ML17251A519: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/25/1989
| issue date = 05/25/1989
| title = Certifies That Plant Licensed Operator Requalification Training Program Developed Using Systematic Approach to Training.Program Accredited in Conjunction W/Initial Licensed Program by Natl Nuclear Accrediting Board
| title = Certifies That Plant Licensed Operator Requalification Training Program Developed Using Systematic Approach to Training.Program Accredited in Conjunction W/Initial Licensed Program by Natl Nuclear Accrediting Board
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:gc CEM RATED D BUTTON DEMONS ATION SYFI EM REGULAT INFORMATION DISTRIBUTIO STEM (RIDS), A'CCESSION'NBR:8906020235 DOC.DATE: 89/05/25 NOTARIZED:
{{#Wiki_filter:gc CEM RATED         D         BUTTON       DEMONS         ATION       SYFI EM REGULAT       INFORMATION DISTRIBUTIO           STEM (RIDS)
NO DOCKET¹FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
A'CCESSION'NBR:8906020235         DOC.DATE: 89/05/25       NOTARIZED: NO           DOCKET ¹ FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G                 05000244 AUTH. NAME           AUTHOR AFFILIATION MECREDY,R.C.         Rochester,.Gas 6 Electric Corp.
Rochester,.Gas 6 Electric Corp.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Advises that util licensed operator requalifcation training program accredited by Natl Nuclear Accrediting Boar.DISTRIBUTION CODE: M003D COPIES RECEIVED:LTR
Advises that util licensed operator requalifcation training program accredited by Natl Nuclear Accrediting Boar.
/ENCL 0 SIZE: 0 TITLE.Operator Requalificatxon Program NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
DISTRIBUTION CODE: M003D       COPIES RECEIVED:LTR       /   ENCL   0 SIZE:
05000244 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DOA NRR/DLPQ/HFB 10 NUDOCS-ABSTRACT RGNl COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NR OLB 10~ILE Ol COPIES LTTR E CL h D', 8 EXTERNAL: LPDR NSIC NRC PDR R Di D NOZE IO ALL'KIDS" KKXPIIRIS:
TITLE. Operator Requalificatxon Program 0
PLEASE HELP US IO REDUCE%ASTE!CGNIACT'IHE DOQEKFZ CXWZEKL DESK, RXN Pl-37 (EXT.20079)%0 ELXKBRTB ACR MME PKH DXPXRIH7XXCN LISTS MR DOCtlMENX'8 VXJ DCHPT NEZDf TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 0 g h y ZZIIIII gZimnZI 8r.-:-ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14649-0001 May 25, 1989 TELEPHONE AREA CODE Tl&546-2700 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555  
NOTES:License Exp date       in accordance with 10CFR2,2.109(9/19/72).             05000244 RECIPIENT           COPIES            RECIPIENT            COPIES ID CODE/NAME         LTTR ENCL        ID CODE/NAME        LTTR E CL              h PD1-3 LA                 1            PD1-3 PD JOHNSON,A               1 D',
INTERNAL: AEOD/DOA                                 AEOD/DSP/TPAB NRR/DLPQ/HFB 10 NUDOCS-ABSTRACT RGNl
                                                    ~ILE OLB 10Ol NR 8
EXTERNAL: LPDR                                     NRC PDR NSIC R
Di D
NOZE IO ALL 'KIDS" KKXPIIRIS:
PLEASE HELP US IO REDUCE %ASTE!   CGNIACT 'IHE DOQEKFZ CXWZEKL DESK, RXN Pl-37 (EXT. 20079)   %0 ELXKBRTB ACR   MME PKH DXPXRIH7XXCN LISTS MR DOCtlMENX'8 VXJ DCHPT NEZDf TOTAL NUMBER OF COPIES REQUIRED: LTTR             13   ENCL
 
0 g
h
 
ZZIIIII gZimnZI y
8r.       -:-
ROCHESTER, N.K 14649-0001 ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, TELEPHONE AREA CODE Tl& 546-2700 May 25, 1989 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555


