ML17251A519: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/25/1989
| issue date = 05/25/1989
| title = Certifies That Plant Licensed Operator Requalification Training Program Developed Using Systematic Approach to Training.Program Accredited in Conjunction W/Initial Licensed Program by Natl Nuclear Accrediting Board
| title = Certifies That Plant Licensed Operator Requalification Training Program Developed Using Systematic Approach to Training.Program Accredited in Conjunction W/Initial Licensed Program by Natl Nuclear Accrediting Board
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:gcCEMRATEDDBUTTONDEMONSATIONSYFIEMREGULATINFORMATION DISTRIBUTIO STEM(RIDS),A'CCESSION'NBR:8906020235 DOC.DATE:
{{#Wiki_filter:gc CEM RATED          D        BUTTON        DEMONS        ATION      SYFI EM REGULAT      INFORMATION DISTRIBUTIO           STEM (RIDS)
89/05/25NOTARIZED:
A'CCESSION'NBR:8906020235         DOC.DATE: 89/05/25      NOTARIZED: NO            DOCKET  ¹ FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G                  05000244 AUTH. NAME          AUTHOR AFFILIATION MECREDY,R.C.         Rochester,.Gas 6 Electric Corp.
NODOCKET¹FACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G05000244AUTH.NAMEAUTHORAFFILIATION MECREDY,R.C.
RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
Rochester,.Gas 6ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)


==SUBJECT:==
==SUBJECT:==
Advisesthatutillicensedoperatorrequalifcation trainingprogramaccredited byNatlNuclearAccrediting Boar.DISTRIBUTION CODE:M003DCOPIESRECEIVED:LTR
Advises that util licensed operator requalifcation training program accredited by Natl Nuclear Accrediting Boar.
/ENCL0SIZE:0TITLE.OperatorRequalificatxon ProgramNOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
DISTRIBUTION CODE: M003D      COPIES RECEIVED:LTR       /   ENCL  0  SIZE:
05000244RECIPIENT IDCODE/NAME PD1-3LAJOHNSON,A INTERNAL:
TITLE. Operator Requalificatxon Program 0
AEOD/DOANRR/DLPQ/HFB 10NUDOCS-ABSTRACT RGNlCOPIESLTTRENCL11RECIPIENT IDCODE/NAME PD1-3PDAEOD/DSP/TPAB NROLB10~ILEOlCOPIESLTTRECLhD',8EXTERNAL:
NOTES:License Exp date      in accordance with 10CFR2,2.109(9/19/72).             05000244 RECIPIENT          COPIES            RECIPIENT            COPIES ID CODE/NAME        LTTR ENCL        ID CODE/NAME       LTTR E CL              h PD1-3 LA                1            PD1-3 PD JOHNSON,A               1 D',
LPDRNSICNRCPDRRDiDNOZEIOALL'KIDS"KKXPIIRIS:
INTERNAL: AEOD/DOA                                  AEOD/DSP/TPAB NRR/DLPQ/HFB 10 NUDOCS-ABSTRACT RGNl
PLEASEHELPUSIOREDUCE%ASTE!CGNIACT'IHEDOQEKFZCXWZEKLDESK,RXNPl-37(EXT.20079)%0ELXKBRTBACRMMEPKHDXPXRIH7XXCN LISTSMRDOCtlMENX'8 VXJDCHPTNEZDfTOTALNUMBEROFCOPIESREQUIRED:
                                                    ~ILE OLB 10Ol NR 8
LTTR13ENCL 0gh yZZIIIIIgZimnZI8r.-:-ROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER, N.K14649-0001 May25,1989TELEPHONE AREACODETl&546-2700U.S.NuclearRegulatory Commission ATTN:DocumentControlDeskWashington, DC20555
EXTERNAL: LPDR                                      NRC PDR NSIC R
Di D
NOZE IO ALL 'KIDS" KKXPIIRIS:
PLEASE HELP US IO REDUCE %ASTE!   CGNIACT 'IHE DOQEKFZ CXWZEKL DESK, RXN Pl-37 (EXT. 20079)   %0 ELXKBRTB ACR    MME PKH DXPXRIH7XXCN LISTS MR DOCtlMENX'8 VXJ DCHPT NEZDf TOTAL NUMBER OF COPIES REQUIRED: LTTR            13  ENCL
 
