ML17254A715: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/06/1986
| issue date = 01/06/1986
| title = Forwards Revised Attachments a & B to 851016 Application for Amend to License DPR-18,modifying Tech Specs to Reinstate Senior Reactor Operator Requirement for Operations Manager
| title = Forwards Revised Attachments a & B to 851016 Application for Amend to License DPR-18,modifying Tech Specs to Reinstate Senior Reactor Operator Requirement for Operations Manager
| author name = KOBER R W
| author name = Kober R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = DENTON H R
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000244
| docket = 05000244
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 5
| page count = 5
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:REGULATORFORMWTIONDISTRIBUTIONSTEM(BIDS)ACCESSIONNOR:860113037'PDOC.D,",TE:86/01/06NOTARIZED:NODOCKET0FAGIL:50-24'4RobertEmmetGinnaNuclearPlantiUni+iiRochesterG05000244AUTH.NAMEAUTH~RAFFILIATIONKOBERiR.M.RochesterGas5ElectricCorp.RECIP.NAMERECIPIENIAFFILIATIONDENTONiH.R.OfficeofNuclearReactorRegulationiDirector(post851125SUBJF'CT:ForwardsrevisedAttachmentsA5Bto851016applicationforanendtoLicenseDPR-18'od1fgingTechSpecstoreinstateseniorreac+oropelatorrequirementforopelationsmanager,DISTRIBUTIONCODE:A001DCOPIESRECEIVED:LTRENCLSIZE:TITLE:ORSubmittal:GeneralDistributionNOTES:NRRPNR-BISAPD1cg.OL:O'V/1'P/6905000244RECIPIEN1IDCODE/NAMEPNR-AADTSPNR-AEBFOPSINTERNAL:ACRSELD/HDS4RRAGREGFILE0~COPIESLT1RENCL101166101111RECIPIENTIDCODE/NAMEPNR-APD1PD01PWR-AEICSBCLIFFORD'PNR-ARSBADM/LFMBNRR/DHFT/TSCBNRR/ORASRGN1COPIESLTTRENCL551111110111011EXTERNAL:24XLPDRNSIC'OTES:030511111EGSGBRUSKEISNRCPDR021111TOTALNUMBEROFCOPIESREGUIRED:LTTR31ENCL27 Ih4tht4 t~nrZZZZZIII'LIESCWIJA/II!!SZNF3Z:::-'OCHESTERGASANDELECTRICCORPORATIONo89EASTAVENUE,ROCHESTER,N.K14649-0001ROGERW.KOBER~epReaDENTELECTRICoSTEAMPRODUCTIONJanuary6,1986TELEPHONEARE*CODErid546.2700Mr.HaroldR.DentonDirectorOfficeofNuclearReactorRegulationU.S.NuclearRegulatoryCommissionWashington,D.C.20555Re:RochesterGasandElectricCorporation,R.E.GinnaNuclearPowerPlantDocketNo.50-244
{{#Wiki_filter:REGULATOR          FORMWTION DISTRIBUTION S        TEM (BIDS)
ACCESSION NOR: 860113037'P              DOC. D,",TE: 86/01/06    NOTARIZED: NO          DOCKET 0 FAG IL: 50-24'4 Robert Emmet Ginna Nuclear Planti Uni+               ii  Rochester  G 05000244 AUTH. NAME              AUTH ~R AFFILIATION KOB ER i R. M.           Rochester Gas 5 Electric Corp.
RECIP. NAME              REC IP I EN I AFFILIATION DENTONi H. R.           Office of Nuclear Reactor Regulationi Director (post            851125 SUB JF'CT:   Forwards revised Attachments A 5 B to 851016 application for anend to License DPR-18'od 1 f ging Tech Specs to reinstate senior reac+or opel ator requirement for opel ations manager, DISTRIBUTION CODE: A001D              COPIES RECEIVED: LTR        ENCL      SIZE:
TITLE:   OR  Submittal: General Distribution NOTES: NRR PNR-B ISAPD        1 c g.                                                   05000244 OL: O'V/1'P/69 REC IP I EN 1          COPIES            REC IP IENT        COPIES ID CODE/NAME            LT1 R ENCL        ID CODE/NAME        LTTR ENCL PNR-A ADTS                  1      0      PNR-A PD1 PD 01        5    5 PNR-A EB                    1            PWR-A EICSB                  1 FO                                        CLIFFORD'               1    1 PS                          1            PNR-A RSB              1    1 INTERNAL: ACRS                            6      6      ADM/LFMB                1    0 ELD/HDS4                    1      0      NRR/DHFT/TSCB          1    1 RRAG          1      1      NRR/ORAS                1    0 REG  FILE        0~        1      1      RGN1                    1    1 EXTERNAL: 24X                            1      1      EGSG BRUSKEI S          1    1 LPDR              03        1      1      NRC PDR        02      1    1 NSIC              05              1
'OTES:
TOTAL NUMBER OF COPIES REGUIRED: LTTR                  31  ENCL    27


