued)
SUSQUEHANNA-UNIT1                    TRM / 3.3-17            SUSQEHANA-UITITRM 3.-17EFFECTIVE DATE 11/04/2015


SSES UNIT 1 CYCLE 19 Co      1.10 I
Main Turbine Overspeed Protection System Rev. 2                                                                                    3.3.7 ACTIONS (continued)
z        1.00 C:
CONDITION                      REQUIRED ACTION                  COMPLETION TIME B. Two of twelve intercept      B.1  Close either the intercept          72 hours valves and intermediate            valve or the intermediate stop stop valves inoperable,            valve within one of the affected combined intermediate valves.
Z        0.90 0.
OR 8.2   Isolate main turbine from the      72 hours steam supply.
0.80
C. Turbine Overspeed            C.1  Isolate main turbine from the      6 hours Protection System                  steam supply.
.-I  "-J C;, ._   0.70 C;o 0,
inoperable for reasons other than Condition A or B.
C),. 0) 03  0.60 0o Ct 0.50 m
SUSQUEHANNA-UNIT1                  TRM / 3.3-17a            SUSQEHANA
C)
                                                                  -UNI I RM  DATE 11/04/2015 I3.317aEFFECTIVE
-H m1      0.40 0
H-1 m]      0.30 30 40 50      60 Total Core Flow 70          80  90 100 110 (MLB/HR)
                                                                      "0  "-
nD FLOW DEPENDENT LHGR LIMIT MULTIPLIER            C.D z MAIN TURBINE BYPASS INOPERABLE 01                                ATRIUMTMea-t FUEL                        -Il 0O FIGURE 6.2-4                          0


CO,                        SSES UNIT 1 CYCLE 19 C          1.10 03 m
Main Turbine Overspeed Protection System Rev. 2                                                                                              3.3.7 TECHNICAL REQUIREMENT SURVEILLANCE
=
                        -------------            ~NOTE----              --------
z z
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed up to 6 hours provided the redundant overspeed trip device is OPERABLE.
C z
SURVEILLANCE                                              FREQUENCY
a..
                          --      NOTE--..........----......
      .5.
The provisions of TRS 3.0.4 are not applicable TRS 3.3.7.1    Cycle each high pressure turbine control valve from the              92 days running position and observe valve closure.
      .5 0
                        -- -- NOTE--...............................
---I
The provisions of TRS 3.0.4 are not applicable TRS 3.3.7.2   Cycle each low pressure turbine combined intermediate                92 days valve from the running position and observe valve closure.
!:
NOTE---------------------.....
a, 1'3    a,                                                                        oD 0
The provisions of TRS 3.0.4 are not applicable TRS 3.3.7.3    Cycle each high pressure turbine stop valves from the                92 days running position and observe valve closure.
I..
TRS 3.3.7.4    Perform a CHANNEL CALIBRATION of main turbine                        24 months overspeed protection instrumentation.
a) 0 0.
TRS 3.3.7.5    Disassemble one of each type valve identified in                      40 months on a TRS 3.3.7.1, TRS 3.3.7.2, and TRS 3.3.7.3, perform a                  STAGGERED TEST visual and surface inspection of valve seats, disks and              BASIS stems and verify no unacceptable flaws or corrosion.
m m
SUSQUEHANNA-UNIT1                              TRM / 3.3-18              SUSQEHANA UNT I RM3.-18EFFECTIVE DATE 10/31/2007
0
.-I m
0 4>              20 30 40     50          60 (% RATED) 70 Core Power                    80 90 100
--I, 01" POWER DEPENDENT LH-GR LIMIT MULTIPLIER MAIN TURBINE BYPASS INOPERABLE                Co C?                                  ATRIUMTM.-10 FUEL FIGURE 6.2-,5 0"C*


Rev. 16                      PL-NF-14-00l Rev. 2 Page 35 of 62 One TSV or TCV Closed SUSQUEHANNA UNIT 1 TRM/3.2-36    NITTR/3.-36DATE 11/04/2015 EFFECTIVE SUSQEHANA
Main Turbine Overspeed Protection System Rev. 2                                                                                      B 3.3.7 B 3.3.7 Main Turbine Overspeed Protection System BASES TRO              The Main Turbine Overspeed Protection System is designed to protect the main turbine from excessive overspeed by initiating a turbine trip by fast closure of the turbine control valves and closure of the intercept valves to essentially secure all steam flow to the turbine (Ref. 1).
To protect the turbine generator from overspeed conditions, two trip devices are provided. Either device, when initiated, will close the main stop valves, control valves, and combined intermediate valves thus isolating the turbine (Ref. 2).
These two trip devices are as follows:
                *A    mechanical overspeed trip which is initiated ifthe turbine speed reaches approximately 10% above rated speed, and o    An electrical overspeed trip which serves as a backup to the mechanical trip and is initiated at approximately 12% above rated speed.
OPERABILITY of at least I of the 2 overspeed protection systems is required for the Turbine Overspeed Protection System to be considered OPERABLE.
Main Turbine Overspeed Protection System (MTOPS) OPERABILITY is also based upon the ability of the valves that control steam flow to the turbine to close following the receipt of a closure signal. The 4 stop valves, 4 control valves, 6 intermediate stop valves, and 6 intercept valves make up a system of 20 valves. A single failure to any one of the above system of 20 valves will not prevent a turbine trip (Ref. 2). Hence, if 19 of the 20 noted valves are OPERABLE, the MTOPS is OPERABLE. Note that for this statement to be true, the intermediate stop valves and intercept valves are considered separate valves. Overspeed protection is only disabled on a CIV failure if both valves within a CIV are inoperable. Failure of only one valve in a CIV does not prevent an overspeed trip, and does not affect operability. Actions to close one inoperable valve if two valves are inoperable maintain the unit within the analysis in Ref. 2. However, redundancy is reduced and repairs should be completed in accordance with the corrective action program.
Excessive turbine overspeed could generate potentially damaging missiles that could present a personnel and equipment hazard. MTOPS is not necessary to provide adequate protection of the public health and safety and is not required to obviate the possibility of an abnormal situation or event giving rise to an immediate threat to the public health and safety.
(continued)
SUSQUEHANNA - UNIT 1                   TRM / B 3.3-14            SUSQEHANA
                                                                      -UNI I TM
                                                                              /BDATE 3.-14EFFECTIVE 06/25/2002


0                                                                                                                    O SSES UNIT 1 CYCLE 19 1.10 C
Main Turbine Overspeed Protection System Rev. 2                                                                                    B 3.3.7 B 3.3.7 Main Turbine Overspeed Protection System BASES (continued)
i"1 1.00 C
ACTIONS          The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.
z      0.90 a,
A.1.l, A.1.2, A.1.3 and A.2 If two of eight stop valves and control valves are inoperable, action must be taken to restore at least one of the valves to OPERABLE status in 72 hours.
        -H1    0.80
This action ensures steam isolation to the turbine in the event of an overspeed condition, and maintains the unit within the bounds of the FSAR analysis. The 72-hour Completion Time provides a reasonable time to troubleshoot the problem, make repairs, and reduce power in an orderly manner if required without challenging plant systems. The required action if the problem is not resolved is to close one of the inoperable valves, or to isolate the main turbine from the steam supply. If one of the inoperable valves is closed, then limit thermal power to less than or equal to 75% of rated power, and apply Minimum Critical Power Ratio (MCPR) and Linear Heat Generation Rate (LHGR) limits as specified in the COLR within 12 hours. Restricting thermal power to less than or equal to 75% of rated power eliminates possible shock loads to the turbine blades that could occur from a non-uniform circumferential steam flow distribution entering the HP turbine for this configuration. If the MCPR and LHGR limits are not in compliance with the applicable requirements at the end of this period, the ACTIONS required by the applicable specifications must be implemented.
            -_J 0.70 CD CD
This time is provided to stabilize operation with a closed Turbine Stop Valve or Turbine Control Valve.
        ",4 0.60 U..
B.1 and B.2 If two of twelve intercept valves and intermediate stop valves are inoperable, action must be taken to restore at least one of these valves to OPERABLE status in 72 hours. This action ensures steam isolation to the turbine in the event of an overspeed condition. The 72-hour Completion Time provides a reasonable time to troubleshoot the problem, make repairs, and reduce power in an orderly manner ifrequired without challenging plant systems.
0.50
The required action ifthe problem is not resolved is to close either the intercept valve or the intermediate stop valve within one of the affected combined intermediate valves, or to isolate the main turbine from the steam supply.
        -T1
(continued)
        -IT 0.40 m
SUSQUEHANNA-UNIT1                  TRM / B 3.3-14a            SUSQEHANA-NITI TR
m      0.30 0          30            40            50            60 Total Core 70Flow (MLB/hr) 80            90  100 110 rl3 FLOW DEPENDENT LHGR LIMIT MULTIPLIER 0                                                          ONE TSV OR TCV CLOSED*                                0-" 0 ATRIUMTM-t10 FUEL                                D' I, -=
                                                                            / 3.314aEFFECTIVE DATE 11/04/2015
FIGURE 6.2-6
                        *Operation with one TSV or TCV closed is only supported at power [evels
* 75% rated power.
n ,, n


C',
Main Turbine Overspeed Protection System Rev. 2                                                                                    B 3.3.7 B 3.3.7 Main Turbine Overspeed Protection System BASES ACTIONS          C.1 (continued)
SSES UNIT 1 CYCLE 19 C
If the MTOPS is inoperable for reasons other than conditions A or B, then action must be taken to isolate the main turbine from the steam supply.
03 m
6 hours allows a reasonable amount of time to complete the plant shutdown associated with isolating the main turbine from the steam supply.
C z
TRS              The TRSs are performed at the specified Frequency to ensure that the turbine overspeed protection function is maintained OPERABLE.
13
The TRSs are modified by a Note to indicate that when a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the redundant overspeed trip device is OPERABLE. Upon completion of the Surveillance, or expiration of the 6 hour allowance, the channel must be returned to OPERABLE status or the applicable Condition entered and Required Actions taken. This Note is based on the average time required to perform channel Surveillance. The 6 hour testing allowance does not significantly reduce the probability that the Main Turbine Overspeed Protection System will function when necessary.
{.i
TRS 3.3.7.1, TRS 3.3.7.2, and TRS 3.3.7.3 Verification of the movement of each of the four high pressure turbine control valves, six low pressure turbine combined intermediate valves (composed of 6 intermediate stop valves and 6 intercept valves), and four high pressure turbine stop valves ensures the OPERABILITY of each valve and that it will be able to close in the event of a turbine trip condition. The 92 day Frequency is based upon current surveillance practice as recommended by the turbine vendor and described in the FSAR (Ref. 3).
--I  ,-J
(continued)
      .1_
SUSQUEHANNA - UNIT 1                TRM / B 3.3-14b              SUSQEHANA-NIT TRM/
C,)
B3.314bEFFECTIVE DATE 11/04/2015
0 cc    0L                                                        0) mT "rn ml 0
<
m1 H3 20 30  40              50 (% RATED)
Core Power            60    70 80 rn
-I POWER DEPENDENT LHGR LIMIT MULTIPLIER      CD  Z ONE TSV OR TCV CLOSED ATRIUMTM-10 FUEL                  *i--  n FIGURE 6,2-7                      c0*


Rev. 16                                      PL-NF-14-OO1 Rev. 2 Page 38 of 82 7.0  ROD BLOCK MONITOR (RBM SETFOINTS AND OPERABILITY REQUIREMENTS 7.1  Technical Specification Reference Technical Specification 3.3.2.1 7.2  Description The RBM Allowable Value and Trip Setpoints for; a)  Low Power Range Setpoint, b)  intermediate Power Range Setpoint, c) High Power Range Setpoint, d) Low Power Range - Upscale, e) Intermediate Power Range - Upscale, and I) High Power Range - Upscale shall be established as specified in Table 7.2-1. The RBM setpoints are valid for Two Loop and Single Loop Operation, Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
Main Turbine Overspeed Protection System Rev. 2                                                                                      B 3.3.7 B 3.3.7 Main Turbine Overspeed Protection System BASES TRS              TRS 3.3.7.4 (continued)
The RBM system design objective is to block erroneous control rod withdrawal initiated by the operator before fuel design limits are violated. Ifthe full withdrawal of any control rod would not violate a fuel design limit, then the RBM system is not required to be operable. Table 7.2-2 provides RBM system operability requirements to ensure that fuel design limits are not violated.
This TRS is for the performance of a CHANNEL CALIBRATION of the required main turbine overspeed protection instrumentation. The calibration is a complete check of the instrument channel from the sensing device to main turbine trip initiation. The Frequency of 24 months is a typical refueling cycle and considers channel reliability.
SUSQUEHANNA UNIT 1                  TRM/3.2-39                    NITTRIS.-39 DATE 11/04/2015 SUSQEHANA EFFECTIVE
TRS 3.3.7.5 The disassembly and inspection of the valves referenced ensures that abnormal wear is not occurring which could result in the valves inability to close upon receipt of a close signal. The Frequency is such that only one of each type valve (i.e., high pressure turbine stop; high pressure turbine control; and low pressure turbine combined intermediate), is required to be inspected within a 40 month period. If unacceptable flaws or excessive corrosion are found in a valve, all valves of its type are inspected (Ref. 3).
Valve bushings are inspected and cleaned, and bore diameters are checked for proper clearance.
REFERENCES      1. FSAR Section 7.7:1.5
: 2. FSAR Section 10.2.2.6.
: 3. FSAR Section 10.2.3.6.
SUSQUEHANNA-UNIT1                  TRM / B 3.3-14c            SUSQEHANA
                                                                      -UNITI TR
                                                                              / 3.314cEFFECTIVE DATE 11/04/2015


Rev. 16                                      PL-NF-14-001 Rev. 2 Page 39 of 62 Table 7.2-I RBM Setpoints Allowable            Nominal Trip Function                        Value( 1 )             Setpoint Low Power Range Setpoint                              28.0                  24.9 Intermediate Power Range Setpoint                      63.0                  61.0 High Power Range Setpoint                              83.0                  81.0 Low Power Range - Upscale                            123.4                  123.0 Intermediate Power Range - Upscale                    117.4                  117.0 High Power Range - Upscale                            107.6                  107.2 (1)   Power setpoint function (Low, Intermediate, and High Power Range Setpoints) determined in percent of RATED THERMAL POWER. Upscale trip setpoint function (Low, Intermediate, and High Power Range - Upscale) determined in percent of reference level.
Nov. 11, 2015 Page       1    of 2 MANIJAL HARD COPY DISTRIBUTION DOCUMENT TRANMSMITTAL 2015-45734 USER INFORMATION:
Table 7.2-2 RBM System Operability Requirements Thermal Power                                MCPR    (2.3)
GERLACH*ROSEY N          EMPL#:028401  CA#:  0363 Address: NUCSA2 Phone#:  254-3194 TRANSMITTAL INFORMATION:
(% of Rated)
TO:      GERLACH*ROSEY N      11/11/2015 LOCATION:    USNRC FROM:    NUCLEAR RECORDS DOCUMENT CONTROL CENTER  (NUCSA-2)
                        > 28 andc<90                                  < 1.76
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL,  ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MNAL.         TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
                        ~90 and <95                                    <1.47
ATTENTION: "REPLACE" directions do not affect the Table of Contents,    Therefore no TOC will be issued with the updated material.
                              >_95                                    < 1.70 (2)  Applicable to Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
TRMI  - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS    DATE: 11/03/2015 ADD      MANUAL TABLE OF CONTENTS  DATE: 11/10/2015 CATEGORY:  DOCUMENTS  TYPE: TRM1 4oc2
(3 Applicable to both Two Loop and Single Loop Operation.
 
SUSQUEHANNA UN]T 1                   TRMI3.2-40          SUSQEHANA NITTRI3.-40 DATE 11/04/201 5 EFFECTIVE
Nov. 11, 2015 Page      2    of  2 ID:  TEXT 3.2.1 REMOVE:    REV:15 ADD:    REV:  16 CATEGORY:  DOCUMENTS  TYPE: TEMI ID:  TEXT 3.3.7 REMOVE:    REV:1 ADD:    REV:  2 CATEGORY:  DOCUMENTS  TYPE: TRMI ID:  TEXT B3.3.7 REMOVE:    REV:I1 ADD:    REV:  2 CATEGORY:  DOCUMENTS  TYPE: TRMI ID:   TEXT LOES REMOVE:    REV: 83 ADD:    REV:  84 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED,   CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.     FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
 
SSES MNUALm Manual Name:z  TRM1 Manual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date:          1LI/I10/2 015 Procedure Name                    Rev  Issue Date        Change ID      Change Numiber TEXT LOES                          84  11/10 /2 015
 
==Title:==
LIST OF EF:FECTIVE SECTIONS TEXT TOC                          25  04/28/2015
 
==Title:==
TABLE OF CONTENTS TEXT 1.1                          1    01/31/2014
 
==Title:==
USE AND APPLICATION DEFINITIONS TEXT 2.1                           2   04/28/2015


Rev. 18                                    PL-NF-1 4-001 Rev. 2 Page 40 of 62 8.0  REGIRCULATION LOOPS - SINGLE LOOP OPERATION 8.1  Technical Specification Reference Technical Specification 3.2.1, 3.2.2, 3.2.3, 3.3.4,1, 3.4.1,3.7.6, and 3.7.8 8.2 Technical Req~uirements Manual Reference Technical Requirements Manual 3.3.7 8.3  Description APLHGR The APLHGR limit for ATRlUMTM-I 0 fuel shall be equal to the APLHGR Limit from Figure 8.2-1.
==Title:==
The APLHGR limits in Figure 8.2-1 are valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Single Loop operation.
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2                           10  01/31/2014
Minimum Critical Power Ratio Limit-The MCPR limit is specified as a function of core power, core flow, and plant equipment operability status. The MCPR limits for all fuel types (ATRIUM TM-10) shall be the greater of the Flow-Dependent or the Power-Dependent MCPR, depending on the applicable equipment operability status.
a)  Main Turbine Bypass I EOC-RPT / Backup Pressure Regulator Operable Figure 8.2-2: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-3: Power-Dependent MCPR value determined from BOC to EOC b)   Main Turbine Bypass [noperable Figure 8.2-4: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-5: Power-Dependent MCPR value determined from BOC to IEOC c)  EOC-RPT Inoperable Figure 8.2-6: Flow-Dependent MCPR value determined from BOG to EOC Figure 8.2-7: Power-Dependent MCPR value determined from BOC to EOC SUSQUEHANNA UNIT 1                  TRMI3.2-41                    NIT TRI3.-41EFFECTIVE SUSQEHANA      DATE 11/04/2015


Rev. 18                                    PL-NF-14-OO1 Rev. 2 Page 4l of 62 d)  Backup Pressure Regulator Inoperable Figure 8.2-8: Flow-Dependent MCPR value determined from BOO to EGOC Figure 8.2-9: Power-Dependent MCPR value determined from BOO to EDO e)  One Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 8.2-1O:Flow-Dependent MOPR value determined from BOO to EDO Figure 8.2-11 :Power-Dependent MOPR value determined from BOO to EOC The MOPR limits in Figures 8.2-2 through 8.2-1 1 are valid only for Single Loop operation.
==Title:==
Linear Heat Generation Rate Limit The LHGR limits for Single Loop Operation are defined in Section 6.0.
PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0                           5    03/05/2015
RBM Setpoints andOperabilityRequirem~ents The RBM setpoints and operability requirements for Single Loop Operation are defined in Section 7.0.
SUSQUEHANNA UNIT 1              TRM/3.2-42                NITTRI3.-42 DATE 1110412015 EFFECTIVE SUSQEHANA


C            16.0        T                  T                    T                    r                T            ~                      T                  ~                        u              1                      1                  ~                  I                  r QI                      I      I   '                I                                  I            l              Il      l        t                I        I        la            1                  l                        l 9      i0 1                                    '
==Title:==
I      E      lI        I                              I  Ii    l    l                                                    l                llI                                                lI                                                    l
TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY & SURVEILLANCE   (TRS)
: z.                                           1. .1.                          II                    .11                                            ..                                  II1lIti1                                                                                                  1 I,    i  I    s I  i    I  r  I,.i        m      i    .              m        m        m    ii.m                                                                                                  n  l4...4      mm~~u            mm.4.*"
APPLICABILITY TEXT 3.1.1                        1    11/09/2007
I11I    1    I    I            Ii      lIlC              Il                  IlIII1I                            I1I1      l      i        l                                                                                                                1 Il      l                            l        ~l      t                                                l                      I!                    ~            l      l                  l        O              l                    1              1 I      I    I    l    I                                  I      I        I      Ii ~ll          I    I                        l1                1      1I tltitjilt                                  SED IND*ERINIG0
 
            *      --    J-      I---. ii!                            I      I-I.--    --            I--  j--i-..J..-,Lf                                                                                                                        lf...f                                          I I1                                                                                                              1'I II&#xa3;            I Ii 1                        I I
==Title:==
I          I I
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2                         0    11/18/2002
1 I1                                                                                                                        I1                  1      1        1        1                I*      I          I        1 I  IIlli  I                                                                  l        II      l                                              I      I                        I                I    I 0l3l                                                                      l                        l          l                  l                                  l                l                                                  I      1                    1
        =                    *oo                ,              Ioo  I            IO  ll .I                                    ,                                  II                              I      II                          I, 1I I        I                                I                I            I        I    I      I        I        I                                            l      l3    l                                            I      [                    II II                                                                      IIII    l    Il      l        lI                            I          1        1    1        I mI.._1111l1                                                                                I          I        lllll1                                    :11!                                l111                            l1!.                        1                  l11l Iiii                      II              !              II                      11                 11          lll                                ll                      l                          Il                                  I        ll HI I I I I ,        l      l      l        l I      ,
I I I I I" I      l    l II I l        l~ll
                                                                                                                                                    ,I l        li
                                                                                                                                                                    ,      ,    I l      l            l:l I
l1 1
:l    l        l 67000,5.6 l
1o                              1                   11 1111              1              Il                                                        liIljlIlIIIIIl                                                                                          l    l        ll II                                      l                l    l            Illl                        I          l      l                      I                                                I            Il                          l 4.0      L U'                    i41--                         LI4l2                    M - -L --                    ~L-              AJ-J                                        L..L
                                                                                                                                                                                          ...........                          ...            --  ,                  I          ,      ,.        ,    I 0.0                  l1000.                          l              2000.0                ll                    000.                                4000.08000.06000.07000.
        -L~l                                                                      l                l            l              l                  l    l                  lI                                        l                l              i                l            l Averag PlanalEpour                                                        MWIMTU)l o    =          a      l                l              l                l                l            l              l                  l2l                                        l                                l                i              t            l                l A                                                                                    '        I      I    I    I        l                                                                          *                    .                .                                                                        Ca AVRAEPLNR                                      INA                  HA              GENERATION RAELMITlERSUtll o                                                            AERAE PANA                                        EPOSRE..SIGL.LOP.OERAIO ATRIUMTMAOll FUELll                                                l                                                                                  l                          owlll FIGURE 8.2-1ll          l        l      l    l                  l      l        lI                              I
......                    , , J2J***
                                    .....   . . . ..    . .. .... .....*.. ....................... . ..... ..... .....                ..........      ... * . ....      .......... ... ... ................. ......    ................... ......... ....... . ..... . ..      .. r*, i, . ... .. ... . .. ... .... .. .


Rev. 16                  PL-NF.-14-001 Rev. 2 Page 43 of 62 Main Turbine Bypass I EOC-RPT/I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 1 TRM/3.2-44    UITTRM3.2-44 SUSQEHANA EFFECTIVE DATE 11/0412.015
==Title:==
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3                        5    04/16/2009


9 SSES UNIT 1 CYCLE 19 3.6                                                        I            I                        I LEGEND m          3.4            4.                          a-    CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM z                                                                        INSERTION TIME z          3.2            +              I            4-C                                                            CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME z
==Title:==
3.0 t                            1--i.
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4                         0   11/18/2002
m I II II . . I H0 4-.
D.1 o~
2.8 2.6 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES L
ARE OPERABLE PER SR 3.7.6.t AND 3.7.6.2 I            I              Ii USED INDETERMINING MFLCPR K
0,  2.4 0
2.2 2.0 i'1
-m        '.8 rI,           


==REFERENCE:==
==Title:==
" T.S. 3.4.1 and 3.2.21                                                              108, 1.49' 1.6 H
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS  INSTRUMENTATION  &
  -m 0        '1.4 1N1                                                                  70          80            90        100          110 0              30        40            50          60 Total Core Flow (MLB/HR)
CHECK VALVE TEXT 3.2.1                         16 11/10/2015
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW                                      Co MAIN TURBINE BYPASS 1 EOC-RPT / BACKUP PRESSURE REGULATOR OPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-2


9                                                                                    0 SSES UNIT I CYCLE 19 4.6 o0 4.4                                        ___      LEGEND 4.2
==Title:==
________CURVE                                        A: MAXIMUM ALLOWABLE AVERAGE SCRAM
CORE OPERATING LIMITS REPORT   (COLR)
____INSERTION                        TIME z      4.0      ____________CURVE                                    B: REALISTIC AVERAGE SCRAM INSERTION TIME
Report Date: 11/11/15 Pagel Page !     of of i~
                                                      ~-CURVE C: CORE POWER _<26% AND coRE FLOW
16                                                        Report Date: 11/11/15
* 50 MLBM/HR 3.6
 
__                          ------
SSES MANUAL Manual Name:       TRMI Manual
S  3.4
                                                                                --fl!SAFETY   ANALYSES ASSUME THAT F~OUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.2 Ho  03 3.0                      _____USED                                                            IN DETERMINING MFLCPR 1.
N)
CD 0 2.8 0);
0) 2.6
_                                        _
2.4 2.2 f                                      140. 2.08!
                                                *-
                          ,4 0A-B-BT*
4 -.--------        ~   I "t100, '
2.0              F                                                                          *,                              ... .. . .. .
  -Iil m
t 1.8 0              REEEC: T.S. 3.4.1 and 3.2.2                                                          "Z 1.6 Hr o      1.4 20                                                                                                                              100 mn                              2040                                50co              60*( RAE70                80          90 "0  "
MCPR OPERATING LIMIT VERSUS CORE POWER                                                  CD MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-3                                                  &deg;<  I
                                                                                                                                                      "*  O 0)' C


Rev. 16                        PL-NF-14-OO1 Rev. 2 Page 46 of 62 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT1  TRM/3.2-47 SUSQEHANA NITTR/3.-47 DATE 1110412015 EFFECTIVE
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1                        0    11/18/2002


C' SSES UNIT 1 CYCLE 19 4.2                                                                  I            I          II C-
==Title:==
_______
INSTRUMENTATION RADIATION MONITORING   INSTRUMENTATION TEXT 3.3.2                       3    03/31/2011
________                ________            LEGEND 4.0 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM 3.8                                                        -          INSERTION TIME z
z
________________CURVE                              B: REALISTIC AVERAGE SCRAM iNSERTiON TIME 3.6 z
3.4
                                                                -   SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS        -
    ,4D 3.2 VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 o* 3.0 H0 0
CD co3 0) 2.4.
2.2 m      2.0 "I1 m                                                                                                                        .
1.8     -1


==REFERENCE:==
==Title:==
T.S. 3.4.1, 3.7.6,, and22                                            -- _,118 0
INSTRUMENTATION  SEISMIC MONITORING  INSTRUMENTATION TEXT 3.3.3                        2    11/09/2007
m      1.6       _  _          _        _        _I            _      _            _-_-_-_
 
1.4 m
==Title:==
30          40                  50            60 Total Core 70            80        90          t00        110 Flow (MLB/HR) 0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW                                    CD  Z
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4                       8    10/14/2015
-J.                                                        MAIN TURBINE BYPASS INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)
 
FIGURE 8,2-4                                                0 o)"
==Title:==
INSTRUMENTATION TRN POST-ACCIDENT MONITORING INSTRUMENTATION LDCN          4552 TEXT 3.3.5                        0     11/18/2002
 
==Title:==
INSTRUMENTATION THIS PAGE INTENTIONALLY    LEFT BLANK TEXT 3.3.6                       4     04/29/2014


C, SSES UNIT I CYCLE 19 4.2    123,4A41                                        *              =*                      *l "1 I    " m                                                            l C-Cin                              I                        LEGEND 4.0 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM F                                                        INSERTION TIME z        3.8 z                                                          CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME
==Title:==
              ~, 3,61              ____________ 4-Z
INSTRUMENTATION TRN ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7                       2     11/10/2015
-I      3.6                                              CURVE C: CORE POWER_*26% AND CORE F~LOW _<50 MLBMIHR
                                                .t-l 3.4                                    I        m
    .1.a                1I~Z~38 I--.*-                  4.              I-I E
-I  Cu 3.2 ISAFETY VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6,2 ANALYSES ASSUME THAT TWO OR MORE BYPASS w 3.0                                                                          USED IN DETERMINING MFLCPR I-
_____
0.
1~oi C~) 0
                                        .41 CD N)
: a. 2.8 CO 0                                                ______      _                                          ________                0) 2.6 2.4 2,2 m
2.0 0r           


==REFERENCE:==
==Title:==
T.S. ,3.4.1, 3.7.6, and 3.2.2                                  ..
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8                        1     10/22/2003
-I      1.8 20                30              40                    6060 Power (%o o70RATED)            80          90  100 50Core "0  "T CD MCPR OPERATING LIMIT VERSUS CORE POWER                              Com    I N)                                                            MAIN TURBINE BYPASS INOPERABLE                                  .CD SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8,2-5                                      ow.
: h. h< .-


Rev. 16                  PL-NF-14-O0l Rev. 2 Page 49 of 62 EOC-RPT Inoperable SUSQUEHANNA UNIT 1  TRM/3.2-50 SUSQEHANA NIT TR/3.-5OEFFECTIVE DATE 11/0412015
==Title:==
INSTRUMENTATION TEN RPS INSTRUMENTATION TEXT 3.3.9                        3     04/17/2008


p SSES UNIT 1 CYCLE 19 4.0 LEGEND m      3.8 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM~
==Title:==
z      3.6              ________________INSERTION                                    TIME z
OPEN INSTRUMENTATION CONFIGURATION TEXT 3.3.10                      1    12/14/2004
C                                                                CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 3.4 z
 
3,2 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVESl E 3.0                                                      -        ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2
==Title:==
  ,U
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11                      1     10/22/2003
-1 I-2,8                                                                    USED IN DETERMINING MFLCPR 4,
 
0.
==Title:==
2.6 0
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12                      1     03/05/2015
N, 0I 2.4                                                                                                                                0) 2.2 2.0 m     1.8 0
 
<           
==Title:==
WATER MONITORING INSTRUMENTATION Report Date: 11/11/15 Page 2      of of  16 I__66                                                    Report Date: 11/11/15


==REFERENCE:==
                                                ~SES MANTJAIJ Manual Namue:      TRMI Manual
T.S 3..,.341              and 3.2.2                                      _            "_-_-_-[_08t" 1.6 1.4 m          30        40                    50          60              70          80        9t0          100              110 Total Core Flow (MLB/HR)
                                                                                                                                    *,     ,I-0                                              MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW 4*                                                            EOC-RPT INOPERABLE                                                  -Q* .:
SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-6


C*
==Title:==
SSES UNIT 1 CYCLE 19 Cb 0*
TECHNICAL REQUIREMENTS      MANUAL UNIT 1 TEXT 3.4.1                           1     04/26/2006
z
.-I C.'
CD C.,
N)
C,'                                                                    0)
'-I"1
['11
-IT m
1-1 20 30 40          5060 Power' (% RATED) 70 80Core                        80 90 100 m                                                                  -U  -D MCPR OPERATING LIMIT VERSUS CORE POWER          Co  z EOC-RPT INOPERABLE 0,-
SINGLE LOOP OPERATION (BOC to EOC)                  ,C FIGURE 8.2-7                      ow' 0


Rev. 15                      PL-NF-14-OO1 Rev. 2 Page 52 of 62 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 1   TRM/3.2-53 SUSQEHANA NITTRIS.-53 DATE 11/04/2016 EFFECTIVE
==Title:==
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2                           1       04/16/2009


C',
==Title:==
SSES UNIT I CYCLE 19 CO                  4.0 I                                    I                        I                                I m                  3.8
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3                           1      11/09/2007
                                                                                                                                                                *:MAXIMUM ALLOWABLE AVERAGE SCRAM z
 
3.6                                                                                                                                    INSERTION TIME V
==Title:==
I                                                                  .
REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4                          2      04/17/2008
C                                                                                                                                                    I: REALISTIC AVERAGE SCRAM INSERTION TIME z                  3.4                                                          4                                    4.-
 
3.2                                                                                                                                       f          ,      ,    .. ,I.,,.I,, I ,                      "                                "
==Title:==
S C
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION  FLOW AND ROD LINE LIMIT TEXT 3.4.5                          1      04/26/2006
3.0 2,8 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR 2
 
H* C)    a.
==Title:==
0 2,6                                                                                                                                                                                                                                                                            CD 0~
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6                          2       04/25/2013
C,          2.4 2,2 2.0 r-n
 
        -n' rni                1.8                                                                                                                        A-
==Title:==
__---_    _          _       ___            __                                                                  B
REACTOR RECIRCULATION  SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1                           1      02/04/2005
                                            ._
 
==Title:==
EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2                           1      11/09/2007
 
==Title:==
EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3                          0      11/18/2002


==REFERENCE:==
==Title:==
T.S. 3.4.1, 3.7.8, and 3.2.2[                                                                      ____.__                                  ..        _. _        _                                  .J._108, 1.48 1.6 m
EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1                           0       11/18/2002
1,4 30                      40                        50                                  60                                  70                                    80                        90                              100                  110 Total Core Flow (MLBJHR) w  r 0*
MOPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE                                                                                                                                              01 SINGLE LOOP OPERATION (BOC to EGOC)
FIGURE 8.2-8                                                                                                                          0O" 0
' I * . ...... .... .......  "..............  ... ...... . ... .  .. ... .  .  . ............  ......  ..............  .........................      .................  .................  .. ..    * ..  . .    =. . ... * " *LZ*:*  I* *,.,. L*** ............  .....


CD SSES UNIT 1 CYCLE 19 C                                                                                                                  "   'I-0*
==Title:==
C      4.4                               ----  LEGEND m                                                                UM ALLOWABLE AVERAGE SCRAM
CONTAINMENT VENTING  OR   PURGING TEXT 3.6.2                            2      04/29/2014
-i-     4.2                                      CURVE A: MAXIM z                    ____
 
_  __ ___
==Title:==
___ ___INSERi                      nION TIME z
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3                            0       11/18/2002
C      4.0                                     CURVE B: REALI*
 
STIC AVERAGE SCRAM INSERTION TiME 3._____,_.__1CURVE                         C: CORE POWER < 26% AND CORE FLOW < 60 MLBMIHR I
==Title:==
I                    I rY ANALYSES      ASSUME THAT FOUR BYPASS VALVES  l---
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Report Date: 11/11/15 Page Page~*        of of  16 i_*6                                                        Report Date: 11/11/15
ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.0          26.01, 2.90 E
 
USED IN DETERMINING MFLCPR CD 0.= 2.6                                    A                                                  *1*
SSES MANUJAL Manual Name :      TE*I 21:Manual
0)
 
O-                                                            60, 2.18 U*                                                                                            4         4 1100 "
==Title:==
                                                                                                                    -
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6.4                           0     11/18/2002 Titles CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1                            0    11/18/2002
2.2                                                          1 m
 
2.0 m
==Title:==
1.8   
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM      (ESW) SHUTDOWN TEXT 3.7.2                            0     11/18/2002
 
==Title:==
PLANT SYSTEMS ULTIMATE HEAT SINK (UHS)    AND GROUND WATER LEVEL TEXT 3.7.3.1                         2    04/16/2009
 
==Title:==
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2                        3    04/16/2009
 
==Title:==
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3                        3    04/16/2009
 
==Title:==
* PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4                        2    04/16/2009 Title :  PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5                        2     04/16/2009 Title :  PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6                        2     04/16/2009 Title :  PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7                        1     04/26/2006 Title :  PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8                        10    09/27/2012
 
==Title:==
. PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4                           1    04/26/2006
 
==Title:==
PLANT SYSTEMS SOLID RADWASTE SYSTEM Report Date: 11/11/15 Page Page A4      of of  16 16


==REFERENCE:==
SSES    MUANTAI
T.S. 3.4.1, 3.7.8, and 3.2.2J11ii 1.4
. IManual
.-I        20          30              40            60  ...    ... 60 ...  ..  .. 70        80        90            100 m                                                          uore r'ower rio KAIi )uJ MCPR OPERATING LIMIT VERSUS CORE POWER                                        CD J\)                                            BACKUP PRESSURE REGULATOR INOPERABLE                                                  "11 0J                                                SINGLE LOOP OPERATION (BOO to EOC)
FIGURE 8.2-9                                                  (:I' .Q DO O--


Rev. 16                      PL-NF-14-001 Rev. 2 Page 55 of 62 One TSV or TCV CloSed SUSQUEHANNA UNIT 1 TRM/3.2-56    NITTR/3.-56 DATE 11/04/2015 EFFECTIVE SUSQEHANA
==Title:==
TECHNICAL REQUIREMVENTS MANUAL UNIT 1 Manual Name:  TRJi1I TEXT 3.7.5.1                      1    03/05/2015


S SSES UNIT 1 CYCLE 19 3,6 0o C
==Title:==
  -i-      3.4 z
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2                      0    11/18/2002 Titleg PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3                      1    04/26/2006
z        3.2 z
 
3.0 2.8 E
==Title:==
0.
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6                        3    06/04/2012
 
==Title:==
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7                        2    09/05/2008 Titles PLANT SYSTEMS MAIM CONDENSER 0FFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING TEXT 3.7.8                        5    03/05/2015
 
==Title:==
PLANT SYSTEMS SNUBBERS TEXT 3.7.9                      2    01/31/2014
 
==Title:==
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10                      1    12/14/2004
 
==Title:==
PLANT SYSTEMS SPENT FUEL STORAGE POOLS  (SFSPS)
TEXT 3.7o11                      0    04/16/2009
 
==Title:==
STRUCTURAL  INTEGRITY TEXT 3.8.1                      2    04/05/2010
 
==Title:==
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1                    2    11/09/2007
 
==Title:==
ELECTRICAL POWER MOTOR OPERATED VALVES  (MOV)  THERMAL OVERLOAD PROTECTI( ON  -.
CONTINUOUS TEXT 3.8.2.2                    2    12/14/2004
 
==Title:==
ELECTRICAL POWER MOTOR OPERATED VALVES  (MOV)  THERMAL OVERLOAD PROTECTICON -
AUTOMATIC Report Date:    11/11/15 Page 5 Page        of of  16 16                                                        Report Date: 11/11/15
 
SSES MANUAL Manual Name:*      TRNI SManual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3                            2      03/05/2015 Title  : ELECTRICAL POWER DIESEL GENERATOR CDG) MAINTENANCE ACTIVITIES TEXT 3.8.4                            0      11/18/2002
 
==Title:==
* ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5                            1      11/14/2013 Title : ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6                            1      12/08/2011 Title : ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7                            1      06/15/2009
 
==Title:==
BATTERY MAINTENANCE AND MONITORING PROGRALM TEXT 3.9.1                            0      11/18/2002
 
==Title:==
REFUELING OPERATIONS  DECAY TIME TEXT 3.9.2                            0      11/18/2002
 
==Title:==
REFUELING OPERATIONS  COMMUNICATIONS TEXT 3.9.3                            0      11/18/2002
 
==Title:==
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1                          1      04/26/2006
 
==Title:==
MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2                          2      08/08/2006
 
==Title:==
MISCELLANEOUS    SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3                          2      06/15/2010
 
==Title:==
MISCELLANEOUS  INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4                          2      04/17/2008
 
==Title:==
MISCELLANEOUS LEADING EDGE FLOW METER    (LEFM)
Report Date: 11/11/15 Page *6 Page          of of  16 16                                                        Report Date: 11/11/15
 
SSES MANUJAL
**    Manual Name:      TRN1
      - Manual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.1                        1      04/26/2006
 
==Title:==
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2                        1      04/26/2006
 
==Title:==
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3                        1      04/26/2006
 
==Title:==
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT        SYSTEM TEXT 3.11.1.4                        2      10109/2012
 
==Title:==
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING      INSTRUMENTATION TEXT 3.11.1.5                        3      03/05/2015
 
==Title:==
RADIOACTIVE EFFLUENTS RADIOACTIVE    LIQUID PROCESS MONITORING INSTRUTMENTATION
    ... TEXT 3.11.2.1                        3      04/26/2006
 
==Title:==
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2                        1      04/26/2006
 