0 g
h
 
ZZIIIII gZimnZI y
8r.       -:-
ROCHESTER, N.K 14649-0001 ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, TELEPHONE AREA CODE Tl& 546-2700 May 25, 1989 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555


==Subject:==
==Subject:==
Certification ofLicensedOperatorRequalification TrainingProgram.R.E.GinnaNuclearPowerPlantOperating LicenseNo.DPR-18DocketNo.50-244
Certification of Licensed Operator Requalification Training Program.
R.E. Ginna Nuclear Power Plant Operating License No. DPR-18 Docket No. 50-244
 
==Dear      Sir:==


==DearSir:==
RGSE    certifies that the R.E. Ginna Licensed Operator Re-qualification Training Program has been developed using a system-atic approach to training.             This program was accredited in conjunction with the Initial Licensed Program by the National Nuclear Accrediting Board in February, 1987. This certification is    made      in accordance with the requirements of 10      CFR    55.59(c).
RGSEcertifies thattheR.E.GinnaLicensedOperatorRe-qualification TrainingProgramhasbeendeveloped usingasystem-aticapproachtotraining.
Should you have any questions, please contact Mr. Robert Carroll, Ginna Training Manager at (315) 524-4446, ext. 328.
Thisprogramwasaccredited inconjunction withtheInitialLicensedProgrambytheNationalNuclearAccrediting BoardinFebruary, 1987.Thiscertification ismadeinaccordance withtherequirements of10CFR55.59(c).
Very truly  yours, r
Shouldyouhaveanyquestions, pleasecontactMr.RobertCarroll,GinnaTrainingManagerat(315)524-4446, ext.328.Verytrulyyours,rxc:R.GalloP.Eselgroth C.Marschall G.MeierR.CarrollRobertC.MecdyGeneralManagerNuclearProduction as/rcm'nrc+90602K050002P4-02g5890525PDRADOPDCvpop0lp Distribution SheetDistri16.txt Priority:
Robert C. Mec dy General Manager Nuclear Production xc:       R. Gallo P. Eselgroth C. Marschall G. Meier R. Carroll as/rcm 'nrc                                                                     pop0 l p 890525
NormalFrom:StefanieFountainActionRecipients:
                  +90602-02g5K 050002P4 PDR  ADO        PDC v
NRR/DLPM/LPD1-1 GVissingInternalRecipients:
 
RGN1FILE01NRR/DIPM/OLHPF,.FNKE~'CRSExternalRecipients:
Distri16.txt Distribution Sheet Priority: Normal From: Stefanie Fountain Action Recipients:             Copies:
NOACCopies:1PaperCopyPaperCopyPaperCopyPaperCopyPaperCopyPaperCopyPaperCopyTotalCopies:Item:ADAMSDocumentLibrary:MLADAMS"HQNTAD01ID'03686785
NRR/DLPM/LPD1-1                     1        Paper Copy G  Vissing                            Paper Copy Internal Recipients:
RGN1 FILE 01                              Paper Copy NRR/DIP M/OLHP                              Paper Copy F,.FNKE~                                 Paper Copy
                  'CRS Paper Copy External Recipients:
NOAC                                  Paper Copy Total Copies:
Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID'03686785


==Subject:==
==Subject:==
SeniorReactorandReactorOperatorInitialExaminations
-R.E.GinnaBody:ADAMSDISTRIBUTION NOTIFICATION.
Electronic Recipients canRIGHTCLICKandOPENthefirstAttachment toViewtheDocumentinADAMS.TheDocumentmayalsobeviewedbysearching forAccession NumberML003686785.
IE42-OperatorLicensing Examination ReportsDocket:05000244Page1 Distri16.txt Page2