==Subject:==
==Subject:==
Certification of Licensed Operator Requalification Training Program.R.E.Ginna Nuclear Power Plant Operating License No.DPR-18 Docket No.50-244  
Certification of Licensed Operator Requalification Training Program.
R.E. Ginna Nuclear Power Plant Operating License No. DPR-18 Docket No. 50-244
 
==Dear      Sir:==


==Dear Sir:==
RGSE   certifies that the R.E. Ginna Licensed Operator Re-qualification Training Program has been developed using a system-atic approach to training.             This program was accredited in conjunction with the Initial Licensed Program by the National Nuclear Accrediting Board in February, 1987. This certification is   made     in accordance with the requirements of 10     CFR     55.59(c).
RGSE certifies that the R.E.Ginna Licensed Operator Re-qualification Training Program has been developed using a system-atic approach to training.This program was accredited in conjunction with the Initial Licensed Program by the National Nuclear Accrediting Board in February, 1987.This certification is made in accordance with the requirements of 10 CFR 55.59(c).Should you have any questions, please contact Mr.Robert Carroll, Ginna Training Manager at (315)524-4446, ext.328.Very truly yours, r xc: R.Gallo P.Eselgroth C.Marschall G.Meier R.Carroll Robert C.Mec dy General Manager Nuclear Production as/rcm'nrc+90602 K 050002P4-02g5 890525 PDR ADO PDC v pop0 l p Distribution Sheet Distri16.txt Priority: Normal From: Stefanie Fountain Action Recipients:
Should you have any questions, please contact Mr. Robert Carroll, Ginna Training Manager at (315) 524-4446, ext. 328.
NRR/DLPM/LPD1-1 G Vissing Internal Recipients:
Very truly yours, r
RGN1 FILE 01 NRR/DIP M/OLHP F,.FNKE~'CRS External Recipients:
Robert C. Mec dy General Manager Nuclear Production xc:       R. Gallo P. Eselgroth C. Marschall G. Meier R. Carroll as/rcm 'nrc                                                                     pop0 l p 890525
NOAC Copies: 1 Paper Copy Paper Copy Paper Copy Paper Copy Paper Copy Paper Copy Paper Copy Total Copies: Item: ADAMS Document Library: ML ADAMS" HQNTAD01 ID'03686785
                  +90602-02g5K 050002P4 PDR   ADO         PDC v
 
Distri16.txt Distribution Sheet Priority: Normal From: Stefanie Fountain Action Recipients:              Copies:
NRR/DLPM/LPD1-1                     1        Paper Copy G Vissing                             Paper Copy Internal Recipients:
RGN1 FILE 01                             Paper Copy NRR/DIP M/OLHP                             Paper Copy F,.FNKE~                                 Paper Copy
                  'CRS Paper Copy External Recipients:
NOAC                                 Paper Copy Total Copies:
Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID'03686785


==Subject:==
==Subject:==
Senior Reactor and Reactor Operator Initial Examinations
-R.E.Ginna Body: ADAMS DISTRIBUTION NOTIFICATION.
Electronic Recipients can RIGHT CLICK and OPEN the first Attachment to View the Document in ADAMS.The Document may also be viewed by searching for Accession Number ML003686785.
IE42-Operator Licensing Examination Reports Docket: 05000244 Page 1 Distri16.txt Page 2


February 28, 2000 Dr.Robert C.Mecredy Vice President, Nuclear Operations Rochester Gas and Electric 89 East Avenue Rochester, NY 14649  
Senior Reactor and Reactor Operator Initial Examinations - R. E. Ginna Body:
ADAMS DISTRIBUTION NOTIFICATION.
Electronic Recipients can RIGHT CLICK and OPEN the first Attachment to View the Document in ADAMS. The Document may also be viewed by searching for Accession Number ML003686785.
IE42 - Operator Licensing Examination Reports Docket: 05000244 Page  1
 
Distri16.txt Page 2
 
February 28, 2000 Dr. Robert C. Mecredy Vice President, Nuclear Operations Rochester Gas and Electric 89 East Avenue Rochester, NY 14649


==SUBJECT:==
==SUBJECT:==
SENIOR REACTOR AND REACTOR OPERATOR INITIAL EXAMINATIONS-R.E.GINNA  
SENIOR REACTOR AND REACTOR OPERATOR INITIALEXAMINATIONS-R. E. GINNA


