ML17296B146: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/12/1980
| issue date = 12/12/1980
| title = Requests Evaluation of Deficiency Repts within 30 Days Re Weld Overstress Caused by Pulled Pipe Spools,Cable Tray Supports Not Meeting Drawing Requirements & Class IE Conductors Too Close to non-Class IE Conductors
| title = Requests Evaluation of Deficiency Repts within 30 Days Re Weld Overstress Caused by Pulled Pipe Spools,Cable Tray Supports Not Meeting Drawing Requirements & Class IE Conductors Too Close to non-Class IE Conductors
| author name = VAN BRUNT E E
| author name = Van Brunt E
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name = WILSON W H
| addressee name = Wilson W
| addressee affiliation = BECHTEL POWER CORP.
| addressee affiliation = BECHTEL POWER CORP.
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULATORY I'RMATION DISTRIBUTION SYST M (RIDS)ACCESSION NBR:8012230496 DOC~DATE: 80/12/12 NOTARIZE: NO FACIL:STN 50-528 Palo Verde Nuclear Stationi Unit ii Arizona Publi STN 50-529 Palo Verde Nuclear Stations Unit 2i Arizona Publi STN"50-530 Palo Verde Nuclear Stationi Unit 3i Arizona Publi AUTH INANE AUTHOR AFF IL I ATION VAN BRUNTiE.ED Arizona Public Service Co, REC IP.NAME RECIPIEN1 AFF ILIATION NILSONi H~H~Bechtel Power Corp.(subs.of Bechtel Corp.)DOCKET¹05000528 05000529 05000530 S I ZE e2
{{#Wiki_filter:REGULATORY   I'RMATION DISTRIBUTION         SYST   M (RIDS)
ACCESSION NBR:8012230496           DOC ~ DATE: 80/12/12   NOTARIZE: NO                 DOCKET  ¹ FACIL:STN STN 50-528 50-529 Palo Palo Verde Verde Nuclear Nuclear Stationi Stations Unit Unit ii 2i Arizona Publi Arizona Publi 05000528 05000529 STN"50-530 Palo Verde Nuclear Stationi Unit 3i Arizona Publi                     05000530 AUTH INANE           AUTHOR AFF IL I ATION VAN BRUNTiE.ED       Arizona Public Service Co, REC IP. NAME         RECIPIEN1 AFF ILIATION NILSONi H ~ H ~     Bechtel Power Corp. (subs. of Bechtel Corp.)


==SUBJECT:==
==SUBJECT:==
Requests deficiency repts within 30 days re weld overstress caused by pulled pipe spoolsicable tray supports not meeting drawing requirements L class IE condctors too close to non-Class IE conductors.
Requests deficiency repts within 30 days re weld overstress caused by pulled pipe spoolsicable tray supports not meeting drawing requirements L class IE condctors too close to non-Class IE conductors.
DISTRIBUTION CODE: 8019S COPIES RECEIVED:LTR i ENCL TITLE: Construction Deficiency Report (10CFR50.55E)
DISTRIBUTION CODE: 8019S         COPIES RECEIVED:LTR     i ENCL         S I ZE 2 e
NOTES:Standardized Plant.Standardized Plant.Standardized Plant.05000528 05000529 05000530 RFCIPIENT ID CODE/NAME CTI ON: A/D LICE,NSNG 04 LEEpJ~06 NTERNAL: AD/RCI/IE 1 1 ASLBP/J.HARD DIRg DIV OF LIC EQUIP QUAL BR11'LE 09 MPA 20 OELD 21 QA BR 14 RUTHERFORDiW IE COPIES LTTR ENCI RECIPIENT ID CODE/NAME MIRAGLIAg F.05 KERRIGAN J, 07 AEOD 18 D/DIR HUM FAC15 EDO 8 STAFF 19 HYD/GEO BR 22 LIC QUAL BR 12 NRC PDR 02 P REV 13 tG FILE 01 V 21 COPIES LTTR ENCL XTERHALe ACRS NSIC 16 08 16 1 1 LPDR 03 DE'c~glSea 0 TOTAL NUMBER OF COPIES REQUIRED: LTTR 40 ENCL 0  
TITLE: Construction Deficiency Report (10CFR50.55E)
NOTES:Standardized     Plant.                                                         05000528 Standardized     Plant.                                                         05000529 Standardized     Plant.                                                         05000530 RFCIPIENT         COPIES            RECIPIENT            COPIES ID CODE/NAME         LTTR ENCI        ID CODE/NAME          LTTR ENCL CTI ON:   A/D LICE,NSNG 04                       MIRAGLIAgF.      05 LEEpJ ~         06                   KERRIGAN  J,    07 NTERNAL:   AD/RCI/IE       1 1                   AEOD              18 ASLBP/J.HARD                           D/DIR HUM FAC15 DIRg DIV OF LIC                        EDO 8 STAFF       19 EQUIP  QUAL BR11                      HYD/GEO BR       22
        'LE                09                    LIC QUAL   BR     12 MPA              20                    NRC PDR         02 OELD            21                    P         REV 13 QA BR            14                      tG FILE         01 RUTHERFORDiW    IE                                  V   21 XTERHALe ACRS               16     16     1     LPDR             03 NSIC            08      1 DE'c ~g lSea 0
TOTAL NUMBER OF COPIES       REQUIRED: LTTR     40   ENCL       0


