| issue date = 07/12/1989
| issue date = 07/12/1989
| title = Responds to NRC 890428 Ltr Re Violations Noted in Insp Rept 50-244/89-04.Corrective Actions:Existing Info Assembled & Performed Confirmatory Addl Analyses to Demonstrate That Operability of Replacement PORV Block Valves Assured
| title = Responds to NRC 890428 Ltr Re Violations Noted in Insp Rept 50-244/89-04.Corrective Actions:Existing Info Assembled & Performed Confirmatory Addl Analyses to Demonstrate That Operability of Replacement PORV Block Valves Assured
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = MARTIN T T
| addressee name = Martin T
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| docket = 05000244
| docket = 05000244
Line 14: Line 14:
| page count = 18
| page count = 18
}}
}}
See also: [[followed by::IR 05000244/1989004]]


=Text=
=Text=
{{#Wiki_filter:t,'/I'4'.''tttI";"i.l)t>"7,"i~Plllfifll
{{#Wiki_filter:t,'/I'4'. '
ROCHESTER GAS AND ELECTRIC CORPORATION
  'tttI";"i.l)t>"7,"i~Plllfifll ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001
~89 EAST AVENUE, ROCHESTER, N.Y.14649-0001
                                                                                >El,t>>>>O>>E A+EA CODE ~l4 546 2700 July 12, 1989 U.S. Nuclear, Regulatory Commission Region I Attn: Thomas T. Martin, Director Divisinn n f Reactor Sa fether 475.Allendale Road King of Prussia, PA 19406
July 12, 1989>El,t>>>>O>>E
 
A+EA CODE~l4 546 2700 U.S.Nuclear, Regulatory
==Subject:==
Commission
Inspection Report 50-244/89-04 and Notice of Violation (PORV Block Valve Replacement)
Region I Attn: Thomas T.Martin, Director Divisinn n f Reactor Sa f ether 475.Allendale
R.E. Ginna Nuclear Power Plant Docket No. 50-244
Road King of Prussia, PA 19406 Subject: Inspection
 
Report 50-244/89-04
==Dear Mr.                     Martin:==
and Notice of Violation (PORV Block Valve Replacement)
 
R.E.Ginna Nuclear Power Plant Docket No.50-244 Dear Mr.Martin: By letter dated April 28, 1989, the NRC provided RG&E with the results of Inspection
By letter dated April 28, 1989, the NRC provided RG&E with the results of Inspection No. 50-244/89-04. Appendix A to that letter consisted of a Notice of Violation related to the               extent           of documentation     addressing   operability qualification of replacement PORV block valves. RG&E was requested to respond, within 30 days, and provide a written statement or explanation in reply to the Notice, including (1) the reasons for the violation, (2) corrective steps which have been taken and the results achieved, (3) corrective steps which will be taken to avoid further violations, and (4) the date the full compliance will be achieved. The Notice further s A.a v>-d iEAai I wAAere good cause is shown cons3.ueration would be given to extending the response time.
No.50-244/89-04.
Pertinent information regarding additional documentation supporting operability qualification of the replacement PORV block valves, as requested by the NRC inspector, was submitted on May 3, 1989.                       This was found to be acceptable, as stated in the NRC response, dated May 18, 1989. Since key RG&E personnel were fully engaged in completing the Spring 1989 Refueling Outage and its associated modification activities, and since the technical issues concerning the valves had been resolved, RG&E requested, by letter dated May 26, 1989, that an additional 45 days be allowed for our formal response to the Inspection Report and Notice of Violation.
Appendix A to that letter consisted of a Notice of Violation related to the extent of documentation
 
addressing
In accordance with 10 CFR 2.201, RG&E provides Attachment I to this letter   as our reply. to the Notice of Violation contained in Appendix A to NRC Inspection Report 50-244/89-
operability
: 04. The reply admits the violation and provides the explanatory information requested in the Notice of Violation.
qualification
Very truly yours, Robert C. Mecr dy General Manager Nuclear Production JCMN054 Attachment xc:   U.S. Nuclear Regulatory Commission   (original)
of replacement
Document Control Desk Washington, D.C. 20555 Allen R. Johnson (Mail Stop   14D1)
PORV block valves.RG&E was requested to respond, within 30 days, and provide a written statement or explanation
Project Directorate I-3 Washington, D.C. 20555 Ginna Senior Resident Inspector
in reply to the Notice, including (1)the reasons for the violation, (2)corrective
 
steps which have been taken and the results achieved, (3)corrective
8 0
steps which will be taken to avoid further violations, and (4)the date the full compliance
 