==Dear Dr.'Mecredy:==
==Dear Dr.'Mecredy:==


In a telephone conversation on February 24, 2000, between Mr.Joseph D'Antonio, Examiner/Inspector, and Mr.Ken Masker, Senior Instructor, arrangements were made for the administration of licensing examinations at R.E.Ginna, during the week of May 8, 2000.As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 8, of NUREG-1021,"Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
In a telephone conversation on February 24, 2000, between Mr. Joseph D'Antonio, Examiner/Inspector, and Mr. Ken Masker, Senior Instructor, arrangements were made for the administration of licensing examinations at R. E. Ginna, during the week of May 8, 2000.
To meet the above schedule, it will be necessary for your staff to furnish the written, examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 by March 27, 2000.Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the outlines, examinations and tests before they are submitted to the NRC for review and approval.All materials should be complete and ready-to-use.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 8, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
To meet the above schedule, it will be necessary for your staff to furnish the written, examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 by March 27, 2000. Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the outlines, examinations and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES<02, and to make the simulation facility available on the dates noted above.In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels)generated during the dynamic operating tests until the examination results are final.Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in, effect while the written examinations and operating tests are being administered.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES<02, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Officeof Management and Budget (OMB)approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first  
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in, effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Officeof Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
 
Dr. Robert C. Mecredy                              examination date. If the applications are not received at least 30 days before the examination
. date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reducfion Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on September 30, 2000.
The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructioris, gathering and maintaining the data needed, writing the examinations, and completirig and reviewing the collection of information.
Send comments on ariy aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33),
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1ONRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. Masker has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact J. D'Antonio at (610) 337-5085, or me at (610) 337-5183.
Sincerely, Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 05000244 License No. DPR-18


Dr.Robert C.Mecredy-2-examination date.If the applications are not received at least 30 days before the examination
Dr. Robert C. Mecredy                         CC:
.date, a postponement may be necessary.
P. Wilkens, Senior Vice President, Generation Central Records (7 copies)                 ~
Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.This letter contains information collections that are subject to the Paperwork Reducfion Act of 1995 (44 U.S.C.3501 et seq.).These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on September 30, 2000.The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructioris, gathering and maintaining the data needed, writing the examinations, and completirig and reviewing the collection of information.
P. Eddy, Electric Division, Department of Public Service, State of New York C. Donaldson, Esquire, State of New York, Department of Law N. Reynolds, Esquire F. William Valentino, President, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority F. Maciuska, Manager - Operations Training
Send comments on ariy aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1ONRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.Thank you for your cooperation in this matter.Mr.Masker has been advised of the policies and guidelines referenced in this letter.If you have any questions regarding the NRC's examination procedures and guidelines, please contact J.D'Antonio at (610)337-5085, or me at (610)337-5183.Sincerely, Richard J.Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No.05000244 License No.DPR-18 Dr.Robert C.Mecredy-3-CC: P.Wilkens, Senior Vice President, Generation Central Records (7 copies)~P.Eddy, Electric Division, Department of Public Service, State of New York C.Donaldson, Esquire, State of New York, Department of Law N.Reynolds, Esquire F.William Valentino, President, New York State Energy Research and Development Authority J.Spath, Program Director, New York State Energy Research and Development Authority F.Maciuska, Manager-Operations Training  