ARIZONA NUCLEAIZ POVIEll PAOJEGT''II~,I<)IIII,'I:
ARIZONA NUCLEAIZ POVIEll PAOJEGT
tJiIr.2 l I'III)I,'Illx, AIIIOIIII 8.'>(UG ,~j'/i'ecember 12., 1980 ANPP-16886-BSK/JAR Nr.W.H.Wilson , Project Manager Bechtel Power Corporation
                                                          ''II~,I <)IIII,'I: tJiIr. 2 l   I'III)I,'Illx,AIIIOIIII8.'>(UG
'11445 South Lakewood Boulevard Downey, California
                                                                                              ~j'/i'ecember 12., 1980 ANPP-16886-BSK/JAR Nr. W. H. Wilson
          ,   Project Manager Bechtel Power Corporation
              '11445 South Lakewood Boulevard Downey, California


==Subject:==
==Subject:==
Potentially Reportable Deficiencies
Potentially Reportable Deficiencies -                   10CFR50.55(e)
-10CFR50.55(e)
File: 80-019-026; 0.4. 33. 2 Re:           (1)     ANPP-15525.-BSK/JAR, dated Nay 28, 1980
File: 80-019-026; 0.4.33.2 Re: (1)ANPP-15525.-BSK/JAR, dated Nay 28, 1980  


==Dear Bill:==
==Dear   Bill:==
The NRC was notified yesterday of the following potentially reportable defi-"ciencies:
 
DER 80-38: Pipe spools pulled to facilitate installation of pi pe supports may overs tress wel ds C/7)ILK CD>CD CD~I<C,Q~i gtf$'hal,>'b~C DER 80-39: Item 3 Only-Cable tray supports do not meet drawling requirements DER 80-41: 'lass IE conductors come within six inche's (6")of non-class IE conductors on six (6)ITE Gould 480 Volt Load Center Isolation Relay Cabinets As noted in the referenced letter, inter'r final reports are required within thirty (30)days unless a deficiency is evaluated as Not Reportable, in wh'ich case, a written report is not required.You are requested to evaluate these DER's for reportabi lity and submit your recommendations along with the applicable wri tten reports to APS, in accor-.dance with the Reference (1), by January 5, 1981.Very truly yours, E.E.Van Brunt, Jr.APS Vice President, Nuclear Projects e~ANPP Project Director 0 I 0/~8830~g 0 J I f 0 Ilr.W.II.14,Llson Pro'Icct H lnaper ANPP-16886-BSK/.Ihl<
The   NRC was     notified yesterday of the following potentially reportable defi-
December 12, 1980 Page 2 cc: R.L.Robb D.B.Fasnacht J.A.Roedel J.H.Allen A.C.Rogers W.E.Ide A.C.Gehr J.A.Brand W.J.Stubblefield W.G.Bingham R.L.Patterson R.W.Welcher R.H.Grant D.R.Hawkinson lf I}}
            "ciencies:
DER 80-38:   Pipe spools pulled to facilitate installation of pi pe supports may overs tress wel ds DER   80-39:   Item 3 Only - Cable tray supports do not meet drawling requirements DER 80-41: 'lass   IE conductors come within six inche's (6") of non-class   IE conductors on six (6) ITE Gould 480 Volt   Load Center Isolation Relay Cabinets As   noted in the referenced letter, thirty inter'r             final reports are required within (30) days unless a deficiency is evaluated as Not Reportable, in wh'ich case, a written report is not required.
You are     requested     to evaluate these   DER's     for reportabi       lity and         submit your recommendations along with the applicable wri tten reports to APS, in accor-
      . dance with the Reference ( 1), by January 5, 1981.
Very       truly yours, C/7)                                      E. E. Van       Brunt, Jr.
  ~i                        ILK CD>                                        APS       Vice President, Nuclear Projects e~                                                   ANPP       Project Director gtf$
CD~
CD 0 I 0/
        'hal,>'b I<
C,Q
~
C
                                      ~8830
                                                ~g
 