will be achieved.The Notice further s A.a v>-d iEAai I wAAere good cause is shown<cons3.ueration
ATTACHMENT   I Violation NRC Inspection Report   No. 50-244/89-04,   Appendix A, identified the following violation:
would be given to extending the response time.Pertinent information
      "10 CFR 50, Appendix B, Criterion III requires that measures be   established   to assure that applicable regulatory requirements...are correctly translated into specifications, drawings, procedures and instructions." It further requires that, "design changes, including field changes shall be subject to design control measures commensurate with the original design."
regarding additional
      "Contrary to the above, the licensee's Design Criteria and Safety Analysis for the PORV block valve replacement to be performed during the 1989 refueling outage did not address operability qualification of the replacement-., valves.
documentation
Operability qualification of PORV block valves was a NUREG-0737 Item (II.D.l) committed to by the licensee as confirmed in Commission Order dated July 10, 1981."
supporting
RG&E admits to the violation.
operability
Reason   for Violation The PORV   Block Valve Replacement project Design Criteria document (Revision 0, dated January 22, 1986) sets forth the requirements for operability qualification.       It references NUREG-0737, Section II.D.1, EPRI report NP-2541-LD, "EPRI/Marshall Electric Motor'-
qualification
Operated Valve (Block Valve) Interim Test Data Report" and NRC IE Bulletins 81-02 and 85-03.           These referenced documents were reviewed when the project was initiated, and were consulted, periodically during the conceptual design, detailed design,, and.
of the replacement
procurement phases. Other sections of the Design Criteria (1.1.1, 1.1.2, 1.2.2, 1.3.2, 3.0, 4.0, 7.1, 8.1, 8.2,,13.1 and 13.2) also emphasize the anticipated service of the new PORV block valves.
PORV block valves, as requested by the NRC inspector, was submitted on May 3, 1989.This was found to be acceptable, as stated in the NRC response, dated May 18, 1989.Since key RG&E personnel were fully engaged in completing
The   RG&E   Safety Analysis for this project (Revision 0, dated January   22, 19861 specifically considers decreases         in reactor coolant inventory, including inadvertent opening of a PORV. The Design Criteria document discussed above is specifically referenced in the Safety Analysis.         The Design Criteria and the Safety Analysis   constitute   the project design input and address valve operability.
the Spring 1989 Refueling Outage and its associated
In the Design Criteria     and Safety Analysis for this modification, RG&E did consider valve and operator operability requirements, and did reference NUREG-0737; Item II.D.1, as well as the EPRI-Marshall tests (Report NP-2541-LD).         However, . RG&E did not explicitly require that operability calculations supporting conformance to the EPRI-Marshall   test results   be generated.
modification
RG&E did, however, explicitly address the subject of valve/operator qualification     on the installation drawing for this modification.
activities, and since the technical issues concerning
This was done by requiring conformance with our MOVATS commitments.
the valves had been resolved, RG&E requested, by letter dated May 26, 1989, that an additional
RG&E considered that, based on extensive industry interaction with the NRC regarding the acceptability of MOVATS as commitment  a means of defining acceptable valve/operator       operability, our             to
45 days be allowed for our formal response to the Inspection
 
Report and Notice of Violation.  
MOVATS superseded the commitment to NUREG-0737 as embodied by the EPRI-Marshall test results.         (Note that Ginna-specific NRC acceptance     for the use of MOVATS was provided by NRC correspondence, Carl H. Berlinger to William F. Kane, dated March 22, 1989.)
The omission of calculations demonstrating conformance to the EPRI-Marshall test results, using what RGEE considered to be an acceptable (and superior), alternative means of defining acceptable valve/operator operability, is considered the reason for the violation.
In accordance
Corrective Ste s Taken and Results Achieved Corrective steps taken to resolve the issues involved in the notice of violation have consisted of assembling existing information and per forming conf irmatory additional, analvses tn demonst at th t operability of the replacement PORV block valves is assured,. This information was transmitted to the NRC by letter, dated May 3, 1989.
with 10 CFR 2.201, RG&E provides Attachment
Satisfactory results   have been achieved. By letter dated May 18, 1989, the NRC Region I staff found the additional information to be comprehensive     and responsive   to their concerns .regarding operability of the subject valves.             No   changes   to the valve/operator were required as a result of this additional verzf ication.
I to this letter as our reply.to the Notice of Violation contained in Appendix A to NRC Inspection
Corrective Ste   s to Avoid Future Violations All references in Design Criteria documents which contain licensing commitments will be explicitly evaluated     and justification for differences, such as superseding requirements, will be placed in the modification work package.       This will be accomplished revision of Procedure QE-301, "Preparation, Review and Approval by of Design Input Documents".
Report 50-244/89-
Date When Full Com liance Will Be Achieved August 15, 1989.
04.The reply admits the violation and provides the explanatory
 
information
ggcELERATED               DISSIBUTl05         DEMOBSTRAT105             SYFI FM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
requested in the Notice of Violation.
ACCESSION NBR:8907240194           DOC.DATE: 89/07/12     NOTARIZED: NO             DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester               G 05000244 AUTH. NAME             AUTHOR AFFILIATION MECREDY,R.C.           Rochester Gas 6 Electric Corp.
Very truly yours, Robert C.Mecr dy General Manager Nuclear Production
RECIP.NAME       'ECIPIENTOfc'AFFILIATION MARTIN,T.T.     -     Region 1,       of the Director
JCMN054 Attachment
 
xc: U.S.Nuclear Regulatory
==SUBJECT:==
Commission (original)
Responds       to NRC 890428 ltr re violations noted in Insp Rept
Document Control Desk Washington, D.C.20555 Allen R.Johnson (Mail Stop 14D1)Project Directorate
                      /
I-3 Washington, D.C.20555 Ginna Senior Resident Inspector  
50-244 89-04.
80
DISTRIBUTION CODE: IE01D         COPIES RECEIVED:LTR       ENCL       SIZE:
ATTACHMENT
TITLE: General   E (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:License 'Exp date in accordanc'e with 10CFR2,2.109(9/19/72).                 05000244 RECIPIENT           COPIES          RECIPIENT            COPIES ID  CODE/NAME        LTTR ENCL      ID CODE/NAME         LTTR ENCL PD1-3 PD                 1      1    JOHNSON,A                1    1 INTERNAL: AEOD                       1      1    AEOD/DE  I IB            1 1
I Violation NRC Inspection
1 1
Report No.50-244/89-04, Appendix A, identified
AEOD/TPAD                1      1    DEDRO NRR SHANKMAN,S           1      1    NRR/DEST DIR            1    1-NRR/DLPQ/PEB             1      1    NRR/DOEA DIR 11          1    1 NRR/DREP/EPB 10           1      1    NRR/DREP/RPB, 10        2    2 NRR/PMAS/ILRB12           1      1    NUDOCS-ABSTRACT          1    1 OE   IEBERMAN,J           1          OGC/HDS2.                1    1
the following violation:
          ~G
"10 CFR 50, Appendix B, Criterion III requires that measures be established
        ~RG         FILE 02 01 1
to assure that applicable
1
regulatory
                                          . 1 1
requirements...are
RES MORISSEAU,D          1     1 EXTERNAL:, LPDR                      1     1   NRC PDR                  1     1 NSIC                      1     1 NOXK 'IQ  ALL ''RZDS" REXXPZZ&#xc3;IS'l PXZASE HELP US 1X) REMCE HASTE!  CXMlRCT ~    IXXXIME&#xc3;ZCONZK)L DESK, LTSTS H3R DOCUMEMZS YOU IXN~T NEED!
correctly translated
TOTAL NUMBER OF COPIES REQUIRED: LTTR           23  ENCL     23
into specifications, drawings, procedures
 