==Title:==
RADIOACTIVE EFFLUENTS DOSE      -  NOBLE GASES TEXT 3.11.2.3                        1      04/26/2006
 
==Title:==
RADIOACTIVE EFFLUENTS DOSE      -  IODINE,  TRITIUM,  AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4                        0      11/18/2002
 
==Title:==
RADIOACTIVE EFFLUENTS GASEOUS RAD WASTE TREATMENT SYSTEM TEXT 3.11.2.5                        4      07/03/2013
 
==Title:==
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT      SYSTEM TEXT 3.11.2.6                        5      04/28/2015
 
==Title:==
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION ac*    TEXT 3.11.3                          1
 
==Title:==
RADIOACTIVE EFFLUENTS TOTAL DOSE 04/26/2006 Report Date:  11/11/15 Page *:i~      of of  16 I_66                                                          Report Date:  11/11/15
 
SSES MANUAL Manual Name :    TRMI Manual
 
==Title:==
TECHNICAL REQUIREMENTS      MANUAL UNIT 1 TEXT 3.11.4.1                        5      03/05 /2015
 
==Title:==
RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2                        2      04/26 /2006
 
==Title:==
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3                      1      04/26/2006
 
==Title:==
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1                        0      11/19/2002
 
==Title:==
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2                        4      04/17 /2008
 
==Title:==
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3                        0      11/19/2002                                        0
 
==Title:==
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4.1                            0      08/31/1998
 
==Title:==
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2                            0      08/31/1998
 
==Title:==
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3                            0      08/31/1998
 
==Title:==
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4                            1      12/18/2008
 
==Title:==
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5                            0      08/31/1998
 
==Title:==
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6                            0      08/31/1998
 
==Title:==
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM 16Reprt                                                          Dte:11/1/1 Page8.a Page          of  16                                                        Report Date: 11/11/15
 
SSES MANUJAL
. 1-- Manual Name: TECHNICAL Manual
 
==Title:==
TRMI      REQUIREMENTS MANUAL UNIT 1 TEXT 4.7                          0      08/31/1998
 
==Title:==
ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0                          5      03/05/2015
 
==Title:==
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION    (TRO)    APPLICABILITY TEXT B3.1.1                        2      04/29/2014
 
==Title:==
REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION  (ATWS-ARI)  INSTRUMENTATION TEXT B3.1.2                        0      11/19/2002
 
==Title:==
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE    (CRD)  HOUSING SUPPORT TEXT B3.1.3                        3      03/31/2006
 
==Title:==
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4                        0      11/19/2002
 
==Title:==
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMU/LATORS      INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1                        0      11/19/2002
 
==Title:==
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT      (COLR)
TEXT B3.3.1                        1      01/31/2014
 
==Title:==
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2                        2      03/31/2011
 
==Title:==
INSTRUMENTATION  BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3                        3      12/18/2008
 
==Title:==
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4                        5      10/14/2015
 
==Title:==
INSTRUMENTATION BASES TEN POST ACCIDENT MONITORING  (PAM)  INSTRUMENTATION
. TEXT B3.3.5                        2      11/09/2007
 
==Title:==
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK Page        of  16                                                            Report Date: 11/11/15
 
9--I    *o        0--*D*d ST/TT/TT  :~~c1 ~od~a                                                                              ~T ;o              ~T  9.~2d sTZLVWH~*  THSS*HA HO&DVH S*Sva WNHJS2XS          d NWIOOD HO1DVZH *IL*
Z00Z/6T/TT              0                              S'9"[H J&X~H JLIWlI ZIlI UOH QNT    MO'EA NOllvqIflHIDZa HOJ*DV*        S*SVE NHLSAS LN-'IOOD HOLD*'d :eYZ; Z00Z/6T/TT              0                              9""H&H HOLINOW *D'f>VI-'  HDV*aHJI aH~nSS*H      MO'I/HDIH S*SVH        *SXS INWIOOD          [ODV'H*I xE
* LOOZ/60/TT              T
* hI~f00o      :xa:si*
VZD M A*IEIDJNI  I-*-hLDflHLS      SHSva NacISLS 600Z/9T/90              T
                                                                                        ~LNTWEOODT'O&deg;DV      6 H      XTJ 2AJSIW*H3 NILSXS LN'IOOD HOLDOWN S*SVH W2.SAS Z00Z/6T/Tt              0 NOI1*N*WflHLSNI      DNIHOllINO      aH*NM        9!ZTI 600Z/9T/90              0                            ZTE"E*      HTX.*,T N01N~WfldJSNI NOIlWIosI JAW
                                                &#xa3;00Z/ZZ/0T              T SaSvH NOILVNHXflaLSNI :eT;*.
0T''&#xa3;H LXHL SJOIS LNS OW JNflJ NOI~VqlDOHIDHa HOLD*aH 010*/60/80              &#xa3; WOIL*N*WaaJSNI      WIHdO :9*;t*
800Z/LT/90              &#xa3; 6"V&#xa3;H c*Xai NOIJNLN*rHLSNI      (Saa) wka&sXS NOILD*O&~d HOJ*Dv*Ha TaJ*
                                                &#xa3;00*I/*IOT              T WkLS2S NOI DHLO'HJ    *HJSHAO      ~HNIEHf1L  NIVW SZSVH NOIJNN[IWnaL*SNI              S*IW*
NOI*LN*TIflqHSNI  NOIl*fDY      NOILVqosI WIHL S*S*a        NOILVN        &LOHSNJ      *!I1J&
9TOZ/T&#xa3;/T0 TI ,,INfl    I~fl*  S,,*ZHf0*        rI\DINHD.&,T    :*~            y        I~r
                                          ~IVL1NVW S~S~
 
SSES    MATJi*
* Manual Name:      TRMI
    =iManual
 
==Title:==
TECHNICAL REQUIREM'cENTS MANUAL UNIT 1 TEXT B3.4.6                        2    04/25/2013
 
==Title:==
REACTOR RECIRCULATION SINGLE LOOP OPERATION  SLO FLOW RATE RESTRICTION TEXT B3.5.1                        0    11/19/2002
 
==Title:==
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2                        1    11/09/2007
 
==Title:==
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3                        1    11/09/2007
 
==Title:==
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1                        0    11/19/2002
 
==Title:==
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2                        0    11/19/2002
 
==Title:==
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL  VACUUM BREAKER POSITION INDICATION TEXT B3.6.3                        2    04/17/2008
 
==Title:==
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3o6.4                        1    12/14/2004
 
==Title:==
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1                        0    11/19/2002
 
==Title:==
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM    (SHUTDOWN)
TEXT B3.7.2                        0    11/19/2002
 
==Title:==
PLANT SYSTEMS BASES ULTIMATE HEAT SINK  (UHS)  GROUND WATER LEVEL TEXT B3.7.3.1                    3      06/15/2010
 
==Title:==
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM
* TEXT B3.7.3.2                    2      04/26/2006 W.
 
==Title:==
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 1_1    of  i__66                                                        Report Date: 11/11/15
 
SSES    MANUAL Manual Name:        TRMI SManual Title*        TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.3                          0    11/19/2002
 
==Title:==
* PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4                          3    04/29/2014
 
==Title:==
* PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5                          1    04/26/2006 Title :  PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6                          1    04/26/2006 Title : PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7                          0    11/19/2002 Title : PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES STEXT B3.7.3.8                            3    09/27/2012
 
==Title:==
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3 7.4                            0    11/19/2002 Title : PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1                          0    11/19/2002 Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2                          0    11/19/2002 Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3                          0    11/19/2002 Title : PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6                            4    06/04/2013 Title : PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION
  . TEXT B3.7.7                            2    01/31/2008
    ...-  Title :  PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Report Date: 11/11/15 Page 1/2 Page    12      of of  16 16                                                        Report Date: 11/11/15
 
SSES MANTJAI~
Manual Name :      TPR41 Manual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.8                          4      01/31/2 014
 
==Title:==
PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9                          2      12/08/2011 Title :  PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10                          1      12/14/2004 Title :  PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11                          1      04/14/2010
 
==Title:==
STRUCTURAL INTEGRITY TEXT B3.8.1                          2      03/10/2010
 
==Title:==
ELECTRICAL POWER BASES  PRIMARY  CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1                        0      11/19/2002
 
==Title:==
ELECTRICAL POWER BASES MOTOR OPERATED VALVES      (MOV) THERMAL OVERLOAD PROTECTION  -
CONTINUOUS TEXT B3.8.2.2                        1      09/17/2004
 
==Title:==
ELECTRICAL POWER BASES MOTOR OPERATED VALVES      (MOV) THERMAL OVERLOAD PROTECTION  -
AUTOMATIC TEXT B3.8.3                          0      11/19/2002
 
==Title:==
ELECTRICAL POWER BASES DIESEL GENERATOR    (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4                          0      11/19/2002
 
==Title:==
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5                          1      11/14/2013
 
==Title:==
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6                          2      12/08/2011
 
==Title:==
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7                          2      06/04/2013
 
==Title:==
BATTERY MAINTENANCE AND MONITORING    PROGRAM Report Date:  11/11/15 Page i~
Page  13      of of  ii 16                                                            Report Date:  11/11/15
 
S.~ES MM~AL
  <?=Manual Name: TRMI
  "*Manual Titles&deg; TECHNICAL REQUIREMENTS MANUAL UNIT 1                                              0 TEXT B3.9.l                          0      11/19/2002
 
==Title:==
REFUELING OPERATIONS BASES DECAY TINE TEXT B3.9.2                          0      11/19/2002
 
==Title:==
REFUELING OPERATIONS BASES COMM4UNICATIONS TEXT B3.9.3                          0      11/19/2002
 
==Title:==
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1                          0      11/19/2002
 
==Title:==
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2                          1      03/31/2006
 
==Title:==
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3                          0      11/19/2002
 
==Title:==
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION  (ISFSI)
TEXT B3.10.4                          1      04/17/2 008
 
==Title:==
MISCELLANEOUS BASES LEADING EDGE FLOW METER  (LEFM)
TEXT B3.ii.ioi                        0      11/19/2002
 
==Title:==
RADIOACTIVE  EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3ol.11Io2                      0      11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.ii.i.3                        0      11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT  SYSTEM TEXT B3.11.I.4                        0      11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.I.5                        0      11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION Report Date:  11/11/15 Page 14 Page  14        of of  ~i*                                                      Report Date:  11/11/15
 
SSES    MANUJAI O Manual Name:          TRMI
... Manual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.11.2.1                  1      12/14/2004
 
==Title:==
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2                    0    11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES DOSE  - NOBLE GASES TEXT B3.11.2.3                    0    11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES DOSE  - IODINE, TRITIUM,  AND RADIONUCLIDES IN SPARTICULATES FORM TEXT B3.11.2.4                    0    11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5                  5      07/03/2013
 
==Title:==
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHqAUST  TREATMENT SYSTEM TEXT B3.11.2.6                  1      01/27/2004
 
==Title:==
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS  EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3                      0    11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1                  5      03/05/2015
 
==Title:==
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2                  0      11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3                  0      11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1                    1      10/04/2007
 
==Title:==
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2                    1      12/03/2010
 
==Title:==
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS Report Date:  11/11/15 Page i~.
15      of of    16 I__66                                                    Report Date: 11/11/15
 
SSES MANUJAL
*-    Manual Name:      TRN1
:*:Manual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3                        0. 11/19/2002
 
==Title:==
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Report Date: 11/11/15 Page 1616    of of    16 16                                              Report Date: 11/11/15
 
SUSQUEHANNA STEAM ELECTRIC STATION                                Rev. 64 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section  Titl__ee                                                Effective Date TOC      TABLE OF CONTENTS                                          04/23/2015 1.0      USE AND APPLICATION Page TRM / 1.0-1                                      10/04/2002 Page TRM / 1.0-2                                      01/21/2014 Page TRM / 1.0-3                                      10/04/2002 2.0      PLANT PROGRAMS Page TRM / 2.0-1                                      04/23/2015 Pages TRM / 2.0-2 and TRM / 2.0-3                    01/28/2005 Page TRM / 2.0-4                                      06/25/2002 Page TRM / 2.0-5                                      01/21/2014 Page TRM / 2.0-6                                      03/27/2008 Page TRM / 2.0-7                                      05/15/2008 Pages TRM / 2.0-8 and TRM / 2.0-9                    01/07/2011 Page TRM / 2.0-10                                    02/02/2010 Page TRM / 2.0-11                                    11/15/2004 Page TRM / 2.0- 12                                    03/27/2008 Pages TRM / 2.0-13 and TRM / 2.0-1*                  11/15/2004 Page TRM / 2.0-15                                    11/15/2005 3.0 PI"I"LI*.jp?.DILI I I Pages TRM / 3.0-1 and                                02/19/2015 Page TRM / 3.0-3                                      03/15/2002 Page TRM / 3.0-4                                      02/19/2015 REACTIVITY CON 3.1 Page TRM / 3.*                                        10/3112007 Pages TRM              an                            08/31/1998 Pages 3.                5                            08/31/1998 Page TR                                              03/22/2006 04/07/2009 03/27/2008 3.1-9 and TRM / 3.1,9a              02/18/1999
                              .1-10                              02/18/1999 3.2 iERATING LIMITS REPORT                        07/07/1999 Pages TRM / 3.2-2 through TRM / 3.2-63                11/04/2015 3.3      INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3                07/16/1999 Page TRM / 3.3-4 and TRM / 3.3-5                      10/31/2007 Page TRM / 3.3-6                                    03/10/2011 SUSQUEHANNA-UNIT1                        TRM / LOES-1 SUSQEHANA UNT I RM LOS-1EFFECTIVE DATE 11/04/2015
 
SUSQUEHANNA STEAM ELECTRIC STATION                                Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section  Title                                                  Effective Date Page TRM / 3.3-7                                      10/31/2007 Page TRM / 3.3-8                                      08/31/1998 Page TRM / 3.3-9                                      10/07/2015 Page T'RM / 3.3-9a                                    06/30/2010 Page TRM / 3.3-10                                      10/31/2007 Page TRM /3.3-11                                      10/07/2015 Page TRM / 3.3-11a                                    10/07/2015 Page TRM I 3.3-12                                      03/30/2001 Page TRM / 3.3-13                                      01/07/2011 Page TRM / 3.3-14                                      12/1 4/1 998 Page TRM / 3.3-15,                                    04/11/2014 Page TRM I 3.3-16                                      01/07/2011 Page TRM / 3.3-17                                      11/04/2015 Page TRM / 3.3-17a                                    11/04/2015 Page TRM / 3.3-18                                      10/31/2007 Pages TRM / 3.3-19 through TRM / 3.3-21                10/22/2003 Page TRM / 3.3-22                                      03/27/2008 Page TRM / 3.3-22a                                    11/15/2004 Pages TRM / 3.3-22b through TRM / 3.3-22d              03/22/2006 Page TRM / 3.3-23                                      12/03/2004 Pages TRM / 3.3-24 and TRM I 3.3-25                    05/16/2003 Page, TRM / 3.3-26                                    10/22/2003 Page TRM / 3.3-27                                      02/19/2015 Page TRM / 3.3-28                                      04/07/2009 3.4      REACTOR COOLANT SYSTEM Page TRM / 3.4-1                                      03/31/2006 Pages TRM / 3.4-2 through TRM / 3.4-5                  10/23/11998 Pages TRM / 3.4-6 through TRM / 3.4-8                  04/01/2009 Page TRM / 3.4-9                                      08/31/1998 Page TRM / 3.4-10                                      10/31/2007 Page TRM / 3.4-11                                      08/31/1998 Page TRM / 3.4-12                                      03/27/2008 Page TRM / 3.4-13                                      03/31/2006 Pages TRM / 3.4-14 and TRM / 3.4-15                    04/25/2013 3.5      EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1                                      01/28/2005 Pages TRM / 3.5-2 and TRM / 3.5-3                      08/31/1998 Pages TRM / 3.5-4 and TRM / 3.5-5                      10/31/2007 Pages 3.5-6 and 3.5-7                                  08/31/1998 SUSQUEHANNA- UNIT 1                  TRM / LOES-2              LOS-2EFFECTIVE I RM UNT SUSQEHANADATE 11/04/2015
 
SUSQUEHANNA STEAM ELECTRIC STATION                                  Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section  Title                                                    Effective Date 3.6      CONTAI NMENT Page 3.6-1                                              08/31/1998 Pages TRM / 3.6-2 and TRM I 3.6-2a                      04/16/2014 Page 3.6-3                                              08/31/1998 Page TRM / 3.6-4                                        01/07/2002 Page 3.6-5                                              08/31/1998 Pages TRM / 3.6-6 through TRM / 3.6-8                    12/31/2002 3.7      PLANT SYSTEMS Pages 3.7-1 through 3.7-3                                08/31/1998 Page TRM / 3.7-4                                        03/31/2006 Pages TRM / 3.7-5                                        04/07/2009 Pages TRM / 3.7-6 through TRM / 3.7-8                    08/02/1999 Pages TRM / 3.7-9 and TRM / 3.7-10                      04/07/2009 Page TRM / 3.7-11                                        12/29/1999 Page TRM / 3.7-12                                        08/02/1999 Page TRM / 3.7.13                                        04/07/2009 Page TRM / 3.7-14                                        08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16                      08/02/1999 Page TRM / 3.7-17                                        04/07/2009 Page TRM / 3.7-18                                        08/02/1999 Page TRM / 3.7-19                                        04/07/2009 Pages TRM / 3.7-20 through TRM / 3.7-22                  08/02/1999 Page TRM / 3.7-23                                        04/07/2 009 Page TRM / 3.7-24                                        03/31/2006 Page TRM / 3.7-25                                        08/02/1999 Page TRM / 3.7-26                                        09/25/2012 Page TRM / 3.7-27                                        11/24/2011 Pages TRM / 3.7-28 through TRM / 3.7-34a                09/25/2012 Page TRM / 3,7-35                                        03/31/2006 Pages TRM / 3.7-36 and TRM / 3.7-37                      02/01/1999 Page TRM / 3.7-38                                      02/19/2015 Page TRM / 3.7-39                                      08/31/1998 Page TRM / 3.7-40                                        03/31/2006 Page TRM / 3.7-41                                      05/24/2012 Pages TRM / 3.7-41a through TRM / 3.7-41c              05/24/2012 Page TRM / 3.7-42                                      09/04/2008 Page TRM / 3.7-43                                      08/31/1998 Page TRM / 3.7-44                                      02/19/2015 Pages TRM / 3.7-45 and TRM / 3.7-46                    10/05/2006 Page TRM / 3.7-47                                      06/07/2007 TRM / LOES-3    EFFECTIVE DATE 11/04/2015 SUSQUEHANNA-UNITI SUSQUEHANNA-UNIT1                    TRM / LOES-3    EFFECTIVE DATE 11/04/2015
 
SUSQUEHANNA STEAM ELECTRIC STATION                                Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section  Title                                                  Effective Date Page                                                  10/05/2006 Page TRM TRM II 3.7-48 3.7-49                                  06/07/2007 Pages TRM / 3.7-49a and TRM / 3.7-49b                10/05/2006 Page TRM / 3.7-50                                    01/21/2014 Page TRM / 3.7-51                                    08/16/2006 Page TRM / 3.7-52                                    12/03/2004 Page TRM / 3.7-53                                    04/15/2003 Page TRM / 3.7-54                                    07/29/1999 Pages TRM / 3.7-55 through TRM / 3.7-57              04/01/2009 3.8      ELECTRICAL POWER Page TRM / 3.8-1                                      04/02/2002 Page TRM / 3.8-2                                      01/28/2005 Pages TRM / 3.8-3 and TRM /3.8-4                      03/25/2010 Pages TRM / 3.8-5 and TRM / 3.8-6                    04/02/2002 Page TRM / 3.8-7                                      10/31/2007 Pages TRM / 3.8-8 through TRM / 3.8-10                12/03/2004 Page TRM /3.8-11                                      09/03/2004 Page TRM / 3.8-12                                    12/03/2004 Page TRM / 3.8-13                                    02/19/2015 Page TRM / 3.8-14                                    08/31/1998 Pages TRM / 3.8-15 through TRM / 3.8-17              04/02/2002 Page 3.8-18                                          08/31/1998 Page TRM / 3.8-19                                    04/02/2002 Page 3.8-20                                          08/31/1998 Pages TRM / 3.8-21 and TRM / 3.8-22                  06/06/1999 Page TRM / 3.8-23                                    11/07/2013 Pages TRM / 3.8-24 and TRM / 3.8-25                  11/30/2011 Page TRM / 3.8-26                                    05/28/2009 Page TRM / 3.8-27                                    11/29/2006 Pages TRM / 3.8-28 and TRM / 3.8-29                  05/28/2009 3.9      REFUELING OPERATIONS Pages 3.9-1 through 3.9-3                            08/31/1998 3.10    MISCELLANEOUS Page TRM / 3.10-1                                    03/31/2006 Pages TRM / 3.10-2 and TRM / 3.10-3                  08/31/1998 Page TRM / 3.10-4                                    08/01/2006 Pages TRM / 3.10-5 and TRM / 3.10-6                  03/22/2006 Page TRM / 3.10-7                                    06/10/2010 Page TRM / 3.10-8                                    03/27/2008 SUSQUEHANNA - UNIT 1                  TRM / LOES-4  SUSQEHANA UNT I RM LOS-4EFFECTIVE DATE 11/04/2015
 
SUSQUEHANNA STEAM ELECTRIC STATION                                Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section  Title                                                  Effective Date 3.11      RADIOACTIVE EFFLUENTS Page TRM / 3.11-1                                      03/31/2006 Pages TRM / 3.11-2 and TRM / 3.11-3                    08/31/1998 Page TRM / 3.11-4                                      03/31/2006 Page TRM / 3.11-5                                      08/31/1998 Page TRM / 3.11-6                                      03/31/2006 Pages TRM / 3.11-7 and TRM / 3.11-8                    08/31/1998 Pages TRM / 3.11-9 and TRM / 3.11-10                  10/09/2012 Pages TRM / 3.11-11 and TRM / 3.11-12                  08/31/1998 Page TRM /3.11-13                                      02/19/2015 Page TRM / 3.11-14                                    12/03/2004 Pages 3.11-15 and 3.11-16                              09/01/1998 Page TRM / 3.11-17                                    03/31/2006 Page 3.11-18                                          08/31/1998 Page TRM / 3.11-19                                    08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21                  03/31/2006 Page TRM / 3.11-22                                    04/02/2002 Page TRM / 3.11-23                                    11/14/2006 Page TRM / 3.11-24                                    06/18/2013 Page TRM / 3.11-25                                    04/12/2007 Pages TRM / 3.11-26 and TRM / 3.11-27                  01/21/2004 Page TRM /3.11-28                                      09/08/2009 Page TRM / 3.11-29                                    12/03/2004 Pages TRM / 3.11.30 and TRM / 3.11.31                  01/21/2004 Page TRM / 3.11.32                                    04/23/2015 Page TRM / 3.11-33                                    03/31/2006 Page TRM / 3.11-34                                    08/31/1998 Page TRM / 3.11-35                                    03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39              11/30/2005 Page TRM / 3.11-40                                    02/19/2015 Pages TRM / 3.11-41 through TRM / 3.11-43              08/31/1998 Page TRM / 3.11-44                                    08/01/2006 Page TRM / 3.11-45                                    03/31/2006 Page 3.11-46                                          08/31/1998 Page TRM / 3.11-47                                    03/31/2006 3.12      LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM /3.12-3                02/05/1999 Page TRM / 3.12-4                                      03/14/2008 Page TRM / 3.12-5                                      02/05/1999 4.0      ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-3                              08/31/1998 Page TRM / 4.0-4                                      12/11/2008 Pages 4.0-5 through 4.0-8                            08/31/1998 SUSQUEHANNA-UNIT1                    TRM/LOES-5      SUSQEHANA UNT I RM LOS-5EFFECTIVE DATE 11/04/2015
 
SUSQUEHANNA STEAM ELECTRIC STATION                                      Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section  Title                                                        Effective Date B 3.0    APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3                  08/31/1998 Page TRM / B 3.0-4                                          02/19/2015 Page TRM / B 3.0-4a and TRM / B 3.0-4b                      02/19/2015 Page TRM / B 3.0-5                                          02/19/2015 Page TRM I B 3.0-6                                          08/31/1998 Page TRM I B 3.0-7                                          04/12/2007 Pages TRM / B 3.0-8 through TRM I B 3.0-10                  08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12                    03/15/2002 Pages TRM / B 3.0-13 through TRM / B 3.0-15                02/19/2015 B 3.1    REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1                                          07/13/1999 Page TRM / B 3.1-2                                          04/16/2014 Page TRM /B 3.1-3                                          10/31/2007 Page B 3.1-4                                                08/31/1998 Page TRM / B 3.1-5                                          11/15/2005 Pages TRM I B 3.1-6 and TRM / B 3.1-7                      03/22/2006 Page TRM / B 3.1-8                                        02/18/1999 B 3.2    CORE OPERATING LIMITS BASES Page B 3.2-1                                              08/31/1998 B 3.3    INSTRUMENTATION BASES Page TRM / B 3.3-1                                        01/21/2014 Page TRM / B 3.3-2                                        03/10/2011 Page TRM / B 3.3-2a                                        10/31/2007 Page TRM / B 3.3-3                                          12/11/2008 Page TRM / B 3.3-3a                                        10/31/2007 Page TRM / B 3.3-4                                        06/30/2010 Page TRM / B 3.3-5                                          10/07/2015 Page TRM I B 3:3-6                                          06/30/2010 Page TRM I B 3.3-7                                          10/07/2015 Page TRM / B. 3.3-8                                        06/30/2010 Page TRM I B 3.3-9                                          10/31./2007 Pages TRM / B 3.3-10 through TRM I B 3.3-12                01/07/2011 Page TRM / B 3.3-13                                        01/21/2014 Page TRM / B 3.3-14                                        06/25/2002 Page TRM / B 3.3-14a                                        11/04/2015 Page TRM I B 3.3-14b                                        11/04/2015 Page TRM / B 3.3-14c                                        11/04/2015 Pages TRM / B 3.3-15 and TRM I B 3.3-16                    10/22/2003 Page TRM / B 3.3-17                                        03/22/2006 Pages TRM / B 3.3-17a through TRM / B 3.3-17c              03/22/2006 Page TRM / B 3.3-17d                                        03/27/2008 TRM / LOES-6        EFFECTIVE DATE 11/04/2015 SUSQUEHANNA-UNITI SUSQUEHANNA - UNIT 1                TRM / LOES-6        EFFECTIVE DATE 11/04/2015
 
SUSQUEHANNA STEAM ELECTRIC STATION                                    Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section  Title                                                      Effective Date TRMI IBB3.3-19 Pages TRM / B 3.3-17e andTRM        3.3-17f              03/22/2006 Pages TRM / B 3.3-18 and                                  08/03/2010 Page TRM / B 3.3-20                                      10/22/2003 Page TRM / B 3.3-21                                      05/16/2003 Pages TRM / B 3.3-22 and TRM / B 3.3-23                  04/07/2009 B 3.4    REACTOR COOLANT SYSTEM BASES Page B 3.4-1                                              08/31/1998 Pages TRM / B 3.4-2 and TRM / B 3.4-3                    04/01/2009 Pages TRM 1 B 3.4-4 and TRM / B 3.4-4a                    10/31/2007 Page TRM / B 3.4-5                                        10/1 5/1 999 Page B 3.4-6                                              08/31/1998 Pages TRM / B 3.4-7 and TRM / B 3.4-8                    04/25/2013 B 3.5    ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2                                08/31/1998 Pages TRM / B 3.5-3 through TRM / B 3.5-5                10/31/2007 B 3.6    CONTAINMENT BASES Page TRM / B 3.6-1                                        07/26/2001 Page TRM / B 3.6-2                                        02/01/1999 Page B 3.6-3                                              08/31/1998 Page TRM / B 3.6-4                                        03/27/2008 Page TRM / B 3.6-5                                        04/04/2007 Page TRM / B 3.6-6                                        12/03/2004 Pages TRM / B.3.6-7 through TRM / B 3.6-11                12/31/2002 B 3.7    PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2                                08/31/1998 Page TRM/IB 3.7-3                                        06/10/2010 Page TRM / B 3.7-3a                                      12/27/2007 Page TRM / B 3.7-4                                        03/31/2006 Page TRM / B 3.7-5                                        08/02/1999 Page TRM / B 3.7-6                                        03/3"1/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a                    08/02/1999 Page TRM / B 3.7-8                                        O5/2 9/2013 Page TRM / B 3.7-9                                        04/11/2014 Page TRM / B 3.7-10                                      08/02/1999 Page TRM / B 3.7-I0a                                      03/31/2006 Page TRM / B 3.7-11                                      08/02/1999 Page TRM / B 3.7-11a                                      03/31/2006 Pages TRM / B 3.7-12 and TRM / B 3.7-13                  08/02/1999 Pages TRM / B 3.7-14 and TRM / B 3.7-14a                  09/25/20 12 EFFECTIVE DATE 11/04/2015 SUSQUEHANNA SUSQUEHANNA-UNIT1
                - UNIT I              TRM // LOES-7 TRM    LOES-7      EFFECTIVE DATE 11/04/2015
 
SUSQUEHANNA STEAM ELECTRIC STATION                                      Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section  Title                                                        Effective Date Page TRM / B 3.7-14b                                        11/24/2011 Pages TRM / B 3.7-15 and TRM I B 3.7-16                    0210111999 Pages B 3.7-17 through B 3.7-20                            08/31/1998 Page TRM I B 3.7-21                                        05/29/2013 Pages TRM / B 3.7-21a through TRM / B 3.7-21d              05/24/2012 Pages TRM / B 3.7-21e through TRM / B 3.7-21g              05/29/2013 Page TRM / B 3.7-22 and TRM / B 3.7-23                      01/30/2008 Page TRM / B 3.7-24                                        10/05/2006 Page TRM / B 3.7-25                                        01/21/2014 Pages TRM / B 3.7-26 through TRM / B 3.7-28                10/05/2006 Pages TRM / B 3.7-29 and TRM I B 3.7-30                    06/07/2007 Page TRM / B 3.7-30a                                        10/05/2006 Page TRM / B 3.7-30b                                        01/21/2014 Page TRM / B 3.7-31                                        11/30/2011 Page TRM / B 3.7-32                                        03/09/2001 Page TRM / B 3.7-33                                        04/15/2003 Page TRM / B 3.7-34                                        12/03/2004 Page TRM / B 3.7-35                                        07/05/2000 Pages TRM / B 3.7-36 through TRM / B 3.7-39                04/01/2009 Page TRM / B 3.7-40                                        04/08/2010 ELECTRICAL POWER BASES B 3.8 Page TRM / B 3.8-1                                          04/02/2002 Page TRM / B 3.8-2                                          01/28/2005 Page TRM / B 3.8-2a                                        03/01/2010 Page TRM / B 3.8-3                                          04/02/2002 Page TRM / B 3.8-3a                                        04/02/2002 Page TRM / B 3.8-4                                          09/03/2004 Page TRM / B 3.8-4a                                        04/02/2002 Page B 3.8-5                                                08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-15                  04/02/2002 Page TRM / B 3.8-16                                        11/07/2013 Page TRM / B 3.8-17                                        11/30/2011 Pages TRM / B 3.8-17a and TRM / B 3.8-17b                  11/30/2011 Pages TRM / B 3.8-18 through TRM / B 3.8-20                05/29/2013 Pages TRM / B 3.8-21 and TRM I B 3.8-22                    05/28/2009 Page TRM I B 3.8-23                                        05/29/2013 Page TRM / B 3.8-24                                        05/28/2009 B.3.9    REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7                              08/31/1998 TRM  / LOES-8        EFFECTIVE DATE 11/04/2015 SUSQUEHANNA - UNIT UNIT 1I            TRM / LOES-8          EFFECTIVE DATE 11/04/2015
 
SUSQUEHANNA STEAM ELECTRIC STATION                                          Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MAN UAL)
Section      Title                                                        Effective Date B 3.10        MISCELLANEOUS BASES Page B 3.10-1                                              08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3                    03/22/2006 Pages TRM / B 3.10-4 and TRM / B 3.10-5                    08/23/1999 Page TRM / B 3.10-6                                        03/27/2008 B 3.11        RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9                            08/30/1998 Page TRM / B 3.11-10                                      02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.1 1-11a                    04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13                      02/01/1999 Page TRM /B 3.11-14                                        12/03/2004 Page TRM / B3.11-15                                        02/01/1999 Pages B 3.11-16 through B 3.1 1-19                        08/30/1998 Page TRM / B 3.11-20                                      04/02/2002 Page TRM / B 3.1 1-20a                                    04/02/2002 Page TRM /B 3.11-21                                        05/13/2005 Pages TRM / B 3.11-22 and TRM / B 3.11-23                  11/14/2006 Pages TRM / B 3.1 1-23a and TRM / B 3.1 1-23b              06/18/2013 Pages TRM / B 3.11-24 and TRM / B 3.11-25                  01/21/2004 Pages B 3.11-26 and B 3.11-27                              08/30/1998 Page TRM / B3.11-28                                        11/30/2005 Page TRM / B 3.11-29                                      02/19/2015 Pages TRM / B3.1 1-30 and TRM / B 3.11-31                  05/29/2013 Page TRM /B 3.11-32                                        08/30/1 998 Page TRM / B 3.11-33                                      06/30/2010 Pages B 3.11-34 and B 3.11-35                              08/30/1998 Page TRM / B 3.11-36                                      02/12/1999 B.3.12        LOADS CONTROL PROGRAM BASES Page TRM / B3.12-1                                        09/19/2007 Page TRM / B 3.12-2                                        11/29/2010 Page TRM / B 3.12-3                                        02/05/1999 TRM1 text LOES 11/4/2015 SUSQUEHANNA - UNIT 1                      TRM / LOES-9          SUSQEHANA UNT I RM LOS-9EFFECTIVE DATE 11/04/2015
 
Core Operating Limits Report (COLR)
Rev. 16                                                                                      3.2.1 3.2    Core Operating Limits Report (COLR) 3.2.1    Core Operating Limits Report (COLR)
TRO 3.2.1      The Core Operating Limits specified in the attached COLR shall be met.
APPLI(CABILITY:      SPecified in the referenced Technical Specifications.
ACTIONS CONDITION                        REQUIRED ACTION                COMPLETION TIME" A. Core Operating Limits not      A,1  Perform action(s) described        Specified in met.                                in referenced Technical            referenced Specification.                      Technical Specifications.
TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE                                        FREQUENCY
                  ------ NOTE-.......... .............        ..                N/A No associated Surveillances. Surveillances are implemented in the applicable Technical Specificatiorns.
SUSQUEHANNA-UNIT1                      TRM / 3.2-1            SUSQEHANA
                                                                    -UNI 1 TM/32-1EFFECTIVE DATE 0710711999
 
Rev. 16              PL-NF-14-001 Rev. 2 Page "i of 62 Susquehanna SES Unit I Cycle 19 CORE OPERATING LIMITS REPORT Nuclear Fuels Engineering September 2015 SUSQUEHANNA UNIT1    TRM!3.2-2 SUSQEHANA UNT I RM/32-2EFFECTIVE DATE 11/0412015
 
Rev. 16                                PL-NF-14-001 Rev. 2 Page 2 of 62 CORE OPERATING LIMITS REPORT REVISION DESCRiPTiON INDEX Rev. Affected                                                          ,
No. Sections                            Description/Purpose of Revision 0      ALL          Issuance of this COLR is in support of Unit I Cycle 19 operation.
1      ALL          New COLR required due to Power/Flow Map revision.
2      ALL          New COLR required for the inclusion of operating limits regarding a Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) closure event.
~J.                  J FORM NFP-QA-008-2, Rev. 1 SUSQUEHANNA UNIT 1                    TRM/3.2-3            TRM/.2-3EFFECTIVE DATE 11/04/2015
 
Rev. 16                                                  PL-NF-14-00i Rev. 2 Page 3 of 62 SUSQUEHANNA STEAM ELECTRIC STATION Unit I Cycle 19 CORE OPERATING LIMITS REPORT Table of Contents
 
==1.0  INTRODUCTION==
............................................................................ 4 2.0  DEFINITIONS................................................................................6 3.0  SHUTDOWN MARGIN ....................................................................... 6 4.0  AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR).................. 7 6.0  MINIMUM CRITICAL POWER RATIO (MCPR)............................................ 9 6.0  LINEAR HEAT GENERATION RATE (LHGR) ......................................                    .......      27 7.0  ROD BLOCK MONITOR (RBM) SETPOINTS AND OPERABILITY REQUIREMENTS ............................................................................ 38 8.0  RECIRCULATION LOOPS - SINGLE LOOP OPERATION............................... 40 9.0  POWER I FLOW MAP ..............................................                :......................... 58 10.0 OPRM SETPOINTS.......................................................................... 60
 
==11.0 REFERENCES==
................        ................................................................ 61 SUSQUEHANNA UNIT 1                TRM/3.2-4                  SUSQEHANA NITTR/3..-4DATE 11/04/2015 EFFECTIVE
 
Rev. 16                                PL-NF-14-0O1 Rev. 2 Page 4 of 62 1.0  iNTRODUCTION This CORE OPERATING LIMITS REPORT for Susquehanna Unit t Cycle 19 is prepared in accordance with the requirements of Susquehanna Unit 1, Technical Specification 5.6.5. As required by Technical Specifications 5.6.5, core shutdown margin, the core operating limits, RBM setpoints, and OPRM setpoints presented herein were developed using NRC-approved methods and are established such that all applicable limits of the plant safety analysis are met.
SUSQUEHANNA UNIT 1                    TRM/3.2-5                UNT I RM/32-5 SUSQEHANA EFFECTIVE  DATE 11/04/2015
 
Rev. 16                                    PL-NF- 14-001 Rev. 2 Page 5 of 62 2.0  DEFINiTIONS Terms used in this COLR but not defined in Section 1.0 of the Technical Specifications or Section 1.1 of the Technical Requirements Manual are provided below.
2.1    The AVERAGE PLANAR EXPOSURE at a specified height shall be equal to the total energy produced per unit length at the specified height divided by the total initial weight of uranium per unit length at that height.
2.2    The PELLET EXPOSURE shall be equal to the total energy produced per unit length of fuel rod at the specified height divided by the total initial weight of uranium per unit length of that rod at that height.
2.3    FDLRX is the ratio of the maximum LHGR calculated by the core monitoring system for each fuel bundle divided by the LHGR limit for the applicable fuel bundle type.
2.4    LHGRFACT is a multiplier applied to the LHGR limit when operating at less than 108 Mlbm/hr core flow. The LHGRFAC1 multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from core flows less than 108 Mlbmlhr.
2.5    LHGRFACp is a multiplier applied to the LHGR limit when operating at less than RATED THERMAL POWER. The LHGRFACp multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from partial power conditions.
2.6    MFLCPR is the ratio of the applicable MCPR operating limit for the applicable fuel bundle type divided by the MCPR calculated by the core monitoring system for each fuel bundle.
2.7    MAPRAT is the ratio of the maximum APLHGR calculated by the core monitoring system for each fuel bundle divided by the APLGHR limit for the applicable fuel bundle type.
2.8    OPRM is the Oscillation Power Range Monitor. The Oscillation Power Range Monitor (OPRM) will reliably detect and suppress anticipated stability related power oscillations while providing a high degree of confidence that the MCPR safety limit is not violated.
2.9    Np is the OPRM setpoint for the number of consecutive confirmations of oscillation half-cycles that will be considered evidence of a stability related power oscillation.
2.10    Sp is the OPRM trip setpoint for the peak to average OPRM signal.
2.11    Fp is the core flow, in Mlbm I hr, below which the OPRM RPS trip is activated.
SUSQUEHANNA UNIT 1                      TRM/3.2-6          SLJSUEHNNAUNITI EFFECTIVE TMI32-6 DATE 111/0412015
 
Rev. 16                                    PL-NF-1 4-001 Rev. 2 Page 6 of 62 3.0  SHUTDOWN MARGIN 3.1  Technical Specification Reference Technical Specification 3.1.1 3.2  Description The SHUTDOWN MARGIN shall be equal to or greater than:
a)    0.38% Ak/k with the highest worth rod analytically determined OR b)  0.28% Ak/k with the highest worth rod determined by test Since core reactivity will vary during the cycle as a function of fuel depletion and poison burnup, Beginning of Cycle (BOG) SHUTDOWN MARGIN (SDM) tests must also account for changes in core reactivty during the cycle. Therefore, the SUM measured at BOC must be equal to or greater than the applicable requirement from either 3.2.a or 3.2.b plus an adder, "R". The adder, "R", is the difference between the calculated value of maximum core reactivity (that is, minimum 8DM) during the operating cycle and the calculated BOG core reactivity. If the value of "R" is zero (that is, BOG is the most reactivepoint in the cycle) no correction to the BOG measured value is required.
The SHUTDOWN MARGIN limits provided in 3.2a and 3.2b are applicable in MODES 1, 2, 3, 4, and 5. This includes core shuffling.
SUSQUEHANNA UNIT t                  TRM/3.2-7              SUSQEHANA UNTI RM/32-7 EFFECTIVE    DATE 11104/2015
 