February28,2000Dr.RobertC.MecredyVicePresident, NuclearOperations Rochester GasandElectric89EastAvenueRochester, NY14649
Senior Reactor and Reactor Operator Initial Examinations - R. E. Ginna Body:
ADAMS DISTRIBUTION NOTIFICATION.
Electronic Recipients can RIGHT CLICK and OPEN the first Attachment to View the Document in ADAMS. The Document may also be viewed by searching for Accession Number ML003686785.
IE42 - Operator Licensing Examination Reports Docket: 05000244 Page  1
 
Distri16.txt Page 2
 
February 28, 2000 Dr. Robert C. Mecredy Vice President, Nuclear Operations Rochester Gas and Electric 89 East Avenue Rochester, NY 14649


==SUBJECT:==
==SUBJECT:==
SENIORREACTORANDREACTOROPERATORINITIALEXAMINATIONS-R.E.GINNA
SENIOR REACTOR AND REACTOR OPERATOR INITIALEXAMINATIONS-R. E. GINNA
 
==Dear Dr.'Mecredy:==


==DearDr.'Mecredy:==
In a telephone conversation on February 24, 2000, between Mr. Joseph D'Antonio, Examiner/Inspector, and Mr. Ken Masker, Senior Instructor, arrangements were made for the administration of licensing examinations at R. E. Ginna, during the week of May 8, 2000.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 8, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the written, examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 by March 27, 2000. Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the outlines, examinations and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES<02, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in, effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Officeof Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first


Inatelephone conversation onFebruary24,2000,betweenMr.JosephD'Antonio, Examiner/Inspector, andMr.KenMasker,SeniorInstructor, arrangements weremadefortheadministration oflicensing examinations atR.E.Ginna,duringtheweekofMay8,2000.Asagreedduringthetelephone conversation, yourstaffwillpreparetheexaminations basedontheguidelines inRevision8,ofNUREG-1021, "Operator Licensing Examination Standards forPowerReactors."
Dr. Robert C. Mecredy                              examination date. If the applications are not received at least 30 days before the examination
TheNRCregionalofficewilldiscusswithyourstaffanychangesthatmightbenecessary beforetheexaminations areadministered.
. date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
Tomeettheaboveschedule, itwillbenecessary foryourstafftofurnishthewritten,examinations, operating tests,andthesupporting reference materials identified inAttachment 2ofES-201byMarch27,2000.Pursuantto10CFR55.40(b)(3),
This letter contains information collections that are subject to the Paperwork Reducfion Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on September 30, 2000.
anauthorized representative ofthefacilitylicenseeshallapprovetheoutlines, examinations andtestsbeforetheyaresubmitted totheNRCforreviewandapproval.
The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructioris, gathering and maintaining the data needed, writing the examinations, and completirig and reviewing the collection of information.
Allmaterials shouldbecompleteandready-to-use.
Send comments on ariy aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33),
Anydelayinreceiving therequiredexamination andreference materials, orthesubmittal ofinadequate orincomplete materials, maycausetheexaminations toberescheduled.
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1ONRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
Inordertoconducttherequested writtenexaminations andoperating tests,itwillbenecessary foryourstafftoprovideadequatespaceandaccommodations inaccordance withES<02,andtomakethesimulation facilityavailable onthedatesnotedabove.Inaccordance withES-302,yourstaffshouldretaintheoriginalsimulator performance data(e.g.,systempressures, temperatures, andlevels)generated duringthedynamicoperating testsuntiltheexamination resultsarefinal.AppendixEofNUREG-1021 containsanumberofNRCpoliciesandguidelines thatwillbein,effectwhilethewrittenexaminations andoperating testsarebeingadministered.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
TopermittimelyNRCreviewandevaluation, yourstaffshouldsubmitpreliminary reactoroperatorandseniorreactoroperatorlicenseapplications (Officeof Management andBudget(OMB)approvalnumber3150-0090),
Thank you for your cooperation in this matter. Mr. Masker has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact J. D'Antonio at (610) 337-5085, or me at (610) 337-5183.
medicalcertifications (OMBapprovalnumber3150-0024),
Sincerely, Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 05000244 License No. DPR-18
andwaiverrequests(ifany)(OMBapprovalnumber3150-0090) atleast30daysbeforethefirst