and instructions." It further requires that,"design changes, including field changes shall be subject to design control measures commensurate
4 ~ M I ~ AW tOaa, 4li'i'~f'I.'rl4AI li~'kP iI'ilia'i'Il                                                            pi;:.,~g "waar,,
with the original design.""Contrary to the above, the licensee's
ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TCLCPiiONC A%CA CODC 7le 546.2700 July 12,  1989 U.S. Nuclear Regulatory Commission Region I Attn: Thomas T. Martin, Director Division of Reactor Safety 475             Allendale Road King of Prussia, PA 19406
Design Criteria and Safety Analysis for the PORV block valve replacement
 
to be performed during the 1989 refueling outage did not address operability
==Subject:==
qualification
Inspection Report 50-244/89-04 and Notice of Violation (PORV Block Valve Replacement)
of the replacement-., valves.Operability
R.E. Ginna Nuclear Power Plant Docket No. 50-244
qualification
 
of PORV block valves was a NUREG-0737 Item (II.D.l)committed to by the licensee as confirmed in Commission
==Dear Mr.                               Martin:==
Order dated July 10, 1981." RG&E admits to the violation.
 
Reason for Violation The PORV Block Valve Replacement
By             letter   dated April   28, 1989, the NRC   provided       RG&E with the results of Inspection No. 50-244/89-04. Appendix A that letter consisted of a Notice of Violation related to
project Design Criteria document (Revision 0, dated January 22, 1986)sets forth the requirements
                                                                                                              'o the                     extent               of documentation     addressing     operability qualification of replacement PORV block valves. RG&E was requested to respond, within 30 days, and provide a written statement or explanation in reply to the Notice, including (1) the reasons for the violation, (2) corrective steps which have been taken and the results achieved, ('3) corrective steps which will be taken to avoid further violations, and (4) the date the full compliance will be achieved. The Notice further stated that, where good cause is shown, consideration would be given to extending the response time.
.for operability
Pertinent information regarding additional documentation supporting operability qualification of the replacement PORV block valves, as requested by the NRC inspector, was submitted on May 3, 1989.                                 This was found to be acceptable, a's stated in the                           NRC     response, dated May 18, 1989.       Since key RG&E personnel                               were fully engaged   in completing the   Spring 1989 Refueling Outage and its associated modification activities, and since the technical issues concerning the valves had been resolved, RG&E requested, by letter dated May 26, 1989, that an additional 45 days be allowed for our formal response to the Inspection Report and Notice of Violation.
qualification.
I" t'qgd 8~4072/+ g i>4 t
It references
Q DR           ADOCk O5OOO24q                                                                 Pgp PDP
NUREG-0737, Section II.D.1, EPRI report NP-2541-LD,"EPRI/Marshall
 
Electric Motor'-Operated Valve (Block Valve)Interim Test Data Report" and NRC IE Bulletins 81-02 and 85-03.These referenced
In accordance with 10 CFR 2.201, RG&E provides Attachment I to this letter   as our reply to the Notice of Violation contained in Appendix A to NRC Inspection Report 50-244/89-
documents were reviewed when the project was initiated, and were consulted, periodically
: 04. The reply admits the violation and provides the explanatory information requested in the Notice of Violation.
during the conceptual
Very truly yours, Robert C. Mecr dy General Manager Nuclear Production JCM~054 Attachment xc:   U.S. Nuclear Regulatory Commission   (original)
design, detailed design,, and.procurement
Document Control Desk Washington, D.C. 20555 Allen R. Johnson (Mail Stop   14D1)
phases.Other sections of the Design Criteria (1.1.1, 1.1.2, 1.2.2, 1.3.2, 3.0, 4.0, 7.1, 8.1, 8.2,,13.1 and 13.2)also emphasize the anticipated
Project Directorate I-3 Washington, D.C. 20555 Ginna Senior Resident Inspector
service of the new PORV block valves.The RG&E Safety Analysis for this project (Revision 0, dated January 22, 19861 specifically
 