Dr.Robert C.Mecredy Distribution:
Dr. Robert C. Mecredy Distribution:
Region I Docket Room (with concurrences)
Region I Docket Room (with concurrences)
PUBLIC NRC Resident Inspector Nuclear Safety Information Center (NSIC)H.Miller, RA/J.Wiggins, DRA (1)M.Evans, DRP W.Cook, DRP R.Junod, DRP W.Lanning, DRS B.Holian, DRS R.Conte, DRS J.D'Antonio, DRS, Chief Examiner V.Curley, DRS, OL Facility File DRS File Distribution (VIA E-MAIL): J.Shea, Rl EDO Coordinator E.Adensam, NRR G.Vissing, NRR Inspection Program Branch, NRR (IPAS)W.Scott, NRR J.Wilcox, NRR DOCDESK.DOCUMENT NAME: G:FOSBtDANTONIO<GIN120DAYEX.WPD Torecelveacop ofthls document, Indicateinthebox: "C"=Copywithoutattachment/enciosure"E"=Cop withattachment/enciosure"N"=Nocop OFFICE Rl/DRS NAME JD'Antonio DATE 02/28/00 Rl/DRS RCont 02/0 02//00 02//00 02//00 OFFICIAL RECORD COPY/t!CP;o7/p/L~<8k,'7sr}}
PUBLIC NRC Resident Inspector Nuclear Safety Information Center (NSIC)
H. Miller, RA/J. Wiggins, DRA (1)
M. Evans, DRP W. Cook, DRP R. Junod, DRP W. Lanning, DRS B. Holian, DRS R. Conte, DRS J. D'Antonio, DRS, Chief Examiner V. Curley, DRS, OL Facility File DRS File Distribution (VIA E-MAIL):
J. Shea, Rl EDO Coordinator E. Adensam, NRR G. Vissing, NRR Inspection Program Branch, NRR (IPAS)
W. Scott, NRR J. Wilcox, NRR DOCDESK.
DOCUMENT NAME: G:FOSBtDANTONIO<GIN120DAYEX.WPD Torecelveacop   ofthls document, Indicateinthebox: "C"=Copywithoutattachment/enciosure "E"=Cop withattachment/enciosure "N"=Nocop OFFICE       Rl/DRS                      Rl/DRS NAME         JD'Antonio                 RCont DATE         02/28/00                   02/     0             02/ /00                 02/ /00               02/ /00 OFFICIAL RECORD COPY
                                                                                              /t!CP;o7/
p/L~<8k,'7sr}}

Latest revision as of 12:25, 4 February 2020

Certifies That Plant Licensed Operator Requalification Training Program Developed Using Systematic Approach to Training.Program Accredited in Conjunction W/Initial Licensed Program by Natl Nuclear Accrediting Board
ML17251A519
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/25/1989
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8906020235
Download: ML17251A519 (13)


Text

gc CEM RATED D BUTTON DEMONS ATION SYFI EM REGULAT INFORMATION DISTRIBUTIO STEM (RIDS)

A'CCESSION'NBR:8906020235 DOC.DATE: 89/05/25 NOTARIZED: NO DOCKET ¹ FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION MECREDY,R.C. Rochester,.Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Advises that util licensed operator requalifcation training program accredited by Natl Nuclear Accrediting Boar.

DISTRIBUTION CODE: M003D COPIES RECEIVED:LTR / ENCL 0 SIZE:

TITLE. Operator Requalificatxon Program 0

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR E CL h PD1-3 LA 1 PD1-3 PD JOHNSON,A 1 D',

INTERNAL: AEOD/DOA AEOD/DSP/TPAB NRR/DLPQ/HFB 10 NUDOCS-ABSTRACT RGNl

~ILE OLB 10Ol NR 8

EXTERNAL: LPDR NRC PDR NSIC R

Di D

NOZE IO ALL 'KIDS" KKXPIIRIS:

PLEASE HELP US IO REDUCE %ASTE! CGNIACT 'IHE DOQEKFZ CXWZEKL DESK, RXN Pl-37 (EXT. 20079) %0 ELXKBRTB ACR MME PKH DXPXRIH7XXCN LISTS MR DOCtlMENX'8 VXJ DCHPT NEZDf TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL

0 g

h

ZZIIIII gZimnZI y

8r. -:-

ROCHESTER, N.K 14649-0001 ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, TELEPHONE AREA CODE Tl& 546-2700 May 25, 1989 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Certification of Licensed Operator Requalification Training Program.

R.E. Ginna Nuclear Power Plant Operating License No. DPR-18 Docket No. 50-244

Dear Sir:

RGSE certifies that the R.E. Ginna Licensed Operator Re-qualification Training Program has been developed using a system-atic approach to training. This program was accredited in conjunction with the Initial Licensed Program by the National Nuclear Accrediting Board in February, 1987. This certification is made in accordance with the requirements of 10 CFR 55.59(c).