Dr.RobertC.Mecredy-2-examination date.Iftheapplications arenotreceivedatleast30daysbeforetheexamination
Dr. Robert C. Mecredy                         CC:
.date,apostponement maybenecessary.
P. Wilkens, Senior Vice President, Generation Central Records (7 copies)                 ~
Signedapplications certifying thatalltraininghasbeencompleted shouldbesubmitted atleast14daysbeforethefirstexamination date.Thislettercontainsinformation collections thataresubjecttothePaperwork Reducfion Actof1995(44U.S.C.3501etseq.).Theseinformation collections wereapprovedbytheOfficeofManagement andBudget,approvalnumber3150-0101, whichexpiresonSeptember 30,2000.Thepublicreporting burdenforthiscollection ofinformation isestimated toaverage500hoursperresponse, including thetimeforreviewing instructioris, gathering andmaintaining thedataneeded,writingtheexaminations, andcompletirig andreviewing thecollection ofinformation.
P. Eddy, Electric Division, Department of Public Service, State of New York C. Donaldson, Esquire, State of New York, Department of Law N. Reynolds, Esquire F. William Valentino, President, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority F. Maciuska, Manager - Operations Training
Sendcommentsonariyaspectofthiscollection ofinformation, including suggestions forreducingtheburden,totheInformation andRecordsManagement Branch(T-6F33),U.S.NuclearRegulatory Commission, Washington, DC20555-0001, orbyInternetelectronic mailatBJS1ONRC.GOV; andtotheDeskOfficer,OfficeofInformation andRegulatory Affairs,NEOB-10202, (3150-0101),
OfficeofManagement andBudget,Washington, DC20503.TheNRCmaynotconductorsponsor,andapersonisnotrequiredtorespondto,acollection ofinformation unlessitdisplaysacurrently validOMBcontrolnumber.Thankyouforyourcooperation inthismatter.Mr.Maskerhasbeenadvisedofthepoliciesandguidelines referenced inthisletter.Ifyouhaveanyquestions regarding theNRC'sexamination procedures andguidelines, pleasecontactJ.D'Antonio at(610)337-5085, ormeat(610)337-5183.Sincerely, RichardJ.Conte,ChiefOperational SafetyBranchDivisionofReactorSafetyDocketNo.05000244LicenseNo.DPR-18 Dr.RobertC.Mecredy-3-CC:P.Wilkens,SeniorVicePresident, Generation CentralRecords(7copies)~P.Eddy,ElectricDivision, Department ofPublicService,StateofNewYorkC.Donaldson, Esquire,StateofNewYork,Department ofLawN.Reynolds, EsquireF.WilliamValentino, President, NewYorkStateEnergyResearchandDevelopment Authority J.Spath,ProgramDirector, NewYorkStateEnergyResearchandDevelopment Authority F.Maciuska, Manager-Operations Training  