considers decreases in reactor coolant inventory, including inadvertent
ATTACHMENT I Violation NRC Inspection Report     No. 50-244/89-04, Appendix A, identified the following violation:
opening of a PORV.The Design Criteria document discussed above is specifically
      "10 CFR 50, Appendix B, Criterion III requires that measures be   established   to assure that applicable regulatory requirements...are correctly translated into specifications, drawings, procedures and instructions." It further requires that, "design changes, including field changes shall be subject to design control measures commensurate with the original design."
referenced
      "Contrary to the above, the licensee's Design Criteria and Safety Analysis for 0he PORV block valve replacement to be performed during the 1989 refueling outage did not address operability qualification of the replacement valves.
in the Safety Analysis.The Design Criteria and the Safety Analysis constitute
Operability qualification of PORV block valves was a NUREG-0737 Item (II.D.1) committed to by the licensee as confirmed in Commission Order dated July 10, 1981."
the project design input and address valve operability.
RG&E   admits to the   violation.
In the Design Criteria and Safety Analysis for this modification, RG&E did consider valve and operator operability
Reason   for Violation The PORV   Block Valve Replacement project Design Criteria document (Revision 0, dated January 22, 1986) sets forth the requirements for operability qualification.       It references NUREG-0737, Section II.D.1, EPRI report NP-2541-LD, "EPRI/Marshall Electric Motor-Operated Valve (Block Valve) Interim Test Data Report" and NRC IE Bulletins 81-02 and 85-03.           These referenced documents were reviewed when the project was initiated, and were consulted periodically during the conceptual design, detailed design, and procurement phases. Other sections of the Design Criteria (1.1.1, 1.1.2, 1.2.2, 1.3.2, 3.0, 4.0, 7.1, 8.1, 8.2, 13.1 and 13.2) also emphasize the anticipated service of the new PORV block valves.
requirements, and did reference NUREG-0737;
The   RG&E   Safety Analysis for this project (Revision 0, dated January     22, 1986) specifically considers decreases     in reactor coolant inventory, including inadvertent opening of a PORV. The Design Criteria document discu'ssed above is specifically referenced in the Safety Analysis.         The Design Criteria and the Safety Analysis constitute the project design input and address valve operability.
Item II.D.1, as well as the EPRI-Marshall
In the Design Criteria and Safety Analysis for this modification, RG&E did consider valve and operator operability requirements, and did reference NUREG-0737, Item II.D.1, as well as the EPRI-Marshall tests (Report NP-2541-LD).         However, RG&E did not explicitly require that operability calculations supporting conformance to the EPRI-Marshall test results be generated.
tests (Report NP-2541-LD).
RG&E did,-however, explicitly address the subject of valve/operator.
However,.RG&E did not explicitly
qualification on the installation drawing for this modification.
require that operability
This was done by requiring conformance with our MOVATS commitments.
calculations
RG&E considered that, based on extensive industry interaction with the NRC regarding the acceptability of MOVATS as a means of defining acceptable valve/operator operability, our commitment to
supporting
 