Rev. 16                              PL-NF-14-O01 Rev. 2 Page?7 of 62 4.0  AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) 4.1  Technical Specification Reference Technical Specification 3.2.1 4.2  Description The APLHGRs for ATRIUMT'-10 fuel shall not exceed the limit shown in Figure 4.2-1.
The APLHGR limits in Figure 4.2-1 are valid for Main Turbine Bypass Operable
        *and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Two Loop operation. The APLHGR limits for Single Loop operation are provided in Section 8.0.
SUSQUEHANNA UNIT 1                TRM/3.2-8          SUSQEHANA UNT I RM/32-8 EFFECTIVE    DATE 11/04/20 15
 
9!
02 SSES UNIT I CYCLE 19 C
        *16.0 C                  , 1111 a    a      I      IIl
                                                          , I                1, I ,      1          111III Ia' II1 1,1                                                ,      ,    I.  .      III .                  .        la
                                                                                                                                                                                                                          .          .              ma
                                                                                                                                                                                                                                                      .a rn                1    1    1a                    I      I        a        aIn                                    1    I II 4                                i      i    i  i      i          l    l      i  ___ 1    1    1        1      a 11__
.--                I    1    I    I      I      I      I        I          I    I      I      I    I    K    I      I      2                            iI      * - 1
* 1I
* l  O          = .                            I      2 z
z        1[4.0        I  1 K I 1 II        I            I I I-- I4 j a I --t-1                          . t. I I--1I-        . I    l
                                                                                                                      .. l 2lI            IlIIl
                                                                                                                                                .. ...................          l
                                                                                                                                                                                    . . . . . . . . ' 4. i. . . .
I          a    al    U    I      I  I        I C
                                    ,IIII2,                ,K,2,*,*,t*IaI*I
                                                                              ;!      IIlIt                                        I      i    i l
i                      a  a      a          a                    a      t II i      mi I      i I  2      II!                                                      i    i                        1      i    i          I 12.0          12 5 I00 a          . a: .*              5 0 ,1              .    .                                : .....        ..  ..              I              I                        1...                    I    ..    .2..      .    ..
i    ~i            i                                          ll              I                                            i              i      iai                aii              i I    I I            II                              1 I              Il                                                        l              i        l          l            l            l              l
                          /    1    /1      1      11                                                                      l      l1Il        l1/                                                      I
                . .      1I  .1                                                              ._          ,    ,      .              .          I.      I      .I      I          !
II
                                                                                                                                                                                                                                                    /
I      I      I      I II        ii          iIa    i    i            i          i              i    i            1nIi    1    a1 1        0I                I i        iI      iI  1      iI      i      iI    i 11                                                            liii !1                      1*11I11111I1                                                                  .1              1111I                                    1                  ,<
i    1  i i            i              i        i          i            iai      a                i1I a    .    .    .      .      .      .        I          I    a      a        a                      a        a*,,. a    a              .a.a.a.a.a.a.a                                                                                          0)
* I                IIaIaI                                                      IaI      IaIaI                  aI                al      IaI    a          Ia                                        l      l
    '-I
                                            ., ., ,*!        .                                                  !
* I          I aI a      ,," ,a a                                        l                            I              a I          I1la.lal Il laimla.!
a      m I        I        ~          ~            a        a        a                  i l          l',I    al I.            II                  l .a. "*        a
                                                                                                              **        I3l            lllam K    a    a    "        *a--a-- *    *:    II            ' Il i    iii l      liIa          1 a      i' a        l a    l a1    1a1        1        a1    a          g        all              1      1        1    11I            a        aI  aI      I    II          a      a    n      a          ai        i        a  a      a              Ia a    I
-I',
"-1                I I I            I        I!                                                                                                          l                l                  Ii..                a                      ~
Cn-,                                aI /a ia                              li1 aII                                  alal a_
a a
aal a                iI__la1a1a1a1a1a l
i
                                                                                                                                                                                                                .*~* _L __*.
I                  a a
                                                                                                                                                                                                                                                          .J aL2 tI 6.0                      la              la      aal      la
                                                                      ,    , , ,*H , ,
aal                      aal I    I              ,            I      ,                  I                    I        I.1._      3                                -
.-t
-- I mr        4.0 0                        10000                                      20000                          30000                            40000 Average Planar Exposure (MWDIMTU) 50000                                                                              60000                            70000 0
                                                                                                                                                                                                                                                                      -*    ,r-SI)
AVERAGE            AVERAGE  PLANAR            LINEAREXPOSURE PLANAR            HEAT GENERATION RATE LIMIT VERSUS
                                                                                                                                                    -TWO LOOP OPERATION                                                                                              Coz ATRIUMTM-10 FUEL                                                                                                                              C:'(D7 FIGURE 4.2-1
 
Rev. 18                                PL-NF-14-001 Rev. 2 Page 9 of 62 5.0 .MINIMUM CRITICAL POWER RATIO (MCPR) 5.1  Technical Specification Reference Technical Specification 3.2.2, 3.3.4.1, 3.7.6, and 3.7.8 5.2  Technical Requirements Manual Reference Technical Requirements Manual 3.3.7 5.3  Description The MOPR limit is specified as a function of core power, core flow, average scram insertion time per Section 5.3 and plant equipment operability status. The MCPR limits for all fuel types (ATRIUM TM-1O) shall be the greater of the Flow-Dependent or the Power-Dependent MOPR, depending on the applicable equipment operability status.
a)  Main Turbine Bypass I EOO-RPT I Backup Pressure Regulator Operable Figure 5.2-1: Flow-Dependent MCPR value determined from BOO to EDOC Figure 5.2-2: Power-Dependent MOPR value determined from BOO to EGOC b)  Main Turbine Bypass lnoperable Figure 6.2-3: Flow-Dependent MCPR value determined from BOO to EDOC Figure 5.2-4: Power-Dependent MOPR value determined from BOO to EGOC c)  EOC-RPT Inoperable Figure 5.2-5: Flow-Dependent MCPR value determined from BOO to EOC Figure 5.2-6: Power-Dependent MCPR value determined from BOG to EOO d)  Backup Pressure Regulator Inoperable Figure 5.2-7: Flow-Dependent MCPR value determined from BOO to EDOC Figure 5.2-8: Power Dependent MCPR value determined from BOG to EDOC e)  One Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 5.2-0: Flow-Dependent MCPR value determined from BOO to EGG Figure 5.2-1 O:Power-Dependent MCPR value determined from BOO to EDO SUSQUEHANNA UNIT 1                  TRM/3.2-10            SUSQEHANA UITTRM3.2I EFFECTIVE    0DATE 11/04/2015
 
Rev. 16                                  PL-NF-1 4-001 Rev. 2 Page 10 of 62 The MCPR limits in Figures 5.2-1 through 5.2-10 are valid for Two Loop operation.
The MCPR limits for Single Loop operation are provided in Section 8.0.
5.4 Averauqe Scram Time Fraction Ifthe average measured scram times are greater than the Realistic Scram times listed in Table 5.3-1 then the MCPR operating limits corresponding to the Maximum Allowable Average Scram Insertion Time must be implemented. Determining MCPR operating limits based on interpolation between scram insertion times is not permitted. The evaluation of scram insertion time data, as it relates to the attached table should be performed per Reactor Engineering procedures.
SUSQUEHANNA UNIT1                  TRM/3.2-11          SUSQEHANA UITTRM3.21 EFFECTIVE    IDATE 11104/2015
 
Rev. i6                      PL-NF-14-O01 Rev. 2 Page Iiof 62 Main Turbine Bypass I EOC-RPT I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 1  TRM/3.2-12    NITTR/32I 2DATE 1110412015 EFFECTIVE SUSQEHANA
 
C' SSES UNIT 1 CYCLE 19 C                  2.2 c,
2,1 z
z 2.0 z
1.9
                                                ._E 1.8 1.7 CD k*        0.
CA        0o    1.6                                                                                                                                                                                                                            <)
1.5 m                1.4 Ill C)
H                1.3 rn ci              1.2 H                        30                          40                              50                            60                          70                        80                    90          100                  110 Total Core Flow (MLBIHR)
                                                                                                                                                                                                                                                                              -o      "o n,      I Ill                                                                                                                                                                                                                                    (.Q0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS 1 EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-1                                                                                    * -< 0
. . .. . . . .. .... . .. ..... ......  .... .... .. . ... ... . . . . .. . . . . .. . . .... . ..  ........ ,... .. .. .. .. . .. .. ,,,,,.. .. .. . .  . . . ...  ... .. 1...  .. . . . .. . .. . .... ... . .. . . .. . . . .. . I J . .. .... .  ,J , , =. .. ... .
 
cj SSES UNIT 1 CYCLE 19 0
z z
C z
1J H  0.
0 m
0 20 30        40          50          60          70      80        90 100 Core Power (% RATED)
                                                                                      "13    -O
                                                                                    *,      I-MCPR OPERATING LIMIT VERSUS CORE POWER 0"          MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE TWO LOOP OPERATION (BOO TO EOC)                      (3 "
n Ii --.
FIGURE 5.2-2
 
Rev. 16                  PL-NF- 14-001 Rev. 2 Page 14 of 62 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT1  TRM/3.2-15    UITTRM3.2l EFFECTIVE SUSQEHANA 5DATE 1 1/04/2015
 
0 SSES UNIT 1 CYCLE 19 2.2 03 C
 
===2.1 LEGENDA===
MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME
                                        -CURVE CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME z
C      2.0 z
-1 1.9                                      I                INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 1.8 H.      '1.7 0J o-01 1,6 1.5
-I"I    1.4
---            I EEENCE:_T.S. 3.7.6 and 3.2.2        ___________                                __________
        '1.3 m
Hr iii    1.2 30        40            50            60              70          80C          I0            100 110 Total Gore Flow (MLB/H-R)
--t                                                                                                                  "D    "
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS INOPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-3                                        ,.-4 <
Q)"*
0
 
CI, SSES UNIT 1 CYCLE 19 C      3.6 Ci, C
mR c
Z
-t
    .E_
-H 0
                                                                          $o O.
-.4
-11 "51 m
z3
-H
<m Fi 20 30 40      50          60          70      80 90 100 Core Power (% RATED)
(73                                                                  -U 51 MCPR OPERATING LIMIT VERSUS CORE POWER          CD CD-
                      *MAIN TURBINE BYPASS INOPERABLE                    Z TWO LOOP OPERATION (BOC to EOC)                    77 FIGURE 5.2-4                      -- h 0)
 
Rev. 16                  PL-NF-14-001 Rev. 2 Page 17 of 62 EOC-RPT Inoperable SUSQUEHANNA UNIT 1  TRM/3,2-18 SUSQEHANA UITTRM3.2I EFFECTIVE 8DATE 11/04/2015
 
CD SSES UNIT 1 CYCLE 19 2.2 03 LEGEND C
m        2.1                                            CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM
=
INSERTION TIME 2.0                                            CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME C
z 1.9                          4.                  SAFETY* ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2
-H  E                                                            I            I          IJ 1.8 L.
USED INDETER[MIN1NG MFLCPR I
-4.      1.7 0.
C0 o                                                                                                                CD 1.6                                                                                                            -3.
C) 1.5
-rr      1.4
 
==REFERENCE:==
T.S. 3.3.4.1 and 3.2.2
--Il
<r m        1.3 m
1.2 30        40              50          60            70            80        90            100  110 U                                                      Total Core Flow (MLBIHR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW EOC-RPT INOPERABLE                                        *QcD TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-5                                                0""
 
ci SSES UNIT 1 CYCLE 19 C
I z
z z
E 0
(D 0
C) m n-I 0
H m
0 50          60                    90 H*    20 30 40          Core Power  (% RATED) 70    80    100 n-MCPR OPERATING LIMIT VERSUS CORE POWER            *(D  Z EOC-RPT INOPERABLE TWO LOOP OPERATION (BOC to EQO)              O-"    -1 FIGURE 5.2-8                      (O1*--
 
Rev. 16                      PL-NF-14-0O1 Rev. 2 Page 20 of 62 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 1  TRM/3.2-21    NIT TR/3.-21 DATE 11/04/2015 EFFECTIVE SUSQEHANA
 
SSES UNIT 1 CYCLE 19 Cn      2.2 LEGEND m
2.1            _____________                    -CURVE        A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME z
C      2.0            ________                          -CURVE        B: REALISTIC AVERAGE SCRAM INSERTION TIME z
1.9              _______        _______          -      SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 1.8 I-1.7 r*o 0 A    BI
: 10.                                                                                                                              0, 1.6 1.5 m
"1      1.4 rri 0             
 
==IREFERENCE:==
TS. 3.7.8 and 3.2.2~
1.3                            I-~            {                4            1      ~~-f 108, 1.221 m      1.2 30          40          50              60              70            80        90          100      110 Total Core Flow (MVLB/HR)
                                                                                                                              "-D    "-
0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE                                                "'.)
0 o',                                                TWO LOOP OPERATION (BOC TO EQO)
FIGURE 5.2-7                                                  "*' <c 0 0)"
 
SSES UNIT I CYCLE 19 60 C
z 0,
    .2
-Il CD C
                                                                            -3.
0)
'i,,
100,1.35 m
20 30 40      50          60 (% RATED) 70 Core Power                  80 90 100 o1                                                                    T1    T1
-L
                                                                      *Q2    Z~
MCPR OPERATING LIMIT VERSUS CORE POWER BACKUP PRESSURE REGULATOR INOPERABLE TWO LOOP OPERATION (BOO to EOC)
FIGURE 5.2-8                          -,h . 0 0)'  ,C
 
Rev. 16                      PL-NE-14-001 Rev. 2 Page 23 of 62 One TSV. or TCV Closed SUSQUEHANNA UNIT 1 TRM/3.2-24 SUSQEHANA UIT ITR IS.-24 EFFECTIVE      DATE 11104/2015
 
SSES UNIT 1 CYCLE 19 2.2                                                                              I LEGEND 2,1                                                          CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 2.0                  _______
_______                      -CURVE        B: REALISTIC AVERAGE SCRAM INSERTION TIME
-r" 1.9 130, 1.831                                              SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES NJ                                          I                                    ARE OPERABLE PER SR 3.7.5.1 AND 3.7.6.2 U'  .4-1.8
                                          *_                                        USED IN DETERMINING MFLCPR E2 1.7 C., 1.6                                                                                                                      CD 1.5 m
-I-1    1.4 m
 
==REFERENCE:==
T.S. 3.2.2 and TRM 3.3.71 0
I-4 1.3
_ _  I            _  I_              _      _            _      _    _      _ _    _    _
1.2 m
30                40              50          60              70            80          90        100      110 Total Core Flow (MLBIHR) 0                                                MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW                                CD  Z N)
ONE TSV OR TCV CLOSED*
TWO LOOP OPERATION (BOC TO EOC)                                        -  ,-<
FIGURE 5.2-9                                            0
                  *Operatofl with one TSV or TCV closed is only supported at power levels -<75%rated power.
 
cj SSES UNIT 1 CYCLE 19 C
m z
C z
S 0.-
-I 0m
*0 CD m
-n m
m C)
-9 20 30    40              50            60  70 80
                      *Core Power (% RATED)
MCPR OPERATING LIMIT VERSUS CORE POWER
                      *ONE TSV OR TCV CLOSED              Co  I TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-10
 
Rev. 16                            PL-NF-14-O01 Rev. 2 Page 26 of 62 Table 5.3-1 Average Scram Time Fraction Table For Use With Scram Time Dependent MCPR Operating Limits Control Rod              Average Scram Time to Position (seconds)
Position 45          0.470                                              0.520 39        0.630                                              0.860 25        1.500                                              1.910 5      -    oo70                                            3.440 Average Scram    Realistic                                          Maximum Insertion Time                                                      Allowable SUSQUEHANNA UNIT 1                SUQEAN NTITRM/3.2-27  EFFECTIVE DATE 11/0412015
: 1. .    . .1  I * ... A...    .    . - -- a L.~cgaa. . ..  .. * .1 L. * -- .  .*... ..&. aaau  I  1S  a. .  .... aJ L&...aa......a..n.
Rev. 16                                          PL-NF- 14-001 Rev. 2 Page 27 of 62 6.0      LINEAR HEAT GENERATION RA*TE (LHGR) 6.1          Technical Specification Reference Technical Specification 3.2.3, 3.3.4.1, 3.7.6, and 3.7.8 6.2          Technical Requirements Manual Reference Technical Requirements Manual 3.3.7 6.3          Description The maximum LHGR for ATRIUMTZ-I 0 fuel shall not exceed the LHGR limit determiined from Figure 6.2-1. The LHGR limit in Figure 6.2-1 is valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
To protect against both fuel centerline melting and cladding strain during anticipated system transients initiated from reduced power and flow conditions, power and flow dependent LHGR limit multipliers are provided in the following figures:
a)  Main Turbine Bypass Operable Figure 6.2-2: Flow-Dependent LHGR Uimit Multiplier Figure 6.2-3: Power-Dependent LHGR Limit Multipiier b)  Main Turbine Bypass Inoperable Figure 6.2-4: Flow-Dependent LHGR Limit Multiplier Figure 6.2-5: Power-Dependent LHGR Limit Multiplier c)  One Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 6.2-6: Flow-Dependent LHGR Limit Multiplier Figure 6.2-7: Power-Dependent LHGR Limit Multiplier
* The LHGR limits and LHGR limit multipliers in Figures 6.2-2 and 6.2-3 are applicable to EOC-RPT Operable and Inoperable and Backup Pressure Regulator Operable and Inoperable.
* The LGHR limits and LHGR limit multipliers in Figures 6.2-1 through 6.2-7 are valid for both Two Loop and Single Loop operation.
SUSQUEHANNA UNIT 1                              TRM/3.2-28              SUSQEHANA EFFECTIVE  NITTRI3.-28 DATE 11/04/2015
 
C,)
SSES UNIT 1                                CYCLE 19 C        16.0 Ii                    Ii                                                        II ii                                                                                                                                                                  i iI ii ii a          ili a                      iI l Ii i                                                                !i Co                                                                                                                                                                                        a              a                  la a        a    l        la      l      a      l 0                a a
a a
a a                                                I            I                                                                        I                    I El 11111                  '        I*            I I
C                                                                                      I              !
m                                                                  lala                                                                                  al                  ala        a        alalala                        alIlal                  al    a      la aa a a              a a              L      +/- Z        ....          L      1 - - .....t....J......-
=                                                                                                                                                                                                                                                                    -
z        '14.0          0.,3.---- f=--I--+ I 900                                                          ,-I--S-I--..
4                                    ..J-                              REFERENCE; T.S 3.2.3 z                  L- i- - - I              I I a a a. a . . a . .a . .a .                                                              .a .        I      &    a                    1          a    a        a a                                                                I a I a. I. ~ alala IaI-aI I I                      IaIaI l      aI                  IaI                  a    Ial          al                l                        lalal                                            lala C
a[
a a
a aI la a al  ia              I    Ia a a a ia a I alalalala I    a    la  alaa a            a    a a
a la a
l n
a        .a .a      a              l    la    aal                                          .    .    .    .      1I          t.          t.      .1 I            ..      .        ..        .      ..          .....                ..        .
4" z    La-Ial lal                        la"1a1                      aI          1ajj                                            ~ I                  i                jII                              !i            i    l 12.0 al    a      lala                                      alalal                        aI    a                    i    l                                                                a      a          /aaa        a            a1 1          a      a1 2          a    .      .a.                          a. a        a      a      a, a            a                                      Iaf                a    a      I a      at          aIa                          aI                  a    a.a.a. a. a aIa          a          ala              aIalal                  lii      l                      al    al    l      al    a      l 0
Cu          ~II        I I II Ia I      I      I    I    I Ia 1      1            11 1        11                  1          ~I      I    Ia    I aaI a    I    I a
I l
aaI Ia        a. I a      a I
al I        a          I      I II a
H    C a          I    l      lall                          l    la                                                                  iala                                                    lalala                              al                    aialaIa                  a
    'a"  10.0 Cu a-          ta          l al            la a      al
                                                                      -- al--          aI a 4aIaa      a- a-  a aIaI a      aI a--a a- a                    a--        a- a a aI IIaa a a              IIaI I            aa aIa a4 - I *              -
0            aa          a      a      a      a a                a            a aia  a aIa a            Iaaatai                                  i      iiaa    a a                    ,aaa      a        a        a                    ,aaa aa a                  Il
                                                                                                                                                                                                                                                                                ,      ,            CD a Ia      a            la      a            alalI              a                                  a    a    a            a      a    a    a      a          a    a              a        a              l        a                            a a Ialal .a  .      .a.aa                .a    .a      a    a      a a a                a a a            a    a    a Ia                      aIa                                    a      aI      aI    .a        a      .a.. a a N)    V          aI    a                                                al    i    lalalala                                                                                    a    a        alal                              aI              a      a1                                    C I    l  l l  l l1-Ta-TaII l        l                                                            I    I-I                    I-yi                                          rw-              l      l l- .            .      .
N)  CD          a    a      i      a      a lalala a      la          a      a    a      a            a al a
la.
a"a a
a a
a ai a      a alal a
a a
a a
a a
a a
l a
ia a      a l    la      la a
a  la l
a l
a la a
l i
4-a Co    0          aI    a      I      Ia    I      Ia I          a            a      Ia    a        Ia  a    a    a    la  a    a            l    la    l    la    a          a              al                Ia a          la      a      la  a      a      a      l            0) 0 I-    8.0 0                            I I    I        Ill                                  I      I      I                                                  a      I                iII            Ia                                Il                    I      *l      lll ali C
Ial          a      lI            ll        l  a      1            l    i      l        lI        l    .          a.          al
                                                                                                                                                      .a.                                                  l                1        l                                7        l iI                                                      al~
l l      l        l1l                  l          l    lal                      lal                        l              lanl                                    l            l      i mm                                              I  I    I      II            I                                              I          I                I        I          I            I          I        I        I      I    I        I      I
-I-        6.0 rn                                            .a..                                    .a..            a      a j      ,    ,    I    a                  ,    ,    t            ,    ,I              a a                        ,iI,                    a a            I        !
H                                      11              11              1              1      11          1111                                                                                                            ai lal                                a all    a      a al  a aI                                                                1                                      I            a              I      a  a      a C        4.0 0                      10000                              20000                              30000                      40000                          50000                              60000                                    70000                              80000 H
Pellet Exposure (MWDIMTU) rr                                                                                                                                                                                                                                                                                            T-0  "
-I-                                                                UNEAR HEAT GENERATION RATETMLIMIT VERSUS PELLET EXPOSURE ATRIUM -10 FUEL FIGURE 6.2-1                                                                                                                                              Oco  a-0")'  0
 
Rev. 16                      PL-NF-'I4-001 Rev. 2 Page 29 of 62 Main Turbine Bypass Operable SUSQUEHANNA UNIT 1  TRM/3.2-30 SUSQEHANA NITTR/3.-30 DATE 11/04/2015 EFFECTIVE
 
C,,
SSES UNIT 1 CYCLE 19 Co        1.10 1.00 z
z 0.90
    -I--
0.80
-I  ._1
('3      0.70 a,                                                                    <D
('3
                                                                            ._)
0.60 0,50
-n r-n m        0.40 m
0.30
-I            30 40 50      60            70            80  90 100 110 m:                              Total Core Flow (MLB/hr)
: 0)                    FLOW DEPENDENT LHGR LIMIT MULTIPLIER NJ                        MAIN TURBINE BYPASS OPERABLE (03 ATRIUMT*-10 FUEL FIGURE 8.2-2
 
SSES UNIT 1 CYCLE 19 1.10                  L            I                  &          "" 'U"' ...........  * "          '
* m                L                4            4 *
* A            A            i C
m3 LEGEND
                            .. "            '                  '
* t              I            "                I                I i
I                                    ii Fji o T                                                                                                                                                                                  ----  ,-------~.------.I-------,                    9 CURVE A: BASE CURVE 1.00 CURVE B: CORE POWER __26% AND CORE FLOW <_.0 MLBM1HR
* I                TI              rS                I      1            31                                    1                        ---      I - .        ..-  j.          a          .I      -    *      --  -
0.90                              I                    I            I                                            I                                a            I                                      i          I                          I
"-I II                            l              l*                                            i            I  [                aI          I                  li                                          l            i k                              I I
I
                                                                                                    .1_J IIS
_    _ J.          _
I
                                                                                                                                                      .        1 IJ          ;
1                    _1          J                          LI z
I--
0.80                  I            I                I                I                I                                                            1            1                  5 I            I                I                  I                                          I                                  1                            I                  I          I            I            I
    ,.I I                                                                              l              ARE OPRAL                              PE        SR                        ANI37lI...
0.70                        .          .    ..._
* 1*.          1.              *              *        ._        ._    .        .              .      .  .          .            .    .      .
C)                                  /II                      I                I              1                          I                    ___              _  _        ___              ___                __    ___        ___          _
1_-
H    0.
0 0.60
__..,.      . IL.__J._.I  *                                ..-                                1          REOERABENCE:                        TSR 3.2.3,1 3.A4N                            3.7.6 an            8            I I
iH i          _  1i_
                                                                                                                ; /
0.50 -
03 iL  I yr                i I"      '-- ""    '                          "- -          !        .    ..  .... ..    .  .  ..  .-. -- -          '-    -  -l . -          -      *      -  *    -      ;  '    ..      .    .
l    26      04 N,3      0.40 23 I -" -
0.0.
I I...
II -'-I....
I
                                                                          .. F - I-'
                                                                                ,            ~l,        I-
* I I    * --I - - - - -l-I
                                                                                                                              ,              ,                I
                                                                                                                                                                      -- - It - -
3I        -        *
                                                                                                                                                                                                                /      -    f - I- -
I            ,
                                                                                                                                                                                                                                                -I - d        - -
i      I                  I                      I              I                                    I                I            I                                    I          I            I            I
                      ! ,,    IJ, J            I                I              I              I              I            r                                                                                    I          I            I            I I            I                  I                              -                                                                                                                3          I            I 0        0.30                                                    I              I              II              I            r                                I            I                1 2,0                          30                              40                                50 Core Power                60 (% RATED) 70                                                    80                      90                            100 POWER DEPENDENT LHGR LIMIT MULTIPLIER MAIN TURBINE BYPASS OPERABLE                                                                                                                                  o ,z AT*iUMTM-10 FUEL FIGURE 6.2-3
 
Rev. 16                      PL-NF-14-O01 Rev. 2 Page 32 of 62 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT I  TRM/3.2-33 SUSQEHANA NITTR/3.-33 DATE 11t10412015 EFFECTIVE
 
SSES UNIT 1 CYCLE 19 Co      1.10 I
z        1.00 C:
Z        0.90 0.
0.80
.-I  "-J C;, ._  0.70 C;o 0,
C),. 0) 03  0.60 0o Ct 0.50 m
C)
-H m1      0.40 0
H-1 m]      0.30 30 40 50      60 Total Core Flow 70          80  90 100 110 (MLB/HR)
                                                                      "0  "-
nD FLOW DEPENDENT LHGR LIMIT MULTIPLIER            C.D z MAIN TURBINE BYPASS INOPERABLE 01                                ATRIUMTMea-t FUEL                        -Il 0O FIGURE 6.2-4                          0
 
CO,                        SSES UNIT 1 CYCLE 19 C          1.10 03 m
=
z z
C z
a..
      .5.
      .5 0
--I  -I a,
1'3    a,                                                                        oD 0
I..
a) 0 0.
m m
0
.-I m
0 4>              20 30 40      50          60 (% RATED) 70 Core Power                    80 90 100
--I, 01" POWER DEPENDENT LH-GR LIMIT MULTIPLIER MAIN TURBINE BYPASS INOPERABLE                Co C?                                  ATRIUMTM.-10 FUEL FIGURE 6.2-,5 0"C*
 
Rev. 16                      PL-NF-14-00l Rev. 2 Page 35 of 62 One TSV or TCV Closed SUSQUEHANNA UNIT 1 TRM/3.2-36    NITTR/3.-36DATE 11/04/2015 EFFECTIVE SUSQEHANA
 
0                                                                                                                    O SSES UNIT 1 CYCLE 19 1.10 C
i"1 1.00 C
z      0.90 a,
        -H1    0.80
            -_J 0.70 CD CD
        ",4 0.60 U..
0.50
        -T1
        -IT 0.40 m
m      0.30 0          30            40            50            60 Total Core 70Flow (MLB/hr) 80            90  100 110 rl3 FLOW DEPENDENT LHGR LIMIT MULTIPLIER 0                                                          ONE TSV OR TCV CLOSED*                                0-" 0 ATRIUMTM-t10 FUEL                                D' I, -=
FIGURE 6.2-6
                        *Operation with one TSV or TCV closed is only supported at power [evels
* 75% rated power.
n ,, n
 
C',
SSES UNIT 1 CYCLE 19 C
03 m
C z
13
{.i
--I  ,-J
      .1_
C,)
0 cc    0L                                                        0) mT "rn ml 0
m1 H3 20 30  40              50 (% RATED)
Core Power            60    70 80 rn
-I POWER DEPENDENT LHGR LIMIT MULTIPLIER      CD  Z ONE TSV OR TCV CLOSED ATRIUMTM-10 FUEL                  *i--  n FIGURE 6,2-7                      c0*
 
Rev. 16                                      PL-NF-14-OO1 Rev. 2 Page 38 of 82 7.0  ROD BLOCK MONITOR (RBM SETFOINTS AND OPERABILITY REQUIREMENTS 7.1  Technical Specification Reference Technical Specification 3.3.2.1 7.2  Description The RBM Allowable Value and Trip Setpoints for; a)  Low Power Range Setpoint, b)  intermediate Power Range Setpoint, c)  High Power Range Setpoint, d) Low Power Range - Upscale, e) Intermediate Power Range - Upscale, and I) High Power Range - Upscale shall be established as specified in Table 7.2-1. The RBM setpoints are valid for Two Loop and Single Loop Operation, Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
The RBM system design objective is to block erroneous control rod withdrawal initiated by the operator before fuel design limits are violated. Ifthe full withdrawal of any control rod would not violate a fuel design limit, then the RBM system is not required to be operable. Table 7.2-2 provides RBM system operability requirements to ensure that fuel design limits are not violated.
SUSQUEHANNA UNIT 1                  TRM/3.2-39                    NITTRIS.-39 DATE 11/04/2015 SUSQEHANA EFFECTIVE
 
Rev. 16                                      PL-NF-14-001 Rev. 2 Page 39 of 62 Table 7.2-I RBM Setpoints Allowable            Nominal Trip Function                        Value( 1 )            Setpoint Low Power Range Setpoint                              28.0                  24.9 Intermediate Power Range Setpoint                      63.0                  61.0 High Power Range Setpoint                              83.0                  81.0 Low Power Range - Upscale                            123.4                  123.0 Intermediate Power Range - Upscale                    117.4                  117.0 High Power Range - Upscale                            107.6                  107.2 (1)  Power setpoint function (Low, Intermediate, and High Power Range Setpoints) determined in percent of RATED THERMAL POWER. Upscale trip setpoint function (Low, Intermediate, and High Power Range - Upscale) determined in percent of reference level.
Table 7.2-2 RBM System Operability Requirements Thermal Power                                MCPR    (2.3)
(% of Rated)
                        > 28 andc<90                                  < 1.76
                        ~90 and <95                                    <1.47
                              >_95                                    < 1.70 (2)  Applicable to Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
(3 Applicable to both Two Loop and Single Loop Operation.
SUSQUEHANNA UN]T 1                  TRMI3.2-40          SUSQEHANA NITTRI3.-40 DATE 11/04/201 5 EFFECTIVE
 
Rev. 18                                    PL-NF-1 4-001 Rev. 2 Page 40 of 62 8.0  REGIRCULATION LOOPS - SINGLE LOOP OPERATION 8.1  Technical Specification Reference Technical Specification 3.2.1, 3.2.2, 3.2.3, 3.3.4,1, 3.4.1,3.7.6, and 3.7.8 8.2  Technical Req~uirements Manual Reference Technical Requirements Manual 3.3.7 8.3  Description APLHGR The APLHGR limit for ATRlUMTM-I 0 fuel shall be equal to the APLHGR Limit from Figure 8.2-1.
The APLHGR limits in Figure 8.2-1 are valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Single Loop operation.
Minimum Critical Power Ratio Limit-The MCPR limit is specified as a function of core power, core flow, and plant equipment operability status. The MCPR limits for all fuel types (ATRIUM TM-10) shall be the greater of the Flow-Dependent or the Power-Dependent MCPR, depending on the applicable equipment operability status.
a)  Main Turbine Bypass I EOC-RPT / Backup Pressure Regulator Operable Figure 8.2-2: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-3: Power-Dependent MCPR value determined from BOC to EOC b)  Main Turbine Bypass [noperable Figure 8.2-4: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-5: Power-Dependent MCPR value determined from BOC to IEOC c)  EOC-RPT Inoperable Figure 8.2-6: Flow-Dependent MCPR value determined from BOG to EOC Figure 8.2-7: Power-Dependent MCPR value determined from BOC to EOC SUSQUEHANNA UNIT 1                  TRMI3.2-41                    NIT TRI3.-41EFFECTIVE SUSQEHANA      DATE 11/04/2015
 
Rev. 18                                    PL-NF-14-OO1 Rev. 2 Page 4l of 62 d)  Backup Pressure Regulator Inoperable Figure 8.2-8: Flow-Dependent MCPR value determined from BOO to EGOC Figure 8.2-9: Power-Dependent MCPR value determined from BOO to EDO e)  One Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 8.2-1O:Flow-Dependent MOPR value determined from BOO to EDO Figure 8.2-11 :Power-Dependent MOPR value determined from BOO to EOC The MOPR limits in Figures 8.2-2 through 8.2-1 1 are valid only for Single Loop operation.
Linear Heat Generation Rate Limit The LHGR limits for Single Loop Operation are defined in Section 6.0.
RBM Setpoints andOperabilityRequirem~ents The RBM setpoints and operability requirements for Single Loop Operation are defined in Section 7.0.
SUSQUEHANNA UNIT 1              TRM/3.2-42                NITTRI3.-42 DATE 1110412015 EFFECTIVE SUSQEHANA
 
C            16.0        T                  T                    T                    r                T            ~                      T                  ~                        u              1                      1                  ~                  I                  r QI                      I      I  '                I                                  I            l              Il      l        t                I        I        la            1                  l                        l 9      i0 1                                    '
I      E      lI        I                              I  Ii    l    l                                                    l                llI                                                lI                                                    l
: z.                                          1. .1.                          II                    .11                                            ..                                  II1lIti1                                                                                                  1 I,    i  I    s I  i    I  r  I,.i        m      i    .              m        m        m    ii.m                                                                                                  n  l4...4      mm~~u            mm.4.*"
I11I    1    I    I            Ii      lIlC              Il                  IlIII1I                            I1I1      l      i        l                                                                                                                1 Il      l                            l        ~l      t                                                l                      I!                    ~            l      l                  l        O              l                    1              1 I      I    I    l    I                                  I      I        I      Ii ~ll          I    I                        l1                1      1I tltitjilt                                  SED IND*ERINIG0
            *      --    J-      I---. ii!                            I      I-I.--    --            I--  j--i-..J..-,Lf                                                                                                                        lf...f                                          I I1                                                                                                              1'I II&#xa3;            I Ii 1                        I I
I          I I
1 I1                                                                                                                        I1                  1      1        1        1                I*      I          I        1 I  IIlli  I                                                                  l        II      l                                              I      I                        I                I    I 0l3l                                                                      l                        l          l                  l                                  l                l                                                  I      1                    1
        =                    *oo                ,              Ioo  I            IO  ll .I                                    ,                                  II                              I      II                          I, 1I I        I                                I                I            I        I    I      I        I        I                                            l      l3    l                                            I      [                    II II                                                                      IIII    l    Il      l        lI                            I          1        1    1        I mI.._1111l1                                                                                I          I        lllll1                                    :11!                                l111                            l1!.                        1                  l11l Iiii                      II              !              II                      11                11          lll                                ll                      l                          Il                                  I        ll HI I I I I ,        l      l      l        l I      ,
I I I I I" I      l    l II I l        l~ll
                                                                                                                                                    ,I l        li
                                                                                                                                                                    ,      ,    I l      l            l:l I
l1 1
:l    l        l 67000,5.6 l
1o                              1                    11 1111              1              Il                                                        liIljlIlIIIIIl                                                                                          l    l        ll II                                      l                l    l            Illl                        I          l      l                      I                                                I            Il                          l 4.0      L U'                    i41--                        LI4l2                    M - -L --                    ~L-              AJ-J                                        L..L
                                                                                                                                                                                          ...........                          ...            --  ,                  I          ,      ,.        ,    I 0.0                  l1000.                          l              2000.0                ll                    000.                                4000.08000.06000.07000.
        -L~l                                                                      l                l            l              l                  l    l                  lI                                        l                l              i                l            l Averag PlanalEpour                                                        MWIMTU)l o    =          a      l                l              l                l                l            l              l                  l2l                                        l                                l                i              t            l                l A                                                                                    '        I      I    I    I        l                                                                          *                    .                .                                                                        Ca AVRAEPLNR                                      INA                  HA              GENERATION RAELMITlERSUtll o                                                            AERAE PANA                                        EPOSRE..SIGL.LOP.OERAIO ATRIUMTMAOll FUELll                                                l                                                                                  l                          owlll FIGURE 8.2-1ll          l        l      l    l                  l      l        lI                              I
......                    , , J2J***
                                    .....    . . . ..    . .. .... .....*.. ....................... . ..... ..... .....                ..........      ... * . ....      .......... ... ... ................. ......    ................... ......... ....... . ..... . ..      .. r*, i, . ... .. ... . .. ... .... .. .
 
