| issue date = 12/20/1983
| issue date = 12/20/1983
| title = Forwards Revs 7 & 0 to Inservice Insp Program for 1980 - 1989.Rev Provides Clarification to Previously Revised Interval Start Dates for Quality Group B & C Components
| title = Forwards Revs 7 & 0 to Inservice Insp Program for 1980 - 1989.Rev Provides Clarification to Previously Revised Interval Start Dates for Quality Group B & C Components
| author name = MAIER J E
| author name = Maier J
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = CRUTCHFIELD D
| addressee name = Crutchfield D
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000244
| docket = 05000244
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:REGULATOR'NFORMATION OISTRISUTION S'EM(RIOS)ACCESSIONNBR;8312280377 DOC~DATE!83/1'2/20 NOTARIZED!
{{#Wiki_filter:REGULATOR'NFORMATION             OISTRISUTION S'EM       (RIOS)
NODOCKEiTFACIL:SQ244'Robent Emme,t<<Ginna NucleariP)antiUnitirRochester-G05000244;AUTHNAME AUTHORAFFILIATION M"IERrJ~E'Rochester GasLElectricCorp+RECIP;NAME RECIPIENT AFFILIATION
ACCESS ION NBR; 8312280377               DOC ~ DATE! 83/1'2/20 NOTARIZED! NO                    DOCKEiT FACIL:SQ 244'Robent         Emme,t<<Ginna       Nuclear iP)anti Unit ir Rochester-             G 05000244
*'GRUTCHFIELDiD
    ;AUTHNAME               AUTHOR    AFFILIATION M" IERr J ~ E'           Rochester     Gas    L  Electric*
~OperatingReactorsBranch5,'SUBJECT!
Corp+
ForwardsRevs780toinservice.inspprogram-for19801989~Revpr'ovides clarification itopreviouslytTevisedintervalistartatesforQualityGroupB8CcomponentsN DISTRIBUTION
RECIP;NAME             RECIPIENT AFFILIATION
'COD0AQQ70IESRECEIVED:LiTR ENCL'SIZE:.'ITLE;-.
  'GRUTCHFIELDiD~               Oper ating Reactor s Br anch 5,
OR"Submi.Otal:
  'SUBJECT! For war ds Revs 7 8            0  to inser vice. insp program for 1980 1989 ~ Rev pr'ovides     clarification ito pr eviously tTevised interval istart      ates for Quality Group B 8 C componentsN DISTRIBUTION 'COD 0 AQQ7                0 IES RECEIVED:LiTR           ENCL     'SIZE:
Inservicei'Inspection/Testing NOTES:NRR/DL/SEP icy,05000204RECIPIENT.
OR"   Submi.Otal: Inser      vicei'Inspection/Testing                       .'ITLE;-.
ID.CODE/NAMEI NRRORBSBC'1INTERNALS
NOTES:NRR/DL/SEP         icy,                                                                   05000204 RECIPIENT.                                 RECIPIENT          COPIES ID .CODE/NAMEI         .LTTR ENCL.        ID CODE/NAME        L'TTR ENCL*
-ELD/HDSO
NRR ORBS    BC'1          "7        7 INTERNALS -ELD/HDSO                           1      0                EB    15
'NRR/DE/MTEB 14RGNiEXTERNAL:
              'NRR/DE/MTEB       14        1      1                      04 RGNi                          1      1 NTIS'OTES'COPIES EXTERNAL: ACRS                    16      10      10      LPDR NRC PDR            02",.      1      1      NSIC 1
ACRS16NRCPDR02",.NTIS'OTES'COPIES
1      1
.LTTRENCL."77101111101011111RECIPIENT IDCODE/NAME EB1504LPDRNSICCOPIESL'TTRENCL*]TOTALNUMBER,OFCOPIESREQUIRED!
]TOTAL NUMBER, OF COPIES REQUIRED! LTTR                    27  ENCL  '6
LTTR27ENCL'6  
 