conformance
MOVATS superseded the commitment to NUREG-0737 as embodied by the EPRI-Marshall test results.         (Note that Ginna-specific NRC acceptance   for the use of MOVATS was provided by NRC correspondence, Carl H. Berlinger to William F. Kane, dated March 22, 1989.)
to the EPRI-Marshall
The omission of calculations demonstrating conformance to the EPRI-Marshall test results, using what RG&E considered to be an acceptable (and superior) alternative means of defining acceptable valve/operator operability, is considered the reason for the violation.
test results be generated.
Corrective Ste s Taken and Results Achieved, Corrective steps taken to resolve the issues involved in the notice of violation have consisted of assembling existing information and performing confirmatory additional analyses to demonstrate that operability of the replacement PORV block valves is assured. This information was transmitted to the NRC by letter, dated May 3, 1989.
RG&E did, however, explicitly
Satisfactory results   have been achieved. By letter dated May 18, 1989, the   NRC Region I staff found the additional information to be comprehensive     and responsive   to their conceins regarding operability of the subject valves.             No   changes to the valve/operator were required as a result of this additional verification.
address the subject of valve/operator
Corrective Ste s to Avoid Future Violations All references in Design Criteria documents which contain licensing commitments will be explicitly evaluated and justification for differences, such as superseding requirements, will be placed in the modification work package.        This will be accomplished by revision of Procedure QE-301, "Preparation, Review and Approval of Design Input Documents".
qualification
Date When Full Com liance Will Be Achieved.
on the installation
August 15, 1989.}}
drawing for this modification.
This was done by requiring conformance
with our MOVATS commitments.
RG&E considered
that, based on extensive industry interaction
with the NRC regarding the acceptability
of MOVATS as a means of defining acceptable
valve/operator
operability, our commitment
to  
MOVATS superseded
the commitment
to NUREG-0737
as embodied by the EPRI-Marshall
test results.(Note that Ginna-specific
NRC acceptance
for the use of MOVATS was provided by NRC correspondence, Carl H.Berlinger to William F.Kane, dated March 22, 1989.)The omission of calculations
demonstrating
conformance
to the EPRI-Marshall test results, using what RGEE considered
to be an acceptable (and superior), alternative
means of defining acceptable
valve/operator
operability, is considered
the reason for the violation.
Corrective
Ste s Taken and Results Achieved Corrective
steps taken to resolve the issues involved in the notice of violation have consisted of assembling
existing information
and per f orming conf irmatory additional, analvses tn demonst at th t operability
of the replacement
PORV block valves is assured,.This information
was transmitted
to the NRC by letter, dated May 3, 1989.Satisfactory
results have been achieved.By letter dated May 18, 1989, the NRC Region I staff found the additional
information
to be comprehensive
and responsive
to their concerns.regarding
operability
of the subject valves.No changes to the valve/operator
were required as a result of this additional
verzf ication.Corrective
Ste s to Avoid Future Violations
All references
in Design Criteria documents which contain licensing commitments
will be explicitly
evaluated and justification
for differences, such as superseding
requirements, will be placed in the modification
work package.This will be accomplished
by revision of Procedure QE-301,"Preparation, Review and Approval of Design Input Documents".
Date When Full Com liance Will Be Achieved August 15, 1989.  
ggcELERATED
DISSIBUTl05
DEMOBSTRAT105
SYFI FM REGULATORY
INFORMATION
DISTRIBUTION
SYSTEM (RIDS)ACCESSION NBR:8907240194
DOC.DATE: 89/07/12 NOTARIZED:
NO FACIL:50-244
Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION
MECREDY,R.C.
Rochester Gas 6 Electric Corp.RECIP.NAME
'ECIPIENT AFFILIATION
MARTIN,T.T.
-Region 1, Ofc', of the Director SUBJECT: Responds to NRC 890428 ltr re violations
noted in Insp Rept 50-244 89-04./DISTRIBUTION
CODE: IE01D COPIES RECEIVED:LTR
ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
of Violation Response E NOTES:License
'Exp date in accordanc'e
with 10CFR2,2.109(9/19/72).
DOCKET 05000244 05000244 RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: AEOD AEOD/TPAD NRR SHANKMAN, S NRR/DLPQ/PEB
NRR/DREP/EPB
10 NRR/PMAS/ILRB12
OE IEBERMAN,J
~G 02~RG FILE 01 EXTERNAL:, LPDR NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1'1.1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME JOHNSON,A AEOD/DE I I B DEDRO NRR/DEST DIR NRR/DOEA DIR 11 NRR/DREP/RPB, 10 NUDOCS-ABSTRACT
OGC/HDS2.RES MORISSEAU,D
NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1-1 1 2 2 1 1 1 1 1 1 1 1 NOXK'IQ ALL''RZDS" REXXPZZ&#xc3;IS'l
PXZASE HELP US 1X)REMCE HASTE!CXMlRCT~IXXXIME&#xc3;Z CONZK)L DESK, LTSTS H3R DOCUMEMZS YOU IXN~T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL 23
4li'i'~f'I.'rl4AI
li~'kP iI'ilia'i'Il
ROCHESTER GAS AND ELECTRIC CORPORATION
~89 EAST AVENUE, 4~M I~AW tOaa, pi;:.,~g"waar,, ROCHESTER, N.Y.14649-0001
July 12, 1989 TCLCPiiONC
A%CA CODC 7le 546.2700 U.S.Nuclear Regulatory
Commission
Region I Attn: Thomas T.Martin, Director Division of Reactor Safety 475 Allendale Road King of Prussia, PA 19406 Subject: Inspection
Report 50-244/89-04
and Notice of Violation (PORV Block Valve Replacement)
R.E.Ginna Nuclear Power Plant Docket No.50-244 Dear Mr.Martin: By letter dated April 28, 1989, the NRC provided RG&E with the results of Inspection
No.50-244/89-04.
Appendix A'o that letter consisted of a Notice of Violation related to the extent of documentation
addressing
operability
qualification
of replacement
PORV block valves.RG&E was requested to respond, within 30 days, and provide a written statement or explanation
in reply to the Notice, including (1)the reasons for the violation, (2)corrective
steps which have been taken and the results achieved, ('3)corrective
steps which will be taken to avoid further violations, and (4)the date the full compliance
will be achieved.The Notice further stated that, where good cause is shown, consideration
would be given to extending the response time.Pertinent information
regarding additional
documentation
supporting
operability
qualification
of the replacement
PORV block valves, as requested by the NRC inspector, was submitted on May 3, 1989.This was found to be acceptable, a's stated in the NRC response, dated May 18, 1989.Since key RG&E personnel were fully engaged in completing
the Spring 1989 Refueling Outage and its associated
modification
activities, and since the technical issues concerning
the valves had been resolved, RG&E requested, by letter dated May 26, 1989, that an additional
45 days be allowed for our formal response to the Inspection
Report and Notice of Violation.
I" t'qgd 8~4072/+g i>4 t DR ADOCk O5OOO24q Q PDP Pgp
In accordance
with 10 CFR 2.201, RG&E provides Attachment
I to this letter as our reply to the Notice of Violation contained in Appendix A to NRC Inspection
Report 50-244/89-
04.The reply admits the violation and provides the explanatory
information
requested in the Notice of Violation.
Very truly yours, Robert C.Mecr dy General Manager Nuclear Production
JCM~054 Attachment
xc: U.S.Nuclear Regulatory
Commission (original)
Document Control Desk Washington, D.C.20555 Allen R.Johnson (Mail Stop 14D1)Project Directorate
I-3 Washington, D.C.20555 Ginna Senior Resident Inspector  
ATTACHMENT
I Violation NRC Inspection
Report No.50-244/89-04, Appendix A, identified
the following violation:
"10 CFR 50, Appendix B, Criterion III requires that measures be established
to assure that applicable
regulatory
requirements...are
correctly translated
into specifications, drawings, procedures
and instructions." It further requires that,"design changes, including field changes shall be subject to design control measures commensurate
with the original design.""Contrary to the above, the licensee's
Design Criteria and Safety Analysis for 0he PORV block valve replacement
to be performed during the 1989 refueling outage did not address operability
qualification
of the replacement
valves.Operability
qualification
of PORV block valves was a NUREG-0737 Item (II.D.1)committed to by the licensee as confirmed in Commission
Order dated July 10, 1981." RG&E admits to the violation.
Reason for Violation The PORV Block Valve Replacement
project Design Criteria document (Revision 0, dated January 22, 1986)sets forth the requirements
for operability
qualification.
It references
NUREG-0737, Section II.D.1, EPRI report NP-2541-LD,"EPRI/Marshall
Electric Motor-Operated Valve (Block Valve)Interim Test Data Report" and NRC IE Bulletins 81-02 and 85-03.These referenced
documents were reviewed when the project was initiated, and were consulted periodically
during the conceptual
design, detailed design, and procurement
phases.Other sections of the Design Criteria (1.1.1, 1.1.2, 1.2.2, 1.3.2, 3.0, 4.0, 7.1, 8.1, 8.2, 13.1 and 13.2)also emphasize the anticipated
service of the new PORV block valves.The RG&E Safety Analysis for this project (Revision 0, dated January 22, 1986)specifically
considers decreases in reactor coolant inventory, including inadvertent
opening of a PORV.The Design Criteria document discu'ssed
above is specifically
referenced
in the Safety Analysis.The Design Criteria and the Safety Analysis constitute
the project design input and address valve operability.
In the Design Criteria and Safety Analysis for this modification, RG&E did consider valve and operator operability
requirements, and did reference NUREG-0737, Item II.D.1, as well as the EPRI-Marshall
tests (Report NP-2541-LD).
However, RG&E did not explicitly
require that operability
calculations
supporting
conformance
to the EPRI-Marshall
test results be generated.
RG&E did,-however, explicitly
address the subject of valve/operator.
qualification
on the installation
drawing for this modification.
This was done by requiring conformance
with our MOVATS commitments.
RG&E considered
that, based on extensive industry interaction
with the NRC regarding the acceptability
of MOVATS as a means of defining acceptable
valve/operator
operability, our commitment
to  
MOVATS superseded
the commitment
to NUREG-0737
as embodied by the EPRI-Marshall
test results.(Note that Ginna-specific
NRC acceptance
for the use of MOVATS was provided by NRC correspondence, Carl H.Berlinger to William F.Kane, dated March 22, 1989.)The omission of calculations
demonstrating
conformance
to the EPRI-Marshall test results, using what RG&E considered
to be an acceptable (and superior)alternative
means of defining acceptable
valve/operator
operability, is considered
the reason for the violation.
Corrective
Ste s Taken and Results Achieved, Corrective
steps taken to resolve the issues involved in the notice of violation have consisted of assembling
existing information
and performing
confirmatory
additional
analyses to demonstrate
that operability
of the replacement
PORV block valves is assured.This information
was transmitted
to the NRC by letter, dated May 3, 1989.Satisfactory
results have been achieved.By letter dated May 18, 1989, the NRC Region I staff found the additional
information
to be comprehensive
and responsive
to their conceins regarding operability
of the subject valves.No changes to the valve/operator
were required as a result of this additional
verification.
Corrective
Ste s to Avoid Future Violations
All references
in Design Criteria documents which contain licensing commitments
will be explicitly
evaluated and justification
for differences, such as superseding
requirements, will be placed in the modification
work package.This will be accomplished
by revision of Procedure QE-301,"Preparation, Review and Approval of Design Input Documents".
Date When Full Com liance Will Be Achieved.August 15, 1989.
}}