Rev. 16                  PL-NF.-14-001 Rev. 2 Page 43 of 62 Main Turbine Bypass I EOC-RPT/I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 1  TRM/3.2-44    UITTRM3.2-44 SUSQEHANA EFFECTIVE DATE 11/0412.015
 
9 SSES UNIT 1 CYCLE 19 3.6                                                        I            I                        I LEGEND m          3.4            4.                          a-    CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM z                                                                        INSERTION TIME z          3.2            +              I            4-C                                                            CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME z
3.0 t                            1--i.
m I II II . . I H0 4-.
D.1 o~
2.8 2.6 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES L
ARE OPERABLE PER SR 3.7.6.t AND 3.7.6.2 I            I              Ii USED INDETERMINING MFLCPR K
0,  2.4 0
2.2 2.0 i'1
-m        '.8 rI,           
 
==REFERENCE:==
" T.S. 3.4.1 and 3.2.21                                                              108, 1.49' 1.6 H
  -m 0        '1.4 1N1                                                                  70          80            90        100          110 0              30        40            50          60  Total Core Flow (MLB/HR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW                                      Co MAIN TURBINE BYPASS 1 EOC-RPT / BACKUP PRESSURE REGULATOR OPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-2
 
9                                                                                    0 SSES UNIT I CYCLE 19 4.6 o0 4.4                                        ___      LEGEND 4.2
________CURVE                                        A: MAXIMUM ALLOWABLE AVERAGE SCRAM
____INSERTION                        TIME z      4.0      ____________CURVE                                    B: REALISTIC AVERAGE SCRAM INSERTION TIME
                                                      ~-CURVE C: CORE POWER _<26% AND coRE FLOW
* 50 MLBM/HR 3.6 S  3.4
                                                                                --fl!SAFETY  ANALYSES ASSUME THAT F~OUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.2 Ho  03 3.0                      _____USED                                                            IN DETERMINING MFLCPR 1.
N)
CD 0  2.8 0);
0) 2.6 2.4 2.2 f                                      140. 2.08!
                          ,4 0A-B-BT*
4  -.--------        ~    I "t100, '
2.0              F                                                                          *,                              ... .. . .. .
  -Iil m
t 1.8 0              REEEC: T.S. 3.4.1 and 3.2.2                                                          "Z 1.6 Hr o      1.4 20                                                                                                                              100 mn                              2040                                50co              60*( RAE70                80          90 "0  "
MCPR OPERATING LIMIT VERSUS CORE POWER                                                  CD MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-3                                                  &deg;<  I
                                                                                                                                                      "*  O 0)' C
 
Rev. 16                        PL-NF-14-OO1 Rev. 2 Page 46 of 62 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT1  TRM/3.2-47 SUSQEHANA NITTR/3.-47 DATE 1110412015 EFFECTIVE
 
C' SSES UNIT 1 CYCLE 19 4.2                                                                  I            I          II C-
________                ________            LEGEND 4.0 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM 3.8                                                        -          INSERTION TIME z
z
________________CURVE                              B: REALISTIC AVERAGE SCRAM iNSERTiON TIME 3.6 z
3.4
                                                                -  SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS        -
    ,4D 3.2 VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 o* 3.0 H0 0
CD co3 0) 2.4.
2.2 m      2.0 "I1 m                                                                                                                        .
1.8    -1
 
==REFERENCE:==
T.S. 3.4.1, 3.7.6,, and22                                            -- _,118 0
m      1.6      _  _          _        _        _I            _      _            _-_-_-_
1.4 m
30          40                  50            60 Total Core 70            80        90          t00        110 Flow (MLB/HR) 0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW                                    CD  Z
-J.                                                        MAIN TURBINE BYPASS INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8,2-4                                                0 o)"
 
C, SSES UNIT I CYCLE 19 4.2    123,4A41                                        *              =*                      *l "1 I    " m                                                            l C-Cin                              I                        LEGEND 4.0 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM F                                                        INSERTION TIME z        3.8 z                                                          CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME
              ~, 3,61              ____________  4-Z
-I      3.6                                              CURVE C: CORE POWER_*26% AND CORE F~LOW _<50 MLBMIHR
                                                .t-l 3.4                                    I        m
    .1.a                1I~Z~38 I--.*-                  4.              I-I E
-I  Cu 3.2 ISAFETY VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6,2 ANALYSES ASSUME THAT TWO OR MORE BYPASS w 3.0                                                                          USED IN DETERMINING MFLCPR I-0.
1~oi C~) 0
                                        .41 CD N)
: a. 2.8 CO 0                                                ______      _                                          ________                0) 2.6 2.4 2,2 m
2.0 0r           
 
==REFERENCE:==
T.S. ,3.4.1, 3.7.6, and 3.2.2                                  ..
-I      1.8 20                30              40                    6060 Power (%o o70RATED)            80          90  100 50Core "0  "T CD MCPR OPERATING LIMIT VERSUS CORE POWER                              Com    I N)                                                            MAIN TURBINE BYPASS INOPERABLE                                  .CD SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8,2-5                                      ow.
: h. h< .-
 
Rev. 16                  PL-NF-14-O0l Rev. 2 Page 49 of 62 EOC-RPT Inoperable SUSQUEHANNA UNIT 1  TRM/3.2-50 SUSQEHANA NIT TR/3.-5OEFFECTIVE DATE 11/0412015
 
p SSES UNIT 1 CYCLE 19 4.0 LEGEND m      3.8 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM~
z      3.6              ________________INSERTION                                    TIME z
C                                                                CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 3.4 z
3,2 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVESl E  3.0                                                      -        ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2
  ,U
-1  I-2,8                                                                    USED IN DETERMINING MFLCPR 4,
0.
2.6 0
N, 0I 2.4                                                                                                                                0) 2.2 2.0 m      1.8 0
 
==REFERENCE:==
T.S 3..,.341              and 3.2.2                                      _            "_-_-_-[_08t" 1.6 1.4 m          30        40                    50          60              70          80        9t0          100              110 Total Core Flow (MLB/HR)
                                                                                                                                    *,      ,I-0                                              MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW 4*                                                            EOC-RPT INOPERABLE                                                  -Q* .:
SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-6
 
C*
SSES UNIT 1 CYCLE 19 Cb 0*
z
.-I C.'
CD C.,
N)
C,'                                                                    0)
'-I"1
['11
-IT m
1-1 20 30 40          5060 Power' (% RATED) 70 80Core                        80 90 100 m                                                                  -U  -D MCPR OPERATING LIMIT VERSUS CORE POWER          Co  z EOC-RPT INOPERABLE 0,-
SINGLE LOOP OPERATION (BOC to EOC)                  ,C FIGURE 8.2-7                      ow' 0
 
Rev. 15                      PL-NF-14-OO1 Rev. 2 Page 52 of 62 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 1  TRM/3.2-53 SUSQEHANA NITTRIS.-53 DATE 11/04/2016 EFFECTIVE
 
C',
SSES UNIT I CYCLE 19 CO                  4.0 I                                    I                        I                                I m                  3.8
                                                                                                                                                                *:MAXIMUM ALLOWABLE AVERAGE SCRAM z
3.6                                                                                                                                    INSERTION TIME V
I                                                                  .
C                                                                                                                                                    I: REALISTIC AVERAGE SCRAM INSERTION TIME z                  3.4                                                          4                                    4.-
3.2                                                                                                                                      f          ,      ,    .. ,I.,,.I,, I ,                      "                                "
S C
3.0 2,8 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR 2
H* C)    a.
0 2,6                                                                                                                                                                                                                                                                            CD 0~
C,          2.4 2,2 2.0 r-n
        -n' rni                1.8                                                                                                                        A-
__---_    _          _      ___            __                                                                  B
 
==REFERENCE:==
T.S. 3.4.1, 3.7.8, and 3.2.2[                                                                      ____.__                                  ..        _. _        _                                  .J._108, 1.48 1.6 m
1,4 30                      40                        50                                  60                                  70                                    80                        90                              100                  110 Total Core Flow (MLBJHR) w  r 0*
MOPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE                                                                                                                                              01 SINGLE LOOP OPERATION (BOC to EGOC)
FIGURE 8.2-8                                                                                                                          0O" 0
' I * . ...... .... .......  "..............  ... ...... . ... .  .. ... .  .  . ............  ......  ..............  .........................      .................  .................  .. ..    * ..  . .    =. . ... * " *LZ*:*  I* *,.,. L*** ............  .....
 
CD SSES UNIT 1 CYCLE 19 C                                                                                                                  "  'I-0*
C      4.4                                ----  LEGEND m                                                                UM ALLOWABLE AVERAGE SCRAM
-i-    4.2                                      CURVE A: MAXIM z                    ____
___ ___INSERi                      nION TIME z
C      4.0                                      CURVE B: REALI*
STIC AVERAGE SCRAM INSERTION TiME 3._____,_.__1CURVE                        C: CORE POWER < 26% AND CORE FLOW < 60 MLBMIHR I
I                    I rY ANALYSES      ASSUME THAT FOUR BYPASS VALVES  l---
ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.0          26.01, 2.90 E
USED IN DETERMINING MFLCPR CD 0.= 2.6                                    A                                                  *1*
0)
O-                                                            60, 2.18 U*                                                                                            4          4 1100 "
2.2                                                          1 m
2.0 m
1.8   
 
==REFERENCE:==
T.S. 3.4.1, 3.7.8, and 3.2.2J11ii 1.4
.-I        20          30              40            60  ...    ... 60 ...  ..  .. 70        80        90            100 m                                                          uore r'ower rio KAIi )uJ MCPR OPERATING LIMIT VERSUS CORE POWER                                        CD J\)                                            BACKUP PRESSURE REGULATOR INOPERABLE                                                  "11 0J                                                SINGLE LOOP OPERATION (BOO to EOC)
FIGURE 8.2-9                                                  (:I' .Q DO O--
 
Rev. 16                      PL-NF-14-001 Rev. 2 Page 55 of 62 One TSV or TCV CloSed SUSQUEHANNA UNIT 1 TRM/3.2-56    NITTR/3.-56 DATE 11/04/2015 EFFECTIVE SUSQEHANA
 
S SSES UNIT 1 CYCLE 19 3,6 0o C
  -i-      3.4 z
z        3.2 z
3.0 2.8 E
0.
2.6
2.6
  -*1 2.4 k*                                                                                                                        *0 0-C, 2.2 2.0 rri "11 1.8 m
  -*1 2.4 k*                                                                                                                        *0 0-C, 2.2 2.0 rri "11 1.8 m
1.6 m
1.6 m
1.4 r'ri                                                                                                            110 30              40            50            60              70              80          90  100 Total Core Flow (MLB/HR)
1.4 r'ri                                                                                                            110 30              40            50            60              70              80          90  100 Total Core Flow (MLB/HR)
C 0*                                            MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW                            o ,-n ONE TSV OR TCV CLOSED*
C 0*                                            MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW                            o ,-n ONE TSV OR TCV CLOSED*
cj                                                    SINGLE LOOP OPERATION (BOC to EOC)
cj                                                    SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-10                                o~
FIGURE 8.2-10                                o~
1'r%-h*
1'r%-h*
* Operation with one TSV or TCV closed is only supported at power levels -<75% rated power.
* Operation with one TSV or TCV closed is only supported at power levels -<75% rated power.
 
0 oi)
SSES UNIT 1 CYCLE 19 4.6I                                                                                                                                    I    I                  I 4.4                                                                    LEGEND m
4.2      ______                                                                        CURVE *: MAXIMUM ALLOWABLE AVERAGE SCRAM z                                                                                                                        INSERTION TIME z          4.0                                                                                      CURVE E3: REALISTIC AVERAGE SCRAM INSERTION TIME C
z              23 .61            23,3.7                                                            CURVE c.: CORE                  POWER < 26% AND CORE FLOW < 50 MLBM/HR 3.6
                                                                "* 26, 3.56-"
C......SAFETY                                                                                          ANALYSES ASSUMEtt      THAT FOUR BYPASS VALVES t 3.4                              26,C    3.33                                                                                ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.2
                            --                                                    ___________USED                                                                              IN DETERMINING MFLCPR 3.0 C,i CJ1 2.8 CD 0) 2.6
___      _    _ __      _      _      _    __        _    _    _      _6,19 2.4 2.2            _________                6.01, 2.40_____                                                                                          _________          -      519 2.0 n
1.8 1.6 m
1.4 20                                    30                                            40                            50                60                  70            80 Core Power (%RATED)
                                                                                                                                                                                                                          -0    7ci MCPR OPERATING LIMIT VERSUS CORE POWER                                                              w"I-ONE TSV OR TCV CLOSED 01 SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-11                                                  0)'
* i jq L. . ... *....... . . .....    .    ...        .  . .......... . . .. .......... ........ T.. .. ............. .... ...... * * * * * ... ... .... -:-.!
                                                                                                                                                            ..                                            ... .=
 
Rev. 16                                  PL-NF-14-OO1 Rev. 2 Page 58 of 62 9.0  POWERI/FLOW MAP 9.1 Technical Specification Reference Technical Specification 3.3.1.1 9.2 Description Monitor reactor conditions to maintain THERMAL POWER / core flow outside of Stability Regions I and II of the Power/IFlow map, Figure 9.1.
Ifthe OPRM Instrumentation is OPERABLE per TS 3.3.1.1, Region I of the Power! Flow map is considered an immediate exit region.
If the OPRM Instrumentation is inoperable perT"S 3.3.1.1, Region I of the Power!
Flow map is considered an immediate sca      region.
Region Ilof the Power!/Flow map is considered an immediate exit region regardless of the operability of the OPRM Instrumentation.
SUSQUEHANNA UNIT1                TRM/3.2-59            SUSQEHANA NITTR/3.-59 DATE 11104/2015 EFFECTIVE


0 oi)
Rev. 16                                     PL-NF-14-O01 Rev. 2 Page 59 of 62 120
SSES UNIT 1 CYCLE 19 4.6I                                                                                                                                    I    I                  I 4.4                                                                    LEGEND m
4.2      ______                                                                        CURVE *: MAXIMUM ALLOWABLE AVERAGE SCRAM z                                                                                                                        INSERTION TIME z          4.0                                                                                      CURVE E3: REALISTIC AVERAGE SCRAM INSERTION TIME C
z              23 .61            23,3.7                                                            CURVE c.: CORE                  POWER < 26% AND CORE FLOW < 50 MLBM/HR 3.6
                                                                "* 26, 3.56-"
C......SAFETY                                                                                          ANALYSES ASSUMEtt      THAT FOUR BYPASS VALVES t 3.4                              26,C    3.33                                                                                ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.2
                            --                                                    ___________USED                                                                              IN DETERMINING MFLCPR 3.0 C,i CJ1 2.8 CD 0) 2.6
___      _    _ __      _      _      _    __        _    _    _      _6,19 2.4 2.2            _________                6.01, 2.40_____                                                                                          _________          -      519 2.0 n
                          .-.
1.8 1.6 m
1.4 20                                    30                                            40                            50                60                  70            80 Core Power (%RATED)
                                                                                                                                                                                                                          -0    7ci MCPR OPERATING LIMIT VERSUS CORE POWER                                                              w"I-ONE TSV OR TCV CLOSED 01 SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-11                                                  0)'
* i jq L. . ... *....... . . .....    .    ...        .  . .......... . . .. .......... ........ T.. .. ............. .... ...... * * * * * ... ... .... -:-.!
                                                                                                                                                            ..                                            ... .=
 
Rev. 16                                   PL-NF-14-OO1 Rev. 2 Page 58 of 62 9.0  POWERI/FLOW MAP 9.1 Technical Specification Reference Technical Specification 3.3.1.1 9.2 Description Monitor reactor conditions to maintain THERMAL POWER / core flow outside of Stability Regions I and II of the Power/IFlow map, Figure 9.1.
Ifthe OPRM Instrumentation is OPERABLE per TS 3.3.1.1, Region I of the Power! Flow map is considered an immediate exit region.
If the OPRM Instrumentation is inoperable perT"S 3.3.1.1, Region I of the Power!
Flow map is considered an immediate sca      region.
Region Ilof the Power!/Flow map is considered an immediate exit region regardless of the operability of the OPRM Instrumentation.
SUSQUEHANNA UNIT1                TRM/3.2-59            SUSQEHANA NITTR/3.-59 DATE 11104/2015 EFFECTIVE


Rev. 16                                    PL-NF-14-O01 Rev. 2 Page 59 of 62 120 Purpose:
==Purpose:==
* 120 110*
* 120 110*
InitialI/Date: "        I 1100 100 9o.                                                                                          90 80 70 L.
InitialI/Date: "        I 1100 100 9o.                                                                                          90 80 70 L.
Line 1,888: Line 2,765:
                         -- -- NOTE--...............................
                         -- -- NOTE--...............................
The provisions of TRS 3.0.4 are not applicable TRS 3.3.7.2    Cycle each low pressure turbine combined intermediate                92 days valve from the running position and observe valve closure.
The provisions of TRS 3.0.4 are not applicable TRS 3.3.7.2    Cycle each low pressure turbine combined intermediate                92 days valve from the running position and observe valve closure.
                        ------...................
NOTE---------------------.....
NOTE---------------------.....
The provisions of TRS 3.0.4 are not applicable TRS 3.3.7.3    Cycle each high pressure turbine stop valves from the                92 days running position and observe valve closure.
The provisions of TRS 3.0.4 are not applicable TRS 3.3.7.3    Cycle each high pressure turbine stop valves from the                92 days running position and observe valve closure.

Latest revision as of 08:21, 5 February 2020

Technical Requirements Manual
ML15329A166
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 11/11/2015
From: Gerlach R
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML15329A166 (97)


Text

Nov. 11, 2015 Page 1 of 2 MANIJAL HARD COPY DISTRIBUTION DOCUMENT TRANMSMITTAL 2015-45734 USER INFORMATION:

GERLACH*ROSEY N EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSEY N 11/11/2015 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MNAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRMI - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 11/03/2015 ADD MANUAL TABLE OF CONTENTS DATE: 11/10/2015 CATEGORY: DOCUMENTS TYPE: TRM1 4oc2

Nov. 11, 2015 Page 2 of 2 ID: TEXT 3.2.1 REMOVE: REV:15 ADD: REV: 16 CATEGORY: DOCUMENTS TYPE: TEMI ID: TEXT 3.3.7 REMOVE: REV:1 ADD: REV: 2 CATEGORY: DOCUMENTS TYPE: TRMI ID: TEXT B3.3.7 REMOVE: REV:I1 ADD: REV: 2 CATEGORY: DOCUMENTS TYPE: TRMI ID: TEXT LOES REMOVE: REV: 83 ADD: REV: 84 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MNUALm Manual Name:z TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date: 1LI/I10/2 015 Procedure Name Rev Issue Date Change ID Change Numiber TEXT LOES 84 11/10 /2 015

Title:

LIST OF EF:FECTIVE SECTIONS TEXT TOC 25 04/28/2015

Title:

TABLE OF CONTENTS TEXT 1.1 1 01/31/2014

Title:

USE AND APPLICATION DEFINITIONS TEXT 2.1 2 04/28/2015

Title:

PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 10 01/31/2014

Title:

PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 5 03/05/2015

Title:

TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY & SURVEILLANCE (TRS)

APPLICABILITY TEXT 3.1.1 1 11/09/2007

Title:

REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 0 11/18/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 5 04/16/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/18/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &

CHECK VALVE TEXT 3.2.1 16 11/10/2015

Title:

CORE OPERATING LIMITS REPORT (COLR)

Report Date: 11/11/15 Pagel Page ! of of i~

16 Report Date: 11/11/15

SSES MANUAL Manual Name: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1 0 11/18/2002

Title:

INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3 03/31/2011

Title:

INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 8 10/14/2015

Title:

INSTRUMENTATION TRN POST-ACCIDENT MONITORING INSTRUMENTATION LDCN 4552 TEXT 3.3.5 0 11/18/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 4 04/29/2014

Title:

INSTRUMENTATION TRN ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 2 11/10/2015

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003

Title:

INSTRUMENTATION TEN RPS INSTRUMENTATION TEXT 3.3.9 3 04/17/2008

Title:

OPEN INSTRUMENTATION CONFIGURATION TEXT 3.3.10 1 12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 1 03/05/2015

Title:

WATER MONITORING INSTRUMENTATION Report Date: 11/11/15 Page 2 of of 16 I__66 Report Date: 11/11/15

~SES MANTJAIJ Manual Namue: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.4.1 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009

Title:

REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4 2 04/17/2008

Title:

REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6 2 04/25/2013

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 1 02/04/2005

Title:

EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007

Title:

EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/18/2002

Title:

EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/18/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 2 04/29/2014

Title:

SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/18/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Report Date: 11/11/15 Page Page~* of of 16 i_*6 Report Date: 11/11/15

SSES MANUJAL Manual Name : TE*I 21:Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6.4 0 11/18/2002 Titles CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/18/2002

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/18/2002

Title:

PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 2 04/16/2009

Title:

PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009

Title:

PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 3 04/16/2009

Title:

  • PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 2 04/16/2009 Title : PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009 Title : PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009 Title : PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006 Title : PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 10 09/27/2012

Title:

. PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04/26/2006

Title:

PLANT SYSTEMS SOLID RADWASTE SYSTEM Report Date: 11/11/15 Page Page A4 of of 16 16

SSES MUANTAI

. IManual

Title:

TECHNICAL REQUIREMVENTS MANUAL UNIT 1 Manual Name: TRJi1I TEXT 3.7.5.1 1 03/05/2015

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/18/2002 Titleg PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006

Title:

PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3 06/04/2012

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008 Titles PLANT SYSTEMS MAIM CONDENSER 0FFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING TEXT 3.7.8 5 03/05/2015

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 2 01/31/2014

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.7o11 0 04/16/2009

Title:

STRUCTURAL INTEGRITY TEXT 3.8.1 2 04/05/2010

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTI( ON -.

CONTINUOUS TEXT 3.8.2.2 2 12/14/2004

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTICON -

AUTOMATIC Report Date: 11/11/15 Page 5 Page of of 16 16 Report Date: 11/11/15

SSES MANUAL Manual Name:* TRNI SManual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3 2 03/05/2015 Title  : ELECTRICAL POWER DIESEL GENERATOR CDG) MAINTENANCE ACTIVITIES TEXT 3.8.4 0 11/18/2002

Title:

  • ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5 1 11/14/2013 Title : ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 1 12/08/2011 Title : ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 1 06/15/2009

Title:

BATTERY MAINTENANCE AND MONITORING PROGRALM TEXT 3.9.1 0 11/18/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/18/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/18/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006

Title:

MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 2 08/08/2006

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2 06/15/2010

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.10.4 2 04/17/2008

Title:

MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)

Report Date: 11/11/15 Page *6 Page of of 16 16 Report Date: 11/11/15

SSES MANUJAL

    • Manual Name: TRN1

- Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.1 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 2 10109/2012

Title:

RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5 3 03/05/2015

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUTMENTATION

... TEXT 3.11.2.1 3 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/18/2002

Title:

RADIOACTIVE EFFLUENTS GASEOUS RAD WASTE TREATMENT SYSTEM TEXT 3.11.2.5 4 07/03/2013

Title:

RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 5 04/28/2015

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION ac* TEXT 3.11.3 1

Title:

RADIOACTIVE EFFLUENTS TOTAL DOSE 04/26/2006 Report Date: 11/11/15 Page *:i~ of of 16 I_66 Report Date: 11/11/15

SSES MANUAL Manual Name : TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.4.1 5 03/05 /2015

Title:

RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2 2 04/26 /2006

Title:

RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2 4 04/17 /2008

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002 0

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4.1 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1 12/18/2008

Title:

ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM 16Reprt Dte:11/1/1 Page8.a Page of 16 Report Date: 11/11/15

SSES MANUJAL

. 1-- Manual Name: TECHNICAL Manual

Title:

TRMI REQUIREMENTS MANUAL UNIT 1 TEXT 4.7 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0 5 03/05/2015

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 2 04/29/2014

Title:

REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 03/31/2006

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMU/LATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

TEXT B3.3.1 1 01/31/2014

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2 03/31/2011

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 3 12/18/2008

Title:

INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 5 10/14/2015

Title:

INSTRUMENTATION BASES TEN POST ACCIDENT MONITORING (PAM) INSTRUMENTATION

. TEXT B3.3.5 2 11/09/2007

Title:

INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK Page of 16 Report Date: 11/11/15

9--I *o 0--*D*d ST/TT/TT  :~~c1 ~od~a ~T ;o ~T 9.~2d sTZLVWH~* THSS*HA HO&DVH S*Sva WNHJS2XS d NWIOOD HO1DVZH *IL*

Z00Z/6T/TT 0 S'9"[H J&X~H JLIWlI ZIlI UOH QNT MO'EA NOllvqIflHIDZa HOJ*DV* S*SVE NHLSAS LN-'IOOD HOLD*'d :eYZ; Z00Z/6T/TT 0 9""H&H HOLINOW *D'f>VI-' HDV*aHJI aH~nSS*H MO'I/HDIH S*SVH *SXS INWIOOD [ODV'H*I xE

  • LOOZ/60/TT T
  • hI~f00o :xa:si*

VZD M A*IEIDJNI I-*-hLDflHLS SHSva NacISLS 600Z/9T/90 T

~LNTWEOODT'O°DV 6 H XTJ 2AJSIW*H3 NILSXS LN'IOOD HOLDOWN S*SVH W2.SAS Z00Z/6T/Tt 0 NOI1*N*WflHLSNI DNIHOllINO aH*NM 9!ZTI 600Z/9T/90 0 ZTE"E* HTX.*,T N01N~WfldJSNI NOIlWIosI JAW

£00Z/ZZ/0T T SaSvH NOILVNHXflaLSNI :eT;*.

0T£H LXHL SJOIS LNS OW JNflJ NOI~VqlDOHIDHa HOLD*aH 010*/60/80 £ WOIL*N*WaaJSNI WIHdO :9*;t*

800Z/LT/90 £ 6"V£H c*Xai NOIJNLN*rHLSNI (Saa) wka&sXS NOILD*O&~d HOJ*Dv*Ha TaJ*

£00*I/*IOT T WkLS2S NOI DHLO'HJ *HJSHAO ~HNIEHf1L NIVW SZSVH NOIJNN[IWnaL*SNI S*IW*

NOI*LN*TIflqHSNI NOIl*fDY NOILVqosI WIHL S*S*a NOILVN &LOHSNJ *!I1J&

9TOZ/T£/T0 TI ,,INfl I~fl* S,,*ZHf0* rI\DINHD.&,T  :*~ y I~r

~IVL1NVW S~S~

SSES MATJi*

  • Manual Name: TRMI

=iManual

Title:

TECHNICAL REQUIREM'cENTS MANUAL UNIT 1 TEXT B3.4.6 2 04/25/2013

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT B3.5.1 0 11/19/2002

Title:

ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 2 04/17/2008

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3o6.4 1 12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002

Title:

PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 3 06/15/2010

Title:

PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM

  • TEXT B3.7.3.2 2 04/26/2006 W.

Title:

PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 1_1 of i__66 Report Date: 11/11/15

SSES MANUAL Manual Name: TRMI SManual Title* TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.3 0 11/19/2002

Title:

  • PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4 3 04/29/2014

Title:

  • PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006 Title : PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006 Title : PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002 Title : PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES STEXT B3.7.3.8 3 09/27/2012

Title:

PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3 7.4 0 11/19/2002 Title : PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002 Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002 Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002 Title : PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4 06/04/2013 Title : PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION

. TEXT B3.7.7 2 01/31/2008

...- Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Report Date: 11/11/15 Page 1/2 Page 12 of of 16 16 Report Date: 11/11/15

SSES MANTJAI~

Manual Name : TPR41 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.8 4 01/31/2 014

Title:

PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 2 12/08/2011 Title : PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004 Title : PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 1 04/14/2010

Title:

STRUCTURAL INTEGRITY TEXT B3.8.1 2 03/10/2010

Title:

ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT B3.8.2.2 1 09/17/2004

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC TEXT B3.8.3 0 11/19/2002

Title:

ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002

Title:

ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1 11/14/2013

Title:

ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 2 12/08/2011

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 2 06/04/2013

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM Report Date: 11/11/15 Page i~

Page 13 of of ii 16 Report Date: 11/11/15

S.~ES MM~AL

<?=Manual Name: TRMI

"*Manual Titles° TECHNICAL REQUIREMENTS MANUAL UNIT 1 0 TEXT B3.9.l 0 11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TINE TEXT B3.9.2 0 11/19/2002

Title:

REFUELING OPERATIONS BASES COMM4UNICATIONS TEXT B3.9.3 0 11/19/2002

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 03/31/2006

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.10.4 1 04/17/2 008

Title:

MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)

TEXT B3.ii.ioi 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3ol.11Io2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.ii.i.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.I.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.I.5 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION Report Date: 11/11/15 Page 14 Page 14 of of ~i* Report Date: 11/11/15

SSES MANUJAI O Manual Name: TRMI

... Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.11.2.1 1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.11.2.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN SPARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 5 07/03/2013

Title:

RADIOACTIVE EFFLUENTS BASES VENTILATION EXHqAUST TREATMENT SYSTEM TEXT B3.11.2.6 1 01/27/2004

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 5 03/05/2015

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1 12/03/2010

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS Report Date: 11/11/15 Page i~.

15 of of 16 I__66 Report Date: 11/11/15

SSES MANUJAL

  • - Manual Name: TRN1
  • Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3 0. 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Report Date: 11/11/15 Page 1616 of of 16 16 Report Date: 11/11/15

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 64 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Titl__ee Effective Date TOC TABLE OF CONTENTS 04/23/2015 1.0 USE AND APPLICATION Page TRM / 1.0-1 10/04/2002 Page TRM / 1.0-2 01/21/2014 Page TRM / 1.0-3 10/04/2002 2.0 PLANT PROGRAMS Page TRM / 2.0-1 04/23/2015 Pages TRM / 2.0-2 and TRM / 2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM / 2.0-5 01/21/2014 Page TRM / 2.0-6 03/27/2008 Page TRM / 2.0-7 05/15/2008 Pages TRM / 2.0-8 and TRM / 2.0-9 01/07/2011 Page TRM / 2.0-10 02/02/2010 Page TRM / 2.0-11 11/15/2004 Page TRM / 2.0- 12 03/27/2008 Pages TRM / 2.0-13 and TRM / 2.0-1* 11/15/2004 Page TRM / 2.0-15 11/15/2005 3.0 PI"I"LI*.jp?.DILI I I Pages TRM / 3.0-1 and 02/19/2015 Page TRM / 3.0-3 03/15/2002 Page TRM / 3.0-4 02/19/2015 REACTIVITY CON 3.1 Page TRM / 3.* 10/3112007 Pages TRM an 08/31/1998 Pages 3. 5 08/31/1998 Page TR 03/22/2006 04/07/2009 03/27/2008 3.1-9 and TRM / 3.1,9a 02/18/1999

.1-10 02/18/1999 3.2 iERATING LIMITS REPORT 07/07/1999 Pages TRM / 3.2-2 through TRM / 3.2-63 11/04/2015 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 07/16/1999 Page TRM / 3.3-4 and TRM / 3.3-5 10/31/2007 Page TRM / 3.3-6 03/10/2011 SUSQUEHANNA-UNIT1 TRM / LOES-1 SUSQEHANA UNT I RM LOS-1EFFECTIVE DATE 11/04/2015

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.3-7 10/31/2007 Page TRM / 3.3-8 08/31/1998 Page TRM / 3.3-9 10/07/2015 Page T'RM / 3.3-9a 06/30/2010 Page TRM / 3.3-10 10/31/2007 Page TRM /3.3-11 10/07/2015 Page TRM / 3.3-11a 10/07/2015 Page TRM I 3.3-12 03/30/2001 Page TRM / 3.3-13 01/07/2011 Page TRM / 3.3-14 12/1 4/1 998 Page TRM / 3.3-15, 04/11/2014 Page TRM I 3.3-16 01/07/2011 Page TRM / 3.3-17 11/04/2015 Page TRM / 3.3-17a 11/04/2015 Page TRM / 3.3-18 10/31/2007 Pages TRM / 3.3-19 through TRM / 3.3-21 10/22/2003 Page TRM / 3.3-22 03/27/2008 Page TRM / 3.3-22a 11/15/2004 Pages TRM / 3.3-22b through TRM / 3.3-22d 03/22/2006 Page TRM / 3.3-23 12/03/2004 Pages TRM / 3.3-24 and TRM I 3.3-25 05/16/2003 Page, TRM / 3.3-26 10/22/2003 Page TRM / 3.3-27 02/19/2015 Page TRM / 3.3-28 04/07/2009 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages TRM / 3.4-2 through TRM / 3.4-5 10/23/11998 Pages TRM / 3.4-6 through TRM / 3.4-8 04/01/2009 Page TRM / 3.4-9 08/31/1998 Page TRM / 3.4-10 10/31/2007 Page TRM / 3.4-11 08/31/1998 Page TRM / 3.4-12 03/27/2008 Page TRM / 3.4-13 03/31/2006 Pages TRM / 3.4-14 and TRM / 3.4-15 04/25/2013 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages TRM / 3.5-2 and TRM / 3.5-3 08/31/1998 Pages TRM / 3.5-4 and TRM / 3.5-5 10/31/2007 Pages 3.5-6 and 3.5-7 08/31/1998 SUSQUEHANNA- UNIT 1 TRM / LOES-2 LOS-2EFFECTIVE I RM UNT SUSQEHANADATE 11/04/2015

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.6 CONTAI NMENT Page 3.6-1 08/31/1998 Pages TRM / 3.6-2 and TRM I 3.6-2a 04/16/2014 Page 3.6-3 08/31/1998 Page TRM / 3.6-4 01/07/2002 Page 3.6-5 08/31/1998 Pages TRM / 3.6-6 through TRM / 3.6-8 12/31/2002 3.7 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 08/31/1998 Page TRM / 3.7-4 03/31/2006 Pages TRM / 3.7-5 04/07/2009 Pages TRM / 3.7-6 through TRM / 3.7-8 08/02/1999 Pages TRM / 3.7-9 and TRM / 3.7-10 04/07/2009 Page TRM / 3.7-11 12/29/1999 Page TRM / 3.7-12 08/02/1999 Page TRM / 3.7.13 04/07/2009 Page TRM / 3.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 04/07/2009 Page TRM / 3.7-18 08/02/1999 Page TRM / 3.7-19 04/07/2009 Pages TRM / 3.7-20 through TRM / 3.7-22 08/02/1999 Page TRM / 3.7-23 04/07/2 009 Page TRM / 3.7-24 03/31/2006 Page TRM / 3.7-25 08/02/1999 Page TRM / 3.7-26 09/25/2012 Page TRM / 3.7-27 11/24/2011 Pages TRM / 3.7-28 through TRM / 3.7-34a 09/25/2012 Page TRM / 3,7-35 03/31/2006 Pages TRM / 3.7-36 and TRM / 3.7-37 02/01/1999 Page TRM / 3.7-38 02/19/2015 Page TRM / 3.7-39 08/31/1998 Page TRM / 3.7-40 03/31/2006 Page TRM / 3.7-41 05/24/2012 Pages TRM / 3.7-41a through TRM / 3.7-41c 05/24/2012 Page TRM / 3.7-42 09/04/2008 Page TRM / 3.7-43 08/31/1998 Page TRM / 3.7-44 02/19/2015 Pages TRM / 3.7-45 and TRM / 3.7-46 10/05/2006 Page TRM / 3.7-47 06/07/2007 TRM / LOES-3 EFFECTIVE DATE 11/04/2015 SUSQUEHANNA-UNITI SUSQUEHANNA-UNIT1 TRM / LOES-3 EFFECTIVE DATE 11/04/2015

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page 10/05/2006 Page TRM TRM II 3.7-48 3.7-49 06/07/2007 Pages TRM / 3.7-49a and TRM / 3.7-49b 10/05/2006 Page TRM / 3.7-50 01/21/2014 Page TRM / 3.7-51 08/16/2006 Page TRM / 3.7-52 12/03/2004 Page TRM / 3.7-53 04/15/2003 Page TRM / 3.7-54 07/29/1999 Pages TRM / 3.7-55 through TRM / 3.7-57 04/01/2009 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Page TRM / 3.8-2 01/28/2005 Pages TRM / 3.8-3 and TRM /3.8-4 03/25/2010 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Page TRM / 3.8-7 10/31/2007 Pages TRM / 3.8-8 through TRM / 3.8-10 12/03/2004 Page TRM /3.8-11 09/03/2004 Page TRM / 3.8-12 12/03/2004 Page TRM / 3.8-13 02/19/2015 Page TRM / 3.8-14 08/31/1998 Pages TRM / 3.8-15 through TRM / 3.8-17 04/02/2002 Page 3.8-18 08/31/1998 Page TRM / 3.8-19 04/02/2002 Page 3.8-20 08/31/1998 Pages TRM / 3.8-21 and TRM / 3.8-22 06/06/1999 Page TRM / 3.8-23 11/07/2013 Pages TRM / 3.8-24 and TRM / 3.8-25 11/30/2011 Page TRM / 3.8-26 05/28/2009 Page TRM / 3.8-27 11/29/2006 Pages TRM / 3.8-28 and TRM / 3.8-29 05/28/2009 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages TRM / 3.10-2 and TRM / 3.10-3 08/31/1998 Page TRM / 3.10-4 08/01/2006 Pages TRM / 3.10-5 and TRM / 3.10-6 03/22/2006 Page TRM / 3.10-7 06/10/2010 Page TRM / 3.10-8 03/27/2008 SUSQUEHANNA - UNIT 1 TRM / LOES-4 SUSQEHANA UNT I RM LOS-4EFFECTIVE DATE 11/04/2015

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages TRM / 3.11-2 and TRM / 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page TRM / 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages TRM / 3.11-7 and TRM / 3.11-8 08/31/1998 Pages TRM / 3.11-9 and TRM / 3.11-10 10/09/2012 Pages TRM / 3.11-11 and TRM / 3.11-12 08/31/1998 Page TRM /3.11-13 02/19/2015 Page TRM / 3.11-14 12/03/2004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM / 3.11-17 03/31/2006 Page 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21 03/31/2006 Page TRM / 3.11-22 04/02/2002 Page TRM / 3.11-23 11/14/2006 Page TRM / 3.11-24 06/18/2013 Page TRM / 3.11-25 04/12/2007 Pages TRM / 3.11-26 and TRM / 3.11-27 01/21/2004 Page TRM /3.11-28 09/08/2009 Page TRM / 3.11-29 12/03/2004 Pages TRM / 3.11.30 and TRM / 3.11.31 01/21/2004 Page TRM / 3.11.32 04/23/2015 Page TRM / 3.11-33 03/31/2006 Page TRM / 3.11-34 08/31/1998 Page TRM / 3.11-35 03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39 11/30/2005 Page TRM / 3.11-40 02/19/2015 Pages TRM / 3.11-41 through TRM / 3.11-43 08/31/1998 Page TRM / 3.11-44 08/01/2006 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM /3.12-3 02/05/1999 Page TRM / 3.12-4 03/14/2008 Page TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-3 08/31/1998 Page TRM / 4.0-4 12/11/2008 Pages 4.0-5 through 4.0-8 08/31/1998 SUSQUEHANNA-UNIT1 TRM/LOES-5 SUSQEHANA UNT I RM LOS-5EFFECTIVE DATE 11/04/2015

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 08/31/1998 Page TRM / B 3.0-4 02/19/2015 Page TRM / B 3.0-4a and TRM / B 3.0-4b 02/19/2015 Page TRM / B 3.0-5 02/19/2015 Page TRM I B 3.0-6 08/31/1998 Page TRM I B 3.0-7 04/12/2007 Pages TRM / B 3.0-8 through TRM I B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12 03/15/2002 Pages TRM / B 3.0-13 through TRM / B 3.0-15 02/19/2015 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 07/13/1999 Page TRM / B 3.1-2 04/16/2014 Page TRM /B 3.1-3 10/31/2007 Page B 3.1-4 08/31/1998 Page TRM / B 3.1-5 11/15/2005 Pages TRM I B 3.1-6 and TRM / B 3.1-7 03/22/2006 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 01/21/2014 Page TRM / B 3.3-2 03/10/2011 Page TRM / B 3.3-2a 10/31/2007 Page TRM / B 3.3-3 12/11/2008 Page TRM / B 3.3-3a 10/31/2007 Page TRM / B 3.3-4 06/30/2010 Page TRM / B 3.3-5 10/07/2015 Page TRM I B 3:3-6 06/30/2010 Page TRM I B 3.3-7 10/07/2015 Page TRM / B. 3.3-8 06/30/2010 Page TRM I B 3.3-9 10/31./2007 Pages TRM / B 3.3-10 through TRM I B 3.3-12 01/07/2011 Page TRM / B 3.3-13 01/21/2014 Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 11/04/2015 Page TRM I B 3.3-14b 11/04/2015 Page TRM / B 3.3-14c 11/04/2015 Pages TRM / B 3.3-15 and TRM I B 3.3-16 10/22/2003 Page TRM / B 3.3-17 03/22/2006 Pages TRM / B 3.3-17a through TRM / B 3.3-17c 03/22/2006 Page TRM / B 3.3-17d 03/27/2008 TRM / LOES-6 EFFECTIVE DATE 11/04/2015 SUSQUEHANNA-UNITI SUSQUEHANNA - UNIT 1 TRM / LOES-6 EFFECTIVE DATE 11/04/2015

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date TRMI IBB3.3-19 Pages TRM / B 3.3-17e andTRM 3.3-17f 03/22/2006 Pages TRM / B 3.3-18 and 08/03/2010 Page TRM / B 3.3-20 10/22/2003 Page TRM / B 3.3-21 05/16/2003 Pages TRM / B 3.3-22 and TRM / B 3.3-23 04/07/2009 B 3.4 REACTOR COOLANT SYSTEM BASES Page B 3.4-1 08/31/1998 Pages TRM / B 3.4-2 and TRM / B 3.4-3 04/01/2009 Pages TRM 1 B 3.4-4 and TRM / B 3.4-4a 10/31/2007 Page TRM / B 3.4-5 10/1 5/1 999 Page B 3.4-6 08/31/1998 Pages TRM / B 3.4-7 and TRM / B 3.4-8 04/25/2013 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM / B 3.5-3 through TRM / B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM / B 3.6-4 03/27/2008 Page TRM / B 3.6-5 04/04/2007 Page TRM / B 3.6-6 12/03/2004 Pages TRM / B.3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Page TRM/IB 3.7-3 06/10/2010 Page TRM / B 3.7-3a 12/27/2007 Page TRM / B 3.7-4 03/31/2006 Page TRM / B 3.7-5 08/02/1999 Page TRM / B 3.7-6 03/3"1/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08/02/1999 Page TRM / B 3.7-8 O5/2 9/2013 Page TRM / B 3.7-9 04/11/2014 Page TRM / B 3.7-10 08/02/1999 Page TRM / B 3.7-I0a 03/31/2006 Page TRM / B 3.7-11 08/02/1999 Page TRM / B 3.7-11a 03/31/2006 Pages TRM / B 3.7-12 and TRM / B 3.7-13 08/02/1999 Pages TRM / B 3.7-14 and TRM / B 3.7-14a 09/25/20 12 EFFECTIVE DATE 11/04/2015 SUSQUEHANNA SUSQUEHANNA-UNIT1

- UNIT I TRM // LOES-7 TRM LOES-7 EFFECTIVE DATE 11/04/2015

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / B 3.7-14b 11/24/2011 Pages TRM / B 3.7-15 and TRM I B 3.7-16 0210111999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Page TRM I B 3.7-21 05/29/2013 Pages TRM / B 3.7-21a through TRM / B 3.7-21d 05/24/2012 Pages TRM / B 3.7-21e through TRM / B 3.7-21g 05/29/2013 Page TRM / B 3.7-22 and TRM / B 3.7-23 01/30/2008 Page TRM / B 3.7-24 10/05/2006 Page TRM / B 3.7-25 01/21/2014 Pages TRM / B 3.7-26 through TRM / B 3.7-28 10/05/2006 Pages TRM / B 3.7-29 and TRM I B 3.7-30 06/07/2007 Page TRM / B 3.7-30a 10/05/2006 Page TRM / B 3.7-30b 01/21/2014 Page TRM / B 3.7-31 11/30/2011 Page TRM / B 3.7-32 03/09/2001 Page TRM / B 3.7-33 04/15/2003 Page TRM / B 3.7-34 12/03/2004 Page TRM / B 3.7-35 07/05/2000 Pages TRM / B 3.7-36 through TRM / B 3.7-39 04/01/2009 Page TRM / B 3.7-40 04/08/2010 ELECTRICAL POWER BASES B 3.8 Page TRM / B 3.8-1 04/02/2002 Page TRM / B 3.8-2 01/28/2005 Page TRM / B 3.8-2a 03/01/2010 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 09/03/2004 Page TRM / B 3.8-4a 04/02/2002 Page B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-15 04/02/2002 Page TRM / B 3.8-16 11/07/2013 Page TRM / B 3.8-17 11/30/2011 Pages TRM / B 3.8-17a and TRM / B 3.8-17b 11/30/2011 Pages TRM / B 3.8-18 through TRM / B 3.8-20 05/29/2013 Pages TRM / B 3.8-21 and TRM I B 3.8-22 05/28/2009 Page TRM I B 3.8-23 05/29/2013 Page TRM / B 3.8-24 05/28/2009 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 08/31/1998 TRM / LOES-8 EFFECTIVE DATE 11/04/2015 SUSQUEHANNA - UNIT UNIT 1I TRM / LOES-8 EFFECTIVE DATE 11/04/2015

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MAN UAL)

Section Title Effective Date B 3.10 MISCELLANEOUS BASES Page B 3.10-1 08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3 03/22/2006 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 Page TRM / B 3.10-6 03/27/2008 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/30/1998 Page TRM / B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.1 1-11a 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM /B 3.11-14 12/03/2004 Page TRM / B3.11-15 02/01/1999 Pages B 3.11-16 through B 3.1 1-19 08/30/1998 Page TRM / B 3.11-20 04/02/2002 Page TRM / B 3.1 1-20a 04/02/2002 Page TRM /B 3.11-21 05/13/2005 Pages TRM / B 3.11-22 and TRM / B 3.11-23 11/14/2006 Pages TRM / B 3.1 1-23a and TRM / B 3.1 1-23b 06/18/2013 Pages TRM / B 3.11-24 and TRM / B 3.11-25 01/21/2004 Pages B 3.11-26 and B 3.11-27 08/30/1998 Page TRM / B3.11-28 11/30/2005 Page TRM / B 3.11-29 02/19/2015 Pages TRM / B3.1 1-30 and TRM / B 3.11-31 05/29/2013 Page TRM /B 3.11-32 08/30/1 998 Page TRM / B 3.11-33 06/30/2010 Pages B 3.11-34 and B 3.11-35 08/30/1998 Page TRM / B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B3.12-1 09/19/2007 Page TRM / B 3.12-2 11/29/2010 Page TRM / B 3.12-3 02/05/1999 TRM1 text LOES 11/4/2015 SUSQUEHANNA - UNIT 1 TRM / LOES-9 SUSQEHANA UNT I RM LOS-9EFFECTIVE DATE 11/04/2015

Core Operating Limits Report (COLR)

Rev. 16 3.2.1 3.2 Core Operating Limits Report (COLR) 3.2.1 Core Operating Limits Report (COLR)

TRO 3.2.1 The Core Operating Limits specified in the attached COLR shall be met.