==DearMr.Denton:==
I h 4
RG&EsubmittedanApplicationforAmendmentdatedOctober16,1985toreflectmanagementorganizationchangesatRG&E.InresponsetotheStaff'sconcernsregardingtheproposedchangetotherequirementfortheOperationsManagertoholdacurrentSROlicense,thatrequirementwillberetained.Therefore,newTechnicalSpecificationpagesinAttachmentAandAttachmentBtothisletterreplacetheattachmentspreviouslytransmittedwithourApplicationforAmendmentdatedOctober16,1985.TheenclosedAttachmentsAandBdifferfromtheOctober16,1985Applicationinthefollowingways:oProposedFigure6.2-5wasmodifiedtoreinstatetheSROrequirementfortheOperationsManager.oProposedspecification6.5.1.2wasmodifiedtodeletetheproposedadditionoftheOperationsSupervisortotHePORC.StatementsassociatedwiththeadditionoftheOperationsSupervisortoPORChavebeenremovedfromAttachmentB.oSpecification6.5.2.9hasbeenmodifiedtoreflectremovalofthepositionofSeniorVicePresident,Operations.ThischangewasinadvertentlyomittedfromtheOctober16application.ItisourunderstandingthattheseproposedTechnicalSpecificationchangesmeetcurrentNRCStaffrequirements.Iffurtherdiscussionisnecessary,RG&Estaffwillbeavailableatyourconvenience.Vetrulyyours,l'p.4Rnn,w.Kpber,860ii30379860i06,'DRADOCK05000244Enclosures','PDRxc:Mr.JayDunkleberger,NewYorkStateEnergyOffice/CP IIkEpLf'"tl AttachmentARevisetheTechnicalSpecificationpagesasfollows:RemoveInsert6.1-16.2-36.2-46.2-56.2-66.2-76.5-16.5-26.5-116.1-16.2-36.2-46.2-56.2-66.2-76.5-16.5-26.5-11  
th t
}}
4
 
          ~nrZZZZZ
                /II III'LIES
                    !!SZNF t
GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14649-0001 3Z:::-'OCHESTER CWI JA ROGER W. KOBER
~e pReaDENT                                                                              TELEPHONE ELECTRIC o STEAM PRODUCTION                                                      ARE* CODE rid 546.2700 January 6, 1986 Mr . Harold R. Denton Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re:      Rochester Gas and Electric Corporation, R.E. Ginna Nuclear Power Plant Docket No. 50-244
 
==Dear Mr. Denton:==
 
RG&E      submitted an Application    for Amendment dated October 16, 1985 to reflect          management    organization changes at RG&E. In response to the Staff's concerns regarding the proposed change to the requirement for the Operations Manager to hold a current SRO license, that requirement will be retained.
Therefore, new Technical Specification pages in Attachment A and Attachment B to this letter replace the attachments previously transmitted with our Application for      Amendment dated October 16, 1985.
The enclosed        Attachments  A and  B differ  from the October 16, 1985 Application in the following ways:
o          Proposed Figure 6.2-5 was modified to      reinstate the  SRO    requirement for the Operations Manager.
o        Proposed  specification 6.5. 1.2 was modified to delete the proposed addition of the Operations Supervisor to tHe PORC. Statements associated with the addition of the Operations Supervisor to PORC                          have been removed from Attachment B.
o        Specification 6.5.2.9 has been modified to reflect removal of the position of Senior Vice President, Operations. This change was inadvertently omitted from the October 16 application.
It is    our understanding that these proposed Technical Specification changes meet        current      NRC Staff requirements. If further discussion is necessary, RG&E staff will            be available at your convenience.
Ve    truly yours, l'p.
4 Rnn    ,w. Kpber
                                        ,860ii30379 860i06
                                      ,'DR ADOCK 05000244 Enclosures                  ',
PDR                                                              /CP xc:       Mr. Jay Dunkleberger, New York State Energy Office
 
I I      k E
f'"
p L
tl
 
Attachment  A Revise the Technical Specification pages as follows:
Remove                            Insert 6.1-1                              6. 1-1 6.2-3                              6. 2-3 6.2-4                              6. 2-4 6.2-5                              6. 2-5 6.2-6                              6. 2-6
: 6. 2-7                            6. 2-7 6.5-1                              6.5-1 6.5-2                             6.5-2 6.5-11                            6.5-11}}