Should you have any questions, please contact Mr. Robert Carroll, Ginna Training Manager at (315) 524-4446, ext. 328.

Very truly yours, r

Robert C. Mec dy General Manager Nuclear Production xc: R. Gallo P. Eselgroth C. Marschall G. Meier R. Carroll as/rcm 'nrc pop0 l p 890525

+90602-02g5K 050002P4 PDR ADO PDC v

Distri16.txt Distribution Sheet Priority: Normal From: Stefanie Fountain Action Recipients: Copies:

NRR/DLPM/LPD1-1 1 Paper Copy G Vissing Paper Copy Internal Recipients:

RGN1 FILE 01 Paper Copy NRR/DIP M/OLHP Paper Copy F,.FNKE~ Paper Copy

'CRS Paper Copy External Recipients:

NOAC Paper Copy Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID'03686785

Subject:

Senior Reactor and Reactor Operator Initial Examinations - R. E. Ginna Body:

ADAMS DISTRIBUTION NOTIFICATION.

Electronic Recipients can RIGHT CLICK and OPEN the first Attachment to View the Document in ADAMS. The Document may also be viewed by searching for Accession Number ML003686785.

IE42 - Operator Licensing Examination Reports Docket: 05000244 Page 1

Distri16.txt Page 2

February 28, 2000 Dr. Robert C. Mecredy Vice President, Nuclear Operations Rochester Gas and Electric 89 East Avenue Rochester, NY 14649

SUBJECT:

SENIOR REACTOR AND REACTOR OPERATOR INITIALEXAMINATIONS-R. E. GINNA

Dear Dr.'Mecredy:

In a telephone conversation on February 24, 2000, between Mr. Joseph D'Antonio, Examiner/Inspector, and Mr. Ken Masker, Senior Instructor, arrangements were made for the administration of licensing examinations at R. E. Ginna, during the week of May 8, 2000.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 8, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the written, examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 by March 27, 2000. Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the outlines, examinations and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES<02, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in, effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Officeof Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first

Dr. Robert C. Mecredy examination date. If the applications are not received at least 30 days before the examination

. date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reducfion Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on September 30, 2000.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructioris, gathering and maintaining the data needed, writing the examinations, and completirig and reviewing the collection of information.

Send comments on ariy aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33),

U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1ONRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Masker has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact J. D'Antonio at (610) 337-5085, or me at (610) 337-5183.

Sincerely, Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 05000244 License No. DPR-18

Dr. Robert C. Mecredy CC:

P. Wilkens, Senior Vice President, Generation Central Records (7 copies) ~

P. Eddy, Electric Division, Department of Public Service, State of New York C. Donaldson, Esquire, State of New York, Department of Law N. Reynolds, Esquire F. William Valentino, President, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority F. Maciuska, Manager - Operations Training

Dr. Robert C. Mecredy Distribution:

Region I Docket Room (with concurrences)

PUBLIC NRC Resident Inspector Nuclear Safety Information Center (NSIC)

H. Miller, RA/J. Wiggins, DRA (1)

M. Evans, DRP W. Cook, DRP R. Junod, DRP W. Lanning, DRS B. Holian, DRS R. Conte, DRS J. D'Antonio, DRS, Chief Examiner V. Curley, DRS, OL Facility File DRS File Distribution (VIA E-MAIL):

J. Shea, Rl EDO Coordinator E. Adensam, NRR G. Vissing, NRR Inspection Program Branch, NRR (IPAS)

W. Scott, NRR J. Wilcox, NRR DOCDESK.

DOCUMENT NAME: G:FOSBtDANTONIO<GIN120DAYEX.WPD Torecelveacop ofthls document, Indicateinthebox: "C"=Copywithoutattachment/enciosure "E"=Cop withattachment/enciosure "N"=Nocop OFFICE Rl/DRS Rl/DRS NAME JD'Antonio RCont DATE 02/28/00 02/ 0 02/ /00 02/ /00 02/ /00 OFFICIAL RECORD COPY

/t!CP;o7/

p/L~<8k,'7sr