APPLI(CABILITY: SPecified in the referenced Technical Specifications.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME" A. Core Operating Limits not A,1 Perform action(s) described Specified in met. in referenced Technical referenced Specification. Technical Specifications.

TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY


NOTE-.......... ............. .. N/A No associated Surveillances. Surveillances are implemented in the applicable Technical Specificatiorns.

SUSQUEHANNA-UNIT1 TRM / 3.2-1 SUSQEHANA

-UNI 1 TM/32-1EFFECTIVE DATE 0710711999

Rev. 16 PL-NF-14-001 Rev. 2 Page "i of 62 Susquehanna SES Unit I Cycle 19 CORE OPERATING LIMITS REPORT Nuclear Fuels Engineering September 2015 SUSQUEHANNA UNIT1 TRM!3.2-2 SUSQEHANA UNT I RM/32-2EFFECTIVE DATE 11/0412015

Rev. 16 PL-NF-14-001 Rev. 2 Page 2 of 62 CORE OPERATING LIMITS REPORT REVISION DESCRiPTiON INDEX Rev. Affected ,

No. Sections Description/Purpose of Revision 0 ALL Issuance of this COLR is in support of Unit I Cycle 19 operation.

1 ALL New COLR required due to Power/Flow Map revision.

2 ALL New COLR required for the inclusion of operating limits regarding a Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) closure event.

~J. J FORM NFP-QA-008-2, Rev. 1 SUSQUEHANNA UNIT 1 TRM/3.2-3 TRM/.2-3EFFECTIVE DATE 11/04/2015

Rev. 16 PL-NF-14-00i Rev. 2 Page 3 of 62 SUSQUEHANNA STEAM ELECTRIC STATION Unit I Cycle 19 CORE OPERATING LIMITS REPORT Table of Contents

1.0 INTRODUCTION

............................................................................ 4 2.0 DEFINITIONS................................................................................6 3.0 SHUTDOWN MARGIN ....................................................................... 6 4.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR).................. 7 6.0 MINIMUM CRITICAL POWER RATIO (MCPR)............................................ 9 6.0 LINEAR HEAT GENERATION RATE (LHGR) ...................................... ....... 27 7.0 ROD BLOCK MONITOR (RBM) SETPOINTS AND OPERABILITY REQUIREMENTS ............................................................................ 38 8.0 RECIRCULATION LOOPS - SINGLE LOOP OPERATION............................... 40 9.0 POWER I FLOW MAP ..............................................  :......................... 58 10.0 OPRM SETPOINTS.......................................................................... 60

11.0 REFERENCES

................ ................................................................ 61 SUSQUEHANNA UNIT 1 TRM/3.2-4 SUSQEHANA NITTR/3..-4DATE 11/04/2015 EFFECTIVE

Rev. 16 PL-NF-14-0O1 Rev. 2 Page 4 of 62 1.0 iNTRODUCTION This CORE OPERATING LIMITS REPORT for Susquehanna Unit t Cycle 19 is prepared in accordance with the requirements of Susquehanna Unit 1, Technical Specification 5.6.5. As required by Technical Specifications 5.6.5, core shutdown margin, the core operating limits, RBM setpoints, and OPRM setpoints presented herein were developed using NRC-approved methods and are established such that all applicable limits of the plant safety analysis are met.

SUSQUEHANNA UNIT 1 TRM/3.2-5 UNT I RM/32-5 SUSQEHANA EFFECTIVE DATE 11/04/2015

Rev. 16 PL-NF- 14-001 Rev. 2 Page 5 of 62 2.0 DEFINiTIONS Terms used in this COLR but not defined in Section 1.0 of the Technical Specifications or Section 1.1 of the Technical Requirements Manual are provided below.

2.1 The AVERAGE PLANAR EXPOSURE at a specified height shall be equal to the total energy produced per unit length at the specified height divided by the total initial weight of uranium per unit length at that height.

2.2 The PELLET EXPOSURE shall be equal to the total energy produced per unit length of fuel rod at the specified height divided by the total initial weight of uranium per unit length of that rod at that height.

2.3 FDLRX is the ratio of the maximum LHGR calculated by the core monitoring system for each fuel bundle divided by the LHGR limit for the applicable fuel bundle type.

2.4 LHGRFACT is a multiplier applied to the LHGR limit when operating at less than 108 Mlbm/hr core flow. The LHGRFAC1 multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from core flows less than 108 Mlbmlhr.

2.5 LHGRFACp is a multiplier applied to the LHGR limit when operating at less than RATED THERMAL POWER. The LHGRFACp multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from partial power conditions.

2.6 MFLCPR is the ratio of the applicable MCPR operating limit for the applicable fuel bundle type divided by the MCPR calculated by the core monitoring system for each fuel bundle.

2.7 MAPRAT is the ratio of the maximum APLHGR calculated by the core monitoring system for each fuel bundle divided by the APLGHR limit for the applicable fuel bundle type.

2.8 OPRM is the Oscillation Power Range Monitor. The Oscillation Power Range Monitor (OPRM) will reliably detect and suppress anticipated stability related power oscillations while providing a high degree of confidence that the MCPR safety limit is not violated.

2.9 Np is the OPRM setpoint for the number of consecutive confirmations of oscillation half-cycles that will be considered evidence of a stability related power oscillation.

2.10 Sp is the OPRM trip setpoint for the peak to average OPRM signal.

2.11 Fp is the core flow, in Mlbm I hr, below which the OPRM RPS trip is activated.

SUSQUEHANNA UNIT 1 TRM/3.2-6 SLJSUEHNNAUNITI EFFECTIVE TMI32-6 DATE 111/0412015

Rev. 16 PL-NF-1 4-001 Rev. 2 Page 6 of 62 3.0 SHUTDOWN MARGIN 3.1 Technical Specification Reference Technical Specification 3.1.1 3.2 Description The SHUTDOWN MARGIN shall be equal to or greater than:

a) 0.38% Ak/k with the highest worth rod analytically determined OR b) 0.28% Ak/k with the highest worth rod determined by test Since core reactivity will vary during the cycle as a function of fuel depletion and poison burnup, Beginning of Cycle (BOG) SHUTDOWN MARGIN (SDM) tests must also account for changes in core reactivty during the cycle. Therefore, the SUM measured at BOC must be equal to or greater than the applicable requirement from either 3.2.a or 3.2.b plus an adder, "R". The adder, "R", is the difference between the calculated value of maximum core reactivity (that is, minimum 8DM) during the operating cycle and the calculated BOG core reactivity. If the value of "R" is zero (that is, BOG is the most reactivepoint in the cycle) no correction to the BOG measured value is required.

The SHUTDOWN MARGIN limits provided in 3.2a and 3.2b are applicable in MODES 1, 2, 3, 4, and 5. This includes core shuffling.

SUSQUEHANNA UNIT t TRM/3.2-7 SUSQEHANA UNTI RM/32-7 EFFECTIVE DATE 11104/2015

Rev. 16 PL-NF-14-O01 Rev. 2 Page?7 of 62 4.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) 4.1 Technical Specification Reference Technical Specification 3.2.1 4.2 Description The APLHGRs for ATRIUMT'-10 fuel shall not exceed the limit shown in Figure 4.2-1.

The APLHGR limits in Figure 4.2-1 are valid for Main Turbine Bypass Operable

SUSQUEHANNA UNIT 1 TRM/3.2-8 SUSQEHANA UNT I RM/32-8 EFFECTIVE DATE 11/04/20 15

9!

02 SSES UNIT I CYCLE 19 C

  • 16.0 C , 1111 a a I IIl

, I 1, I , 1 111III Ia' II1 1,1 , , I. . III . . la

. . ma

.a rn 1 1 1a I I a aIn 1 I II 4 i i i i i l l i ___ 1 1 1 1 a 11__

.-- I 1 I I I I I I I I I I I K I I 2 iI * - 1

  • 1I
  • l O = . I 2 z

z 1[4.0 I 1 K I 1 II I I I I-- I4 j a I --t-1 . t. I I--1I- . I l

.. l 2lI IlIIl

.. ................... l

. . . . . . . . ' 4. i. . . .

I a al U I I I I C

,IIII2, ,K,2,*,*,t*IaI*I

! IIlIt I i i l

i a a a a a t II i mi I i I 2 II! i i 1 i i I 12.0 12 5 I00 a . a: .* 5 0 ,1 . .  : ..... .. .. I I 1... I .. .2.. . ..

i ~i i ll I i i iai aii i I I I II 1 I Il l i l l l l l

/ 1 /1 1 11 l l1Il l1/ I

. . 1I .1 ._ , , . . I. I .I I  !

II

/

I I I I II ii iIa i i i i i i 1nIi 1 a1 1 0I I i iI iI 1 iI i iI i 11 liii !1 1*11I11111I1 .1 1111I 1 ,<

i 1 i i i i i i iai a i1I a . . . . . . I I a a a a a*,,. a a .a.a.a.a.a.a.a 0)

  • I IIaIaI IaI IaIaI aI al IaI a Ia l l

'-I

., ., ,*! .  !

  • I I aI a ,," ,a a l I a I I1la.lal Il laimla.!

a m I I ~ ~ a a a i l l',I al I. II l .a. "* a

    • I3l lllam K a a " *a--a-- * *: II ' Il i iii l liIa 1 a i' a l a l a1 1a1 1 a1 a g all 1 1 1 11I a aI aI I II a a n a ai i a a a Ia a I

-I',

"-1 I I I I I! l l Ii.. a ~

Cn-, aI /a ia li1 aII alal a_

a a

aal a iI__la1a1a1a1a1a l

i

.*~* _L __*.

I a a

.J aL2 tI 6.0 la la aal la

, , , ,*H , ,

aal aal I I , I , I I I.1._ 3 -

.-t

-- I mr 4.0 0 10000 20000 30000 40000 Average Planar Exposure (MWDIMTU) 50000 60000 70000 0

-* ,r-SI)

AVERAGE AVERAGE PLANAR LINEAREXPOSURE PLANAR HEAT GENERATION RATE LIMIT VERSUS

-TWO LOOP OPERATION Coz ATRIUMTM-10 FUEL C:'(D7 FIGURE 4.2-1

Rev. 18 PL-NF-14-001 Rev. 2 Page 9 of 62 5.0 .MINIMUM CRITICAL POWER RATIO (MCPR) 5.1 Technical Specification Reference Technical Specification 3.2.2, 3.3.4.1, 3.7.6, and 3.7.8 5.2 Technical Requirements Manual Reference Technical Requirements Manual 3.3.7 5.3 Description The MOPR limit is specified as a function of core power, core flow, average scram insertion time per Section 5.3 and plant equipment operability status. The MCPR limits for all fuel types (ATRIUM TM-1O) shall be the greater of the Flow-Dependent or the Power-Dependent MOPR, depending on the applicable equipment operability status.

a) Main Turbine Bypass I EOO-RPT I Backup Pressure Regulator Operable Figure 5.2-1: Flow-Dependent MCPR value determined from BOO to EDOC Figure 5.2-2: Power-Dependent MOPR value determined from BOO to EGOC b) Main Turbine Bypass lnoperable Figure 6.2-3: Flow-Dependent MCPR value determined from BOO to EDOC Figure 5.2-4: Power-Dependent MOPR value determined from BOO to EGOC c) EOC-RPT Inoperable Figure 5.2-5: Flow-Dependent MCPR value determined from BOO to EOC Figure 5.2-6: Power-Dependent MCPR value determined from BOG to EOO d) Backup Pressure Regulator Inoperable Figure 5.2-7: Flow-Dependent MCPR value determined from BOO to EDOC Figure 5.2-8: Power Dependent MCPR value determined from BOG to EDOC e) One Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 5.2-0: Flow-Dependent MCPR value determined from BOO to EGG Figure 5.2-1 O:Power-Dependent MCPR value determined from BOO to EDO SUSQUEHANNA UNIT 1 TRM/3.2-10 SUSQEHANA UITTRM3.2I EFFECTIVE 0DATE 11/04/2015

Rev. 16 PL-NF-1 4-001 Rev. 2 Page 10 of 62 The MCPR limits in Figures 5.2-1 through 5.2-10 are valid for Two Loop operation.

The MCPR limits for Single Loop operation are provided in Section 8.0.

5.4 Averauqe Scram Time Fraction Ifthe average measured scram times are greater than the Realistic Scram times listed in Table 5.3-1 then the MCPR operating limits corresponding to the Maximum Allowable Average Scram Insertion Time must be implemented. Determining MCPR operating limits based on interpolation between scram insertion times is not permitted. The evaluation of scram insertion time data, as it relates to the attached table should be performed per Reactor Engineering procedures.

SUSQUEHANNA UNIT1 TRM/3.2-11 SUSQEHANA UITTRM3.21 EFFECTIVE IDATE 11104/2015

Rev. i6 PL-NF-14-O01 Rev. 2 Page Iiof 62 Main Turbine Bypass I EOC-RPT I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 1 TRM/3.2-12 NITTR/32I 2DATE 1110412015 EFFECTIVE SUSQEHANA

C' SSES UNIT 1 CYCLE 19 C 2.2 c,

2,1 z

z 2.0 z

1.9

._E 1.8 1.7 CD k* 0.

CA 0o 1.6 <)

1.5 m 1.4 Ill C)

H 1.3 rn ci 1.2 H 30 40 50 60 70 80 90 100 110 Total Core Flow (MLBIHR)

-o "o n, I Ill (.Q0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS 1 EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE TWO LOOP OPERATION (BOC TO EOC)

FIGURE 5.2-1 * -< 0

. . .. . . . .. .... . .. ..... ...... .... .... .. . ... ... . . . . .. . . . . .. . . .... . .. ........ ,... .. .. .. .. . .. .. ,,,,,.. .. .. . . . . . ... ... .. 1... .. . . . .. . .. . .... ... . .. . . .. . . . .. . I J . .. .... . ,J , , =. .. ... .

cj SSES UNIT 1 CYCLE 19 0

z z

C z

1J H 0.

0 m

0 20 30 40 50 60 70 80 90 100 Core Power (% RATED)

"13 -O

n Ii --.

FIGURE 5.2-2

Rev. 16 PL-NF- 14-001 Rev. 2 Page 14 of 62 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT1 TRM/3.2-15 UITTRM3.2l EFFECTIVE SUSQEHANA 5DATE 1 1/04/2015

0 SSES UNIT 1 CYCLE 19 2.2 03 C

2.1 LEGENDA

MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME

-CURVE CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME z

C 2.0 z

-1 1.9 I INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 1.8 H. '1.7 0J o-01 1,6 1.5

-I"I 1.4

--- I EEENCE:_T.S. 3.7.6 and 3.2.2 ___________ __________

'1.3 m

Hr iii 1.2 30 40 50 60 70 80C I0 100 110 Total Gore Flow (MLB/H-R)

--t "D "

MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS INOPERABLE TWO LOOP OPERATION (BOC TO EOC)

FIGURE 5.2-3 ,.-4 <

Q)"*

0

CI, SSES UNIT 1 CYCLE 19 C 3.6 Ci, C

mR c

Z

-t

.E_

-H 0

$o O.

-.4

-11 "51 m

z3

-H

<m Fi 20 30 40 50 60 70 80 90 100 Core Power (% RATED)

(73 -U 51 MCPR OPERATING LIMIT VERSUS CORE POWER CD CD-

Rev. 16 PL-NF-14-001 Rev. 2 Page 17 of 62 EOC-RPT Inoperable SUSQUEHANNA UNIT 1 TRM/3,2-18 SUSQEHANA UITTRM3.2I EFFECTIVE 8DATE 11/04/2015

CD SSES UNIT 1 CYCLE 19 2.2 03 LEGEND C

m 2.1 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM

=

INSERTION TIME 2.0 CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME C

z 1.9 4. SAFETY* ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2

-H E I I IJ 1.8 L.

USED INDETER[MIN1NG MFLCPR I

-4. 1.7 0.

C0 o CD 1.6 -3.

C) 1.5

-rr 1.4

REFERENCE:

T.S. 3.3.4.1 and 3.2.2

--Il

<r m 1.3 m

1.2 30 40 50 60 70 80 90 100 110 U Total Core Flow (MLBIHR)

MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW EOC-RPT INOPERABLE *QcD TWO LOOP OPERATION (BOC TO EOC)

FIGURE 5.2-5 0""

ci SSES UNIT 1 CYCLE 19 C

I z

z z

E 0

(D 0

C) m n-I 0

H m

0 50 60 90 H* 20 30 40 Core Power (% RATED) 70 80 100 n-MCPR OPERATING LIMIT VERSUS CORE POWER *(D Z EOC-RPT INOPERABLE TWO LOOP OPERATION (BOC to EQO) O-" -1 FIGURE 5.2-8 (O1*--

Rev. 16 PL-NF-14-0O1 Rev. 2 Page 20 of 62 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 1 TRM/3.2-21 NIT TR/3.-21 DATE 11/04/2015 EFFECTIVE SUSQEHANA

SSES UNIT 1 CYCLE 19 Cn 2.2 LEGEND m

2.1 _____________ -CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME z

C 2.0 ________ -CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME z

1.9 _______ _______ - SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 1.8 I-1.7 r*o 0 A BI

10. 0, 1.6 1.5 m

"1 1.4 rri 0

IREFERENCE:

TS. 3.7.8 and 3.2.2~

1.3 I-~ { 4 1 ~~-f 108, 1.221 m 1.2 30 40 50 60 70 80 90 100 110 Total Core Flow (MVLB/HR)

"-D "-

0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE "'.)

0 o', TWO LOOP OPERATION (BOC TO EQO)

FIGURE 5.2-7 "*' <c 0 0)"

SSES UNIT I CYCLE 19 60 C

z 0,

.2

-Il CD C

-3.

0)

'i,,

100,1.35 m

20 30 40 50 60 (% RATED) 70 Core Power 80 90 100 o1 T1 T1

-L

  • Q2 Z~

MCPR OPERATING LIMIT VERSUS CORE POWER BACKUP PRESSURE REGULATOR INOPERABLE TWO LOOP OPERATION (BOO to EOC)

FIGURE 5.2-8 -,h . 0 0)' ,C

Rev. 16 PL-NE-14-001 Rev. 2 Page 23 of 62 One TSV. or TCV Closed SUSQUEHANNA UNIT 1 TRM/3.2-24 SUSQEHANA UIT ITR IS.-24 EFFECTIVE DATE 11104/2015

SSES UNIT 1 CYCLE 19 2.2 I LEGEND 2,1 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 2.0 _______

_______ -CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME

-r" 1.9 130, 1.831 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES NJ I ARE OPERABLE PER SR 3.7.5.1 AND 3.7.6.2 U' .4-1.8

  • _ USED IN DETERMINING MFLCPR E2 1.7 C., 1.6 CD 1.5 m

-I-1 1.4 m

REFERENCE:

T.S. 3.2.2 and TRM 3.3.71 0

I-4 1.3

_ _ I _ I_ _ _ _ _ _ _ _ _ _

1.2 m

30 40 50 60 70 80 90 100 110 Total Core Flow (MLBIHR) 0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW CD Z N)

ONE TSV OR TCV CLOSED*

TWO LOOP OPERATION (BOC TO EOC) - ,-<

FIGURE 5.2-9 0

  • Operatofl with one TSV or TCV closed is only supported at power levels -<75%rated power.

cj SSES UNIT 1 CYCLE 19 C

m z

C z

S 0.-

-I 0m

  • 0 CD m

-n m

m C)

-9 20 30 40 50 60 70 80

  • Core Power (% RATED)

MCPR OPERATING LIMIT VERSUS CORE POWER

FIGURE 5.2-10

Rev. 16 PL-NF-14-O01 Rev. 2 Page 26 of 62 Table 5.3-1 Average Scram Time Fraction Table For Use With Scram Time Dependent MCPR Operating Limits Control Rod Average Scram Time to Position (seconds)

Position 45 0.470 0.520 39 0.630 0.860 25 1.500 1.910 5 - oo70 3.440 Average Scram Realistic Maximum Insertion Time Allowable SUSQUEHANNA UNIT 1 SUQEAN NTITRM/3.2-27 EFFECTIVE DATE 11/0412015

1. . . .1 I * ... A... . . - -- a L.~cgaa. . .. .. * .1 L. * -- . .*... ..&. aaau I 1S a. . .... aJ L&...aa......a..n.

Rev. 16 PL-NF- 14-001 Rev. 2 Page 27 of 62 6.0 LINEAR HEAT GENERATION RA*TE (LHGR) 6.1 Technical Specification Reference Technical Specification 3.2.3, 3.3.4.1, 3.7.6, and 3.7.8 6.2 Technical Requirements Manual Reference Technical Requirements Manual 3.3.7 6.3 Description The maximum LHGR for ATRIUMTZ-I 0 fuel shall not exceed the LHGR limit determiined from Figure 6.2-1. The LHGR limit in Figure 6.2-1 is valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.

To protect against both fuel centerline melting and cladding strain during anticipated system transients initiated from reduced power and flow conditions, power and flow dependent LHGR limit multipliers are provided in the following figures:

a) Main Turbine Bypass Operable Figure 6.2-2: Flow-Dependent LHGR Uimit Multiplier Figure 6.2-3: Power-Dependent LHGR Limit Multipiier b) Main Turbine Bypass Inoperable Figure 6.2-4: Flow-Dependent LHGR Limit Multiplier Figure 6.2-5: Power-Dependent LHGR Limit Multiplier c) One Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 6.2-6: Flow-Dependent LHGR Limit Multiplier Figure 6.2-7: Power-Dependent LHGR Limit Multiplier

  • The LGHR limits and LHGR limit multipliers in Figures 6.2-1 through 6.2-7 are valid for both Two Loop and Single Loop operation.

SUSQUEHANNA UNIT 1 TRM/3.2-28 SUSQEHANA EFFECTIVE NITTRI3.-28 DATE 11/04/2015

C,)

SSES UNIT 1 CYCLE 19 C 16.0 Ii Ii II ii i iI ii ii a ili a iI l Ii i !i Co a a la a a l la l a l 0 a a

a a

a a I I I I El 11111 ' I* I I

C I  !

m lala al ala a alalala alIlal al a la aa a a a a L +/- Z .... L 1 - - .....t....J......-

= -

z '14.0 0.,3.---- f=--I--+ I 900 ,-I--S-I--..

4 ..J- REFERENCE; T.S 3.2.3 z L- i- - - I I I a a a. a . . a . .a . .a . .a . I & a 1 a a a a I a I a. I. ~ alala IaI-aI I I IaIaI l aI IaI a Ial al l lalal lala C

a[

a a

a aI la a al ia I Ia a a a ia a I alalalala I a la alaa a a a a

a la a

l n

a .a .a a l la aal . . . . 1I t. t. .1 I .. . .. . .. ..... .. .

4" z La-Ial lal la"1a1 aI 1ajj ~ I i jII !i i l 12.0 al a lala alalal aI a i l a a /aaa a a1 1 a a1 2 a . .a. a. a a a a, a a Iaf a a I a at aIa aI a a.a.a. a. a aIa a ala aIalal lii l al al l al a l 0

Cu ~II I I II Ia I I I I I Ia 1 1 11 1 11 1 ~I I Ia I aaI a I I a

I l

aaI Ia a. I a a I

al I a I I II a

H C a I l lall l la iala lalala al aialaIa a

'a" 10.0 Cu a- ta l al la a al

-- al-- aI a 4aIaa a- a- a aIaI a aI a--a a- a a-- a- a a aI IIaa a a IIaI I aa aIa a4 - I * -

0 aa a a a a a a a aia a aIa a Iaaatai i iiaa a a ,aaa a a a ,aaa aa a Il

, , CD a Ia a la a alalI a a a a a a a a a a a a a l a a a Ialal .a . .a.aa .a .a a a a a a a a a a a a Ia aIa a aI aI .a a .a.. a a N) V aI a al i lalalala a a alal aI a a1 C I l l l l l1-Ta-TaII l l I I-I I-yi rw- l l l- . . .

N) CD a a i a a lalala a la a a a a a al a

la.

a"a a

a a

a ai a a alal a

a a

a a

a a

a a

l a

ia a a l la la a

a la l

a l

a la a

l i

4-a Co 0 aI a I Ia I Ia I a a Ia a Ia a a a la a a l la l la a a al Ia a la a la a a a l 0) 0 I- 8.0 0 I I I Ill I I I a I iII Ia Il I *l lll ali C

Ial a lI ll l a 1 l i l lI l . a. al

.a. l 1 l 7 l iI al~

l l l l1l l l lal lal l lanl l l i mm I I I II I I I I I I I I I I I I I I

-I- 6.0 rn .a.. .a.. a a j , , I a , , t , ,I a a ,iI, a a I  !

H 11 11 1 1 11 1111 ai lal a all a a al a aI 1 I a I a a a C 4.0 0 10000 20000 30000 40000 50000 60000 70000 80000 H

Pellet Exposure (MWDIMTU) rr T-0 "

-I- UNEAR HEAT GENERATION RATETMLIMIT VERSUS PELLET EXPOSURE ATRIUM -10 FUEL FIGURE 6.2-1 Oco a-0")' 0

Rev. 16 PL-NF-'I4-001 Rev. 2 Page 29 of 62 Main Turbine Bypass Operable SUSQUEHANNA UNIT 1 TRM/3.2-30 SUSQEHANA NITTR/3.-30 DATE 11/04/2015 EFFECTIVE

C,,

SSES UNIT 1 CYCLE 19 Co 1.10 1.00 z

z 0.90

-I--

0.80

-I ._1

('3 0.70 a, <D

('3

._)

0.60 0,50

-n r-n m 0.40 m

0.30

-I 30 40 50 60 70 80 90 100 110 m: Total Core Flow (MLB/hr)

0) FLOW DEPENDENT LHGR LIMIT MULTIPLIER NJ MAIN TURBINE BYPASS OPERABLE (03 ATRIUMT*-10 FUEL FIGURE 8.2-2

SSES UNIT 1 CYCLE 19 1.10 L I & "" 'U"' ........... * " '

  • m L 4 4 *
  • A A i C

m3 LEGEND

.. " ' '

  • t I " I I i

I ii Fji o T ---- ,-------~.------.I-------, 9 CURVE A: BASE CURVE 1.00 CURVE B: CORE POWER __26% AND CORE FLOW <_.0 MLBM1HR

  • I TI rS I 1 31 1 --- I - . ..- j. a .I - * -- -

0.90 I I I I a I i I I

"-I II l l* i I [ aI I li l i k I I

I

.1_J IIS

_ _ J. _

I

. 1 IJ  ;

1 _1 J LI z

I--

0.80 I I I I I 1 1 5 I I I I I 1 I I I I I

,.I I l ARE OPRAL PE SR ANI37lI...

0.70 . . ..._

  • 1*. 1. * * ._ ._ . . . . . . . . .

C) /II I I 1 I ___ _ _ ___ ___ __ ___ ___ _

1_-

H 0.

0 0.60

__..,. . IL.__J._.I * ..- 1 REOERABENCE: TSR 3.2.3,1 3.A4N 3.7.6 an 8 I I

iH i _ 1i_

/

0.50 -

03 iL I yr i I" '-- "" ' "- -  ! . .. .... .. . . .. .-. -- - '- - -l . - - * - * -  ; ' .. . .

l 26 04 N,3 0.40 23 I -" -

0.0.

I I...

II -'-I....

I

.. F - I-'

, ~l, I-

  • I I * --I - - - - -l-I

, , I

-- - It - -

3I - *

/ - f - I- -

I ,

-I - d - -

i I I I I I I I I I I I

! ,, IJ, J I I I I I r I I I I I I I - 3 I I 0 0.30 I I II I r I I 1 2,0 30 40 50 Core Power 60 (% RATED) 70 80 90 100 POWER DEPENDENT LHGR LIMIT MULTIPLIER MAIN TURBINE BYPASS OPERABLE o ,z AT*iUMTM-10 FUEL FIGURE 6.2-3

Rev. 16 PL-NF-14-O01 Rev. 2 Page 32 of 62 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT I TRM/3.2-33 SUSQEHANA NITTR/3.-33 DATE 11t10412015 EFFECTIVE

SSES UNIT 1 CYCLE 19 Co 1.10 I

z 1.00 C:

Z 0.90 0.

0.80

.-I "-J C;, ._ 0.70 C;o 0,

C),. 0) 03 0.60 0o Ct 0.50 m

C)

-H m1 0.40 0

H-1 m] 0.30 30 40 50 60 Total Core Flow 70 80 90 100 110 (MLB/HR)

"0 "-

nD FLOW DEPENDENT LHGR LIMIT MULTIPLIER C.D z MAIN TURBINE BYPASS INOPERABLE 01 ATRIUMTMea-t FUEL -Il 0O FIGURE 6.2-4 0

CO, SSES UNIT 1 CYCLE 19 C 1.10 03 m

=

z z

C z

a..

.5.

.5 0

--I -I a,

1'3 a, oD 0

I..

a) 0 0.

m m

0

.-I m

0 4> 20 30 40 50 60 (% RATED) 70 Core Power 80 90 100

--I, 01" POWER DEPENDENT LH-GR LIMIT MULTIPLIER MAIN TURBINE BYPASS INOPERABLE Co C? ATRIUMTM.-10 FUEL FIGURE 6.2-,5 0"C*

Rev. 16 PL-NF-14-00l Rev. 2 Page 35 of 62 One TSV or TCV Closed SUSQUEHANNA UNIT 1 TRM/3.2-36 NITTR/3.-36DATE 11/04/2015 EFFECTIVE SUSQEHANA

0 O SSES UNIT 1 CYCLE 19 1.10 C

i"1 1.00 C

z 0.90 a,

-H1 0.80

-_J 0.70 CD CD

",4 0.60 U..

0.50

-T1

-IT 0.40 m

m 0.30 0 30 40 50 60 Total Core 70Flow (MLB/hr) 80 90 100 110 rl3 FLOW DEPENDENT LHGR LIMIT MULTIPLIER 0 ONE TSV OR TCV CLOSED* 0-" 0 ATRIUMTM-t10 FUEL D' I, -=

FIGURE 6.2-6

  • Operation with one TSV or TCV closed is only supported at power [evels
  • 75% rated power.

n ,, n

C',

SSES UNIT 1 CYCLE 19 C

03 m

C z

13

{.i

--I ,-J

.1_

C,)

0 cc 0L 0) mT "rn ml 0

m1 H3 20 30 40 50 (% RATED)

Core Power 60 70 80 rn

-I POWER DEPENDENT LHGR LIMIT MULTIPLIER CD Z ONE TSV OR TCV CLOSED ATRIUMTM-10 FUEL *i-- n FIGURE 6,2-7 c0*

Rev. 16 PL-NF-14-OO1 Rev. 2 Page 38 of 82 7.0 ROD BLOCK MONITOR (RBM SETFOINTS AND OPERABILITY REQUIREMENTS 7.1 Technical Specification Reference Technical Specification 3.3.2.1 7.2 Description The RBM Allowable Value and Trip Setpoints for; a) Low Power Range Setpoint, b) intermediate Power Range Setpoint, c) High Power Range Setpoint, d) Low Power Range - Upscale, e) Intermediate Power Range - Upscale, and I) High Power Range - Upscale shall be established as specified in Table 7.2-1. The RBM setpoints are valid for Two Loop and Single Loop Operation, Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.

The RBM system design objective is to block erroneous control rod withdrawal initiated by the operator before fuel design limits are violated. Ifthe full withdrawal of any control rod would not violate a fuel design limit, then the RBM system is not required to be operable. Table 7.2-2 provides RBM system operability requirements to ensure that fuel design limits are not violated.

SUSQUEHANNA UNIT 1 TRM/3.2-39 NITTRIS.-39 DATE 11/04/2015 SUSQEHANA EFFECTIVE

Rev. 16 PL-NF-14-001 Rev. 2 Page 39 of 62 Table 7.2-I RBM Setpoints Allowable Nominal Trip Function Value( 1 ) Setpoint Low Power Range Setpoint 28.0 24.9 Intermediate Power Range Setpoint 63.0 61.0 High Power Range Setpoint 83.0 81.0 Low Power Range - Upscale 123.4 123.0 Intermediate Power Range - Upscale 117.4 117.0 High Power Range - Upscale 107.6 107.2 (1) Power setpoint function (Low, Intermediate, and High Power Range Setpoints) determined in percent of RATED THERMAL POWER. Upscale trip setpoint function (Low, Intermediate, and High Power Range - Upscale) determined in percent of reference level.

Table 7.2-2 RBM System Operability Requirements Thermal Power MCPR (2.3)

(% of Rated)

> 28 andc<90 < 1.76

~90 and <95 <1.47

>_95 < 1.70 (2) Applicable to Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.

(3 Applicable to both Two Loop and Single Loop Operation.

SUSQUEHANNA UN]T 1 TRMI3.2-40 SUSQEHANA NITTRI3.-40 DATE 11/04/201 5 EFFECTIVE

Rev. 18 PL-NF-1 4-001 Rev. 2 Page 40 of 62 8.0 REGIRCULATION LOOPS - SINGLE LOOP OPERATION 8.1 Technical Specification Reference Technical Specification 3.2.1, 3.2.2, 3.2.3, 3.3.4,1, 3.4.1,3.7.6, and 3.7.8 8.2 Technical Req~uirements Manual Reference Technical Requirements Manual 3.3.7 8.3 Description APLHGR The APLHGR limit for ATRlUMTM-I 0 fuel shall be equal to the APLHGR Limit from Figure 8.2-1.

The APLHGR limits in Figure 8.2-1 are valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Single Loop operation.

Minimum Critical Power Ratio Limit-The MCPR limit is specified as a function of core power, core flow, and plant equipment operability status. The MCPR limits for all fuel types (ATRIUM TM-10) shall be the greater of the Flow-Dependent or the Power-Dependent MCPR, depending on the applicable equipment operability status.

a) Main Turbine Bypass I EOC-RPT / Backup Pressure Regulator Operable Figure 8.2-2: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-3: Power-Dependent MCPR value determined from BOC to EOC b) Main Turbine Bypass [noperable Figure 8.2-4: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-5: Power-Dependent MCPR value determined from BOC to IEOC c) EOC-RPT Inoperable Figure 8.2-6: Flow-Dependent MCPR value determined from BOG to EOC Figure 8.2-7: Power-Dependent MCPR value determined from BOC to EOC SUSQUEHANNA UNIT 1 TRMI3.2-41 NIT TRI3.-41EFFECTIVE SUSQEHANA DATE 11/04/2015

Rev. 18 PL-NF-14-OO1 Rev. 2 Page 4l of 62 d) Backup Pressure Regulator Inoperable Figure 8.2-8: Flow-Dependent MCPR value determined from BOO to EGOC Figure 8.2-9: Power-Dependent MCPR value determined from BOO to EDO e) One Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 8.2-1O:Flow-Dependent MOPR value determined from BOO to EDO Figure 8.2-11 :Power-Dependent MOPR value determined from BOO to EOC The MOPR limits in Figures 8.2-2 through 8.2-1 1 are valid only for Single Loop operation.

Linear Heat Generation Rate Limit The LHGR limits for Single Loop Operation are defined in Section 6.0.

RBM Setpoints andOperabilityRequirem~ents The RBM setpoints and operability requirements for Single Loop Operation are defined in Section 7.0.

SUSQUEHANNA UNIT 1 TRM/3.2-42 NITTRI3.-42 DATE 1110412015 EFFECTIVE SUSQEHANA

C 16.0 T T T r T ~ T ~ u 1 1 ~ I r QI I I ' I I l Il l t I I la 1 l l 9 i0 1 '

I E lI I I Ii l l l llI lI l

z. 1. .1. II .11 .. II1lIti1 1 I, i I s I i I r I,.i m i . m m m ii.m n l4...4 mm~~u mm.4.*"

I11I 1 I I Ii lIlC Il IlIII1I I1I1 l i l 1 Il l l ~l t l I! ~ l l l O l 1 1 I I I l I I I I Ii ~ll I I l1 1 1I tltitjilt SED IND*ERINIG0

  • -- J- I---. ii! I I-I.-- -- I-- j--i-..J..-,Lf lf...f I I1 1'I II£ I Ii 1 I I

I I I

1 I1 I1 1 1 1 1 I* I I 1 I IIlli I l II l I I I I I 0l3l l l l l l l I 1 1

= *oo , Ioo I IO ll .I , II I II I, 1I I I I I I I I I I I l l3 l I [ II II IIII l Il l lI I 1 1 1 I mI.._1111l1 I I lllll1 :11! l111 l1!. 1 l11l Iiii II  ! II 11 11 lll ll l Il I ll HI I I I I , l l l l I ,

I I I I I" I l l II I l l~ll

,I l li

, , I l l l:l I

l1 1

l l l 67000,5.6 l

1o 1 11 1111 1 Il liIljlIlIIIIIl l l ll II l l l Illl I l l I I Il l 4.0 L U' i41-- LI4l2 M - -L -- ~L- AJ-J L..L

........... ... -- , I , ,. , I 0.0 l1000. l 2000.0 ll 000. 4000.08000.06000.07000.