Dr.RobertC.MecredyDistribution:
Dr. Robert C. Mecredy Distribution:
RegionIDocketRoom(withconcurrences)
Region I Docket Room (with concurrences)
PUBLICNRCResidentInspector NuclearSafetyInformation Center(NSIC)H.Miller,RA/J.Wiggins,DRA(1)M.Evans,DRPW.Cook,DRPR.Junod,DRPW.Lanning,DRSB.Holian,DRSR.Conte,DRSJ.D'Antonio, DRS,ChiefExaminerV.Curley,DRS,OLFacilityFileDRSFileDistribution (VIAE-MAIL):J.Shea,RlEDOCoordinator E.Adensam,NRRG.Vissing,NRRInspection ProgramBranch,NRR(IPAS)W.Scott,NRRJ.Wilcox,NRRDOCDESK.DOCUMENTNAME:G:FOSBtDANTONIO<GIN120DAYEX.WPD Torecelveacop ofthlsdocument, Indicateinthebox:
PUBLIC NRC Resident Inspector Nuclear Safety Information Center (NSIC)
"C"=Copywithoutattachment/enciosure "E"=Copwithattachment/enciosure "N"=Nocop OFFICERl/DRSNAMEJD'Antonio DATE02/28/00Rl/DRSRCont02/002//0002//0002//00OFFICIALRECORDCOPY/t!CP;o7/
H. Miller, RA/J. Wiggins, DRA (1)
M. Evans, DRP W. Cook, DRP R. Junod, DRP W. Lanning, DRS B. Holian, DRS R. Conte, DRS J. D'Antonio, DRS, Chief Examiner V. Curley, DRS, OL Facility File DRS File Distribution (VIA E-MAIL):
J. Shea, Rl EDO Coordinator E. Adensam, NRR G. Vissing, NRR Inspection Program Branch, NRR (IPAS)
W. Scott, NRR J. Wilcox, NRR DOCDESK.
DOCUMENT NAME: G:FOSBtDANTONIO<GIN120DAYEX.WPD Torecelveacop   ofthls document, Indicateinthebox: "C"=Copywithoutattachment/enciosure "E"=Cop withattachment/enciosure "N"=Nocop OFFICE      Rl/DRS                      Rl/DRS NAME        JD'Antonio                 RCont DATE        02/28/00                    02/     0            02/ /00                  02/ /00                02/ /00 OFFICIAL RECORD COPY
                                                                                              /t!CP;o7/
p/L~<8k,'7sr}}
p/L~<8k,'7sr}}

Latest revision as of 12:25, 4 February 2020

Certifies That Plant Licensed Operator Requalification Training Program Developed Using Systematic Approach to Training.Program Accredited in Conjunction W/Initial Licensed Program by Natl Nuclear Accrediting Board
ML17251A519
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/25/1989
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8906020235
Download: ML17251A519 (13)


Text

gc CEM RATED D BUTTON DEMONS ATION SYFI EM REGULAT INFORMATION DISTRIBUTIO STEM (RIDS)

A'CCESSION'NBR:8906020235 DOC.DATE: 89/05/25 NOTARIZED: NO DOCKET ¹ FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION MECREDY,R.C. Rochester,.Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Advises that util licensed operator requalifcation training program accredited by Natl Nuclear Accrediting Boar.

DISTRIBUTION CODE: M003D COPIES RECEIVED:LTR / ENCL 0 SIZE:

TITLE. Operator Requalificatxon Program 0

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR E CL h PD1-3 LA 1 PD1-3 PD JOHNSON,A 1 D',

INTERNAL: AEOD/DOA AEOD/DSP/TPAB NRR/DLPQ/HFB 10 NUDOCS-ABSTRACT RGNl

~ILE OLB 10Ol NR 8

EXTERNAL: LPDR NRC PDR NSIC R

Di D

NOZE IO ALL 'KIDS" KKXPIIRIS:

PLEASE HELP US IO REDUCE %ASTE! CGNIACT 'IHE DOQEKFZ CXWZEKL DESK, RXN Pl-37 (EXT. 20079) %0 ELXKBRTB ACR MME PKH DXPXRIH7XXCN LISTS MR DOCtlMENX'8 VXJ DCHPT NEZDf TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL

0 g

h

ZZIIIII gZimnZI y

8r. -:-

ROCHESTER, N.K 14649-0001 ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, TELEPHONE AREA CODE Tl& 546-2700 May 25, 1989 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Certification of Licensed Operator Requalification Training Program.

R.E. Ginna Nuclear Power Plant Operating License No. DPR-18 Docket No. 50-244

Dear Sir:

RGSE certifies that the R.E. Ginna Licensed Operator Re-qualification Training Program has been developed using a system-atic approach to training. This program was accredited in conjunction with the Initial Licensed Program by the National Nuclear Accrediting Board in February, 1987. This certification is made in accordance with the requirements of 10 CFR 55.59(c).