Latest revision as of 11:36, 4 February 2020

Forwards Revised Attachments a & B to 851016 Application for Amend to License DPR-18,modifying Tech Specs to Reinstate Senior Reactor Operator Requirement for Operations Manager
ML17254A715
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/06/1986
From: Kober R
ROCHESTER GAS & ELECTRIC CORP.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML17254A716 List:
References
NUDOCS 8601130379
Download: ML17254A715 (5)


Text

REGULATOR FORMWTION DISTRIBUTION S TEM (BIDS)

ACCESSION NOR: 860113037'P DOC. D,",TE: 86/01/06 NOTARIZED: NO DOCKET 0 FAG IL: 50-24'4 Robert Emmet Ginna Nuclear Planti Uni+ ii Rochester G 05000244 AUTH. NAME AUTH ~R AFFILIATION KOB ER i R. M. Rochester Gas 5 Electric Corp.

RECIP. NAME REC IP I EN I AFFILIATION DENTONi H. R. Office of Nuclear Reactor Regulationi Director (post 851125 SUB JF'CT: Forwards revised Attachments A 5 B to 851016 application for anend to License DPR-18'od 1 f ging Tech Specs to reinstate senior reac+or opel ator requirement for opel ations manager, DISTRIBUTION CODE: A001D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES: NRR PNR-B ISAPD 1 c g. 05000244 OL: O'V/1'P/69 REC IP I EN 1 COPIES REC IP IENT COPIES ID CODE/NAME LT1 R ENCL ID CODE/NAME LTTR ENCL PNR-A ADTS 1 0 PNR-A PD1 PD 01 5 5 PNR-A EB 1 PWR-A EICSB 1 FO CLIFFORD' 1 1 PS 1 PNR-A RSB 1 1 INTERNAL: ACRS 6 6 ADM/LFMB 1 0 ELD/HDS4 1 0 NRR/DHFT/TSCB 1 1 RRAG 1 1 NRR/ORAS 1 0 REG FILE 0~ 1 1 RGN1 1 1 EXTERNAL: 24X 1 1 EGSG BRUSKEI S 1 1 LPDR 03 1 1 NRC PDR 02 1 1 NSIC 05 1

'OTES:

TOTAL NUMBER OF COPIES REGUIRED: LTTR 31 ENCL 27

I h 4

th t

4

~nrZZZZZ

/II III'LIES

!!SZNF t

GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14649-0001 3Z:::-'OCHESTER CWI JA ROGER W. KOBER

~e pReaDENT TELEPHONE ELECTRIC o STEAM PRODUCTION ARE* CODE rid 546.2700 January 6, 1986 Mr . Harold R. Denton Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Rochester Gas and Electric Corporation, R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Denton:

RG&E submitted an Application for Amendment dated October 16, 1985 to reflect management organization changes at RG&E. In response to the Staff's concerns regarding the proposed change to the requirement for the Operations Manager to hold a current SRO license, that requirement will be retained.

Therefore, new Technical Specification pages in Attachment A and Attachment B to this letter replace the attachments previously transmitted with our Application for Amendment dated October 16, 1985.

The enclosed Attachments A and B differ from the October 16, 1985 Application in the following ways:

o Proposed Figure 6.2-5 was modified to reinstate the SRO requirement for the Operations Manager.

o Proposed specification 6.5. 1.2 was modified to delete the proposed addition of the Operations Supervisor to tHe PORC. Statements associated with the addition of the Operations Supervisor to PORC have been removed from Attachment B.

o Specification 6.5.2.9 has been modified to reflect removal of the position of Senior Vice President, Operations. This change was inadvertently omitted from the October 16 application.

It is our understanding that these proposed Technical Specification changes meet current NRC Staff requirements. If further discussion is necessary, RG&E staff will be available at your convenience.

Ve truly yours, l'p.

4 Rnn ,w. Kpber

,860ii30379 860i06

,'DR ADOCK 05000244 Enclosures ',

PDR /CP xc: Mr. Jay Dunkleberger, New York State Energy Office

I I k E

f'"

p L

tl

Attachment A Revise the Technical Specification pages as follows:

Remove Insert 6.1-1 6. 1-1 6.2-3 6. 2-3 6.2-4 6. 2-4 6.2-5 6. 2-5 6.2-6 6. 2-6

6. 2-7 6. 2-7 6.5-1 6.5-1 6.5-2 6.5-2 6.5-11 6.5-11