-L~l l l l l l l lI l l i l l Averag PlanalEpour MWIMTU)l o = a l l l l l l l l2l l l i t l l A ' I I I I l * . . Ca AVRAEPLNR INA HA GENERATION RAELMITlERSUtll o AERAE PANA EPOSRE..SIGL.LOP.OERAIO ATRIUMTMAOll FUELll l l owlll FIGURE 8.2-1ll l l l l l l lI I

...... , , J2J***

..... . . . .. . .. .... .....*.. ....................... . ..... ..... ..... .......... ... * . .... .......... ... ... ................. ...... ................... ......... ....... . ..... . .. .. r*, i, . ... .. ... . .. ... .... .. .

Rev. 16 PL-NF.-14-001 Rev. 2 Page 43 of 62 Main Turbine Bypass I EOC-RPT/I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 1 TRM/3.2-44 UITTRM3.2-44 SUSQEHANA EFFECTIVE DATE 11/0412.015

9 SSES UNIT 1 CYCLE 19 3.6 I I I LEGEND m 3.4 4. a- CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM z INSERTION TIME z 3.2 + I 4-C CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME z

3.0 t 1--i.

m I II II . . I H0 4-.

D.1 o~

2.8 2.6 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES L

ARE OPERABLE PER SR 3.7.6.t AND 3.7.6.2 I I Ii USED INDETERMINING MFLCPR K

0, 2.4 0

2.2 2.0 i'1

-m '.8 rI,

REFERENCE:

" T.S. 3.4.1 and 3.2.21 108, 1.49' 1.6 H

-m 0 '1.4 1N1 70 80 90 100 110 0 30 40 50 60 Total Core Flow (MLB/HR)

MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW Co MAIN TURBINE BYPASS 1 EOC-RPT / BACKUP PRESSURE REGULATOR OPERABLE SINGLE LOOP OPERATION (BOC to EOC)

FIGURE 8.2-2

9 0 SSES UNIT I CYCLE 19 4.6 o0 4.4 ___ LEGEND 4.2

________CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM

____INSERTION TIME z 4.0 ____________CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME

~-CURVE C: CORE POWER _<26% AND coRE FLOW

  • 50 MLBM/HR 3.6 S 3.4

--fl!SAFETY ANALYSES ASSUME THAT F~OUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.2 Ho 03 3.0 _____USED IN DETERMINING MFLCPR 1.

N)

CD 0 2.8 0);

0) 2.6 2.4 2.2 f 140. 2.08!

,4 0A-B-BT*

4 -.-------- ~ I "t100, '

2.0 F *, ... .. . .. .

-Iil m

t 1.8 0 REEEC: T.S. 3.4.1 and 3.2.2 "Z 1.6 Hr o 1.4 20 100 mn 2040 50co 60*( RAE70 80 90 "0 "

MCPR OPERATING LIMIT VERSUS CORE POWER CD MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE SINGLE LOOP OPERATION (BOC to EOC)

FIGURE 8.2-3 °< I

"* O 0)' C

Rev. 16 PL-NF-14-OO1 Rev. 2 Page 46 of 62 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT1 TRM/3.2-47 SUSQEHANA NITTR/3.-47 DATE 1110412015 EFFECTIVE

C' SSES UNIT 1 CYCLE 19 4.2 I I II C-

________ ________ LEGEND 4.0 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM 3.8 - INSERTION TIME z

z

________________CURVE B: REALISTIC AVERAGE SCRAM iNSERTiON TIME 3.6 z

3.4

- SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS -

,4D 3.2 VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 o* 3.0 H0 0

CD co3 0) 2.4.

2.2 m 2.0 "I1 m .

1.8 -1

REFERENCE:

T.S. 3.4.1, 3.7.6,, and22 -- _,118 0

m 1.6 _ _ _ _ _I _ _ _-_-_-_

1.4 m

30 40 50 60 Total Core 70 80 90 t00 110 Flow (MLB/HR) 0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW CD Z

-J. MAIN TURBINE BYPASS INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)

FIGURE 8,2-4 0 o)"

C, SSES UNIT I CYCLE 19 4.2 123,4A41 * =* *l "1 I " m l C-Cin I LEGEND 4.0 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM F INSERTION TIME z 3.8 z CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME

~, 3,61 ____________ 4-Z

-I 3.6 CURVE C: CORE POWER_*26% AND CORE F~LOW _<50 MLBMIHR

.t-l 3.4 I m

.1.a 1I~Z~38 I--.*- 4. I-I E

-I Cu 3.2 ISAFETY VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6,2 ANALYSES ASSUME THAT TWO OR MORE BYPASS w 3.0 USED IN DETERMINING MFLCPR I-0.

1~oi C~) 0

.41 CD N)

a. 2.8 CO 0 ______ _ ________ 0) 2.6 2.4 2,2 m

2.0 0r

REFERENCE:

T.S. ,3.4.1, 3.7.6, and 3.2.2 ..

-I 1.8 20 30 40 6060 Power (%o o70RATED) 80 90 100 50Core "0 "T CD MCPR OPERATING LIMIT VERSUS CORE POWER Com I N) MAIN TURBINE BYPASS INOPERABLE .CD SINGLE LOOP OPERATION (BOC to EOC)

FIGURE 8,2-5 ow.

h. h< .-

Rev. 16 PL-NF-14-O0l Rev. 2 Page 49 of 62 EOC-RPT Inoperable SUSQUEHANNA UNIT 1 TRM/3.2-50 SUSQEHANA NIT TR/3.-5OEFFECTIVE DATE 11/0412015

p SSES UNIT 1 CYCLE 19 4.0 LEGEND m 3.8 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM~

z 3.6 ________________INSERTION TIME z

C CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 3.4 z

3,2 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVESl E 3.0 - ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2

,U

-1 I-2,8 USED IN DETERMINING MFLCPR 4,

0.

2.6 0

N, 0I 2.4 0) 2.2 2.0 m 1.8 0

REFERENCE:

T.S 3..,.341 and 3.2.2 _ "_-_-_-[_08t" 1.6 1.4 m 30 40 50 60 70 80 9t0 100 110 Total Core Flow (MLB/HR)

SINGLE LOOP OPERATION (BOC to EOC)

FIGURE 8.2-6

C*

SSES UNIT 1 CYCLE 19 Cb 0*

z

.-I C.'

CD C.,

N)

C,' 0)

'-I"1

['11

-IT m

1-1 20 30 40 5060 Power' (% RATED) 70 80Core 80 90 100 m -U -D MCPR OPERATING LIMIT VERSUS CORE POWER Co z EOC-RPT INOPERABLE 0,-

SINGLE LOOP OPERATION (BOC to EOC) ,C FIGURE 8.2-7 ow' 0

Rev. 15 PL-NF-14-OO1 Rev. 2 Page 52 of 62 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 1 TRM/3.2-53 SUSQEHANA NITTRIS.-53 DATE 11/04/2016 EFFECTIVE

C',

SSES UNIT I CYCLE 19 CO 4.0 I I I I m 3.8

  • MAXIMUM ALLOWABLE AVERAGE SCRAM z

3.6 INSERTION TIME V

I .

C I: REALISTIC AVERAGE SCRAM INSERTION TIME z 3.4 4 4.-

3.2 f , , .. ,I.,,.I,, I , " "

S C

3.0 2,8 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR 2

H* C) a.

0 2,6 CD 0~

C, 2.4 2,2 2.0 r-n

-n' rni 1.8 A-

__---_ _ _ ___ __ B

REFERENCE:

T.S. 3.4.1, 3.7.8, and 3.2.2[ ____.__ .. _. _ _ .J._108, 1.48 1.6 m

1,4 30 40 50 60 70 80 90 100 110 Total Core Flow (MLBJHR) w r 0*

MOPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE 01 SINGLE LOOP OPERATION (BOC to EGOC)

FIGURE 8.2-8 0O" 0

' I * . ...... .... ....... ".............. ... ...... . ... . .. ... . . . ............ ...... .............. ......................... ................. ................. .. .. * .. . . =. . ... * " *LZ*:* I* *,.,. L*** ............ .....

CD SSES UNIT 1 CYCLE 19 C " 'I-0*

C 4.4 ---- LEGEND m UM ALLOWABLE AVERAGE SCRAM

-i- 4.2 CURVE A: MAXIM z ____

___ ___INSERi nION TIME z

C 4.0 CURVE B: REALI*

STIC AVERAGE SCRAM INSERTION TiME 3._____,_.__1CURVE C: CORE POWER < 26% AND CORE FLOW < 60 MLBMIHR I

I I rY ANALYSES ASSUME THAT FOUR BYPASS VALVES l---

ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.0 26.01, 2.90 E

USED IN DETERMINING MFLCPR CD 0.= 2.6 A *1*

0)

O- 60, 2.18 U* 4 4 1100 "

2.2 1 m

2.0 m

1.8

REFERENCE:

T.S. 3.4.1, 3.7.8, and 3.2.2J11ii 1.4

.-I 20 30 40 60 ... ... 60 ... .. .. 70 80 90 100 m uore r'ower rio KAIi )uJ MCPR OPERATING LIMIT VERSUS CORE POWER CD J\) BACKUP PRESSURE REGULATOR INOPERABLE "11 0J SINGLE LOOP OPERATION (BOO to EOC)

FIGURE 8.2-9 (:I' .Q DO O--

Rev. 16 PL-NF-14-001 Rev. 2 Page 55 of 62 One TSV or TCV CloSed SUSQUEHANNA UNIT 1 TRM/3.2-56 NITTR/3.-56 DATE 11/04/2015 EFFECTIVE SUSQEHANA

S SSES UNIT 1 CYCLE 19 3,6 0o C

-i- 3.4 z

z 3.2 z

3.0 2.8 E

0.

2.6

-*1 2.4 k* *0 0-C, 2.2 2.0 rri "11 1.8 m

1.6 m

1.4 r'ri 110 30 40 50 60 70 80 90 100 Total Core Flow (MLB/HR)

C 0* MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW o ,-n ONE TSV OR TCV CLOSED*

cj SINGLE LOOP OPERATION (BOC to EOC)

FIGURE 8.2-10 o~

1'r%-h*

  • Operation with one TSV or TCV closed is only supported at power levels -<75% rated power.

0 oi)

SSES UNIT 1 CYCLE 19 4.6I I I I 4.4 LEGEND m

4.2 ______ CURVE *: MAXIMUM ALLOWABLE AVERAGE SCRAM z INSERTION TIME z 4.0 CURVE E3: REALISTIC AVERAGE SCRAM INSERTION TIME C

z 23 .61 23,3.7 CURVE c.: CORE POWER < 26% AND CORE FLOW < 50 MLBM/HR 3.6

"* 26, 3.56-"

C......SAFETY ANALYSES ASSUMEtt THAT FOUR BYPASS VALVES t 3.4 26,C 3.33 ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.2

-- ___________USED IN DETERMINING MFLCPR 3.0 C,i CJ1 2.8 CD 0) 2.6

___ _ _ __ _ _ _ __ _ _ _ _6,19 2.4 2.2 _________ 6.01, 2.40_____ _________ - 519 2.0 n

1.8 1.6 m

1.4 20 30 40 50 60 70 80 Core Power (%RATED)

-0 7ci MCPR OPERATING LIMIT VERSUS CORE POWER w"I-ONE TSV OR TCV CLOSED 01 SINGLE LOOP OPERATION (BOC to EOC)

FIGURE 8.2-11 0)'

  • i jq L. . ... *....... . . ..... . ... . . .......... . . .. .......... ........ T.. .. ............. .... ...... * * * * * ... ... .... -:-.!

.. ... .=

Rev. 16 PL-NF-14-OO1 Rev. 2 Page 58 of 62 9.0 POWERI/FLOW MAP 9.1 Technical Specification Reference Technical Specification 3.3.1.1 9.2 Description Monitor reactor conditions to maintain THERMAL POWER / core flow outside of Stability Regions I and II of the Power/IFlow map, Figure 9.1.

Ifthe OPRM Instrumentation is OPERABLE per TS 3.3.1.1, Region I of the Power! Flow map is considered an immediate exit region.

If the OPRM Instrumentation is inoperable perT"S 3.3.1.1, Region I of the Power!

Flow map is considered an immediate sca region.

Region Ilof the Power!/Flow map is considered an immediate exit region regardless of the operability of the OPRM Instrumentation.

SUSQUEHANNA UNIT1 TRM/3.2-59 SUSQEHANA NITTR/3.-59 DATE 11104/2015 EFFECTIVE

Rev. 16 PL-NF-14-O01 Rev. 2 Page 59 of 62 120

Purpose:

  • 120 110*

InitialI/Date: " I 1100 100 9o. 90 80 70 L.

60 0

fi-50 40 If 30 201 10

-H-I-I-4--]l- 0*-

0 10 20 30 40 50 50 70 80 90 100 110 Total Core Flow (Mlbmlhr)

(for SLO <75% Pump Speed Use Form GO-100-009-2)

Figure 9.1 SSES Unit 1 Cycle 19 Power/IFlow Map SUSQUEHANNA UNIT 1 TRM/3.2-60 SUSQEHANA NITTR/3.-60 DATE 11104/2015 EFFECTIVE

Rev. 16 PL-NF-14-001 Rev. 2 Page 60 of 62 10.0 OPRM SETPOINTS 10.1 Technical Specification Reference Technical Specification 3.3.1.1 10.2 Description Setpoints for the OPRM Instrumentation are established that will reliably detect and suppress anticipated stability related power oscillations while providing a high degree of confidence that the MCPR Safety limit is not violated. The setpoints are described in Section 2.0 and are fisted below:

SF = 1.11 Np = 15 Fp = 60OMlbm /hr SUSQUEHANNA UNIT ! TRM/3.2-61 UNT SUSQEHANA DATE 11/04/20 15 I RM/32-61EFFECTIVE

Rev. 16 PL-NF-14-001 Rev. 2 Page 61 of 82

11.0 REFERENCES

11.1 The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:

1. XN-NF-81-58(P)(A), Revision 2 and Supplements I and 2, "RQDEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model," Exxon Nuclear Company, March 1984.
2. EMF-2361 (P)(A), Revision 0, "EXEM BWR-2000 ECCS Evaluation Model,"

Framatome ANP, May 2001.

3. EMF-2292(P)(A), Revision 0, "ATRlUMW-10: Appendix K Spray Heat Transfer Coefficients," Siemens Power Corporation, September 2000.
4. XN-NF-84-105(P)(A), Volume 1 and Volume I Supplements 1 and 2, lJXCOBRA-T: A Computer Code for BWR Transient Thermal-Hydraulic Core Analysis," Exxon Nuclear Company, February 1987.
5. XN-NF-80-19(P)(A), Volume 1 and Supplements I and 2, "Exxon Nuclear Methodology for Boiling Water Reactors: Neutronic Methods for Design and Analysis," Exxon Nuclear Company, March 1983.
6. XN-NF-80-19(P)(A), Volumes 2, 2A, 2B, and 2C "Exxon Nuclear Methodology for Boiling Water Reactors: EXEM BWR ECCS Evaluation Model, t' Exxon Nuclear Company, September 1982.
7. XN-NF-80-19(P)(A), Volume 3 Revision 2 "Exxon Nuclear Methodology for Boiling Water Reactors Thermex: Thermal Limits Methodology Summary Description," Exxon Nuclear Company, January 1987.
8. XN-NF-80-1 9(P)(A), Volume 4, Revision 1, "Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads," Exxon Nuclear Company, June 1986.
9. XN-NF-85-67(P)(A), Revision 1, "Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel," Exxon Nuclear Company, Inc.,

September 1986.

10. ANF-524(P)(A), Revision 2 and Supplements 1 and 2, "Advanced Nuclear Fuels Corporation Critical Power Methodology for Boiling Water Reactors1 "

November 1990.

11. NE-092-001A, Revision 1, "Licensing Topical Report for Power Uprate With increased Core Flow," Pennsylvania Power & Light Company, December 1992 and NRC SER (November 30, 1993).
12. ANF-89-98(P)(A) Revision 1 and Supplement 1, "Generic Mechanical Design Criteria for BWR Fuel Designs," Advanced Nuclear Fuels Corporation, May 1995.

SUSQUEHANNA UNiT1 TRM/3.2-62 EFFECTIVE DATE 11/04/2015

Rev. 16 PL-NF-14-001 Rev. 2 Page 62 of 62

13. EMF-22O9(P)(A), Revision 3, "SPCB Critical Power Correlation," AREVA NP, September 2009.
14. EMF-85-74(P)(A), Revision 0, Supplement 1(P)(A) and Supplement 2(P)(A),

"RQDEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model,"

Siemens Power Corporation, February 1998.

15. EMF-2168(P)(A), Revision 0, "Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASMO-4/Microburn-B2," Siemens Power Corporation, October 1999.
16. EMF-CC-074(P)(A), Volume 4, Revision 0, "BWR Stability Analysis -

Assessment of STAiF with Input from MICROBURN-B2," Siemens Power Corporation, August 2000.

17. NEDO-32465-A, "BWROG Reactor Core Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications," August 1996.
18. ANF-913(P)(A), Volume t Revision I and Volume I Supplements 2, 3, and 4, "COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses," Advanced Nuclear Fuels Corporation, August 1990.
19. ANF-1 358(P)(A), Revision 3, "The Loss of Feedwater Heating Transient in Boiling Water Reactors," Framatome ANP, September 2005.

SUSQUEHANNA UNIT1 TRM/3.2-63 SUSQEHANA EFFECTIVE NITTR/3.-63 DATE 11/04/2015

Main Turbine Overspeed Protection System Rev. 2 3.3.7 3.3 Instrumentation 3.3.7 Main Turbine Overspeed Protection System TRO 3.3.7 One Main Turbine Overspeed Protection System shall be OPERABLE.

APPLICABILITY: MODES I and 2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Two of eight stop valves A.1.1 Close one of the inoperable 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and control valves valves.

inoperable.

AND A.1 .2 Limit THERMAL POWER 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> following

< 75% RTP. closure of the inoperable valve AND A.1.3 Apply the following limits for a 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> following closed Turbine Stop Valve or closure of the Turbine Control Valve as inoperable valve specified in the COLR:

a. LCO 3.2.2, 'MINIMUM CRITICAL POWER RATIO (MCPR),"
b. LCO 3.2.3, 'LINEAR HEAT GENERATION RATE (LHGR)."

OR A.2 Isolate main turbine from the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> steam supply.

(continued)

SUSQUEHANNA-UNIT1 TRM / 3.3-17 SUSQEHANA-UITITRM 3.-17EFFECTIVE DATE 11/04/2015

Main Turbine Overspeed Protection System Rev. 2 3.3.7 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. Two of twelve intercept B.1 Close either the intercept 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> valves and intermediate valve or the intermediate stop stop valves inoperable, valve within one of the affected combined intermediate valves.

OR 8.2 Isolate main turbine from the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> steam supply.

C. Turbine Overspeed C.1 Isolate main turbine from the 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Protection System steam supply.

inoperable for reasons other than Condition A or B.

SUSQUEHANNA-UNIT1 TRM / 3.3-17a SUSQEHANA

-UNI I RM DATE 11/04/2015 I3.317aEFFECTIVE

Main Turbine Overspeed Protection System Rev. 2 3.3.7 TECHNICAL REQUIREMENT SURVEILLANCE


~NOTE---- --------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the redundant overspeed trip device is OPERABLE.

SURVEILLANCE FREQUENCY

-- NOTE--..........----......

The provisions of TRS 3.0.4 are not applicable TRS 3.3.7.1 Cycle each high pressure turbine control valve from the 92 days running position and observe valve closure.

-- -- NOTE--...............................

The provisions of TRS 3.0.4 are not applicable TRS 3.3.7.2 Cycle each low pressure turbine combined intermediate 92 days valve from the running position and observe valve closure.

NOTE---------------------.....

The provisions of TRS 3.0.4 are not applicable TRS 3.3.7.3 Cycle each high pressure turbine stop valves from the 92 days running position and observe valve closure.

TRS 3.3.7.4 Perform a CHANNEL CALIBRATION of main turbine 24 months overspeed protection instrumentation.

TRS 3.3.7.5 Disassemble one of each type valve identified in 40 months on a TRS 3.3.7.1, TRS 3.3.7.2, and TRS 3.3.7.3, perform a STAGGERED TEST visual and surface inspection of valve seats, disks and BASIS stems and verify no unacceptable flaws or corrosion.

SUSQUEHANNA-UNIT1 TRM / 3.3-18 SUSQEHANA UNT I RM3.-18EFFECTIVE DATE 10/31/2007

Main Turbine Overspeed Protection System Rev. 2 B 3.3.7 B 3.3.7 Main Turbine Overspeed Protection System BASES TRO The Main Turbine Overspeed Protection System is designed to protect the main turbine from excessive overspeed by initiating a turbine trip by fast closure of the turbine control valves and closure of the intercept valves to essentially secure all steam flow to the turbine (Ref. 1).

To protect the turbine generator from overspeed conditions, two trip devices are provided. Either device, when initiated, will close the main stop valves, control valves, and combined intermediate valves thus isolating the turbine (Ref. 2).

These two trip devices are as follows:

  • A mechanical overspeed trip which is initiated ifthe turbine speed reaches approximately 10% above rated speed, and o An electrical overspeed trip which serves as a backup to the mechanical trip and is initiated at approximately 12% above rated speed.

OPERABILITY of at least I of the 2 overspeed protection systems is required for the Turbine Overspeed Protection System to be considered OPERABLE.

Main Turbine Overspeed Protection System (MTOPS) OPERABILITY is also based upon the ability of the valves that control steam flow to the turbine to close following the receipt of a closure signal. The 4 stop valves, 4 control valves, 6 intermediate stop valves, and 6 intercept valves make up a system of 20 valves. A single failure to any one of the above system of 20 valves will not prevent a turbine trip (Ref. 2). Hence, if 19 of the 20 noted valves are OPERABLE, the MTOPS is OPERABLE. Note that for this statement to be true, the intermediate stop valves and intercept valves are considered separate valves. Overspeed protection is only disabled on a CIV failure if both valves within a CIV are inoperable. Failure of only one valve in a CIV does not prevent an overspeed trip, and does not affect operability. Actions to close one inoperable valve if two valves are inoperable maintain the unit within the analysis in Ref. 2. However, redundancy is reduced and repairs should be completed in accordance with the corrective action program.

Excessive turbine overspeed could generate potentially damaging missiles that could present a personnel and equipment hazard. MTOPS is not necessary to provide adequate protection of the public health and safety and is not required to obviate the possibility of an abnormal situation or event giving rise to an immediate threat to the public health and safety.

(continued)

SUSQUEHANNA - UNIT 1 TRM / B 3.3-14 SUSQEHANA

-UNI I TM

/BDATE 3.-14EFFECTIVE 06/25/2002

Main Turbine Overspeed Protection System Rev. 2 B 3.3.7 B 3.3.7 Main Turbine Overspeed Protection System BASES (continued)

ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.

A.1.l, A.1.2, A.1.3 and A.2 If two of eight stop valves and control valves are inoperable, action must be taken to restore at least one of the valves to OPERABLE status in 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

This action ensures steam isolation to the turbine in the event of an overspeed condition, and maintains the unit within the bounds of the FSAR analysis. The 72-hour Completion Time provides a reasonable time to troubleshoot the problem, make repairs, and reduce power in an orderly manner if required without challenging plant systems. The required action if the problem is not resolved is to close one of the inoperable valves, or to isolate the main turbine from the steam supply. If one of the inoperable valves is closed, then limit thermal power to less than or equal to 75% of rated power, and apply Minimum Critical Power Ratio (MCPR) and Linear Heat Generation Rate (LHGR) limits as specified in the COLR within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Restricting thermal power to less than or equal to 75% of rated power eliminates possible shock loads to the turbine blades that could occur from a non-uniform circumferential steam flow distribution entering the HP turbine for this configuration. If the MCPR and LHGR limits are not in compliance with the applicable requirements at the end of this period, the ACTIONS required by the applicable specifications must be implemented.

This time is provided to stabilize operation with a closed Turbine Stop Valve or Turbine Control Valve.

B.1 and B.2 If two of twelve intercept valves and intermediate stop valves are inoperable, action must be taken to restore at least one of these valves to OPERABLE status in 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. This action ensures steam isolation to the turbine in the event of an overspeed condition. The 72-hour Completion Time provides a reasonable time to troubleshoot the problem, make repairs, and reduce power in an orderly manner ifrequired without challenging plant systems.

The required action ifthe problem is not resolved is to close either the intercept valve or the intermediate stop valve within one of the affected combined intermediate valves, or to isolate the main turbine from the steam supply.

(continued)

SUSQUEHANNA-UNIT1 TRM / B 3.3-14a SUSQEHANA-NITI TR

/ 3.314aEFFECTIVE DATE 11/04/2015

Main Turbine Overspeed Protection System Rev. 2 B 3.3.7 B 3.3.7 Main Turbine Overspeed Protection System BASES ACTIONS C.1 (continued)

If the MTOPS is inoperable for reasons other than conditions A or B, then action must be taken to isolate the main turbine from the steam supply.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allows a reasonable amount of time to complete the plant shutdown associated with isolating the main turbine from the steam supply.

TRS The TRSs are performed at the specified Frequency to ensure that the turbine overspeed protection function is maintained OPERABLE.

The TRSs are modified by a Note to indicate that when a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the redundant overspeed trip device is OPERABLE. Upon completion of the Surveillance, or expiration of the 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allowance, the channel must be returned to OPERABLE status or the applicable Condition entered and Required Actions taken. This Note is based on the average time required to perform channel Surveillance. The 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> testing allowance does not significantly reduce the probability that the Main Turbine Overspeed Protection System will function when necessary.

TRS 3.3.7.1, TRS 3.3.7.2, and TRS 3.3.7.3 Verification of the movement of each of the four high pressure turbine control valves, six low pressure turbine combined intermediate valves (composed of 6 intermediate stop valves and 6 intercept valves), and four high pressure turbine stop valves ensures the OPERABILITY of each valve and that it will be able to close in the event of a turbine trip condition. The 92 day Frequency is based upon current surveillance practice as recommended by the turbine vendor and described in the FSAR (Ref. 3).

(continued)

SUSQUEHANNA - UNIT 1 TRM / B 3.3-14b SUSQEHANA-NIT TRM/

B3.314bEFFECTIVE DATE 11/04/2015

Main Turbine Overspeed Protection System Rev. 2 B 3.3.7 B 3.3.7 Main Turbine Overspeed Protection System BASES TRS TRS 3.3.7.4 (continued)

This TRS is for the performance of a CHANNEL CALIBRATION of the required main turbine overspeed protection instrumentation. The calibration is a complete check of the instrument channel from the sensing device to main turbine trip initiation. The Frequency of 24 months is a typical refueling cycle and considers channel reliability.

TRS 3.3.7.5 The disassembly and inspection of the valves referenced ensures that abnormal wear is not occurring which could result in the valves inability to close upon receipt of a close signal. The Frequency is such that only one of each type valve (i.e., high pressure turbine stop; high pressure turbine control; and low pressure turbine combined intermediate), is required to be inspected within a 40 month period. If unacceptable flaws or excessive corrosion are found in a valve, all valves of its type are inspected (Ref. 3).

Valve bushings are inspected and cleaned, and bore diameters are checked for proper clearance.

REFERENCES 1. FSAR Section 7.7:1.5

2. FSAR Section 10.2.2.6.
3. FSAR Section 10.2.3.6.

SUSQUEHANNA-UNIT1 TRM / B 3.3-14c SUSQEHANA

-UNITI TR

/ 3.314cEFFECTIVE DATE 11/04/2015

Nov. 11, 2015 Page 1 of 2 MANIJAL HARD COPY DISTRIBUTION DOCUMENT TRANMSMITTAL 2015-45734 USER INFORMATION:

GERLACH*ROSEY N EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSEY N 11/11/2015 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MNAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRMI - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 11/03/2015 ADD MANUAL TABLE OF CONTENTS DATE: 11/10/2015 CATEGORY: DOCUMENTS TYPE: TRM1 4oc2

Nov. 11, 2015 Page 2 of 2 ID: TEXT 3.2.1 REMOVE: REV:15 ADD: REV: 16 CATEGORY: DOCUMENTS TYPE: TEMI ID: TEXT 3.3.7 REMOVE: REV:1 ADD: REV: 2 CATEGORY: DOCUMENTS TYPE: TRMI ID: TEXT B3.3.7 REMOVE: REV:I1 ADD: REV: 2 CATEGORY: DOCUMENTS TYPE: TRMI ID: TEXT LOES REMOVE: REV: 83 ADD: REV: 84 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MNUALm Manual Name:z TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date: 1LI/I10/2 015 Procedure Name Rev Issue Date Change ID Change Numiber TEXT LOES 84 11/10 /2 015

Title:

LIST OF EF:FECTIVE SECTIONS TEXT TOC 25 04/28/2015

Title:

TABLE OF CONTENTS TEXT 1.1 1 01/31/2014

Title:

USE AND APPLICATION DEFINITIONS TEXT 2.1 2 04/28/2015

Title:

PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 10 01/31/2014

Title:

PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 5 03/05/2015

Title:

TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY & SURVEILLANCE (TRS)

APPLICABILITY TEXT 3.1.1 1 11/09/2007

Title:

REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 0 11/18/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 5 04/16/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/18/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &

CHECK VALVE TEXT 3.2.1 16 11/10/2015

Title:

CORE OPERATING LIMITS REPORT (COLR)

Report Date: 11/11/15 Pagel Page ! of of i~

16 Report Date: 11/11/15

SSES MANUAL Manual Name: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1 0 11/18/2002

Title:

INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3 03/31/2011

Title:

INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 8 10/14/2015

Title:

INSTRUMENTATION TRN POST-ACCIDENT MONITORING INSTRUMENTATION LDCN 4552 TEXT 3.3.5 0 11/18/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 4 04/29/2014

Title:

INSTRUMENTATION TRN ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 2 11/10/2015

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003

Title:

INSTRUMENTATION TEN RPS INSTRUMENTATION TEXT 3.3.9 3 04/17/2008

Title:

OPEN INSTRUMENTATION CONFIGURATION TEXT 3.3.10 1 12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 1 03/05/2015

Title:

WATER MONITORING INSTRUMENTATION Report Date: 11/11/15 Page 2 of of 16 I__66 Report Date: 11/11/15

~SES MANTJAIJ Manual Namue: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.4.1 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009

Title:

REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4 2 04/17/2008

Title:

REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6 2 04/25/2013

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 1 02/04/2005

Title:

EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007

Title:

EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/18/2002

Title:

EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/18/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 2 04/29/2014

Title:

SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/18/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Report Date: 11/11/15 Page Page~* of of 16 i_*6 Report Date: 11/11/15

SSES MANUJAL Manual Name : TE*I 21:Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6.4 0 11/18/2002 Titles CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/18/2002

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/18/2002

Title:

PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 2 04/16/2009

Title:

PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009

Title:

PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 3 04/16/2009

Title:

  • PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 2 04/16/2009 Title : PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009 Title : PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009 Title : PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006 Title : PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 10 09/27/2012

Title:

. PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04/26/2006

Title:

PLANT SYSTEMS SOLID RADWASTE SYSTEM Report Date: 11/11/15 Page Page A4 of of 16 16

SSES MUANTAI

. IManual

Title:

TECHNICAL REQUIREMVENTS MANUAL UNIT 1 Manual Name: TRJi1I TEXT 3.7.5.1 1 03/05/2015

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/18/2002 Titleg PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006

Title:

PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3 06/04/2012

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008 Titles PLANT SYSTEMS MAIM CONDENSER 0FFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING TEXT 3.7.8 5 03/05/2015

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 2 01/31/2014

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.7o11 0 04/16/2009

Title:

STRUCTURAL INTEGRITY TEXT 3.8.1 2 04/05/2010

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTI( ON -.

CONTINUOUS TEXT 3.8.2.2 2 12/14/2004

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTICON -

AUTOMATIC Report Date: 11/11/15 Page 5 Page of of 16 16 Report Date: 11/11/15

SSES MANUAL Manual Name:* TRNI SManual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3 2 03/05/2015 Title  : ELECTRICAL POWER DIESEL GENERATOR CDG) MAINTENANCE ACTIVITIES TEXT 3.8.4 0 11/18/2002

Title:

  • ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5 1 11/14/2013 Title : ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 1 12/08/2011 Title : ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 1 06/15/2009

Title:

BATTERY MAINTENANCE AND MONITORING PROGRALM TEXT 3.9.1 0 11/18/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/18/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/18/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006

Title:

MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 2 08/08/2006

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2 06/15/2010

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.10.4 2 04/17/2008

Title:

MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)

Report Date: 11/11/15 Page *6 Page of of 16 16 Report Date: 11/11/15

SSES MANUJAL

    • Manual Name: TRN1

- Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.1 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 2 10109/2012

Title:

RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5 3 03/05/2015

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUTMENTATION

... TEXT 3.11.2.1 3 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/18/2002

Title:

RADIOACTIVE EFFLUENTS GASEOUS RAD WASTE TREATMENT SYSTEM TEXT 3.11.2.5 4 07/03/2013

Title:

RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 5 04/28/2015

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION ac* TEXT 3.11.3 1

Title:

RADIOACTIVE EFFLUENTS TOTAL DOSE 04/26/2006 Report Date: 11/11/15 Page *:i~ of of 16 I_66 Report Date: 11/11/15

SSES MANUAL Manual Name : TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.4.1 5 03/05 /2015

Title:

RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2 2 04/26 /2006

Title:

RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2 4 04/17 /2008

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002 0

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4.1 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1 12/18/2008

Title:

ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM 16Reprt Dte:11/1/1 Page8.a Page of 16 Report Date: 11/11/15

SSES MANUJAL

. 1-- Manual Name: TECHNICAL Manual

Title:

TRMI REQUIREMENTS MANUAL UNIT 1 TEXT 4.7 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0 5 03/05/2015

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 2 04/29/2014

Title:

REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 03/31/2006

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMU/LATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

TEXT B3.3.1 1 01/31/2014

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2 03/31/2011

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 3 12/18/2008

Title:

INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 5 10/14/2015

Title:

INSTRUMENTATION BASES TEN POST ACCIDENT MONITORING (PAM) INSTRUMENTATION

. TEXT B3.3.5 2 11/09/2007

Title:

INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK Page of 16 Report Date: 11/11/15

9--I *o 0--*D*d ST/TT/TT  :~~c1 ~od~a ~T ;o ~T 9.~2d sTZLVWH~* THSS*HA HO&DVH S*Sva WNHJS2XS d NWIOOD HO1DVZH *IL*

Z00Z/6T/TT 0 S'9"[H J&X~H JLIWlI ZIlI UOH QNT MO'EA NOllvqIflHIDZa HOJ*DV* S*SVE NHLSAS LN-'IOOD HOLD*'d :eYZ; Z00Z/6T/TT 0 9""H&H HOLINOW *D'f>VI-' HDV*aHJI aH~nSS*H MO'I/HDIH S*SVH *SXS INWIOOD [ODV'H*I xE

  • LOOZ/60/TT T
  • hI~f00o :xa:si*

VZD M A*IEIDJNI I-*-hLDflHLS SHSva NacISLS 600Z/9T/90 T

~LNTWEOODT'O°DV 6 H XTJ 2AJSIW*H3 NILSXS LN'IOOD HOLDOWN S*SVH W2.SAS Z00Z/6T/Tt 0 NOI1*N*WflHLSNI DNIHOllINO aH*NM 9!ZTI 600Z/9T/90 0 ZTE"E* HTX.*,T N01N~WfldJSNI NOIlWIosI JAW

£00Z/ZZ/0T T SaSvH NOILVNHXflaLSNI :eT;*.

0T£H LXHL SJOIS LNS OW JNflJ NOI~VqlDOHIDHa HOLD*aH 010*/60/80 £ WOIL*N*WaaJSNI WIHdO :9*;t*

800Z/LT/90 £ 6"V£H c*Xai NOIJNLN*rHLSNI (Saa) wka&sXS NOILD*O&~d HOJ*Dv*Ha TaJ*

£00*I/*IOT T WkLS2S NOI DHLO'HJ *HJSHAO ~HNIEHf1L NIVW SZSVH NOIJNN[IWnaL*SNI S*IW*

NOI*LN*TIflqHSNI NOIl*fDY NOILVqosI WIHL S*S*a NOILVN &LOHSNJ *!I1J&

9TOZ/T£/T0 TI ,,INfl I~fl* S,,*ZHf0* rI\DINHD.&,T  :*~ y I~r

~IVL1NVW S~S~

SSES MATJi*

  • Manual Name: TRMI

=iManual

Title:

TECHNICAL REQUIREM'cENTS MANUAL UNIT 1 TEXT B3.4.6 2 04/25/2013

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT B3.5.1 0 11/19/2002

Title:

ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 2 04/17/2008

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3o6.4 1 12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002

Title:

PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 3 06/15/2010

Title:

PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM

  • TEXT B3.7.3.2 2 04/26/2006 W.

Title:

PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 1_1 of i__66 Report Date: 11/11/15

SSES MANUAL Manual Name: TRMI SManual Title* TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.3 0 11/19/2002

Title:

  • PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4 3 04/29/2014

Title:

  • PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006 Title : PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006 Title : PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002 Title : PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES STEXT B3.7.3.8 3 09/27/2012

Title:

PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3 7.4 0 11/19/2002 Title : PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002 Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002 Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002 Title : PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4 06/04/2013 Title : PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION

. TEXT B3.7.7 2 01/31/2008

...- Title : PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Report Date: 11/11/15 Page 1/2 Page 12 of of 16 16 Report Date: 11/11/15

SSES MANTJAI~

Manual Name : TPR41 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.8 4 01/31/2 014

Title:

PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 2 12/08/2011 Title : PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004 Title : PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 1 04/14/2010

Title:

STRUCTURAL INTEGRITY TEXT B3.8.1 2 03/10/2010

Title:

ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT B3.8.2.2 1 09/17/2004

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC TEXT B3.8.3 0 11/19/2002

Title:

ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002

Title:

ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1 11/14/2013

Title:

ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 2 12/08/2011

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 2 06/04/2013

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM Report Date: 11/11/15 Page i~

Page 13 of of ii 16 Report Date: 11/11/15

S.~ES MM~AL

<?=Manual Name: TRMI

"*Manual Titles° TECHNICAL REQUIREMENTS MANUAL UNIT 1 0 TEXT B3.9.l 0 11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TINE TEXT B3.9.2 0 11/19/2002

Title:

REFUELING OPERATIONS BASES COMM4UNICATIONS TEXT B3.9.3 0 11/19/2002

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 03/31/2006

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.10.4 1 04/17/2 008

Title:

MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)

TEXT B3.ii.ioi 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3ol.11Io2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.ii.i.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.I.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.I.5 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION Report Date: 11/11/15 Page 14 Page 14 of of ~i* Report Date: 11/11/15

SSES MANUJAI O Manual Name: TRMI

... Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.11.2.1 1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.11.2.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN SPARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 5 07/03/2013

Title:

RADIOACTIVE EFFLUENTS BASES VENTILATION EXHqAUST TREATMENT SYSTEM TEXT B3.11.2.6 1 01/27/2004

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 5 03/05/2015

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1 12/03/2010

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS Report Date: 11/11/15 Page i~.