Latest revision as of 12:30, 4 February 2020

Responds to NRC 890428 Ltr Re Violations Noted in Insp Rept 50-244/89-04.Corrective Actions:Existing Info Assembled & Performed Confirmatory Addl Analyses to Demonstrate That Operability of Replacement PORV Block Valves Assured
ML17250A885
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/12/1989
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8907240194
Download: ML17250A885 (18)


Text

t,'/I'4'. '

'tttI";"i.l)t>"7,"i~Plllfifll ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001

>El,t>>>>O>>E A+EA CODE ~l4 546 2700 July 12, 1989 U.S. Nuclear, Regulatory Commission Region I Attn: Thomas T. Martin, Director Divisinn n f Reactor Sa fether 475.Allendale Road King of Prussia, PA 19406

Subject:

Inspection Report 50-244/89-04 and Notice of Violation (PORV Block Valve Replacement)

R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Martin:

By letter dated April 28, 1989, the NRC provided RG&E with the results of Inspection No. 50-244/89-04. Appendix A to that letter consisted of a Notice of Violation related to the extent of documentation addressing operability qualification of replacement PORV block valves. RG&E was requested to respond, within 30 days, and provide a written statement or explanation in reply to the Notice, including (1) the reasons for the violation, (2) corrective steps which have been taken and the results achieved, (3) corrective steps which will be taken to avoid further violations, and (4) the date the full compliance will be achieved. The Notice further s A.a v>-d iEAai I wAAere good cause is shown cons3.ueration would be given to extending the response time.

Pertinent information regarding additional documentation supporting operability qualification of the replacement PORV block valves, as requested by the NRC inspector, was submitted on May 3, 1989. This was found to be acceptable, as stated in the NRC response, dated May 18, 1989. Since key RG&E personnel were fully engaged in completing the Spring 1989 Refueling Outage and its associated modification activities, and since the technical issues concerning the valves had been resolved, RG&E requested, by letter dated May 26, 1989, that an additional 45 days be allowed for our formal response to the Inspection Report and Notice of Violation.

In accordance with 10 CFR 2.201, RG&E provides Attachment I to this letter as our reply. to the Notice of Violation contained in Appendix A to NRC Inspection Report 50-244/89-

04. The reply admits the violation and provides the explanatory information requested in the Notice of Violation.

Very truly yours, Robert C. Mecr dy General Manager Nuclear Production JCMN054 Attachment xc: U.S. Nuclear Regulatory Commission (original)

Document Control Desk Washington, D.C. 20555 Allen R. Johnson (Mail Stop 14D1)

Project Directorate I-3 Washington, D.C. 20555 Ginna Senior Resident Inspector

8 0

ATTACHMENT I Violation NRC Inspection Report No. 50-244/89-04, Appendix A, identified the following violation:

"10 CFR 50, Appendix B, Criterion III requires that measures be established to assure that applicable regulatory requirements...are correctly translated into specifications, drawings, procedures and instructions." It further requires that, "design changes, including field changes shall be subject to design control measures commensurate with the original design."