~i]103~)g~"btlilrVlg33A94)I"lePf~sl'ID)c'Qfl30'~
                                                                  ~ )g~"                           l g,H.".
.iT'<I)fi,nr0t,qiJ~~~>lg,H.".H>>,".'lrp'
btlil r V H>>,".'lrp'
)iP4~'Oc),>heii~t'"~i>P>lgr>g-,,>.ioqz~l;~nrggrVqe'~et",4f>~4pro>l".t>'sr>~
                                                                                                            )i P4~'Oc lg  3 3A    94) I "le                                ),>hei
I'fi'0~rEf1'3Vlitg~rp9'1')E)'l>i>r'.tri')r0r9(pf')e~~ylf>fVrl)'1qp''I'3~0'>lb~i'fIl'3A<)*~
                                  ~ i]103                          Pf~sl   'ID)c'Qfl30'~
il)lli'><<))lily'g<rr~>llvipre'li"94foal>PlE,'le~frQ'IA'lfiI:4~I~.lliTj:l>>rg)>>c)Il>g~~liih,''(<>0~ITl>>li"1ifarl~lW~n'r'0g~snIaarv~o,.~)
                                                                              .iT'<I   ) f                              i~ t'" ~
I:fr'0>r~A~~~~'>;:IITII pyui~zrzjjzrnuzrnZZ.ROCHESTER GASANDELECTRICCORPORATION
i, n r 0 t,q iJ~~~>
~89EASTAVENUE,ROCHESTER.
i>P>   l gr>g   ,, >.ioqz ~l;~nr gg r Vqe'~et ",4 f> ~ 4 pro>l ".t>'sr>~ I '
N.Y.14649REEYORKSTATEJOHNE.MA1CRVicePreeiYSent TELEPHONE AREAcooETie546-2700December20I1983DirectorofNuclearReactorRegulation Attention:
fi'0 r Ef 1'3 V l i tg~ r p9'1') E) 'l >i> r '.t ri') r 0 r 9(p f ') e~~ylf> f Vrl)'1 q p''I '3 ~ 0'>lb
Mr.DennisM.CrutchfieldE ChiefOperating ReactorBranchNumber5U.S.NuclearRegulatory Commission Nashingtoni D.C.20555
          ~
~ i'f Il'3A<)*~ i l ) ll i    '> <<))lily' g < r r~>llvi pre'l i" 94 foal> P lE,'le~ f r Q'IA'l fi I j: l rg     )>>                                     ''(<>0                   I Tl>>li"1
: 4~I~.              l  l          iT ar l ~lW
                                              ~n'r'0g~   s c  )I  l >g nI aarv~o,.~)           I:
                                                                                ~~ l iih, fr'0 > r ~ A~~~
                                                                                                                      ~            i f
                                                                                                                            ~'>;:I IT I I
 
REE py j
ui~zrz jzrnuzrn ZZ.
YORK STATE ROCHESTER GAS AND ELECTRIC CORPORATION      ~ 89 EAST AVENUE, ROCHESTER. N.Y. 14649 JOHN E. MA1CR                                                            TELEPHONE Vice PreeiYSent                                                AREA cooE Tie 546-2700 December 20I 1983 Director of Nuclear Reactor Regulation Attention: Mr. Dennis M. CrutchfieldE Chief Operating Reactor Branch Number    5 U. S.         Nuclear Regulatory Commission Nashingtoni D.C. 20555


==Subject:==
==Subject:==
Inservice Inspection ProgramForthe1980-1989 IntervalR.E.GinnaNuclearPowerPlantDocketNo.50-244
Inservice Inspection Program For the 1980-1989 Interval R. E. Ginna Nuclear Power Plant Docket No. 50-244
 
==Dear Mr.            Crutchfield:==
 
Enclosed is Revision 7 to Appendix B to the Ginna Station Quality Assurance Manual which describes the Inservice Inspection for the 1980-1989 Interval. This revision provides clarification to the previously revised interval start dates for Quality Group B and C components and for High Energy Piping Outside of Containment inspection. Enclosed Revision 7 also provides clarification for scope and extent of examinations associated with Quality Group B and C pressure testing which are consistent with our program commitments.
The      Interval 1 start date for Groups B and C was 40 months later        than    for Group A. Prior to the start of Interval 2I it was determined that eliminating the 40-month of fset would be beneficial by having the Interval 2 dates for the three groups coincide. Howeveri the previous revisions did not clearly depict the transition-induced 40-month overlap for Group B and C Interval 1 completion of May 1983 and Interval 2 start of January 1980; Early in the second interval>              it  was also determined that our 10-year program for High Energy Piping Outside of Containment<
which also formally commenced in 1973 should be adjusted to coincide with the interval start dates for Groups AI B and C.
As with Groups B and CI the transition was completed earlier this yeari and all piping groups are embarking on the second 40-month period of the second interval.
A related proposed change to Ginna Technical Specifications is being submitted to identify the second and subsequent interval dates. Its accompanying safety evaluation indicates that the change in interval dates will not affect the health and safety of the public> since the date shift was in a conservative direction, resulting in an increase in component surveillance during the recently completed 40-month transition period.
8312280377 831220
'PDR ADOCK 05000244 8                          PDR il
 