Should you have any questions, please contact Mr. Robert Carroll, Ginna Training Manager at (315) 524-4446, ext. 328.

Very truly yours, r

Robert C. Mec dy General Manager Nuclear Production xc: R. Gallo P. Eselgroth C. Marschall G. Meier R. Carroll as/rcm 'nrc pop0 l p 890525

+90602-02g5K 050002P4 PDR ADO PDC v

Distri16.txt Distribution Sheet Priority: Normal From: Stefanie Fountain Action Recipients: Copies:

NRR/DLPM/LPD1-1 1 Paper Copy G Vissing Paper Copy Internal Recipients:

RGN1 FILE 01 Paper Copy NRR/DIP M/OLHP Paper Copy F,.FNKE~ Paper Copy

'CRS Paper Copy External Recipients:

NOAC Paper Copy Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID'03686785

Subject:

Senior Reactor and Reactor Operator Initial Examinations - R. E. Ginna Body:

ADAMS DISTRIBUTION NOTIFICATION.

Electronic Recipients can RIGHT CLICK and OPEN the first Attachment to View the Document in ADAMS. The Document may also be viewed by searching for Accession Number ML003686785.

IE42 - Operator Licensing Examination Reports Docket: 05000244 Page 1

Distri16.txt Page 2

February 28, 2000 Dr. Robert C. Mecredy Vice President, Nuclear Operations Rochester Gas and Electric 89 East Avenue Rochester, NY 14649

SUBJECT:

SENIOR REACTOR AND REACTOR OPERATOR INITIALEXAMINATIONS-R. E. GINNA

Dear Dr.'Mecredy:

In a telephone conversation on February 24, 2000, between Mr. Joseph D'Antonio, Examiner/Inspector, and Mr. Ken Masker, Senior Instructor, arrangements were made for the administration of licensing examinations at R. E. Ginna, during the week of May 8, 2000.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 8, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the written, examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 by March 27, 2000. Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the outlines, examinations and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES<02, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in, effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Officeof Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first

Dr. Robert C. Mecredy examination date. If the applications are not received at least 30 days before the examination

. date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reducfion Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on September 30, 2000.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructioris, gathering and maintaining the data needed, writing the examinations, and completirig and reviewing the collection of information.

Send comments on ariy aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33),

U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1ONRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Masker has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact J. D'Antonio at (610) 337-5085, or me at (610) 337-5183.

Sincerely, Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 05000244 License No. DPR-18

Dr. Robert C. Mecredy CC:

P. Wilkens, Senior Vice President, Generation Central Records (7 copies) ~

P. Eddy, Electric Division, Department of Public Service, State of New York C. Donaldson, Esquire, State of New York, Department of Law N. Reynolds, Esquire F. William Valentino, President, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority F. Maciuska, Manager - Operations Training

Dr. Robert C. Mecredy Distribution:

Region I Docket Room (with concurrences)

PUBLIC NRC Resident Inspector Nuclear Safety Information Center (NSIC)

H. Miller, RA/J. Wiggins, DRA (1)

M. Evans, DRP W. Cook, DRP R. Junod, DRP W. Lanning, DRS B. Holian, DRS R. Conte, DRS J. D'Antonio, DRS, Chief Examiner V. Curley, DRS, OL Facility File DRS File Distribution (VIA E-MAIL):

J. Shea, Rl EDO Coordinator E. Adensam, NRR G. Vissing, NRR Inspection Program Branch, NRR (IPAS)

W. Scott, NRR J. Wilcox, NRR DOCDESK.

DOCUMENT NAME: G:FOSBtDANTONIO<GIN120DAYEX.WPD Torecelveacop ofthls document, Indicateinthebox: "C"=Copywithoutattachment/enciosure "E"=Cop withattachment/enciosure "N"=Nocop OFFICE Rl/DRS Rl/DRS NAME JD'Antonio RCont DATE 02/28/00 02/ 0 02/ /00 02/ /00 02/ /00 OFFICIAL RECORD COPY

/t!CP;o7/

p/L~<8k,'7sr