"Contrary to the above, the licensee's Design Criteria and Safety Analysis for the PORV block valve replacement to be performed during the 1989 refueling outage did not address operability qualification of the replacement-., valves.

Operability qualification of PORV block valves was a NUREG-0737 Item (II.D.l) committed to by the licensee as confirmed in Commission Order dated July 10, 1981."

RG&E admits to the violation.

Reason for Violation The PORV Block Valve Replacement project Design Criteria document (Revision 0, dated January 22, 1986) sets forth the requirements for operability qualification. It references NUREG-0737,Section II.D.1, EPRI report NP-2541-LD, "EPRI/Marshall Electric Motor'-

Operated Valve (Block Valve) Interim Test Data Report" and NRC IE Bulletins 81-02 and 85-03. These referenced documents were reviewed when the project was initiated, and were consulted, periodically during the conceptual design, detailed design,, and.

procurement phases. Other sections of the Design Criteria (1.1.1, 1.1.2, 1.2.2, 1.3.2, 3.0, 4.0, 7.1, 8.1, 8.2,,13.1 and 13.2) also emphasize the anticipated service of the new PORV block valves.

The RG&E Safety Analysis for this project (Revision 0, dated January 22, 19861 specifically considers decreases in reactor coolant inventory, including inadvertent opening of a PORV. The Design Criteria document discussed above is specifically referenced in the Safety Analysis. The Design Criteria and the Safety Analysis constitute the project design input and address valve operability.

In the Design Criteria and Safety Analysis for this modification, RG&E did consider valve and operator operability requirements, and did reference NUREG-0737; Item II.D.1, as well as the EPRI-Marshall tests (Report NP-2541-LD). However, . RG&E did not explicitly require that operability calculations supporting conformance to the EPRI-Marshall test results be generated.

RG&E did, however, explicitly address the subject of valve/operator qualification on the installation drawing for this modification.

This was done by requiring conformance with our MOVATS commitments.

RG&E considered that, based on extensive industry interaction with the NRC regarding the acceptability of MOVATS as commitment a means of defining acceptable valve/operator operability, our to

MOVATS superseded the commitment to NUREG-0737 as embodied by the EPRI-Marshall test results. (Note that Ginna-specific NRC acceptance for the use of MOVATS was provided by NRC correspondence, Carl H. Berlinger to William F. Kane, dated March 22, 1989.)

The omission of calculations demonstrating conformance to the EPRI-Marshall test results, using what RGEE considered to be an acceptable (and superior), alternative means of defining acceptable valve/operator operability, is considered the reason for the violation.

Corrective Ste s Taken and Results Achieved Corrective steps taken to resolve the issues involved in the notice of violation have consisted of assembling existing information and per forming conf irmatory additional, analvses tn demonst at th t operability of the replacement PORV block valves is assured,. This information was transmitted to the NRC by letter, dated May 3, 1989.

Satisfactory results have been achieved. By letter dated May 18, 1989, the NRC Region I staff found the additional information to be comprehensive and responsive to their concerns .regarding operability of the subject valves. No changes to the valve/operator were required as a result of this additional verzf ication.

Corrective Ste s to Avoid Future Violations All references in Design Criteria documents which contain licensing commitments will be explicitly evaluated and justification for differences, such as superseding requirements, will be placed in the modification work package. This will be accomplished revision of Procedure QE-301, "Preparation, Review and Approval by of Design Input Documents".

Date When Full Com liance Will Be Achieved August 15, 1989.

ggcELERATED DISSIBUTl05 DEMOBSTRAT105 SYFI FM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8907240194 DOC.DATE: 89/07/12 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION MECREDY,R.C. Rochester Gas 6 Electric Corp.

RECIP.NAME 'ECIPIENTOfc', AFFILIATION MARTIN,T.T. - Region 1, of the Director

SUBJECT:

Responds to NRC 890428 ltr re violations noted in Insp Rept

/

50-244 89-04.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General E (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:License 'Exp date in accordanc'e with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 PD 1 1 JOHNSON,A 1 1 INTERNAL: AEOD 1 1 AEOD/DE I IB 1 1

1 1

AEOD/TPAD 1 1 DEDRO NRR SHANKMAN,S 1 1 NRR/DEST DIR 1 1-NRR/DLPQ/PEB 1 1 NRR/DOEA DIR 11 1 1 NRR/DREP/EPB 10 1 1 NRR/DREP/RPB, 10 2 2 NRR/PMAS/ILRB12 1 1 NUDOCS-ABSTRACT 1 1 OE IEBERMAN,J 1 OGC/HDS2. 1 1

~G

~RG FILE 02 01 1

1

. 1 1

RES MORISSEAU,D 1 1 EXTERNAL:, LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOXK 'IQ ALL RZDS" REXXPZZÃIS'l PXZASE HELP US 1X) REMCE HASTE! CXMlRCT ~ IXXXIMEÃZCONZK)L DESK, LTSTS H3R DOCUMEMZS YOU IXN~T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL 23

4 ~ M I ~ AW tOaa, 4li'i'~f'I.'rl4AI li~'kP iI'ilia'i'Il pi;:.,~g "waar,,

ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TCLCPiiONC A%CA CODC 7le 546.2700 July 12, 1989 U.S. Nuclear Regulatory Commission Region I Attn: Thomas T. Martin, Director Division of Reactor Safety 475 Allendale Road King of Prussia, PA 19406

Subject:

Inspection Report 50-244/89-04 and Notice of Violation (PORV Block Valve Replacement)

R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Martin:

By letter dated April 28, 1989, the NRC provided RG&E with the results of Inspection No. 50-244/89-04. Appendix A that letter consisted of a Notice of Violation related to

'o the extent of documentation addressing operability qualification of replacement PORV block valves. RG&E was requested to respond, within 30 days, and provide a written statement or explanation in reply to the Notice, including (1) the reasons for the violation, (2) corrective steps which have been taken and the results achieved, ('3) corrective steps which will be taken to avoid further violations, and (4) the date the full compliance will be achieved. The Notice further stated that, where good cause is shown, consideration would be given to extending the response time.