I I
I I ~ I
          '4 J)l 8


==DearMr.Crutchfield:==
Mr. Dennis M. Crut December 20> 1983 ield                      0        Page 2 Revision with respect to 7 has been implemented since the current Technical it is conservative Specifications.
Very  truly yours, John E. Naier Enclosure


EnclosedisRevision7toAppendixBtotheGinnaStationQualityAssurance Manualwhichdescribes theInservice Inspection forthe1980-1989 Interval.
c g C 4 J}}
Thisrevisionprovidesclarification tothepreviously revisedintervalstartdatesforQualityGroupBandCcomponents andforHighEnergyPipingOutsideofContainment inspection.
EnclosedRevision7alsoprovidesclarification forscopeandextentofexaminations associated withQualityGroupBandCpressuretestingwhichareconsistent withourprogramcommitments.
TheInterval1startdateforGroupsBandCwas40monthslaterthanforGroupA.PriortothestartofInterval2Iitwasdetermined thateliminating the40-monthoffsetwouldbebeneficial byhavingtheInterval2datesforthethreegroupscoincide.
Howeverithepreviousrevisions didnotclearlydepictthetransition-induced 40-monthoverlapforGroupBandCInterval1completion ofMay1983andInterval2startofJanuary1980;Earlyinthesecondinterval>
itwasalsodetermined thatour10-yearprogramforHighEnergyPipingOutsideofContainment<
whichalsoformallycommenced in1973shouldbeadjustedtocoincidewiththeintervalstartdatesforGroupsAIBandC.AswithGroupsBandCIthetransition wascompleted earlierthisyeariandallpipinggroupsareembarking onthesecond40-monthperiodofthesecondinterval.
ArelatedproposedchangetoGinnaTechnical Specifications isbeingsubmitted toidentifythesecondandsubsequent intervaldates.Itsaccompanying safetyevaluation indicates thatthechangeinintervaldateswillnotaffectthehealthandsafetyofthepublic>sincethedateshiftwasinaconservative direction, resulting inanincreaseincomponent surveillance duringtherecentlycompleted 40-monthtransition period.8312280377 831220'PDRADOCK050002448PDRil III~II'4J)l8 Mr.DennisM.CrutieldDecember20>19830Page2Revision7hasbeenimplemented sinceitisconservative withrespecttothecurrentTechnical Specifications.
Verytrulyyours,JohnE.NaierEnclosure gC4Jc}}

Latest revision as of 11:29, 4 February 2020

Forwards Revs 7 & 0 to Inservice Insp Program for 1980 - 1989.Rev Provides Clarification to Previously Revised Interval Start Dates for Quality Group B & C Components
ML17255A572
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/20/1983
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
Shared Package
ML17255A573 List:
References
NUDOCS 8312280377
Download: ML17255A572 (6)


Text

REGULATOR'NFORMATION OISTRISUTION S'EM (RIOS)

ACCESS ION NBR; 8312280377 DOC ~ DATE! 83/1'2/20 NOTARIZED! NO DOCKEiT FACIL:SQ 244'Robent Emme,t<<Ginna Nuclear iP)anti Unit ir Rochester- G 05000244

AUTHNAME AUTHOR AFFILIATION M" IERr J ~ E' Rochester Gas L Electric*

Corp+

RECIP;NAME RECIPIENT AFFILIATION

'GRUTCHFIELDiD~ Oper ating Reactor s Br anch 5,

'SUBJECT! For war ds Revs 7 8 0 to inser vice. insp program for 1980 1989 ~ Rev pr'ovides clarification ito pr eviously tTevised interval istart ates for Quality Group B 8 C componentsN DISTRIBUTION 'COD 0 AQQ7 0 IES RECEIVED:LiTR ENCL 'SIZE:

OR" Submi.Otal: Inser vicei'Inspection/Testing .'ITLE;-.