15 of of 16 I__66 Report Date: 11/11/15

SSES MANUJAL

  • - Manual Name: TRN1
  • Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3 0. 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Report Date: 11/11/15 Page 1616 of of 16 16 Report Date: 11/11/15

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 64 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Titl__ee Effective Date TOC TABLE OF CONTENTS 04/23/2015 1.0 USE AND APPLICATION Page TRM / 1.0-1 10/04/2002 Page TRM / 1.0-2 01/21/2014 Page TRM / 1.0-3 10/04/2002 2.0 PLANT PROGRAMS Page TRM / 2.0-1 04/23/2015 Pages TRM / 2.0-2 and TRM / 2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM / 2.0-5 01/21/2014 Page TRM / 2.0-6 03/27/2008 Page TRM / 2.0-7 05/15/2008 Pages TRM / 2.0-8 and TRM / 2.0-9 01/07/2011 Page TRM / 2.0-10 02/02/2010 Page TRM / 2.0-11 11/15/2004 Page TRM / 2.0- 12 03/27/2008 Pages TRM / 2.0-13 and TRM / 2.0-1* 11/15/2004 Page TRM / 2.0-15 11/15/2005 3.0 PI"I"LI*.jp?.DILI I I Pages TRM / 3.0-1 and 02/19/2015 Page TRM / 3.0-3 03/15/2002 Page TRM / 3.0-4 02/19/2015 REACTIVITY CON 3.1 Page TRM / 3.* 10/3112007 Pages TRM an 08/31/1998 Pages 3. 5 08/31/1998 Page TR 03/22/2006 04/07/2009 03/27/2008 3.1-9 and TRM / 3.1,9a 02/18/1999

.1-10 02/18/1999 3.2 iERATING LIMITS REPORT 07/07/1999 Pages TRM / 3.2-2 through TRM / 3.2-63 11/04/2015 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 07/16/1999 Page TRM / 3.3-4 and TRM / 3.3-5 10/31/2007 Page TRM / 3.3-6 03/10/2011 SUSQUEHANNA-UNIT1 TRM / LOES-1 SUSQEHANA UNT I RM LOS-1EFFECTIVE DATE 11/04/2015

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.3-7 10/31/2007 Page TRM / 3.3-8 08/31/1998 Page TRM / 3.3-9 10/07/2015 Page T'RM / 3.3-9a 06/30/2010 Page TRM / 3.3-10 10/31/2007 Page TRM /3.3-11 10/07/2015 Page TRM / 3.3-11a 10/07/2015 Page TRM I 3.3-12 03/30/2001 Page TRM / 3.3-13 01/07/2011 Page TRM / 3.3-14 12/1 4/1 998 Page TRM / 3.3-15, 04/11/2014 Page TRM I 3.3-16 01/07/2011 Page TRM / 3.3-17 11/04/2015 Page TRM / 3.3-17a 11/04/2015 Page TRM / 3.3-18 10/31/2007 Pages TRM / 3.3-19 through TRM / 3.3-21 10/22/2003 Page TRM / 3.3-22 03/27/2008 Page TRM / 3.3-22a 11/15/2004 Pages TRM / 3.3-22b through TRM / 3.3-22d 03/22/2006 Page TRM / 3.3-23 12/03/2004 Pages TRM / 3.3-24 and TRM I 3.3-25 05/16/2003 Page, TRM / 3.3-26 10/22/2003 Page TRM / 3.3-27 02/19/2015 Page TRM / 3.3-28 04/07/2009 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages TRM / 3.4-2 through TRM / 3.4-5 10/23/11998 Pages TRM / 3.4-6 through TRM / 3.4-8 04/01/2009 Page TRM / 3.4-9 08/31/1998 Page TRM / 3.4-10 10/31/2007 Page TRM / 3.4-11 08/31/1998 Page TRM / 3.4-12 03/27/2008 Page TRM / 3.4-13 03/31/2006 Pages TRM / 3.4-14 and TRM / 3.4-15 04/25/2013 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages TRM / 3.5-2 and TRM / 3.5-3 08/31/1998 Pages TRM / 3.5-4 and TRM / 3.5-5 10/31/2007 Pages 3.5-6 and 3.5-7 08/31/1998 SUSQUEHANNA- UNIT 1 TRM / LOES-2 LOS-2EFFECTIVE I RM UNT SUSQEHANADATE 11/04/2015

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.6 CONTAI NMENT Page 3.6-1 08/31/1998 Pages TRM / 3.6-2 and TRM I 3.6-2a 04/16/2014 Page 3.6-3 08/31/1998 Page TRM / 3.6-4 01/07/2002 Page 3.6-5 08/31/1998 Pages TRM / 3.6-6 through TRM / 3.6-8 12/31/2002 3.7 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 08/31/1998 Page TRM / 3.7-4 03/31/2006 Pages TRM / 3.7-5 04/07/2009 Pages TRM / 3.7-6 through TRM / 3.7-8 08/02/1999 Pages TRM / 3.7-9 and TRM / 3.7-10 04/07/2009 Page TRM / 3.7-11 12/29/1999 Page TRM / 3.7-12 08/02/1999 Page TRM / 3.7.13 04/07/2009 Page TRM / 3.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 04/07/2009 Page TRM / 3.7-18 08/02/1999 Page TRM / 3.7-19 04/07/2009 Pages TRM / 3.7-20 through TRM / 3.7-22 08/02/1999 Page TRM / 3.7-23 04/07/2 009 Page TRM / 3.7-24 03/31/2006 Page TRM / 3.7-25 08/02/1999 Page TRM / 3.7-26 09/25/2012 Page TRM / 3.7-27 11/24/2011 Pages TRM / 3.7-28 through TRM / 3.7-34a 09/25/2012 Page TRM / 3,7-35 03/31/2006 Pages TRM / 3.7-36 and TRM / 3.7-37 02/01/1999 Page TRM / 3.7-38 02/19/2015 Page TRM / 3.7-39 08/31/1998 Page TRM / 3.7-40 03/31/2006 Page TRM / 3.7-41 05/24/2012 Pages TRM / 3.7-41a through TRM / 3.7-41c 05/24/2012 Page TRM / 3.7-42 09/04/2008 Page TRM / 3.7-43 08/31/1998 Page TRM / 3.7-44 02/19/2015 Pages TRM / 3.7-45 and TRM / 3.7-46 10/05/2006 Page TRM / 3.7-47 06/07/2007 TRM / LOES-3 EFFECTIVE DATE 11/04/2015 SUSQUEHANNA-UNITI SUSQUEHANNA-UNIT1 TRM / LOES-3 EFFECTIVE DATE 11/04/2015

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page 10/05/2006 Page TRM TRM II 3.7-48 3.7-49 06/07/2007 Pages TRM / 3.7-49a and TRM / 3.7-49b 10/05/2006 Page TRM / 3.7-50 01/21/2014 Page TRM / 3.7-51 08/16/2006 Page TRM / 3.7-52 12/03/2004 Page TRM / 3.7-53 04/15/2003 Page TRM / 3.7-54 07/29/1999 Pages TRM / 3.7-55 through TRM / 3.7-57 04/01/2009 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Page TRM / 3.8-2 01/28/2005 Pages TRM / 3.8-3 and TRM /3.8-4 03/25/2010 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Page TRM / 3.8-7 10/31/2007 Pages TRM / 3.8-8 through TRM / 3.8-10 12/03/2004 Page TRM /3.8-11 09/03/2004 Page TRM / 3.8-12 12/03/2004 Page TRM / 3.8-13 02/19/2015 Page TRM / 3.8-14 08/31/1998 Pages TRM / 3.8-15 through TRM / 3.8-17 04/02/2002 Page 3.8-18 08/31/1998 Page TRM / 3.8-19 04/02/2002 Page 3.8-20 08/31/1998 Pages TRM / 3.8-21 and TRM / 3.8-22 06/06/1999 Page TRM / 3.8-23 11/07/2013 Pages TRM / 3.8-24 and TRM / 3.8-25 11/30/2011 Page TRM / 3.8-26 05/28/2009 Page TRM / 3.8-27 11/29/2006 Pages TRM / 3.8-28 and TRM / 3.8-29 05/28/2009 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages TRM / 3.10-2 and TRM / 3.10-3 08/31/1998 Page TRM / 3.10-4 08/01/2006 Pages TRM / 3.10-5 and TRM / 3.10-6 03/22/2006 Page TRM / 3.10-7 06/10/2010 Page TRM / 3.10-8 03/27/2008 SUSQUEHANNA - UNIT 1 TRM / LOES-4 SUSQEHANA UNT I RM LOS-4EFFECTIVE DATE 11/04/2015

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages TRM / 3.11-2 and TRM / 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page TRM / 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages TRM / 3.11-7 and TRM / 3.11-8 08/31/1998 Pages TRM / 3.11-9 and TRM / 3.11-10 10/09/2012 Pages TRM / 3.11-11 and TRM / 3.11-12 08/31/1998 Page TRM /3.11-13 02/19/2015 Page TRM / 3.11-14 12/03/2004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM / 3.11-17 03/31/2006 Page 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21 03/31/2006 Page TRM / 3.11-22 04/02/2002 Page TRM / 3.11-23 11/14/2006 Page TRM / 3.11-24 06/18/2013 Page TRM / 3.11-25 04/12/2007 Pages TRM / 3.11-26 and TRM / 3.11-27 01/21/2004 Page TRM /3.11-28 09/08/2009 Page TRM / 3.11-29 12/03/2004 Pages TRM / 3.11.30 and TRM / 3.11.31 01/21/2004 Page TRM / 3.11.32 04/23/2015 Page TRM / 3.11-33 03/31/2006 Page TRM / 3.11-34 08/31/1998 Page TRM / 3.11-35 03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39 11/30/2005 Page TRM / 3.11-40 02/19/2015 Pages TRM / 3.11-41 through TRM / 3.11-43 08/31/1998 Page TRM / 3.11-44 08/01/2006 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM /3.12-3 02/05/1999 Page TRM / 3.12-4 03/14/2008 Page TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-3 08/31/1998 Page TRM / 4.0-4 12/11/2008 Pages 4.0-5 through 4.0-8 08/31/1998 SUSQUEHANNA-UNIT1 TRM/LOES-5 SUSQEHANA UNT I RM LOS-5EFFECTIVE DATE 11/04/2015

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 08/31/1998 Page TRM / B 3.0-4 02/19/2015 Page TRM / B 3.0-4a and TRM / B 3.0-4b 02/19/2015 Page TRM / B 3.0-5 02/19/2015 Page TRM I B 3.0-6 08/31/1998 Page TRM I B 3.0-7 04/12/2007 Pages TRM / B 3.0-8 through TRM I B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12 03/15/2002 Pages TRM / B 3.0-13 through TRM / B 3.0-15 02/19/2015 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 07/13/1999 Page TRM / B 3.1-2 04/16/2014 Page TRM /B 3.1-3 10/31/2007 Page B 3.1-4 08/31/1998 Page TRM / B 3.1-5 11/15/2005 Pages TRM I B 3.1-6 and TRM / B 3.1-7 03/22/2006 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 01/21/2014 Page TRM / B 3.3-2 03/10/2011 Page TRM / B 3.3-2a 10/31/2007 Page TRM / B 3.3-3 12/11/2008 Page TRM / B 3.3-3a 10/31/2007 Page TRM / B 3.3-4 06/30/2010 Page TRM / B 3.3-5 10/07/2015 Page TRM I B 3:3-6 06/30/2010 Page TRM I B 3.3-7 10/07/2015 Page TRM / B. 3.3-8 06/30/2010 Page TRM I B 3.3-9 10/31./2007 Pages TRM / B 3.3-10 through TRM I B 3.3-12 01/07/2011 Page TRM / B 3.3-13 01/21/2014 Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 11/04/2015 Page TRM I B 3.3-14b 11/04/2015 Page TRM / B 3.3-14c 11/04/2015 Pages TRM / B 3.3-15 and TRM I B 3.3-16 10/22/2003 Page TRM / B 3.3-17 03/22/2006 Pages TRM / B 3.3-17a through TRM / B 3.3-17c 03/22/2006 Page TRM / B 3.3-17d 03/27/2008 TRM / LOES-6 EFFECTIVE DATE 11/04/2015 SUSQUEHANNA-UNITI SUSQUEHANNA - UNIT 1 TRM / LOES-6 EFFECTIVE DATE 11/04/2015

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date TRMI IBB3.3-19 Pages TRM / B 3.3-17e andTRM 3.3-17f 03/22/2006 Pages TRM / B 3.3-18 and 08/03/2010 Page TRM / B 3.3-20 10/22/2003 Page TRM / B 3.3-21 05/16/2003 Pages TRM / B 3.3-22 and TRM / B 3.3-23 04/07/2009 B 3.4 REACTOR COOLANT SYSTEM BASES Page B 3.4-1 08/31/1998 Pages TRM / B 3.4-2 and TRM / B 3.4-3 04/01/2009 Pages TRM 1 B 3.4-4 and TRM / B 3.4-4a 10/31/2007 Page TRM / B 3.4-5 10/1 5/1 999 Page B 3.4-6 08/31/1998 Pages TRM / B 3.4-7 and TRM / B 3.4-8 04/25/2013 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM / B 3.5-3 through TRM / B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM / B 3.6-4 03/27/2008 Page TRM / B 3.6-5 04/04/2007 Page TRM / B 3.6-6 12/03/2004 Pages TRM / B.3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Page TRM/IB 3.7-3 06/10/2010 Page TRM / B 3.7-3a 12/27/2007 Page TRM / B 3.7-4 03/31/2006 Page TRM / B 3.7-5 08/02/1999 Page TRM / B 3.7-6 03/3"1/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08/02/1999 Page TRM / B 3.7-8 O5/2 9/2013 Page TRM / B 3.7-9 04/11/2014 Page TRM / B 3.7-10 08/02/1999 Page TRM / B 3.7-I0a 03/31/2006 Page TRM / B 3.7-11 08/02/1999 Page TRM / B 3.7-11a 03/31/2006 Pages TRM / B 3.7-12 and TRM / B 3.7-13 08/02/1999 Pages TRM / B 3.7-14 and TRM / B 3.7-14a 09/25/20 12 EFFECTIVE DATE 11/04/2015 SUSQUEHANNA SUSQUEHANNA-UNIT1

- UNIT I TRM // LOES-7 TRM LOES-7 EFFECTIVE DATE 11/04/2015

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / B 3.7-14b 11/24/2011 Pages TRM / B 3.7-15 and TRM I B 3.7-16 0210111999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Page TRM I B 3.7-21 05/29/2013 Pages TRM / B 3.7-21a through TRM / B 3.7-21d 05/24/2012 Pages TRM / B 3.7-21e through TRM / B 3.7-21g 05/29/2013 Page TRM / B 3.7-22 and TRM / B 3.7-23 01/30/2008 Page TRM / B 3.7-24 10/05/2006 Page TRM / B 3.7-25 01/21/2014 Pages TRM / B 3.7-26 through TRM / B 3.7-28 10/05/2006 Pages TRM / B 3.7-29 and TRM I B 3.7-30 06/07/2007 Page TRM / B 3.7-30a 10/05/2006 Page TRM / B 3.7-30b 01/21/2014 Page TRM / B 3.7-31 11/30/2011 Page TRM / B 3.7-32 03/09/2001 Page TRM / B 3.7-33 04/15/2003 Page TRM / B 3.7-34 12/03/2004 Page TRM / B 3.7-35 07/05/2000 Pages TRM / B 3.7-36 through TRM / B 3.7-39 04/01/2009 Page TRM / B 3.7-40 04/08/2010 ELECTRICAL POWER BASES B 3.8 Page TRM / B 3.8-1 04/02/2002 Page TRM / B 3.8-2 01/28/2005 Page TRM / B 3.8-2a 03/01/2010 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 09/03/2004 Page TRM / B 3.8-4a 04/02/2002 Page B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-15 04/02/2002 Page TRM / B 3.8-16 11/07/2013 Page TRM / B 3.8-17 11/30/2011 Pages TRM / B 3.8-17a and TRM / B 3.8-17b 11/30/2011 Pages TRM / B 3.8-18 through TRM / B 3.8-20 05/29/2013 Pages TRM / B 3.8-21 and TRM I B 3.8-22 05/28/2009 Page TRM I B 3.8-23 05/29/2013 Page TRM / B 3.8-24 05/28/2009 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 08/31/1998 TRM / LOES-8 EFFECTIVE DATE 11/04/2015 SUSQUEHANNA - UNIT UNIT 1I TRM / LOES-8 EFFECTIVE DATE 11/04/2015

SUSQUEHANNA STEAM ELECTRIC STATION Rev. 84 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MAN UAL)

Section Title Effective Date B 3.10 MISCELLANEOUS BASES Page B 3.10-1 08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3 03/22/2006 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 Page TRM / B 3.10-6 03/27/2008 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/30/1998 Page TRM / B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.1 1-11a 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM /B 3.11-14 12/03/2004 Page TRM / B3.11-15 02/01/1999 Pages B 3.11-16 through B 3.1 1-19 08/30/1998 Page TRM / B 3.11-20 04/02/2002 Page TRM / B 3.1 1-20a 04/02/2002 Page TRM /B 3.11-21 05/13/2005 Pages TRM / B 3.11-22 and TRM / B 3.11-23 11/14/2006 Pages TRM / B 3.1 1-23a and TRM / B 3.1 1-23b 06/18/2013 Pages TRM / B 3.11-24 and TRM / B 3.11-25 01/21/2004 Pages B 3.11-26 and B 3.11-27 08/30/1998 Page TRM / B3.11-28 11/30/2005 Page TRM / B 3.11-29 02/19/2015 Pages TRM / B3.1 1-30 and TRM / B 3.11-31 05/29/2013 Page TRM /B 3.11-32 08/30/1 998 Page TRM / B 3.11-33 06/30/2010 Pages B 3.11-34 and B 3.11-35 08/30/1998 Page TRM / B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B3.12-1 09/19/2007 Page TRM / B 3.12-2 11/29/2010 Page TRM / B 3.12-3 02/05/1999 TRM1 text LOES 11/4/2015 SUSQUEHANNA - UNIT 1 TRM / LOES-9 SUSQEHANA UNT I RM LOS-9EFFECTIVE DATE 11/04/2015

Core Operating Limits Report (COLR)

Rev. 16 3.2.1 3.2 Core Operating Limits Report (COLR) 3.2.1 Core Operating Limits Report (COLR)

TRO 3.2.1 The Core Operating Limits specified in the attached COLR shall be met.

APPLI(CABILITY: SPecified in the referenced Technical Specifications.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME" A. Core Operating Limits not A,1 Perform action(s) described Specified in met. in referenced Technical referenced Specification. Technical Specifications.

TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY


NOTE-.......... ............. .. N/A No associated Surveillances. Surveillances are implemented in the applicable Technical Specificatiorns.

SUSQUEHANNA-UNIT1 TRM / 3.2-1 SUSQEHANA

-UNI 1 TM/32-1EFFECTIVE DATE 0710711999

Rev. 16 PL-NF-14-001 Rev. 2 Page "i of 62 Susquehanna SES Unit I Cycle 19 CORE OPERATING LIMITS REPORT Nuclear Fuels Engineering September 2015 SUSQUEHANNA UNIT1 TRM!3.2-2 SUSQEHANA UNT I RM/32-2EFFECTIVE DATE 11/0412015

Rev. 16 PL-NF-14-001 Rev. 2 Page 2 of 62 CORE OPERATING LIMITS REPORT REVISION DESCRiPTiON INDEX Rev. Affected ,

No. Sections Description/Purpose of Revision 0 ALL Issuance of this COLR is in support of Unit I Cycle 19 operation.

1 ALL New COLR required due to Power/Flow Map revision.

2 ALL New COLR required for the inclusion of operating limits regarding a Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) closure event.

~J. J FORM NFP-QA-008-2, Rev. 1 SUSQUEHANNA UNIT 1 TRM/3.2-3 TRM/.2-3EFFECTIVE DATE 11/04/2015

Rev. 16 PL-NF-14-00i Rev. 2 Page 3 of 62 SUSQUEHANNA STEAM ELECTRIC STATION Unit I Cycle 19 CORE OPERATING LIMITS REPORT Table of Contents

1.0 INTRODUCTION

............................................................................ 4 2.0 DEFINITIONS................................................................................6 3.0 SHUTDOWN MARGIN ....................................................................... 6 4.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR).................. 7 6.0 MINIMUM CRITICAL POWER RATIO (MCPR)............................................ 9 6.0 LINEAR HEAT GENERATION RATE (LHGR) ...................................... ....... 27 7.0 ROD BLOCK MONITOR (RBM) SETPOINTS AND OPERABILITY REQUIREMENTS ............................................................................ 38 8.0 RECIRCULATION LOOPS - SINGLE LOOP OPERATION............................... 40 9.0 POWER I FLOW MAP ..............................................  :......................... 58 10.0 OPRM SETPOINTS.......................................................................... 60

11.0 REFERENCES

................ ................................................................ 61 SUSQUEHANNA UNIT 1 TRM/3.2-4 SUSQEHANA NITTR/3..-4DATE 11/04/2015 EFFECTIVE

Rev. 16 PL-NF-14-0O1 Rev. 2 Page 4 of 62 1.0 iNTRODUCTION This CORE OPERATING LIMITS REPORT for Susquehanna Unit t Cycle 19 is prepared in accordance with the requirements of Susquehanna Unit 1, Technical Specification 5.6.5. As required by Technical Specifications 5.6.5, core shutdown margin, the core operating limits, RBM setpoints, and OPRM setpoints presented herein were developed using NRC-approved methods and are established such that all applicable limits of the plant safety analysis are met.

SUSQUEHANNA UNIT 1 TRM/3.2-5 UNT I RM/32-5 SUSQEHANA EFFECTIVE DATE 11/04/2015

Rev. 16 PL-NF- 14-001 Rev. 2 Page 5 of 62 2.0 DEFINiTIONS Terms used in this COLR but not defined in Section 1.0 of the Technical Specifications or Section 1.1 of the Technical Requirements Manual are provided below.

2.1 The AVERAGE PLANAR EXPOSURE at a specified height shall be equal to the total energy produced per unit length at the specified height divided by the total initial weight of uranium per unit length at that height.

2.2 The PELLET EXPOSURE shall be equal to the total energy produced per unit length of fuel rod at the specified height divided by the total initial weight of uranium per unit length of that rod at that height.

2.3 FDLRX is the ratio of the maximum LHGR calculated by the core monitoring system for each fuel bundle divided by the LHGR limit for the applicable fuel bundle type.

2.4 LHGRFACT is a multiplier applied to the LHGR limit when operating at less than 108 Mlbm/hr core flow. The LHGRFAC1 multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from core flows less than 108 Mlbmlhr.

2.5 LHGRFACp is a multiplier applied to the LHGR limit when operating at less than RATED THERMAL POWER. The LHGRFACp multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from partial power conditions.

2.6 MFLCPR is the ratio of the applicable MCPR operating limit for the applicable fuel bundle type divided by the MCPR calculated by the core monitoring system for each fuel bundle.

2.7 MAPRAT is the ratio of the maximum APLHGR calculated by the core monitoring system for each fuel bundle divided by the APLGHR limit for the applicable fuel bundle type.

2.8 OPRM is the Oscillation Power Range Monitor. The Oscillation Power Range Monitor (OPRM) will reliably detect and suppress anticipated stability related power oscillations while providing a high degree of confidence that the MCPR safety limit is not violated.

2.9 Np is the OPRM setpoint for the number of consecutive confirmations of oscillation half-cycles that will be considered evidence of a stability related power oscillation.

2.10 Sp is the OPRM trip setpoint for the peak to average OPRM signal.

2.11 Fp is the core flow, in Mlbm I hr, below which the OPRM RPS trip is activated.

SUSQUEHANNA UNIT 1 TRM/3.2-6 SLJSUEHNNAUNITI EFFECTIVE TMI32-6 DATE 111/0412015

Rev. 16 PL-NF-1 4-001 Rev. 2 Page 6 of 62 3.0 SHUTDOWN MARGIN 3.1 Technical Specification Reference Technical Specification 3.1.1 3.2 Description The SHUTDOWN MARGIN shall be equal to or greater than:

a) 0.38% Ak/k with the highest worth rod analytically determined OR b) 0.28% Ak/k with the highest worth rod determined by test Since core reactivity will vary during the cycle as a function of fuel depletion and poison burnup, Beginning of Cycle (BOG) SHUTDOWN MARGIN (SDM) tests must also account for changes in core reactivty during the cycle. Therefore, the SUM measured at BOC must be equal to or greater than the applicable requirement from either 3.2.a or 3.2.b plus an adder, "R". The adder, "R", is the difference between the calculated value of maximum core reactivity (that is, minimum 8DM) during the operating cycle and the calculated BOG core reactivity. If the value of "R" is zero (that is, BOG is the most reactivepoint in the cycle) no correction to the BOG measured value is required.

The SHUTDOWN MARGIN limits provided in 3.2a and 3.2b are applicable in MODES 1, 2, 3, 4, and 5. This includes core shuffling.

SUSQUEHANNA UNIT t TRM/3.2-7 SUSQEHANA UNTI RM/32-7 EFFECTIVE DATE 11104/2015

Rev. 16 PL-NF-14-O01 Rev. 2 Page?7 of 62 4.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) 4.1 Technical Specification Reference Technical Specification 3.2.1 4.2 Description The APLHGRs for ATRIUMT'-10 fuel shall not exceed the limit shown in Figure 4.2-1.

The APLHGR limits in Figure 4.2-1 are valid for Main Turbine Bypass Operable

SUSQUEHANNA UNIT 1 TRM/3.2-8 SUSQEHANA UNT I RM/32-8 EFFECTIVE DATE 11/04/20 15

9!

02 SSES UNIT I CYCLE 19 C

  • 16.0 C , 1111 a a I IIl

, I 1, I , 1 111III Ia' II1 1,1 , , I. . III . . la

. . ma

.a rn 1 1 1a I I a aIn 1 I II 4 i i i i i l l i ___ 1 1 1 1 a 11__

.-- I 1 I I I I I I I I I I I K I I 2 iI * - 1

  • 1I
  • l O = . I 2 z

z 1[4.0 I 1 K I 1 II I I I I-- I4 j a I --t-1 . t. I I--1I- . I l

.. l 2lI IlIIl

.. ................... l

. . . . . . . . ' 4. i. . . .

I a al U I I I I C

,IIII2, ,K,2,*,*,t*IaI*I

! IIlIt I i i l

i a a a a a t II i mi I i I 2 II! i i 1 i i I 12.0 12 5 I00 a . a: .* 5 0 ,1 . .  : ..... .. .. I I 1... I .. .2.. . ..

i ~i i ll I i i iai aii i I I I II 1 I Il l i l l l l l

/ 1 /1 1 11 l l1Il l1/ I

. . 1I .1 ._ , , . . I. I .I I  !

II

/

I I I I II ii iIa i i i i i i 1nIi 1 a1 1 0I I i iI iI 1 iI i iI i 11 liii !1 1*11I11111I1 .1 1111I 1 ,<

i 1 i i i i i i iai a i1I a . . . . . . I I a a a a a*,,. a a .a.a.a.a.a.a.a 0)

  • I IIaIaI IaI IaIaI aI al IaI a Ia l l

'-I

., ., ,*! .  !

  • I I aI a ,," ,a a l I a I I1la.lal Il laimla.!

a m I I ~ ~ a a a i l l',I al I. II l .a. "* a

    • I3l lllam K a a " *a--a-- * *: II ' Il i iii l liIa 1 a i' a l a l a1 1a1 1 a1 a g all 1 1 1 11I a aI aI I II a a n a ai i a a a Ia a I

-I',

"-1 I I I I I! l l Ii.. a ~

Cn-, aI /a ia li1 aII alal a_

a a

aal a iI__la1a1a1a1a1a l

i

.*~* _L __*.

I a a

.J aL2 tI 6.0 la la aal la

, , , ,*H , ,

aal aal I I , I , I I I.1._ 3 -

.-t

-- I mr 4.0 0 10000 20000 30000 40000 Average Planar Exposure (MWDIMTU) 50000 60000 70000 0

-* ,r-SI)

AVERAGE AVERAGE PLANAR LINEAREXPOSURE PLANAR HEAT GENERATION RATE LIMIT VERSUS

-TWO LOOP OPERATION Coz ATRIUMTM-10 FUEL C:'(D7 FIGURE 4.2-1

Rev. 18 PL-NF-14-001 Rev. 2 Page 9 of 62 5.0 .MINIMUM CRITICAL POWER RATIO (MCPR) 5.1 Technical Specification Reference Technical Specification 3.2.2, 3.3.4.1, 3.7.6, and 3.7.8 5.2 Technical Requirements Manual Reference Technical Requirements Manual 3.3.7 5.3 Description The MOPR limit is specified as a function of core power, core flow, average scram insertion time per Section 5.3 and plant equipment operability status. The MCPR limits for all fuel types (ATRIUM TM-1O) shall be the greater of the Flow-Dependent or the Power-Dependent MOPR, depending on the applicable equipment operability status.

a) Main Turbine Bypass I EOO-RPT I Backup Pressure Regulator Operable Figure 5.2-1: Flow-Dependent MCPR value determined from BOO to EDOC Figure 5.2-2: Power-Dependent MOPR value determined from BOO to EGOC b) Main Turbine Bypass lnoperable Figure 6.2-3: Flow-Dependent MCPR value determined from BOO to EDOC Figure 5.2-4: Power-Dependent MOPR value determined from BOO to EGOC c) EOC-RPT Inoperable Figure 5.2-5: Flow-Dependent MCPR value determined from BOO to EOC Figure 5.2-6: Power-Dependent MCPR value determined from BOG to EOO d) Backup Pressure Regulator Inoperable Figure 5.2-7: Flow-Dependent MCPR value determined from BOO to EDOC Figure 5.2-8: Power Dependent MCPR value determined from BOG to EDOC e) One Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 5.2-0: Flow-Dependent MCPR value determined from BOO to EGG Figure 5.2-1 O:Power-Dependent MCPR value determined from BOO to EDO SUSQUEHANNA UNIT 1 TRM/3.2-10 SUSQEHANA UITTRM3.2I EFFECTIVE 0DATE 11/04/2015

Rev. 16 PL-NF-1 4-001 Rev. 2 Page 10 of 62 The MCPR limits in Figures 5.2-1 through 5.2-10 are valid for Two Loop operation.

The MCPR limits for Single Loop operation are provided in Section 8.0.

5.4 Averauqe Scram Time Fraction Ifthe average measured scram times are greater than the Realistic Scram times listed in Table 5.3-1 then the MCPR operating limits corresponding to the Maximum Allowable Average Scram Insertion Time must be implemented. Determining MCPR operating limits based on interpolation between scram insertion times is not permitted. The evaluation of scram insertion time data, as it relates to the attached table should be performed per Reactor Engineering procedures.

SUSQUEHANNA UNIT1 TRM/3.2-11 SUSQEHANA UITTRM3.21 EFFECTIVE IDATE 11104/2015

Rev. i6 PL-NF-14-O01 Rev. 2 Page Iiof 62 Main Turbine Bypass I EOC-RPT I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 1 TRM/3.2-12 NITTR/32I 2DATE 1110412015 EFFECTIVE SUSQEHANA

C' SSES UNIT 1 CYCLE 19 C 2.2 c,

2,1 z

z 2.0 z

1.9

._E 1.8 1.7 CD k* 0.

CA 0o 1.6 <)

1.5 m 1.4 Ill C)

H 1.3 rn ci 1.2 H 30 40 50 60 70 80 90 100 110 Total Core Flow (MLBIHR)

-o "o n, I Ill (.Q0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS 1 EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE TWO LOOP OPERATION (BOC TO EOC)

FIGURE 5.2-1 * -< 0

. . .. . . . .. .... . .. ..... ...... .... .... .. . ... ... . . . . .. . . . . .. . . .... . .. ........ ,... .. .. .. .. . .. .. ,,,,,.. .. .. . . . . . ... ... .. 1... .. . . . .. . .. . .... ... . .. . . .. . . . .. . I J . .. .... . ,J , , =. .. ... .

cj SSES UNIT 1 CYCLE 19 0

z z

C z

1J H 0.

0 m

0 20 30 40 50 60 70 80 90 100 Core Power (% RATED)

"13 -O

n Ii --.

FIGURE 5.2-2

Rev. 16 PL-NF- 14-001 Rev. 2 Page 14 of 62 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT1 TRM/3.2-15 UITTRM3.2l EFFECTIVE SUSQEHANA 5DATE 1 1/04/2015

0 SSES UNIT 1 CYCLE 19 2.2 03 C

2.1 LEGENDA

MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME

-CURVE CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME z

C 2.0 z

-1 1.9 I INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 1.8 H. '1.7 0J o-01 1,6 1.5

-I"I 1.4

--- I EEENCE:_T.S. 3.7.6 and 3.2.2 ___________ __________

'1.3 m

Hr iii 1.2 30 40 50 60 70 80C I0 100 110 Total Gore Flow (MLB/H-R)

--t "D "

MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS INOPERABLE TWO LOOP OPERATION (BOC TO EOC)

FIGURE 5.2-3 ,.-4 <

Q)"*

0

CI, SSES UNIT 1 CYCLE 19 C 3.6 Ci, C

mR c

Z

-t

.E_

-H 0

$o O.

-.4

-11 "51 m

z3

-H

<m Fi 20 30 40 50 60 70 80 90 100 Core Power (% RATED)

(73 -U 51 MCPR OPERATING LIMIT VERSUS CORE POWER CD CD-

Rev. 16 PL-NF-14-001 Rev. 2 Page 17 of 62 EOC-RPT Inoperable SUSQUEHANNA UNIT 1 TRM/3,2-18 SUSQEHANA UITTRM3.2I EFFECTIVE 8DATE 11/04/2015

CD SSES UNIT 1 CYCLE 19 2.2 03 LEGEND C

m 2.1 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM

=

INSERTION TIME 2.0 CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME C

z 1.9 4. SAFETY* ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2

-H E I I IJ 1.8 L.

USED INDETER[MIN1NG MFLCPR I

-4. 1.7 0.

C0 o CD 1.6 -3.

C) 1.5

-rr 1.4

REFERENCE:

T.S. 3.3.4.1 and 3.2.2

--Il

<r m 1.3 m

1.2 30 40 50 60 70 80 90 100 110 U Total Core Flow (MLBIHR)

MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW EOC-RPT INOPERABLE *QcD TWO LOOP OPERATION (BOC TO EOC)

FIGURE 5.2-5 0""

ci SSES UNIT 1 CYCLE 19 C

I z

z z

E 0

(D 0

C) m n-I 0

H m

0 50 60 90 H* 20 30 40 Core Power (% RATED) 70 80 100 n-MCPR OPERATING LIMIT VERSUS CORE POWER *(D Z EOC-RPT INOPERABLE TWO LOOP OPERATION (BOC to EQO) O-" -1 FIGURE 5.2-8 (O1*--

Rev. 16 PL-NF-14-0O1 Rev. 2 Page 20 of 62 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 1 TRM/3.2-21 NIT TR/3.-21 DATE 11/04/2015 EFFECTIVE SUSQEHANA

SSES UNIT 1 CYCLE 19 Cn 2.2 LEGEND m

2.1 _____________ -CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME z

C 2.0 ________ -CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME z

1.9 _______ _______ - SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 1.8 I-1.7 r*o 0 A BI

10. 0, 1.6 1.5 m

"1 1.4 rri 0

IREFERENCE:

TS. 3.7.8 and 3.2.2~

1.3 I-~ { 4 1 ~~-f 108, 1.221 m 1.2 30 40 50 60 70 80 90 100 110 Total Core Flow (MVLB/HR)

"-D "-

0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE "'.)

0 o', TWO LOOP OPERATION (BOC TO EQO)

FIGURE 5.2-7 "*' <c 0 0)"

SSES UNIT I CYCLE 19 60 C

z 0,

.2

-Il CD C

-3.

0)

'i,,

100,1.35 m

20 30 40 50 60 (% RATED) 70 Core Power 80 90 100 o1 T1 T1

-L

  • Q2 Z~

MCPR OPERATING LIMIT VERSUS CORE POWER BACKUP PRESSURE REGULATOR INOPERABLE TWO LOOP OPERATION (BOO to EOC)

FIGURE 5.2-8 -,h . 0 0)' ,C

Rev. 16 PL-NE-14-001 Rev. 2 Page 23 of 62 One TSV. or TCV Closed SUSQUEHANNA UNIT 1 TRM/3.2-24 SUSQEHANA UIT ITR IS.-24 EFFECTIVE DATE 11104/2015

SSES UNIT 1 CYCLE 19 2.2 I LEGEND 2,1 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 2.0 _______

_______ -CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME

-r" 1.9 130, 1.831 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES NJ I ARE OPERABLE PER SR 3.7.5.1 AND 3.7.6.2 U' .4-1.8

  • _ USED IN DETERMINING MFLCPR E2 1.7 C., 1.6 CD 1.5 m

-I-1 1.4 m

REFERENCE:

T.S. 3.2.2 and TRM 3.3.71 0

I-4 1.3

_ _ I _ I_ _ _ _ _ _ _ _ _ _

1.2 m

30 40 50 60 70 80 90 100 110 Total Core Flow (MLBIHR) 0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW CD Z N)

ONE TSV OR TCV CLOSED*

TWO LOOP OPERATION (BOC TO EOC) - ,-<

FIGURE 5.2-9 0

  • Operatofl with one TSV or TCV closed is only supported at power levels -<75%rated power.

cj SSES UNIT 1 CYCLE 19 C

m z

C z

S 0.-

-I 0m

  • 0 CD m

-n m

m C)

-9 20 30 40 50 60 70 80

  • Core Power (% RATED)

MCPR OPERATING LIMIT VERSUS CORE POWER

FIGURE 5.2-10

Rev. 16 PL-NF-14-O01 Rev. 2 Page 26 of 62 Table 5.3-1 Average Scram Time Fraction Table For Use With Scram Time Dependent MCPR Operating Limits Control Rod Average Scram Time to Position (seconds)

Position 45 0.470 0.520 39 0.630 0.860 25 1.500 1.910 5 - oo70 3.440 Average Scram Realistic Maximum Insertion Time Allowable SUSQUEHANNA UNIT 1 SUQEAN NTITRM/3.2-27 EFFECTIVE DATE 11/0412015

1. . . .1 I * ... A... . . - -- a L.~cgaa. . .. .. * .1 L. * -- . .*... ..&. aaau I 1S a. . .... aJ L&...aa......a..n.

Rev. 16 PL-NF- 14-001 Rev. 2 Page 27 of 62 6.0 LINEAR HEAT GENERATION RA*TE (LHGR) 6.1 Technical Specification Reference Technical Specification 3.2.3, 3.3.4.1, 3.7.6, and 3.7.8 6.2 Technical Requirements Manual Reference Technical Requirements Manual 3.3.7 6.3 Description The maximum LHGR for ATRIUMTZ-I 0 fuel shall not exceed the LHGR limit determiined from Figure 6.2-1. The LHGR limit in Figure 6.2-1 is valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.

To protect against both fuel centerline melting and cladding strain during anticipated system transients initiated from reduced power and flow conditions, power and flow dependent LHGR limit multipliers are provided in the following figures:

a) Main Turbine Bypass Operable Figure 6.2-2: Flow-Dependent LHGR Uimit Multiplier Figure 6.2-3: Power-Dependent LHGR Limit Multipiier b) Main Turbine Bypass Inoperable Figure 6.2-4: Flow-Dependent LHGR Limit Multiplier Figure 6.2-5: Power-Dependent LHGR Limit Multiplier c) One Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 6.2-6: Flow-Dependent LHGR Limit Multiplier Figure 6.2-7: Power-Dependent LHGR Limit Multiplier

  • The LGHR limits and LHGR limit multipliers in Figures 6.2-1 through 6.2-7 are valid for both Two Loop and Single Loop operation.

SUSQUEHANNA UNIT 1 TRM/3.2-28 SUSQEHANA EFFECTIVE NITTRI3.-28 DATE 11/04/2015

C,)

SSES UNIT 1 CYCLE 19 C 16.0 Ii Ii II ii i iI ii ii a ili a iI l Ii i !i Co a a la a a l la l a l 0 a a

a a

a a I I I I El 11111 ' I* I I

C I  !

m lala al ala a alalala alIlal al a la aa a a a a L +/- Z .... L 1 - - .....t....J......-

= -

z '14.0 0.,3.---- f=--I--+ I 900 ,-I--S-I--..

4 ..J- REFERENCE; T.S 3.2.3 z L- i- - - I I I a a a. a . . a . .a . .a . .a . I & a 1 a a a a I a I a. I. ~ alala IaI-aI I I IaIaI l aI IaI a Ial al l lalal lala C

a[

a a

a aI la a al ia I Ia a a a ia a I alalalala I a la alaa a a a a

a la a

l n

a .a .a a l la aal . . . . 1I t. t. .1 I .. . .. . .. ..... .. .

4" z La-Ial lal la"1a1 aI 1ajj ~ I i jII !i i l 12.0 al a lala alalal aI a i l a a /aaa a a1 1 a a1 2 a . .a. a. a a a a, a a Iaf a a I a at aIa aI a a.a.a. a. a aIa a ala aIalal lii l al al l al a l 0

Cu ~II I I II Ia I I I I I Ia 1 1 11 1 11 1 ~I I Ia I aaI a I I a

I l

aaI Ia a. I a a I

al I a I I II a

H C a I l lall l la iala lalala al aialaIa a

'a" 10.0 Cu a- ta l al la a al

-- al-- aI a 4aIaa a- a- a aIaI a aI a--a a- a a-- a- a a aI IIaa a a IIaI I aa aIa a4 - I * -

0 aa a a a a a a a aia a aIa a Iaaatai i iiaa a a ,aaa a a a ,aaa aa a Il

, , CD a Ia a la a alalI a a a a a a a a a a a a a l a a a Ialal .a . .a.aa .a .a a a a a a a a a a a a Ia aIa a aI aI .a a .a.. a a N) V aI a al i lalalala a a alal aI a a1 C I l l l l l1-Ta-TaII l l I I-I I-yi rw- l l l- . . .