0 J
I f
 
Ilr. W. II. 14,Llson 0
Pro'Icct H lnaper ANPP-16886-BSK/.Ihl<
December 12, 1980 Page 2 cc:   R. L. Robb D. B. Fasnacht J. A. Roedel J. H. Allen A. C. Rogers W. E. Ide A. C. Gehr J. A. Brand W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. H. Grant D. R. Hawkinson
 
lf I}}

Latest revision as of 05:44, 4 February 2020

Requests Evaluation of Deficiency Repts within 30 Days Re Weld Overstress Caused by Pulled Pipe Spools,Cable Tray Supports Not Meeting Drawing Requirements & Class IE Conductors Too Close to non-Class IE Conductors
ML17296B146
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/12/1980
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Wilson W
BECHTEL POWER CORP.
References
10CFR-050.55E, 10CFR-50.55E, ANPP-16886-BSK, NUDOCS 8012230496
Download: ML17296B146 (6)


Text

REGULATORY I'RMATION DISTRIBUTION SYST M (RIDS)

ACCESSION NBR:8012230496 DOC ~ DATE: 80/12/12 NOTARIZE: NO DOCKET ¹ FACIL:STN STN 50-528 50-529 Palo Palo Verde Verde Nuclear Nuclear Stationi Stations Unit Unit ii 2i Arizona Publi Arizona Publi 05000528 05000529 STN"50-530 Palo Verde Nuclear Stationi Unit 3i Arizona Publi 05000530 AUTH INANE AUTHOR AFF IL I ATION VAN BRUNTiE.ED Arizona Public Service Co, REC IP. NAME RECIPIEN1 AFF ILIATION NILSONi H ~ H ~ Bechtel Power Corp. (subs. of Bechtel Corp.)

SUBJECT:

Requests deficiency repts within 30 days re weld overstress caused by pulled pipe spoolsicable tray supports not meeting drawing requirements L class IE condctors too close to non-Class IE conductors.

DISTRIBUTION CODE: 8019S COPIES RECEIVED:LTR i ENCL S I ZE 2 e

TITLE: Construction Deficiency Report (10CFR50.55E)

NOTES:Standardized Plant. 05000528 Standardized Plant. 05000529 Standardized Plant. 05000530 RFCIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCI ID CODE/NAME LTTR ENCL CTI ON: A/D LICE,NSNG 04 MIRAGLIAgF. 05 LEEpJ ~ 06 KERRIGAN J, 07 NTERNAL: AD/RCI/IE 1 1 AEOD 18 ASLBP/J.HARD D/DIR HUM FAC15 DIRg DIV OF LIC EDO 8 STAFF 19 EQUIP QUAL BR11 HYD/GEO BR 22

'LE 09 LIC QUAL BR 12 MPA 20 NRC PDR 02 OELD 21 P REV 13 QA BR 14 tG FILE 01 RUTHERFORDiW IE V 21 XTERHALe ACRS 16 16 1 LPDR 03 NSIC 08 1 DE'c ~g lSea 0

TOTAL NUMBER OF COPIES REQUIRED: LTTR 40 ENCL 0

ARIZONA NUCLEAIZ POVIEll PAOJEGT

II~,I <)IIII,'I: tJiIr. 2 l I'III)I,'Illx,AIIIOIIII8.'>(UG

~j'/i'ecember 12., 1980 ANPP-16886-BSK/JAR Nr. W. H. Wilson

, Project Manager Bechtel Power Corporation

'11445 South Lakewood Boulevard Downey, California

Subject:

Potentially Reportable Deficiencies - 10CFR50.55(e)

File: 80-019-026; 0.4. 33. 2 Re: (1) ANPP-15525.-BSK/JAR, dated Nay 28, 1980

Dear Bill:

The NRC was notified yesterday of the following potentially reportable defi-

"ciencies:

DER 80-38: Pipe spools pulled to facilitate installation of pi pe supports may overs tress wel ds DER 80-39: Item 3 Only - Cable tray supports do not meet drawling requirements DER 80-41: 'lass IE conductors come within six inche's (6") of non-class IE conductors on six (6) ITE Gould 480 Volt Load Center Isolation Relay Cabinets As noted in the referenced letter, thirty inter'r final reports are required within (30) days unless a deficiency is evaluated as Not Reportable, in wh'ich case, a written report is not required.

You are requested to evaluate these DER's for reportabi lity and submit your recommendations along with the applicable wri tten reports to APS, in accor-

. dance with the Reference ( 1), by January 5, 1981.

Very truly yours, C/7) E. E. Van Brunt, Jr.

~i ILK CD> APS Vice President, Nuclear Projects e~ ANPP Project Director gtf$

CD~

CD 0 I 0/

'hal,>'b I<

C,Q

~

C

~8830

~g

0 J

I f

Ilr. W. II. 14,Llson 0

Pro'Icct H lnaper ANPP-16886-BSK/.Ihl<

December 12, 1980 Page 2 cc: R. L. Robb D. B. Fasnacht J. A. Roedel J. H. Allen A. C. Rogers W. E. Ide A. C. Gehr J. A. Brand W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. H. Grant D. R. Hawkinson

lf I