Pertinent information regarding additional documentation supporting operability qualification of the replacement PORV block valves, as requested by the NRC inspector, was submitted on May 3, 1989. This was found to be acceptable, a's stated in the NRC response, dated May 18, 1989. Since key RG&E personnel were fully engaged in completing the Spring 1989 Refueling Outage and its associated modification activities, and since the technical issues concerning the valves had been resolved, RG&E requested, by letter dated May 26, 1989, that an additional 45 days be allowed for our formal response to the Inspection Report and Notice of Violation.

I" t'qgd 8~4072/+ g i>4 t

Q DR ADOCk O5OOO24q Pgp PDP

In accordance with 10 CFR 2.201, RG&E provides Attachment I to this letter as our reply to the Notice of Violation contained in Appendix A to NRC Inspection Report 50-244/89-

04. The reply admits the violation and provides the explanatory information requested in the Notice of Violation.

Very truly yours, Robert C. Mecr dy General Manager Nuclear Production JCM~054 Attachment xc: U.S. Nuclear Regulatory Commission (original)

Document Control Desk Washington, D.C. 20555 Allen R. Johnson (Mail Stop 14D1)

Project Directorate I-3 Washington, D.C. 20555 Ginna Senior Resident Inspector

ATTACHMENT I Violation NRC Inspection Report No. 50-244/89-04, Appendix A, identified the following violation:

"10 CFR 50, Appendix B, Criterion III requires that measures be established to assure that applicable regulatory requirements...are correctly translated into specifications, drawings, procedures and instructions." It further requires that, "design changes, including field changes shall be subject to design control measures commensurate with the original design."

"Contrary to the above, the licensee's Design Criteria and Safety Analysis for 0he PORV block valve replacement to be performed during the 1989 refueling outage did not address operability qualification of the replacement valves.

Operability qualification of PORV block valves was a NUREG-0737 Item (II.D.1) committed to by the licensee as confirmed in Commission Order dated July 10, 1981."

RG&E admits to the violation.

Reason for Violation The PORV Block Valve Replacement project Design Criteria document (Revision 0, dated January 22, 1986) sets forth the requirements for operability qualification. It references NUREG-0737,Section II.D.1, EPRI report NP-2541-LD, "EPRI/Marshall Electric Motor-Operated Valve (Block Valve) Interim Test Data Report" and NRC IE Bulletins 81-02 and 85-03. These referenced documents were reviewed when the project was initiated, and were consulted periodically during the conceptual design, detailed design, and procurement phases. Other sections of the Design Criteria (1.1.1, 1.1.2, 1.2.2, 1.3.2, 3.0, 4.0, 7.1, 8.1, 8.2, 13.1 and 13.2) also emphasize the anticipated service of the new PORV block valves.

The RG&E Safety Analysis for this project (Revision 0, dated January 22, 1986) specifically considers decreases in reactor coolant inventory, including inadvertent opening of a PORV. The Design Criteria document discu'ssed above is specifically referenced in the Safety Analysis. The Design Criteria and the Safety Analysis constitute the project design input and address valve operability.

In the Design Criteria and Safety Analysis for this modification, RG&E did consider valve and operator operability requirements, and did reference NUREG-0737, Item II.D.1, as well as the EPRI-Marshall tests (Report NP-2541-LD). However, RG&E did not explicitly require that operability calculations supporting conformance to the EPRI-Marshall test results be generated.

RG&E did,-however, explicitly address the subject of valve/operator.

qualification on the installation drawing for this modification.

This was done by requiring conformance with our MOVATS commitments.

RG&E considered that, based on extensive industry interaction with the NRC regarding the acceptability of MOVATS as a means of defining acceptable valve/operator operability, our commitment to

MOVATS superseded the commitment to NUREG-0737 as embodied by the EPRI-Marshall test results. (Note that Ginna-specific NRC acceptance for the use of MOVATS was provided by NRC correspondence, Carl H. Berlinger to William F. Kane, dated March 22, 1989.)

The omission of calculations demonstrating conformance to the EPRI-Marshall test results, using what RG&E considered to be an acceptable (and superior) alternative means of defining acceptable valve/operator operability, is considered the reason for the violation.

Corrective Ste s Taken and Results Achieved, Corrective steps taken to resolve the issues involved in the notice of violation have consisted of assembling existing information and performing confirmatory additional analyses to demonstrate that operability of the replacement PORV block valves is assured. This information was transmitted to the NRC by letter, dated May 3, 1989.

Satisfactory results have been achieved. By letter dated May 18, 1989, the NRC Region I staff found the additional information to be comprehensive and responsive to their conceins regarding operability of the subject valves. No changes to the valve/operator were required as a result of this additional verification.

Corrective Ste s to Avoid Future Violations All references in Design Criteria documents which contain licensing commitments will be explicitly evaluated and justification for differences, such as superseding requirements, will be placed in the modification work package. This will be accomplished by revision of Procedure QE-301, "Preparation, Review and Approval of Design Input Documents".

Date When Full Com liance Will Be Achieved.

August 15, 1989.