N) CD a a i a a lalala a la a a a a a al a

la.

a"a a

a a

a ai a a alal a

a a

a a

a a

a a

l a

ia a a l la la a

a la l

a l

a la a

l i

4-a Co 0 aI a I Ia I Ia I a a Ia a Ia a a a la a a l la l la a a al Ia a la a la a a a l 0) 0 I- 8.0 0 I I I Ill I I I a I iII Ia Il I *l lll ali C

Ial a lI ll l a 1 l i l lI l . a. al

.a. l 1 l 7 l iI al~

l l l l1l l l lal lal l lanl l l i mm I I I II I I I I I I I I I I I I I I

-I- 6.0 rn .a.. .a.. a a j , , I a , , t , ,I a a ,iI, a a I  !

H 11 11 1 1 11 1111 ai lal a all a a al a aI 1 I a I a a a C 4.0 0 10000 20000 30000 40000 50000 60000 70000 80000 H

Pellet Exposure (MWDIMTU) rr T-0 "

-I- UNEAR HEAT GENERATION RATETMLIMIT VERSUS PELLET EXPOSURE ATRIUM -10 FUEL FIGURE 6.2-1 Oco a-0")' 0

Rev. 16 PL-NF-'I4-001 Rev. 2 Page 29 of 62 Main Turbine Bypass Operable SUSQUEHANNA UNIT 1 TRM/3.2-30 SUSQEHANA NITTR/3.-30 DATE 11/04/2015 EFFECTIVE

C,,

SSES UNIT 1 CYCLE 19 Co 1.10 1.00 z

z 0.90

-I--

0.80

-I ._1

('3 0.70 a, <D

('3

._)

0.60 0,50

-n r-n m 0.40 m

0.30

-I 30 40 50 60 70 80 90 100 110 m: Total Core Flow (MLB/hr)

0) FLOW DEPENDENT LHGR LIMIT MULTIPLIER NJ MAIN TURBINE BYPASS OPERABLE (03 ATRIUMT*-10 FUEL FIGURE 8.2-2

SSES UNIT 1 CYCLE 19 1.10 L I & "" 'U"' ........... * " '

  • m L 4 4 *
  • A A i C

m3 LEGEND

.. " ' '

  • t I " I I i

I ii Fji o T ---- ,-------~.------.I-------, 9 CURVE A: BASE CURVE 1.00 CURVE B: CORE POWER __26% AND CORE FLOW <_.0 MLBM1HR

  • I TI rS I 1 31 1 --- I - . ..- j. a .I - * -- -

0.90 I I I I a I i I I

"-I II l l* i I [ aI I li l i k I I

I

.1_J IIS

_ _ J. _

I

. 1 IJ  ;

1 _1 J LI z

I--

0.80 I I I I I 1 1 5 I I I I I 1 I I I I I

,.I I l ARE OPRAL PE SR ANI37lI...

0.70 . . ..._

  • 1*. 1. * * ._ ._ . . . . . . . . .

C) /II I I 1 I ___ _ _ ___ ___ __ ___ ___ _

1_-

H 0.

0 0.60

__..,. . IL.__J._.I * ..- 1 REOERABENCE: TSR 3.2.3,1 3.A4N 3.7.6 an 8 I I

iH i _ 1i_

/

0.50 -

03 iL I yr i I" '-- "" ' "- -  ! . .. .... .. . . .. .-. -- - '- - -l . - - * - * -  ; ' .. . .

l 26 04 N,3 0.40 23 I -" -

0.0.

I I...

II -'-I....

I

.. F - I-'

, ~l, I-

  • I I * --I - - - - -l-I

, , I

-- - It - -

3I - *

/ - f - I- -

I ,

-I - d - -

i I I I I I I I I I I I

! ,, IJ, J I I I I I r I I I I I I I - 3 I I 0 0.30 I I II I r I I 1 2,0 30 40 50 Core Power 60 (% RATED) 70 80 90 100 POWER DEPENDENT LHGR LIMIT MULTIPLIER MAIN TURBINE BYPASS OPERABLE o ,z AT*iUMTM-10 FUEL FIGURE 6.2-3

Rev. 16 PL-NF-14-O01 Rev. 2 Page 32 of 62 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT I TRM/3.2-33 SUSQEHANA NITTR/3.-33 DATE 11t10412015 EFFECTIVE

SSES UNIT 1 CYCLE 19 Co 1.10 I

z 1.00 C:

Z 0.90 0.

0.80

.-I "-J C;, ._ 0.70 C;o 0,

C),. 0) 03 0.60 0o Ct 0.50 m

C)

-H m1 0.40 0

H-1 m] 0.30 30 40 50 60 Total Core Flow 70 80 90 100 110 (MLB/HR)

"0 "-

nD FLOW DEPENDENT LHGR LIMIT MULTIPLIER C.D z MAIN TURBINE BYPASS INOPERABLE 01 ATRIUMTMea-t FUEL -Il 0O FIGURE 6.2-4 0

CO, SSES UNIT 1 CYCLE 19 C 1.10 03 m

=

z z

C z

a..

.5.

.5 0

--I -I a,

1'3 a, oD 0

I..

a) 0 0.

m m

0

.-I m

0 4> 20 30 40 50 60 (% RATED) 70 Core Power 80 90 100

--I, 01" POWER DEPENDENT LH-GR LIMIT MULTIPLIER MAIN TURBINE BYPASS INOPERABLE Co C? ATRIUMTM.-10 FUEL FIGURE 6.2-,5 0"C*

Rev. 16 PL-NF-14-00l Rev. 2 Page 35 of 62 One TSV or TCV Closed SUSQUEHANNA UNIT 1 TRM/3.2-36 NITTR/3.-36DATE 11/04/2015 EFFECTIVE SUSQEHANA

0 O SSES UNIT 1 CYCLE 19 1.10 C

i"1 1.00 C

z 0.90 a,

-H1 0.80

-_J 0.70 CD CD

",4 0.60 U..

0.50

-T1

-IT 0.40 m

m 0.30 0 30 40 50 60 Total Core 70Flow (MLB/hr) 80 90 100 110 rl3 FLOW DEPENDENT LHGR LIMIT MULTIPLIER 0 ONE TSV OR TCV CLOSED* 0-" 0 ATRIUMTM-t10 FUEL D' I, -=

FIGURE 6.2-6

  • Operation with one TSV or TCV closed is only supported at power [evels
  • 75% rated power.

n ,, n

C',

SSES UNIT 1 CYCLE 19 C

03 m

C z

13

{.i

--I ,-J

.1_

C,)

0 cc 0L 0) mT "rn ml 0

m1 H3 20 30 40 50 (% RATED)

Core Power 60 70 80 rn

-I POWER DEPENDENT LHGR LIMIT MULTIPLIER CD Z ONE TSV OR TCV CLOSED ATRIUMTM-10 FUEL *i-- n FIGURE 6,2-7 c0*

Rev. 16 PL-NF-14-OO1 Rev. 2 Page 38 of 82 7.0 ROD BLOCK MONITOR (RBM SETFOINTS AND OPERABILITY REQUIREMENTS 7.1 Technical Specification Reference Technical Specification 3.3.2.1 7.2 Description The RBM Allowable Value and Trip Setpoints for; a) Low Power Range Setpoint, b) intermediate Power Range Setpoint, c) High Power Range Setpoint, d) Low Power Range - Upscale, e) Intermediate Power Range - Upscale, and I) High Power Range - Upscale shall be established as specified in Table 7.2-1. The RBM setpoints are valid for Two Loop and Single Loop Operation, Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.

The RBM system design objective is to block erroneous control rod withdrawal initiated by the operator before fuel design limits are violated. Ifthe full withdrawal of any control rod would not violate a fuel design limit, then the RBM system is not required to be operable. Table 7.2-2 provides RBM system operability requirements to ensure that fuel design limits are not violated.

SUSQUEHANNA UNIT 1 TRM/3.2-39 NITTRIS.-39 DATE 11/04/2015 SUSQEHANA EFFECTIVE

Rev. 16 PL-NF-14-001 Rev. 2 Page 39 of 62 Table 7.2-I RBM Setpoints Allowable Nominal Trip Function Value( 1 ) Setpoint Low Power Range Setpoint 28.0 24.9 Intermediate Power Range Setpoint 63.0 61.0 High Power Range Setpoint 83.0 81.0 Low Power Range - Upscale 123.4 123.0 Intermediate Power Range - Upscale 117.4 117.0 High Power Range - Upscale 107.6 107.2 (1) Power setpoint function (Low, Intermediate, and High Power Range Setpoints) determined in percent of RATED THERMAL POWER. Upscale trip setpoint function (Low, Intermediate, and High Power Range - Upscale) determined in percent of reference level.

Table 7.2-2 RBM System Operability Requirements Thermal Power MCPR (2.3)

(% of Rated)

> 28 andc<90 < 1.76

~90 and <95 <1.47

>_95 < 1.70 (2) Applicable to Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.

(3 Applicable to both Two Loop and Single Loop Operation.

SUSQUEHANNA UN]T 1 TRMI3.2-40 SUSQEHANA NITTRI3.-40 DATE 11/04/201 5 EFFECTIVE

Rev. 18 PL-NF-1 4-001 Rev. 2 Page 40 of 62 8.0 REGIRCULATION LOOPS - SINGLE LOOP OPERATION 8.1 Technical Specification Reference Technical Specification 3.2.1, 3.2.2, 3.2.3, 3.3.4,1, 3.4.1,3.7.6, and 3.7.8 8.2 Technical Req~uirements Manual Reference Technical Requirements Manual 3.3.7 8.3 Description APLHGR The APLHGR limit for ATRlUMTM-I 0 fuel shall be equal to the APLHGR Limit from Figure 8.2-1.

The APLHGR limits in Figure 8.2-1 are valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Single Loop operation.

Minimum Critical Power Ratio Limit-The MCPR limit is specified as a function of core power, core flow, and plant equipment operability status. The MCPR limits for all fuel types (ATRIUM TM-10) shall be the greater of the Flow-Dependent or the Power-Dependent MCPR, depending on the applicable equipment operability status.

a) Main Turbine Bypass I EOC-RPT / Backup Pressure Regulator Operable Figure 8.2-2: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-3: Power-Dependent MCPR value determined from BOC to EOC b) Main Turbine Bypass [noperable Figure 8.2-4: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-5: Power-Dependent MCPR value determined from BOC to IEOC c) EOC-RPT Inoperable Figure 8.2-6: Flow-Dependent MCPR value determined from BOG to EOC Figure 8.2-7: Power-Dependent MCPR value determined from BOC to EOC SUSQUEHANNA UNIT 1 TRMI3.2-41 NIT TRI3.-41EFFECTIVE SUSQEHANA DATE 11/04/2015

Rev. 18 PL-NF-14-OO1 Rev. 2 Page 4l of 62 d) Backup Pressure Regulator Inoperable Figure 8.2-8: Flow-Dependent MCPR value determined from BOO to EGOC Figure 8.2-9: Power-Dependent MCPR value determined from BOO to EDO e) One Turbine Stop Valve (TSV) or Turbine Control Valve (TCV) Closed Figure 8.2-1O:Flow-Dependent MOPR value determined from BOO to EDO Figure 8.2-11 :Power-Dependent MOPR value determined from BOO to EOC The MOPR limits in Figures 8.2-2 through 8.2-1 1 are valid only for Single Loop operation.

Linear Heat Generation Rate Limit The LHGR limits for Single Loop Operation are defined in Section 6.0.

RBM Setpoints andOperabilityRequirem~ents The RBM setpoints and operability requirements for Single Loop Operation are defined in Section 7.0.

SUSQUEHANNA UNIT 1 TRM/3.2-42 NITTRI3.-42 DATE 1110412015 EFFECTIVE SUSQEHANA

C 16.0 T T T r T ~ T ~ u 1 1 ~ I r QI I I ' I I l Il l t I I la 1 l l 9 i0 1 '

I E lI I I Ii l l l llI lI l

z. 1. .1. II .11 .. II1lIti1 1 I, i I s I i I r I,.i m i . m m m ii.m n l4...4 mm~~u mm.4.*"

I11I 1 I I Ii lIlC Il IlIII1I I1I1 l i l 1 Il l l ~l t l I! ~ l l l O l 1 1 I I I l I I I I Ii ~ll I I l1 1 1I tltitjilt SED IND*ERINIG0

  • -- J- I---. ii! I I-I.-- -- I-- j--i-..J..-,Lf lf...f I I1 1'I II£ I Ii 1 I I

I I I

1 I1 I1 1 1 1 1 I* I I 1 I IIlli I l II l I I I I I 0l3l l l l l l l I 1 1

= *oo , Ioo I IO ll .I , II I II I, 1I I I I I I I I I I I l l3 l I [ II II IIII l Il l lI I 1 1 1 I mI.._1111l1 I I lllll1 :11! l111 l1!. 1 l11l Iiii II  ! II 11 11 lll ll l Il I ll HI I I I I , l l l l I ,

I I I I I" I l l II I l l~ll

,I l li

, , I l l l:l I

l1 1

l l l 67000,5.6 l

1o 1 11 1111 1 Il liIljlIlIIIIIl l l ll II l l l Illl I l l I I Il l 4.0 L U' i41-- LI4l2 M - -L -- ~L- AJ-J L..L

........... ... -- , I , ,. , I 0.0 l1000. l 2000.0 ll 000. 4000.08000.06000.07000.

-L~l l l l l l l lI l l i l l Averag PlanalEpour MWIMTU)l o = a l l l l l l l l2l l l i t l l A ' I I I I l * . . Ca AVRAEPLNR INA HA GENERATION RAELMITlERSUtll o AERAE PANA EPOSRE..SIGL.LOP.OERAIO ATRIUMTMAOll FUELll l l owlll FIGURE 8.2-1ll l l l l l l lI I

...... , , J2J***

..... . . . .. . .. .... .....*.. ....................... . ..... ..... ..... .......... ... * . .... .......... ... ... ................. ...... ................... ......... ....... . ..... . .. .. r*, i, . ... .. ... . .. ... .... .. .

Rev. 16 PL-NF.-14-001 Rev. 2 Page 43 of 62 Main Turbine Bypass I EOC-RPT/I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 1 TRM/3.2-44 UITTRM3.2-44 SUSQEHANA EFFECTIVE DATE 11/0412.015

9 SSES UNIT 1 CYCLE 19 3.6 I I I LEGEND m 3.4 4. a- CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM z INSERTION TIME z 3.2 + I 4-C CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME z

3.0 t 1--i.

m I II II . . I H0 4-.

D.1 o~

2.8 2.6 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES L

ARE OPERABLE PER SR 3.7.6.t AND 3.7.6.2 I I Ii USED INDETERMINING MFLCPR K

0, 2.4 0

2.2 2.0 i'1

-m '.8 rI,

REFERENCE:

" T.S. 3.4.1 and 3.2.21 108, 1.49' 1.6 H

-m 0 '1.4 1N1 70 80 90 100 110 0 30 40 50 60 Total Core Flow (MLB/HR)

MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW Co MAIN TURBINE BYPASS 1 EOC-RPT / BACKUP PRESSURE REGULATOR OPERABLE SINGLE LOOP OPERATION (BOC to EOC)

FIGURE 8.2-2

9 0 SSES UNIT I CYCLE 19 4.6 o0 4.4 ___ LEGEND 4.2

________CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM

____INSERTION TIME z 4.0 ____________CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME

~-CURVE C: CORE POWER _<26% AND coRE FLOW

  • 50 MLBM/HR 3.6 S 3.4

--fl!SAFETY ANALYSES ASSUME THAT F~OUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.2 Ho 03 3.0 _____USED IN DETERMINING MFLCPR 1.

N)

CD 0 2.8 0);

0) 2.6 2.4 2.2 f 140. 2.08!

,4 0A-B-BT*

4 -.-------- ~ I "t100, '

2.0 F *, ... .. . .. .

-Iil m

t 1.8 0 REEEC: T.S. 3.4.1 and 3.2.2 "Z 1.6 Hr o 1.4 20 100 mn 2040 50co 60*( RAE70 80 90 "0 "

MCPR OPERATING LIMIT VERSUS CORE POWER CD MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE SINGLE LOOP OPERATION (BOC to EOC)

FIGURE 8.2-3 °< I

"* O 0)' C

Rev. 16 PL-NF-14-OO1 Rev. 2 Page 46 of 62 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT1 TRM/3.2-47 SUSQEHANA NITTR/3.-47 DATE 1110412015 EFFECTIVE

C' SSES UNIT 1 CYCLE 19 4.2 I I II C-

________ ________ LEGEND 4.0 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM 3.8 - INSERTION TIME z

z

________________CURVE B: REALISTIC AVERAGE SCRAM iNSERTiON TIME 3.6 z

3.4

- SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS -

,4D 3.2 VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 o* 3.0 H0 0

CD co3 0) 2.4.

2.2 m 2.0 "I1 m .

1.8 -1

REFERENCE:

T.S. 3.4.1, 3.7.6,, and22 -- _,118 0

m 1.6 _ _ _ _ _I _ _ _-_-_-_

1.4 m

30 40 50 60 Total Core 70 80 90 t00 110 Flow (MLB/HR) 0 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW CD Z

-J. MAIN TURBINE BYPASS INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)

FIGURE 8,2-4 0 o)"

C, SSES UNIT I CYCLE 19 4.2 123,4A41 * =* *l "1 I " m l C-Cin I LEGEND 4.0 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM F INSERTION TIME z 3.8 z CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME

~, 3,61 ____________ 4-Z

-I 3.6 CURVE C: CORE POWER_*26% AND CORE F~LOW _<50 MLBMIHR

.t-l 3.4 I m

.1.a 1I~Z~38 I--.*- 4. I-I E

-I Cu 3.2 ISAFETY VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6,2 ANALYSES ASSUME THAT TWO OR MORE BYPASS w 3.0 USED IN DETERMINING MFLCPR I-0.

1~oi C~) 0

.41 CD N)

a. 2.8 CO 0 ______ _ ________ 0) 2.6 2.4 2,2 m

2.0 0r

REFERENCE:

T.S. ,3.4.1, 3.7.6, and 3.2.2 ..

-I 1.8 20 30 40 6060 Power (%o o70RATED) 80 90 100 50Core "0 "T CD MCPR OPERATING LIMIT VERSUS CORE POWER Com I N) MAIN TURBINE BYPASS INOPERABLE .CD SINGLE LOOP OPERATION (BOC to EOC)

FIGURE 8,2-5 ow.

h. h< .-

Rev. 16 PL-NF-14-O0l Rev. 2 Page 49 of 62 EOC-RPT Inoperable SUSQUEHANNA UNIT 1 TRM/3.2-50 SUSQEHANA NIT TR/3.-5OEFFECTIVE DATE 11/0412015

p SSES UNIT 1 CYCLE 19 4.0 LEGEND m 3.8 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM~

z 3.6 ________________INSERTION TIME z

C CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 3.4 z

3,2 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVESl E 3.0 - ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2

,U

-1 I-2,8 USED IN DETERMINING MFLCPR 4,

0.

2.6 0

N, 0I 2.4 0) 2.2 2.0 m 1.8 0

REFERENCE:

T.S 3..,.341 and 3.2.2 _ "_-_-_-[_08t" 1.6 1.4 m 30 40 50 60 70 80 9t0 100 110 Total Core Flow (MLB/HR)

SINGLE LOOP OPERATION (BOC to EOC)

FIGURE 8.2-6

C*

SSES UNIT 1 CYCLE 19 Cb 0*

z

.-I C.'

CD C.,

N)

C,' 0)

'-I"1

['11

-IT m

1-1 20 30 40 5060 Power' (% RATED) 70 80Core 80 90 100 m -U -D MCPR OPERATING LIMIT VERSUS CORE POWER Co z EOC-RPT INOPERABLE 0,-

SINGLE LOOP OPERATION (BOC to EOC) ,C FIGURE 8.2-7 ow' 0

Rev. 15 PL-NF-14-OO1 Rev. 2 Page 52 of 62 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 1 TRM/3.2-53 SUSQEHANA NITTRIS.-53 DATE 11/04/2016 EFFECTIVE

C',

SSES UNIT I CYCLE 19 CO 4.0 I I I I m 3.8

  • MAXIMUM ALLOWABLE AVERAGE SCRAM z

3.6 INSERTION TIME V

I .

C I: REALISTIC AVERAGE SCRAM INSERTION TIME z 3.4 4 4.-

3.2 f , , .. ,I.,,.I,, I , " "

S C

3.0 2,8 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR 2

H* C) a.

0 2,6 CD 0~

C, 2.4 2,2 2.0 r-n

-n' rni 1.8 A-

__---_ _ _ ___ __ B

REFERENCE:

T.S. 3.4.1, 3.7.8, and 3.2.2[ ____.__ .. _. _ _ .J._108, 1.48 1.6 m

1,4 30 40 50 60 70 80 90 100 110 Total Core Flow (MLBJHR) w r 0*

MOPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE 01 SINGLE LOOP OPERATION (BOC to EGOC)

FIGURE 8.2-8 0O" 0

' I * . ...... .... ....... ".............. ... ...... . ... . .. ... . . . ............ ...... .............. ......................... ................. ................. .. .. * .. . . =. . ... * " *LZ*:* I* *,.,. L*** ............ .....

CD SSES UNIT 1 CYCLE 19 C " 'I-0*

C 4.4 ---- LEGEND m UM ALLOWABLE AVERAGE SCRAM

-i- 4.2 CURVE A: MAXIM z ____

___ ___INSERi nION TIME z

C 4.0 CURVE B: REALI*

STIC AVERAGE SCRAM INSERTION TiME 3._____,_.__1CURVE C: CORE POWER < 26% AND CORE FLOW < 60 MLBMIHR I

I I rY ANALYSES ASSUME THAT FOUR BYPASS VALVES l---

ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.0 26.01, 2.90 E

USED IN DETERMINING MFLCPR CD 0.= 2.6 A *1*

0)

O- 60, 2.18 U* 4 4 1100 "

2.2 1 m

2.0 m

1.8

REFERENCE:

T.S. 3.4.1, 3.7.8, and 3.2.2J11ii 1.4

.-I 20 30 40 60 ... ... 60 ... .. .. 70 80 90 100 m uore r'ower rio KAIi )uJ MCPR OPERATING LIMIT VERSUS CORE POWER CD J\) BACKUP PRESSURE REGULATOR INOPERABLE "11 0J SINGLE LOOP OPERATION (BOO to EOC)

FIGURE 8.2-9 (:I' .Q DO O--

Rev. 16 PL-NF-14-001 Rev. 2 Page 55 of 62 One TSV or TCV CloSed SUSQUEHANNA UNIT 1 TRM/3.2-56 NITTR/3.-56 DATE 11/04/2015 EFFECTIVE SUSQEHANA

S SSES UNIT 1 CYCLE 19 3,6 0o C

-i- 3.4 z

z 3.2 z

3.0 2.8 E

0.

2.6

-*1 2.4 k* *0 0-C, 2.2 2.0 rri "11 1.8 m

1.6 m

1.4 r'ri 110 30 40 50 60 70 80 90 100 Total Core Flow (MLB/HR)

C 0* MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW o ,-n ONE TSV OR TCV CLOSED*

cj SINGLE LOOP OPERATION (BOC to EOC)

FIGURE 8.2-10 o~

1'r%-h*

  • Operation with one TSV or TCV closed is only supported at power levels -<75% rated power.

0 oi)

SSES UNIT 1 CYCLE 19 4.6I I I I 4.4 LEGEND m

4.2 ______ CURVE *: MAXIMUM ALLOWABLE AVERAGE SCRAM z INSERTION TIME z 4.0 CURVE E3: REALISTIC AVERAGE SCRAM INSERTION TIME C

z 23 .61 23,3.7 CURVE c.: CORE POWER < 26% AND CORE FLOW < 50 MLBM/HR 3.6

"* 26, 3.56-"

C......SAFETY ANALYSES ASSUMEtt THAT FOUR BYPASS VALVES t 3.4 26,C 3.33 ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.2

-- ___________USED IN DETERMINING MFLCPR 3.0 C,i CJ1 2.8 CD 0) 2.6

___ _ _ __ _ _ _ __ _ _ _ _6,19 2.4 2.2 _________ 6.01, 2.40_____ _________ - 519 2.0 n

1.8 1.6 m

1.4 20 30 40 50 60 70 80 Core Power (%RATED)

-0 7ci MCPR OPERATING LIMIT VERSUS CORE POWER w"I-ONE TSV OR TCV CLOSED 01 SINGLE LOOP OPERATION (BOC to EOC)

FIGURE 8.2-11 0)'

  • i jq L. . ... *....... . . ..... . ... . . .......... . . .. .......... ........ T.. .. ............. .... ...... * * * * * ... ... .... -:-.!

.. ... .=

Rev. 16 PL-NF-14-OO1 Rev. 2 Page 58 of 62 9.0 POWERI/FLOW MAP 9.1 Technical Specification Reference Technical Specification 3.3.1.1 9.2 Description Monitor reactor conditions to maintain THERMAL POWER / core flow outside of Stability Regions I and II of the Power/IFlow map, Figure 9.1.

Ifthe OPRM Instrumentation is OPERABLE per TS 3.3.1.1, Region I of the Power! Flow map is considered an immediate exit region.

If the OPRM Instrumentation is inoperable perT"S 3.3.1.1, Region I of the Power!

Flow map is considered an immediate sca region.

Region Ilof the Power!/Flow map is considered an immediate exit region regardless of the operability of the OPRM Instrumentation.

SUSQUEHANNA UNIT1 TRM/3.2-59 SUSQEHANA NITTR/3.-59 DATE 11104/2015 EFFECTIVE

Rev. 16 PL-NF-14-O01 Rev. 2 Page 59 of 62 120

Purpose:

  • 120 110*

InitialI/Date: " I 1100 100 9o. 90 80 70 L.

60 0

fi-50 40 If 30 201 10

-H-I-I-4--]l- 0*-

0 10 20 30 40 50 50 70 80 90 100 110 Total Core Flow (Mlbmlhr)

(for SLO <75% Pump Speed Use Form GO-100-009-2)

Figure 9.1 SSES Unit 1 Cycle 19 Power/IFlow Map SUSQUEHANNA UNIT 1 TRM/3.2-60 SUSQEHANA NITTR/3.-60 DATE 11104/2015 EFFECTIVE

Rev. 16 PL-NF-14-001 Rev. 2 Page 60 of 62 10.0 OPRM SETPOINTS 10.1 Technical Specification Reference Technical Specification 3.3.1.1 10.2 Description Setpoints for the OPRM Instrumentation are established that will reliably detect and suppress anticipated stability related power oscillations while providing a high degree of confidence that the MCPR Safety limit is not violated. The setpoints are described in Section 2.0 and are fisted below:

SF = 1.11 Np = 15 Fp = 60OMlbm /hr SUSQUEHANNA UNIT ! TRM/3.2-61 UNT SUSQEHANA DATE 11/04/20 15 I RM/32-61EFFECTIVE

Rev. 16 PL-NF-14-001 Rev. 2 Page 61 of 82

11.0 REFERENCES

11.1 The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:

1. XN-NF-81-58(P)(A), Revision 2 and Supplements I and 2, "RQDEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model," Exxon Nuclear Company, March 1984.
2. EMF-2361 (P)(A), Revision 0, "EXEM BWR-2000 ECCS Evaluation Model,"

Framatome ANP, May 2001.

3. EMF-2292(P)(A), Revision 0, "ATRlUMW-10: Appendix K Spray Heat Transfer Coefficients," Siemens Power Corporation, September 2000.
4. XN-NF-84-105(P)(A), Volume 1 and Volume I Supplements 1 and 2, lJXCOBRA-T: A Computer Code for BWR Transient Thermal-Hydraulic Core Analysis," Exxon Nuclear Company, February 1987.
5. XN-NF-80-19(P)(A), Volume 1 and Supplements I and 2, "Exxon Nuclear Methodology for Boiling Water Reactors: Neutronic Methods for Design and Analysis," Exxon Nuclear Company, March 1983.
6. XN-NF-80-19(P)(A), Volumes 2, 2A, 2B, and 2C "Exxon Nuclear Methodology for Boiling Water Reactors: EXEM BWR ECCS Evaluation Model, t' Exxon Nuclear Company, September 1982.
7. XN-NF-80-19(P)(A), Volume 3 Revision 2 "Exxon Nuclear Methodology for Boiling Water Reactors Thermex: Thermal Limits Methodology Summary Description," Exxon Nuclear Company, January 1987.
8. XN-NF-80-1 9(P)(A), Volume 4, Revision 1, "Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads," Exxon Nuclear Company, June 1986.
9. XN-NF-85-67(P)(A), Revision 1, "Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel," Exxon Nuclear Company, Inc.,

September 1986.

10. ANF-524(P)(A), Revision 2 and Supplements 1 and 2, "Advanced Nuclear Fuels Corporation Critical Power Methodology for Boiling Water Reactors1 "

November 1990.

11. NE-092-001A, Revision 1, "Licensing Topical Report for Power Uprate With increased Core Flow," Pennsylvania Power & Light Company, December 1992 and NRC SER (November 30, 1993).
12. ANF-89-98(P)(A) Revision 1 and Supplement 1, "Generic Mechanical Design Criteria for BWR Fuel Designs," Advanced Nuclear Fuels Corporation, May 1995.

SUSQUEHANNA UNiT1 TRM/3.2-62 EFFECTIVE DATE 11/04/2015

Rev. 16 PL-NF-14-001 Rev. 2 Page 62 of 62

13. EMF-22O9(P)(A), Revision 3, "SPCB Critical Power Correlation," AREVA NP, September 2009.
14. EMF-85-74(P)(A), Revision 0, Supplement 1(P)(A) and Supplement 2(P)(A),

"RQDEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model,"

Siemens Power Corporation, February 1998.

15. EMF-2168(P)(A), Revision 0, "Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASMO-4/Microburn-B2," Siemens Power Corporation, October 1999.
16. EMF-CC-074(P)(A), Volume 4, Revision 0, "BWR Stability Analysis -

Assessment of STAiF with Input from MICROBURN-B2," Siemens Power Corporation, August 2000.

17. NEDO-32465-A, "BWROG Reactor Core Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications," August 1996.
18. ANF-913(P)(A), Volume t Revision I and Volume I Supplements 2, 3, and 4, "COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses," Advanced Nuclear Fuels Corporation, August 1990.
19. ANF-1 358(P)(A), Revision 3, "The Loss of Feedwater Heating Transient in Boiling Water Reactors," Framatome ANP, September 2005.

SUSQUEHANNA UNIT1 TRM/3.2-63 SUSQEHANA EFFECTIVE NITTR/3.-63 DATE 11/04/2015

Main Turbine Overspeed Protection System Rev. 2 3.3.7 3.3 Instrumentation 3.3.7 Main Turbine Overspeed Protection System TRO 3.3.7 One Main Turbine Overspeed Protection System shall be OPERABLE.

APPLICABILITY: MODES I and 2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Two of eight stop valves A.1.1 Close one of the inoperable 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and control valves valves.

inoperable.

AND A.1 .2 Limit THERMAL POWER 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> following

< 75% RTP. closure of the inoperable valve AND A.1.3 Apply the following limits for a 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> following closed Turbine Stop Valve or closure of the Turbine Control Valve as inoperable valve specified in the COLR:

a. LCO 3.2.2, 'MINIMUM CRITICAL POWER RATIO (MCPR),"
b. LCO 3.2.3, 'LINEAR HEAT GENERATION RATE (LHGR)."

OR A.2 Isolate main turbine from the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> steam supply.

(continued)

SUSQUEHANNA-UNIT1 TRM / 3.3-17 SUSQEHANA-UITITRM 3.-17EFFECTIVE DATE 11/04/2015

Main Turbine Overspeed Protection System Rev. 2 3.3.7 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. Two of twelve intercept B.1 Close either the intercept 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> valves and intermediate valve or the intermediate stop stop valves inoperable, valve within one of the affected combined intermediate valves.

OR 8.2 Isolate main turbine from the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> steam supply.

C. Turbine Overspeed C.1 Isolate main turbine from the 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Protection System steam supply.

inoperable for reasons other than Condition A or B.

SUSQUEHANNA-UNIT1 TRM / 3.3-17a SUSQEHANA

-UNI I RM DATE 11/04/2015 I3.317aEFFECTIVE

Main Turbine Overspeed Protection System Rev. 2 3.3.7 TECHNICAL REQUIREMENT SURVEILLANCE


~NOTE---- --------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the redundant overspeed trip device is OPERABLE.

SURVEILLANCE FREQUENCY

-- NOTE--..........----......

The provisions of TRS 3.0.4 are not applicable TRS 3.3.7.1 Cycle each high pressure turbine control valve from the 92 days running position and observe valve closure.

-- -- NOTE--...............................

The provisions of TRS 3.0.4 are not applicable TRS 3.3.7.2 Cycle each low pressure turbine combined intermediate 92 days valve from the running position and observe valve closure.

NOTE---------------------.....

The provisions of TRS 3.0.4 are not applicable TRS 3.3.7.3 Cycle each high pressure turbine stop valves from the 92 days running position and observe valve closure.

TRS 3.3.7.4 Perform a CHANNEL CALIBRATION of main turbine 24 months overspeed protection instrumentation.

TRS 3.3.7.5 Disassemble one of each type valve identified in 40 months on a TRS 3.3.7.1, TRS 3.3.7.2, and TRS 3.3.7.3, perform a STAGGERED TEST visual and surface inspection of valve seats, disks and BASIS stems and verify no unacceptable flaws or corrosion.

SUSQUEHANNA-UNIT1 TRM / 3.3-18 SUSQEHANA UNT I RM3.-18EFFECTIVE DATE 10/31/2007

Main Turbine Overspeed Protection System Rev. 2 B 3.3.7 B 3.3.7 Main Turbine Overspeed Protection System BASES TRO The Main Turbine Overspeed Protection System is designed to protect the main turbine from excessive overspeed by initiating a turbine trip by fast closure of the turbine control valves and closure of the intercept valves to essentially secure all steam flow to the turbine (Ref. 1).

To protect the turbine generator from overspeed conditions, two trip devices are provided. Either device, when initiated, will close the main stop valves, control valves, and combined intermediate valves thus isolating the turbine (Ref. 2).

These two trip devices are as follows:

  • A mechanical overspeed trip which is initiated ifthe turbine speed reaches approximately 10% above rated speed, and o An electrical overspeed trip which serves as a backup to the mechanical trip and is initiated at approximately 12% above rated speed.

OPERABILITY of at least I of the 2 overspeed protection systems is required for the Turbine Overspeed Protection System to be considered OPERABLE.

Main Turbine Overspeed Protection System (MTOPS) OPERABILITY is also based upon the ability of the valves that control steam flow to the turbine to close following the receipt of a closure signal. The 4 stop valves, 4 control valves, 6 intermediate stop valves, and 6 intercept valves make up a system of 20 valves. A single failure to any one of the above system of 20 valves will not prevent a turbine trip (Ref. 2). Hence, if 19 of the 20 noted valves are OPERABLE, the MTOPS is OPERABLE. Note that for this statement to be true, the intermediate stop valves and intercept valves are considered separate valves. Overspeed protection is only disabled on a CIV failure if both valves within a CIV are inoperable. Failure of only one valve in a CIV does not prevent an overspeed trip, and does not affect operability. Actions to close one inoperable valve if two valves are inoperable maintain the unit within the analysis in Ref. 2. However, redundancy is reduced and repairs should be completed in accordance with the corrective action program.

Excessive turbine overspeed could generate potentially damaging missiles that could present a personnel and equipment hazard. MTOPS is not necessary to provide adequate protection of the public health and safety and is not required to obviate the possibility of an abnormal situation or event giving rise to an immediate threat to the public health and safety.

(continued)

SUSQUEHANNA - UNIT 1 TRM / B 3.3-14 SUSQEHANA

-UNI I TM

/BDATE 3.-14EFFECTIVE 06/25/2002

Main Turbine Overspeed Protection System Rev. 2 B 3.3.7 B 3.3.7 Main Turbine Overspeed Protection System BASES (continued)

ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.

A.1.l, A.1.2, A.1.3 and A.2 If two of eight stop valves and control valves are inoperable, action must be taken to restore at least one of the valves to OPERABLE status in 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

This action ensures steam isolation to the turbine in the event of an overspeed condition, and maintains the unit within the bounds of the FSAR analysis. The 72-hour Completion Time provides a reasonable time to troubleshoot the problem, make repairs, and reduce power in an orderly manner if required without challenging plant systems. The required action if the problem is not resolved is to close one of the inoperable valves, or to isolate the main turbine from the steam supply. If one of the inoperable valves is closed, then limit thermal power to less than or equal to 75% of rated power, and apply Minimum Critical Power Ratio (MCPR) and Linear Heat Generation Rate (LHGR) limits as specified in the COLR within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Restricting thermal power to less than or equal to 75% of rated power eliminates possible shock loads to the turbine blades that could occur from a non-uniform circumferential steam flow distribution entering the HP turbine for this configuration. If the MCPR and LHGR limits are not in compliance with the applicable requirements at the end of this period, the ACTIONS required by the applicable specifications must be implemented.

This time is provided to stabilize operation with a closed Turbine Stop Valve or Turbine Control Valve.

B.1 and B.2 If two of twelve intercept valves and intermediate stop valves are inoperable, action must be taken to restore at least one of these valves to OPERABLE status in 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. This action ensures steam isolation to the turbine in the event of an overspeed condition. The 72-hour Completion Time provides a reasonable time to troubleshoot the problem, make repairs, and reduce power in an orderly manner ifrequired without challenging plant systems.

The required action ifthe problem is not resolved is to close either the intercept valve or the intermediate stop valve within one of the affected combined intermediate valves, or to isolate the main turbine from the steam supply.

(continued)

SUSQUEHANNA-UNIT1 TRM / B 3.3-14a SUSQEHANA-NITI TR

/ 3.314aEFFECTIVE DATE 11/04/2015

Main Turbine Overspeed Protection System Rev. 2 B 3.3.7 B 3.3.7 Main Turbine Overspeed Protection System BASES ACTIONS C.1 (continued)

If the MTOPS is inoperable for reasons other than conditions A or B, then action must be taken to isolate the main turbine from the steam supply.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allows a reasonable amount of time to complete the plant shutdown associated with isolating the main turbine from the steam supply.

TRS The TRSs are performed at the specified Frequency to ensure that the turbine overspeed protection function is maintained OPERABLE.

The TRSs are modified by a Note to indicate that when a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the redundant overspeed trip device is OPERABLE. Upon completion of the Surveillance, or expiration of the 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allowance, the channel must be returned to OPERABLE status or the applicable Condition entered and Required Actions taken. This Note is based on the average time required to perform channel Surveillance. The 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> testing allowance does not significantly reduce the probability that the Main Turbine Overspeed Protection System will function when necessary.

TRS 3.3.7.1, TRS 3.3.7.2, and TRS 3.3.7.3 Verification of the movement of each of the four high pressure turbine control valves, six low pressure turbine combined intermediate valves (composed of 6 intermediate stop valves and 6 intercept valves), and four high pressure turbine stop valves ensures the OPERABILITY of each valve and that it will be able to close in the event of a turbine trip condition. The 92 day Frequency is based upon current surveillance practice as recommended by the turbine vendor and described in the FSAR (Ref. 3).

(continued)

SUSQUEHANNA - UNIT 1 TRM / B 3.3-14b SUSQEHANA-NIT TRM/

B3.314bEFFECTIVE DATE 11/04/2015

Main Turbine Overspeed Protection System Rev. 2 B 3.3.7 B 3.3.7 Main Turbine Overspeed Protection System BASES TRS TRS 3.3.7.4 (continued)

This TRS is for the performance of a CHANNEL CALIBRATION of the required main turbine overspeed protection instrumentation. The calibration is a complete check of the instrument channel from the sensing device to main turbine trip initiation. The Frequency of 24 months is a typical refueling cycle and considers channel reliability.

TRS 3.3.7.5 The disassembly and inspection of the valves referenced ensures that abnormal wear is not occurring which could result in the valves inability to close upon receipt of a close signal. The Frequency is such that only one of each type valve (i.e., high pressure turbine stop; high pressure turbine control; and low pressure turbine combined intermediate), is required to be inspected within a 40 month period. If unacceptable flaws or excessive corrosion are found in a valve, all valves of its type are inspected (Ref. 3).

Valve bushings are inspected and cleaned, and bore diameters are checked for proper clearance.

REFERENCES 1. FSAR Section 7.7:1.5

2. FSAR Section 10.2.2.6.
3. FSAR Section 10.2.3.6.

SUSQUEHANNA-UNIT1 TRM / B 3.3-14c SUSQEHANA

-UNITI TR

/ 3.314cEFFECTIVE DATE 11/04/2015