NOTES:NRR/DL/SEP icy, 05000204 RECIPIENT. RECIPIENT COPIES ID .CODE/NAMEI .LTTR ENCL. ID CODE/NAME L'TTR ENCL*

NRR ORBS BC'1 "7 7 INTERNALS -ELD/HDSO 1 0 EB 15

'NRR/DE/MTEB 14 1 1 04 RGNi 1 1 NTIS'OTES'COPIES EXTERNAL: ACRS 16 10 10 LPDR NRC PDR 02",. 1 1 NSIC 1

1 1

]TOTAL NUMBER, OF COPIES REQUIRED! LTTR 27 ENCL '6

~ )g~" l g,H.".

btlil r V H>>,".'lrp'

)i P4~'Oc lg 3 3A 94) I "le ),>hei

~ i]103 Pf~sl 'ID)c'Qfl30'~

.iT'

i>P> l gr>g ,, >.ioqz ~l;~nr gg r Vqe'~et ",4 f> ~ 4 pro>l ".t>'sr>~ I '

fi'0 r Ef 1'3 V l i tg~ r p9'1') E) 'l >i> r '.t ri') r 0 r 9(p f ') e~~ylf> f Vrl)'1 q pI '3 ~ 0'>lb

~

~ i'f Il'3A<)*~ i l ) ll i '> <<))lily' g < r r~>llvi pre'l i" 94 foal> P lE,'le~ f r Q'IA'l fi I j: l rg )>> (<>0 I Tl>>li"1

4~I~. l l iT ar l ~lW

~n'r'0g~ s c )I l >g nI aarv~o,.~) I:

~~ l iih, fr'0 > r ~ A~~~

~ i f

~'>;:I IT I I

REE py j

ui~zrz jzrnuzrn ZZ.

YORK STATE ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER. N.Y. 14649 JOHN E. MA1CR TELEPHONE Vice PreeiYSent AREA cooE Tie 546-2700 December 20I 1983 Director of Nuclear Reactor Regulation Attention: Mr. Dennis M. CrutchfieldE Chief Operating Reactor Branch Number 5 U. S. Nuclear Regulatory Commission Nashingtoni D.C. 20555

Subject:

Inservice Inspection Program For the 1980-1989 Interval R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Crutchfield:

Enclosed is Revision 7 to Appendix B to the Ginna Station Quality Assurance Manual which describes the Inservice Inspection for the 1980-1989 Interval. This revision provides clarification to the previously revised interval start dates for Quality Group B and C components and for High Energy Piping Outside of Containment inspection. Enclosed Revision 7 also provides clarification for scope and extent of examinations associated with Quality Group B and C pressure testing which are consistent with our program commitments.

The Interval 1 start date for Groups B and C was 40 months later than for Group A. Prior to the start of Interval 2I it was determined that eliminating the 40-month of fset would be beneficial by having the Interval 2 dates for the three groups coincide. Howeveri the previous revisions did not clearly depict the transition-induced 40-month overlap for Group B and C Interval 1 completion of May 1983 and Interval 2 start of January 1980; Early in the second interval> it was also determined that our 10-year program for High Energy Piping Outside of Containment<

which also formally commenced in 1973 should be adjusted to coincide with the interval start dates for Groups AI B and C.

As with Groups B and CI the transition was completed earlier this yeari and all piping groups are embarking on the second 40-month period of the second interval.

A related proposed change to Ginna Technical Specifications is being submitted to identify the second and subsequent interval dates. Its accompanying safety evaluation indicates that the change in interval dates will not affect the health and safety of the public> since the date shift was in a conservative direction, resulting in an increase in component surveillance during the recently completed 40-month transition period.

8312280377 831220

'PDR ADOCK 05000244 8 PDR il

I I

I I ~ I

'4 J)l 8

Mr. Dennis M. Crut December 20> 1983 ield 0 Page 2 Revision with respect to 7 has been implemented since the current Technical it is conservative Specifications.

Very truly yours, John E. Naier Enclosure

c g C 4 J